AIC Mines Limited

Company Profile Analysis

Ticker: A1M.AX

ESOMAR 23 Corporate BadgeISO Certifications Badge
AIC Mines Limited - Company showcase

Year Founded & Workforce

1993

AIC Mines Limited logo

AIC Mines Limited Employee Contacts

3 verified contactsNames, job titles, seniority and locations

View Employee Contacts

AIC Mines Limited Overview

AIC Mines is an ASX-listed, single-hub Australian copper producer that owns and operates the high-grade underground Eloise copper-gold mine, 60km south-east of Cloncurry in North Queensland, and is bringing the adjacent Jericho deposit, 4km south, into production through an underground link from the Eloise decline. In FY26 the company produced 13,064t of copper and 6,621oz of gold in concentrate at an AISC of A$4.99/lb, generating A$245.2m revenue, A$108.1m EBITDA and A$41.5m net profit [FR26]. Its investment case rests on a fully permitted, largely funded brownfield expansion: a Stage 1 plant upgrade from 725ktpa to 1.1Mtpa due for commissioning in the December 2026 quarter, and an accelerated Stage 2 upgrade to 1.5Mtpa targeted for the December 2028 quarter, lifting output to 25,000–27,000t copper by FY29 [OUT26]. It is unhedged-by-design (apart from protective puts), sells all concentrate to Trafigura, and pays no dividend while it reinvests in growth.


What the company does. AIC Mines explores for, develops, mines and processes copper-gold-silver sulphide ore and sells the resulting copper concentrate. The FY26 Directors' Report defines principal activities as exploration, mine development and production, mine operations and the sale of copper concentrate in Australia [FR26 s.1]. The company's own self-description, repeated on every ASX announcement, characterises it as a growth-focused Australian resources company whose strategy is to assemble a portfolio of copper and gold assets in Australia via exploration, development and acquisition, anchored by the Eloise and Jericho mines.

Business model. AIC operates a classic "hub-and-spoke" brownfield mining model. The Eloise processing plant (the hub) has run since 1996; the company's value creation comes from (a) extending mine life at Eloise through resource definition at depth and in remnant upper levels (for example the Lens 6 and Elrose/Levuka North blocks), (b) adding new ore sources within trucking or underground-haulage distance (Jericho, and potentially Sandy Creek and Artemis), and (c) scaling plant throughput to dilute fixed costs. The FY27 guidance documents show that Jericho's lower mining cost (A$83.8/t mining vs A$99.2/t at Eloise; total LOM opex A$139.8/t vs A$156.6/t) is central to the margin thesis [OUT26].

Revenue model. Revenue is 100% product sales: copper concentrate containing payable copper, with gold and silver credits. There is no service, subscription or licensing revenue. All FY23–FY26 mining revenue was earned from a single customer [FR24 Note 5; FR26 Note 2.1], which is Trafigura under a life-of-mine offtake agreement over Eloise concentrate entered into in 2021 [TRAF25]. Sales are provisionally priced at bill of lading and finalised by reference to market prices over a quotation period, typically one to four months after shipment [FR25 accounting policies]. FY26 revenue comprised A$244.3m from contracts with customers, a A$1.3m positive provisional pricing adjustment and a A$0.4m hedging expense [FR26 Note 2.2]. In FY24, gross metal revenue before treatment, refining and transport charges comprised A$174.8m copper, A$21.5m gold and A$5.1m silver, i.e. copper ≈87% of gross metal value [FR24].

Value chain position. AIC sits in the upstream mine-and-concentrate segment of the copper value chain. It does not smelt or refine; concentrate is trucked from site and sold to a trader (Trafigura), which places it with third-party smelters. Final smelter destinations are not publicly disclosed. AIC therefore bears treatment and refining charge (TC/RC) exposure, freight and payability terms, but not smelter capacity risk.

Customer types and end-markets. The direct customer is a global commodity trader. The ultimate end-markets are those of refined copper — electrical and power infrastructure, construction, transport (including electric vehicles), consumer and industrial equipment — and, for the by-products, gold and silver bullion markets. Management cited copper's role in electrification and the energy transition when acquiring Jericho [Resources Roadhouse, 2024].

Independent characterisation. AIC is best understood as a small but now consistently profitable Australian copper "growth producer" in transition from a single 725ktpa underground operation to a 1.5Mtpa dual-mine hub. Execution in FY24–FY26 has been notably consistent: guidance was met for three consecutive years and for eleven consecutive quarters through March 2026 [FR26; QR-M26]. Its main structural characteristics are high operating leverage to the A$ copper price, total dependence on one processing hub and one offtaker, and a capital-intensive growth phase that has turned free cash flow negative despite record operating cash flow.

Strategy

Stated strategy (paraphrased from annual reports and announcements)

The company's stated strategy, unchanged since 2019, is to build a portfolio of copper and gold assets in Australia through three levers — exploration, development and acquisition [FR26 header; all FY26 ASX announcements]. The FY26 Directors' Report, July 2026 outlook and July 2026 leadership announcement add the following themes:

  1. Transform Eloise into a cornerstone, long-life, high-volume hub — move from a small single-mine operation to a 1.5Mtpa dual-mine operation producing more than 25,000tpa Cu [OUT26].

  2. Reduce unit costs through scale and shallower Jericho ore, and de-risk production by increasing the number of ore sources [FR26 s.4.3].

  3. Grow resources and reserves organically in the ~1,700km² Eloise Regional tenure; Jericho is open along strike and at depth [FR26].

  4. Disciplined capital allocation — retain flexibility to slow underground development if copper prices weaken [OUT26].

  5. Inorganic growth — the board explicitly framed the CEO transition as positioning for "production ramp-up, operational improvement and inorganic growth" [MD26]. The FY24 STI scorecard recorded a missed "acquisition" goal [FR24], confirming M&A is an active objective.

  6. Values: safety, honesty and reliability (September 2026 corporate presentation, Quartr summary).

Strategic initiatives — last 24 months

InitiativeDateDescriptionStatus / target
Stage 1 Eloise plant expansion (725ktpa → 1.1Mtpa)EPC awarded May/Jun 2025Fixed-price A$77.6m EPC with GR Engineering; new crushing, grinding, flotation, filter press, HV power81% complete at 30 Jun 2026; commissioning December 2026 quarter [OUT26]
Jericho mine developmentAccess drive started Jun 20243km access drive; J1/Jolly reached Feb 2026 (four months early); JS3 vent shaft; four declines plannedCommercial production assumed 1 Jan 2027 [OUT26]
Stage 2 plant expansion (→ 1.5Mtpa)Accelerated 20 Jul 2026~A$15m flotation and ancillary upgrades in FY28; previously targeted FY31Completion December 2028 quarter [OUT26]
Funding packageJun 2025US$40m Trafigura prepayment; A$55m placement; A$10m SPP; A$25m surety bond facility; Hawke's Point strategic investor agreementComplete; prepayment upsized to US$50m (Jul 2026)
Tailings capacityLodged 23 Dec 2025Stage 2 EA/PRCP amendment for 10m raise across TD1–TD5, lifting LOM capacity to 11.3Mt and deposition to end-FY35Decision expected December 2026 quarter [OUT26]
Portfolio rationalisationFY25–FY26Divest Pyramid (completed 20 Jul 2026), Lamil (conditional), Lake Purdilla; acquire tenements adjoining Eloise RegionalOngoing [FR26]
Safety assurance programFY26Group safety assurance; Permit-to-Work review ahead of new plantTRIFR 12.0 → 5.7 [FR26]
Climate-related financial disclosuresFY26First Sustainability Report under Australian climate reporting standards, with KPMG review of specified disclosuresPublished with FR26 [FR26 contents]
Leadership successionJul–Oct 2026Operational CEO (Donkin), founder CEO to ChairEffective by 31 Oct 2026 [MD26]

