Altamin Limited Overview
Altamin Limited is an ASX-listed, Perth-headquartered developer of base-metal and critical-raw-material projects located entirely in Italy, a jurisdiction that has re-opened to primary mining under its revised Mining Decree (August 2024) and the EU Critical Raw Materials Act. The company's strategic centre of gravity has shifted from zinc to geothermal brines: its flagship Lazio Project, roughly 20–30 km north of Rome, aims to use the heat of high-temperature Cesano geothermal brines to drive mechanical evaporation, producing sulphate of potash (SOP) fertiliser with lithium carbonate and boron by-products, without evaporation ponds or the acid-intensive Mannheim process. Its second asset, the 100%-owned Gorno zinc-lead-silver brownfield project in Lombardy, received a retrospective environmental approval in January 2026 and is being marketed for sale or partnership through Argent Partners. Altamin is controlled by the Victor Smorgon Group, is unprofitable, has ~A$2.4m cash, and relies on equity and Italian/EU grants.
What the company does
Altamin is a mineral exploration and project-development company. It does not mine, process or sell product. Its business consists of acquiring Italian mineral tenure (exploration licences, "permessi di ricerca"), defining JORC-compliant Mineral Resources, conducting metallurgical testwork and technical studies (scoping, pre-feasibility, feasibility), securing environmental and mining permits, and then either developing projects with partners or monetising them by sale, joint venture or farm-in.
The company describes itself in its quarterly reports as an ASX-listed company focused on base and critical metals mine development in Italy, actively exploring and developing Italian brownfield projects since 2014, with commodities aligned to EU energy-transition goals and an emphasis on relaunching mining with minimal environmental impact, supported by government, stakeholders and partners (paraphrased from the "About Altamin" boilerplate, Jun-2026 Quarterly Report).
Project portfolio (the company's "product" set)
| Project | Location | Commodities | Interest | Stage | Tenure |
|---|---|---|---|---|---|
| Lazio (flagship) | Lazio region, Central Italy (north of Rome; Cesano geothermal field) | SOP (potassium), lithium carbonate, boron | 100% | Maiden JORC MRE (Apr 2024); Scoping Study being finalised by Micon (H2 CY2026); pilot plant design under BRAIN grant | 6 exploration licences: Campagnano (G12019), Galeria (G12831), Melazza (G02909), Cassia (G02908), Sabazia (G02907), Sacrofano (G02906) |
| Gorno | Lombardy region, Northern Italy (Bergamo Alps) | Zinc, lead, silver | 100% (via Vedra Metals Srl, held by Energia Minerals (Italia) Srl) | Nov-2021 MRE; 2021/22 Scoping Study; DFS work undertaken under Appian JV; retrospective environmental approval Jan 2026; strategic sale/partner process | Cime EL (Decree 2166) and Cime 2 EL (Decree 11100) — renewal in progress; amalgamation proposed |
| Punta Corna | Piedmont region, Northern Italy | Cobalt, nickel, copper, silver | 100% | Early-stage exploration | Decree 486 — granted |
Source: Tenement schedule, Jun-2026 Quarterly Report (29 Jul 2026).
Business model and revenue model
Revenue model: None operational. Reported "revenue" in FY2023–FY2025 (A$0.08m, A$0.15m, A$0.08m) is other income (interest, recharges, sundry), not product sales. FY2026 shows no revenue line (S&P Global via StockAnalysis). Product vs service vs subscription vs licensing mix: not applicable.
Funding model: Equity raisings (entitlement offers and placements, heavily supported by the Victor Smorgon Group), Italian VAT refunds (A$0.654m received in FY2026 per Appendix 5B), non-dilutive grants (A$3.62m BRAIN grant from the Italian Ministry of Environment and Energy Security, MASE, announced 11 Sep 2025, shared with partners RINA and University of L'Aquila), and historically project-level equity from a financial partner (Appian Natural Resources Fund II at Gorno, 2022–2024).
Value-realisation model: For Gorno, a stated objective to secure a sale and/or a strategic partner (Dec-2025 Quarterly). For Lazio, an owner-led path through Scoping Study → drilling of a production/reinjection well doublet → pilot plant → feasibility, with a strategic partner (Iren MoU signed 1 Mar 2024) and grant funding.
