Altech Batteries Limited Overview
Altech Batteries Limited is a Perth-based, ASX-listed micro-cap that spent almost two decades pursuing advanced-materials and battery-technology projects without reaching commercial production.
It began as Altech Chemicals, a would-be producer of high-purity alumina (HPA) from kaolin. It planned to mine kaolin at Meckering, Western Australia, and refine it in Johor, Malaysia. That project stalled and was impaired. Altech then rebranded around two German battery projects in Saxony:
-
CERENERGY®, a sodium-chloride (sodium-nickel-chloride) solid-state grid-storage battery, developed in a 75/25 joint venture with Fraunhofer IKTS.
-
Silumina Anodes™, an alumina-coated silicon additive for lithium-ion anodes.
In May and July 2026 the board discontinued both projects. It cited failure to secure strategic partners, offtake or project finance, despite a conditional €46.1–46.7 million German STARK grant for CERENERGY.
Today Altech is effectively a cash-constrained shell. Its assets are residual land sale proceeds, a retained mining lease, and the liquidation proceeds of its German subsidiaries. Its strategy is asset monetisation and the search for a new project.
What the company does (current state, October 2026)
Altech currently has no operating business and no commercial product. Its activities are:
-
Liquidating Altech Industries Germany GmbH (AIG), the Silumina Anodes project vehicle. AIG was placed into liquidation on 30 June 2026, with net proceeds to flow to Altech as sole shareholder.
-
Unwinding Altech Batteries GmbH (ABG), the CERENERGY project vehicle, 75% owned via Altech Energy Holdings GmbH and 25% by the Fraunhofer Society.
-
ABG's primary asset, a land parcel in Spreetal, Saxony, is to be sold back to the municipality for gross proceeds of approximately €675,000.
-
Net proceeds are to be split 75/25 after creditor claims.
-
-
Monetising other residual assets.
-
The Meckering (WA) land was sold for approximately A$950,000 (announced 29 June 2026), with Mining Lease M70/1334 retained under an access and option agreement with the new landowner.
-
Malaysian land (the former HPA plant site in Johor) was marketed for sale and was pledged as security for the Deutsche Balaton bond facility (March 2025).
-
-
Searching for "a new project with potential to provide future for company and shareholders" (ASX announcement, 31 July 2026).
Company's own description (latest pre-discontinuation disclosure)
In its FY2025 Annual Report and announcements through mid-2026, Altech described itself as:
-
"a specialty battery technology company that has a joint venture agreement with world-leading German battery institute Fraunhofer IKTS to commercialise the revolutionary CERENERGY® Sodium Chloride Solid State (SCSS) Battery."
-
A company whose CERENERGY® batteries are "fire and explosion-proof," have a long life span, operate in extreme climates, and are free of lithium, cobalt, graphite and copper.
It also described its patented Silumina Anodes™ coating technology as aiming to raise lithium-ion battery capacity by incorporating high-purity-alumina-coated silicon and graphite into the anode.
The FY2025 Annual Report defined four reportable segments: Silumina Anodes, CERENERGY, High Purity Alumina (HPA) and Corporate. Operations were located in Germany, Australia and Malaysia.
Business model and revenue model
| Dimension | Historical intent | Actual outcome |
|---|---|---|
| Business model | Pre-revenue developer: build first-of-kind manufacturing plants (HPA in Malaysia; CERENERGY 120 MWh and Silumina 8,000 tpa in Saxony), then sell product under offtake | No plant reached commercial production; all three projects abandoned or impaired |
| Revenue model (intended) | Product sales (HPA powder; CERENERGY battery packs/BESS; Silumina anode material); brief distribution model for third-party UPS batteries (AMPower, Sep–Dec 2025) | Product revenue: nil. Reported revenue (~A$0.08–0.09m per year) is interest and other income |
| Product vs service vs subscription vs licensing mix | 100% intended product; licensing of HPA coating technology to subsidiary (intra-group only) | Not applicable (no commercial revenue) |
| Funding model | Equity placements, rights issues, options, German grants, related-party bonds, part-sales of project subsidiaries to affiliate AAM | Continuous dilution: share count rose from ~1,286m (FY2021) to ~2,669m (2026) |
Value chain position
The intended positions were:
HPA (2014–2022): vertically integrated, from kaolin mine (Meckering, WA) to refinery (Johor, Malaysia) to 4N HPA powder for LED substrates, lithium-ion separators and synthetic sapphire.
CERENERGY (2022–2026): cell and battery-pack manufacturer and system integrator for stationary storage, licensing Fraunhofer IKTS technology. Fraunhofer retains the patents.
Silumina Anodes (2020–2026): battery-materials processor supplying a coated silicon additive to anode and cell makers.
AMPower distribution (Sep–Dec 2025): brand owner and distributor of third-party sodium-nickel-chloride UPS batteries made in China.
