Anax Metals Limited Overview

Anax Metals is a pre-production Western Australian base-metals developer whose investment case rests almost entirely on restarting the historical Whim Creek copper-zinc operation, 120 km south-west of Port Hedland in the Pilbara. The company describes itself as "consolidating base metals production in the Pilbara," and its strategy has two layers. The first is a conventional mine restart: four polymetallic volcanogenic massive sulphide (VMS) deposits — Mons Cupri, Whim Creek, Evelyn and Salt Creek — feeding a new 400 ktpa concentrator, underpinned by a 4.61 Mt Ore Reserve and a February 2026 DFS Update showing a pre-tax NPV7 of A$501M and 98% IRR on ~A$91M total development cost. The second is a regional "processing hub" thesis: Whim Creek holds the only fully permitted heap-leach and processing infrastructure in the western Pilbara, which Anax intends to use for third-party satellite ores and its proprietary bioleaching technology. The company remains loss-making, funding-dependent and targeting a Final Investment Decision in Q4 CY2026.


What the company does. Anax is a mineral exploration and development company. Its stated principal activities (FY2025 Directors' Report) are mineral exploration and the assessment and, where appropriate, acquisition of exploration and mine development projects. In practice, essentially all expenditure is directed at the Whim Creek Copper-Zinc Project: in the June 2026 quarter, A$770,491 of A$790,169 total exploration, site and feasibility expenditure (97%) related to Whim Creek (June 2026 Quarterly, Listing Rule 5.3.1 disclosure).

Company's own description (paraphrased from FY2025 Annual Report). Anax describes its strategy as becoming a near-term producer of sustainable Pilbara copper and associated base metals by advancing Whim Creek, while pursuing resource expansion and a plan to consolidate other regional deposits by developing a processing hub at Whim Creek. It positions Whim Creek as capable of producing copper, zinc and lead concentrates, copper cathode and zinc sulphate crystal, and notes the site is fully permitted for mining and processing including in-pit tailings disposal.

Business model (planned). Once in production, the model is a conventional concentrate-producing base-metals mine:

  • Open-pit mining at Mons Cupri and Whim Creek for the first 3–4 years (low strip ratio), followed by underground mining at Evelyn and Salt Creek (both open at depth).

  • An 800 ktpa pre-concentration (ore sorting) plant feeding a 400 ktpa flotation concentrator producing copper, zinc and lead concentrates with gold and silver by-product credits (December 2025 announcement).

  • A parallel, permitted heap-leach / solvent-extraction / electrowinning circuit capable of producing copper cathode and zinc sulphate from oxide, transitional and low-grade sulphide ores, including third-party ores.

  • An interim revenue line from crushing barren waste rock into aggregates and road base.

Revenue model mix. Current: effectively nil operating revenue. Reported "other income" was A$197,272 in FY2025, comprising interest, minor sundry income and small aggregate-related amounts. Future: ~100% product sales (concentrate, potentially cathode and zinc sulphate), with no service, subscription or licensing component — though management has flagged that its bioleaching intellectual property could be applied to third-party Pilbara ores, which could create a toll-treatment or technology-licensing element (not quantified).

Value-chain position. Upstream mining and primary processing (mine-to-concentrate). Anax would sell concentrates to smelters/traders and has received interest from trading groups seeking copper offtake (Strategic Outlook, 5 February 2026). No binding offtake has been announced as at the latest disclosures.

Customer types and end-markets. Prospective customers are smelters and metals traders (Asia-Pacific concentrate markets). End-use exposure is to copper (electrification, power grids, EVs, construction), zinc (galvanising), lead (batteries), silver and gold. The aggregate business targets Pilbara civil construction and road building; Castle Civil Pty Ltd signed an agreement for up to 50,000 tonnes of aggregate (8 December 2025 announcement).

Independent characterisation. Anax is a micro-cap, single-asset copper restart story whose economics have been transformed by the commodity cycle rather than by new geology: the jump in NPV from A$224M (2023 DFS) to A$501M (2026 DFS Update) was driven chiefly by higher copper, silver and gold prices on substantially the same Ore Reserve. Its distinguishing features are (i) a brownfield site with existing infrastructure, permits and a rehabilitated environmental position, (ii) a small capital requirement relative to project NPV, and (iii) a strategic hub option. Its principal weakness has been a multi-year inability to close project financing, which produced a heavily diluted share register (shares on issue rose to ~1.74 billion) and repeated reliance on a related major shareholder for bridge loans.

Strategy

Stated strategy themes (FY2025 AR "Strategy and Work Plan for FY2026", paraphrased):

  1. Progress debt and equity financing for the Whim Creek Copper Project, with an optimal mix of debt and equity.

  2. Progress project consolidation initiatives across the Pilbara (Whundo, Sulphur Springs, Carlow Castle and others).

  3. Grow resources through exploration of base-metal and gold prospectivity across Whim Creek tenure, using specialist consultants.

