Acrow Limited Overview
Acrow Limited is an Australian provider of engineered temporary works and access solutions, spanning formwork, falsework and shoring, perimeter screens, hydraulic/electric jacking systems (Jumpform), retractable loading platforms, commercial scaffolding and, increasingly, labour-intensive industrial access services for the energy, mining, ports, defence and utilities sectors. Since its 2018 re-listing it has transformed from a cyclical, Queensland-weighted formwork hirer into a two-engine group: a high-margin Construction Services division (FY26 segment EBITDA margin c.42%) leveraged to the civil infrastructure and multi-storey building cycle, and a lower-margin but recurring Industrial Access division that crossed A$200m revenue in FY26 and now represents 60% of group revenue. Growth has been driven by disciplined bolt-on acquisitions at roughly 4x EBITDA, proprietary product development (Uni-Ring, Column Climber, Powershore 60) and an engineering-led sales model. FY27 is positioned by management as an inflection year, underpinned by acquisitions, a Queensland formwork recovery and the Brisbane 2032 Olympic construction pipeline.
What the company does
Acrow designs, hires, sells, installs and services temporary structural and access systems used during construction and asset maintenance. In its FY26 preliminary report the company describes itself as operating in both the Australian construction services industry and the Australian industrial access industry. Construction Services consists of hiring formwork (including screen systems), falsework, Jumpform and scaffolding equipment, and selling formwork and scaffolding equipment and consumables. The formwork operation supplies the temporary mould that supports concrete structures during construction; the scaffolding operation supplies equipment and access solutions to builders working at height; and the Industrial Access operation supplies industrial labour services that complement scaffold hire to the energy, mining and industrial sectors (FY26 Appendix 4E, Note 1).
The company's own marketing description is that it is a leading provider of "smart integrated construction systems" across formwork, industrial access and commercial scaffolding, augmented by falsework and shoring, screen solutions, Jacking Systems (Jumpform), loading platforms and internal engineering capability (FY26 Results Announcement).
Business model and revenue model
Acrow's economics combine three distinct revenue engines:
-
Equipment hire (rental annuity). Dry hire of formwork, falsework, scaffolding and screens, typically priced per tonne per week or per cubic metre per week, generally over minimum hire periods (FY22 Annual Report, Business Overview). Hire revenue is the highest-margin stream; the Formwork/Construction Services contribution margin has run at 70–74% (FY24–FY26).
-
Labour and wet-hire services. Erection, dismantling, project management and maintenance labour, predominantly within Industrial Access, priced as contract sums or schedule-of-rates under multi-year maintenance and shutdown contracts. This is the fastest-growing stream but carries lower margins (Industrial Access gross margin 32.5% in FY26).
-
Product sales. Sales of consumables, timber, new equipment, and — importantly — ex-hire equipment disposals, which are treated as ordinary activities. Ex-hire proceeds were A$18.7m (FY23), A$22.1m (FY24), A$23.5m (FY25) and A$20.3m (FY26), generating gains of A$12.0m, A$15.0m, A$15.9m and A$7.3m respectively.
Revenue by nature (statutory), A$m — FY24 and FY26 Appendix 4E
Note: FY25 hire revenue was A$95.7m in the FY25 4E and restated to A$91.3m (with A$4.4m reclassified to "other services") in the FY26 comparatives.
Mix interpretation. Labour services rose from 20% of continuing revenue in FY23 to 47% in FY26, while hire fell from 49% to 31%. This is the single most important structural change in the business: it has improved revenue recurrence and reduced construction-cycle exposure, but compressed group margins (EBITDA margin from 34.7% in FY24 to 23.9% in FY26) and raised working-capital intensity.
Value-chain position
Acrow sits between global equipment manufacturers (it imports most standard formwork and scaffold product — FY22 Annual Report — and uses third-party systems such as Layher scaffolding and, under a 10-year exclusive licence, Jacking Systems' Jumpform) and the head contractors, specialist subcontractors and asset owners who consume temporary works. Its value-add is engineering design (temporary works engineering team grew from 15 engineers in April 2018 to 32 by end FY22), fleet availability, logistics and labour. Increasingly it also owns proprietary IP (Uni-Ring, Column Climber, Powershore 60, SuperDeck/SuperPropping following the July 2026 Preston acquisition).
Customer types and end-markets
Civil infrastructure: road, rail, tunnels, bridges, water (e.g., Cross River Rail, Sydney Metro, Sydney Gateway, Melbourne Metro Tunnel, West Gate Tunnel, North East Link, Bruce Highway, Rockhampton Ring Road, Coomera Connector).
Multi-storey commercial and residential building: Jumpform, screens, loading platforms (e.g., Meriton Cypress Palms, Gold Coast).
Energy and resources maintenance/shutdowns: Origin Energy, Snowy Hydro 2.0, Perdaman urea plant (Karratha WA), Ampol refinery work, Incitec Pivot Phosphate Hill, Visy Tumut, Mount Piper power station; post-AGIS: Peabody, Glencore, Anglo American, BHP/BMA, Dalrymple Bay Coal Terminal.
Government/defence/utilities asset maintenance: Australian Defence Force, Transport for NSW, Sydney Water, Sydney Harbour Bridge maintenance (via Above Scaffolding).
Commercial building contractors: for scaffold dry/wet hire.
Independent characterisation
Acrow is best understood as a capital-light-turned-capital-intensive hire platform pivoting to services. The Construction Services division is a classic rental business with high incremental margins and strong operating leverage to Queensland and east-coast infrastructure volumes. The Industrial Access division is closer to a maintenance contractor (comparable in model, though not scale, to SRG Global's asset services or Monadelphous' maintenance arm), where returns depend on labour productivity, contract pricing and working-capital discipline. The investment case therefore hinges on whether the higher-quality, recurring IA earnings stream can be grown at acceptable returns while the cyclical but high-ROI construction franchise recovers into the Olympic build cycle.
Strategy
Stated strategy
Across the FY24–FY26 Appendix 4E documents the company consistently states that it pursues a strategy of growing scale in engineered systems and services, with particular emphasis on the Industrial Access business, both organically and through targeted acquisitions and capital expenditure. The FY22 remuneration report articulated the long-standing strategic pillars: become the leading engineered formwork sales and hire provider in Australia; become the leading engineered solutions provider to the Australian industrial services market; prioritise profitable organic growth; pursue strategically sensible acquisitions; and target high-ROI organic opportunities across all states (with an internal 40% return hurdle on growth capex).