Customer types and end-markets targeted
| Project | Target customers | End-markets |
|---|---|---|
| CERENERGY® | Utilities, grid operators, renewable developers, industrial users | Stationary / grid energy storage (BESS), renewables firming, long-duration storage in Europe |
| AMPower-sourced SNC UPS batteries | Critical infrastructure, data centres, telecom, explosion-sensitive industrial sites | Uninterruptible power supply in Europe, Australia, US |
| Silumina Anodes™ | Battery cell manufacturers, automotive OEMs | EV and consumer-electronics lithium-ion batteries |
| HPA (legacy) | LED substrate makers, separator-coating suppliers, sapphire producers | LED lighting, lithium-ion separators, semiconductors |
Independent characterisation
Altech has been a serial pre-revenue project developer. Its main capabilities were capital-markets access (especially from German retail and affiliated investors through Deutsche Balaton and AAM), grant-seeking, and engineering studies.
Its three flagship projects shared one failure mode. They required large, first-of-kind capital commitments (US$280m for HPA; a 120 MWh CERENERGY plant requiring a €46m grant to cover ~30% of eligible capex; an 8,000 tpa anode plant). Each depended on securing strategic partners or offtakers, and the company never did. Each ended in impairment or discontinuation.
As of October 2026, Altech is a cash shell with a residual land and mining-lease asset base and a 2.67-billion-share register. Any equity value depends on a new transaction such as a reverse takeover or new project acquisition.
Strategy
Stated strategy (current)
The 31 July 2026 announcement sets out two themes:
-
"Monetisation of remaining assets"
-
"Finding a new project with potential to provide future for company and shareholders"
The liquidation of ABG is expected to reduce costs.
Stated strategy (FY2025 Annual Report / Oct 2025 placement — now superseded)
The themes were:
-
Commercialise CERENERGY® through a 120 MWh plant in Saxony, with a 4 GWh giga-factory as a long-term option.
-
Commercialise Silumina Anodes™ through an 8,000 tpa plant and offtake.
-
Gain "immediate market entry" through AMPower-produced, Altech-branded SNC UPS batteries.
-
Build selling, distribution and installation infrastructure across Europe, Australia and the US.
Strategic initiatives register (last 24 months)
| Date | Initiative | Type | Target / scope | Outcome |
|---|---|---|---|---|
| Mar 2025 | Deutsche Balaton €2.5m bearer-bond facility | Financing | Working capital without dilution; secured on Malaysian land | — |
| 2,025 | CERENERGY plant permitting | Project | Environmental and construction permits | Achieved |
| Apr 2025 | Hannover Messe 2025 showcase | Marketing | Industry and investor engagement | Completed |
| 2,025 | CERENERGY extreme-condition testing; prototype | Technical | Validate safety and performance | Reported success |
| 2,025 | Silumina pilot plant commissioning | Technical | Customer sampling | Operational |
| 30 Sep 2025 | AMPower SNC UPS distribution | New business | Immediate revenue in Australia, Europe, US | Exited 18 Dec 2025 without disclosed sales |
| Oct 2025 | A$6m placement | Financing | UPS trials, 90 kWh prototype, 120 MWh plant development, giga-factory assessment | Raised; funds largely consumed by Jun 2026 |
| 28 Nov 2025 | Board and management overhaul | Governance | New MD and Chair | Completed |
| 6 Jan 2026 | STARK grant (€46.11m; later cited as €46.7m) | Funding | ~30% of eligible CERENERGY capex; financial close by 30 Jun 2026 | Deadline extended to 30 Sep 2026; project then discontinued, so the grant lapses |
| 13 Jan 2026 | Silumina lab relocated to Germany | Cost programme | Operational and cost efficiency | Completed, then made redundant by discontinuation |
| 11 Mar 2026 | Kerrigan licence surrender | Cost programme | Reduce holding costs | Completed |
| 10–11 May 2026 | Silumina discontinued; AIG liquidation | Restructuring | Focus funds on CERENERGY | Completed |
| 29 Jun 2026 | Meckering land sale | Asset monetisation | ~A$950k working capital | Completed |
| 31 Jul 2026 | CERENERGY discontinued; ABG unwind | Restructuring | Cut costs; recover land value | In progress |
| From Jul 2026 | New-project search | Strategy | Unspecified | No project announced as of this dossier date |
Sustainability / ESG commitments
Altech's ESG narrative was product-based: lithium- and cobalt-free batteries, and lower-carbon HPA made from kaolin. No formal emissions targets have been disclosed.
Medium-term financial targets / guidance
None. Altech has never issued revenue or earnings guidance. Earlier project studies (HPA, CERENERGY DFS, Silumina) contained NPV, IRR and EBITDA projections, but these are now void.
Products & Services
None of the products below reached commercial sale by Altech. All are listed for completeness and historical value.