Cost programs

No formal cost-reduction program with numerical targets has been announced. Cost initiatives disclosed are tactical: a FY25 change in concentrate invoicing strategy to save costs (which increased receivables) [FR25]; a 25% reduction in Eloise development metres in FY27 as equipment is redeployed to Jericho [OUT26]; and a voluntary deferral of A$200,000 of the CEO's FY26 fixed pay contingent on cash balance targets [FR25].

Management guidance and medium-term targets [OUT26]

MetricFY26AH1 FY27H2 FY27FY27 guidance
Copper in concentrate (t)13,0647,750–8,2509,750–10,25017,500–18,500
Gold in concentrate (oz)6,6213,500–3,7503,750–4,0007,250–7,750
AISC (A$/lb Cu sold)4.994.10–4.405.30–5.604.80–5.20
All-in Cost (A$/lb Cu sold)5.324.20–4.505.90–6.205.20–5.60
Assumed gold price (A$/oz)6,1005,7505,7505,750
Assumed diesel (A$/L net)1.251.301.221.26
Production outlook metricFY27FY28FY29—
Copper target — low (t)17,50020,00025,000—
Copper target — high (t)18,50022,00027,000—
Share from Probable Ore Reserves (%)969693—
Share from Inferred Resources (%)447—
Eloise share of production (%)725546—
Jericho share of production (%)284554—

Products & Services

AIC has a single saleable product (copper concentrate). The "portfolio" is therefore best catalogued as product, producing assets, development assets and exploration projects.

Product

ProductDescriptionSpecificationCustomerPricing model
Eloise copper concentrateChalcopyrite flotation concentrate, thickened and disc-filtered, sun-dried to 8–9% moisture for transport~26% Cu, ~4.4g/t Au, ~100g/t Ag; no deleterious elements historically [OUT26]. FY25 output: 48,021dmt containing 12,863t Cu [FR25]; FY24: 49,994dmt containing 13,412t Cu [FR24]Trafigura (life-of-mine offtake since 2021)Provisional pricing; LME-referenced copper and LBMA-referenced precious metals (market-standard; specific references not disclosed); QP 1–4 months
Jericho copper concentrate (blended)Jericho ore processed through Eloise plant, blended with Eloise oreBlended trial: 25% Cu concentrate, 92.3% recovery vs typical Eloise 25–26% Cu and 93–95% recovery [FR26]Trafigura (minimum 400,000dmt under prepayment-linked offtake) [TRAF25]As above; 199t of Jericho copper sold in FY26 [FR26]

Producing and development assets

AssetStatusKey factsLatest data year
Eloise Copper Mine (Qld)Operating underground mine since 1996; acquired 1 Nov 202160km SE of Cloncurry; four mining leases (~505.9ha); sublevel cave (Eloise Deeps) and long-hole open stoping; >14.7Mt ore mined historically for >400,000t Cu and >200,000oz Au (company website; note an older website figure of 376,000t Cu); FY26 ore mined 635,472t @ 2.05% Cu; processed 662,843t @ 2.03% Cu; recovery 94.6%; payable Cu 12,257t; AISC A$4.99/lb; AIC A$5.32/lb; operating mine cash flow A$120.5m; net mine cash flow A$63.3m [FR26]FY26
Eloise processing plantOperating; Stage 1 expansion under constructionCurrent: three-stage crush to −12mm at 120tph, two-stage grind to P80 125µm, rougher/scavenger/cleaner/recleaner flotation, 725ktpa. Stage 1 (to 1.1Mtpa): new crushing and grinding circuits, extra rougher cell, conditioning tank, hydraulic filter press, HV generation; fixed-price EPC A$77.6m (GR Engineering) including ~A$15m of oversizing for 1.5Mtpa; 81% complete vs 84% budget at end-June 2026; commissioning December 2026 quarter. Stage 2 (to 1.5Mtpa): ~A$15m in FY28 (extra flotation cell, HV generator, cyclones, filter plates, tailings line); completion December 2028 quarter [OUT26]FY26
Jericho Copper Mine (Qld)Development / early ore; commercial production assumed 1 Jan 20274km south of Eloise plant; two parallel lenses (J1, J2) with high-grade shoots (Jolly, Matilda, Jumbuck, Swagman, Tucker, Billabong, Squatter); 5km strike, ~700m depth extent, open north and south; accessed via ~3km Jericho Access Drive from the Eloise 1065 Level (125m below surface); 2,451m developed in FY26; JS3 ventilation shaft commissioning planned September 2026 quarter; ore ~26% harder than Eloise; test recoveries 93% Cu, 79% Au, 70% Ag [FR26; OUT26]FY26
Lens 6 (Eloise lease)In mine planHigh-grade discovery; Nov 2023 update +74% resource and +119% reserve copper [FR24]FY24
Sandy Creek (Eloise Regional)Inferred resource2.62Mt @ 1.1% Cu, 0.3g/t Au (28,100t Cu) [OUT26]Dec 2025
Artemis (Eloise Regional)Inferred resource0.58Mt @ 1.4% Cu, 1.1g/t Au, 45.5g/t Ag (8,100t Cu) [OUT26]Dec 2025

Mineral Resources and Ore Reserves (as at 31 December 2025, reported 31 March 2026) [OUT26]

DepositTonnesCu %Au g/tAg g/tContained Cu (t)Contained Au (oz)
Jericho (Indicated + Inferred)22,137,0002.00.42.3444,900275,800
Eloise (Measured + Indicated + Inferred)5,848,0002.60.79.8150,700125,900
Sandy Creek (Inferred)2,620,0001.10.34.428,10022,200
Artemis (Inferred)580,0001.41.145.58,10021,100
Total31,185,0002.00.44.7631,800445,000
DepositTonnesCu %Au g/tContained Cu (t)Contained Au (oz)
Jericho (Probable)7,105,0001.80.4125,40081,900
Eloise (Proved + Probable)3,139,0002.10.665,60057,700
Total10,244,0001.90.4191,000139,600

Combined Mineral Resources (inclusive of Ore Reserves)

Classification split: Measured 28kt; Indicated 12.98Mt @ 2.2% Cu (283,400t Cu); Inferred 18.18Mt @ 1.9% Cu (348,000t Cu). Inferred material represents ~55% of contained copper.

