Ankit Metal & Power Limited is a Kolkata-headquartered secondary-route steelmaker. Its single integrated plant at Jorehira, Chhatna in Bankura district, West Bengal, converts iron ore and coal into sponge iron (DRI) and pellets. It melts these in induction furnaces into MS billets and rolls them into TMT bars and wire rods. Waste-heat-recovery and fluidised-bed captive power plants supply the plant's electricity.
The SKP Group floated the company in 2005 as a diversification into steelmaking. It peaked at INR 1,476 crore of revenue in FY2014 before a debt-funded expansion and a weak steel cycle tipped it into chronic losses. Lenders classified the account as a non-performing asset (NPA) in August 2014. Net worth turned negative by FY2016. The company entered CIRP in May 2024 on the petition of Assets Care & Reconstruction Enterprise (ACRE).
Today AMPL is best characterised as a distressed asset in late-stage insolvency resolution. Its equity value depends almost entirely on the treatment of existing shareholders under the CoC-approved resolution plan, not on operating fundamentals.
Company's own description
The latest annual report (FY2023) and the RP's investment teasers describe the company in broadly the same terms. AMPL runs an integrated steel plant producing rolled products. It manufactures iron ore pellets, TMT bars, sponge iron, MS billets and re-rolled products through a rolling mill and steel melting shop, and has a captive power plant (Screener.in summary citing the FY2023 Annual Report, pp. 17 and 91).
The November 2024 RP teaser states that the company was floated in 2005 as an integrated steel plant to produce rolled products. Its listed product range is:
-
sponge iron
-
billets
-
TMT bars (rolling mill)
-
ferro silicon
-
pellets
-
pig iron
-
wire rod
-
silico manganese
Independent characterisation
AMPL is a mini integrated steel plant (ISP) using the DRI–induction furnace route. This is the typical model for eastern India's secondary steel sector. The value chain runs as follows:
-
Iron-making: Iron ore fines are pelletised, and pellets or lump ore are reduced with non-coking coal in rotary kilns to produce sponge iron (DRI).
-
Steel-making: Sponge iron, scrap, pig iron and ferro alloys are melted in induction furnaces and continuously cast into MS billets.
-
Rolling: Billets are hot-rolled into TMT reinforcement bars and wire rods.
-
Captive power: Waste kiln gases feed a waste-heat-recovery boiler (WHRB) power plant. Coal washery rejects and dolochar feed an atmospheric fluidised bed combustion (AFBC) unit. Together they supply electricity for the energy-intensive induction furnaces.
Revenue model: 100% product sales (manufactured goods). There is no material service, subscription or licensing revenue. Power is primarily consumed captively; any surplus sale is not separately disclosed.
Value chain position: Mid-stream. The company buys iron ore and coal from third parties, with no captive mines disclosed. It sells intermediates (sponge iron, billets, pellets) to other secondary steelmakers and finished long products (TMT, wire rod) to construction-linked demand.
Customer types: According to the ROIC.ai profile, these are construction contractors, real-estate developers, steel fabricators and industrial consumers, chiefly in eastern India. Intermediate products go to induction-furnace and rolling-mill operators. Related-party sales of manganese ore, dolomite and pearl coke to group company Impex Ferro Tech Limited were authorised up to INR 200 crore annually, with purchases of silico manganese from the same party (ROIC.ai summary of shareholder resolutions).
End-markets: Infrastructure, housing and real estate, and general fabrication in West Bengal, Jharkhand, Bihar, Odisha and the north-east (inferred from plant location and product type; no regional sales split is disclosed).
Operating reality, FY2017 to date: Revenue collapsed to INR 24 crore in FY2017 (Screener.in), indicating a near shutdown. It recovered to INR 854 crore by FY2023. Persistent negative EBITDA margins in FY2023 and the first nine months of FY2024 (−7% and −28% TTM) show that the plant has struggled to cover cash costs. This reflects working-capital starvation typical of NPA accounts, high conversion costs and possibly tolling or job-work arrangements, though the latter is not disclosed.
Strategy
Stated strategy
There is no forward-looking corporate strategy, investor day or medium-term target from management. The company has been under insolvency processes almost continuously since December 2023, apart from the NCLAT set-aside window from March to May 2024.