Value-chain position and end-markets
Altamin sits at the very top of the upstream value chain (resource definition and permitting). If developed, its prospective products would serve:
SOP (sulphate of potash): Premium chloride-free potassium fertiliser for high-value horticulture (fruit, vegetables, vines, tobacco, olives) — principal end-markets would be Italian, Mediterranean and wider European agriculture. The FL Global sales and marketing study (14 Apr 2026) identified the geothermal-brine route as differentiated from the Mannheim process (which requires sulphuric acid, is energy-intensive and generates hydrochloric acid by-product streams).
Lithium carbonate: Battery cathode supply chain (technical-grade demonstrated; battery-grade the stated optimisation target per ANSTO release, Mar 2025).
Boron (as borax/boric acid): Glass, ceramics, agriculture micronutrients, specialty chemicals; ANSTO testwork indicated boron by-product value is substantial relative to contained lithium value.
Zinc and lead concentrates with silver credits (Gorno): European smelters (historically clean, low-impurity concentrates).
Customer types: None contracted. Prospective customers would be fertiliser distributors/blenders, cathode/battery chemical producers, and zinc/lead smelters.
Independent characterisation
Altamin is best characterised as a Victor Smorgon–controlled, sub-A$25m option on two Italian assets with very different risk profiles. Lazio is a technology-and-permitting-driven geothermal brine project whose economics depend primarily on SOP (a fertiliser) rather than lithium — a meaningful pivot from the "geothermal lithium" narrative of 2023–24 that reflects both lithium price weakness and the brine's high potassium content (indicated resource grades around 84,000 mg/L K versus ~190 mg/L Li, per Adamas Intelligence's summary of the maiden MRE). Gorno is an advanced brownfield zinc asset that the company no longer intends to fund to production on its own. The company's spend rate (~A$3.8–4.0m per year of operating cash outflow) versus cash of A$2.39m (≈4 quarters of runway per the Appendix 5B) means further funding — equity, grant, or Gorno sale proceeds — is a near-term necessity.
Strategy
Stated strategy (themes from latest reports)
-
Lazio as the growth engine: Advance Lazio through Scoping Study, drilling ESIA, a production/reinjection well doublet and pilot plant toward feasibility, positioning it as a low-impact, renewable-energy-powered source of SOP and EU critical raw materials (lithium, boron).
-
Alignment with Italian and EU policy: Explicit alignment with Italy's revised Mining Decree (Aug 2024) and the EU Critical Raw Materials Act (Regulation (EU) 2024/1252), including potential pursuit of "Strategic Project" status.
-
Non-dilutive funding first: Continued focus on Italian and EU grant programs (validated by the A$3.62m BRAIN grant under Mission Innovation 2.0 via MASE).
-
Monetise or partner Gorno: Argent Partners-led process to secure a sale and/or strategic partner; alternatively retain and advance toward development.
-
Strengthened board and management with majority-shareholder representation.
Initiatives in the last 24 months
| Initiative | Date | Detail | Status |
|---|---|---|---|
| Iren collaboration | MoU 1 Mar 2024 | Non-binding collaboration with Italian multi-utility on Lazio raw-material production; Iren and Altamin presented jointly at MASE geothermal-lithium conference, 27 Jun 2024 | Non-binding; no definitive agreement disclosed |
| Gorno re-consolidation | Announced 31 Oct 2024; completed Q1 2025 | Acquired Appian Italy B.V.'s 29.85% of Vedra Metals | Complete |
| ANSTO testwork | 21 Mar 2025 | SOP, lithium carbonate, boron recovery demonstrated | Complete |
| SRC testwork / flowsheet | 2,025 | Flowsheet basis for RINA plant design | Complete |
| BRAIN research initiative | Grant announced 11 Sep 2025 | A$3.62m MASE grant with RINA and UNIVAQ; pilot plant design and scale-up of combined SOP/lithium/boron process | Phase 1 deliverables completed 30 Jun 2026 |
| Lazio Scoping Study | 2025–2026 | Workstreams: FL Global marketing, RINA logistics and plant design/capex/opex, Steam reservoir model and well design; compiled by Micon | Report being finalised (slipped from H1 CY2026) |
| Drilling ESIA | 2,026 | Stakeholder meetings, technical assessments, baseline environmental inputs | Baseline monitoring initiated |
| Gorno strategic process | 2025–2026 | Argent Partners engagement and due diligence with several parties | Extended in Jun-2026 quarter |
| Gorno permitting | 2,026 | Retrospective environmental approval (27 Jan 2026); Cime EL extension and amalgamation with Cime 2 EL | Application to Regione Lombardia scheduled end-Jul 2026 |
Medium-term targets / guidance
No financial guidance is provided. The indicative Lazio development timeline (Dec-2025 Quarterly, Figure 2) envisaged a Scoping Study in H1 CY2026 followed by drilling permitting and pilot work; Kalkine notes that lab-to-pilot progression typically spans 18–36 months. ESG targets: none quantified.