Combined Ore Reserves

Reserves are estimated at a conservative A$11,000/t copper price and 1.3% Cu cut-off (1.8% below 0mRL at Eloise). At FY29 target rates (~25–27ktpa), the reserve represents roughly 7–8 years of production before resource conversion — a key monitorable.

Exploration portfolio

ProjectLocationCommodity focusFY26 status [FR26]
Eloise Regional Project~1,700km² contiguous 100%-owned tenure around Eloise, Qld (was ~2,000km² in FY25; reduction reflects rationalisation)Cu-Au (Levuka Shear Zone, Middle Creek Anticline)Drilling at Eloise South, Iris and Big Foot; 2026 program of 7,600m diamond + 1,500m RC across 12 targets; A$203,500 Queensland Government grant for Oro Grande (InvestSMART summary, 1 Apr 2026)
Cannington Project~100km south of Eloise, QldCu (Black Rock, Brumby)Brumby data reprocessed; small drill program started end-June 2026
Windsor Project35km south of Charters Towers, QldBase metalsGround EM over Orewin and Ken's Bore; soil geochem and gravity follow-up; drill-ready targets
North Cloncurry Project~100km north of Cloncurry, QldIOCGAdded in FY24 (two tenements, 460km²) [FR24]
Delamerian ProjectWestern NSW (four licences)Ni-Cu (Koonenberry), VMS Cu-ZnFourth licence staked in FY26
Peake and DenisonNE Gawler Craton, SAIOCGBHP withdrew from earn-in (FY24); partner sought; no material work FY26
MarymiaWACu-AuRationalised to core tenure after Wardens Court forfeiture applications by Pingem Metals [FR25]
Lamil (50% JV with Rumble)Paterson Province, WAAu-CuSale to Aventine Resources agreed (A$1.1m total consideration split cash/shares plus a 1% NSR shared with Rumble); completion conditional [FR26; InvestSMART 15 May 2026]
PyramidDrummond Basin, QldAuDivested to Cooper Metals via asset swap; completed 20 Jul 2026 (CPM shares + contingent consideration; AIC received two tenements adjoining Eloise Regional) [FR26]
Lake PurdillaSAGypsumDivested in FY24 [FR24]

Financial Narrative

Basis. FY22 is a six-month transitional period (Jan–Jun 2022) and is not comparable with the twelve-month years. FY23–FY26 are audited twelve-month years (PwC for FY23–FY24; KPMG for FY25–FY26). EBITDA is a company-reported non-IFRS measure. FY21 (calendar 2021, which included only two months of Eloise ownership) is shown in the remuneration reports as revenue A$24.8m, EBITDA A$7.5m and NPAT A$1.8m (restated) [FR25], but is excluded from the tables for consistency.

Income statement — A$m

Sources: FR24 (FY23–FY24 P&L); FR25 (FY25 P&L, FY22 performance summary); FR26 (FY26 P&L; FY25 cost of sales presented inclusive of D&A at A$148.0m in FY26 comparatives — the FY25 report shows A$105.1m excluding D&A; both reconcile). FY23 EBIT is after A$1.5m transaction and integration costs related to Demetallica.

Margins and growth — %

Revenue CAGR FY23–FY26 (three twelve-month years): ≈25.0% p.a. (analyst-derived: (245.2/125.6)^(1/3) − 1).

Operating drivers

Sources: FR24, FR25, FR26 operating tables; performance summaries in remuneration reports. Diesel note: FR25 reports average diesel of A$1.74/L (FY24) and A$1.58/L (FY25), while FR26 reports A$1.05/L (FY25) and A$1.25/L (FY26) "net of diesel tax rebate". The bases differ (gross vs net of rebate); the FY26 figure is shown on the net basis per FR26.

Balance sheet — A$m (as at 30 June)

Sources: FR24, FR25, FR26 statements of financial position. FY22 cash is the FY23 opening balance; FY22 equity is the 1 July 2022 opening balance [FR24 statement of changes in equity]. The Trafigura prepayment (US$30m drawn at 30 June 2026, drawdowns hedged at 0.664) is the principal component of FY26 interest-bearing liabilities; equipment finance drawn was A$13.0m of a A$20m facility (increased to A$35m after year end) [FR26].

Cash flow — A$m

Sources: FR24, FR25, FR26 cash flow statements. FY26 debt drawn net = A$45.2m Trafigura less A$0.6m costs plus A$8.1m equipment finance less A$8.9m repayments. FY23 investing included A$5.7m cash acquired with Demetallica.

Ratios (analyst-derived from audited data)

The cash conversion cycle is structurally negative because trade payables include capital creditors from the expansion program; it should not be read as a working-capital competitive advantage.

Commentary on trends, inflections and drivers

Revenue. The FY23→FY24 step-up (+43.7%) was volumetric: payable copper rose from 10,164t to 12,912t as fleet refurbishment, improved plant availability and multiple ore sources lifted throughput from 574kt to 688kt [FR24]. FY25 growth (+5.0%) was price-led and partially offset by lower volumes (12,295t sold vs 13,056t) as ore processed fell to 634kt. FY26 growth (+29.3%) was almost entirely price: realised copper rose 22% to A$17,269/t and gold 36% to A$6,121/oz, while copper sales slipped to 12,112t [FR26]. AIC therefore has not yet delivered volume growth since FY24; FY27 guidance (17,500–18,500t) is the first volume inflection.

Costs and margins. Unit costs have been remarkably stable — AISC A$4.98–5.15/lb for three years — despite inflation, which is the strongest evidence of operating control. FY26 cost of sales rose 10% to A$163.1m (incl. D&A), driven by mine operating costs (+A$5.5m to A$66.2m, diesel), employee costs (+A$5.7m to A$40.1m, incentives and leave provisions) and royalties/transport (+A$1.8m to A$11.9m) [FR26]. The June 2026 quarter showed the cost sensitivity: AISC spiked to A$6.15/lb and AIC to A$6.49/lb as diesel averaged ~A$1.70/L during a Middle East supply shock [QR-J26; FR26].

Earnings quality. FY26 NPAT of A$41.5m is high quality: no material one-offs (exploration write-down only A$0.1m), an effective tax rate of 31.5%, and EBITDA reconciling cleanly to cash. FY25 NPAT benefited from A$4.3m Kitumba consideration, offset by a A$3.0m exploration write-down. Importantly, AIC is not yet a cash taxpayer (no income tax paid FY24–FY26) [FR24–FR26]; the deferred tax liability rose to A$22.2m, and cash tax will begin once carried-forward losses and accelerated deductions are absorbed — an under-appreciated drag on future free cash flow.