Growth drivers identified in the FY26 results (24 Aug 2026)
| Driver | Management's stated thesis |
|---|---|
| Industrial Access | Integrate AGIS; expand within existing contract base; new organic contracts; grow Above Scaffolding with major customers; maintenance, shutdown and sustaining-capital work including Sydney Harbour Bridge; defence, energy and critical infrastructure via national Uni-Ring rollout |
| New product development | Proprietary equipment tailored to Australia: Uni-Ring, Powershore 60, advanced propping and shoring, custom-engineered solutions |
| Brisbane 2032 Olympics | Major venue builder awards expected Jul–Dec 2026; construction ramp-up from Jan–Mar 2027; peak delivery 2027–2031; no Olympic revenue in FY27 guidance |
| Queensland civil infrastructure | Ramp-up of Rockhampton Ring Road, Coomera Connector; tenders for "The Wave" Sunshine Coast–Brisbane rail and Chambers Flat water treatment plant |
| National civil infrastructure | Transport, rail, road, water and energy packages; cross-selling and larger, more complex packages |
| Jumpform | Adoption of electric, computer-controlled jacking; Column Climber commercialisation |
| Screens | Share gains in under-represented states, especially WA; premium screen adoption |
| Cross-sell | Preston SuperDeck bundled with Jumpform, Screens and slab formwork on multi-storey projects ("one-stop shop") |
Initiatives in the last 24 months
| Initiative | Date | Detail |
|---|---|---|
| Industrial Access M&A program | Feb 2025 – Sep 2026 | ATEC, Above Scaffolding, Brand Australia, AGIS; Industrial Access revenue from A$72m (FY24) to A$201m (FY26), FY27 forecast A$280m |
| Construction Services product expansion | Jul 2026 | Preston SuperDeck/SuperPropping acquisition (A$25m, 4.0x EBITDA) |
| Jumpform and Screens fleet investment | FY25–FY26 | FY26 growth capex: A$18.9m Jumpform, A$7.9m Screens, A$4.3m Industrial Access (Uni-Ring, Layher) |
| ERP replacement | FY25–FY27 | A$0.5m (FY25) and A$1.5m (FY26) capitalised; go-live expected FY27 |
| Labour supply security | Feb 2025 | ATEC acquisition to secure training pipeline; Mackay centre Aug 2025 |
| Balance sheet and capital management | Jun 2026 | A$70m placement + A$16m SPP; target net debt/EBITDA 1.0–1.5x; dividend payout 25–40% of underlying NPAT (previously 30–50% of operating cash profit per FY22 policy) |
| Debt restructuring | Nov 2025 – Apr 2026 | Core facilities A$84m → A$96m; working capital and other facilities +A$20m; equipment finance A$37m → A$40m; maturities to Sep 2028 |
| Sale-and-leaseback of motor vehicles | FY26 | A$2.5m proceeds |
| Sustainability / ESG commitments | — | No quantified emissions targets or formal ESG program disclosed in documents reviewed |
Medium-term targets and guidance
| Target | Value | Source |
|---|---|---|
| FY27 revenue | A$410–430m (+30% at midpoint) | FY26 Results, 24 Aug 2026 |
| FY27 underlying EBITDA | A$105–115m (+37% at midpoint) | FY26 Results |
| 1H FY27 revenue | A$195–215m (+31%) | FY26 Results |
| 1H FY27 EBITDA | A$50–55m (+39%) | FY26 Results |
| FY27 Industrial Access revenue | c.A$280m; c.A$180m secured as at Jun 2026 | FY26 Presentation (via Quartr); 3 Jun 2026 update |
| FY27 capex | c.A$30m | FY26 Results |
| Net debt / EBITDA | 1.0–1.5x target range; 1.5–1.6x pro forma | 18 Jun 2026 announcement; FY26 Results |
| Dividend payout | 25–40% of underlying NPAT | 18 Jun 2026 announcement |
| Acquisition accretion | Mid-single-digit underlying EPS accretion | 18 Jun 2026 announcement |
Products & Services
Construction Services
| Product / service | Description and capabilities | Target customer | Launch / latest | Pricing model | Flagship deployments |
|---|---|---|---|---|---|
| Wall and column formwork (MK system) | Versatile civil formwork system for high load-bearing applications | Civil contractors on tunnels, stations, bridges | Long-established | Dry hire per tonne/week or per m³/week | Cross River Rail (Roma St station walls) |
| SMK single-sided frames | Truss-based single-sided wall formwork; pre-assembled 10.875m frames enabled a single 10.3m pour on Cross River Rail | Tunnel and basement contractors | Established | Dry hire | Cross River Rail, Brisbane |
| RKS rail-climbing formwork | Crane-assisted climbing formwork; adapted with fabricated SHS steel and proprietary clamps for curved vent shafts; pour heights increased from 3.0m to 3.6m | Infrastructure vent shafts, cores | Established | Dry hire plus engineering | Rozelle Interchange vent shafts (WestConnex) |
| Falsework, propping and shoring | Systems supporting suspended horizontal structures during construction | Building and civil contractors | Ongoing | Dry hire | Multiple |
| Powershore 60 | New proprietary heavy shoring/propping product designed for the Australian market | Civil and high-rise | Cited as new product in FY26 results | Dry hire | — |
| Custom-engineered special formwork | Bespoke temporary works for complex, non-standard structures | Major projects | Ongoing | Project pricing | Sydney Metro, Melbourne Metro, West Gate Tunnel, Bruce Highway |
| Acrow Screens (perimeter screens) and Premium Screens | Screen-based edge protection/formwork systems for high-rise and infrastructure; Premium Screens range added after A$23.5m FY23 asset purchase | High-rise builders | Natform acquired 2018; Premium range FY23 | Dry hire | FY26 revenue A$22.4m (+49%); share gains in VIC, SA, WA |
| Jumpform (Jacking Systems) | Electric, computer-controlled jacking system for lift/stair cores; industry-leading safety features; 10-year exclusive licence | Multi-storey builders | Licence 2022; first contracts FY23 | Hire plus mobilisation/sales fees | FY26 revenue A$11.7m (+12.5%); FY26 wins A$11.2m; pipeline approaching A$100m; Meriton Cypress Palms (Gold Coast) |
| Column Climber | Proprietary system to form, pour and climb columns simultaneously with screens hung below; described as an industry first | High-rise builders | Deployed 2H FY26 | Hire | Cypress Palms Tower 2 (to level 9 at Aug 2026) |