Products & Services
Altamin has no commercial products. Its "portfolio" is a set of mineral projects and prospective products. Each is catalogued below.
Lazio Project (SOP–lithium–boron from geothermal brine)
Description: Six 100%-owned exploration licences over the Cesano geothermal field and surrounding volcanic districts north of Rome. Historic exploration by ENEL in the 1970s–80s included deep wells (notably Cesano-1) and pilot extraction work, giving Altamin a substantial historical dataset.
Process concept: High-temperature Cesano brines drive conventional mechanical evaporation, eliminating surface evaporation ponds; glaserite (an SOP precursor) precipitates and is converted to SOP; the barren liquor is concentrated in lithium and boron, from which technical-grade lithium carbonate and borax were demonstrated (ANSTO, Mar 2025). The flowsheet is designed to be closed-loop, with depleted brine reinjected into the reservoir.
Development concept (Jun-2026 Quarterly): Two directional wells — one to access the reservoir identified by historic Cesano-1 for brine production, a second for reinjection. Steam Srl designed the wells to deliver a brine/glaserite slurry while maximising available steam and heat for the plant.
Resource: Maiden JORC MRE released 18 Apr 2024, amended 21 Jun 2024; ~2.1 Mt LCE total with ~208 kt LCE Indicated grading ~190 mg/L Li and ~84,000 mg/L K, TDS up to ~400 g/L (Adamas Intelligence summary). The MRE also reports a large potassium/SOP-equivalent tonnage (aggregator headline references "38.4 million tonnes" — the unit/commodity could not be fully verified from the truncated source and should be checked against the original release).
Key technical partners: K-UTEC (desktop SOP flowsheet), ANSTO (brine simulant testwork), Saskatchewan Research Council (SOP flowsheet/testwork), Steam Srl (dynamic reservoir model, well design), RINA SpA (process plant design, capex/opex, logistics), FL Global Pte Ltd (SOP marketing), Micon International (Scoping Study compilation), University of L'Aquila (pilot plant).
Target customers: European/Mediterranean fertiliser buyers (SOP); battery-chemical and borate buyers.
Latest version: Scoping Study in finalisation by Micon (all technical workstreams completed by 30 Jun 2026; original target H1 CY2026 — now slipped into H2 CY2026).
Pricing model: Not disclosed.
Gorno Project (zinc–lead–silver)
Description: High-grade polymetallic brownfield asset in Lombardy with a long history of producing clean zinc and lead/silver concentrates; extensive existing underground infrastructure; exploration licences covering ~1,200 hectares centred on the historic mine (FY2023 Annual Report).
Resource: Updated MRE 15 Nov 2021. The Scoping Study was based on a resource of 7.79 Mt grading 6.8% Zn, 1.8% Pb and 32 g/t Ag (Engineering News).
Scoping Study metrics (CSA Global, c. late 2021): Initial LOM 9 years; LOM production target 6.04 Mt @ 7.1% Zn, 1.9% Pb, 31 g/t Ag; recovered metal ~396 kt Zn, ~81.8 kt Pb, ~3.4 Moz Ag; concentrate ~630 kt Zn conc and ~108 kt Pb conc; mining rate 800 ktpa, processing 520 ktpa; initial capex ~114m (currency per Engineering News report; original study units should be confirmed). The study's original schedule (construction decision mid-2023, first production H2 2024) was not achieved.
Permitting: Retrospective environmental approval issued by MASE on 27 Jan 2026. Cime and Cime 2 ELs under renewal; technical status report prepared for Regione Lombardia supporting extension and amalgamation (lodgement scheduled end-July 2026). Ongoing water monitoring with ARPA and hydrogeological model update.
Exploration upside: High-grade channel sampling results outside the current MRE reported in FY2025.
Commercial status: Strategic process run by Argent Partners (sale and/or strategic partner), extended in the June 2026 quarter, with due diligence by several parties; no certainty of a transaction.
