Alligator Energy Limited Overview
Alligator Energy is a South Australia–focused uranium developer whose investment case rests almost entirely on the Samphire Uranium Project, a shallow, sediment-hosted, palaeochannel deposit near Whyalla engineered for in-situ recovery (ISR). In 2026 the company converted Samphire from a scoping-stage concept into a field-validated project: its pilot-plant Field Recovery Trial met the industry benchmark of roughly 70% uranium recovery within 70 pore volumes, and the global resource rose 67% to 30 Mlbs U3O8 after the addition of the Plumbush deposit. Having sold its legacy Northern Territory exploration portfolio to DevEx Resources for A$7.5M, Alligator is now a simplified, single-jurisdiction story with a greenfield discovery option at Big Lake in the Cooper/Lake Eyre Basin. It carries no debt, funds itself through equity, and is targeting a feasibility study in Q3 2027, financing in 2027–28 and first production in 2030/31 into a record-high long-term uranium price environment.
Company's own description
In its FY2025 and H1 FY2026 directors' reports, the company describes its principal activities as uranium and energy-minerals exploration and development (earlier reports framed this as exploration and "potential development"). Its standard ASX boilerplate characterises Alligator as a uranium and energy-metals project development and exploration group whose projects have clear pathways for approval and development, and emphasises leadership experience including the approval of Western Australia's first uranium mine (Wiluna, Toro Energy), discovery and pre-feasibility work on Husab in Namibia (Extract Resources), and management roles at WMC Olympic Dam, ERA's Ranger mine and Heathgate's Beverley and Four Mile ISR operations (Source: ASX announcement 22 Jun 2026, "About Alligator Energy").
The company's employer-facing description (Playford Trust scholarship page) positions Alligator as an Australian uranium and energy-metals developer with Samphire, about 20 km south of Whyalla, at the centre of its growth, targeting first production in 2030/2031.
Independent characterisation
Alligator is a single-asset, pre-production uranium developer with one exploration option. Its activities are:
-
Resource definition and project de-risking at Samphire (Blackbush and Plumbush deposits plus the corridor between them), using ISR technology. This means pumping a leaching solution (lixiviant) through permeable uranium-bearing sands via wellfields and recovering uranium from solution at a central processing plant, without open-pit or underground mining.
-
Greenfield exploration at Big Lake (Lake Eyre Basin sediments above the Cooper Basin), seeking a new ISR-amenable uranium province.
-
Passive financial exposure to ISR copper through its equity investment in EnviroCopper Limited (ECL), which holds the Kapunda and Alford copper ISR projects in South Australia.
Business model and revenue model
| Dimension | Characterisation |
|---|---|
| Current revenue | None from operations. "Revenue" consists of interest income, R&D tax incentive refunds and minor sundry items (H1 FY2026: interest A$0.475M, R&D incentive A$0.702M, sundry A$0.001M) |
| Future revenue model (target) | Sale of uranium oxide concentrate (U3O8) under long-term utility offtake contracts plus spot sales. 100% product revenue; no service, subscription or licensing mix |
| Value-chain position | Upstream: exploration → resource definition → feasibility → permitting → ISR mining and processing to U3O8. Downstream conversion, enrichment and fuel fabrication are performed by third parties |
| Customer types (future) | Nuclear utilities (North America, Europe, Asia) via direct contracts or through traders/marketers; Alligator has a disclosed strategic relationship with Traxys North America LLC for uranium marketing, offtake contracting, project-finance assistance and acquisition opportunities (Yahoo company profile) |
| End-markets | Civil nuclear power generation, including emerging small modular reactor (SMR) and data-centre-linked demand |
| Funding model | Equity placements, share purchase plans, option exercises, asset sales (NT divestment), R&D tax incentives |
Strategy
Stated strategy (themes, paraphrased from FY2025–FY2026 disclosures)
-
Become an emerging uranium producer through Samphire ISR development: FRT → feasibility study → Mining Lease → financing → production in 2030/31.
-
Grow Samphire into a district-scale platform, with a central processing plant at Blackbush fed by multiple wellfields (Blackbush, Plumbush, corridor). The Aug 2026 presentation is titled "Unveiling the Samphire Growth Strategy".
-
Disciplined portfolio focus: exit non-core NT assets to eliminate holding costs and complexity, and concentrate capital in South Australia (H1 FY2026 directors' report).
-
Exploration upside at Big Lake, targeting a new ISR-amenable uranium province above the Cooper Basin.
-
Leverage ISR expertise to assess other opportunities.
-
Jurisdictional advantage: South Australia is the only Australian state with operating ISR uranium mines (Beverley, Four Mile, Honeymoon) and an established approvals framework.