  4. Maintain site operations and environmental monitoring at Whim Creek.

  5. Pursue near-term revenue from construction materials made from waste rock.

Strategic Outlook H1 2026 (5 February 2026): release of an updated DFS reflecting much higher metal prices (copper ~+40%, silver ~+400%, gold ~+270% since the 2023 DFS); optimisation of precious-metal (especially silver) recoveries; partnership expansion; resource growth at Salt Creek; exploration on new tenements; enhancement of bioleaching and ore-sorting IP for oxide/transitional ores; and regional consolidation focused on satellite assets with near-term production potential.

Initiatives in the last 24 months

Sustainability / ESG commitments. The FY2025 AR acknowledges rising investor expectations on sustainability, diversity and Indigenous engagement and refers to "progressing plans for sustainability reporting"; no quantified targets have been published.

Cost programmes. The FY2025 going-concern note refers to deferral of payment obligations and "significant cost saving initiatives"; no quantified target was disclosed.

Medium-term guidance / targets. Final Investment Decision in Q4 CY2026; Ore Reserve update in the December 2026 quarter. No production, revenue or earnings guidance beyond DFS projections. Anax's share of development cost is approximately A$76M.

Products & Services

Anax has no commercial products in production. The catalog below lists every planned product stream and technology offering as disclosed.

5.1 Copper concentrate (planned). Produced from the 400 ktpa flotation concentrator processing sulphide ore from all four deposits. Target customers: smelters and traders. The 2026 DFS Update projects average saleable output of roughly 13,000 t/yr copper-equivalent metal in concentrate over the first eight years of a ten-year life (Mining Weekly / Engineering News project update, 31 July 2026). Pricing: LME-linked, net of treatment/refining charges (DFS assumed Cu TC US$50/t, RC US$0.05/lb in CuEq calculation, August 2026 MRE). First production year: subject to FID (targeted Q4 2026).

5.2 Zinc concentrate (planned). From zinc-rich zones, particularly Salt Creek (Ore Reserve grade 6.00% Zn) and the Mons Cupri massive sulphide cap. Payability assumed 85% at US$3,000/t base case.

5.3 Lead concentrate with silver and gold credits (planned). Lead concentrate carries significant silver credits. Test work shows aggregate gold and silver recoveries into copper and lead concentrates of 60–80% (August 2026 MRE). The DFS Update flagged ~11.5 koz gold currently forecast to report to tailings, prompting a precious-metals recovery optimisation workstream (24 Feb 2026).

5.4 Copper cathode (permitted, not in base case). Via the existing heap leach and SX-EW circuit at Whim Creek. Feedstock: oxide/transitional ores and low-grade sulphides, including potential third-party satellite ores. The 2023 Heap Leach Scoping Study proposed starting heap leaching in year two, funded from cash flow.

5.5 Zinc sulphate crystal (permitted, not in base case). By-product of zinc leaching; management has described downstream zinc sulphate as a potential new business line after zinc extraction above 90% in column tests (FY2025 AR).

5.6 Proprietary bioleaching technology (IP). Developed over four years, including three years with CSIRO Mineral Resources in Perth, using bacteria harvested and cultivated from Whim Creek. 1 m column tests achieved 77–80% copper and >90% zinc extraction from primary chalcopyrite sulphides (29 January 2025). Positioned as applicable to third-party Pilbara ores; commercial licensing model not disclosed.

5.7 Advanced ore sorting / pre-concentration. 800 ktpa pre-concentration plant ahead of the concentrator; Anax describes ongoing enhancement of ore-sorting IP for oxide and transitional ores (Strategic Outlook, 5 Feb 2026).

5.8 Regional processing hub / toll treatment (concept). Whim Creek promoted as a hub with expanded potential capacity of 20,000 t CuEq per annum, split roughly equally between concentrator and heap leach (FY2025 AR). Candidate feed: Sulphur Springs (Develop), Whundo (GreenTech), Carlow Castle (Artemis). Commercial terms not disclosed.

5.9 Aggregates and road base. Crushed and screened barren waste rock from the Whim Creek dump; permitted to repurpose up to 500,000 t/yr for sale via the North West Coastal Highway, which runs past the site (FY2025 AR). Commercial-scale trial completed October 2024; agreement with Castle Civil Pty Ltd for up to 50,000 t (December 2025). Pricing not disclosed.

5.10 Accommodation camp (third-party). Gold Valley Pilbara holds a Right of First Refusal to build, own and operate the Whim Creek mine camp (8 Dec 2025) — not an Anax product but part of the development model.