Punta Corna Project (cobalt–nickel–copper–silver)
Description: Early-stage battery-metals exploration licence (Decree 486) in Piedmont, 100% owned and granted. No current resource or recent activity disclosed in 2026 quarterly reports.
Historical/other applications
Earlier corporate material referred to "two 100% owned mineral projects and five under licence application" and to graphite and other critical-mineral targets (InvestSMART legacy profile; Dec-2023 Half-Year Report). Current status of those applications is not disclosed in 2026 reports; they do not appear in the June 2026 tenement schedule.
Financial Narrative
Source for all statutory figures: S&P Global Market Intelligence via StockAnalysis (annual data FY2022–FY2026, last updated 29 Sep 2026), cross-checked to the June 2026 Appendix 5B for FY2026 cash flows. A$ millions unless stated. FY = year to 30 June.
Income statement
EPS derived by dividing net income by weighted average basic shares; diluted equals basic because the company is loss-making. FY2021 reference points (same source): operating expenses A$5.73m, pre-tax loss A$5.38m.
Margins: Gross, operating, EBITDA and net margins are not meaningful because the company has no operating revenue. Aggregator-computed margins against sundry income (e.g., FY2025 operating margin of about -4,024%) carry no analytical value. Revenue CAGR is likewise not meaningful.
Commentary. Altamin's loss profile tracks its activity cycle rather than any commercial driver. FY2022's A$5.7m loss reflected peak Gorno drilling and the Scoping Study period under sole ownership. FY2023–FY2025 operating costs fell sharply (to A$2.2–3.3m) because Gorno spending moved into the Appian-funded Vedra JV, but Altamin's share of JV losses (A$1.7–3.7m per year) kept net losses at A$2.8–5.0m. FY2023 losses were cushioned by a one-off A$3.93m gain on the JV transaction. Net loss narrowed to A$4.36m. SG&A has been cut by almost half since FY2023 (A$0.98m → A$0.52m), indicating the incremental spend is overwhelmingly technical.
Balance sheet
Commentary. The balance sheet is small and almost entirely cash. Total equity of A$2.34m at 30 June 2026 is set against A$71.0m of cumulative contributed equity and A$65.2m of accumulated losses — i.e., roughly 92 cents of every dollar raised since inception has been expensed. Under the company's accounting approach, exploration and evaluation spend appears to be expensed rather than capitalised (the balance sheet carries no material E&E asset), so the book value materially understates the option value of the tenements and the historic Gorno infrastructure. Share count has more than doubled in four years (391.7m → 793.0m), reflecting three entitlement-offer rounds at A$0.024–0.05.
Cash flow
FY2026 from Appendix 5B (12 months to 30 Jun 2026).
FY2026 Appendix 5B detail (A$ thousands, 12 months): exploration and evaluation payments 3,992; staff costs 394; administration and corporate 147; interest received 35; Italian VAT refund received 654; net operating outflow 3,844; PP&E 2; equity proceeds 5,391 less costs 248; FX -11; opening cash 1,103; closing cash 2,389.
Quarterly cash trajectory
June 2026 quarter net operating outflow was only A$0.589m because a A$0.585m Italian VAT refund offset A$1.112m of exploration spend. Underlying quarterly burn is closer to A$1.2m. The Appendix 5B computed 4.06 quarters of funding available, but this relies on the VAT-assisted quarter; on an underlying basis runway is closer to two quarters (analyst estimate), implying a funding event around the end of CY2026 or early CY2027 unless grants or Gorno proceeds arrive.