Initiatives in the last 24 months
| Initiative | Date | Detail / target |
|---|---|---|
| Samphire FRT | Aug 2025 – Jun 2026 | Approved, built under budget, ~70% recovery achieved |
| Feasibility study (BFS/DFS) | Commenced H1 FY2026 | Completion target Q3 2027 (slipped from "mid-2027" in Jul 2026 to Q3 2027 in Aug/Sep 2026) |
| Mining Lease application | 2026 onward | Being progressed; funded from Aug 2026 raise |
| Resource growth drilling | From 8 Jul 2026 | Multi-rig program; ~300 holes by end Nov 2027; MRE upgrade early 2027 |
| Mullaquana Crown Lease option | 19 Jun 2026 | A$0.5M initial option fee; 18-month option to acquire; immediate drilling access |
| NT divestment | Dec 2025 – Jun 2026 | A$7.5M total consideration |
| Big Lake drilling | 2,026 | Exploration target estimate in 2027 |
| Corporate restructure | Sep 2025 | Adelaide consolidation; finance leadership change |
| Capital raising | Aug–Sep 2026 | A$17.1M gross (placement + SPP) |
| ESG framework development | Ongoing | Establishing framework and goals; low-disturbance practices; progressive rehabilitation |
Medium-term targets / guidance
| Target | Timing | Source |
|---|---|---|
| Samphire MRE upgrade (Plumbush Inferred → Indicated) | Early 2027 | Skillings / AGE Aug 2026 |
| Big Lake exploration target | 2,027 | ASX 10 Sep 2026 |
| Feasibility study completion | Q3 2027 | ASX 6 Aug & 10 Sep 2026 |
| Project financing | 2027/28 | SmallCaps (Aug 2026 presentation) |
| First production | 2030/2031 | Aug 2026 presentation |
| Production rate (scoping basis) | 1.2 Mlbs U3O8 pa | Dec 2023 Scoping Study Update |
| Scoping IRR / capex / payback | 42% / A$131M / 2.45 years at US$75/lb | Dec 2023 Scoping Study Update |
No financial (earnings) guidance is provided; none is expected before production.
Products & Services
Alligator sells no products or services today. Its "portfolio" is a set of mineral assets and technical capabilities. Each is catalogued below.
Samphire Uranium Project — Blackbush Deposit (flagship)
Location: ~20 km south of Whyalla, Eyre Peninsula, South Australia.
Geology: Roll-front style uranium in up to three sub-horizontal tabular lenses at ~50–90 m depth, within sand-dominated basal sediments of the Eocene Kanaka Beds in a Tertiary palaeochannel. Principal uranium minerals are uraninite and coffinite (Source: Mining Intelligence & News project summary).
Resource history: 10 Mt @ 666 ppm U3O8 (Sep 2022) → upgraded Mar 2023 → ~18 Mlbs U3O8 with expanded Indicated portion (6 May 2025; a 135% increase since AGE's resource drilling began in 2022, per the May 2025 presentation) → reported as 18.1 Mlbs within the Jun 2026 global estimate (Skillings).
Extraction method: ISR (acid or alkaline lixiviant route as determined in feasibility; the FRT validated the selected process).
Field Recovery Trial (FRT): PEPR approval Aug 2025; pilot plant built Oct–Dec 2025; commissioning complete 17 Feb 2026; extraction from 23 Mar 2026; completed 30 Jun 2026. Results: the pattern representing the initial development orebody achieved the industry benchmark of ~70% uranium recovery over 70 pore volumes; recovered solution grade reached 115 ppm U3O8; flow rates up to 5 L/s, which the company reported as above peer averages (Source: SmallCaps summary of AGE ASX release 28 Jul 2026).
Study economics (Dec 2023 Scoping Study Update, US$75/lb): 1.2 Mlbs U3O8 pa, A$131M capex, 42% IRR, 2.45-year payback (Source: AGE presentations Feb 2025 and May 2025). The study was based on the former 18 Mlbs resource and US$75/lb.
Target timetable: Feasibility study completion Q3 2027 (latest guidance; previously "mid-2027"); project funding 2027/28; first production 2030/31.
Target customer: Nuclear utilities, with marketing support available from Traxys.
Samphire Uranium Project — Plumbush Deposit
Location: ~5 km south of Blackbush, in the same palaeochannel system, on the Mullaquana Crown Lease.
Resource: Maiden 12 Mlbs U3O8 Inferred MRE (effective 19 Jun 2026), assessed as ISR-amenable within the Kanaka Beds and Melton Sands; JORC 2012 (Source: InvestSMART summary of the 19 Jun 2026 ASX release).
Next steps: Infill drilling to convert Inferred to Indicated, targeted for an MRE update in early 2027, a prerequisite for Ore Reserves (Skillings).