Balance sheet inflection. FY26 marks the transition from net cash (A$48.1m at June 2025, excluding leases) to modest net debt (A$14.9m excluding leases; A$37.9m including leases). Leverage remains low at 0.35x EBITDA, but the Trafigura prepayment is repaid in kind from Jericho concentrate over ~36 months after an 18-month grace period [roic.ai summary of TRAF25], so cash-flow headroom depends on Jericho ramping on schedule.

Free cash flow. Despite record OCF, FCF was −A$73.1m in FY26 as total capex reached A$180.1m (Eloise plant expansion, powerhouse and non-process infrastructure A$92.7m; Eloise development A$43.5m; Jericho A$43.9m). Management's FY27 plan guides to strong first-half cash generation from reduced Eloise development, followed by a capex-heavy second half [OUT26].

Dilution. Shares on issue grew substantially to fund growth — Simply Wall St estimated 38.6% growth in shares outstanding over the twelve months to early 2026 — with A$57.2m raised in May 2024 and A$65m (placement + SPP) in June–August 2025. No further equity is required for Stage 2 per management [OUT26].

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Results by Segment and Segment Margins & Growth (%)

MetricFY23FY24FY25FY26

Mining segment revenue (AUD Mn)

125.6180.5189.6245.2

Mining segment EBITDA (AUD Mn)

37.168.188.4128.2

Mining segment EBITDA margin (%)

29.637.746.652.3

Exploration, development & corporate EBITDA (AUD Mn)

-12.7-16.3-25.2-20.1

Group EBITDA (AUD Mn)

24.451.863.2108.1

Mining share of Group revenue (%)

100100100100

Mining segment revenue YoY growth (%)

—43.75.029.3

Segment Assets & Liabilities

MetricFY25FY26

Mining segment assets (AUD Mn)

188.9301.3

Exploration, development & corporate assets (AUD Mn)

188.0199.5

Mining segment liabilities (AUD Mn)

75.6108.6

Exploration, development & corporate liabilities (AUD Mn)

22.047.4

Income Statement and Per-Share Data

MetricFY22FY23FY24FY25FY26

Revenue (AUD Mn)

79.3125.6180.5189.6245.2

Cost of sales excl. D&A (AUD Mn)

—88.5112.3105.1118.1

Gross profit before D&A (AUD Mn)

—37.168.384.4127.2

Depreciation & amortisation (AUD Mn)

—29.639.943.145.3

EBITDA (AUD Mn, company-reported)

29.224.451.863.2108.1

EBIT / operating income (AUD Mn, PBT plus net interest)

—-6.611.920.162.8

Net interest expense (AUD Mn)

—0.50.71.72.2

Pre-tax income (AUD Mn)

—-7.211.218.460.6

Income tax (expense)/benefit (AUD Mn)

—1.3-3.5-3.4-19.1

Net income (AUD Mn)

21.2-5.87.715.041.5

Basic EPS (A cents)

—-1.521.632.605.27

Diluted EPS (A cents)

—-1.461.542.465.02

Dividends per share (A cents)

00000

Margin Analysis (%)

MetricFY22FY23FY24FY25FY26

Gross margin before D&A (%)

—29.537.844.551.9

EBITDA margin (%)

36.819.428.733.444.1

EBIT margin (%)

—-5.36.610.625.6

Net margin (%)

26.7-4.64.37.916.9

Revenue growth YoY (%)

——43.75.029.3

Effective tax rate (%)

—18.731.218.631.5

Operating Metrics (t) and Margin Analysis (%)

MetricFY22FY23FY24FY25FY26

Copper in concentrate (t)

5,87410,55913,41212,86313,064

Payable copper production (t)

—10,16412,91212,38312,257

Ore processed (t)

—574,408687,691633,735662,843

Copper grade processed (%)

—1.962.072.142.03

Copper recovery (%)

—93.6894.2794.7794.6

Copper sales (t)

——13,05612,29512,112

Realised copper price (A$/t)

——13,32914,12817,269

Realised gold price (A$/oz)

——3,2334,5066,121

AISC (A$/lb Cu sold)

—5.585.154.984.99

All-in Cost (A$/lb Cu sold)

5.116.435.395.375.32

Eloise net mine cash flow (AUD Mn)

—-19.923.127.463.3

Average diesel cost net of rebate (A$/L)

——1.741.581.25

Balance Sheet

MetricFY22FY23FY24FY25FY26

Total assets (AUD Mn)

—194.7266.8376.9500.9

Cash and cash equivalents (AUD Mn)

28.130.974.360.941.7

Financial assets at FVTPL incl. receivables in transit (AUD Mn)

—6.913.328.821.5

Interest-bearing liabilities — current (AUD Mn)

—0.82.96.411.6

Interest-bearing liabilities — non-current (AUD Mn)

—1.63.96.445.0

Lease liabilities — total (AUD Mn)

—0.40.232.523.0

Total debt incl. leases (AUD Mn)

—2.87.045.379.6

Net debt excl. leases (AUD Mn; negative = net cash)

—-28.5-67.5-48.114.9

Net debt incl. leases (AUD Mn; negative = net cash)

—-28.1-67.3-15.637.9

Total equity (AUD Mn)

90.2154.3219.1279.3344.9

Goodwill & intangibles (AUD Mn)

—0000

Current assets (AUD Mn)

—49.699.1107.191.6

Current liabilities (AUD Mn)

—18.223.442.458.3

Working capital (AUD Mn)

—31.475.764.733.4

PP&E + mine properties + mines under construction (AUD Mn)

—98.1112.6234.0382.7

Deferred tax liabilities (AUD Mn)

—00.43.222.2

Rehabilitation and other provisions (AUD Mn)

—22.823.927.726.8

Cash Flow

MetricFY22FY23FY24FY25FY26

Operating cash flow (AUD Mn)

26.522.951.950.9107.0

Capex: PP&E (AUD Mn)

—19.814.933.292.7

Capex: mine properties (AUD Mn)

—38.541.435.443.5

Capex: mines under construction — Jericho (AUD Mn)

—0044.143.9

Capex: exploration properties (AUD Mn)

—1.39.300.02

Total capex (AUD Mn)

—59.765.6112.7180.1

Free cash flow (OCF − total capex, AUD Mn)

—-36.8-13.6-61.8-73.1

Lease principal repayments (AUD Mn)

—0.10.39.411.0

Net equity raised (AUD Mn)

—28.653.741.421.1

Debt drawn net (AUD Mn)

—2.44.45.344.4

Dividends paid (AUD Mn)

00000

Share buybacks (AUD Mn)

00000

Returns & Leverage Ratios (%) and Financial Ratios (x)

RatioFY23FY24FY25FY26

ROE (% NPAT / average equity)

-4.84.16.013.3

ROA (% NPAT / average total assets; FY23 on closing assets)

-3.03.34.69.5

ROIC (% EBIT×(1−30%) / (equity + debt incl. leases − cash))

-3.75.55.311.5

Current ratio (x)