Ratios
Analyst calculations from S&P Global data. ROIC, net debt/EBITDA, interest coverage, asset turnover and cash conversion cycle are not meaningful for a pre-revenue, debt-free explorer and are not presented.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Group Entities
| Entity | Role | Interest |
|---|---|---|
Altamin Limited | ASX-listed parent; corporate office South Perth, WA | — |
Energia Minerals (Italia) Srl | Italian operating subsidiary; holds exploration licences and owns Vedra Metals | 100% |
Vedra Metals Srl | Gorno project holding company (formerly the Appian JV vehicle) | 100% (via Energia Minerals (Italia)) |
Other Italian subsidiaries (Lazio/Punta Corna licence holders) | Hold Lazio and Punta Corna licences | — |
Revenue by Segment
| Metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Group revenue / other income (AUD Mn) | 0.15 | 0.08 | 0 |
Mineral exploration segment revenue (AUD Mn) | 0 | 0 | 0 |
Group operating loss (AUD Mn) | -2.18 | -3.11 | -5.36 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansIncome Statement and Share Count (M)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue / other income (AUD Mn) | 0 | 0.08 | 0.15 | 0.08 | 0 |
Gross profit (AUD Mn) | 0 | 0.08 | 0.15 | 0.08 | 0 |
SG&A (AUD Mn) | 0.71 | 0.98 | 0.62 | 0.53 | 0.52 |
Total operating expenses (AUD Mn) | 5.23 | 3.32 | 2.33 | 3.18 | 5.36 |
Operating income (AUD Mn) | -5.23 | -3.24 | -2.18 | -3.11 | -5.36 |
EBITDA (AUD Mn) | -5.21 | -3.22 | -2.16 | -3.02 | -5.21 |
D&A (AUD Mn) | 0.03 | 0.03 | 0.01 | 0.08 | 0.15 |
Interest and investment income (AUD Mn) | 0 | 0.01 | 0.02 | 0.02 | 0.04 |
Share of equity-accounted losses (AUD Mn) | 0 | -3.66 | -1.74 | -2.05 | 0 |
Other non-operating income (AUD Mn) | -0.37 | 0.11 | 0.20 | 0.18 | 0.98 |
Gain on sale of investments (AUD Mn) | 0 | 3.93 | 0 | 0 | 0 |
Pre-tax income (AUD Mn) | -5.63 | -2.83 | -3.69 | -4.96 | -4.36 |
Income tax expense (AUD Mn) | 0.03 | 0 | 0 | 0 | 0 |
Net income (AUD Mn) | -5.66 | -2.83 | -3.69 | -4.96 | -4.36 |
Weighted avg basic shares (M) | 325 | 393 | 416 | 469 | 728 |
EPS basic (A$ cents, derived) | -1.74 | -0.72 | -0.89 | -1.06 | -0.60 |
EPS diluted (A$ cents, derived) | -1.74 | -0.72 | -0.89 | -1.06 | -0.60 |
Dividends per share (A$ cents) | 0 | 0 | 0 | 0 | 0 |
Balance Sheet and Share Count (M)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Cash and equivalents (AUD Mn) | 4.84 | 1.00 | 1.23 | 1.10 | 2.39 |
Receivables (AUD Mn) | 0.14 | 0.20 | 0.45 | 0.26 | 0.82 |
Total current assets (AUD Mn) | 5.04 | 1.23 | 1.75 | 1.44 | 3.29 |
Property plant and equipment (AUD Mn) | 0.34 | 0.02 | 0 | 0.97 | 0.79 |
Equity-accounted investments (AUD Mn) | 0 | 3.87 | 2.05 | 0 | 0 |
Total assets (AUD Mn) | 5.43 | 5.17 | 3.80 | 2.41 | 4.08 |
Accounts payable (AUD Mn) | 0.68 | 0.36 | 0.40 | 0.54 | 0.74 |
Total current liabilities (AUD Mn) | 1.39 | 0.56 | 0.63 | 0.99 | 1.74 |
Total liabilities (AUD Mn) | 1.42 | 0.56 | 0.63 | 0.99 | 1.74 |
Total debt incl. leases (AUD Mn) | 0.06 | 0 | 0 | 0 | 0 |
Short-term debt (AUD Mn) | 0.06 | 0 | 0 | 0 | 0 |
Long-term debt (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Net cash (AUD Mn) | 4.77 | 1.00 | 1.23 | 1.10 | 2.39 |
Contributed equity (AUD Mn) | 59.92 | 59.92 | 62.28 | 65.53 | 71.00 |
Accumulated losses (AUD Mn) | -52.93 | -55.76 | -57.72 | -60.99 | -65.23 |
Total equity (AUD Mn) | 4.01 | 4.60 | 3.17 | 1.43 | 2.34 |
Goodwill and intangibles (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Working capital (AUD Mn) | 3.65 | 0.67 | 1.12 | 0.46 | 1.55 |
Shares outstanding at year end (M) | 391.72 | 391.72 | 438.85 | 574.50 | 792.96 |
Cash Flow
