A B INFRABUILD LTD Overview
A B Infrabuild is a Mumbai-headquartered micro-cap civil engineering and EPC contractor whose franchise is built on railway-linked structures — road over bridges (ROBs), foot over bridges (FOBs), vehicular underpasses, grade separators and associated station and track civil works — plus road and highway construction for municipal, state and central authorities. Historically a Maharashtra contractor serving Western Railway, the Municipal Corporation of Greater Mumbai (MCGM), MMRDA and PWD Maharashtra (where it is described as an AA-class contractor), the company has, since late 2025, pivoted aggressively toward Indian Railways' level-crossing-elimination programme on the East Coast Railway's Khurda Road division and toward NHAI/MoRTH highway structures in Odisha, Madhya Pradesh and Chhattisgarh. Revenue has quadrupled from INR 643 M (FY2022) to INR 2,562 M (FY2026) with EBITDA margins near 15%, but growth has been funded by repeated equity raises and rising short-term debt as working capital has ballooned. A reported INR 17,554 M order book (June 2026) gives multi-year visibility but raises execution and funding questions.
What the company does
A B Infrabuild is an item-rate and EPC civil contractor. Its exchange filings describe its objects as constructing, altering, improving, maintaining, enlarging, replacing, developing and managing roads, railways, branches and sidings, bridges and other civil construction works. Pre-IPO disclosures (SME prospectus summaries, 2019) and later broker summaries add that the company works in new station infrastructure, renovation of old stations, civil and structural work, track formation, track linking, gauge conversion, new railway lines and sidings, steel girder bridges, and road contracts on BOT and turnkey bases. It was the AA-grade contractor with PWD Maharashtra and MCGM at the time of IPO, and it has executed MCGM/MMRDA road reconstruction, road widening, and pedestrian-cum-vehicular subway works.
The company also historically operated a ready-mix concrete (RMC) plant in Thane with a fleet of around 15 RMC mixers and tippers. Broker summaries of the 2024 rights issue letter of offer state that management scaled down RMC because of rising bad debts in that business and refocused on railway and municipal contracts.
Company's own description
The FY2024 and FY2025 annual reports open with the company describing itself as "an infrastructure company" managed by professionals that strives to build robust infrastructure, and the FY2025 chairman's message highlights "robust financial performance" and a "growing order book" reflecting client confidence (Annual Report FY2024-25, filed with NSE 4 Sept 2025). Detailed MD&A text was not accessible in full in this research; verbatim strategy statements beyond these themes are not publicly available in sources reviewed.
Business model and revenue model
| Dimension | Characterisation |
|---|---|
| Revenue model | ~100% contract (service) revenue recognised over time on construction contracts; no subscription, licensing or product revenue of significance. Residual RMC sales historically, now immaterial (not separately disclosed) |
| Contract types | Item-rate contracts (Indian Railways zonal tenders), EPC (NHAI, MPRDC, Chhattisgarh PWD-NH under MoRTH), and earlier municipal works contracts (MCGM, MMRDA) |
| Typical ticket size (FY2026–27 wins) | INR 107.5 M to INR 669.6 M per contract; typical ROB contracts INR 427–670 M |
| Typical execution period | 9 months (MPRDC) to 18 months (NHAI, Chhattisgarh) to 24 months (East Coast Railway ROBs) |
| Customer types | Central government (Indian Railways zones; NHAI; MoRTH via state PWD), state road development corporations (MPRDC), municipal corporations and metropolitan authorities (MCGM, MMRDA) |
| Value-chain position | Tier-2/Tier-3 construction contractor executing structures and civil packages; does not develop/own assets (no BOT/HAM concessions currently disclosed) |
| End-markets | Railway infrastructure (level-crossing elimination, station works), national highway structures (VUPs, grade separators, truck lay-bys), urban roads |
Independent characterisation
On the evidence of FY2026 order intimations, A B Infrabuild has become, in effect, a specialist ROB contractor. Of the nine contracts with verified values disclosed between January and October 2026 (aggregate approx. INR 4,354 M), seven (approx. INR 3,606 M, ~83%) are East Coast Railway road over bridges on the Howrah–Visakhapatnam main line in the Khurda Road division, each with near-identical span configurations (1x36 m composite girder + 2x24 m composite girders + 4x18.75 m T-beam girders). This repeatable design gives economies in design, formwork, girder fabrication and crew deployment — a genuine operational advantage for a small contractor — but it also creates heavy concentration on one railway division and one client category. The balance sheet shows the classic small-contractor profile: high inventories (work-in-progress/materials), large receivables and retention monies, short-term bank borrowings funding working capital, and negative free cash flow in each of FY2024–FY2026.
Strategy
Stated strategy themes
From the FY2024-25 annual report (chairman's message excerpts) and exchange communications, the publicly visible strategic themes are: (1) sustained revenue growth backed by a growing order book; (2) securing new contracts from established government clients; (3) maintaining quality, safety and environmental certifications (ISO 9001, ISO 14001, OHSAS 18001); and (4) strengthening the capital base through rights issues and preferential allotments. A formal investor day, investor presentation or earnings call has not been held or published (no transcripts found).