2.734.232.531.57

Debt / equity incl. leases (x)

0.020.030.160.23

Net debt incl. leases / EBITDA (x)

-1.15-1.30-0.250.35

Interest coverage (EBIT / interest expense, x)

-6.15.95.115.5

Asset turnover (revenue / average assets, x; FY23 on closing)

0.650.780.590.56

Cash conversion cycle (days; receivables + inventory − payables, on cash COGS)

-13-18-20-12

Revenue by Region and Region Margins & Growth (%)

Region (as reported)FY23FY24FY25FY26

Australia — revenue from operations (AUD Mn)

125.6180.5189.6245.2

Australia — YoY growth (%)

—43.75.029.3

Revenue by Region

MetricFY24

Gross copper revenue before TC/RC and transport (AUD Mn)

174.8

Gross gold revenue (AUD Mn)

21.5

Gross silver revenue (AUD Mn)

5.1

Share Price and Margin Analysis (%)

MetricFY22FY23FY24FY25FY26

Closing share price at 30 June (AUD)

0.550.410.420.300.72

Annual change in share price (%)

—-252-29140

Valuation Multiples

MultipleAIC MinesBasis

Enterprise value (AUD Mn)

~673.5

Market cap + interest-bearing debt A$55.6m (company presentation) − cash A$41.7m; excludes leases (~A$696m incl. leases)

P/E (trailing FY26)

~15.9x

659.6 / 41.5

EV/EBITDA (trailing FY26)

~6.2x

673.5 / 108.1

EV/Sales (trailing FY26)

~2.7x

673.5 / 245.2

P/B

~1.9x

659.6 / 344.9

P/NTA

~1.8x

A$0.83 / A$0.4656 NTA per share [FR26]

Analyst Ratings & Targets

BrokerRatingPrice target (AUD)Date / source

Bell Potter

Buy

0.95 (raised from 0.90)

July 2026 (Motley Fool, 21 Jul 2026)

Barrenjoey

Positive (implied)

1.20

July 2026 (Motley Fool)

Unnamed broker (TipRanks)

Buy

0.70

August 2025 (historical)

Coverage breadth

8 analysts

—

Simply Wall St

Formal consensus

Not publicly verified

—

Simply Wall St (Aug 2025) cited forecast revenue growth of ~18% p.a. over three years

Debt Facilities

FacilitySizeDrawnTermsMaturity profile

Trafigura prepayment (AIC Copper Pty Ltd)

US$50m (upsized from US$40m Jul 2026)

US$30m at 30 Jun 2026; ~US$40m by Aug 2026 (company presentation)

Reported 3-month USD SOFR + 3%; no hedging requirement; early repayment flexibility; secured over subsidiaries and Eloise/Jericho leases

Repaid via ≥400,000dmt Jericho concentrate over ~36 months after an 18-month grace period; FY26 split A$11.6m current / A$45.0m non-current (all interest-bearing liabilities) [TRAF25; FR26]

Equipment finance

A$20m → A$35m (post year-end)

A$13.0m

Asset-backed

Amortising

Surety bond facility

A$25m

Supports environmental bonding

——

Lease liabilities (incl. mining contract lease component)

—

A$23.0m

AASB 16

A$9.2m current; A$13.8m non-current

Analyst Conclusions

Management guidance (summary)

FY27: 17,500–18,500t Cu and 7,250–7,750oz Au at AISC A$4.80–5.20/lb and AIC A$5.20–5.60/lb, weighted to H2 after Stage 1 commissioning; H1 AISC A$4.10–4.40/lb on reduced Eloise development. FY28 target: 20,000–22,000t Cu. FY29 target: 25,000–27,000t Cu with Stage 2 at 1.5Mtpa from the December 2028 quarter. FY27 capex guidance includes A$50m Jericho access and development, A$12.5m remaining plant expansion, A$14m tailings and water storage, A$25m sustaining plant and equipment, and A$7m exploration; no additional funding is required [OUT26]. September 2026 quarter guidance: 3,150–3,350t Cu and ~1,500oz Au (Quartr Q4 FY26 summary).

Consensus growth expectations

A formal consensus is not publicly verifiable. Broker commentary (Barrenjoey, July 2026) set FY27 production at the low end of guidance (17.5kt), allowing for execution risk (Motley Fool, 21 Jul 2026).

Bull case

  1. Volume doubling at falling unit costs. Guidance implies copper output roughly doubling from 13.1kt (FY26) to 25–27kt (FY29), with Jericho's LOM opex ~11% below Eloise per tonne and fixed costs spread over 1.5Mtpa. At FY26 realised prices, this could plausibly lift EBITDA well above the FY26 A$108.1m without heroic price assumptions.

  2. Low-capital Stage 2 and conservative reserves. Stage 2 costs ~A$15m; reserves are priced at A$11,000/t Cu versus FY26 realised A$17,269/t, leaving room for reserve growth at higher price decks and continued resource conversion at an open-ended Jericho [OUT26].

  3. Valuation support. At ~6.2x trailing EV/EBITDA on FY26 earnings that do not yet include Jericho volumes, the stock is priced below broker targets of A$0.95–A$1.20, with a three-year record of delivering guidance.

Bear case

  1. Commissioning plus leadership change in the same quarter. The new plant commissions in the December 2026 quarter, Jericho declares commercial production on 1 January 2027, and a new CEO starts on 31 October 2026 — a concentration of execution risk.

  2. Cost and FCF fragility. The June 2026 quarter showed AISC can jump ~23% above the annual average on a diesel shock; FCF was −A$73.1m in FY26, cash fell to A$41.7m, and cash tax is coming. A weaker copper price would force a slowdown of the accelerated program.

  3. Concentration and governance. One customer, one hub, ~55% Inferred resource copper, and a post-transition board likely without an independent majority.

Key catalysts and monitorables (next 12 months)

TimingCatalyst / monitorable
15–16 Oct 2026September 2026 quarterly (vs 3,150–3,350t Cu guidance; JS3 ventilation shaft commissioning); FY26 Annual Report (top-20 holders)
By 31 Oct 2026Clint Donkin commences as CEO; ML90155 renewal decision
Nov 2026AGM — chair transition, CEO LTI grant
Dec 2026 quarterStage 1 plant commissioning to 1.1Mtpa; tailings Stage 2 approval decision
1 Jan 2027Jericho commercial production declaration (costs move from capital to operating)
Jan 2027December quarterly — first ramp-up data; Trafigura drawdown status
Feb 2027H1 FY27 results — expected strong cash generation
Mar 2027Annual MROR update (Jericho extensions, Eloise Deeps)
OngoingCopper and diesel prices; AUD:USD; any M&A under the new leadership's "inorganic growth" mandate

Analyst verdict

AIC Mines has executed the hardest part of a junior-to-producer transition with unusual discipline. In under five years it converted a A$27m acquisition into a business generating A$108m of EBITDA and A$107m of operating cash flow, met guidance three years running, grew resource copper roughly fourfold, and secured a fully permitted, largely funded path to ~25kt of annual copper output. The FY26 accounts show genuine earnings quality: no material one-offs, conservative reserve pricing at A$11,000/t, and stable unit costs through an inflationary cycle. The July 2026 decision to accelerate Stage 2 by two years, for only ~A$15m of incremental plant capital, demonstrates thoughtful engineering decisions made in 2025.

