Company ProfilePremium

Aguia Resources Limited

Company Profile Analysis

Ticker: AGR.AX

ESOMAR 23 Corporate BadgeISO Certifications Badge
Aguia Resources Limited - Company showcase

Year Founded & Workforce

2007

10 Employees

Aguia Resources Limited logo

Aguia Resources Limited Employee Contacts

We don't hold contact details for this company yet — you can request them.

Request Employee Contacts

Aguia Resources Limited Overview

Aguia Resources is an ASX-listed micro-cap that has spent 2024–2026 changing from a stalled single-asset phosphate developer into a two-country, early-stage producer. In southern Brazil it mines direct-application natural phosphate rock at its 100%-owned Três Estradas project in Lavras do Sul, Rio Grande do Sul. It processes the rock at a leased plant at Caçapava do Sul and sells it as the branded fertiliser PAMPAFOS™ to soybean, rice, cattle and tobacco producers in a region that historically imports all of its phosphate. In Colombia it operates the small, very high-grade (>10 g/t Au) underground Santa Barbara gold mine in Bolívar Department, acquired with Andean Mining in 2024, and holds earlier-stage silver-gold (Atocha) and copper-gold VMS (El Dovio) projects. Brazilian copper (Andrade) and the Lucena phosphate project in north-east Brazil provide further optionality. The investment case rests on low-capex cash generation in both countries. The main threats are thin liquidity, repeated equity dilution and an unresolved federal court challenge to Três Estradas' environmental licence.


Company's own description. In its 2026 ASX announcements, Aguia describes itself as an ASX-listed multi-commodity company with pre-production phosphate projects in Rio Grande do Sul (Brazil) and gold projects in Bolívar (Colombia). It says it has experienced in-country teams in Porto Alegre and Medellín, and that the Andean Mining acquisition added gold, silver and copper projects (source: ASX announcement "About Aguia" boilerplate, 13 May 2026 Investor Presentation release). The boilerplate is now outdated: since May–June 2026 the phosphate operation is in production, not pre-production.

Independent characterisation. Aguia is best described as a dual-commodity junior producer-developer with two small, low-capital revenue streams and a portfolio of exploration options.

  1. Agricultural minerals (Brazil): the core value driver. Aguia extracts high-grade phosphate (calcrete/weathered carbonatite-hosted) from a shallow open pit at Três Estradas. It trucks the ore about 100–110 km to a leased fertiliser plant at Caçapava do Sul operated by Aguia. There it is crushed, ground and bagged as PAMPAFOS™, a slow-release natural phosphate suited to the acidic soils of southern Brazil and Uruguay. The model has very low capital intensity. Aguia leases rather than builds the plant (10-year lease from Grupo Dagoberto Barcelos at about A$43,000 per month, upfront fee about A$1.3M). Plant upgrades were funded mostly by a regional development bank loan (BRDE). The product is sold in bulk and in bags to cooperatives (e.g., Cotrisul), large farms (e.g., the Markus family), distributors and smallholders. Guided pricing is about A$150–160/t against guided production cost of about A$55–70/t, compared with an imported Moroccan phosphate benchmark of about A$344/t (Business News, Feb 2025; Mining.com.au, 2025).

  2. Precious metals (Colombia): a cash-supplement and exploration play. Santa Barbara is a narrow-vein (veins up to about 50 cm), very high-grade mesothermal gold system in the Serranía de San Lucas. It is mined by artisanal-style underground methods (shafts, small faces) at about 100 tonnes per month. From late 2025/2026 the ore has been toll-processed at the third-party Quintana plant in Remedios, Antioquia, operated by Colombia Mint. Aguia receives 90% of recovered gold less US$65/t processing (Mining.com.au, 6 Oct 2026). Gold doré sales are made domestically after government certification.

  3. Exploration and development optionality. This includes Andrade copper and Rio Grande copper-belt targets (Brazil); the Lucena phosphate project (Paraíba, north-east Brazil; JORC Inferred 55 Mt @ 6.42% P2O5); the Mato Grande and Passo Feio phosphate targets near the leased plant; and the Atocha (Ag-Au) and El Dovio (Cu-Au VMS) projects in Colombia.

Revenue model mix (latest available).

Value-chain position. Aguia is vertically integrated from mine to bagged fertiliser and farm-gate delivery in Brazil. In Colombia it is upstream only: mining plus toll treatment. It does not do chemical processing (no acidulation to SSP/TSP/MAP), so it avoids the sulphur and sulphuric-acid dependency of conventional soluble-phosphate producers. This matters given 2026 Middle East disruption to sulphur and fertiliser trade flows (Mining.com.au, 5 Oct 2026).

Customer types and end-markets. Grain cooperatives, large commercial soybean, rice and corn farms, cattle producers, tobacco growers (target channel once 25 kg bagging is commissioned in mid-October 2026), farm-supply retailers, and Uruguayan producers (Uruguay branch established; product registration expected mid-October 2026). Gold buyers are Colombian refiners/traders.