Initiatives in the last 24 months (Oct 2024 – Oct 2026)
| Date | Initiative | Description / target | Source |
|---|---|---|---|
| 16 Nov 2024 | Investment teaser re-issued | RP Jalan markets the asset, highlighting India's steel demand outlook, DRI leadership and eastern India investment | RP Teaser Nov 2024 |
| 2 Dec 2024 | Fresh Form G | New invitation for expressions of interest under the new RP | IBBI |
| 13–21 Jan 2025 | Asset-tracing agency | 10th CoC approves appointing an agency to trace the company's assets, approves changes to security charges following a West Bengal government notification, and approves CIRP costs | MoneyWorks4Me / BSE |
| Jan 2025 | CIRP extension or period exclusion | CoC authorises an application to exclude a period or extend CIRP by 60 days | TipRanks / BSE |
| 11 Feb 2025 | Due diligence agency | 12th CoC appoints an agency for due diligence | BSE via Screener |
| 2024–2025 | Challenge mechanism | Multi-round bidding (62 rounds by Apr 2025) to maximise bids | Indian Kanoon (NCLAT 21 Apr 2025) |
| 8 Dec 2025 | Plan submissions | RARE ARC consortium plan received; Amit Metaliks requests a 4-week extension and files an IA; another applicant fails to renew its bank guarantee | NCLT order excerpt (IBC Laws, Jun 2026) |
| Jan 2026 | Plan approval by CoC | One of two plans approved with 89.79% vote at the 34th CoC | BSE disclosure 21 Jan 2026 |
| 2,026 | Plan approval application | IA (IBC) PLAN/3/KB/2026 filed before NCLT for Section 31 approval | IBC Laws |
ESG commitments, cost programmes, medium-term guidance: none disclosed.
Products & Services
All products sit within the single Iron & Steel segment. Product-wise revenue, volumes, pricing and launch years are not publicly disclosed. AMPL sells commodity products at market-linked prices (spot or contract pricing tracking regional sponge iron, billet and TMT benchmarks).
Product Portfolio
| # | Product | Description | Key capacity / specification | Target customer | Year in production | Pricing model |
|---|---|---|---|---|---|---|
| 1 | Iron ore pellets | Agglomerated iron ore fines, indurated; feedstock for DRI kilns, with surplus for sale | — | Captive DRI kilns; third-party sponge iron makers | Not disclosed (pellet plant mentioned in teasers 2024) | Market-linked |
| 2 | Sponge iron (DRI) | Coal-based direct reduced iron from rotary kilns | Phase I 105,000 TPA; additional 350 TPD kiln commissioned FY2011-12 | Captive induction furnaces; merchant induction-furnace mills | c.2006–2008 (Phase I) | Market-linked (eastern India DRI benchmark) |
| 3 | Pig iron | Merchant iron used as melting charge | — | Foundries; induction furnaces | — | Market-linked |
| 4 | MS billets | Mild-steel continuous-cast billets from induction furnace / steel melt shop | Phase I billet caster 65,140 TPA; 15 MT induction furnace added FY2011-12 | Captive rolling mill; merchant re-rollers | c.2008 / 2011-12 | Market-linked |
| 5 | MS ingots | Cast ingots (alternative semi-finished form) | — | Re-rollers | — | Market-linked |
| 6 | TMT bars | Thermo-mechanically treated reinforcement bars from the rolling mill | Re-rolling mill 100,000 TPA (Phase I) | Construction contractors, real estate, dealers | c.2008 | Market-linked / dealer pricing; brand name not disclosed |
| 7 | Wire rods | Hot-rolled wire rods | 1 lakh TPA wire rod mill (FY2011-12) | Wire drawers, fastener and mesh makers | 2011-12 | Market-linked |
| 8 | Re-rolled products / structurals | Other rolled long products | Within rolling-mill capacity | Fabricators | — | Market-linked |
| 9 | Ferro silicon | Ferro alloy used in steelmaking for deoxidation | — | Steelmakers | — | Market-linked |
| 10 | Silico manganese | Ferro alloy; also purchased from related party Impex Ferro Tech | — | Captive SMS; steelmakers | — | Market-linked / related-party pricing |
| 11 | Captive power | Electricity from WHRB (waste kiln gas) and AFBC (coal/char) units | Older disclosure: 8.5 MW WHRB + 4 MW AFBC (12.5 MW), with 33 MW CPP added FY2011-12. RP Teaser Jul 2024: 20 MW WHRB + 25.5 MW AFBC (45.5 MW) | Internal consumption | 2008 / 2011-12 | Captive (cost centre) |
“—” = not publicly disclosed.