Strategic initiatives in the last 24 months (Oct 2024 – Oct 2026)
| Initiative | Date | Description | Status / target |
|---|---|---|---|
| Main-board migration | Nov 2024 | Moved from NSE Emerge to NSE main board; BSE listing added | Completed; broadens investor access |
| Rights issue II | Mar–May 2025 | 1:5 rights at INR 37.50 (pre-split), approx. INR 400 M raised | Completed; funded working capital |
| Maiden dividend | May 2025 | INR 0.05/share (pre-split) for FY2025 | Paid Sep 2025; repeated FY2026 (INR 0.006 post-split) |
| Stock split 1:10 | Aug–Oct 2025 | Face value INR 10 to INR 1 to improve liquidity | Completed 17 Oct 2025 |
| Geographic expansion: ECoR | Jan–Apr 2026 | Seven ROB contracts in Khurda Road division | Under execution; 24-month timelines (to early 2028) |
| Entry into NHAI EPC | Mar 2026 | First NHAI EPC award (INR 629 M) | Under execution; 18 months |
| Entry into MP and Chhattisgarh | Jan 2026; Oct 2026 | MPRDC EPC; Chhattisgarh NH-53 EPC | Under execution |
| Technical services | Mar 2026 | Feasibility/DPR/design for eliminating 9 level crossings (ECoR), bundled with ROB | Positions company for follow-on ROB awards |
| Borrowing capacity increase | Sep 2026 | AGM approval to raise borrowing limits and create security | Approved at 16th AGM |
| Capex (equipment) | FY2024–FY2026 | INR 513 M cumulative capex, machinery gross block INR 385 M (FY2026) | Ongoing |
ESG/sustainability commitments, cost programmes
No quantified ESG targets, carbon commitments or cost-reduction programmes with targets have been published.
Medium-term financial guidance
Not publicly disclosed. The company provides no revenue, margin or order-inflow guidance and has no sell-side coverage (0 analysts, per Simply Wall St).
Products & Services
All offerings sit within the single infrastructure-construction segment. The company does not publish a priced catalogue; pricing is by competitive tender (L1 bidding) on item-rate or lump-sum EPC terms.
Product Portfolio
| # | Service line | Description and key capabilities | Target customer | Latest flagship / recent example | Pricing model |
|---|---|---|---|---|---|
| 1 | Road Over Bridges (ROBs) in lieu of level crossings | Design-build or item-rate construction of ROBs with composite steel-concrete girders (1x36 m, 2x24 m spans) and RCC T-beam girders (18.75 m spans), with approaches, RE walls, service roads and drains | Indian Railways zonal railways (East Coast Railway), state bridge corporations | ROB in lieu of LC 330, Icchapuram–Jhadupudi, INR 669.6 M, LoA 13 Mar 2026 (24 months) | Tender, item-rate |
| 2 | Foot Over Bridges (FOBs) | Steel/composite FOBs at suburban and mainline stations | Western Railway, MCGM, MMRDA | Historical (pre-2024); specific recent awards not disclosed | Tender |
| 3 | Vehicular Underpasses (VUPs) | Box/structural underpasses with approach and service roads on national highways | NHAI | Three VUPs at Km 430+380, Puintola–Ichhapuram section, NH-16; INR 629.4 M; 18 months; LoA 4 Mar 2026 | EPC lump-sum |
| 4 | Grade separators / flyovers | At-grade intersection replacement with flyover structures on four-lane NHs | MoRTH via state PWD (NH wing) | Two grade separators at Sirsa Gate Chowk (Km 295.700) and Khursipar Gate Chowk (Km 300.400), NH-53 Raipur–Durg; INR 481.0 M; 18 months; Oct 2026 | EPC lump-sum |
| 5 | Highway ancillary works | Additional lanes, truck parking/lay-bys | State road development corporations | MPRDC: additional lanes as truck parking on NH-30 (MP); INR 107.5 M; 9 months; Jan 2026 | EPC |
| 6 | Railway station infrastructure | New station buildings, renovation of old stations, platforms, civil and structural works | Indian Railways | Historical — e.g., works linked to extension of Harbour line Andheri–Goregaon (Western Railway, MUTP-II) per company history | Item-rate |
| 7 | Track and alignment civil works | Track formation, track linking, gauge conversion, new lines and sidings | Indian Railways; industrial sidings | Recent awards not disclosed | Item-rate |
| 8 | Urban road reconstruction and widening; subways | Road reconstruction, widening, pedestrian-cum-vehicular subways | MCGM, MMRDA | Historical; recent award values not disclosed | Item-rate |
| 9 | Steel girder bridges | Fabrication/erection of steel girder bridges | Railways, PWD | Historical capability cited at IPO | Tender |
| 10 | Technical services (feasibility, DPR, design development) | Feasibility study, detailed project reports and design development for elimination of 9 level crossings via ROB/RUB, FOB, drainage improvements and rebuilding | East Coast Railway | Bundled within INR 486.8 M LoA dated 17 Mar 2026 (with ROB in lieu of LC 360) | Bundled lump-sum |
| 11 | Ready-mix concrete (RMC) | Thane RMC plant, ~15 mixers/tippers, RMC Manufacturers' Association conformity certificate | Captive use; third-party builders (historical) | Scaled down per 2024 rights issue commentary | Per cubic metre (historical) |
| 12 | Dams, canals, repair works | Listed among service areas in company descriptions | State irrigation departments | No recent awards disclosed | Tender |
Financial Narrative
All figures are standalone (the company has no reported subsidiaries), INR M, fiscal years ending 31 March. Primary source: S&P Global Market Intelligence data via StockAnalysis.com (updated 13 Aug 2026), reconciled to company results filings where possible. EPS and per-share data are adjusted for the 1:10 split (Oct 2025) and rights issues by S&P.