Financial Narrative

6.1 Income statement (A$, FY2021–FY2025; source: FY2025 AR Remuneration Report (g) and Statement of Comprehensive Income)

Notes: Pre-tax and after-tax figures are identical because no income tax expense was recognised. FY2021 EBT is shown equal to NPAT per the five-year table. Gross, operating, EBITDA and net margins are not meaningful: income is not operating revenue and the company is pre-production. Revenue CAGR FY2021–FY2025 is −48% per annum on the "total revenue" line, but this reflects the run-off of one-off investment gains rather than an operating trend.

FY2025 expense detail (A$): Administration 2,866,781; finance cost 105,975; depreciation and amortisation 184,719; loss on modification of financial liabilities 535,985; share-based compensation 185,989; expensed exploration 67,720; expected credit loss 48,125.

6.2 Balance sheet (A$; source: FY2025 AR Statement of Financial Position; FY2023 from Statement of Changes in Equity and Cash Flow Statement)

Net debt as computed here (A$2.86M at FY2025) matches Kalkine's aggregator figure; for FY2024 Kalkine reports net cash of A$1.30M, which differs from the A$0.19M computed from the filed balance sheet — the discrepancy likely arises from treatment of the Jetosea loan and other provisions. Simply Wall St reports total debt of zero, which conflicts with the filed "other financial liabilities"; primary filings are preferred.

FY2026 interim position (unaudited, June 2026 Appendix 5B): cash A$11.146M; drawn loan facility A$3.1M (Jetosea, 6% p.a., secured over Anax's 80% interest in Whim Creek, maturing 31 December 2026). MDP convertible notes (A$3.3M) and Jetosea Loan B (A$3.5M) were both repaid during FY2026. Implied net cash at 30 June 2026 ≈ A$8.0M (excluding leases).

6.3 Cash flow (A$; FY2024–FY2025 audited; FY2026 unaudited Appendix 5B year-to-date)

FY2025 net borrowings include A$3.31M convertible notes less transaction costs excluded. Payments to acquire exploration assets (A$0.5M FY2024; A$1.5M FY2025) are understood to relate to Whim Creek earn-in/acquisition payments; the counterparty breakdown is not itemised in retrieved text. Aggregator net cash flow for FY2021–FY2023: +A$3.57M, +A$0.62M, −A$5.61M (StockAnalysis).

6.4 Ratios

6.5 Commentary. The five-year record divides into two regimes. FY2021–FY2022 show small profits that were not operational: aggregator data attribute roughly A$4.07M in FY2022 to gains on sale of investments, consistent with the legacy Aurora Minerals portfolio of listed holdings being realised to fund the Whim Creek earn-in. From FY2023 onward the company has been a conventional cash-consuming developer, with after-tax losses of A$2.8–3.8M per year and free cash outflow of A$5.6–6.2M per year. The FY2025 loss widened by 36% because of a one-off A$0.54M loss on modification of financial liabilities (the Jetosea loan restructure), higher administration costs tied to the failed MDP transaction (including advisory and legal fees), and a A$0.16M special payment to the Managing Director.

The balance sheet is dominated by A$41.8M of capitalised exploration and evaluation, offset by a A$13.8M rehabilitation provision for historical Whim Creek workings — an unusually large liability for a company of Anax's size, though it is non-cash until closure and largely inherited. The going-concern note in the FY2025 accounts flagged material uncertainty, with net current liabilities of A$0.84M at balance date.

FY2026 marks a clear inflection in liquidity. The company raised approximately A$18.4M of equity across four placements (December 2025 Gold Valley, March 2026 Tranche 1, May 2026 Tranche 2, June 2026), repaid A$6.95M of borrowings (MDP notes and Jetosea Loan B), and ended the year with A$11.15M cash and an estimated 6.8 quarters of funding at the June-quarter burn rate (Appendix 5B item 8.7). The cost was dilution: shares on issue rose from roughly 880M in late 2025 to 1.74 billion by June 2026. Spending is now shifting from care-and-maintenance toward drilling and FEED, so quarterly burn should rise in FY2027.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Revenue by Segment (AUD) and Revenue by Segment (%)

MetricFY2021FY2022FY2023FY2024FY2025

Exploration & evaluation segment — total income (AUD)

2,679,9934,105,373292,800241,580197,272

Segment profit/(loss) after tax (AUD)

241,1531,484,549-2,859,752-2,787,906-3,795,815

Segment share of group income (%)

100100100100100

Group Entities

EntityRoleOwnership

Anax Metals Limited

ASX-listed parent

Listed

Whim Creek Metals Pty Ltd (WCM)

Holds Anax's 80% participating interest in the Whim Creek JV; appointed JV Manager

100% Anax

Whim Creek Copper-Zinc Joint Venture

Unincorporated JV under earn-in and JV agreement dated 21 Jul 2020 (parties: Anax, WCM, VentureX Pilbara Pty Ltd, Jutt Resources Pty Ltd, Develop Global Ltd)