| Preston SuperDeck® | Retractable loading platforms; c.900-deck fleet; c.25-year asset life; company-estimated >70% market share; no customer >11% of revenue | Commercial/residential high-rise, infrastructure, rail, mining | Proprietary range refined since 2001; acquired 3 Jul 2026 | Hire | FY26e revenue A$11.0m, EBITDA A$6.3m (pre-acquisition) |
| SuperPropping® | Propping equipment acquired with Preston business | High-rise builders | Acquired Jul 2026 | Hire | — |
| Commercial scaffold | Access scaffolding for commercial building; dry hire (per tonne/week, minimum 4 weeks) and wet hire (contract sum incl. labour, transport, consumables) | Builders and building contractors | Long-established | Dry/wet hire | Offices, schools, hospitals, retail |
| Timber and consumables | Formply, timber and consumable sales | Formwork subcontractors | Expanded in FY22 amid supply shortages | Sale | Contribution +208% in FY22 |
| New and ex-hire equipment sales | Sales of equipment, including extended-term sales to key customers | Contractors | Ongoing | Sale | FY26 disposal proceeds A$20.3m |
| Temporary works engineering | In-house design engineering (32 engineers at end FY22) | All | Ongoing | Bundled | Differentiator in tenders |
Industrial Access
| Product / service | Description and capabilities | Target customer | Launch / latest | Pricing model | Flagship deployments |
|---|---|---|---|---|---|
| Industrial scaffolding labour and wet hire | Turnkey design, supply, erect, maintain, dismantle for maintenance, shutdowns and projects | Energy, mining, ports, utilities | Uni-span (2019) | Schedule of rates / contract | Perdaman urea plant (A$42m; c.A$28m FY26 revenue), Snowy 2.0 (c.A$60m contract per secondary source), Ampol refinery (c.A$15m) |
| MI Scaffold | Scaffolding, rigging and access across North and Central Queensland; recurring blue-chip base; seasonal peak Sep–Oct shutdowns | Energy, mining, industrial | Acquired Nov 2023 | Maintenance contracts | Exceeded earn-out targets (full A$4.95m paid Nov 2024 and Nov 2025) |
| Benchmark Scaffolding & Edge Protection | Complex access solutions; Townsville HQ with Yatala satellite; Layher users | Industrial, mining, infrastructure | Acquired Mar 2024 | Contracts | Sun Metals projects |
| Above Scaffolding | Technically sophisticated engineered access in NSW since 1995; Layher and Skyclimber systems | Defence, Transport for NSW, Sydney Water, maritime | Acquired Apr 2025 | Contracts | Sydney Harbour Bridge maintenance |
| Acrow Energy & Infrastructure Services (ex-Brand Australia) | Hunter Valley power generation and resources access, small Gladstone presence; QuikDeck suspended platforms | Power utilities, resources | Acquired May 2025 (from BrandSafway) | Contracts | Hunter Valley power stations |
| AGIS (AusGroup Industrial Services) | Integrated industrial services from three facilities between Hay Point and Bowen Basin; access, shutdowns, onsite paint and blast | Peabody, Glencore, Anglo American, BHP/BMA, Dalrymple Bay Coal Terminal (since 2006) | Announced Jun 2026; completion scheduled c.1 Sep 2026 | Contracts | FY26e revenue A$40.0m, EBITDA A$6.5m |
| Uni-Ring scaffold system | Proprietary ring-lock style scaffold system being deployed nationally | Defence, energy, critical infrastructure | Recent (cited FY26) | Hire / bundled | National rollout |
| ATEC training | Nationally accredited licences/certifications for high-risk work, scaffolding, mining, working at heights, confined spaces, asbestos | Industry clients and internal workforce | Acquired Feb 2025; Mackay centre opened Aug 2025 | Course fees | Brisbane and Mackay |
Pricing for individual products (rates per tonne/week, labour rates) is not publicly disclosed.
Financial Narrative
All figures A$m unless stated. Sources: FY22 Annual Report (FY22), FY24 Appendix 4E (FY23, FY24), FY25 Appendix 4E (FY25), FY26 Appendix 4E (FY26 and restated FY25 where noted).
Income statement — underlying (management basis)
Notes: FY25 underlying NPAT was A$34.3m (EPS 11.17c) in the FY25 4E and restated to A$34.7m (EPS 11.27c) in the FY26 4E comparatives; FY25 net interest A$10.4m (FY25 4E) restated to A$10.1m. FY22 EBITDA is pre-AASB16-consistent management basis as reported. FY23 underlying EPS is 11.64c (FY24 4E) versus 11.7c in the FY23 Annual Report.
Income statement — statutory
Note: FY25 profit before finance costs shown as restated in FY26 comparatives (A$44.7m); FY25 4E originally reported A$45.0m with finance costs A$10.2m.
Margins and growth
Revenue CAGR FY22–FY26: 22.7% (A$148.3m → A$336.0m). Underlying EBITDA CAGR FY22–FY26: 22.0%. Underlying NPAT CAGR FY22–FY26: 11.6%. Statutory NPAT CAGR FY22–FY26: 3.2%. (Analyst calculations.)
Commentary. The five-year record divides cleanly into two phases. FY22–FY24 was a high-quality growth phase: revenue grew 45% over two years while EBITDA doubled, as the formwork hire fleet was sweated across national infrastructure projects and scale benefits drove EBITDA margin from 24.5% to 34.7%. Management reported that 60% of incremental FY22 contribution and 73% of FY24 contribution growth fell through to EBITDA. FY25–FY26 was a mix-shift and investment phase: revenue grew a further 56%, but EBITDA was effectively flat at A$80m as (i) Queensland formwork activity stalled ahead of the Olympic cycle and on delayed project commencements, (ii) growth came almost entirely from labour-heavy Industrial Access contracts (Perdaman, Snowy 2.0, Ampol) priced at lower margins, (iii) overheads rose 25% in FY26 to support acquisitions and project management, and (iv) depreciation (+21%) and interest (+28%) rose with the capex and acquisition program. The FY24 normalisation of the effective tax rate (from 8% to 30% as carried-forward losses were consumed) also explains why underlying NPAT growth lagged EBITDA growth from FY24. Statutory earnings have been persistently 25–35% below underlying because of recurring "significant items" (acquisition, integration, ERP and depot costs of A$3–5m per year), share-based payments, contingent consideration remeasurement and acquired-intangible amortisation — a pattern investors should treat as quasi-recurring for a serial acquirer.