Strategy

Stated strategic themes (from 2025–2026 announcements and presentations):

  1. Become a domestic phosphate supplier to southern Brazil. Replace imported product with locally produced PAMPAFOS™, using a "low technical risk business aiming to deliver into strong product demand at a time of high phosphate prices" approach (Grigor, 2025).

  2. Capital-light development. Lease rather than build processing capacity. Use development-bank debt (BRDE covering about 90% of plant and mine capex) and customer pre-payments or bank-financed farmer credit (Sicredi, Banco Daycoval discussions).

  3. Disciplined scaling of Santa Barbara. Prioritise underground development and grade control over tonnes. Reduce capex (-80%), opex (-56%) and overheads (-38%). Lift ore output from about 100 to 200 t/month before Q1 2027. Restart exploration drilling by end-2026.

  4. Portfolio optionality. Reassess Lucena phosphate (NE Brazil); advance Mato Grande and Passo Feio as feed closer to the plant; hold Colombian Ag/Cu and Brazilian copper options.

Strategic initiatives in the last 24 months:

No formal targets disclosed.

Cost programmes: Colombian monthly cost reduced from A$459,096 to A$117,309 (ASX, 24 Jun 2026); Colombian operating and overhead costs covered by gold revenue for the first time in September 2026.

Medium-term guidance:

No formal revenue or EBITDA guidance has been issued.

Products & Services

Brazil — Agricultural Minerals

ItemDescription & specificationsTarget customerLaunch / statusPricingSource
PAMPAFOS™ (flagship)Natural (direct-application) phosphate fertiliser from Três Estradas ore. Gradual-release phosphorus, positioned for acidic soils. Marketed as organic/natural. Produced at the leased Caçapava do Sul plant (nominal 150 ktpa, potential >200 ktpa).Soybean, rice, corn, cattle and tobacco producers; cooperatives; distributors; Uruguayan farmersBrand launched Mar 2026 (Expodireto Cotrijal); MAPA approval 25 May 2026; commercial production from late May 2026; formal launch event June 2026Guided A$150–160/t (2025 guidance). Cotrisul order of 2,000 t for R$1.36M (about A$380k), implying about R$680/t or about A$190/t. Pre-order discounts for payment before 8 Jul 2026.ASX 26 May, 11 Jun, 18 Jun 2026; Business News Feb 2025
PAMPAFOS™ 25 kg bagsBagged retail format; refurbished 25 kg bagging machine due mid-October 2026Tobacco and cattle producers; farm-supply retailPending commissioning—Mining.com.au, 21 Sep 2026
Stockpiled pre-processed oreAbout 22,680 t at the blending facility (gross market value about A$5M) plus about 1,600 t processed product at CaçapavaSupports about 6 months of sales at 4,000 t/monthSep 2026—Mining.com.au, 21 Sep 2026
Três Estradas Phosphate Project (asset)Measured + Indicated 83 Mt @ 4.11% P2O5; Inferred 21.8 Mt @ 3.6% P2O5 (total about 105 Mt). Proven + Probable Reserve 5.02 Mt @ 8.8% P2O5. 18-year potential life of mine (Phase 1).—In production; licence under court challenge—Mining.com.au 2025; 5 Oct 2026
Lucena Phosphate Project (asset)Paraíba, NE Brazil; JORC Inferred 55 Mt @ 6.42% P2O5; preliminary pit at 3% cut-offFuture supply to NE BrazilBeing reassessed; awaiting ANM licence extensions—Mining.com.au, 31 Aug 2026
Mato Grande & Passo Feio (assets)Phosphate targets closer to the leased plant, intended as medium-term feed—Resource definition targeted; status n/d—Business News, 2025

Brazil — Copper

ItemDescriptionStatusSource
Andrade Copper ProjectRio Grande do Sul; JORC/NI 43-101 resource as of 13 Mar 2019 (tonnage/grade not re-verified here); open along strike and at depthExploration; earlier "green copper" pre-feasibility planning (2021–22)GlobeNewswire 2019; FY2022 Annual Report
Rio Grande Copper Belt targetsPrimavera, Salso (Cu-Ag), Piquiri (Cu), Estuque (Au) and othersEarly explorationInterim Report Dec 2021

Colombia — Precious & Base Metals

ItemDescription & specificationsStatusSource
Santa Barbara Gold Project (flagship, Colombia)About 320 ha at the northern tip of the Serranía de San Lucas, Bolívar. Mariana and Santa Barbara vein systems with historical grades close to 1 oz/t Au. Veins up to 50 cm wide. Vein 2 channel samples averaged 30.99 g/t Au and 67.52 g/t Ag; drill hole SB-25-03 returned 25.43 g/t Au. Very fine gold (>85% of particles <75 µm).Small-scale production. Run-of-mine grade >10 g/t (recent batch 12.75 g/t). About 100 t/month, targeting 200 t/month before Q1 2027. Diamond drilling planned to resume by end-2026. No JORC resource disclosed.ASX 22 Nov 2024, 6 Feb 2026, 13 Jul 2026; Annual Report FY2025; Mining.com.au 6 Oct 2026
Santa Barbara pilot plant30 tpd plant recommissioned (2024); planned upgrades to 50 tpd, crushing circuit of 200–330 tpd, 300% more leach capacity, Merrill Crowe, smelting room. Capacity later described as "secured" at 250+ t/month. Ore processed at the Quintana plant (Remedios) in Sep 2026.Operational mode has shifted toward toll treatmentMining Technology Jun 2024; ASX 13 Jul 2026; Mining.com.au 6 Oct 2026
Atocha ProjectHigh-grade Ag-Au exploration projectExplorationASX 22 Dec 2023
El Dovio ProjectCu-Au VMS-style mineralisation; 34 historical drill holesExploration / longer-term developmentASX 22 Dec 2023