The next twelve months, however, are the most execution-dense in the company's history. A new crushing and grinding circuit must be commissioned on harder Jericho ore, Jericho must transition to commercial production, and a new CEO from a major-company background must take control. The June 2026 quarter, when a diesel shock pushed AIC above A$6.40/lb, is a reminder that this remains a small, diesel-powered, single-hub operation whose equity is highly levered to copper. Free cash flow is still negative, cash tax is coming, and debt is now repaid in concentrate rather than at the company's discretion.

At roughly 6x trailing EV/EBITDA, the market does not appear to price in the FY28–FY29 volume uplift. The thesis would be invalidated by a commissioning delay beyond the March 2027 quarter, a sustained A$ copper price below ~A$14,000/t, or evidence that Jericho grade or recovery underperforms the 1.8% Cu reserve and 93% recovery assumptions. Monitor the December 2026 and March 2027 quarterlies closely; they will decide whether AIC becomes a re-rated mid-tier producer or a stretched small cap.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Executive Leadership Team

NameTitleTenurePrior rolesEducation

Aaron Colleran

Managing Director & CEO (to Donkin's start; then Non-Executive Chairman)

Joined 2019 (service agreement 17 Apr 2019)

Founding executive team, Evolution Mining (business development and investor relations to 2018); mining analyst and investment banker; started as exploration geologist; NED of Demetallica (Nov 2022 to delisting) [FR26]

—

Clint Donkin

Incoming Managing Director & CEO

Effective 31 Oct 2026 or earlier by agreement

Glencore: Head of Copper – Africa Region; Chief Technology Officer; most recently Head of Joint Ventures – Copper South America; previously Ausenco [MD26]

—

Tim Benfield

Chief Operating Officer

Since 29 Jan 2024

COO Fetch Metals; COO Kingsgate Consolidated (Australia and Thailand) [FR26]

Diploma Mining Engineering; MBA; FAusIMM

John Callagher

Chief Financial Officer

Since 12 May 2025

CFO Aurora Healthcare; GM Finance Whitehaven Coal (8 years); Group Financial Controller Aveo; Director, KPMG M&A (Sydney/London) [FR26]

B.Com (UNSW); Chartered Accountant

Audrey Ferguson

Company Secretary

Since Jan 2023

General Counsel & Company Secretary, Bindaree Food Group; senior legal roles at Rio Tinto (London, Sydney) [FR26]

Solicitor; GAICD

Michael Frame (former)

Chief Financial Officer

Nov 2021 – 1 Jul 2025

Group Finance Manager, Evolution Mining [FR25]

B.Com, B.Econ, Grad Dip Materials Science

“—” = not publicly disclosed.

Board of Directors

NameRoleAppointedIndependence (dossier assessment)Committee roles (FY26)Background

Josef El-Raghy

Non-Executive Chairman (retiring on Donkin's commencement)

Chair since 2017 (AIC Resources); AIC Mines board from Apr 2019

Holds 41.0m shares (~5.1%); substantial-holder-level stake

Member: Audit; Risk & Sustainability; Remuneration & Nomination

Former MD then Chairman of Centamin plc (Sukari, Egypt) 2002–2020; ex-director CIBC Wood Gundy and Paterson Ord Minnett; Non-Executive Chairman of WIA Gold (ASX: WIA) [FR26]

Aaron Colleran

MD & CEO; Chairman-elect

Board since Apr 2019

Executive; will not be independent as Chair

Member: Risk & Sustainability

See above

Jon Young

Non-Executive Director

Letter of appointment 22 Oct 2021

Not independent — Chairman of FMR Investments (largest shareholder)

Chair: Risk & Sustainability

Director of Wealth Management, Canaccord Genuity (since 2001, formerly Patersons); B.Com (UWA); CA ANZ [FR26]

Linda Hale

Non-Executive Director

Board since late Jan 2023

—

Chair: Audit

30+ years financial services; ex-Executive Director Finance & Admin and Company Secretary, CIBC Eyres Reed; B.Bus; CPA; GAICD [FR26]

Mark Le Messurier

Independent Non-Executive Director

1 Sep 2026

Independent (per company)

Not yet disclosed

Co-founder and MD of Federation Mining (Snowy River, NZ); former COO Evolution Mining; senior roles at Eldorado Gold, Sino Gold, Barrick; B.Eng (Hons), MBA, GAICD [NED26]

Brett Montgomery (retired)

Non-Executive Director

Apr 2019 – 31 Aug 2026

Described as independent

Chair: Remuneration & Nomination

Founding MD of AIC Resources; NED Tanami Gold, Asara Resources; retired on relocation to Hong Kong [NED26; FR26]

Directors' Remuneration

NameSalary & feesCash STISuperannuationLeave accruedShare-based payments (amortised)Statutory totalPerformance-related %

Aaron Colleran (MD & CEO)

670,000566,90030,000

17,616 (net)

1,872,8953,157,41177

Tim Benfield (COO)

300,068166,30030,000-12,701215,699699,36655

John Callagher (CFO)

300,068166,30030,00017,306127,044640,71846

Josef El-Raghy (Chair)

81,448—9,774——91,2220

Brett Montgomery

63,348—7,602——70,9500

Jon Young

63,348—7,602——70,9500

Linda Hale

67,873—8,145——76,0180

Board & Management Changes

DateChangeContext

29 Jan 2024

Tim Benfield appointed COO; Matt Fallon ceases to be KMP

Operational strengthening ahead of Jericho [FR24]

12 May 2025

John Callagher appointed CFO

Replaces Michael Frame (departed 1 Jul 2025; treated as good leaver) [FR25]

22 Jul 2026

Clint Donkin appointed MD & CEO (effective 31 Oct 2026); Colleran to Chair; El-Raghy to retire after nine years as Chair

Six-month succession process; shift toward operational leadership for ramp-up and "inorganic growth" [MD26]

31 Aug / 1 Sep 2026

Montgomery retires; Le Messurier appointed

Maintain independence and add development/operating experience [NED26]

Major Shareholders

HolderShares% of issued capitalSource / date

FMR Investments Pty Ltd

111,206,27713.94

Substantial holder register (InvestSMART; Simply Wall St); Kalkine (Jul 2026) cites 14.0%

Josef El-Raghy (and related entities)

41,000,000

~5.1 (analyst-derived on 797.6m shares)

FR26 Directors' interests

Mount Gibson Iron Limited

—

~4.88

Simply Wall St top-holder list (2026)

Aaron Colleran

14,100,000 (+13,886,288 performance rights)

~1.8

FR26

Hawke's Point (Hawke's Point Holdings L.P.)