Balance sheet
Notes: FY22 "total bank debt" is the A$35.9m debt figure in the FY22 Directors' Report (lease treatment not separated in that disclosure). FY23 net debt derived from the FY24 statement that net debt "rose by A$22.3m to A$68.6m". Goodwill FY22 = A$7.4m (balance unchanged through FY23).
Commentary. The balance sheet has more than doubled since FY23, driven by hire-fleet investment (hire equipment NBV A$128.9m FY23 → A$230.7m FY26) and five acquisitions adding A$24m of goodwill and A$21m of customer-relationship intangibles. Receivables are the key watch-point: gross trade receivables rose from A$41.7m (FY23) to A$97.3m (FY26), with balances over 90 days increasing to A$19.3m (FY26) from A$7.4m (FY24), and the expected credit loss provision rising to A$5.3m. Management attributes this to extended terms granted on large equipment sales and Jumpform mobilisation fees, and to front-loaded labour and freight costs on Industrial Access contracts. The June 2026 equity raising restored liquidity (net current assets A$58.6m; no overdraft at year-end) and post balance date a further A$53.3m was received, but net debt is expected to remain around A$133.6m pro forma after funding the two acquisitions.
Cash flow
Notes: FY22 capex is the A$21.1m cited in the Chairman's Address (the Directors' Report cites A$22.4m including stay-in-business). FY22 acquisitions line is the final Uni-span deferred payment. FY25 OCF A$31.9m in the FY25 4E, restated to A$32.4m in FY26 comparatives. FY26 capex combines A$55.3m PP&E and A$1.5m ERP software; management's "capital expenditure" measure (excluding replacement of ex-hire equipment) was A$36.5m (A$31.1m growth, A$5.4m stay-in-business). EBITDA-to-OCF conversion: FY24 44%, FY25 40%, FY26 49% (analyst calculation, pre-AASB16 EBITDA basis).
Commentary. Acrow has not generated positive free cash flow before disposal proceeds in any of the last five years; the business has been funded by debt, equity and DRP. Operating cash conversion of EBITDA has been structurally weak (c.40–50%), reflecting working-capital absorption in Industrial Access and extended-terms equipment sales. The FY26 dividend cut (DPS −42%) and new 25–40% payout policy, combined with FY27 capex budgeted at around A$30m (versus A$36.5m management capex in FY26), are the first signs of a deliberate pivot toward cash generation and deleveraging.
Returns and efficiency ratios (analyst calculations unless stated)
Notes: Company-reported underlying ROE was 32.7% (FY23) and 27.1% (FY24), consistent with the analyst calculation. Company reported FY22 receivable days of 63 (on a different denominator including ex-hire sales and excluding negotiated extended-term sales); analyst DSO uses gross revenue from continuing operations and will overstate relative to the company metric. Net debt/EBITDA for FY25 shown as 1.8x per the FY25 4E; the FY26 4E restates it as 1.73x. Cash conversion cycle: not publicly disclosed (inventory and payable days not reported by the company); inventory was A$17.4m and trade payables A$19.6m at FY26.
Commentary on returns. Returns peaked in FY23–FY24, when the formwork hire fleet was fully utilised and the group was still tax-shielded. The step-down to a c.11% ROIC and 16.5% underlying ROE in FY26 reflects three compounding effects: capital deployed ahead of earnings (Jumpform and Screens fleet, A$26.8m of FY26 growth capex alone), lower-margin labour revenue, and the normalised 30% tax rate. Management's FY27 guidance (EBITDA +37%) would, if delivered with capex held at A$30m, restore ROIC towards the mid-teens.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Segment Overview
| Segment | Contents | Delivery model | Key brands/products |
|---|---|---|---|
Construction Services | Formwork, falsework/shoring, Jumpform, screens, commercial scaffold, loading platforms (from Jul 2026) for commercial/residential high-rise, public arenas and infrastructure | Dry hire (equipment only) and wet hire (equipment, labour, transport) | Acrow formwork systems (MK, SMK, RKS), Powershore 60, Acrow Screens / Premium Screens, Jumpform (Jacking Systems licence), Column Climber, SuperDeck, SuperPropping |
Industrial Access | Specialised scaffolding services with customised engineering for energy, mining, ports, utilities, defence; maintenance and project work; training; paint and blast (from AGIS) | Labour-intensive services plus hire; long-term maintenance contracts | MI Scaffold, Benchmark, Above Scaffolding, Acrow Energy & Infrastructure Services (ex-Brand), ATEC, AGIS (from Sep 2026), Uni-Ring, Layher, QuikDeck, Skyclimber |
Corporate | Head office and unallocated costs | — | — |
Revenue by Segment and Segment Assets & Liabilities
| Metric | FY25 | FY26 |
|---|---|---|
Construction Services revenue (AUD Mn) | 129.5 | 135.2 |
Industrial Access revenue (AUD Mn) | 135.7 | 200.9 |
Construction Services contribution (AUD Mn) | 94.6 | 95.1 |
Industrial Access contribution (AUD Mn) | 49.8 | 65.3 |
Construction Services segment EBITDA (AUD Mn) | 59.5 | 56.6 |
Industrial Access segment EBITDA (AUD Mn) | 32.6 | 36.9 |
Corporate overheads (AUD Mn) | -11.8 | -13.1 |
Construction Services capex (AUD Mn) | 37.8 | 48.9 |
Industrial Access capex (AUD Mn) | 12.0 | 6.4 |
Segment Margins & Growth (%) and Revenue by Segment (%)
| Ratio | FY25 | FY26 |
|---|---|---|
Construction Services contribution margin (%) | 73.1 | 70.4 |