Income statement
Notes: (a) FY2026 net profit INR 1,934.13 lakh and PBT INR 2,625.41 lakh per NSE iXBRL results filing (28 May 2026) match S&P to within rounding. (b) S&P's FY2026 interest expense was revised between snapshots (INR 101.61 M in one snapshot vs. INR 84.62 M in the 13 Aug 2026 update); the latter, which matches cash interest paid, is used. (c) FY2025 dividend was INR 0.05 per INR 10 share (0.5%), equivalent to INR 0.005 post-split; FY2026 final dividend INR 0.006 per INR 1 share (record date 21 Sep 2026).
Margins and growth
Revenue CAGR FY2022–FY2026: 41.3% (INR 643 M to INR 2,562 M, four compounding years; Claude calculation). Net income CAGR over the same period: approx. 117.5% (off a depressed FY2022 base). Revenue CAGR FY2024–FY2026: 18.1%.
Commentary. The income statement shows three phases. FY2022 was a post-COVID trough (EBITDA margin 8.7%, net margin 1.3%). FY2023–FY2024 delivered a step-change: revenue nearly tripled across two years as the company executed larger Western Railway and Mumbai municipal packages, and gross margin expanded from 17.0% to 20.9% as scale absorbed site overheads and as the low-margin RMC business was de-emphasised. FY2025–FY2026 saw slower top-line growth (13% then 23%) but further operating leverage: EBITDA margin peaked at 15.9% in FY2025 before slipping to 14.9% in FY2026, and EBIT margin eased to 12.9%. The FY2026 dip reflects two factors visible in the quarterly data: a weak Q2 FY2026 (revenue INR 373 M, down 21% YoY, net profit INR 21.3 M, down 44%) as monsoon and order-transition effects hit execution, and a 57% jump in interest cost (INR 53.9 M to INR 84.6 M) as short-term borrowings rose. Net income growth (+20%) therefore lagged revenue, and EPS fell 11% because the weighted share count rose 33% after the April 2025 rights issue.
Quarterly trajectory
Sources: Capital Market/Business Standard quarterly result notes; Q2 FY2025 revenue derived as FY2025 total less other three quarters; Q3 FY2026 net profit INR 612.09 lakh per ScanX; Q4 FY2026 per NSE iXBRL (revenue INR 8,393.29 lakh, PAT INR 597.04 lakh). Q1 FY2027 OPM 13.89% vs 15.87% in Q1 FY2026; PBT INR 72.3 M (+4%).
Commentary. Revenue has stabilised at INR 740–840 M per quarter outside the monsoon quarter, implying an annualised run-rate of roughly INR 3,000–3,300 M. However, Q1 FY2027 showed 26% revenue growth with only 4% profit growth, and OPM compressed by about 200 bp YoY, consistent with input-cost pressure (steel, cement) and a higher interest burden. The September 2026 quarter (due by mid-November 2026) faces an easy base (Q2 FY2026 revenue INR 373 M).
Balance sheet
Commentary. Total assets grew 3.5x in four years, but the composition is telling: receivables plus inventory rose from INR 732 M (FY2022) to INR 2,147 M (FY2026), or 59% of total assets. FY2026 receivables more than doubled (INR 502 M to INR 1,042 M) on 23% revenue growth — a significant red flag requiring diligence on certified-but-unpaid bills, retention monies and any disputed claims. The FY2024 jump in PP&E (INR 53 M to INR 373 M, including INR 135.8 M of buildings and machinery additions) reflects a large capex year (INR 354.8 M) to build in-house equipment capacity. Total debt has nearly tripled since FY2024, with short-term borrowings (likely cash credit/working capital lines) now INR 882.5 M. Equity has grown faster than debt thanks to INR 877 M of equity raised over FY2024–FY2026, which has kept gross debt/equity at 0.68x, but net debt/EBITDA has risen to 2.2x. "Short-term investments" of INR 287 M are likely fixed deposits under lien as margin money for bank guarantees (typical for contractors; not confirmed in sources reviewed), so effective free cash is lower than the headline figure.