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Operating cash flow (AUD Mn) | — | — | — | — | -3.84 |
Capital expenditure (AUD Mn) | — | — | — | — | -0.002 |
Free cash flow (AUD Mn) | -5.14 | -3.83 | -2.02 | -3.15 | -3.84 |
Gross equity proceeds (AUD Mn) | — | — | — | — | 5.39 |
Equity issue costs (AUD Mn) | — | — | — | — | -0.25 |
Dividends paid (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Share buybacks (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Quarter End Details
| Quarter end | Group cash (AUD Mn) | Source |
|---|---|---|
31 Mar 2025 | 1.742 | Mar-2025 Quarterly |
30 Jun 2025 | 1.103 | Jun-2026 Appendix 5B (opening YTD) |
31 Dec 2025 | 3.914 | Dec-2025 Quarterly |
31 Mar 2026 | 2.979 | Mar-2026 Quarterly |
30 Jun 2026 | 2.389 | Jun-2026 Quarterly |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
ROE on year-end equity (%) | -141 | -62 | -116 | -347 | -186 |
ROA on year-end assets (%) | -104 | -55 | -97 | -206 | -107 |
Current ratio (x) | 3.63 | 2.20 | 2.78 | 1.45 | 1.89 |
Debt to equity (x) | 0.01 | 0 | 0 | 0 | 0 |
Cash as % of total assets (%) | 89 | 19 | 32 | 46 | 59 |
Geographic Revenue
| Region | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Italy revenue (AUD Mn) | 0 | 0 | 0 |
Australia revenue (AUD Mn) | 0 | 0 | 0 |
Share Price History
| Date | Price (AUD) | Source |
|---|---|---|
11 Aug 2023 | 0.08 (52-week high at the time) | InvestSMART |
12 Apr 2024 | ~0.05 (52-week low at the time) | InvestSMART |
18 Apr 2024 | ~0.046–0.049 | InvestSMART |
Nov 2024 | 0.024 (entitlement offer price) | TipRanks |
Sep 2025 | 0.025 (VSG subscription price) | Simply Wall St |
30 Jan 2026 | 0.026 | InvestSMART |
27 Feb 2026 | 0.030 | InvestSMART |
30 Apr 2026 | 0.026 | InvestSMART |
24 Jun 2026 | 0.024 | StockAnalysis |
10 Jul 2026 | 0.020–0.022 | InvestSMART |
6 Oct 2026 | 0.026 | StockAnalysis |
Valuation Snapshot
| Metric | Value | Comment |
|---|---|---|
Market cap | ≈ A$20.7m | 795.2m × A$0.026 |
Enterprise value | ≈ A$18.3m | Market cap less A$2.39m cash, no debt |
P/E | n/m | Loss-making |
EV/EBITDA | n/m | Negative EBITDA |
EV/Sales | n/m | No revenue |
P/B | ≈ 8.8x | A$20.7m / A$2.34m book equity (book understates asset value as E&E is expensed) |
EV per tonne LCE (resource) | ≈ A$8.7 per t LCE | A$18.3m / ~2.1 Mt LCE (illustrative only; ignores SOP/boron and Gorno) |
Capital Markets
| Item | Status |
|---|---|
Analyst coverage | 0 analysts (Simply Wall St) |
Dividend history / policy | Never paid; none expected |
Credit ratings (Moody's/S&P/Fitch) | Not rated |
Debt maturity profile | No debt |
Balance Sheet and Share Count (M) (FY2024–FY2026)
| Metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Contributed equity added (AUD Mn) | 2.36 | 3.25 | 5.47 |
Year-end shares outstanding (M) | 438.85 | 574.50 | 792.96 |
Analyst Conclusions
Management guidance
No financial guidance. Operational guidance from the June 2026 quarter: release of the Micon Scoping Study for Lazio; progression of drilling ESIA; continuation of BRAIN pilot-plant phases; renewal of Campagnano and Galeria licences; lodgement and processing of the Cime EL extension/amalgamation for Gorno; continuation of the Argent Partners strategic process; pursuit of further non-dilutive Italian/EU funding.
Consensus
No sell-side coverage; no consensus growth expectations.
Bull case
-
Gorno monetisation re-rates the stock: With full ownership, a retrospective environmental approval and an advisor-run process with multiple parties in due diligence, a sale or partner deal could deliver cash or carried interest worth a meaningful fraction of the ~A$18m EV.