Industrial Access contribution margin (%) | 36.7 | 32.5 |
Construction Services EBITDA margin (%) | 45.9 | 41.9 |
Industrial Access EBITDA margin (%) | 24.0 | 18.4 |
Industrial Access share of group revenue (%) | 51.2 | 59.8 |
Revenue by Segment
| Metric | FY22 | FY23 | FY24 | FY25 |
|---|---|---|---|---|
Formwork revenue (AUD Mn) | 78.7 | 102.0 | 121.1 | 115.6 |
Industrial Services/Access revenue (AUD Mn) | 45.6 | 40.4 | 72.1 | 131.6 |
Commercial Scaffold revenue (AUD Mn) | 24.0 | 26.1 | 22.1 | 17.9 |
Total revenue (AUD Mn) | 148.3 | 168.5 | 215.3 | 265.1 |
Formwork contribution (AUD Mn) | — | 71.3 | 90.1 | 84.1 |
Industrial Services contribution (AUD Mn) | — | 15.2 | 27.5 | 48.2 |
Commercial Scaffold contribution (AUD Mn) | — | 18.1 | 16.2 | 12.2 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansSegment Margins & Growth (%) and Revenue by Segment (%) (FY22–FY25)
| Ratio | FY22 | FY23 | FY24 | FY25 |
|---|---|---|---|---|
Formwork revenue growth (%) | 30 | 30 | 19 | -5 |
Industrial Services revenue growth (%) | 110 | -11 | 78 | 83 |
Commercial Scaffold revenue growth (%) | — | 9 | -15 | -19 |
Formwork contribution margin (%) | — | 70.0 | 74.4 | 72.7 |
Industrial Services contribution margin (%) | — | 37.7 | 38.2 | 36.6 |
Commercial Scaffold contribution margin (%) | — | 69.1 | 73.3 | 68.0 |
Formwork share of revenue (%) | 53 | 60.5 | 56.3 | 43.6 |
Industrial share of revenue (%) | 31 | 24.0 | 33.5 | 49.6 |
Revenue by Segment (Half-Yearly)
| Metric | 1H FY25 | 2H FY25 | 1H FY26 | 2H FY26 |
|---|---|---|---|---|
Group revenue (AUD Mn) | 126.6 | 138.6 | 155.9 | 180.1 |
Underlying EBITDA (AUD Mn) | 39.0 | 41.2 | 38.0 | 42.3 |
Formwork revenue (AUD Mn) | — | — | 52.9 | 66.7 |
Income Statement and Per-Share Data
| Metric | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
Revenue incl. ex-hire sales (AUD Mn) | 148.3 | 168.5 | 215.3 | 265.2 | 336.0 |
Gross profit / sales contribution (AUD Mn) | 81.4 | 104.6 | 133.8 | 144.4 | 160.4 |
Underlying EBITDA (AUD Mn) | 36.3 | 53.2 | 74.6 | 80.2 | 80.3 |
Depreciation (AUD Mn) | 13.1 | 15.2 | 20.7 | 23.9 | 29.1 |
Underlying EBIT / operating income (AUD Mn) | 23.2 | 38.0 | 53.9 | 56.3 | 51.3 |
Net interest (AUD Mn) | 3.5 | 4.8 | 7.8 | 10.1 | 12.9 |
Underlying pre-tax profit (AUD Mn) | 19.8 | 33.2 | 46.1 | 46.2 | 38.4 |
Underlying NPAT (AUD Mn) | 17.8 | 30.5 | 33.0 | 34.7 | 27.6 |
Underlying EPS basic (cents) | 7.2 | 11.6 | 11.5 | 11.3 | 8.9 |
Dividends per share (cents) | 2.7 | 4.4 | 5.85 | 5.85 | 3.42 |
Income Statement and Per-Share Data — Revenue from continuing operations
| Metric | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
Revenue from continuing operations (AUD Mn) | — | 149.8 | 193.1 | 241.7 | 315.8 |
Other income incl. gains on disposal (AUD Mn) | — | 12.0 | 15.0 | 16.0 | 7.9 |
Profit before net finance costs and tax (AUD Mn) | — | 33.3 | 46.0 | 44.7 | 42.2 |
Finance costs (AUD Mn) | — | 4.5 | 7.6 | 9.9 | 13.7 |
Profit before tax (AUD Mn) | — | 28.8 | 38.5 | 34.8 | 28.6 |
Income tax expense (AUD Mn) | 2.0 | 5.4 | 13.1 | 11.6 | 10.8 |
Statutory NPAT (AUD Mn) | 15.7 | 23.5 | 25.6 | 23.3 | 17.8 |
Basic EPS (cents) | — | 8.96 | 8.94 | 7.57 | 5.71 |
Diluted EPS (cents) | — | 8.69 | 8.66 | 7.42 | 5.61 |
Significant items and SBP after tax (AUD Mn) | 2.1 | 7.0 | 7.4 | 11.4 | 9.8 |
Margin Analysis (%)
| Ratio | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
Gross / contribution margin (%) | 54.9 | 62.1 | 62.1 | 54.5 | 47.7 |
Underlying EBITDA margin (%) | 24.5 | 31.6 | 34.7 | 30.3 | 23.9 |
Underlying EBIT margin (%) | 15.6 | 22.6 | 25.0 | 21.2 | 15.3 |
Underlying NPAT margin (%) | 12.0 | 18.1 | 15.3 | 13.1 | 8.2 |
Statutory net margin (%) | 10.6 | 13.9 | 11.9 | 8.8 | 5.3 |
Revenue growth (%) | 40 | 14 | 28 | 23 | 27 |
Underlying EBITDA growth (%) | 49 | 47 | 40 | 8 | 0 |
Underlying NPAT growth (%) | 104 | 71 | 8 | 5 | -20 |
Effective tax rate, underlying (%) | 10 | 8 | 28 | 25 | 28 |
Balance Sheet and Per-Share Data
| Metric | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
Total assets (AUD Mn) | — | 218.5 | 312.4 | 406.1 | 482.7 |
Cash and equivalents (AUD Mn) | 3.0 | 4.9 | 5.6 | 8.0 | 31.1 |
Bank overdraft (AUD Mn) | — | 0.0 | 3.6 | 22.2 | 0.0 |
Loans and borrowings — current (AUD Mn) | — | 21.9 | 21.5 | 18.1 | 27.4 |
Loans and borrowings — non-current (AUD Mn) | — | 29.4 | 49.1 | 90.9 | 136.7 |
Total bank debt incl. overdraft (AUD Mn) | 35.9 | 51.3 | 74.2 | 131.2 | 164.1 |
Lease liabilities (AUD Mn) | — | 23.9 | 32.5 | 40.6 | 45.8 |
Net bank debt, company definition (AUD Mn) | 32.8 | 46.3 | 68.6 | 123.3 | 133.0 |
Total equity (AUD Mn) | 83.3 | 102.9 | 141.0 | 149.1 | 185.9 |
Goodwill (AUD Mn) | — | 7.4 | 20.0 | 31.2 | 31.2 |
Other intangible assets (AUD Mn) | — | 0.0 | 16.2 | 21.9 | 21.1 |
Property, plant and equipment (AUD Mn) | 95.5 | 131.6 | 170.4 | 211.3 | 237.6 |
Trade and other receivables (AUD Mn) | 34.4 | 39.2 | 53.7 | 74.2 | 92.0 |
Working capital, company definition (AUD Mn) | 32.8 | — | 50.6 | 68.2 | 85.4 |
Net current assets (AUD Mn) | 3.0 | 5.7 | 13.7 | 6.8 | 58.6 |
Net tangible assets per share (cents) | — | 39.31 | 43.34 | 40.82 | 46.11 |
Cash Flow
| Metric | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
Operating cash flow (AUD Mn) | 18.9 | 29.9 | 32.5 | 32.4 | 39.0 |
Capex — purchase of PP&E incl. software (AUD Mn) | 21.1 | 44.9 | 40.2 | 50.2 | 56.8 |
Free cash flow, OCF less capex (AUD Mn) | -2.2 | -15.1 | -7.7 | -17.8 | -17.8 |