Samphire — Blackbush–Plumbush corridor and southern extensions
-
Underexplored ground between the deposits, accessed through the Mullaquana option.
-
Early 2026 drilling extended mineralisation ~600 m south of Blackbush at grades similar to the existing deposit (SmallCaps, Aug 2026).
-
Plan: ~300 drill holes across Blackbush extensions, Plumbush infill and the corridor by end November 2027 (SmallCaps; Aug 2026 presentation).
Samphire Global Resource (consolidated)
| Deposit | Mlbs U3O8 | Classification | Effective date |
|---|---|---|---|
| Blackbush | ~18 (18.1) | Indicated + Inferred | May 2025 |
| Plumbush | ~12 | Inferred | 19 Jun 2026 |
| Total Samphire | ~30 | Indicated + Inferred | 19 Jun 2026 |
Note: Secondary summaries differ in wording. One describes the 30 Mlbs as "indicated and inferred" in total (Kalkine), while another states that the new estimate is entirely Inferred (InvestSMART). Read together, the correct interpretation is that the Plumbush component is entirely Inferred, and Blackbush contains the Indicated portion.
Big Lake Uranium Project
Location: Lake Eyre Basin sediments overlying the hydrocarbon-rich southern Cooper Basin, north-east South Australia.
Concept: Uranium-bearing fluids, potentially sourced from the uranium-enriched Big Lake Granite Suite, migrate into shallow palaeochannel sands of the Namba Formation. Reducing hydrocarbons precipitate the uranium, a model compared by management to Kazakhstan-style basin systems.
Discovery: 2024 inaugural program; assays (23 Oct 2024) confirmed significant thicknesses of anomalous uranium. Four holes exceeded 100 ppm, with mineralised layers up to 20 m thick in discovery holes.
2026 program: 33 aircore holes; identification of a south-easterly trending redox front of significant scale; similar oxidised/reduced sands intersected 6 km south of Site 10. Maiden-program widths of up to 35 m were cited in the Aug 2026 strategy (ASX 24 Aug 2026; SmallCaps).
Next milestone: Exploration target estimate in 2027.
Recognition: 2025 Australian Mining Prospect Awards, Discovery of the Year.
EnviroCopper Limited (equity investment)
-
Kapunda and Alford ISR copper projects (South Australia).
-
Dec 2025: ECL received A$3.5M from an international partner, convertible into a 16.8% equity interest in ECL within five years. At Kapunda, groundwater conditioning for the Site Environmental Lixiviant Test (SELT) commenced (H1 FY2026 report).
-
AGE's carrying value: A$2.70M (financial asset, 31 Dec 2025).
Divested / legacy assets
ARUP (NT): TCC, Beatrice, Nabarlek North, Caramal (historical 6.5 Mlbs @ 0.31% U3O8). Sold to DevEx.
Piedmont (Italy): Energy-metals (Ni-Co) project. One data aggregator (roic.ai) describes it as a uranium roll-front target, which conflicts with earlier descriptions.
Technical capability ("service" equivalent)
- In-house ISR expertise, including former Heathgate (Beverley/Four Mile) personnel, which AGE presents as a differentiator for screening further ISR opportunities. The Aug 2026 strategy references assessing other opportunities suited to its ISR expertise.
Pricing model: Not applicable (no sales). Offtake pricing structure not publicly disclosed.
Financial Narrative
Income statement
Sources: TradingView via Kalkine (net income FY2021–FY2025); InvestSMART (FY2023–FY2025 net profit, EPS rounded to -0.1¢); financialfilings.com and Koalagains (FY2025 revenue A$1.11M, D&A A$2.31M, SBC A$0.53M). Discrepancy: FY2022 net income is shown as -A$2.216M in one TradingView line and -A$2.248M in another; the difference likely reflects a non-controlling or continuing-operations presentation. Gross profit, operating income and EBITDA are not reported on a meaningful basis for this pre-revenue company. Revenue CAGR is not meaningful.
H1 FY2026 (six months to 31 Dec 2025) — reviewed accounts:
Source: H1 FY2026 Half-Year Financial Report. Note that the reported continuing-plus-discontinued totals for H1 FY2025 sum to A$1.47M, as restated.
The FY2026 loss will include the ~A$3.3M ARUP impairment recognised in H1. Any gain or loss on completion of the DevEx sale should be immaterial, given that the disposal group was carried at fair value less costs to sell (A$7.28M) against consideration of A$7.5M less escrow and discounting.
Commentary. Losses have widened from ~A$1M (FY2021) to ~A$5.9M (FY2025) as the company scaled from a shell-like explorer into a development organisation. FY2025's step-up was driven by a A$2.93M exploration impairment (Note 7 opening/closing reconciliation, H1 FY2026 report) and higher corporate costs. H1 FY2026's A$4.96M loss is dominated by the A$3.51M discontinued-operations loss on the ARUP write-down to fair value. Underlying continuing-operations losses are stable at ~A$1.3–1.5M per half-year, cushioned by A$0.70M of R&D tax incentive income. Interest income is declining as cash is drawn down.