-
Lazio Scoping Study confirms SOP-led economics: A positive Micon study, backed by independent marketing (FL Global), logistics (RINA) and reservoir (Steam) work, could support CRMA Strategic Project designation, Iren or other strategic entry, and further grants.
-
Funding alignment: A controlling shareholder that has repeatedly underwritten raises reduces the probability of a distressed outcome.
Bear case
-
Funding gap: ~A$2.4m cash and ~A$1.1–1.2m underlying quarterly burn imply another raise within months at depressed prices, extending dilution (share count already doubled since FY2023).
-
Technical and resource risk at Lazio: Mostly Inferred resource, possible lateral heterogeneity, and unproven pilot-scale processing; the Scoping Study has already slipped.
-
Governance and minority risk: A non-independent board and concentrated ownership mean minority holders have limited protection on pricing of future raises or asset sales.
Key catalysts and monitorables (next 12 months)
| Catalyst | Expected timing | Watch for |
|---|---|---|
| Lazio Scoping Study release | H2 CY2026 | Capex, opex, SOP price deck, production rate, NPV/IRR, funding pathway |
| Sep-2026 Quarterly | By 30 Oct 2026 | Cash, burn, licence renewals |
| Gorno strategic process outcome | Undetermined | Sale price/structure, retained interest |
| Capital raising | Likely late CY2026 – H1 CY2027 | Price, VSG participation |
| Campagnano/Galeria renewals | Post Sep 2026 | Tenure continuity |
| Cime EL extension/amalgamation | 2026–2027 | Regione Lombardia decision |
| Drilling ESIA submission | 2026–2027 | Permit timeline for well doublet |
| Further grants / CRMA Strategic Project | 2026–2027 | Non-dilutive funding |
| AGM | ~Nov 2026 | Board independence, remuneration |
Analyst verdict
Altamin is a speculative, controlled micro-cap whose investment case has become a two-part bet: that Gorno can be sold or partnered for value, and that Lazio's geothermal-brine flowsheet can be proven economic with SOP as the anchor product. The company has done the hard, inexpensive groundwork well — assembling credible technical partners (RINA, Steam, SRC, ANSTO, Micon, FL Global), winning a A$3.62m ministerial grant, renewing the bulk of its Lazio tenure to 2028, and securing a retrospective environmental approval that materially improves Gorno's saleability. These are real, documentable de-risking steps achieved on roughly A$4m per year of spend.
The financial position, however, leaves little margin for delay. Cash of A$2.39m covers only a few quarters of underlying activity; book equity is A$2.34m after A$71m of capital raised since inception; and every recent raise has been priced at A$0.024–0.025, close to today's A$0.026. The Lazio Scoping Study — the single most important near-term data point — has already slipped beyond its H1 CY2026 target, and the resource underpinning it is predominantly Inferred. Governance is a further discount factor: a three-person, entirely non-independent board controlled by a ~60% shareholder.
On balance, at an EV of roughly A$18m, the market is ascribing modest value to two assets that have each consumed far more capital historically, which leaves asymmetric upside if either the Gorno process or the Lazio study delivers. But the most probable near-term event is another dilutive raise, and the timing and pricing of that raise relative to the Scoping Study release will largely determine minority-shareholder outcomes.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Executive Leadership Team
| Name | Role | Tenure | Background (as disclosed) | Compensation |
|---|---|---|---|---|
Peter Edwards | Non-Executive Chairman | Appointed 21/22 Aug 2025 | CEO of Victor Smorgon Group 1995–2023, now its Executive Chairman; involved in VSG resource investments including ownership/operation of Stawell Gold Mines (Victoria) and investment in the Leichhardt Eramurra Solar Salt Project (WA); represents the majority shareholder; held no AZI securities on appointment | — |
Geraint Harris | CEO & Director | Previously Managing Director (to Mar 2024); re-appointed Director 22 Aug 2025, CEO from 1 Sep 2025 | Mining engineer; previously led Lazio and Gorno development; led ministerial engagement in Rome | A$60,000 director fees plus proposed 10m options (subject to AGM approval); FY2024 total A$166k incl. A$108k salary; FY2023 A$185k (Simply Wall St); holds ~1.7–1.9% |
Stephen Hills | Finance Director, CFO & Company Secretary | Joined as CFO Jun 2017; Interim MD Mar 2024 – Aug 2025 | Prior roles: financing and commissioning of Kipoi Copper Project (DRC); TSX listing of Mirabela Nickel and Santa Rita nickel mine project finance (Brazil); CFO of Gallery Gold (Mupane gold mine, Botswana); CFO of a global laboratory services group sold to SGS | ~A$410.65k total (Simply Wall St, latest reported year); 2.25m performance shares issued 1 Dec 2025; 3.5m options |
Enej Catovic | Chief Operating Officer | Named in FY2025 Annual Report | Brine/SOP process engineering and project experience (per FY2025 Annual Report description) | — |
Erik Bergseng, CFA | Investor Relations (external, NRInvestor) | — | — | Not applicable |
“—” = not publicly disclosed.