Financial Narrative

Sources: Annual Reports FY2021–FY2025 as aggregated by EOD Historical Data/Kalkine, MarketScreener (S&P Capital IQ), StockAnalysis, Simply Wall St and Morningstar (via InvestSMART). Figures in A$ millions unless stated. Audited FY2026 figures are not yet verified.

Income statement

Margins. Gross margin was 100% in FY2025 because cost of production is not separated from operating expenses in aggregator data. Operating, EBITDA and net margins were deeply negative (net margin about -973% on A$0.284M revenue in FY2025; Simply Wall St reports -728% on an LTM basis). Revenue CAGR is not meaningful, as revenue is zero before FY2025.

FY2026 interim indicators. TTM to 31 Dec 2025: revenue A$0.494M; net loss A$3.6M (Yahoo Finance/S&P, May 2026). The latest reported quarter had revenue of A$0.252M and a net loss of A$2.50M (Investing.com, quarter label as reported).

Balance sheet

Balance sheet notes:

  • Cash for FY2021–FY2024 is derived as the negative of EOD-reported net debt, on the basis that Simply Wall St reports a debt-to-equity ratio of 0% five years earlier.

  • FY2025 net debt: EOD reports A$5.149M, while Simply Wall St debt of A$2.35M less cash of A$0.579M gives about A$1.77M. The EOD figure likely includes lease liabilities (Dagoberto Barcelos lease) and other obligations. The table uses the narrower measure; investors should treat lease-adjusted net debt of about A$5.1M as the conservative view.

  • The bulk of total assets is capitalised exploration and evaluation / mine development (Brazil and Colombia). The exact split is n/d.

Latest liquidity (FY2026, Appendix 5B to 30 Jun 2026): cash A$1.548M; available funding A$2.687M (including undrawn facilities), equal to 1.20 quarters of funding. This was before the A$3.0M placement settled on 27 July 2026.

Cash flow

FY2026 indicators (Appendix 5B):

FY2026 equity raised (identified): Feb 2026 placement A$5.0M; May 2026 placement (size n/d; about 218M options issued alongside, consistent with roughly A$4.4M at A$0.02); Dec 2025 placement and Oct 2025 rights issue (sizes n/d); plus BRDE loan drawdowns. July 2026 placement A$3.0M (176.8M shares at A$0.017) falls in FY2027.

Free-cash-flow yield (third-party, FY2025) was -23.75% (AlphaPilot).

Ratios

Ratio notes:

  • ROE and ROA are computed as net income divided by year-end equity or assets.

  • ROIC, net debt/EBITDA and interest coverage come from AlphaPilot.

  • Third-party TTM ROE is -7.13% to -8.29% (StockAnalysis; Yahoo, May 2026).

  • The cash conversion cycle is not meaningful (third-party values are distorted by near-zero revenue).

Commentary on trends, inflections and drivers

FY2021–FY2023: a stalled developer. Aguia was a pure pre-revenue explorer with a modest cost base (about A$2M per year in G&A per Simply Wall St). Cash fell from about A$4.3M to about A$0.4M. The June 2021 federal injunction action froze Três Estradas, which had been funded (BRDE plus cash) and targeted for Q1 2022 production. The share price fell from A$0.076 (Jun 2021) to A$0.028 (Jun 2023).

FY2024: the reset. The board and management were overhauled (Grigor, Howe). Andean Mining was acquired for scrip, pivoting the company toward Colombian gold. A rights issue restored minimal liquidity. The net loss widened to A$5.8M on a A$4.2M non-operating charge.

FY2025: first revenue. Santa Barbara gold sales began, giving A$0.284M of revenue. Total assets grew 29% to A$48.1M as the plant lease and Colombian development were capitalised. The Dagoberto Barcelos lease and BRDE offer set up a low-capex phosphate restart. Working capital turned sharply negative (current ratio 0.21), and the company became structurally dependent on frequent small equity raises.