Margins
Gross, operating, EBITDA and net margins are not meaningful: there is no operating revenue, and interest/R&D income is not a sales base.
Balance sheet
Sources: TipRanks (cash FY2021–FY2024); H1 FY2026 report comparatives (FY2025 balance sheet; FY2024 E&E opening balance A$33.68M; FY2024 equity A$65.85M from the statement of changes in equity); TradingView/Kalkine (net debt series; FY2021–FY2023 net tangible assets used as equity proxy because the company carries no goodwill); InvestSMART (current assets, long-term debt). Capitalised exploration is classified as an intangible-type asset under AASB 6, but no goodwill or acquired intangibles exist.
Quarterly cash trajectory (A$M):
Sources: Sep 2025 quarterly (InvestSMART); H1 FY2026 report; May 2026 investor presentation (A$13.3M, per Quartr; the exact date of that figure is assumed to be 31 Mar 2026); June 2026 quarterly (InvestSMART). Q4 included A$5.48M of NT sale proceeds, A$4.229M of exploration and evaluation investment and a A$1.735M operating outflow.
Pro forma liquidity (analyst illustration, not reported): A$12.93M (30 Jun 2026) + A$15.0M placement + A$2.121M SPP ≈ A$30.05M before raising costs and July–September 2026 expenditure. A further A$1.75M sits in escrow pending restatement of TCC access agreements.
Cash flow
Sources: TipRanks (FY2021–FY2024); InvestSMART (FY2025 operating/investing/financing, rounded); Koalagains (FY2025 capex A$11.11M; FCF -A$13.09M). Discrepancy: FY2025 FCF of -A$13.09M (Koalagains) implies capex of ~A$11.1M, versus an InvestSMART investing outflow of ~A$12M. The difference is attributable to non-capex investing items such as bonds and the ECL investment.
H1 FY2026 cash flow: operating -A$1.60M; investing -A$7.85M (exploration A$3.36M, FRT capital works A$2.33M, tenement bonds A$2.23M, DevEx deposit +A$0.10M); financing -A$0.12M.
Commentary. The cash "engine" is entirely externally funded. The cumulative FY2021–FY2025 free-cash outflow of ~A$43.6M was financed by ~A$75M of net financing inflows. Investment intensity peaked in FY2024 (Samphire resource drilling and FRT preparation) and remained elevated through FY2026 (FRT build and operation). The FY2026 NT sale is the company's first non-dilutive capital event of scale.
Ratios
Sources: InvestSMART (ROE, return on capital, net gearing); analyst computation for ROA (-5.91/79.49) and current ratio (30.85/1.51). Current ratio at 31 Dec 2025: 5.8x (29.16/5.02). ROIC, net debt/EBITDA, interest coverage, asset turnover and cash conversion cycle are not meaningful (no EBITDA, no revenue, no borrowings, no inventory cycle).
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Revenue by Segment and Revenue by Segment (%)
| Metric | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Segment revenue / other income (AUD Mn) | — | 1.10 | 1.11 |
Segment pre-tax result (AUD Mn) | -2.86 | -3.45 | -5.91 |
Contribution to total revenue (%) | 100 | 100 | 100 |
Business Units
| Unit | Ownership | Stage (Oct 2026) | Role |
|---|---|---|---|
Samphire Uranium Project (Blackbush, Plumbush, corridor, Mullaquana option) — near Whyalla, SA | 100% | Post-FRT; feasibility study underway; Mining Lease application in progress | Flagship development asset |
Big Lake Uranium Project — Lake Eyre Basin / Cooper Basin, SA | 100% | Greenfield discovery; second-phase drilling; exploration target planned 2027 | Exploration growth option |
EnviroCopper Limited (Kapunda, Alford ISR copper, SA) | — | Partner-funded field testing | Non-core financial asset |
ARUP (TCC, Beatrice, Nabarlek North), NT | Divested to DevEx (completed 29 Jun 2026) | Exited | Sold for A$7.5M |
Piedmont (Italy) | — | No longer reported as significant | Legacy energy-metals asset |
Income Statement and Per-Share Data
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Revenue incl. other income (AUD Mn) | — | — | — | 1.10 | 1.11 |
Pre-tax income (AUD Mn) | -0.99 | -2.22 | -2.86 | -3.45 | -5.91 |
Net income (AUD Mn) | -0.99 | -2.22 | -2.86 | -3.45 | -5.91 |
EPS basic (A$ cents) | — | — | -0.1 | -0.1 | -0.1 |
EPS diluted (A$ cents) | — | — | -0.1 | -0.1 | -0.1 |