Financial Narrative
Period: FY2019–FY2023 (last five audited years). FY2024 audited figures are not published; nine-month FY2024 data is shown in Table 6.6.
Source: Screener.in standalone financials compiled from company annual reports. Ratios are computed by the analyst from these figures unless otherwise stated.
Income statement
Table 6.1: Income statement (INR crore)
Notes:
-
EBIT is computed as EBITDA plus other income minus depreciation.
-
Gross profit is from TipRanks, which labels the periods as December year-ends in error.
-
FY2022 EPS is shown as INR −3.66 by Screener and TipRanks but INR −3.37 by Anand Rathi. The discrepancy is unresolved.
Table 6.2: Margins and growth (%)
Revenue CAGR, FY2019–FY2023: about 20.2% per year (INR 409 crore to INR 854 crore over four years). This growth is off a deeply depressed base. Revenue was INR 1,476 crore in FY2014. The 10-year sales CAGR to FY2023 is −3% (Screener.in).
Commentary. The five-year record has three distinct phases.
-
Restart, FY2019–FY2020. After the near-shutdown of FY2017 (revenue of INR 24 crore), the plant ramped up. FY2020 was the only year in the window with positive EBITDA (INR 20 crore, 3.6% margin). Even then, finance costs of INR 44 crore and depreciation of INR 51 crore produced a net loss of INR 75 crore.
-
COVID dip and recovery, FY2021–FY2022. Revenue fell 24% in FY2021 to INR 418 crore. It then rose 81% to INR 757 crore in FY2022 on the post-pandemic steel price upcycle. Despite record realisations industry-wide in FY2022, AMPL's EBITDA remained negative (INR −5 crore). This is a strong indicator of structural cost disadvantage: high conversion cost and the inability to buy raw materials efficiently without working-capital lines.
-
Deterioration, FY2023 to Q3 FY2024. Revenue reached INR 854 crore, but EBITDA collapsed to INR −63 crore as steel prices corrected while coal and iron-ore costs stayed elevated. This deteriorated further in FY2024: nine-month EBITDA of INR −206 crore and a TTM margin of −28%.
Interest expense. Interest fell from INR 44 crore (FY2020) to nil (FY2023). This does not reflect deleveraging; book borrowings were still INR 1,105 crore. Lenders' claims accrue contractually regardless. ACRE's claim of INR 2,213.81 crore at 31 Jan 2023 is roughly double book borrowings.
Balance sheet
Table 6.3: Balance sheet (INR crore, as at 31 March)
Latest available balance sheet (30 Sep 2023, half-year):
-
Equity capital: INR 141 crore
-
Reserves: INR −1,173 crore
-
Net worth: INR −1,032 crore
-
Borrowings: INR 1,105 crore
-
Other liabilities: INR 1,105 crore
-
Total assets: INR 1,178 crore
The implied book value per share is INR −73.2, matching Screener.in.
Items not separately disclosed in sources reviewed:
Cash and equivalents: immaterial; net cash flow is approximately zero each year.
Short-term vs long-term debt split: following recall notices, the entire borrowing is in practice current and overdue.
Goodwill and intangibles: none disclosed.
Contingent liabilities: INR 934 crore (Screener.in, latest annual report).
Net debt: approximately equal to gross borrowings, INR 1,105 crore at book (FY2023). On a claims basis (ACRE alone, INR 2,214 crore at Jan 2023), economic net debt is materially higher.
Working capital: Screener reports deeply negative working-capital days (FY2023: −574). This means current liabilities, including overdue debt and payables, far exceed current assets. A precise current-asset and current-liability split is not disclosed in sources reviewed.
Cash flow
Table 6.4: Cash flow (INR crore)
Commentary. Operating cash flow is positive in every year despite operating losses. This pattern reflects working-capital release from stretched creditors (payable days of 300–550) rather than earnings quality. Each year, virtually all operating cash was swept to lenders (negative financing flows matching CFO almost exactly), leaving zero net cash. This is the signature of a lender-controlled cash-sweep arrangement. Capex was negligible until FY2022–FY2023 (CWIP built to INR 47 crore), which implies chronic under-investment in maintenance.