FY2026: transition to producer. More than A$14.5M of financing was raised during the year. The FEPAM operating licence (May 2026) and MAPA approval enabled first phosphate sales, with orders above A$2.3M within six weeks. Colombia was restructured: costs fell by roughly 75% monthly, and grades rose from 3–4 g/t to >10 g/t. The key inflection to watch in the FY2026 audited accounts is whether Brazilian phosphate revenue has been recognised at scale before 30 June 2026. This is unlikely; most deliveries began in July 2026, so the earnings inflection falls in FY2027. The going-concern assessment is also critical: 1.2 quarters of funding at 30 June 2026 points to a likely emphasis-of-matter.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Segment (Operational) Overview

Segment (operational)ContentsProducts / servicesKey legal entities

Brazil (Agricultural Minerals & Copper)

Três Estradas phosphate mine; leased Caçapava do Sul processing plant; blending facility about 40 km from mine; Lucena phosphate; Mato Grande / Passo Feio phosphate targets; Andrade copper and Rio Grande copper-belt tenements

PAMPAFOS™ natural phosphate fertiliser (bulk, big-bag, 25 kg bags from Oct 2026); copper exploration

Aguia Fertilizantes S.A. and other Brazilian subsidiaries (full list n/d)

Colombia (Precious & Base Metals)

Santa Barbara gold mine (about 320 ha, Bolívar); Atocha Ag-Au project; El Dovio Cu-Au VMS project

Gold doré (toll-treated); exploration

Corporación Minera de Colombia S.A.S.; Andean Mining Limited (acquired 2024); "Oro Sinú" named as equipment purchaser (legal status n/d)

Corporate (Australia)

Sydney head office, listing, treasury

—

Aguia Resources Limited

Revenue by Segment

SegmentFY2023FY2024FY2025

Colombia gold revenue (AUD Mn)

000.284

Brazil phosphate revenue (AUD Mn)

000

Total operating revenue (AUD Mn)

000.284

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Income Statement and Per-Share Data

MetricFY2021FY2022FY2023FY2024FY2025

Operating revenue (AUD Mn)

00000.284

Other / interest income (AUD Mn)

0.0070.1550.0600.010—

Gross profit (AUD Mn)

00000.284

Operating income / EBIT (AUD Mn)

————-2.59

EBITDA (AUD Mn)

————-2.57

Pre-tax income (AUD Mn)

————-2.76

Net income (AUD Mn)

-10.835-1.856-2.237-5.795-2.764

EPS basic (A$ cents)

—-0.50-0.54-1.10-0.20

EPS diluted (A$ cents)

—-0.50-0.54-1.10-0.20

Dividends per share (A$ cents)

00000

Balance Sheet

MetricFY2021FY2022FY2023FY2024FY2025

Total assets (AUD Mn)

30.20532.38334.33437.28248.108

Cash and equivalents (AUD Mn)

4.2983.7260.4380.8230.579

Total debt (AUD Mn)

00002.35

Net debt (AUD Mn)

-4.298-3.726-0.438-0.8231.77

Total liabilities (AUD Mn)

————6.942

Shareholders' equity (AUD Mn)

————41.17

Current assets (AUD Mn)

————0.898

Current liabilities (AUD Mn)

————4.3

Working capital (AUD Mn)

————-3.40

Financial Analysis

MetricFY2021FY2022FY2023FY2024FY2025

Dividends paid (AUD Mn)

00000

Share buybacks (AUD Mn)

00000

FY2026 Indicator Details

FY2026 indicatorValueSource

Q4 FY2026 net operating cash outflow

A$1.453M

Appendix 5B, 31 Jul 2026

Q4 FY2026 net investing cash outflow (PP&E plus exploration)

A$2.233M

Appendix 5B

FY2026 YTD net financing inflow

A$14.525M

Appendix 5B

Cash at 30 Jun 2026

A$1.548M

Appendix 5B

Returns & Leverage Ratios (%) and Financial Ratios (x)

MetricFY2022FY2023FY2024FY2025

ROE (%)

———-6.7

ROA (%)

-5.7-6.5-15.5-5.7

ROIC (%)

-6.35-6.74-4.27-5.44

Current ratio (x)

———0.21

Debt / equity (%)

0005.7

Net debt / EBITDA (x)

1.860.190.14-2.02

Interest coverage (x)

000-13.69

Asset turnover (x)

0000.01

Revenue by Region

Region (AUD Mn)FY2023FY2024FY2025

Colombia (gold) revenue

000.284

Brazil (phosphate) revenue

000

Uruguay (phosphate) revenue

000

Australia revenue

000

Share Price

MetricFY2021FY2022FY2023FY2024FY2025

Share price at 30 June (AUD)

0.0760.0690.0280.0240.033

Return metric

Value

Source / basis

———

Latest observed price

A$0.011–0.019 (Jul–Aug 2026); A$0.016 at end-July (market cap about A$36M)

InvestSMART

———

1-year relative performance

-73.65% vs sector; -45.27% vs ASX 200

Market Index (accessed Oct 2026)

———

3-year absolute (30 Jun 2023 → about A$0.016)

About -43%

Computed

———

5-year absolute (30 Jun 2021 → about A$0.016)

About -79%

Computed

———

52-week high / low

A$0.032 / A$0.012

Kalkine (date of snapshot n/d)

———

Valuation Multiples

MultipleAguiaBasis

P/E

n/m (loss-making)

—

EV/EBITDA

n/m (negative EBITDA); FY2025 third-party -19.0x

AlphaPilot

EV/Sales (TTM)

About 161x (EV A$45.8M / revenue A$0.494M)

Yahoo Finance, 8 May 2026

P/B

0.87 (May 2026); about 0.60 (Morningstar)