Dividends per share (A$ cents) | 0 | 0 | 0 | 0 | 0 |
Depreciation & amortisation incl. capitalised (AUD Mn) | — | — | — | — | 2.31 |
Share-based payments (AUD Mn) | — | — | — | — | 0.53 |
Per-Share Data
| Line item | H1 FY2025 (AUD) | H1 FY2026 (AUD) |
|---|---|---|
Interest income | 736,556 | 474,998 |
R&D tax incentive income | 0 | 702,173 |
Sundry income | 0 | 749 |
Employee benefits expense | (796,692) | (1,054,995) |
Share-based payments | (211,301) | (160,401) |
Business development | (184,739) | (211,154) |
Other expenses | (186,915) | (433,091) |
Loss from continuing operations | (1,320,267) | (1,451,670) |
Loss from discontinued operations (ARUP) | (150,910) | (3,512,711) |
Loss for the period | (1,471,177) | (4,964,381) |
Basic/diluted EPS — continuing (cents) | (0.034) | (0.037) |
Basic/diluted EPS — discontinued (cents) | (0.004) | (0.075) |
Balance Sheet
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Total assets (AUD Mn) | — | — | — | — | 79.49 |
Cash & equivalents (AUD Mn) | 1.63 | 27.13 | 18.50 | 28.39 | 30.15 |
Total debt incl. leases (AUD Mn) | — | — | — | — | 0.19 |
Short-term debt / current leases (AUD Mn) | — | — | — | — | 0.07 |
Long-term debt / non-current leases (AUD Mn) | — | — | 0.2 | 0.2 | 0.12 |
Net debt (negative = net cash) (AUD Mn) | -1.63 | -27.13 | -18.19 | -28.33 | -29.96 |
Shareholders' equity (AUD Mn) | 13.35 | 44.00 | 41.44 | 65.85 | 77.35 |
Capitalised exploration & evaluation (AUD Mn) | — | — | — | 33.68 | 40.96 |
Goodwill (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Working capital (AUD Mn) | — | — | — | — | 29.34 |
Total current assets (AUD Mn) | — | — | 19.2 | 29.3 | 30.85 |
Balance Sheet (30 Jun 2025–31 Dec 2025)
| Item (AUD Mn) | 30 Jun 2025 | 31 Dec 2025 |
|---|---|---|
Cash | 30.15 | 20.58 |
Assets held for sale (ARUP) | 0.00 | 7.68 |
Plant & equipment (incl. FRT capital WIP 8.31) | 4.09 | 8.79 |
Financial assets (ECL) | 2.70 | 2.70 |
Exploration & evaluation | 40.96 | 33.97 |
Non-current receivables (bonds) | 0.71 | 2.94 |
Total assets | 79.49 | 77.65 |
Total liabilities | 2.13 | 5.19 |
Net assets / equity | 77.35 | 72.46 |
Contributed equity | 116.46 | 116.57 |
Accumulated losses | (40.33) | (45.13) |
Key Financials
| Metric | Q1 FY2026 (30 Sep 2025) | Q2 FY2026 (31 Dec 2025) | Q3 FY2026 (31 Mar 2026) | Q4 FY2026 (30 Jun 2026) |
|---|---|---|---|---|
Closing cash (AUD Mn) | 25.3 | 20.58 | 13.3 | 12.93 |
Cash Flow
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Operating cash flow (AUD Mn) | -0.79 | -1.70 | -1.53 | -1.71 | -1.98 |
Investing cash flow (AUD Mn) | -0.06 | -2.96 | -7.08 | -15.38 | -12.0 |
Capex incl. capitalised exploration (AUD Mn) | — | — | — | — | 11.11 |
Free cash flow (AUD Mn) | -1.43 | -4.63 | -8.48 | -15.99 | -13.09 |
Financing cash flow (AUD Mn) | 1.57 | 30.15 | -0.03 | 26.99 | 16.0 |
Dividends paid (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Share buybacks (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Metric | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
ROE (%) | -7.0 | -5.2 | -7.6 |
Return on capital (%) | -7 | -5 | -8 |
ROA (%) | — | — | -7.4 |
Current ratio (x) | — | — | 20.4 |
Debt / equity (x) | 0.00 | 0.00 | 0.00 |
Net gearing (%) | -43.9 | -42.7 | -38.7 |
Results by Region
| Region | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Australia — other income (AUD Mn) | — | 1.10 | 1.11 |
Italy — revenue (AUD Mn) | 0 | 0 | 0 |
Share Price and Margin Analysis (%)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Share price at 30 June (AUD) | 0.036 | 0.049 | 0.034 | 0.053 | 0.029 |
Total shareholder return FY (%) | — | — | -30.6 | 55.9 | -45.3 |
Cash at year end (AUD Mn) | 1.63 | 27.13 | 18.50 | 28.39 | 30.15 |
Share Price & Returns
| Horizon | Start reference | Approx. return |
|---|---|---|
~1 year | A$0.023 (Oct 2025) | ~+100–130% |
~3 years | A$0.034 (Jun 2023) | ~+56% |
~5 years | A$0.036 (Jun 2021) | ~+47% |
Valuation Snapshot
| Metric | Value | Basis |
|---|---|---|
Market cap | A$235.2M | Company presentation |
Cash (30 Jun 2026) | A$12.9M | Quarterly |
Debt | ~A$0.15M (leases) | H1 FY2026 |