Anax 80% / Develop 20%

Other subsidiaries

Not individually named in retrieved documents (see Consolidated Entity Disclosure Statement, FY2025 AR p.93)

—

Asset Portfolio

AssetTenement(s)InterestStageFunction

Mons Cupri

M47/238

80%

Reserve / pre-development

Cornerstone open pit (~55% of Ore Reserve)

Whim Creek deposit

M47/236, M47/237, M47/323, M47/324, M47/443

80%

Reserve

Open pit; site of existing heap-leach infrastructure

Evelyn

M47/1455 (Liberty Indee)

80%

Reserve

Underground, high-grade Cu-Zn-Au

Salt Creek

Within JV tenure

80%

Reserve

Underground, high-grade Zn-Cu

Whim Creek regional

E47/3495, L47/0036

80%

Exploration / infrastructure

Exploration licence, miscellaneous licence

Loudens Patch

E47/4281

100%

Exploration

Pilbara greenfields

Sherlock

E47/5275 (application, ~207 km²)

100%

Application

Greenstone and Mallina Basin ground adjoining JV

Mount Short

E74/651

100% subject to Orbminco farm-in to 70%

Exploration (farmed out)

Lithium/gold/base metals, Ravensthorpe; not listed in June 2026 tenement schedule — current status not confirmed

Waste rock / aggregates

Whim Creek waste dump

80% project

Trial / early commercial

Near-term cash flow

Income Statement (AUD) and Per-Share Data

MetricFY2021FY2022FY2023FY2024FY2025

Total revenue / other income (AUD)

2,679,9934,105,373292,800241,580197,272

EBITDA (AUD)

322,7291,752,610-2,607,358-2,389,072-3,505,231

EBIT / operating income (AUD)

253,6811,641,170-2,743,373-2,565,750-3,689,950

Pre-tax profit/(loss) (AUD)

241,1531,484,549-2,859,752-2,787,906-3,795,815

Net profit/(loss) after tax (AUD)

241,1531,484,549-2,859,752-2,787,906-3,795,815

Basic EPS (A$ cents)

0.090.401-0.700-0.561-0.461

Diluted EPS (A$ cents)

0.090.401-0.700-0.561-0.461

Dividends per share (A$ cents)

00000

Share price at 30 June (AUD)

0.0760.0770.0630.0230.006

Balance Sheet (AUD)

MetricFY2023FY2024FY2025

Total assets (AUD)

—43,271,46845,366,519

Cash and cash equivalents (AUD)

1,710,5344,094,6692,930,901

Capitalised exploration & evaluation (AUD)

—38,100,06641,771,074

Short-term financial liabilities (AUD)

—4,105,7042,949,648

Long-term financial liabilities (AUD)

—02,789,819

Lease liabilities (AUD)

—174,27450,360

Total debt incl. leases (AUD)

—4,279,9785,789,827

Net debt (AUD)

—185,3092,858,926

Rehabilitation provision (AUD)

—12,648,85713,805,368

Total liabilities (AUD)

—20,981,40223,321,943

Total equity (AUD)

17,006,43622,290,06622,044,576

Goodwill & intangibles (AUD)

000

Working capital (AUD)

—-3,685,173-838,795

Cash Flow (AUD)

MetricFY2024FY2025FY2026

Operating cash flow (AUD)

-2,092,082-2,358,758-3,214,000

Capex — plant & equipment (AUD)

-51,450-1,879-106,000

Capex — exploration & evaluation (AUD)

-2,939,178-2,382,312-2,617,000

Payments to acquire exploration assets (AUD)

-500,000-1,500,0000

Net investing cash flow (AUD)

-3,490,628-3,884,191-2,723,000

Free cash flow (OCF + investing) (AUD)

-5,582,710-6,242,949-5,937,000

Proceeds from equity (AUD)

7,971,9712,544,76118,413,000

Net borrowings / (repayments) (AUD)

602,5153,321,614-3,316,000

Net financing cash flow (AUD)

7,966,8455,079,18114,152,000

Dividends paid (AUD)

000

Share buybacks (AUD)

000

Closing cash (AUD)

4,094,6692,930,90111,146,000

Returns & Leverage Ratios (%) and Financial Ratios (x)

MetricFY2024FY2025

Return on equity (%)

-14.2-17.1

Return on assets (%)

—-8.6

Current ratio (x)

0.550.79

Debt / equity (x)

0.190.26

Asset turnover (x)

0.0060.004

Revenue by Region (AUD)

RegionFY2023FY2024FY2025

Australia — total income (AUD)

292,800241,580197,272

Rest of world — total income (AUD)

000

Share Price

MetricFY2021FY2022FY2023FY2024FY2025

Share price at 30 June (AUD)