CERENERGY® segment (discontinued 31 Jul 2026)
| Product | Description | Key specifications / capabilities (as disclosed by Altech) | Target customer | Year | Pricing |
|---|---|---|---|---|---|
| CERENERGY® SCSS cell | Sodium-nickel-chloride ("salt") solid-state cell with ceramic (β″-alumina) electrolyte, technology of Fraunhofer IKTS | No lithium, cobalt, graphite or copper; claimed fire- and explosion-proof; long life; operates in extreme temperatures; passed extreme-condition safety tests (2025) | Grid / BESS integrators | Prototype cells 2023–2025 | — |
| CERENERGY® battery pack ("ABS60" / GridPack) | Multi-cell module for stationary storage (~60 kWh class per Altech materials; specs not re-verified) | Grid-scale stationary storage | Utilities, renewable developers | Prototype exceeded expectations (reported Q3 FY2025) | — |
| 90 kWh CERENERGY prototype | Larger demonstration battery | Stated milestone in Oct 2025 placement | Demonstration / customer validation | Planned FY2026 | Not applicable |
| 120 MWh CERENERGY plant | Planned manufacturing facility, Schwarze Pumpe / Spreetal, Saxony | Environmental and construction permits obtained 2025; €46.1–46.7m STARK grant conditional | Captive manufacturing | Discontinued Jul 2026 | Not applicable |
| 4 GWh "giga-factory" concept | Preliminary assessment | Stated in Oct 2025 placement | Not applicable | Concept only | Not applicable |
IP note: Patent rights to CERENERGY® technology remain with the Fraunhofer Society (ASX, 31 Jul 2026).
AMPower-sourced sodium-nickel-chloride UPS batteries (Sep–Dec 2025)
| Product | Description | Capabilities | Target customer | Status |
|---|---|---|---|---|
| Altech-branded SNC UPS battery | Made by AMPower (Chilwee Group subsidiary; originally a JV with GE for Durathon-branded batteries) to Altech specifications under Altech brand | Conventional "ZEBRA" design SNC chemistry (same chemistry as CERENERGY); fireproof; long cycle life; suited to explosion-sensitive sites | Data centres, critical infrastructure, industrial UPS in Australia, Europe, US | Final UPS engineering design completed Nov 2025; board decided on 18 Dec 2025 to discontinue the AMPower direction. No sales disclosed |
| SNC BESS (planned co-development) | Household, industrial and grid BESS with AMPower | Not specified | Not specified | Abandoned Dec 2025 |
Silumina Anodes™ segment (discontinued 10–11 May 2026)
| Product | Description | Key specifications (as disclosed) | Target customer | Year | Pricing |
|---|---|---|---|---|---|
| Silumina Anodes™ (1st generation) | Silicon particles coated with HPA, blended into graphite anode | ~30% capacity uplift claimed in early work | Li-ion cell makers, EV OEMs | c. 2021–2023 | — |
| Silumina Anodes™ (2nd generation, "2G Silumina") | Optimised silicon content | ~50% capacity increase reported in 2025; long-cycle retention results with 5% 2G Silumina (Oct–Nov 2025) | Cell makers; anode makers wanting to apply Altech coating to their own substrate | 2,025 | — |
| Silumina coating-as-a-service concept | Applying Altech coating to customers' own graphite/silicon substrate | Under assessment by an unnamed party (ASX, 24 Nov 2025) | Anode producers | Nov 2025 | — |
| Silumina pilot plant | 120 kg/day pilot plant, Saxony | Operational 2025 for customer sampling | Qualification | 2024–2025 | Not applicable |
| 8,000 tpa Silumina plant | Commercial plant plan, Saxony | Definitive studies completed; no funding or offtake | Not applicable | Discontinued May 2026 | Not applicable |
High Purity Alumina segment (legacy, impaired)
| Product | Description | Specifications | Target customer | Status |
|---|---|---|---|---|
| 4N HPA (99.99% Al₂O₃) | HPA produced directly from high-purity kaolin (Meckering) | Planned 4,500 tpa Johor plant; ~US$280m fixed-price EPC (SMS group); long-term price assumption US$26,900/t in early studies | LED, Li-ion separator, sapphire makers | Construction halted; impaired FY2023; Meckering land sold Jun 2026 |
| HPA coating technology | Proprietary alumina coating; licensed to subsidiary AIG for Silumina | Patented | Internal | Value tied to discontinued Silumina project |
Financial Narrative
Basis and sources:
-
Figures are from S&P Global Market Intelligence's standardisation of Altech's FY2021–FY2026 annual reports (via StockAnalysis.com, data updated 1 October 2026), plus ASX quarterly reports.
-
A$ millions unless stated. FY ends 30 June.
-
FY2026 income-statement data reflect the FY2026 Annual Report, released approximately September 2026.
Income statement (FY2022–FY2026)
FY2021 reference point: Net income attributable was +A$2.33m, on operating income of −A$4.02m, driven by non-operating gains. Revenue was nil.
Margins:
- Gross margin is mechanically 100%. Operating, EBITDA and net margins are not meaningful: S&P shows an operating margin of −16,451% in FY2025 and −10,548% in FY2026.