Ratios
Table 6.5: Key ratios
Notes:
ROE: is not meaningful because equity is negative in all years.
ROIC: is not meaningful; it is approximated by ROCE.
Debt/equity: is not meaningful (negative equity). Debt to total assets was 0.92 in FY2023.
Net debt/EBITDA: is not meaningful (negative EBITDA except FY2020, when it was about 60x).
Current ratio: is not publicly disclosed; it is well below 1.0 given negative working capital.
Interest coverage in FY2023: is undefined (nil interest booked) and is shown as 0.
Commentary. Asset turnover improved from 0.29x to 0.71x as volumes rose on a depreciating asset base. Inventory days fell from 651 to 292. The cash conversion cycle compressed to 14–17 days in FY2022–FY2023, but only because payable days were extended in step. AMPL is effectively financed by its suppliers and defaulted lenders. ROCE deteriorated to −34% in FY2023, the worst in the window.
Most recent reported period (FY2024, nine months)
Table 6.6: Quarterly results, Q1 FY2023 to Q3 FY2024 (INR crore)
Source: Screener.in quarterly data (standalone, from exchange filings); Business Standard (Q3 FY2023: sales INR 196.26 crore, net loss INR 43.15 crore); Simply Wall St (Q3 FY2024: revenue INR 1.47 billion, net loss INR 760.6 million, EPS INR −5.39).
Nine months FY2024: revenue INR 556 crore; EBITDA INR −206 crore; net loss INR −226 crore.
TTM to Dec 2023: revenue INR 818 crore; EBITDA INR −228 crore; net loss INR −257 crore; EPS INR −18.20.
The sharp deterioration in Q2 and Q3 FY2024 (EBITDA margins of −45% to −46%) preceded the May 2024 CIRP admission. It likely reflects raw-material starvation and lower capacity utilisation as lenders moved to enforce. Operating status after May 2024 under the RP is not quantified in public filings. Under the IBC, the RP must run the company as a going concern, but post-CIRP production data has not been published.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Segment Revenue
| Segment | FY2021 | FY2022 | FY2023 |
|---|---|---|---|
Iron & Steel Products (single segment) | 418 | 757 | 854 |
Results by Segment and Segment Margins & Growth (%)
| Metric | FY2021 | FY2022 | FY2023 |
|---|---|---|---|
Segment EBITDA (INR Cr) | -13 | -5 | -63 |
Segment pre-tax income (INR Cr) | -76 | -52 | -99 |
Segment EBITDA margin (%) | -3.1 | -0.7 | -7.4 |
Segment revenue YoY growth (%) | -23.7 | 81.1 | 12.8 |
Contribution to total revenue (%) | 100 | 100 | 100 |
Income Statement and Per-Share Data
| Metric | FY2019 | FY2020 | FY2021 | FY2022 | FY2023 |
|---|---|---|---|---|---|
Revenue from operations (INR Cr) | 409 | 548 | 418 | 757 | 854 |
Total expenses excl. D&A and interest (INR Cr) | 454 | 528 | 431 | 762 | 917 |
Gross profit per TipRanks (INR Cr) | -47.6 | 22.7 | -77.2 | -69.3 | -142.0 |
EBITDA / operating profit (INR Cr) | -45 | 20 | -13 | -5 | -63 |
Other income (INR Cr) | 0 | 0 | 0 | 1 | 0 |
Depreciation (INR Cr) | 45 | 51 | 44 | 42 | 35 |
Operating income / EBIT (INR Cr) | -90 | -31 | -57 | -46 | -98 |
Interest (INR Cr) | 3 | 44 | 19 | 5 | 0 |
Pre-tax income (INR Cr) | -92 | -75 | -76 | -52 | -99 |
Tax (INR Cr) | 0 | 0 | 0 | 0 | 0 |
Net income (INR Cr) | -92 | -75 | -76 | -52 | -99 |
EPS basic (INR) | -6.54 | -5.32 | -5.37 | -3.66 | -7.00 |
EPS diluted (INR) | -6.54 | -5.32 | -5.37 | -3.66 | -7.00 |
Dividend per share (INR) | 0 | 0 | 0 | 0 | 0 |
Margin Analysis (%)
| Metric | FY2019 | FY2020 | FY2021 | FY2022 | FY2023 |
|---|---|---|---|---|---|
EBITDA margin (%) | -11.0 | 3.6 | -3.1 | -0.7 | -7.4 |