0.0760.0770.0630.0230.006

Approximate Change by Period

PeriodApproximate change

1 year (from A$0.006, 30 Jun 2025)

+550% to +567%

3 years (from A$0.063, 30 Jun 2023)

−37% to −38%

5 years (from A$0.076, 30 Jun 2021)

−47% to −49%

Capital Instruments

InstrumentAmountRateMaturitySecurity

Jetosea loan

A$3.1M

6% p.a. simple

31 Dec 2026

Secured over Anax's 80% Whim Creek interest

Lease liabilities

Minor

—

Short-dated

—

MDP convertible notes

Repaid Dec 2025

———

Jetosea Loan B

Repaid Mar 2026

0%——

Share Price & Returns

DateRaise (AUD)Price (AUD)Shares

Oct 2024

2,544,7610.015169,650,712

Dec 2025

2,400,0000.011219,324,227

Mar 2026 (T1)

5,200,0000.023225,500,000

May 2026 (T2)

4,800,0000.023209,249,661

Jun 2026

6,000,0000.034176,470,592

Analyst Conclusions

Management guidance. FID on Whim Creek in Q4 CY2026; updated Ore Reserve (incorporating the larger Mons Cupri resource) in the December 2026 quarter; FEED to deliver refined capital and operating costs, an execution plan and an updated financial model; continued Phase 1 drilling; heap leach study update in H2 2026. No production or financial guidance beyond DFS projections; consensus: none.

Bull case

  1. Economics are robust at conservative prices: a 98% IRR at US$11,500/t copper and only ~A$91M total development cost gives wide headroom for cost overruns.

  2. Resource momentum is real: a 24% larger Mons Cupri resource, with the primary sulphide system largely untested at depth, could lengthen mine life materially when folded into the Q4 reserve.

  3. Funding visibility has improved: A$11M cash, indicative debt of up to US$40M for Anax's share, a strategic shareholder with contracting capability, and a materially higher share price reduce the equity gap at FID.

Bear case

  1. Funding history is poor: the 2023 DFS and the 2025 MDP package both failed to deliver financing; indicative debt offers are non-binding and Anax's ~A$76M share still requires meaningful equity.

  2. Value is price-dependent: most of the NPV uplift since 2023 came from metal prices, not from new reserves; a commodity pullback would compress economics just as financing closes.

  3. Dilution and governance: 1.74 billion shares, ~400M options and 153M performance rights cap per-share upside, while related-party arrangements and the lack of an audit committee are below institutional standards.

Key catalysts and monitorables (next 12 months)

  • Ore Reserve update (Q4 2026) and remaining Phase 1 assay results.

  • FEED capital estimate vs A$77.2M DFS figure.

  • Binding debt term sheets and concentrate offtake agreements.

  • FID decision (Q4 CY2026) and any accompanying equity raise.

  • Develop Global's election on its 20% funding option.

  • Refinancing or repayment of the A$3.1M Jetosea loan by 31 Dec 2026.

  • Identity and intentions of the August 2026 substantial holder; Gold Valley's stake.

  • FY2026 audited accounts and whether the going-concern emphasis is removed.

Analyst verdict. Anax Metals in late 2026 is a markedly different proposition from the company that closed FY2025 at a share price of six-tenths of a cent with a failed cornerstone deal and a going-concern warning. The repair since then has been genuine: the MDP relationship was unwound cleanly, the 2.5% royalty overhang attached to the Jetosea bridge loan was removed, roughly A$16M of fresh equity was raised at rising prices, and the board and management gained the exploration and project-delivery experience they previously lacked. The 2026 DFS Update shows a small, fully permitted, high-return restart with an unusually low capital requirement, and the August resource update shows the geological base is growing rather than static.

The investment question, however, has not changed — it has simply moved closer to resolution. Whim Creek's value to Anax shareholders depends almost entirely on closing a funding package of around A$76M for Anax's share on terms that do not hand most of the upside to lenders, offtakers or new equity. The company's record on that front is weak, and the current economics lean heavily on copper, silver and gold prices near cyclical highs. At an implied market value of roughly one-sixth of Anax's attributable pre-tax NPV, the market is applying a steep, and defensible, discount for financing, execution and dilution risk.