Revenue CAGR (FY2022–FY2026): not meaningful, because the base was zero and revenue is non-operating.
Commentary:
Operating cost trend: Operating losses peaked at A$20.4m in FY2024, at the height of parallel CERENERGY and Silumina study, pilot and prototype spending (R&D A$6.0m). They then fell to A$13.5m in FY2025 and A$9.4m in FY2026 as spending was cut. The R&D line rose slightly in FY2026 (A$2.83m), reflecting final prototype and long-cycle testing before discontinuation.
Non-operating items dominate the bottom line: - FY2023: the A$63.96m asset write-down (HPA plant impairment) was partly offset by a A$14.74m gain on sale of investments (the 25% AIG sale to AAM).
-
FY2024: A$12.33m loss on sale of investments, most likely the write-down or disposal of Altech's holding in AAM.
-
FY2026: A$26.89m of asset write-downs (Saxony plant assets and capitalised project costs), a A$5.01m goodwill impairment, A$9.79m of other unusual items, A$1.91m loss on investments and A$0.68m loss on asset sales. These were partly offset by a A$9.96m gain from discontinued operations, most likely the deconsolidation of AIG.
Minority interests: Minority interests absorbed A$4.1–4.2m of losses each year in FY2024–FY2026. This reflects Fraunhofer's 25% of ABG and AAM's 25% of AIG.
Per-share losses: The EPS trend understates the damage. The weighted share count rose 2.3× from FY2022 to FY2026.
Balance sheet (FY2021–FY2025)
Post-FY2025 data points:
31 Dec 2025 (half-year): total assets A$33.86m; cash A$2.40m; total debt A$0.06m; current liabilities A$8.11m; equity A$25.64m; working capital −A$4.43m.
31 Mar 2026 (Q3 report): cash A$1.4m.
30 Jun 2026 (Q4 report): cash A$548k, about 0.43 quarters of funding at the then burn rate.
- Given A$26.89m of write-downs and a A$5.01m goodwill impairment, FY2026 equity is expected to be a fraction of the A$25.6m at December 2025.
Goodwill and intangibles: S&P shows no separately classified goodwill or intangibles for FY2021–FY2025. However, the FY2026 income statement records a A$5.01m goodwill impairment, and capitalised development costs (cash purchases of intangibles: A$3.75m in FY2023, A$6.71m in FY2024, A$3.35m in FY2025) appear to have been classified within PP&E or other long-term assets. This is a classification discrepancy between the standardised data and the statutory notes; consult the FY2026 Annual Report.
Debt: Long-term debt rose to A$12.88m by FY2025. This largely comprised shareholder or affiliate funding, including the Deutsche Balaton bonds. It fell to A$0.06m by December 2025, which implies conversion, repayment or reclassification to other current liabilities (A$4.02m at December 2025).
Cash flow (FY2021–FY2025)
FY2026:
-
Free cash flow was −A$8.44m (S&P), the lowest burn in four years, reflecting cost cuts.
-
Funding came from the ~A$6m October 2025 placement (S&P shows A$6.61m of equity issued in the twelve months to December 2025), net borrowings of ~A$3.6m, and asset sales (Meckering land ~A$950k).
Cumulative FY2021–FY2025: ~A$61.6m of free cash outflow, financed by ~A$63.0m of new equity and ~A$10.0m of net new debt.
Ratios
Other ratios:
Trailing twelve months to 31 Dec 2025 (S&P): ROE −54.9%; ROA −18.3%; ROIC −21.9%; current ratio 0.45; interest coverage −106.8x; Altman Z-score −0.86; Piotroski F-score 1.
Not meaningful: ROIC (for FY2021–FY2025 individually), net debt/EBITDA, interest coverage and the cash conversion cycle, because EBITDA is negative and there is no revenue base.
Trend synthesis
The five-year record falls into three phases:
-
FY2021–FY2022: well-capitalised but static HPA developer. Net cash was A$6–11m and assets ~A$90–98m, mostly the Johor plant under construction.
-
FY2023: impairment year. The HPA write-down cut total assets by more than half.
-
FY2024–FY2026: battery-pivot phase. Burn was A$12–21m a year. It was funded by heavy dilution and shareholder or affiliate debt, and ended in A$37m+ of further write-downs and impairments in FY2026.