Ex-hire disposal proceeds (AUD Mn) | — | 18.7 | 22.2 | 23.5 | 20.3 |
FCF after disposal proceeds (AUD Mn) | — | 3.6 | 14.5 | 5.7 | 2.5 |
Acquisitions incl. deferred/contingent (AUD Mn) | 3.5 | 0.0 | 31.0 | 26.7 | 6.4 |
Dividends paid in cash, net of DRP (AUD Mn) | — | 7.4 | 14.3 | 16.5 | 14.1 |
Lease principal repayments (AUD Mn) | — | 5.8 | 6.2 | 9.1 | 11.8 |
Equity raised, net (AUD Mn) | 10.5 | 0.3 | 21.6 | 0.0 | 31.4 |
Share buybacks (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
ROE — underlying NPAT / average equity (%) | — | 32.8 | 27.1 | 23.7 | 16.5 |
ROE — statutory NPAT / closing equity (%) | 18.8 | 22.8 | 18.1 | 15.6 | 9.6 |
ROA — statutory NPAT / total assets (%) | — | 10.7 | 8.2 | 5.7 | 3.7 |
ROIC — underlying EBIT × 0.7 / (net debt + equity) (%) | 14.0 | 17.8 | 18.0 | 14.5 | 11.3 |
Current ratio (x) | — | 1.11 | 1.21 | 1.07 | 1.62 |
Bank debt / equity (x) | 0.43 | 0.50 | 0.53 | 0.88 | 0.88 |
Net debt / underlying EBITDA, company-reported (x) | 0.9 | 1.0 | 1.1 | 1.8 | 1.9 |
Net gearing, net debt / (net debt + equity), company (%) | 28.3 | — | 32.7 | 45.3 | 41.7 |
Interest cover — underlying EBIT / net interest (x) | 6.6 | 8.0 | 6.9 | 5.6 | 4.0 |
Asset turnover — revenue / total assets (x) | — | 0.77 | 0.69 | 0.65 | 0.70 |
Receivable days — trade receivables / continuing revenue (days) | — | 95 | 101 | 112 | 106 |
State Details
| State | Share of FY22 revenue (%) | Implied revenue (AUD Mn) |
|---|---|---|
Queensland | 56.1 | 83.2 |
New South Wales | 15.7 | 23.3 |
Victoria | 13.2 | 19.6 |
Western Australia | 5.9 | 8.7 |
South Australia | 4.8 | 7.1 |
Tasmania | 4.3 | 6.4 |
Region Overview
| Region | FY26 trend | Driver |
|---|---|---|
Queensland formwork | 2H FY26 revenue +33% vs 1H FY26; recovery concentrated in Q4 and continuing into FY27 | Civil infrastructure restart (Rockhampton Ring Road, Coomera Connector); pre-Olympic venue awards; March 2026 QLD revenue highest in over 12 months (1 Apr 2026 update) |
New South Wales, South Australia, Western Australia (formwork combined) | FY26 revenue +34% on pcp; 2H +36% | Market-share gains, Screens growth in SA/WA, industrial projects |
Victoria | "Acceptable" trading | North East Link project |
Western Australia (Industrial Access) | Material new exposure | Perdaman urea plant, Karratha (A$42m contract, c.65% complete at Aug 2026) |
NSW Hunter Valley / Sydney (Industrial Access) | Full-year contribution of FY25 acquisitions | Above Scaffolding, AEIS (ex-Brand); Sydney Harbour Bridge maintenance |
North/Central Queensland and Bowen Basin (Industrial Access) | Expanding via AGIS from FY27 | Coal terminals and mining maintenance |
NSW Snowy Mountains | Major contract | Snowy 2.0 (c.A$60m contract, c.A$15.8m FY26 revenue, per secondary source) |
Share Price
| Metric | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 |
|---|---|---|---|---|---|---|
Share price at 30 June (AUD) | 0.315 | 0.375 | 0.505 | 0.78 | 1.07 | 0.99 |
Valuation Multiples
| Multiple | Basis | Acrow |
|---|---|---|
P/E (underlying) | FY26 underlying EPS 8.86c | 9.9x |
P/E (statutory) | FY26 basic EPS 5.71c | 15.4x |
EV/EBITDA | FY26 underlying EBITDA A$80.3m | 6.3x |
EV/EBITDA (forward) | FY27 guidance midpoint A$110m | 4.6x |
EV/Sales | FY26 revenue A$336.0m | 1.5x |
P/B | FY26 equity A$185.9m plus c.A$60m post-balance-date equity issued, ≈A$0.58/share | c.1.5x |
Dividend yield | FY26 DPS 3.42c | c.3.9% (fully franked) |
Per-Share Data and Margin Analysis (%)
| Metric | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|
Interim DPS (cents) | 1.0 | 0.0 | 0.75 | 1.2 | 1.7 | 2.85 | 2.9 | 2.0 |
Final DPS (cents) | 1.0 | 1.05 | 1.15 | 1.5 | 2.7 | 3.0 | 2.95 | 1.42 |
Total DPS (cents) | 2.0 | 1.05 | 1.9 | 2.7 | 4.4 | 5.85 | 5.85 | 3.42 |
Franking (%) | 0 | 100 | 100 | 42 | 94 | 100 | 100 | 100 |
Debt Facilities
| Facility | Limit (AUD Mn) | Drawn at 30 Jun 2026 (AUD Mn) | Maturity |
|---|---|---|---|
Cash advance term facility | 65.0 | 66.4 (incl. accrued interest) | 30 Sep 2028 |
Cash advance facility | 31.0 | 31.7 | 30 Sep 2028 |
Working capital (A$19.0m overdraft + A$22.5m cash advance) | 41.5 | 23.0 | 30 Sep 2028 |
Asset and equipment finance | 40.0 | 39.6 | Revolving; refinanced 12 Nov 2025 |
Trade finance | 20.0 | 3.4 | 20 Apr 2027 |
Premium funding | 3.3 | 0.0 | Policy-period |
Bank guarantee (non-cash) | 3.6 | 3.5 | — |
Total | 206.5 | 167.6 | Headroom A$38.9m |
Capital Markets Data and Financial Ratios (x)
| Metric | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
Net bank debt (AUD Mn) | 32.8 | 46.3 | 68.6 | 123.3 | 133.0 |
Net debt / underlying EBITDA (x) | 0.9 | 1.0 | 1.1 | 1.8 | 1.9 |
Total facility limits (AUD Mn) | — | 69.4 | 91.8 | 166.0 | 206.5 |
Analyst Conclusions
Management guidance (24 Aug 2026)
| Metric | 1H FY26 actual | 1H FY27 guidance | FY26 actual | FY27 guidance |
|---|---|---|---|---|
| Revenue (A$ M) | 155.9 | 195–215 | 336.0 | 410–430 |
| Underlying EBITDA (A$ M) | 38.0 | 50–55 | 80.3 | 105–115 |
Note: the FY26 Results table presents FY26 revenue on a A$323.6m basis in the guidance comparison, versus A$336.0m reported elsewhere (the difference appears to relate to the treatment of equipment disposal proceeds); growth percentages are stated on midpoints. FY27 guidance includes Preston SuperDeck (from 1 Jul 2026) and AGIS (from Aug/Sep 2026), with c.A$14m EBITDA attributed to acquisitions in the June 2026 bridge, and excludes Olympic-related revenue.