On balance, Anax is a high-risk, catalyst-driven development play whose rating over the next six months will be set by three events: the updated Ore Reserve, the FEED capital estimate, and whether binding debt and offtake can be signed in time for a Q4 FID. A credible FID on largely debt-funded terms would likely justify a material re-rating; a slipped FID or another large discounted raise would confirm the pattern of the past three years. Investors should treat the DFS headline numbers as an upper-bound indication rather than a valuation anchor until financing is executed.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Board of Directors

NameRoleAppointedBackgroundIndependence

Phillip Jackson (BJuris, LLB, MBA, FAICD)

Non-Executive Chairman

24 Sep 2003

Barrister and solicitor; former managing legal counsel at a major international mining company; 13 years as Asia-Pacific regional legal counsel at a leading oil services company; former General Counsel of an international oil and gas company

—

Geoffrey Laing (BSc, MBA, MAusIMM)

Managing Director

1 Jul 2018

Chemical engineer, 30+ years; former MD/GM Corporate of Exco Resources (Cloncurry Copper, White Dam Gold); principal of Nexus Bonum consultancy; former director of Exterra Resources/Anova Metals

Executive

Peter Cordin (BE, MIEAust, FAusIMM)

Independent Non-Executive Director

20 Feb 2014

Civil engineer, 40+ years in mining; construction and operation of diamond and gold mines in Australia, Fenno-Scandinavia, Indonesia; projects in Kazakhstan and New Caledonia

Independent

Philip Warren (BCom, CA)

Independent Non-Executive Director

12 Apr 2021

MD of Grange Corporate and Advisory; Principal of Automic Group (Anax's share registry); NED of Qoria, Killi Resources, Narryer Metals, Rent.com.au

Classified independent by company; related-party advisory fees paid

Nick Jolly

Non-Executive Director

3 Jun 2026

Geologist and mining executive, 25+ years; senior geology and operational roles with Spartan Resources and Northern Star Resources; Competent Person for exploration results and reserves/resources statements

Classified by company as NED; related-party consulting fees paid

Executive Leadership Team

NameTitleSinceBackground

Geoff Laing

Managing Director

Jul 2018

As above

Danny George

Chief Operating Officer

11 Jun 2026

20+ years delivering mining, processing, infrastructure and critical-minerals projects; senior roles at Mineral Resources, ThyssenKrupp, Fortescue and Ausenco; accountable for FEED through to operations

Jenine Owen

Chief Financial Officer

14 Jul 2020

Chartered Accountant, 20+ years; began at Deloitte (Zimbabwe), London 1999–2008; CFO services to Predictive Discovery and Xantippe Resources

Andrew McDonald

Project Manager / Competent Person (geology, resources)

—

Full-time employee and shareholder; MAIG

Steven Wood

Joint Company Secretary

—

Principal at Automic Group; Chartered Accountant

Daniel Coletta

Joint Company Secretary

—

Chartered Accountant; Governance Institute of Australia member

“—” = not publicly disclosed.

Directors' Remuneration

PersonSalary & feesOtherSTI cashSuperOptions / rightsTotal FY2025Total FY2024

Geoff Laing (MD)

310,197162,369040,27369,720582,559379,563

Phillip Jackson (Chair)

61,800007,10719,77188,67873,690

Peter Cordin (NED)

46,350005,33014,82866,50855,268

Philip Warren (NED)

46,350005,33022,24273,92257,177

Total KMP

464,697162,369058,040126,561811,667565,698

Major Shareholders

HolderStakeSource / note

Holihox Pty Ltd (P. Jackson)

98.1M shares (~5.6% of 1.74B) at Sep 2025, plus further participation in March 2026 placement (~A$1.1M total director participation in Tranche 2)

FY2025 AR; June 2026 Quarterly

Laing Family Trust / G. Laing

19.3M shares (FY2025)

FY2025 AR

P. Cordin

5.76M shares (FY2025)

FY2025 AR

P. Warren (Philuchna)

3.14M shares (FY2025)

FY2025 AR

Competitive Landscape

Key Competitors

CompetitorSegment overlapRelative positioning vs Anax

Develop Global (ASX: DVP)

Pilbara base metals (Sulphur Springs); also Anax's JV partner

Larger, producing (Woodlawn) and mining-services group; potential competitor or partner for Pilbara processing

GreenTech Metals (ASX: GRE)

Whundo Cu-Zn, West Pilbara

Smaller explorer; needs a processing solution — potential hub customer

Artemis Resources (ASX: ARV)

Carlow Castle Cu-Au-Co, West Pilbara

Explorer; potential hub customer

Sandfire Resources (ASX: SFR)

Australian copper concentrate producer

Mid-tier producer; competes for capital, people and offtake terms

29Metals (ASX: 29M)

Golden Grove Cu-Zn VMS, WA

Producing VMS analogue; cost and grade benchmark

AIC Mines (ASX: A1M)

Eloise copper, QLD

Small producer; peer for restart/expansion financing

Aeris Resources (ASX: AIS)

Tritton copper, Cracow gold

Small producer

Caravel Minerals (ASX: CVV)

Caravel copper, WA wheatbelt

Large low-grade developer competing for copper project finance

Hillgrove Resources (ASX: HGO)

Kanmantoo copper restart, SA

Recent restart analogue

Northern Star Resources (ASX: NST)