The inflection to watch is not operational. It is whether the residual cash, liquidation proceeds and land sales can cover the company's liabilities. Those include the Deutsche Balaton bond, repayable by 31 October 2026 if drawn and outstanding.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Segment Overview
| Segment | Contents | Products / services | Status (Oct 2026) |
|---|---|---|---|
CERENERGY® | Altech Batteries GmbH (75% via Altech Energy Holdings GmbH; Fraunhofer 25%); Spreetal (Schwarze Pumpe) land, Saxony | CERENERGY® SCSS / SNC cells and ABS60 / GridPack battery modules; 120 MWh plant plan | Discontinued 31 Jul 2026; ABG to be liquidated |
Silumina Anodes™ | Altech Industries Germany GmbH (Altech 100% at liquidation, per May 2026 announcement); Saxony land, pilot plant, R&D lab | Silumina Anodes™ alumina-coated silicon/graphite anode material; 8,000 tpa plant plan | Discontinued 10–11 May 2026; AIG liquidated from 30 Jun 2026 |
High Purity Alumina (HPA) | Altech Chemicals Australia Pty Ltd; Malaysian subsidiary (Johor land); Meckering kaolin (WA) | 4N HPA (legacy) | Dormant/impaired; Meckering land sold Jun 2026; Malaysian land pledged and marketed |
Corporate | Parent entity (Perth), treasury, listed-company costs | Head-office functions | Continuing (shell) |
Segment revenue (AUD K)
| Segment revenue (AUD K) | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
CERENERGY | 0 | 70 | 20 |
Silumina Anodes | 0 | 20 | 60 |
High Purity Alumina | 0 | 0 | 0 |
Total (standardised) | 20 | 90 | 80 |
Change by Period
| Period | Change |
|---|---|
FY2021–FY2022 | Single focus: HPA (kaolin to HPA) |
FY2023 | Battery segments added (Silumina Anodes, CERENERGY) alongside HPA and Corporate |
FY2026 | Silumina Anodes (and, after year-end, CERENERGY) treated as discontinued. S&P records A$9.96m "earnings from discontinued operations" in FY2026. The FY2026 Annual Report segment note should be checked for formal re-presentation |
Income Statement and Share Count (millions)
| Metric (AUD Mn) | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue (standardised) | 0 | 0.02 | 0.09 | 0.08 | 0.09 |
Revenue as reported (incl. other income) | 0.47 | 15.04 | 0.26 | 0.18 | 0.09 |
Gross profit | 0 | 0.02 | 0.09 | 0.08 | 0.09 |
SG&A | 2.37 | 4.96 | 6.83 | 6.49 | 4.54 |
Research & development | 0.55 | 3.75 | 6.00 | 2.08 | 2.83 |
Other operating expenses | 2.01 | 3.38 | 4.05 | 4.16 | 3.17 |
Operating income (EBIT) | -5.83 | -13.49 | -20.39 | -13.53 | -9.43 |
EBITDA | -5.73 | -13.33 | -20.15 | -12.82 | -5.33 |
Pre-tax income | -6.07 | -62.30 | -32.80 | -16.46 | -53.76 |
Income tax (benefit) | -0.27 | -0.52 | -0.51 | -0.60 | -0.43 |
Net income incl. minorities | -5.80 | -61.78 | -32.29 | -15.86 | -43.36 |
Net income attributable to shareholders | -5.73 | -59.72 | -28.06 | -11.72 | -39.24 |
Weighted avg shares basic (millions) | 1,081 | 1,081 | 1,288 | 1,502 | 2,536 |
EPS basic (AUD cents, derived) | -0.53 | -5.52 | -2.18 | -0.78 | -1.55 |
EPS diluted (AUD cents, derived) | -0.53 | -5.52 | -2.18 | -0.78 | -1.55 |
Dividends per share (AUD cents) | 0 | 0 | 0 | 0 | 0 |
Balance Sheet and Share Count (millions)
| Metric (AUD Mn) | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Total assets | 89.77 | 98.39 | 44.88 | 38.10 | 36.89 |
Cash and equivalents | 6.73 | 10.91 | 3.57 | 2.12 | 0.45 |
Receivables | 0.22 | 0.47 | 2.84 | 4.04 | 1.97 |
Total current assets | 6.98 | 11.42 | 6.46 | 6.20 | 2.49 |
Property plant and equipment | 73.20 | 76.41 | 17.98 | 26.38 | 31.76 |
Long-term investments | 2.09 | 3.35 | 17.85 | 5.52 | 2.64 |
Total current liabilities | 0.69 | 0.69 | 6.59 | 5.90 | 3.34 |
Short-term debt and current leases | 0.03 | 0.06 | 0.03 | 0.04 | 0.04 |
Long-term debt and leases | 0.05 | 0.03 | 4.24 | 9.41 | 12.91 |
Total debt | 0.08 | 0.09 | 4.28 | 9.45 | 12.94 |
Net debt (negative = net cash) | -6.65 | -10.82 | 0.71 | 7.33 | 12.49 |
Total liabilities | 0.84 | 0.85 | 11.00 | 15.47 | 16.45 |
Total equity incl. minorities | 88.93 | 97.54 | 33.88 | 22.64 | 20.44 |