Cash flow
Commentary. Cumulative FY2022–FY2026 free cash flow is approximately –INR 1,116 M against cumulative net income of INR 553 M — the company has consumed roughly two rupees of cash for every rupee of reported profit. Every growth phase has been financed externally: FY2024 by the preferential issue/warrant money (INR 350 M), FY2025 by short-term debt (INR 443 M), and FY2026 by the INR 37.50 rights issue (INR 399 M) plus further debt (INR 267 M). The deterioration in FY2026 operating cash flow (–INR 512 M) is driven almost entirely by the receivables build (–INR 540 M) and inventory build (–INR 294 M). This is the single most important analytical issue in the company: profitability is real on an accrual basis, but cash conversion is poor, and growth depends on continued access to capital. The AGM approval on 28 Sep 2026 to raise borrowing limits signals management expects further debt funding.
Ratios
Sources: ROE, ROA, ROIC, ROCE, current/quick ratios, leverage and turnover ratios from S&P via StockAnalysis.com; interest coverage and cash-conversion-cycle components computed on year-end balances (DSO on revenue; DIO and DPO on cost of revenue).
Commentary. Returns peaked in FY2023 (ROE 23.9%, ROCE 32.6%) and have declined every year since, to ROE 13.8% and ROIC 11.8% in FY2026, as equity issuance outpaced profit growth and capital was locked in working capital. The cash conversion cycle has deteriorated from 124 days (FY2024) to 266 days (FY2026), back to FY2022 trough levels. Interest coverage fell from 5.1x to 3.9x in FY2026 and is likely lower on a TTM basis (TTM interest INR 110.4 M vs TTM EBIT INR 338.4 M = 3.1x). Asset turnover has fallen from 1.30x to 0.84x.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Segment Overview
| Segment | Contents | Products/services |
|---|---|---|
Infrastructure construction (sole segment) | Railway civil works, road over bridges, foot over bridges, vehicular underpasses, grade separators, road construction and widening, subways, station infrastructure; residual RMC (not separately disclosed) | Item-rate and EPC construction contracts; feasibility/DPR technical services (one 2026 contract) |
Results by Segment and Segment Margins & Growth (%)
| Metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Segment revenue (INR Mn) | 1,838 | 2,082 | 2,562 |
Segment operating income EBIT (INR Mn) | 208.03 | 276.23 | 331.34 |
Segment pre-tax income (INR Mn) | 155.91 | 218.56 | 262.54 |
EBIT margin (%) | 11.32 | 13.27 | 12.93 |
YoY revenue growth (%) | 49.33 | 13.25 | 23.08 |
Share of total revenue (%) | 100 | 100 | 100 |
Segment Revenue
| Category | Number of contracts | Aggregate value (INR Mn) | Share (%) |
|---|---|---|---|
East Coast Railway ROBs (incl. one bundled DPR services scope) | 7 | 3,606.0 | 82.8 |
NHAI EPC (NH-16 VUPs) | 1 | 629.4 | 14.5 |
MPRDC EPC (NH-30 lay-by lanes) | 1 | 107.5 | 2.5 |
Chhattisgarh PWD-NH EPC (NH-53 grade separators) | 1 | 481.0 | — |
Total verified (Jan–Oct 2026) | 10 | 4823.9 | — |
Income Statement and Margin Analysis (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue (INR Mn) | 643.16 | 1,231 | 1,838 | 2,082 | 2,562 |
Revenue growth (%) | 4.10 | 91.38 | 49.33 | 13.25 | 23.08 |
Cost of revenue (INR Mn) | 531.98 | 1,022 | 1,454 | 1,651 | 2,040 |
Gross profit (INR Mn) | 111.18 | 209.25 | 384.09 | 430.62 | 521.66 |
Operating income EBIT (INR Mn) | 47.61 | 142.16 | 208.03 | 276.23 | 331.34 |
EBITDA (INR Mn) | 55.78 | 149.6 | 242.97 | 330.34 | 381.19 |
Depreciation and amortisation (INR Mn) | 8.18 | 7.44 | 34.94 | 54.11 | 49.85 |
Interest expense (INR Mn) | 35.08 | 40.36 | 46.66 | 53.87 | 84.62 |
Pre-tax income (INR Mn) | 11.25 | 102.67 | 155.91 | 218.56 | 262.54 |
Income tax (INR Mn) | 2.61 | 27.3 | 41.73 | 57.34 | 69.13 |