An aggregator (Simply Wall St, Aug 2025) cited forecast revenue growth of c.14% p.a. over three years, pre-dating the June 2026 acquisitions and upgrade.
Bull case
-
Earnings inflection is largely "bought and booked." Of the c.A$30m FY27 EBITDA uplift at midpoint, c.A$14m comes from acquisitions completed at c.4x, c.A$180m of FY27 Industrial Access revenue was secured by June 2026, and Construction Services exited FY26 at record half-yearly formwork revenue (A$66.7m), implying high delivery probability.
-
Operating leverage in Construction Services. With contribution margins of c.70% and EBITDA margins above 40%, a Queensland and Olympic-driven recovery in hire volumes should flow disproportionately to EBITDA, reversing the margin dilution of FY25–FY26.
-
Undemanding valuation with deleveraging. At c.4.6x FY27 EV/EBITDA guidance and c.10x FY26 underlying P/E, with capex falling to c.A$30m and payout reduced, the business should generate positive free cash flow and approach the 1.0–1.5x leverage target within FY27, creating scope for re-rating.
Bear case
-
History of over-promising on margin. EBITDA has been flat for two years despite +56% revenue; FY25 EPS guidance was cut in April 2025 and FY26 EBITDA landed at the bottom of the original A$80–84m range. Labour-heavy IA work may continue to dilute margins (IA EBITDA margin fell to 18.4%).
-
Cash conversion and credit risk. OCF has covered capex in none of the last five years; receivables over 90 days nearly tripled since FY24 to A$19.3m; extended-terms equipment sales flatter revenue while absorbing cash.
-
Dilution and EPS drag. Share count is rising c.37% (308m to c.421m) in roughly 15 months; even with +37% EBITDA, higher depreciation, interest and a full tax rate mean FY27 underlying EPS growth will be much lower than EBITDA growth, and underlying EPS remains below its FY23–FY24 peak.
Key catalysts and monitorables (next 12 months)
| Timing | Catalyst / monitorable |
|---|---|
| Sep–Oct 2026 | FY26 audited Annual Report (any differences to preliminary result; remuneration outcomes); formal AGIS completion confirmation |
| 30 Oct 2026 | Final dividend payment; DRP take-up |
| 12 Nov 2026 (forecast) | AGM trading update — hire contract wins, pipeline, 1H FY27 tracking vs A$50–55m EBITDA |
| Jul–Dec 2026 | Brisbane 2032 venue builder awards; Acrow package wins |
| Feb 2027 | 1H FY27 result — margins in IA, receivables ageing, net debt vs 1.5x target |
| Ongoing | Replacement of maturing major IA contracts (Perdaman c.65% complete; Snowy 2.0 c.50%); Column Climber and SuperDeck cross-sell evidence |
| Ongoing | Queensland civil awards (The Wave rail, Chambers Flat WTP) |
| Apr 2027 | Trade finance facility maturity (A$20m) |
Analyst verdict
Acrow enters FY27 at a genuine strategic crossroads. Over five years the company has executed a credible transformation, roughly doubling revenue to A$336m and building, almost from nothing, a A$200m-plus Industrial Access business that has materially reduced its dependence on the Queensland construction cycle. Its acquisition discipline — consistently buying at around four times EBITDA, with earn-outs that have mostly paid out because targets outperformed — is a real and repeatable capability, and the high-return Construction Services franchise retains enviable margins of roughly 70% at the contribution line.
Yet the financial evidence of the last two years is sobering. Revenue growth has not converted into profit: EBITDA has been stuck at about A$80m, underlying EPS has fallen by almost a quarter since FY24, statutory profit has declined for two consecutive years, and free cash flow has been negative throughout the period. The balance sheet was repaired in mid-2026 only through a dilutive A$86m equity raising, and the dividend was cut by 42%. The quality of reported "underlying" earnings, the rising receivables tail and the reliance on equipment sales on extended terms deserve continued scrutiny.
The FY27 setup is, however, unusually favourable. Acquisitions contribute visible EBITDA, a large share of Industrial Access revenue is already contracted, Queensland formwork has turned, and the Olympic pipeline provides multi-year optionality that is not in guidance. At roughly 4.6 times forward EV/EBITDA, the market appears to be pricing a high probability of disappointment.
On balance, we view Acrow as a positively skewed but execution-dependent recovery story. Delivery of 1H FY27 guidance, with improving cash conversion and leverage moving toward 1.5x, would validate a re-rating; another period of revenue growth without earnings growth would confirm the bear thesis. The February 2027 half-year result is the decisive monitorable.