Equity attributable to owners | 88.93 | 97.61 | 35.99 | 28.98 | 30.92 |
Goodwill and intangibles (reported separately) | 0 | 0 | 0 | 0 | 0 |
Working capital | 6.29 | 10.73 | -0.13 | 0.30 | -0.85 |
Shares outstanding year-end (millions) | 1,286 | 1,427 | 1,427 | 1,711 | 2,003 |
Cash Flow
| Metric (AUD Mn) | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Operating cash flow | -3.70 | -4.82 | -8.28 | -11.41 | -7.65 |
Capital expenditure | -5.21 | -2.62 | -3.46 | -9.54 | -4.94 |
Free cash flow | -8.91 | -7.44 | -11.74 | -20.96 | -12.59 |
Purchase of intangibles (capitalised development) | 0 | 0 | -3.75 | -6.71 | -3.35 |
Investing cash flow | -6.79 | -4.33 | -2.15 | -13.66 | -8.28 |
Equity issued | 16.66 | 13.83 | 0 | 19.58 | 12.97 |
Net debt issued (repaid) | -0.27 | -0.06 | 3.08 | 5.00 | 2.29 |
Financing cash flow | 16.38 | 13.35 | 3.08 | 23.63 | 14.26 |
Dividends paid | 0 | 0 | 0 | 0 | 0 |
Share buybacks | 0 | 0 | 0 | 0 | 0 |
Net change in cash | 5.90 | 4.18 | -7.34 | -1.45 | -1.67 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
ROE % (net income / year-end total equity) | 2.6 | -5.9 | -176.3 | -123.9 | -57.3 |
ROA % (net income / year-end total assets) | 2.6 | -5.8 | -133.1 | -73.6 | -31.8 |
Current ratio (x) | 10.1 | 16.6 | 1.0 | 1.1 | 0.7 |
Debt to equity (x) | 0.00 | 0.00 | 0.13 | 0.42 | 0.63 |
Asset turnover (x) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Segment Overview — CERENERGY
| Segment | Principal geography |
|---|---|
CERENERGY | Germany (Saxony) |
Silumina Anodes | Germany (Saxony) |
HPA | Malaysia (Johor plant site) and Australia (Meckering kaolin) |
Corporate | Australia (Perth) |
Region Overview
| Region | Disclosure status |
|---|---|
Germany | Not publicly disclosed (amounts) |
Malaysia | Not publicly disclosed (amounts) |
Australia | Not publicly disclosed (amounts) |
Share Price & Returns
| Reference point | Price (AUD) | Source |
|---|---|---|
~Dec 2023 | ~0.07 | StockLight (18 Dec 2023 close) |
16 Sep 2025 | ~0.03 | StockLight (FY2025 Annual Report day) |
6 Jan 2026 | 0.026 | InvestSMART (price at release) |
31 Mar 2026 | ~0.018 (market cap A$48.0m) | Company Q3 report / InvestSMART |
11 May 2026 | ~0.010 (after −41%) | StockLight |
30 Jun 2026 | 0.010 (market cap A$26.7m) | Company Q4 report |
31 Jul 2026 | ~0.002 | InvestSMART / StockLight |
7 Oct 2026 | 0.002 | StockAnalysis |
Share Price & Returns by Period
| Period | Return | Basis |
|---|---|---|
1-year | about −97% | 52-week change −96.97% to end-Aug 2026 (S&P); 52-week range A$0.001–0.059 |
3-year | about −97% | From ~A$0.07 (Dec 2023) |
Share Count (millions) and Capital Markets Data
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Shares outstanding year-end (millions) | 1,286 | 1,427 | 1,427 | 1,711 | 2,003 |
Cash year-end (AUD Mn) | 6.73 | 10.91 | 3.57 | 2.12 | 0.45 |
Valuation Multiples
| Multiple | Altech (current) | Comment |
|---|---|---|
P/E | Not meaningful (losses) | — |
P/S | ~36x (on A$0.11m trailing revenue) | Not meaningful |
P/B | ~0.16x (on December 2025 book value of A$25.6m) | Pre-dates FY2026 write-downs; post-impairment P/B likely much higher |
Capital Instruments
| Instrument | Number | Terms | Status |
|---|---|---|---|
Unlisted options | 126.67m | Exercise price A$0.065, expiry 31 Oct 2028 | Deep out of the money |
Unlisted options | 28.55m | Exercise price A$0.08, expiry 30 Apr 2026 | Expired |
Performance rights | 55.15m | — | Partially ceased in Jul 2026 per Appendix 3H |
Analyst Conclusions
Management guidance
No financial guidance. Management's stated agenda (31 Jul 2026) is:
-
Monetise remaining assets.
-
Complete the ABG and AIG liquidations.
-
Find a new project.
Consensus expectations
None (no analyst coverage).
Bull case (grounded in data)
-
Cash-shell optionality. An ASX-listed vehicle with roughly A$1–2m of potential near-term cash inflows could attract a reverse takeover at a premium to a ~A$5m market cap. Those inflows comprise:
-
Meckering land ~A$950k;
-
75% of net Spreetal proceeds on ~€675k gross;
-
AIG land ~€450k plus equipment;
-
the possible Malaysian land sale.