Net income (INR Mn) | 8.64 | 75.38 | 114.18 | 161.22 | 193.41 |
Weighted basic shares (M, split-adjusted) | 127 | 127 | 386 | 479 | 638 |
EPS basic (INR, split-adjusted) | 0.07 | 0.59 | 0.30 | 0.34 | 0.30 |
EPS diluted (INR, split-adjusted) | 0.07 | 0.59 | 0.30 | 0.34 | 0.30 |
Dividend per share (INR, split-adjusted) | 0 | 0 | 0 | 0.005 | 0.006 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansMargin Analysis (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Gross margin (%) | 17.29 | 17.00 | 20.90 | 20.69 | 20.36 |
Operating (EBIT) margin (%) | 7.40 | 11.55 | 11.32 | 13.27 | 12.93 |
EBITDA margin (%) | 8.67 | 12.15 | 13.22 | 15.87 | 14.88 |
Net margin (%) | 1.34 | 6.12 | 6.21 | 7.74 | 7.55 |
Effective tax rate (%) | 23.17 | 26.59 | 26.77 | 26.24 | 26.33 |
Income Statement and Margin Analysis (%) (Quarterly)
| Metric | Q1FY25 | Q2FY25 | Q3FY25 | Q4FY25 | Q1FY26 | Q2FY26 | Q3FY26 | Q4FY26 | Q1FY27 |
|---|---|---|---|---|---|---|---|---|---|
Revenue (INR Mn) | 141.5 | 472.3 | 750.4 | 717.5 | 605.6 | 373.0 | 744.1 | 839.3 | 762.5 |
Net profit (INR Mn) | 5.4 | 35.8 | 52.7 | 67.3 | 51.2 | 21.3 | 61.2 | 59.7 | 53.4 |
Net margin (%) | 3.8 | 7.6 | 7.0 | 9.4 | 8.5 | 5.7 | 8.2 | 7.1 | 7.0 |
Balance Sheet and Per-Share Data
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Total assets (INR Mn) | 1,031 | 1,252 | 1,566 | 2,491 | 3,616 |
Cash and equivalents (INR Mn) | 11.47 | 6.65 | 88.83 | 86.01 | 32.88 |
Short-term investments (INR Mn) | 11.97 | 11.45 | 11.54 | 248.65 | 287.18 |
Cash plus short-term investments (INR Mn) | 23.44 | 18.1 | 100.36 | 334.66 | 320.06 |
Accounts receivable (INR Mn) | 273.49 | 322.98 | 209.6 | 502.35 | 1,042 |
Inventory (INR Mn) | 458.72 | 527.36 | 505.14 | 811.13 | 1,105 |
Total current assets (INR Mn) | 972.9 | 1,129 | 965.24 | 1,861 | 2,779 |
Property plant and equipment (INR Mn) | 22.4 | 53.14 | 373 | 363.49 | 428.32 |
Short-term debt incl. current LTD (INR Mn) | 237.24 | 240.10 | 236.43 | 669.09 | 931.17 |
Long-term debt (INR Mn) | 63.92 | 82.99 | 174.59 | 189.37 | 215.87 |
Total debt (INR Mn) | 301.15 | 323.1 | 411.02 | 858.46 | 1,147 |
Net debt (INR Mn) | 277.71 | 305 | 310.66 | 523.81 | 826.98 |
Accounts payable (INR Mn) | 295.81 | 407.85 | 176.06 | 339.5 | 446.64 |
Total current liabilities (INR Mn) | 689.2 | 816.22 | 499.58 | 1,102 | 1,581 |
Shareholders equity (INR Mn) | 277.88 | 353.21 | 815.46 | 1,104 | 1,693 |
Goodwill and intangibles (INR Mn) | 0 | 0 | 0 | 0 | 0 |
Working capital (INR Mn) | 283.7 | 312.69 | 465.67 | 759.6 | 1,198 |
Book value per share (INR) | 2.19 | 2.79 | 1.84 | 2.07 | 2.65 |
Cash Flow and Margin Analysis (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Operating cash flow (INR Mn) | 8.1 | 153.32 | 54.04 | -254.83 | -511.74 |
Change in working capital (INR Mn) | -43.83 | 5.31 | -146.04 | -515.14 | -807.26 |
Capital expenditure (INR Mn) | -13.03 | -38.23 | -354.83 | -44.28 | -114.25 |
Free cash flow (INR Mn) | -4.93 | 115.1 | -300.79 | -299.11 | -625.99 |
FCF margin (%) | -0.77 | 9.35 | -16.36 | -14.37 | -24.43 |
Equity issued (INR Mn) | 0 | 0 | 350.14 | 127.74 | 399.24 |
Net debt issued (INR Mn) | 46.76 | 15.47 | 80.76 | 442.88 | 266.61 |
Dividends paid (INR Mn) | 0 | 0 | 0 | 0 | 3.19 |
Share buybacks (INR Mn) | 0 | 0 | 0 | 0 | 0 |
Cash interest paid (INR Mn) | 39.39 | 44.5 | 52.15 | 53.87 | 84.62 |
Cash tax paid (INR Mn) | 11.25 | 5.16 | 36.62 | 50.75 | 67.63 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
ROE (%) | 3.16 | 23.89 | 19.54 | 16.80 | 13.83 |
ROA (%) | 2.75 | 7.78 | 9.22 | 8.51 | 6.78 |
ROIC (%) | 6.96 | 17.20 | 17.08 | 14.80 | 11.77 |
ROCE (%) | 13.90 | 32.60 | 19.50 | 19.90 | 16.30 |
Current ratio (x) | 1.41 | 1.38 | 1.93 | 1.69 | 1.76 |
Quick ratio (x) | 0.46 | 0.43 | 0.65 | 0.79 | 0.89 |