Enterprise value | ~A$222M | Market cap minus net cash |
P/B | ~3.2x | A$235M / A$72.5M book (31 Dec 2025) |
P/E, EV/EBITDA, EV/Sales | Not meaningful (losses; no revenue) | — |
Shares on Issue by Date
| Date | Shares on issue | Event |
|---|---|---|
30 Jun 2025 | 4,430,050,965 | — |
11 Sep 2025 | +6,983,180 | STI option exercise at A$0.029 |
31 Dec 2025 | 4,437,034,145 | — |
12 Aug 2026 | +333,333,334 | Placement at A$0.045 (A$15.0M) |
10 Sep 2026 | +47,133,479 | SPP at A$0.045 (A$2.121M) |
~Sep 2026 | ~4.82bn (approx.) | Analyst computation incl. option conversions |
Analyst Conclusions
Management guidance (latest)
-
Multi-rig resource drilling at Blackbush, Plumbush and the corridor (~300 holes by Nov 2027).
-
MRE upgrade with Plumbush Indicated conversion in early 2027.
-
Big Lake exploration target in 2027.
-
Mining Lease application progression.
-
Feasibility study completion in Q3 2027.
-
Project financing in 2027/28.
-
First production in 2030/2031 at a scoping-basis 1.2 Mlbs pa.
Consensus
No reliable broker consensus exists. One TipRanks-reported target of A$0.07 (Sep 2025) is the only price target located.
Bull case
-
Price leverage: Scoping economics (42% IRR) were struck at US$75/lb. With term prices at a record US$96.50/lb, a feasibility study incorporating a larger resource (30 Mlbs vs 18 Mlbs) could materially lift NPV and project life, and potentially the production rate.
-
De-risked technology: The FRT met the ~70% / 70 PV benchmark with strong flow rates, removing the largest technical uncertainty for an ISR developer. Few ASX developers have field-validated ISR in a proven jurisdiction.
-
Exploration optionality: The corridor drilling (+600 m south of Blackbush) and Big Lake's regional redox front offer resource growth that the current ~A$7.4/lb EV/resource multiple may not price in.
Bear case
-
Dilution treadmill: ~4.8bn shares and recurring discounted raises. Funding a A$131M+ (likely higher after inflation) capex could require heavy equity issuance unless debt or strategic funding is secured.
-
Resource quality and confidence: 40% of the resource (Plumbush) is Inferred, recovered grades are modest (≤115 ppm), and commercial-scale wellfield performance remains unproven.
-
Timeline and execution: Production is 4–5 years away, the feasibility study has already slipped a quarter, finance leadership is interim, and the company remains exposed to a uranium price correction before financing.
Key catalysts and monitorables (next 12 months)
| Expected timing | Catalyst / monitorable |
|---|---|
| Oct 2026 | Sep 2026 quarterly (cash post-raise; drilling progress); FY2026 Annual Report detail (if not yet reviewed) |
| ~Nov 2026 | AGM: remuneration votes, board renewal (McIntyre succession) |
| Q4 2026 – Q2 2027 | Samphire drilling results (corridor, southern Blackbush, Plumbush infill) |
| CY2026 | NT escrow release (A$1.75M) on TCC access-agreement restatement |
| H1 2027 | Samphire MRE upgrade (Indicated conversion) |
| 2,027 | Big Lake exploration target |
| 2,027 | Permanent CFO appointment |
| Ongoing | Mining Lease application milestones; offtake/strategic partner discussions (Traxys, Sprott-linked capital) |
| Q3 2027 | Feasibility study release (capex, opex, NPV, IRR, Ore Reserves) |
| Ongoing | Uranium term price (US$96.50/lb, Sep 2026) and spot (US$89.63/lb) |
Concluding analyst verdict
Alligator Energy enters late 2026 as a materially better company than it was eighteen months ago. Between mid-2025 and mid-2026 it permitted, built, commissioned and completed a Field Recovery Trial at Samphire on schedule and under budget. The trial met the industry recovery benchmark that ISR financiers look for. Over the same period the company lifted the Samphire resource to 30 Mlbs U3O8, secured land access over the Mullaquana Crown Lease, and exited its Northern Territory legacy portfolio for A$7.5M. These are genuine de-risking events, and they arrive alongside a record nominal long-term uranium price of US$96.50/lb. That price sits more than 25% above the US$75/lb assumption that underpinned the 2023 scoping study's 42% IRR.