Operating (EBIT) margin (%) | -22.0 | -5.7 | -13.6 | -6.1 | -11.5 |
Pre-tax margin (%) | -22.5 | -13.7 | -18.2 | -6.9 | -11.6 |
Net margin (%) | -22.5 | -13.7 | -18.2 | -6.9 | -11.6 |
Revenue growth YoY (%) | 119.9 | 34.0 | -23.7 | 81.1 | 12.8 |
Balance Sheet
| Metric | FY2019 | FY2020 | FY2021 | FY2022 | FY2023 |
|---|---|---|---|---|---|
Equity share capital (INR Cr) | 141 | 141 | 141 | 141 | 141 |
Reserves and surplus (INR Cr) | -724 | -800 | -875 | -926 | -1,024 |
Total equity / net worth (INR Cr) | -583 | -659 | -734 | -785 | -883 |
Borrowings, total (INR Cr) | 1,220 | 1,197 | 1,170 | 1,140 | 1,105 |
Other liabilities (INR Cr) | 793 | 737 | 781 | 865 | 973 |
Total liabilities and equity (INR Cr) | 1,430 | 1,275 | 1,216 | 1,219 | 1,195 |
Net fixed assets (INR Cr) | 599 | 548 | 504 | 461 | 426 |
Capital work in progress (INR Cr) | 0 | 0 | 0 | 28 | 47 |
Investments (INR Cr) | 0 | 0 | 0 | 0 | 0 |
Other assets incl. current assets (INR Cr) | 831 | 727 | 712 | 729 | 722 |
Total assets (INR Cr) | 1,430 | 1,275 | 1,216 | 1,219 | 1,195 |
Cash Flow
| Metric | FY2019 | FY2020 | FY2021 | FY2022 | FY2023 |
|---|---|---|---|---|---|
Cash from operations (INR Cr) | 139 | 212 | 27 | 60 | 54 |
Capital expenditure, approx. = CFI (INR Cr) | 0 | 0 | 0 | 28 | 19 |
Free cash flow (INR Cr) | 139 | 212 | 27 | 32 | 35 |
Cash from financing (INR Cr) | -140 | -212 | -27 | -32 | -35 |
Dividends paid (INR Cr) | 0 | 0 | 0 | 0 | 0 |
Share buybacks (INR Cr) | 0 | 0 | 0 | 0 | 0 |
Net cash flow (INR Cr) | -2 | 0 | 0 | 0 | 0 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2019 | FY2020 | FY2021 | FY2022 | FY2023 |
|---|---|---|---|---|---|
ROCE (%) per Screener | -13 | -5 | -12 | -12 | -34 |
ROA, net income / total assets (%) | -6.4 | -5.9 | -6.3 | -4.3 | -8.3 |
Asset turnover, revenue / total assets (x) | 0.29 | 0.43 | 0.34 | 0.62 | 0.71 |
Interest coverage, EBIT / interest (x) | -30.0 | -0.7 | -3.0 | -9.2 | 0 |
Debtor days | 131 | 74 | 45 | 17 | 26 |
Inventory days | 533 | 446 | 651 | 387 | 292 |
Payable days | 548 | 416 | 537 | 390 | 302 |
Cash conversion cycle (days) | 116 | 105 | 159 | 14 | 17 |
Income Statement and Margin Analysis (%)
| Metric | Q1FY2023 | Q2FY2023 | Q3FY2023 | Q4FY2023 | Q1FY2024 | Q2FY2024 | Q3FY2024 |
|---|---|---|---|---|---|---|---|
Revenue (INR Cr) | 207 | 187 | 197 | 262 | 203 | 206 | 147 |
EBITDA (INR Cr) | -4 | -3 | -34 | -22 | -45 | -94 | -67 |
EBITDA margin (%) | -2.2 | -1.5 | -17 | -9 | -22 | -46 | -45 |
Net income (INR Cr) | -14 | -12 | -43 | -31 | -53 | -97 | -76 |
EPS (INR) | -0.96 | -0.82 | -3.06 | -2.17 | -3.77 | -6.87 | -5.39 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansGeographic Revenue
| Region | FY2021 | FY2022 | FY2023 |
|---|---|---|---|
India (domestic) | 418 | 757 | 854 |
Outside India | 0 | 0 | 0 |
Region Margins & Growth (%)
| Region | FY2021 | FY2022 | FY2023 |
|---|---|---|---|
India (domestic) growth (%) | -23.7 | 81.1 | 12.8 |
Capital Markets
| Measure | Value | Source |
|---|---|---|
Share price (19 Oct 2026) | INR 2.37 | Screener.in |
Market capitalisation | INR 33.4 crore | Screener.in |
52-week high / low | INR 2.72 / INR 1.26 | Screener.in |
1-year price return | +27% | Screener.in stock price CAGR |
3-year price CAGR | -17% | Screener.in |
5-year price CAGR | -6% | Screener.in |
10-year price CAGR | +1% | Screener.in |
Price around CoC approval (Jan 2026) | INR 1.54–1.64 | Arihant Capital; ScanX |
Shares outstanding | 141.11 million | Simply Wall St; MCA |