-
-
Residual assets and tax losses: the Meckering mining lease, HPA and Silumina patents, and over A$130m of accumulated losses could add value in a recapitalisation if their use is preserved.
-
Patient anchor shareholders: the Deutsche Balaton / AAM group has repeatedly funded Altech and controls the board, so it could underwrite a restructuring rather than let the vehicle fail.
Bear case (grounded in data)
-
Funding gap: A$548k cash at 30 Jun 2026 versus a quarterly burn of more than A$1m, plus a bond repayment due 31 Oct 2026. Insolvency or administration is a realistic outcome.
-
Residual proceeds likely fully consumed by creditors, liquidation costs, corporate overhead and Fraunhofer's 25% share of ABG, leaving little for equity.
-
Extreme dilution: any recapitalisation at A$0.001–0.002 on a 2.67bn-share base would heavily dilute existing holders. AAM, itself with negative equity (Jul 2026), may be unable to participate.
Key catalysts and monitorables (next 12 months)
| # | Catalyst / monitorable | Expected timing |
|---|---|---|
| 1 | Q1 FY2027 Appendix 5B: cash, burn, liquidation receipts | By ~31 Oct 2026 |
| 2 | Deutsche Balaton bond repayment or refinancing | By 31 Oct 2026 |
| 3 | Annual General Meeting: board re-elections, remuneration vote, capital-raising approvals (LR 7.1A) | ~Nov 2026 |
| 4 | Completion of ABG and AIG liquidations and distribution of net proceeds | H2 CY2026 – 2027 |
| 5 | Malaysian (Johor) land sale | Unscheduled |
| 6 | Announcement of a new project, acquisition or reverse takeover, and any related ASX recompliance | Unscheduled |
| 7 | ASX query letters, suspension or Listing Rule 12.1 actions | Ongoing risk |
| 8 | AAM restructuring outcomes after its September 2026 EGM | Q4 CY2026 |
| 9 | Any administrator appointment or insolvency event | Risk event |
Concluding analyst verdict
Altech Batteries is no longer a battery company in any operational sense. Over nearly two decades it moved from high-purity alumina (2014–2022) to silicon-enhanced anodes (2020–2026) and sodium-chloride solid-state grid batteries (2022–2026), with a three-month detour into Chinese-made UPS distribution. Each pivot followed the same arc:
-
technically credible pilots;
-
permits and studies;
-
headline grant or debt support (KfW's US$190m mandate; a €46m STARK grant);
-
failure to secure an equity partner or offtake;
-
impairment.
The FY2026 accounts crystallise the outcome: A$39.2m attributable loss, A$26.9m of write-downs, and a balance sheet that will have shrunk sharply from December 2025's A$25.6m of equity.
The investment case today is a liquidation-and-optionality calculation, not a growth thesis.
Upside: is limited to residual cash from land and equipment sales, the retained Meckering mining lease, possible use of tax losses, and the value of an ASX listing to a vendor seeking a reverse takeover.
Downside: is immediate. Cash of A$548k at 30 June 2026 covers less than half a quarter of the historical burn. The Deutsche Balaton bonds fall due on 31 October 2026. The supportive German shareholder group is itself financially impaired.
At about A$5m market capitalisation, the market prices Altech as an option on a recapitalisation. Holders would bear near-total dilution even in the success case.
Governance warrants attention. The board is three people, includes a director tied to the controlling shareholder group, and was installed after an uncontested approach by that group. Minority holders should scrutinise any related-party recapitalisation or asset transfer closely.
Verdict: Altech is a distressed shell with high probability of further dilution or insolvency. Fundamental equity value is indeterminate pending the Q1 FY2027 report and the outcome of the October 2026 bond maturity.