Yahoo; InvestSMART

Book value per share

A$0.022

Market Index

Share Price & Returns

DateTypePrice (AUD)SharesGross (AUD Mn)Lead

Jun 2024

Rights issue

0.022———

Sep 2024

Placement

0.016———

May–Jul 2025

SPP

0.0418,033,2910.649—

Jul 2025

Placement

0.036———

Oct 2025

Rights issue

0.027———

Dec 2025

Placement

about 0.036

———

Feb 2026

Placement plus 1:1 options (A$0.022)

0.020250,000,0005.0

Alpine Capital

May 2026

Placement plus options

0.020

n/d (about 218M options issued)

——

Jul 2026

Placement

0.017176,800,0003.0

Far East Capital

Analyst Conclusions

Management guidance (qualitative):

  • Phosphate: ramp to full capacity by early 2027 and potentially double via a second circuit. Throughput above 160 ktpa. Cost A$55–70/t, price about A$150–160/t. Stockpile supports about six months of sales.

  • Colombia: 200 t/month of ore before Q1 2027 and drilling restart by end-2026.

  • No numerical revenue or earnings guidance. No consensus estimates exist.

Illustrative unit economics (analyst arithmetic on company guidance, not a forecast). At 150 ktpa × A$150–160/t, revenue would be about A$22.5–24M per year. At A$55–70/t cost, gross margin would be about A$12–14M per year before overheads, lease, freight assumptions and interest. Achieving even half of this would transform a company valued at about A$36M. September 2026's actual run-rate of about 4,000 t/month (about 48 ktpa) is about a third of nameplate.

Bull case

  1. Rapid phosphate cash flow. About A$2.3M of sales within six weeks, a A$5M stockpile, and nameplate economics implying gross profit near the current market cap within about two years. All this with minimal remaining capex (leased plant, BRDE-funded).

  2. Structural demand shock and policy support. Hormuz and sulphur disruption plus the R$10bn onshoring incentive favour the only local supplier in Rio Grande do Sul.

  3. Colombia now self-funding with upside. Grades above 10 g/t, costs covered from September 2026, a doubling target, gold above US$4,000/oz, and drilling that could define a maiden resource.

Bear case

  1. Legal existential risk. The TRF4 invalidation of the environmental licence (15 Sep 2026) could force a halt at Três Estradas, repeating the 2021–2025 paralysis.

  2. Funding treadmill. 1.2 quarters of funding at 30 June 2026 and placement prices falling to A$0.017, plus about 463M options overhang. Per-share value creation may lag operational progress.

  3. Execution and adoption risk. Actual throughput (about 48 ktpa) is far below nameplate. Sales are seasonal and credit-dependent. Santa Barbara is tiny (about 37 oz per month) and unresourced.

Key catalysts and monitorables (next 12 months)

TimingCatalyst
Oct 2026Clarification of ASX trading status; FY2026 audited accounts and going-concern note
Oct 2026 onwardTRF4 motion-for-clarification outcome and any higher-court appeal
30 Oct 2026September-quarter 4C/5B: revenue recognised, cash, funding runway
Mid-Oct 2026Uruguay registration; 25 kg bagging line commissioning
Q4 2026 – Q1 2027Conversion of about 9,979 t of pending orders; Sicredi/Daycoval facilities finalised; summer planting-season sales
Before Q1 2027Santa Barbara reaching 200 t/month; drilling restart by end-2026
2,027Capacity expansion decision; Lucena licence extensions; next capital raise terms

Concluding analyst verdict

Aguia Resources has achieved in roughly 24 months what it failed to do in the previous decade: it has become a producer. Under Warwick Grigor's chairmanship and, since late 2025, Tim Hosking's executive leadership, the company replaced a capital-heavy, litigation-bound mine-and-plant plan with a pragmatic lease-and-truck model. That model delivered a licensed mine, a commissioned 150 ktpa plant, a registered fertiliser brand and over A$2.3M of early sales by mid-2026. In parallel, the Colombian acquisition has been disciplined into a high-grade, cost-covered micro-operation with genuine exploration upside, helped by record gold prices.

The investment case nonetheless remains binary and early. The 15 September 2026 TRF4 ruling invalidating Três Estradas' environmental licence strikes at the asset that underpins almost all of Aguia's value. The company's assertion that operations will continue is not yet tested by a final judicial outcome. The balance sheet is fragile: cash of about A$1.5M at 30 June 2026, a further A$3M raise at a lower price in July, and a large option overhang. Without a quick ramp toward nameplate throughput, dilution will likely continue to absorb operating gains.

On balance, Aguia is a high-risk, high-optionality special situation. Its valuation (about A$36M; P/B below 1) implies substantial scepticism about both legal durability and execution. That scepticism is justified until two conditions are met: (i) the licence challenge is resolved or neutralised on appeal, and (ii) quarterly reports show phosphate revenue at an annualised run-rate above A$10M with stable working-capital funding. If both occur, the asymmetry is attractive given the cost and import-parity gap and supportive Brazilian policy. If either fails, further dilution or a renewed project stall is the more likely path. Monitor the October 2026 filings closely.