The investment case nonetheless remains that of an early-stage developer, not a producer. The company has no revenue, a recurring cash burn of roughly A$9–15M a year and a register of ~4.8 billion shares. Its funding pathway has relied on discounted placements, the latest at a 15.1% discount. Two-fifths of the resource is Inferred, commercial-scale recovery remains untested, the feasibility study has already slipped to Q3 2027, and finance leadership is interim. The share price's violent reactions (+26.8% and -29.5% around the June resource release; -11.3% on the August raise) show how heavily valuation depends on sentiment and newsflow.
On balance, AGE offers leveraged, jurisdictionally advantaged exposure to the uranium term-price cycle. Its next value inflection is the 2027 resource upgrade and feasibility study, which will show whether Samphire can scale beyond the 1.2 Mlbs pa scoping concept at competitive costs. At ~A$7.4 per resource pound (August 2026 reference), the market is pricing partial, not full, de-risking. The key monitorables are disciplined capital management, a permanent CFO appointment, credible feasibility economics and the uranium term price.
End of dossier. All figures are in A$ unless stated; FY = year to 30 June. Analyst computations are labelled as such and are not company-reported figures.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Executive Leadership Team
| Name | Title | Tenure / start | Background | Disclosed compensation |
|---|---|---|---|---|
Dr Andrea Marsland-Smith | CEO (from 1 Jul 2025) and Managing Director (from ~Apr 2026) | Previously COO | PhD in Economic Geology; uranium ISR operating background (company references Heathgate Beverley/Four Mile experience within the leadership team) | — |
Blayney Morgan | Interim CFO | Appointed during Jun 2026 quarter | — | — |
Jake van der Hoek | Company Secretary | Appointed during Jun 2026 quarter | — | — |
Michael Barlow | Group Exploration Manager | — | — | A$64.5k (earlier year, Yahoo) |
Joe Sutanto (former) | CFO & Company Secretary | — | 20+ years in mining, PE and professional services; ex-CFO/CoSec Hillgrove Resources | — |
Michael Meintjes (former) | CFO & Company Secretary | Until Sep 2025 | ACA, B.Com (Hons), GradDipAppFin | A$141.7k (earlier year, Yahoo) |
“—” = not publicly disclosed.
Board of Directors
| Name | Role | Tenure | Notes | Shareholding (10 Sep 2026) |
|---|---|---|---|---|
Paul Dickson | Independent Non-Executive Chairman | Director since 2009; Chair since 28 Nov 2018 | Founder of DDM Capital and Paradigm Capital; Chair of Axel REE; NED of Condor Energy Services and Verity Resources | 19.87M indirect shares; 6.16M options |
Dr Andrea Marsland-Smith | CEO & Managing Director | Board seat from ~Apr 2026 | See above | 5.91M shares; 7.61M options |
Gregory (Greg) Hall | Non-Executive Director (from 1 Feb 2026) | Former long-serving CEO/MD (to Jun 2025) | B.E., M AusIMM, MAICD; born 1959 (Yahoo) | 24.24M shares |
Fiona Nicholls | Non-Executive Director | Since at least 2023 | Bought 2M shares on-market at A$0.025 in Dec 2025 | 3.67M indirect; 4.10M options |
Daniel (Dan) Lougher | Non-Executive Director | Appointed 15 Dec 2025 | — | 0.72M shares |
Peter McIntyre | Non-Executive Director (retiring) | Long-serving | Retirement announced ~Apr 2026, to follow a Samphire milestone. He does not appear in the 10 Sep 2026 director-interest register, suggesting he has retired (not confirmed) | Labonne Enterprises (McIntyre Family A/C) held 38.3M at Sep 2025 |
Callum McIntyre | Alternate Director for Peter McIntyre | — | Status presumed ceased with Peter McIntyre's retirement (not confirmed) | — |
Board & Management Changes
| Date | Change | Context |
|---|---|---|
1 Jul 2025 | Marsland-Smith CEO; Hall remains Executive Director | Planned succession ahead of FRT |