Debt to equity (x) | 1.08 | 0.92 | 0.50 | 0.78 | 0.68 |
Net debt to EBITDA (x) | 4.98 | 2.04 | 1.28 | 1.59 | 2.17 |
Interest coverage EBIT/interest (x) | 1.36 | 3.52 | 4.46 | 5.13 | 3.92 |
Asset turnover (x) | 0.59 | 1.08 | 1.30 | 1.03 | 0.84 |
Inventory turnover (x) | 1.11 | 2.07 | 2.82 | 2.51 | 2.13 |
Days sales outstanding (days) | 155.2 | 95.8 | 41.6 | 88.1 | 148.4 |
Days inventory outstanding (days) | 314.7 | 188.3 | 126.8 | 179.3 | 197.7 |
Days payables outstanding (days) | 203.0 | 145.7 | 44.2 | 75.1 | 79.9 |
Cash conversion cycle (days) | 266.9 | 138.4 | 124.2 | 192.3 | 266.2 |
Revenue by Region and Region Margins & Growth (%)
| Region | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
India revenue (INR Mn) | 1,838 | 2,082 | 2,562 |
India YoY growth (%) | 49.33 | 13.25 | 23.08 |
Rest of world revenue (INR Mn) | 0 | 0 | 0 |
State / Corridor Details
| State / corridor | Client(s) | Direction | Evidence |
|---|---|---|---|
Maharashtra (Mumbai/MMR) | Western Railway, MCGM, MMRDA, PWD Maharashtra | Historical core; relative share likely declining | — |
Odisha – north coastal Andhra Pradesh (ECoR Khurda Road division, Howrah–Visakhapatnam main line between Icchapuram, Jhadupudi, Sompeta, Baruva, Mandasa, Summadevi) | East Coast Railway | Fastest-growing; dominant in 2026 order intake | Seven LoAs Jan–Apr 2026 (INR 3,606 M verified) |
Odisha (NH-16 Puintola–Ichhapuram) | NHAI | New in 2026 | INR 629.4 M VUP package (Mar 2026) |
Madhya Pradesh (NH-30) | MPRDC | New in 2026 | INR 107.5 M (Jan 2026) |
Chhattisgarh (NH-53 Raipur–Durg) | PWD NH Zone under MoRTH | New in Oct 2026 | INR 481.0 M (Oct 2026) |
Valuation Snapshot
| Metric | Value | Source / as-of |
|---|---|---|
Last close | INR 12.19 (8 Oct 2026); INR 12.50 (9 Oct 2026) | S&P / StockAnalysis |
52-week high / low | INR 23.56 / INR 8.82 | IIFL, Torus (Sep 2026) |
1-year return | –42.7% | IIFL, 11 Sep 2026 |
3-year CAGR | +60.2% | IIFL, 11 Sep 2026 |
5-year CAGR | +79.4% | IIFL, 11 Sep 2026 |
6-month return | –35.6% | IIFL, 11 Sep 2026 |
IPO price (split- and rights-unadjusted) | INR 29 per INR 10 share (July 2019) | HDFC Securities |
Metric | FY2022 | FY2023 |
FY-end share price adjusted (INR) | 0.84 | 2.10 |
FY-end market cap (INR Mn) | 129 | 321 |
P/E at FY-end (x) | 14.88 | 4.26 |
EV/EBITDA at FY-end (x) | 5.31 | 3.36 |
P/B at FY-end (x) | 0.46 | 0.91 |
Valuation Multiples (x) and Returns & Leverage Ratios (%)
| Metric | A B Infrabuild (8 Oct 2026) |
|---|---|
P/E TTM (x) | 40.6 |
EV/EBITDA (x) | 22.3 |
EV/Sales (x) | 3.17 |
P/B (x) | 4.60 |
P/S (x) | 2.86 |
Earnings yield (%) | 2.5 |
FCF yield (%) | –8.0 |
Dividend History
| Fiscal year | DPS as declared | DPS split-adjusted (INR) | Record / ex-date | Payout |
|---|---|---|---|---|
FY2025 | INR 0.05 per INR 10 share (0.5%) | 0.005 | 22 Sep 2025 | approx. 2% of FY2025 PAT |
FY2026 | INR 0.006 per INR 1 share (0.6%) | 0.006 | 21 Sep 2026 | approx. 2% of FY2026 PAT |
Bucket Details
| Bucket | Amount (INR Mn) |
|---|---|
Short-term borrowings (repayable on demand / <12 months) | 882.49 |
Current portion of long-term debt | 48.68 |
Long-term debt (>12 months) | 215.87 |
Total | 1,147.04 |
Analyst Conclusions
Management guidance and consensus
Management has issued no quantitative guidance, and there is no sell-side consensus. Implied trajectory: the Q3 FY2026–Q1 FY2027 run-rate (INR 744–839 M per quarter) and the 26% Q1 FY2027 growth suggest FY2027 revenue in the region of INR 3,000–3,300 M if monsoon-quarter execution normalises — this is a Claude extrapolation, not company guidance.
Bull case
-
Backlog-driven growth runway. A reported INR 17.55 bn order book (6.9x FY2026 revenue) — even if only the verified ~INR 4.8 bn of 2026 awards converts on schedule over 18–24 months — supports 20%+ revenue growth through FY2028.