Principal sources consulted

ASX announcements (3 Feb 2026; 6 Feb 2026; 7 Jan 2026; 13 May 2026; 22 Nov 2024; 22 Dec 2023; trading halts 30 Jan, 15 May and 20 Jul 2026); Aguia Annual Reports FY2020, FY2022, FY2024 and FY2025; Half-Year Reports Dec 2021 and Dec 2025; Appendix 5B for June 2026 quarter (via InvestSMART); InvestSMART, Market Index, Kalkine/EOD, MarketScreener (S&P Capital IQ), StockAnalysis, Simply Wall St, Yahoo Finance, AlphaPilot; Mining.com.au (articles dated 2025 to 6 Oct 2026); Mining Weekly (8 Jun 2021; 18 May 2026); Miningreporters/Reporte Minero (Nov 2025 to Feb 2026); Business News; SmallCaps; Mining Technology (10 Jun 2024); TipRanks; PitchBook; GlobeNewswire (28 Jun 2019).

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Executive Leadership Team

NameRoleTenureBackground / prior rolesEducationLatest disclosed total remuneration

Timothy (Tim) Hosking

Managing Director & CEO

CEO from 24/25 Nov 2025; MD from 7 Jan 2026

20+ years in executive and project management roles, 15 in South America (mainly Brazil and Peru). Fluent in Portuguese. Previously led Aguia's Brazilian work: the Dagoberto Barcelos lease, development-bank financing, mine planning and offtakes.

——

Warwick Grigor

Non-Executive Chairman

NED Chair from 19 Sep 2023; Executive Chairman 14 Jun 2024 – 7 Jan 2026; Non-Executive Chair since

Veteran mining analyst and capital-markets figure. Publicly associated with Far East Capital Limited (top-20 holder and July 2026 placement manager; see related-party note).

—

A$92.84k (latest disclosed, Simply Wall St)

Christina (Christine) McGrath

Non-Executive Director

Director since 11 Jun 2019. Executive Chair from 7 Jan 2022; MD 6 Sep 2023 – 14 Jun 2024; NED since.

Long-serving director through the legal-stall period

—

A$235.07k (latest disclosed; likely reflects executive period)

Benjamin (Ben) Jarvis

Non-Executive Director

6 Sep 2023 (Morningstar) or 6 Sep 2024 (FY2024 Annual Report print)

Championed the Andean acquisition (quoted in 22 Dec 2023 offer announcement)

—

A$50.32k

Ross Pearson

Company Secretary

Since 10 Nov 2023 (Annual Report prints 2024)

———

William (Bill) Howe

Former MD

14 Jun 2024 – 25 Nov 2025

B.Sc., FAusIMM. Former Andean-side executive. Still a substantial holder (5.07%, older notice).

B.Sc.

FY2025 A$209.4k (83.7% salary)

Fernando Tallarico

Former MD

to Sep 2023

Led Três Estradas permitting and the 2021 BRDE loan

——

Board & Management Changes

DateChangeContext

19 Sep 2023

Grigor appointed Non-Executive Chairman

Brought in as external adviser to revive the company

14 Jun 2024

Grigor becomes Executive Chairman; Howe appointed MD; McGrath reverts to NED

Completion of the Andean takeover

25 Nov 2025

Howe resigns as MD, CEO and director; Hosking appointed CEO

Shift of focus to Brazilian phosphate start-up

7 Jan 2026

Hosking appointed MD; Grigor becomes Non-Executive Chair

Governance separation ahead of mining start

Major Shareholders

HolderShares%Notice date

John McRae Clough

212,746,1588.87

29 Jul 2026

William Howe

67,023,699

5.07 (dilution has likely reduced this below 5%; current n/d)

older notice

Major Shareholders by Rank

RankHolderShares%
1

Far East Capital Limited

57,839,0004.37
2

Finhill Capital Pty Ltd

46,187,4363.49
3

Twynman Investments Pty Limited

40,000,0003.02
4

Merrill Lynch (Australia) Nominees

32,039,7152.42
5

Andean Mining Limited

28,329,0422.14
6

Ayers Capital Pty Ltd

23,947,2921.81
7

Tawmii Management Services Pty Ltd

21,322,6351.61
8

Malabar Gold Corp

21,000,0001.59
9

All States Finance Pty Limited

20,000,0001.51
10

Robmar Investments Pty Limited

20,000,0001.51

Directors' Shareholdings

DirectorSharesOptions

Grigor

95,083,972 (indirect)

25,000,000

McGrath

6,371,5064,500,000

Jarvis

6,148,8893,000,000

Hosking

1,155,5552,000,000

Competitive Landscape

Key Competitors

CompetitorTypeRelative positioning vs Aguia

OCP Group (Morocco), via imports

Global phosphate leader; principal supplier of imported rock and MAP into Rio Grande do Sul

Sets the import price benchmark (about A$344/t cited). Aguia competes on freight, supply security and nutrient-adjusted cost.