Toweranna gold deposit adjacent to Sherlock application

Neighbouring tenure; not a base-metals competitor

Recent Developments

--

Company Snapshot

7

Employees

2003

Founded

West Perth, Australia

Headquarters

SWOT Analysis

Strengths

  • Fully permitted: Stage 2 Mining Proposal approved August 2023, completing DMIRS approvals for mining and processing including in-pit tailings (FY2025 AR).
  • Strong study economics: pre-tax NPV7 A$501M and 98% IRR on A$77.2M pre-production capital (DFS Update, Feb 2026).
  • Rapid payback: ~14 months on base-case prices.
  • Resource growth momentum: Mons Cupri MRE up 24% to 6.32 Mt @ 1.38% CuEq, with >78% Measured and Indicated (25 Aug 2026).
  • Improved liquidity: A$11.15M cash at 30 June 2026 and ~6.8 quarters of funding (Appendix 5B).
  • High-quality reserve classification: 94% of the DFS production target from Proven and Probable reserves (DFS Update).
  • Existing infrastructure: power, water, roads, offices, workshops and heap-leach pads integrated into the plan (Dec 2025 announcement).

Weaknesses

  • No revenue and recurring losses: A$2.8–3.8M annual net losses FY2023–FY2025.
  • Going-concern material uncertainty in the FY2025 accounts; net current liabilities A$0.84M at 30 June 2025.
  • Severe dilution: ~1.74 billion shares on issue at June 2026, plus ~400M options and 153M performance rights.
  • Short mine life: ~10 years from a 4.61 Mt reserve.
  • Failed MDP transaction consumed a year and cost (loss on modification A$0.54M; special payments to MD).
  • Thin governance structures: no separate Audit Committee; multiple related-party consulting arrangements with directors.
  • Large inherited rehabilitation liability: A$13.8M provision at FY2025.

Opportunities

  • Ore Reserve update incorporating the larger Mons Cupri resource (targeted Q4 2026) could extend mine life.
  • Primary sulphide horizon at Mons Cupri is largely untested below ~120 m vertical depth (June 2026 Quarterly).
  • Evelyn and Salt Creek are open at depth; Evelyn South rock chips up to 14.6% Cu (FY2025 AR).
  • Regional hub: candidate feed from Sulphur Springs, Whundo and Carlow Castle; nominal 20,000 t CuEq/yr capacity.
  • Bioleaching could add copper cathode and zinc sulphate streams from low-grade material.
  • Precious-metal recovery optimisation (~11.5 koz gold to tailings in DFS Update case).
  • Strategic investor interest (Gold Valley; traders seeking offtake).

Threats

  • Funding risk: Anax's share of capex is ~A$76M; debt offers (up to US$40M) are indicative only.
  • Commodity price reversal: the DFS uplift is price-driven; copper spot assumption ~US$13,000/t.
  • Further dilution at FID if equity is required to complement debt.
  • Partner dynamics: Develop's 20% funding option and Gold Valley's large stake could influence control and terms.
  • Heritage and land access: Heritage Deed requires good-faith negotiation with NAC before mining at Evelyn.
  • Refinancing: A$3.1M Jetosea loan, secured over Anax's 80% interest, matures 31 Dec 2026.
  • Pilbara cost inflation affecting FEED capital estimates.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
5 May 2025Binding term sheets with MDP for up to A$103MApparent funding solution; later collapsed
20 May 2025A$3.3M convertible notes issued to MDP at A$0.015 conversionShort-term liquidity
22 May 2025Second-ranking security deed with MDPSubordinated to Jetosea loan
4 Jun 2025Convertible note placement clarificationDisclosure housekeeping
24 Jun 2025SIAC arbitration filed against MDPBreakdown of cornerstone deal
30 Jun 2025Share price closes FY2025 at A$0.006Trough valuation
3 Jul 2025Arbitration withdrawn; no conversion/redemption until 18 Nov 2026 agreedDispute contained
25 Sep 2025FY2025 Annual Report; loss A$3.80M; going-concern material uncertaintyFinancial stress flagged
29 Oct 2025Agreement to monetise Whim Creek waste rockNear-term revenue pathway
30 Oct 2025September 2025 QuarterlyFunding talks continuing
20 Nov 2025Jetosea A$3.1M loan extended to 31 Dec 2026 (subject to approval)Removes near-term maturity
8 Dec 2025A$2.4M Gold Valley placement; A$3.5M Jetosea Loan B; MDP notes repaidRegister reset; MDP exit
19 Dec 2025General Meeting (loan variation approvals)Governance
27 Jan 2026December 2025 Quarterly: cash A$2.4MTight liquidity
5 Feb 2026Strategic Outlook H1 2026Roadmap for DFS update and funding
24 Feb 2026DFS Update: NPV7 A$501M, IRR 98%; debt offers up to A$57MMajor re-rating; shares +34.6% on the day
25 Feb 2026Investor webinarMarketing
12 Mar 2026Jetosea Loan B variedBridge to raise
18 Mar 2026A$10M placement at A$0.023 announcedBalance-sheet repair
Mar 2026Half-year report released; H1 loss ~A$4.36MInterim accounts
25–26 Mar 2026Tranche 1 (225.5M shares) settled and quoted; Jetosea Loan B repaid2.5% NSR overhang removed
19 May 2026EGM approves Tranche 2 and director participation (>99% support)Shareholder endorsement
25 May 2026Tranche 2 (209.2M shares, A$4.8M) completedA$10M raise complete
1 Jun 2026Trading haltPending raise
3 Jun 2026A$6M placement at A$0.034; Nick Jolly appointed NEDExploration funding; technical board
11 Jun 2026Danny George appointed COOExecution capability
12 Jun 2026June placement completedCash A$11.15M at 30 Jun
7 Jul 2026Phase 1 drilling (18 holes, 5,000 m) announcedResource growth
22 Jul 2026Drilling commences at Mons CupriExecution
27 Jul 2026FEED commences; FID targeted Q4 CY2026Development milestone
30 Jul 2026June 2026 Quarterly: indicative debt up to US$40M for Anax's 80%Funding visibility
12 Aug 2026New substantial holder notice–
25 Aug 2026Mons Cupri MRE 6.32 Mt @ 1.38% CuEq (+24% tonnes)Supports reserve update
23 Sep 2026High-grade near-surface infill results at Mons CupriValidates MRE model
Late Sep 2026FY2026 Annual Report expected (statutory deadline 30 Sep)–