16 Sep 2025 | Sutanto CFO/CoSec (from 1 Oct 2025); Meintjes departs; Brisbane office closed | "Explorer to producer" repositioning |
15 Dec 2025 | Lougher appointed NED | Board renewal |
1 Feb 2026 | Hall becomes NED | Completion of CEO transition |
~Apr 2026 | Marsland-Smith adds MD role; McIntyre retirement flagged | Governance streamlining |
Apr–Jun 2026 | Interim CFO Blayney Morgan; CoSec Jake van der Hoek | Sutanto's departure (reason not disclosed); interim CFO arrangement is a monitorable item |
Major Shareholders
| Holder | Shares | % | Last notice |
|---|---|---|---|
Sprott Inc. and controlled entities | 544,169,808 | 12.26 | 4 Aug 2026 |
Macquarie Group Ltd | 194,952,068 | 5.05 | 25 Sep 2025 (per register; later notices show entry/exit around 5.08% in Dec 2025–Jan 2026) |
Morgan Stanley / MUFG | 225,540,256 | 5.08 → ceased | Became 4 Aug 2026; ceased 12 Aug 2026 |
MM Asset Management | 222,561,080 | 5.02 → ceased | Ceased 6 Jan 2026 |
Major Shareholders by Rank
| Rank | Holder | Shares | % |
|---|---|---|---|
| 1 | HSBC Custody Nominees (Aust) Ltd | 609,441,448 | 13.75 |
| 2 | BNP Paribas Nominees (IB Au Noms Retail) | 310,597,436 | 7.01 |
| 3 | Citicorp Nominees Pty Ltd | 268,559,417 | 6.06 |
| 4 | Buttonwood Nominees Pty Ltd | 211,566,124 | 4.77 |
| 5 | BNP Paribas Nominees (Hub24) | 99,654,529 | 2.25 |
| 6 | Wanna Quickie Pty Ltd | 84,305,011 | 1.90 |
| 7 | Mr M S Robinson | 68,138,751 | 1.54 |
| 8 | BNP Paribas Noms Pty Ltd | 63,425,234 | 1.43 |
| 9 | J P Morgan Nominees Aus Pty Ltd | 62,994,005 | 1.42 |
| 10 | Mr P M J Welst | 62,000,000 | 1.40 |
Competitive Landscape
Key Competitors
| Company | Listing | Key asset(s) | Stage | Relevance to AGE |
|---|---|---|---|---|
Boss Energy | ASX: BOE | Honeymoon ISR, SA; Alta Mesa interest (US) | Producer (Honeymoon restarted 2024) | Closest SA ISR analogue; production benchmark |
Heathgate Resources | Private (General Atomics) | Beverley / Four Mile ISR, SA | Producer | SA ISR operating benchmark; talent pool |
BHP (Olympic Dam) | ASX/LSE/NYSE: BHP | Olympic Dam, SA (by-product uranium) | Producer | SA uranium incumbent |
Kazatomprom | LSE/AIX: KAP | Kazakh ISR mines | World's largest producer | Global ISR cost benchmark |
Cameco | TSX/NYSE: CCJ | McArthur River/Cigar Lake (Canada) | Major producer | Price setter; contracting competitor |
Paladin Energy | ASX/TSX: PDN | Langer Heinrich (Namibia) | Producer | ASX uranium capital competitor |
Deep Yellow | ASX: DYL | Tumas (Namibia), Mulga Rock (WA) | Developer | ASX developer peer |
Bannerman Energy | ASX: BMN | Etango (Namibia) | Developer | ASX developer peer |
Lotus Resources | ASX: LOT | Kayelekera (Malawi) | Restart / producer | ASX uranium capital competitor |
Peninsula Energy | ASX: PEN | Lance ISR (Wyoming, US) | ISR producer / ramp-up | ISR peer (Market Index lists as similar company) |
Elevate Uranium | ASX: EL8 | Namibia and Australia | Explorer / developer | Small-cap peer |
Toro Energy | ASX: TOE | Wiluna / Lake Maitland (WA) | Developer (WA policy-constrained) | Jurisdiction contrast |
enCore Energy / Uranium Energy Corp | NASDAQ/TSX | US ISR | Producers | Global ISR peers |
DevEx Resources | ASX: DEV | Nabarlek (NT), now incl. ex-AGE ARUP tenure | Explorer | Former AGE assets |
Aeris (AEU) / Cauldron (CXU) | ASX | Market Index "similar companies" | Small-cap | Trading peers for investor capital |
Peer Comparison FY2025
| Metric | Alligator Energy | Boss Energy | Peninsula Energy | Deep Yellow |
|---|---|---|---|---|
Stage | Pre-feasibility / FRT complete | ISR producer (SA) | ISR producer (US) | Developer |
Revenue | Nil | — | — | Nil / minimal |
Jurisdiction | South Australia | South Australia / Texas | Wyoming | Namibia / WA |
Resource (AGE only verified) | ~30 Mlbs U3O8 | — | — | — |
Recent Developments
The only "guidance revision" is the feasibility-study timing shift from mid-2027 to Q3 2027.