-
Margins resilient at scale. EBITDA margins of ~15% in FY2025–FY2026 are in line with far larger peers (J Kumar 14.4%), indicating genuine cost competitiveness in its niche.
-
Credential compounding. Successful delivery of seven ECoR ROBs, the first NHAI EPC package and the DPR mandate for nine more level crossings could qualify the company for larger, repeat awards, with operating leverage on a lean overhead base (SG&A ~1.5% of revenue).
Bear case
-
Cash, not profit, is the constraint. Cumulative FCF of –INR 1.1 bn over five years versus INR 553 M cumulative PAT, receivables doubling in FY2026, and a 266-day cash conversion cycle mean each rupee of growth needs new capital; another equity raise at depressed prices would be highly dilutive.
-
Earnings per share are not compounding. EPS was INR 0.30 in both FY2024 and FY2026 despite revenue rising 39%, because share count grew ~65% over the period; ROE has fallen from 23.9% to 13.8%.
-
Concentration and margin risk. ~83% of verified 2026 award value sits in one railway division on fixed-price contracts, while Q1 FY2027 margins already compressed ~200 bp YoY on input costs; a payment or approval slowdown in one division would hit both revenue and working capital.
Key catalysts and monitorables (next 12 months)
| # | Catalyst / monitorable | Timing |
|---|---|---|
| 1 | Q2 FY2027 results (easy base: revenue INR 373 M, PAT INR 21.3 M) | By 14 Nov 2026 |
| 2 | H1 FY2027 balance sheet and cash flow — receivables, inventory, borrowings trend | Nov 2026 |
| 3 | Disclosure of order-book composition and execution schedule (validation of INR 17.55 bn figure) | Ongoing |
| 4 | Further ECoR awards arising from the 9-level-crossing DPR mandate | FY2027 |
| 5 | Any fresh equity raise (rights/preferential/QIP) or warrant conversions | FY2027 |
| 6 | Credit rating initiation or bank-limit enhancement disclosures | FY2027 |
| 7 | Margin trajectory vs steel/cement prices | Each quarter |
| 8 | Promoter holding changes and any SAST disclosures | Quarterly |
| 9 | Q3 FY2027 and FY2027 results; dividend decision | Feb and May 2027 |
Concluding analyst verdict
A B Infrabuild has transformed itself in five years from a sub-INR 650 M Mumbai contractor scraping a 1% net margin into a INR 2.6 bn, 15%-EBITDA-margin specialist in railway road over bridges and highway structures, with a reported order book approaching seven years of current revenue. The operating story is genuine: revenue has compounded at 41% a year, margins have expanded and held, and 2026 order intake shows the company can win repeat business from Indian Railways and break into NHAI and state NH work. The repeatable ROB design across the East Coast Railway corridor is a real, if narrow, competitive edge.
The financial story is less flattering. Growth has consumed far more cash than it has generated — free cash flow has been negative in four of the last five years, receivables doubled in FY2026, and the cash conversion cycle is back to 266 days. The gap has been filled by three equity raises in three years and a near-tripling of debt since FY2024, so that per-share earnings have stagnated at INR 0.30 and returns on equity have halved from their FY2023 peak. Disclosure is thin: no guidance, no investor presentations, no earnings calls, no order-book breakdown, and the INR 17.55 bn backlog rests on a single secondary source. Governance is adequate but basic, with a combined Chair/MD and a promoter stake now only 31%.
At roughly 40x trailing earnings and 22x EV/EBITDA after a 60% drawdown, the market is still pricing in substantial conversion of the backlog. The investment case therefore hinges on one question: can management convert orders into cash, not just revenue? Until H1 FY2027 accounts demonstrate stabilising receivables and positive operating cash flow, the risk-reward is best characterised as speculative/high-risk — monitor for cash-conversion evidence before underwriting the growth narrative. This is an analytical assessment, not investment advice.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Title | Tenure / since | Prior roles and background | Education | Age | FY2025/26 compensation |
|---|---|---|---|---|---|---|
Amit Bholanath Mishra (DIN 03388129) | Managing Director, Chairperson; Promoter | Founder of AB Enterprises (1999); director since incorporation (2011) | Founded and ran the predecessor proprietorship; built relationships with Western Railway, MCGM, PWD Maharashtra | — | 47 (MarketScreener) | — |
Bharatkumar Punmaji Parmar (DIN 07645422) | Whole-time Director | Board since 28 Oct 2016 | Executive director; signatory on exchange filings (2023) | — | ~54 (MarketScreener, attribution probable) | — |
Archana Rakesh Pandey (DIN 10121285) | Independent Director | Committee member from 14 Jan 2025 | — | — | — | Sitting fees not disclosed |
Danish Salmani | Chief Financial Officer | Since 1 Dec 2021 | — | — | — | — |
Amrit Suthar | Company Secretary and Compliance Officer | Since 12 Nov 2024 | — | Company Secretary qualification implied | — | — |
Other directors (4–5) | Independent / non-executive | — | Names not captured in sources reviewed | — | — | — |
“—” = not publicly disclosed.