Subscribed A$5.0m at A$0.30 (~16.7m shares)

~2.1 (analyst-derived)

PLC25

Jon Young

1,219,055

~0.2

FR26

Linda Hale

544,021

~0.1

FR26

Undisclosed new substantial holder

—

≥5%

—

Competitive Landscape

Key Competitors

CompanyKey copper assets (indicative)Relative positioning vs AICSource basis

Sandfire Resources (ASX: SFR)

MATSA (Spain), Motheo (Botswana)

Multi-asset, materially larger copper producer; in AIC's RTSR peer group

FR26 peer group; general knowledge

29Metals (ASX: 29M)

Golden Grove (WA); Capricorn Copper (NW Qld)

Larger base-metals producer; Capricorn is a district peer near Mount Isa

FR26 peer group

Aeris Resources (ASX: AIS)

Tritton (NSW) and other Australian assets

Comparable-scale Australian copper/gold producer

FR26 peer group

Hillgrove Resources (ASX: HGO)

Kanmantoo underground (SA)

Smaller underground copper producer

FR26 peer group

Develop Global (ASX: DVP)

Woodlawn (NSW) zinc-copper; mining services

Base-metals producer with contracting arm

FR26 peer group

Aurelia Metals (ASX: AMI)

Peak and Federation (NSW)

Polymetallic underground producer

FR26 peer group

True North Copper (ASX: TNC)

Cloncurry-district copper projects

Direct district peer competing for labour and ground

FR26 peer group

Carnaby Resources (ASX: CNB)

Greater Duchess (Mount Isa–Cloncurry district)

District developer; potential consolidation counterparty

FR26 peer group

Polymetals Resources (ASX: POL)

Endeavor (NSW) restart

Small base-metals restart

FR26 peer group

Evolution Mining (ASX: EVN) — Ernest Henry

Large underground Cu-Au mine near Cloncurry

Much larger regional neighbour; competes for skilled labour

Regional context

Glencore — Mount Isa operations / South32 — Cannington

Regional majors

Compete for labour, contractors, logistics capacity

Regional context

Peer Comparison FY2026

MetricAIC Mines (FY26, verified)Sandfire29Metals

Revenue

A$245.2m

——

Revenue growth

+29.3%——

EBITDA margin

44.1%——

R&D intensity

0% (exploration 3.2% of revenue)

Not reported as R&D

Not reported as R&D

Copper output

13.1kt (FY26); 17.5–18.5kt (FY27G)

Larger

Larger

AISC

A$4.99/lb

——

Company Snapshot

$158.2M

Revenue

1993

Founded

Subiaco, Australia

Headquarters

SWOT Analysis

Strengths

  • Consistent delivery: Eloise met production and cost guidance for three consecutive years (FY24–FY26) and 11 consecutive quarters to March 2026 [FR26; QR-M26].
  • High-grade, growing resource base: 31.2Mt @ 2.0% Cu (631.8kt Cu), up 10% in tonnes and 12% in contained copper in the 31 March 2026 update [OUT26].
  • Capital-efficient expansion: Stage 2 to 1.5Mtpa costs ~A$15m because ~A$15m of Stage 1's A$77.6m fixed-price EPC pre-built capacity [OUT26].
  • Financial momentum: FY26 EBITDA A$108.1m (+71%), OCF A$107.0m (+110%), NPAT A$41.5m (+177%) [FR26].
  • Fully permitted: Jericho ML, EA, PRCP, UWIR and ERC approved; plant expansion approved for up to 100,000tpa concentrate [OUT26].
  • Supportive capital partners: Trafigura (offtake since 2021, US$50m prepayment), FMR (13.9%), Hawke's Point HOA [TRAF25; PLC25].
  • Improving safety: TRIFR fell from 12.0 to 5.7 per million hours in FY26 [FR26].

Weaknesses

  • Customer concentration: 100% of mining revenue from one customer [FR26 Note 2.1].
  • Single hub dependency: all production flows through one plant; any extended outage halts revenue.
  • Negative free cash flow: FCF −A$73.1m in FY26 and −A$61.8m in FY25 (analyst-derived) despite record OCF.
  • Flat volumes to date: copper sales declined from 13,056t (FY24) to 12,112t (FY26) [FR25; FR26].
  • Cost sensitivity to diesel: direct diesel ~10% of production costs; June 2026 quarter AIC A$6.49/lb vs FY guidance A$5.10–5.50 [FR26; QR-J26].
  • Resource quality mix: ~55% of contained resource copper is Inferred; FY29 target relies 7% on Inferred material [OUT26].
  • Governance concentration: post-transition board likely lacks an independent majority (former CEO as chair, FMR nominee) [MD26; NED26].

Opportunities

  • Volume step-change: FY27 17.5–18.5kt, FY28 20–22kt, FY29 25–27kt Cu [OUT26] — ~2x FY26 by FY29.
  • Unit cost reduction: scale plus Jericho's A$139.8/t LOM opex vs Eloise A$156.6/t [OUT26].
  • Jericho open-ended: 5km strike, ~700m depth extent, open north and south; Jolly intercepts up to 7.1% Cu [InvestSMART 17 Jun 2026].
  • District consolidation: board mandate for inorganic growth; tenure adjoining Eloise acquired via Pyramid swap [MD26; FR26].
  • Regional exploration: ~1,700km² Eloise Regional tenure; 12 targets drilled in 2026 [FR26].
  • Operational upside from new CEO: Glencore copper operations and technology background [MD26].
  • Deleveraging path: Trafigura prepayment repaid in concentrate from Jericho after an 18-month grace period.