The Mosaic Company (Mosaic Fertilizantes)

Largest integrated phosphate producer in Brazil (Minas Gerais, Goiás); soluble products

Vastly larger, but focused on soluble MAP/SSP and centre-west Brazil

EuroChem (Serra do Salitre)

Integrated phosphate producer, Minas Gerais

Large-scale soluble-phosphate competitor

Yara Brasil

Major fertiliser distributor and producer (phosphate via Salitre/Galvani history)

Strong distribution in the south; potential channel competitor

Galvani Fertilizantes

Brazilian phosphate miner and producer

Mid-tier domestic producer, mainly in the north-east and centre

CMOC (Copebrás)

Phosphate producer, Goiás

Domestic soluble-phosphate supplier

Itafos (Arraias, Brazil)

TSXV-listed phosphate producer

Peer junior with Brazilian assets

Verde AgriTech (TSX: NPK)

Brazilian multinutrient potash (K Forte) producer

Closest analogue in business model (direct-application rock fertiliser, Brazil)

Minbos Resources (ASX: MNB)

Angolan phosphate developer

ASX peer for phosphate junior valuation

Nevada Organic Phosphate (CSE: NOP)

US direct-application organic rock phosphate developer

Model analogue in the US

Key Competitors — Aris Mining

CompetitorPositioning

Aris Mining (Segovia, Antioquia)

Major high-grade narrow-vein producer near Remedios; regional benchmark

Soma Gold

Small Antioquia producer with its own mill

Denarius Metals (Zancudo)

Colombian junior gold-silver

Collective Mining

Well-funded Colombian explorer

Artisanal/small-scale miners (Serranía de San Lucas)

Compete for labour, ore and social licence; illustrate district grade

Competitor Detail

MetricAguia (FY2025)

Revenue

A$0.28M

Revenue growth

n/m (first revenue)

Net margin

about -973%

R&D intensity

0%

Recent Developments

--

Company Snapshot

$0.2M

Revenue

10

Employees

2007

Founded

Sydney, Australia

Headquarters

SWOT Analysis

Strengths

  • Licensed and producing phosphate operation. FEPAM Operating Licence (18 May 2026), MAPA approval (25 May 2026), plant commissioned (11 Jun 2026).
  • Early commercial traction. Sales above A$2.3M within six weeks of commissioning (ASX, 15 Jul 2026). Cotrisul 2,000 t order.
  • Capital-light model. Plant leased for about A$43k/month (about A$5/t) instead of a multi-million greenfield build. BRDE loan covers about 90% of capex.
  • Cost advantage. Guided A$55–70/t cost against about A$150–160/t pricing and an A$344/t import benchmark.
  • High-grade gold. Run-of-mine grades above 10 g/t; September 2026 batch at 12.75 g/t. Recoveries above 85%.
  • Substantial resource base. Três Estradas about 105 Mt total resource; reserves of 5.02 Mt @ 8.8% P2O5 support an 18-year Phase 1. Lucena adds 55 Mt Inferred.
  • Inventory buffer. About 22,680 t of stockpiled ore (A$5M gross value) supports about six months of sales.

Weaknesses

  • Liquidity. Cash of A$1.548M and only 1.20 quarters of funding at 30 Jun 2026. FY2025 current ratio 0.21.
  • Serial dilution. At least six equity raises between June 2024 and July 2026. The placement price fell from A$0.036 (Dec 2025) to A$0.017 (Jul 2026). About 463M options outstanding at A$0.022.
  • Minimal audited revenue. A$0.284M in FY2025 against a net loss of A$2.76M.
  • Unresourced gold mine. No JORC resource at Santa Barbara. Production is small: about 37 oz per month.
  • Governance concentration. Four-person board, chair recently executive, placement managed by a firm associated with the chair. Annual-report date errors in FY2024.
  • Seasonal, credit-sensitive sales. Sales slowed by El Niño and credit constraints in September 2026; reliance on Sicredi and Daycoval facilities.

Opportunities

  • Policy tailwind. R$10bn Brazilian fertiliser incentive with onshore-sourcing rules (Aug 2026).
  • Global supply shock. Middle East conflict disrupting sulphur and nitrogen flows, raising soluble-phosphate costs (Oct 2026).
  • Capacity upside. Plant potential above 200 ktpa; second circuit could double output; earlier 300 ktpa ambition.
  • New markets. Uruguay registration (expected mid-Oct 2026); 25 kg bags opening tobacco, cattle and retail channels.
  • Santa Barbara scale-up. Doubling to 200 t/month before Q1 2027; drilling restart by end-2026; record gold prices.
  • Pipeline monetisation. Lucena, Mato Grande, Passo Feio, Andrade copper, Atocha, El Dovio could be developed, partnered or sold.

Threats

  • Licence annulment. TRF4 declared the environmental licence invalid (15 Sep 2026). Further appeals (motion for clarification; potentially STJ/STF) carry stop-work risk.
  • Activist litigation history. The June 2021 federal action stalled the project for about four years.
  • Gold price and security. Bolívar and Antioquia face security, illegal-mining and formalisation challenges. Gold price was weakening in October 2026.
  • Agronomic acceptance. Farmers accustomed to MAP may resist direct-application rock.
  • Financing-cost risk. BRDE loan priced off SELIC (14.75% in 2025), which raises debt-service cost.
  • Possible ASX suspension. A third-party quote page showed a halted/suspended flag (Oct 2026).