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

3 charts
Revenue by Segment (AUD): Exploration & evaluation segment — total income fell from AUD 2,679,993 in FY2021 to AUD 197,272 in FY2025.
Anax Metals Limited — Revenue by Segment (AUD)
Series (AUD)FY2021FY2022FY2023FY2024FY2025
Exploration & evaluation segment — total income2,679,9934,105,373292,800241,580197,272
Segment profit/(loss) after tax241,1531,484,549-2,859,752-2,787,906-3,795,815

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Sources

Sources

  1. Anax Metals Limited, Annual Report 30 June 2025 (anaxmetals.com.au)
  2. Anax Metals, June 2026 Quarterly Activities Report & Appendix 5B (30 Jul 2026) (investorpa.com)
  3. Anax Metals, Strategic Placement to Gold Valley and Loan Funding (8 Dec 2025) (bulletin.webull.com)
  4. Anax Metals, Mons Cupri Mineral Resource Update (25 Aug 2026) (bulletin.webull.com)
  5. Anax Metals, Whim Creek DFS Update (24 Feb 2026) (anaxmetals.com.au)
  6. Anax Metals, Strategic Outlook H1 2026 (5 Feb 2026) (bulletin.webull.com)
  7. Anax Metals, $10M Capital Raising (18 Mar 2026) (bulletin.webull.com)
  8. Anax Metals, $6M Placement (3 Jun 2026) (anaxmetals.com.au)
  9. Anax Metals, Exploration Drilling Commenced (22 Jul 2026) (bulletin.webull.com)
  10. Anax Metals, FEED Commencement (27 Jul 2026) (investorpa.com)
  11. Anax Metals, Mons Cupri Infill Drilling (23 Sep 2026) (announcements.asx.com.au)
  12. Anax Metals, Jetosea Loan Variation (20 Nov 2025) (anaxmetals.com.au)
  13. Anax Metals, Condensed Interim Financial Report 31 Dec 2025 (anaxmetals.com.au)
  14. Anax Metals, September 2025 Quarterly (anaxmetals.com.au)
  15. InvestSMART ANX announcements and summaries (investsmart.com.au)
  16. Mining Weekly, Whim Creek project update (31 Jul 2026) (miningweekly.com)
  17. Mining.com.au, Anax pays outstanding Jetosea loan (mining.com.au)
  18. SmallCaps, $10M raise and DFS coverage (smallcaps.com.au)
  19. Stocklight, DFS announcement market reaction (stocklight.com)
  20. StockAnalysis, ANX cash flow (aggregator) (stockanalysis.com)
  21. Kalkine, ANX financial summary (aggregator) (kalkine.com.au)
  22. Simply Wall St, ANX balance sheet health (aggregator) (simplywall.st)
  23. Morningstar Australia, ANX company profile (morningstar.com.au)
  24. FilingReader, May 2026 general meeting results (filingreader.com)
  25. Business News, Big Hits (Mons Cupri infill) (businessnews.com.au)

Unlock Company Contacts

Connect with Key Decision-Makers

Access verified employee contacts and decision-maker information from this company to support your sales, lead generation, and business development efforts.