Threats

  • Copper price downturn: reserves priced at A$11,000/t, but FY26 economics reflect ~A$17,000/t; accelerated development may be cut if prices fall [OUT26].
  • Commissioning risk: a new crushing/grinding circuit and harder Jericho ore (~26% harder) during the December 2026 quarter [OUT26].
  • Geopolitical diesel shocks: Middle East conflict caused supply disruptions across Australia in late FY26 [FR26].
  • Permitting timing: Stage 2 tailings amendment (decision expected December 2026 quarter) and ML90155 renewal (term ends 31 October 2026) [OUT26].
  • Labour market tightness in North-West Queensland.
  • Leverage and covenants: a covenant breach could accelerate the Trafigura facility [FR26 s.4.7].
  • Leadership transition risk at the most execution-sensitive point in the project schedule.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
16 Apr 2025"Significant Increase in Ore Reserves"; production outlook >20ktpa Cu and 7.5kozpa AuUnderpinned expansion decision [FR25]
17 Apr 2025Regulator approves plant expansion, concentrate up to 100,000tpa and beyond 1.1MtpaRemoves key permitting risk [OUT26]
12 May 2025John Callagher appointed CFOFinance leadership for funding phase [FR25]
21 May 2025KPMG appointed auditor (PwC resigned)Selected on industry expertise and fees [FR25]
20 Jun 2025US$40m Trafigura prepayment/Jericho offtake; A$77.6m EPC to GR EngineeringFully funds expansion with non-dilutive debt [TRAF25]
24 Jun 2025A$55m placement at A$0.30 (9.1% discount); Hawke's Point HOA; A$10m SPPEquity component of funding package [PLC25]
30 Jun 2025Jericho Site-Specific EA and PRCP approvedAll Jericho approvals in place [OUT26]
Jul 2025APAC Resources becomes substantial holderRegister change (TipRanks)
28 Jul 2025Underground Water Impact Report approved for JerichoWater rights secured [OUT26]
1 Aug 2025SPP completes, raising full A$10.0m[FR25]
20 Aug 2025EGM approves Tranche 2 (~40.5m shares); FY25 results (NPAT A$15.0m, +94%)[FR25]
12 Sep 2025Jericho Estimated Rehabilitation Cost approved; A$1.1m surety paid[OUT26]
Oct 2025Plant expansion construction start (planned)[FR25]
19 Nov 2025AGM; KPMG ratified; FY26 LTIs approved; EPP reapproved[FR26]
22 Dec 2025Approval for 10m TD5 cell lift; ML100304 added to EA/PRCPTailings capacity [OUT26]
23 Dec 2025Stage 2 tailings EA/PRCP amendment lodgedDecision expected Dec 2026 quarter [OUT26]
29 Jan 2026December 2025 quarterly; H1 FY26 production 6,526t Cu, 3,223oz AuOn track (Quartr summary)
Feb 2026Jericho Access Drive reaches J1/Jolly four months ahead of scheduleDe-risks schedule [company website; FR26]
Feb 2026H1 FY26 results (Quartr summary 18 Feb 2026)Record production and earnings
Mar–Jun 2026Three US$10m Trafigura drawdowns (Mar, May, Jun) hedged at 0.664Leverage introduced [FR26]
31 Mar 2026Record MROR: resources 31.2Mt @ 2.0% Cu (631.8kt Cu), reserves 10.2Mt @ 1.9% Cu (191kt Cu)Largest resource base in Eloise's history [OUT26]
1 Apr 20262026 exploration program (9,100m across 12 targets); Qld grant A$203,500[InvestSMART]
16 Apr 2026March quarter: 3,432t Cu, 1,692oz Au; AISC A$4.18/lb; net mine cash flow A$27.7m; cash A$31.1m; 11th consecutive quarter of guidance metRecord quarter; share price +26% on day (InvestSMART)
15 May 2026Lamil sale to Aventine agreedNon-core divestment [InvestSMART]
2 Jun 2026Eloise Almanac releasedInvestor reference document (InvestSMART announcement list)
16 Jun 2026New ball mill installed; a new substantial holder notice lodgedCritical path milestone [InvestSMART]
17 Jun 2026High-grade Jolly drilling (e.g., JEDD109 at 7.1% Cu / 8.0% CuEq)Supports first stopes [InvestSMART]
16 Jul 2026June quarter: 3,106t Cu; AISC A$6.15/lb, AIC A$6.49/lb (diesel); cash A$41.7m; FY26 guidance metShares fell ~18% intraday on cost miss (InvestSMART; Motley Fool)
20 Jul 2026Three-year outlook; Stage 2 brought forward ~2 years; Trafigura facility +US$10m; Pyramid divestment completedRe-rating catalyst; Bell Potter PT to A$0.95, Barrenjoey PT A$1.20 (Motley Fool)
22 Jul 2026Clint Donkin appointed MD & CEO; Colleran to Chair; El-Raghy to retireLeadership transition [MD26]
23 Jul 2026Noosa Mining Conference presentationStage 2 cost ~A$15m reiterated (Quartr)
25–26 Aug 2026FY26 results: revenue A$245.2m (+29%), EBITDA A$108.1m (+71%), NPAT A$41.5m (+177%); no dividendRecord earnings [FR26]
31 Aug 2026Montgomery retires; Le Messurier (ex-Evolution COO) appointedBoard refresh [NED26]
9 Sep 2026Corporate presentation: market cap A$659.6m; US$40m of US$50m facility drawn as of August 2026(Quartr summary)
15–16 Oct 2026 (scheduled)September quarterly report and FY26 Annual ReportUpcoming (InvestSMART reporting calendar)

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

5 charts
Income Statement: Revenue & Gross Profit: Revenue rose from AUD 79.3 Mn in FY2022 to AUD 245.2 Mn in FY2026.
AIC Mines Limited — Income Statement: Revenue & Gross Profit
Series (AUD Mn)FY2022FY2023FY2024FY2025FY2026
Revenue79.3125.6180.5189.6245.2
Cost of sales excl. D&A—88.5112.3105.1118.1
Gross profit before D&A—37.168.384.4127.2

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Sources

Sources

  1. FR26AIC Mines Appendix 4E and Financial Report 2026 (incl. Remuneration Report and Sustainability Report) — 26 Aug 2026 (bulletin.webull.com)
  2. FR25AIC Mines Appendix 4E and Financial Statements FY25 — 21 Aug 2025 (announcements.asx.com.au)
  3. FR24AIC Mines Appendix 4E and Financial Statements FY24 — 22 Aug 2024 (announcements.asx.com.au)
  4. OUT26Eloise Three-Year Production Outlook — 20 Jul 2026 (bulletin.webull.com)
  5. QR-J26Quarterly Activities Report, June 2026 — 16 Jul 2026 (bulletin.webull.com)
  6. QR-M26March 2026 Quarterly (summary) — 16 Apr 2026 — InvestSMART; Quartr
  7. MD26Appointment of Managing Director and Board Transition — 22 Jul 2026 (bulletin.webull.com)
  8. NED26Non-Executive Director Changes — 31 Aug 2026 (bulletin.webull.com)
  9. TRAF25US$40M Prepayment Facility and Offtake Agreement — 20 Jun 2025 (announcements.asx.com.au)
  10. PLC25Successful $55M Placement — 24 Jun 2025 (announcements.asx.com.au)
  11. —H1 FY23 and H1 FY24/FY25 Appendix 4D — Feb 2023, Feb 2024, Feb 2025 — announcements.asx.com.au
  12. —Mining Weekly / Engineering News articles (Eloise acquisition, Demetallica takeover, Trafigura facility, Eloise mine profiles) — 2021–2025 — miningweekly.com; engineeringnews.co.za
  13. —Quartr event summaries (guidance, quarterlies, Noosa, corporate presentation) — 2026 — quartr.com
  14. —Kalkine Media; Motley Fool Australia; InvestSMART; Market Index; Simply Wall St; TipRanks; Google Finance; Argonaut; Mining Technology; Resources Roadhouse; Wikipedia (Eloise) — 2022–2026 — Various
  15. —AIC Mines website (Eloise, Jericho, Mineral Resources pages; Board page) — Accessed Oct 2026 — aicmines.com.au