Board & Management Changes
| Date | Change | Context |
|---|---|---|
Mar 2024 | Geraint Harris steps down as MD; Stephen Hills becomes Interim MD | Cost reduction during JV period; Gorno managed via Vedra/Appian |
21–22 Aug 2025 | Peter Edwards appointed NE Chair; Alexander Burns (Chair) and Marcello Cardaci (NED, on board since 2014) resign | Board aligned with majority shareholder ahead of Lazio push |
1 Sep 2025 | Geraint Harris returns as CEO and Director | Continuity on Lazio and Gorno |
1 Dec 2025 | Performance shares issued to Stephen Hills | Approved at 28 Nov 2025 AGM |
Major Shareholders
| Holder | Shares (M) | Stake (%) | Note |
|---|---|---|---|
VBS Exchange Pty Ltd (Victor Smorgon Group) | 339.66 | 47.7 | Simply Wall St register (stake calculated on a pre-2026 share count) |
Gannet Capital Pty Ltd ATF Victor Smorgon Partners Global Multi-Strategy Fund | 101.99 | 14.3 | Same source; added 31.65m shares at A$0.025 on 25 Sep 2025 |
Alexander Burns (former Chair) | 37.10 | 5.21 | Former director |
Marcello Cardaci (former NED) | 19.36 | 2.72 | Former director |
Gavin Dunhill | 13.98 | 1.96 | Private investor |
Geraint Harris (CEO) | 13.74 | 1.93 | Insider |
John Bylsma | 8.18 | 1.15 | Private investor |
Chetan Enterprises Pty Ltd | 5.98 | 1.13 | Private |
Competitive Landscape
Key Competitors
| Company | Project | Positioning vs Altamin |
|---|---|---|
Vulcan Energy Resources (ASX: VUL) | Upper Rhine (Germany); also holds Cesano-area licences in Lazio with Enel | Far better funded and more advanced; direct neighbour at Cesano — Adamas noted landholding consolidation between Vulcan and Altamin could make sense |
Lithium de France (Alsace) | Geothermal lithium, France | Cited by Iren/Altamin as comparable EU project |
Imerys British Lithium (Cornwall, UK) | Hard-rock lithium | Cited as EU-region lithium competitor |
Cornish Lithium (UK) | Geothermal brine and hard-rock | European geothermal-lithium peer |
ExxonMobil (Arkansas, USA) | Smackover brine lithium | Global DLE benchmark cited by Iren/Altamin |
K+S AG (Germany) | Natural salts conversion | Major European SOP incumbent; large-cap |
Tessenderlo Group (Belgium) | Mannheim | Major European SOP producer; the process Altamin positions against |
Compass Minerals (USA) | Solar evaporation of brine | Largest North American SOP producer |
SQM (Chile) | Solar evaporation of brine | Global potassium/lithium producer |
Chinese Mannheim and brine producers | Mixed | Dominant global SOP volume |
Boliden AB | Tara (Ireland), Garpenberg (Sweden) | Integrated European zinc miner-smelter; potential strategic buyer category |
Group Eleven Resources | Irish zinc exploration | Junior peer |
Other Italian brownfield revivals | Various | Limited; Altamin cites "first mover" status in restarting Italian mining |
Peer Comparison FY2026
| Metric | Altamin | Vulcan Energy | European SOP incumbents | Boliden |
|---|---|---|---|---|
Revenue | Nil | Minimal (pre-production lithium; some geothermal/drilling services) | Multi-billion euro | Multi-billion euro |
Growth | n/m | Development | Low single digit | Commodity-driven |
Margins | n/m | Negative | Positive | Positive |
R&D intensity | — | High | Low | Low |
Market cap | ~A$21m | — | Large-cap | Large-cap |
Recent Developments
--