SOURCE LIST (primary and secondary)
Altech ASX announcements:
-
30 Sep 2025 (AMPower)
-
24 Nov 2025 (Silumina assessment)
-
28 Nov 2025 (board changes)
-
2 Jan 2026 (expiry of ATCOC options)
-
6 Jan 2026 (STARK grant)
-
29 Apr 2026 (Q3 FY2026 report)
-
11 May 2026 (Silumina discontinued)
-
29 Jun 2026 (Meckering land sale)
-
2 Jul 2026 (grant deadline extension)
-
31 Jul 2026 (Q4 FY2026 report; Pause in Trading; CERENERGY project discontinued)
Altech periodic reports:
- FY2023, FY2024, FY2025 and FY2026 Annual Reports and H1 FY2026 Half-Year Report, as standardised by S&P Global Market Intelligence (via StockAnalysis.com; data updated 1 Oct 2026)
Historical HPA and AAM-structure announcements:
- ASX announcements of 31 Jan 2019 and 23 Aug 2019 (HPA project; German equity strategy)
Altech Advanced Materials AG disclosures:
-
17 Dec 2024 ad-hoc
-
22 Jul 2026 ad-hoc (H1 2026; loss of half of capital)
-
Oct 2020 release (Saxony HPA grant)
Media and data aggregators:
-
Business News WA (HPA project history; Iggy Tan profile)
-
SmallCaps (Nov 2025 restructure; STARK grant; Silumina discontinuation; placement)
-
Kalkine Media (31 Jul 2026 coverage)
-
Battery-News.de (5 Aug 2026)
-
FNN (25 Mar 2025 bond facility)
-
Australian Manufacturing (Oct 2025 placement)
-
InvestSMART, StockLight, Market Index, Quartr (announcement registers and price data)
-
Morningstar (company profile)
-
FinancialFilings (FY2025 headline figures)
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Executive Leadership Team
| Name | Title | Appointed | Prior roles / background |
|---|---|---|---|
Daniel Raihani | Managing Director & CEO | 28 Nov 2025 | Spelled "Raihini" in the 31 Jul 2026 release and "Raihani" elsewhere |
Giuseppe (Joe) Graziano | Non-Executive Chair | 28 Nov 2025 | — |
Hansjörg Plaggemars | Non-Executive Director | Pre-2025 (continuing) | Management board member, Altech Advanced Materials AG; associated with Deutsche Balaton group companies |
Martin Stein | CFO & Company Secretary | Long-serving (pre-2025) | Finance / company secretarial |
Board of Directors
| Name | Former role | Tenure / background |
|---|---|---|
Iggy (Ignatius) Tan | MD & CEO | MD since 2014. Previously MD of Galaxy Resources, Nickelore and Kogi Iron; GM roles at Westlime, Iluka Resources, Imdex and Metals X. Inaugural chair of Lithium Universe (2023). Left AAM's board on 31 Dec 2024 |
Daniel Tenardi | Non-Executive Chair | Resigned 28 Nov 2025 |
Tunku Yaacob Khyra | Non-Executive Director | Malaysian investor-director. Stocklight records several on-market director sales (e.g., A$563,909 on 18 Dec 2023) |
Peter Bailey | Non-Executive Director | Resigned 28 Nov 2025 |
Major Shareholders
| Holder | Stake |
|---|---|
Unnamed substantial holder | Ceased to be substantial on 27 Jan 2026 |
Insiders (S&P) | 3.81% |
Institutions (S&P) | 4.41% |
Free float (S&P) | ~1.73 billion shares (~65%) |
Competitive Landscape
Competitors by Segment
| Segment | Competitor | Listing / status | Relative positioning vs Altech |
|---|---|---|---|
SNC / sodium-metal-halide batteries | FZSoNick (FIAMM / SoNick, Italy) | Private | Incumbent commercial SNC maker (UPS, telecom, rail); in production for years |
SNC batteries | AMPower (Chilwee Group, China) | Subsidiary of Chilwee Power (HKEX-listed parent) | Ex-GE Durathon production line; was Altech's supplier, not just a competitor |
SNC / sodium-metal-halide | Inlyte Energy (US / UK) | Private, venture-backed | Iron-sodium-halide grid storage; competing for the same "safe LDES" narrative |
Sodium-ion (grid and EV) | CATL; BYD; HiNa Battery | Listed (Shenzhen / HKEX) / private | Scale players driving sodium-ion cost down; erode SNC's niche |
Long-duration storage | Form Energy (iron-air) | Private | Large capital base; utility contracts |
Flow batteries | ESS Tech (NYSE: GWH); Invinity Energy Systems (AIM: IES) | Listed | Commercial deployments; themselves capital-constrained |
Grid-scale Li-ion (LFP) | CATL, BYD, Tesla Energy, Fluence (ASX/NASDAQ) | Listed | Dominant, rapidly falling costs, the core economic hurdle for CERENERGY |
Silicon anodes | Sila Nanotechnologies; Group14 Technologies | Private | Large funding, commercial plants, OEM offtakes |
Silicon anodes | Amprius Technologies (NYSE: AMPX); Nexeon (UK) | Listed / private | Commercial cells or materials |
Anode materials (ASX peers) | Talga Group (ASX: TLG); Novonix (ASX: NVX) | Listed | Graphite and anode developers with European / US projects |
HPA | Alpha HPA (ASX: A4N); Sumitomo Chemical; Baikowski; Sasol | Listed / private | Alpha HPA reached first production in Australia; incumbents dominate |
Redflow (zinc-bromine) | ASX: RFX (former) | Entered administration 2024 | Cautionary ASX battery-tech peer |
Competitor Detail
| Metric | Altech Batteries (FY2026, A$) |
|---|---|
Revenue | ~0.09m (non-operating) |
Operating margin | Not meaningful (op. loss A$9.43m) |
R&D intensity | Not meaningful (R&D A$2.83m) |
Recent Developments
*Upcoming: Q1 FY2027 quarterly report (due by ~30–31 Oct 2026); Deutsche Balaton bond repayment date (31 Oct 2026); AGM (expected ~Nov 2026).
*Layoffs / hiring: Not specifically disclosed. Headcount reductions are implied by the liquidation of both German subsidiaries.