Governance Overview
| Attribute | Detail | Source |
|---|---|---|
Board size | 8 directors (board meetings of 14 Oct 2025 and 14 Nov 2025) | NSE governance iXBRL (Apr 2026 filing) |
Independent directors | At least 4 (four independents attended the 14 Nov 2025 meeting) | Same |
Chair/CEO separation | Not separated — the Managing Director (promoter) also chairs the board | Governance filing lists Amit Mishra as "Chairperson" |
Committee example | A committee constituted 14 Jan 2025 with Amit Mishra (Chair, ED), Bharatkumar Parmar (ED) and Archana Pandey (ID) — composition consistent with a Stakeholders' Relationship or CSR committee | Governance iXBRL |
Applicability of LODR governance rules | Exempt under Reg. 15(2) while on NSE Emerge (filings of Apr 2022 and Apr 2023); full Reg. 17–27 compliance required after main-board migration (Nov 2024) | NSE filings |
Gender diversity | At least one woman director (Archana Pandey) | Governance filing |
Board & Management Changes
| Date | Change | Context |
|---|---|---|
1 Dec 2021 | Danish Salmani appointed CFO | Pre-dates growth phase |
12 Nov 2024 | Amrit Suthar becomes Compliance Officer | Coincides with main-board migration |
14 Jan 2025 | Committee reconstitution including new independent director Archana Pandey | Main-board governance compliance |
21 May 2026 | Board meeting scheduled 26 May 2026 cancelled for "unavoidable reason"; rescheduled to 28 May 2026 | Minor governance/process flag |
4 Sep 2025 | Appointment of secretarial auditor for FY2026–FY2030 (five-year term) proposed at 15th AGM | New SEBI secretarial auditor tenure rules |
Shareholding Trend
| Holder category | Mar 2023 | Sep 2023 | Mar 2024 | Mar 2025 | Sep 2025 | Mar 2026 | Jun 2026 |
|---|---|---|---|---|---|---|---|
Promoter and promoter group (%) | 59.35 | 36.82 | 36.82 | 37.13 | 30.95 | 30.95 | 30.95 |
FII (%) | 0 | 0 | 0 | 0 | 0 | 0.03 | 0.01 |
DII incl. mutual funds (%) | 0 | 0 | 0 | 0 | 0 | 0.01 | 0.01 |
Public / retail and others (%) | 40.65 | 63.18 | 63.18 | 62.87 | 69.05 | 69.02 | 69.03 |
Competitive Landscape
Key Competitors
| Competitor | Listing | Overlap with A B Infrabuild | Relative scale |
|---|---|---|---|
Rail Vikas Nigam Ltd (RVNL) | NSE/BSE (PSU) | Railway civil works, ROBs; often awards sub-packages | ~80x larger by revenue (FY2026 revenue INR 20,412 crore) |
IRCON International | NSE/BSE (PSU) | Railway construction, ROBs | — |
J Kumar Infraprojects | NSE/BSE | Mumbai flyovers, elevated corridors, MCGM/MMRDA roads | FY2026 revenue INR 5,723 crore; order book INR 18,554 crore |
PNC Infratech | NSE/BSE | NHAI EPC highways, structures | FY2026 consolidated revenue INR 5,368 crore |
KNR Constructions | NSE/BSE | NHAI EPC roads | — |
HG Infra Engineering | NSE/BSE | Highways, railway EPC | — |
Ceigall India | NSE/BSE | Elevated structures, ROBs, highways | — |
Akash Infra-Projects | NSE/BSE | Roads (Gujarat), small-cap peer | — |
RBM Infracon | NSE Emerge | Infrastructure EPC micro-cap | — |
Integrity Infrabuild Developers | NSE Emerge | Civil EPC micro-cap | — |
Regional unlisted contractors (Odisha/AP/MP/Chhattisgarh) | Unlisted | Direct L1 competition on ROB and NH structure tenders | — |
“—” = not publicly disclosed.
Peer Comparison FY2026
| Metric | A B Infrabuild | J Kumar Infraprojects | PNC Infratech (consolidated) | RVNL (consolidated) |
|---|---|---|---|---|
Revenue FY2026 (INR Mn) | 2,562 | 57,230 | 53,681 | 204,121 |
Revenue growth FY2026 (%) | 23.1 | 1.0 | -20.7 | 2.5 |
EBITDA margin FY2026 (%) | 14.9 | 14.4 | 21.2 | — |
Net profit FY2026 (INR Mn) | 193.4 | 3,870 | 8,318 | 8,000 |
Net margin FY2026 (%) | 7.5 | 6.8 | 15.5 | 3.9 |
Order book (INR Mn) | 17,554 | 185,540 | 191,000 | — |
Order book / FY2026 revenue (x) | 6.9 | 3.2 | 3.6 | — |
Recent Developments
Other LoAs reported by aggregators without verified dates: INR 699.8 M (Western Railway), INR 520.8 M, INR 542.6 M and INR 517.9 M (East Coast Railway). Some of these likely correspond to the 8 Jan and 29 Jan 2026 intimations whose values were not captured.