It is not financial advice. Figures marked as analyst estimates or calculations are derived, not company-reported.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Executive Leadership Team
| Name | Title | Tenure | Prior roles | Education / notes |
|---|---|---|---|---|
Steven Boland | Managing Director & CEO; Executive Director | CEO of Acrow since c.2013; listed-company CEO since 27 Mar 2018 | CEO Melbourne Rebels (Super Rugby start-up); Global Executive Director (Recycling), Visy Industries (2004–2010); Executive Director (Commercial Waste), Veolia Environment UK (2002–2004) | Age not disclosed; holds c.6.1m shares (Aug 2026) |
Andrew Crowther | Chief Financial Officer | Since 8 Jul 2019 | Senior finance/CFO roles at Thorn Group, SFG Ltd, BT Financial Group, Colonial First State | Age not disclosed |
Matthew (Matt) Caporella | Chief Operating Officer | With Acrow since 2012; promoted COO from National Manager – Engineering Operations (c.2022) | Engineering operations | Holds c.1.7m shares (top-20 list, Sep 2025) |
Jurie Roetger | — | Joined via Uni-span, Oct 2019 | Uni-span roles incl. National Industrial Services Manager | — |
Robert Parovel | — | Since Nov 2021 | Harsco, GCC Services, Webuild | — |
Board of Directors
| Name | Role | Appointed | Background | Independence |
|---|---|---|---|---|
Peter Lancken AM | Non-Executive Chairman | 27 Mar 2018 | Former MD and Chairman of Kennards Hire (stepped down from Kennards board Aug 2025); former Chairman of Propertylink Group (ASX: PLG); BE (Civil) UNSW; FIEAust; FAICD | Independent (per company); significant shareholder (15.2m shares) |
Steven Boland | Managing Director & CEO | 27 Mar 2018 | See above | Executive |
David Moffat | Non-Executive Director | 19 Sep 2019 | 35+ years in construction; MD Lipman Group 2013–2018; founder Cornerstone (NSW); BE (Civil) UTS | Independent |
Laurie Lefcourt | Non-Executive Director; Chair, Audit & Risk Committee | 1 Oct 2021 | Rio Tinto, Queensland Rail, Sinopec Oil & Gas, Wiggins Island Coal Terminal; FCA (CA ANZ); GAICD | Independent; re-elected Nov 2025 |
James Scott | Non-Executive Director; Chair, Remuneration & Nomination Committee | 1 Mar 2025 | — | Independent; re-elected Nov 2025 |
Rod (Rodney) Heale | Non-Executive Director | 1 Jul 2025 | Civil infrastructure, engineering delivery and major project management (per 2025 AGM Chair's address) | Independent |
Directors' Remuneration
| KMP | Salary | STI (cash) | Non-cash | Post-employment | Long-term | Share-based | Total | % performance-based |
|---|---|---|---|---|---|---|---|---|
Steven Boland (CEO) | 529,951 | 276,760 | 97,072 | 23,568 | 67,404 | -7,443 | 987,312 | 27 |
Andrew Crowther (CFO) | 305,000 | 93,926 | 0 | 22,818 | 28,905 | 31,235 | 481,884 | 26 |
Major Shareholders
| Holder | Shares | % |
|---|---|---|
HSBC Custody Nominees (Australia) Limited | 28,070,698 | 9.07 |
Citicorp Nominees Pty Limited | 20,670,843 | 6.68 |
Netwealth Investments Limited | 13,154,806 | 4.25 |
Keneco Property Pty Ltd | 13,086,667 | 4.23 |
Margaret Anna Prokop (former Executive Director) | 7,126,209 | 2.30 |
MRP Property Pty Ltd | 5,376,043 | 1.74 |
Conchord Pty Ltd | 3,853,044 | 1.25 |
Malcolm & June Ross Investments Pty Ltd | 3,209,129 | 1.04 |
11 Belgravia Pty Ltd | 3,095,897 | 1.00 |
J P Morgan Nominees Australia Pty Limited | 3,095,890 | 1.00 |
Competitive Landscape
Competitors by Segment
| Segment | Competitor | Ownership / listing | Relative positioning |
|---|---|---|---|
Formwork & shoring | Waco Kwikform | Private (Waco International group) | Long-established national formwork and scaffold hire incumbent |
Formwork & shoring | PERI Australia | Private (PERI SE, Germany) | Global engineered formwork leader; strong in climbing systems and high-rise |
Formwork & shoring / climbing | Doka Australia | Private (Umdasch Group, Austria) | Global formwork and climbing systems; direct Jumpform/automatic climbing competitor |
Formwork | ULMA Construction | Private (Spain) | Engineered formwork for civil projects |
Shoring/propping and equipment hire | Coates | Seven Group Holdings (ASX: SVW) | Largest Australian equipment hire firm; competes in shoring, propping and temporary works |
Scaffold / access (commercial) | Numerous regional scaffold contractors and hirers | Mostly private | Fragmented, price-competitive market |
Industrial access | Altrad (Australia) | Private (Altrad Group, France) | Major industrial access, insulation and coatings services provider |
Industrial access / asset services | SRG Global | ASX: SRG | Diversified asset services incl. access; c.80% recurring earnings; much larger scale |
Maintenance & industrial services | Monadelphous | ASX: MND | Large maintenance contractor; competes for shutdown scopes in which access is a component |
Loading platforms | Smaller platform hirers | Private | Preston SuperDeck holds an estimated >70% share (company estimate) |
Jumpform/self-climbing systems | Doka, PERI and specialist local providers | Private | Acrow claims a unique combined Jumpform-plus-screens offering |
Peer Comparison FY2027
| Metric | Acrow (ACF) | SRG Global (SRG) | Monadelphous (MND) |
|---|---|---|---|
FY26 revenue (AUD Mn) | 336.0 | 1,675.5 | 2980 (incl. JV share) |
Revenue growth FY26 (%) | 27 | 27 | 31.5 |
Underlying EBITDA (AUD Mn) | 80.3 | 170.1 | 226.0 |
EBITDA margin (%) | 23.9 | 10.2 | 7.6 |
NPAT (AUD Mn) | 27.6 underlying / 17.8 statutory | 71.9 | 127.3 |
Net debt / (cash) (AUD Mn) | 133.0 | (6.2) net cash | Net cash (c.A$294m cash) |
FY27 EBITDA guidance growth (%) | 37 | 15–21 | Broadly flat (consolidation year) |