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
May 2025First gold sales at Santa Barbara (about A$193k); government certification obtainedFirst revenue in company history
30 May 2025SPP launched to raise up to A$3M at A$0.04Funding for drilling and phosphate
Jun 2025BRDE offers up to A$4M, 20-year development financeDebt validation of Três Estradas
Jun–Jul 2025SPP closes with about A$0.649M (18.03M shares); placement at about A$0.036 (director participation)Weak retail take-up
1 Aug 2025DB plant lease payments commence (about A$43k/month)Fixed cost begins before revenue
29 Sep 2025FY2025 Annual Report: net loss A$2.76M; revenue A$0.28MConfirms going-concern reliance on raises
Oct 2025BRDE loan agreement signed (about 90% of capex)Funds plant refurbishment and mine opening
Oct 2025Rights issue at A$0.027; Clough becomes a 5.66% substantial holder (28 Oct)New cornerstone private investor
24 Oct 2025Listed options (AGRO) suspended from quotationOption expiry / housekeeping
25 Nov 2025Howe resigns; Hosking appointed CEOLeadership shift to Brazil focus
19 Dec 2025Placement at about A$0.036–0.037 with Grigor and Jarvis participationBoard alignment
7 Jan 2026Hosking appointed MD; Grigor becomes Non-Executive ChairGovernance improvement
28 Jan 2026Seven LOIs for about 54,000 t PAMPAFOS™; DB processing start targeted April 2026Demand evidence
3 Feb 2026A$5.0M placement at A$0.020 plus 1:1 options at A$0.022 (Alpine Capital)Main FY2026 funding event
6 Feb 2026Santa Barbara recoveries improve from 70% to >85%Metallurgical progress
Mar 2026ANM mining concession granted; PAMPAFOS™ launched at Expodireto Cotrijal; MOUs for about 44,000 t (>70% of 2026 output)De-risking
Early Apr 2026Aguia Fertilizantes registered by MAPA to sell fertiliserRegulatory step
Apr 2026Final FEPAM information requests answered; phosphate shortage at Port of Rio Grande highlightedMarket tailwind
15–19 May 2026Trading halt; placement at A$0.020 (Grigor takes 25M shares plus 25M options; Clough rises to 7.58%)Pre-production funding
18 May 2026FEPAM Operating Licence issued; mining startsMost material milestone to date
20 May 2026Santa Barbara head grades above 10 g/t (batch recovery 10.31 g/t; est. head grade 12 g/t)Grade inflection
22–26 May 2026Plant commissioning at 24 tph; MAPA commercialisation approval (25 May)Sales enabled
11 Jun 2026Commissioning complete; nominal 150 ktpa with up to +30% potentialTransition to producer
18 Jun 2026A$600k of sales in 14 days; Cotrisul 2,000 t order; Daycoval talksCommercial validation
24 Jun 2026Monthly Colombian costs cut to A$117k (from A$459k); two shafts completedCost discipline
13 Jul 2026Santa Barbara June output 851.9 g Au from 100 t (3x prior month); capex -80%, opex -56%, overheads -38%Operational turnaround
15 Jul 2026PAMPAFOS™ sales exceed A$2.3M (A$1.6M secured this year); first delivery 7 JulRevenue build
17 Jul 2026Highest gold assays to date; diamond drilling plannedExploration upside
20–29 Jul 2026Trading halt; A$3.0M placement at A$0.017 (176.8M shares; Far East Capital; Jarvis takes 1M shares); Clough rises to 8.87%Continued dilution at lower prices
31 Jul 2026June quarter 5B: cash A$1.548M; 1.20 quarters of fundingLiquidity stress flag
5–7 Aug 2026Grigor buys 3.0M shares on-marketInsider confidence
27 Aug 2026Brazilian Senate approves R$10bn fertiliser incentive scheme with onshore-sourcing requirementsPolicy tailwind
31 Aug 2026Lucena Phosphate Project reassessment announcedPipeline optionality
15–16 Sep 2026TRF4 declares Três Estradas environmental licence invalid; record August gold output (942 g)Major legal risk; Colombia momentum
21 Sep 2026Stockpile of 22,680 t (A$5M gross); orders of about 9,979 t pending; Sicredi credit; Uruguay branch; motion for clarification filedOperations continue despite ruling
c. 28–30 Sep 2026Going-concern disclosure key
6 Oct 2026September gold: about 37 oz; A$218k gross; Colombian costs covered; workforce -15%; target 200 t/month before Q1 2027Colombia self-funding

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

2 charts
Revenue by Segment: Total operating revenue rose from AUD 0 Mn in FY2023 to AUD 0.3 Mn in FY2025.
Aguia Resources Limited — Revenue by Segment
Series (AUD Mn)FY2023FY2024FY2025
Total operating revenue000.3
Colombia gold revenue000.3

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Unlock Company Contacts

Connect with Key Decision-Makers

Access verified employee contacts and decision-maker information from this company to support your sales, lead generation, and business development efforts.