NSE trade series | BZ (restricted / non-compliance category) | Screener.in |
Market Valuation
| Metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Market cap snapshot (INR Cr) | 29.3 | 63.2 | 23.1 |
Valuation Multiples
| Multiple | AMPL | Basis | Comment |
|---|---|---|---|
EV (book) | About INR 1,138 crore | Market cap INR 33.4 crore + borrowings INR 1,105 crore (Sep 2023), minus negligible cash | Excludes accrued interest and contingent liabilities |
EV/Sales | About 1.39x | EV / TTM revenue INR 818 crore (Dec 2023) | Using FY2023 revenue: 1.33x |
Implied enterprise value from resolution process | Indicatively INR 510 crore range | Bid figure referenced in NCLT order excerpt (attribution to the winning plan unconfirmed) | Implies recovery well below ACRE's INR 2,214 crore claim |
Credit Ratings
| Rating agency | Rating | Date | Source |
|---|---|---|---|
ICRA | — | 4 Mar 2016; 30 Dec 2016 | ICRA (via Screener.in) |
Moody's / S&P / Fitch | Not rated | — | — |
Analyst Conclusions
Management guidance and consensus
Management guidance: None. The board is suspended; the RP provides no financial guidance.
Consensus growth expectations: None.
The only forward-looking anchors are:
-
NCLT disposal of the plan approval application (PLAN/3/KB/2026).
-
Resolution of residual interlocutory applications by Amit Metaliks and the suspended CMD.
-
Plan implementation, including the treatment of existing equity and any capital reduction, delisting or re-listing mechanics.
Bull case
-
Resolution unlocks an operating asset. A CoC-approved plan exists (89.79% vote). The NCLT's 10 June 2026 ruling that a suspended director lacks locus removes a major obstacle. Sanction could come within months, after which a well-capitalised acquirer can restart the plant at full utilisation. The plant generated INR 854 crore of revenue in FY2023 even while starved of capital.
-
The asset is strategically valued. Sixty-two challenge rounds and bids from regional strategics (Amit Metaliks, Rungta Sons) and an ARC-led consortium show competitive interest. A bid figure of about INR 510 crore against a book EV of about INR 1,138 crore suggests the asset is being acquired at a deep discount to replacement cost, positioning the new owner for profitable operation as peer margins (12–22% EBITDA) show.
-
Residual equity optionality. Some IBC plans for listed companies retain a small stake for public shareholders after capital reduction. With the market cap at only INR 33 crore and the stock up 27% in a year, the market may be pricing a non-zero residual. Any favourable equity treatment would deliver multi-bagger returns from the current base.
Bear case
-
Equity likely extinguished. Claims run into thousands of crores (ACRE alone INR 2,214 crore at Jan 2023, plus INR 934 crore of contingent liabilities), while bid values are in the hundreds of crores. The waterfall leaves nothing for equity. Most IBC plans for deeply insolvent listed companies reduce existing share capital to near zero, making the current INR 2.37 price speculative.
-
Litigation could derail or delay approval. Interlocutory applications were still listed on 9 Oct 2026, and the NCLT's own 2025 findings of asset non-disclosure leave grounds for appeal to NCLAT and the Supreme Court. Delays erode the asset, and failure leads to liquidation.
-
Operating economics are structurally weak. EBITDA was negative in FY2022 even during a steel upcycle. Without captive raw materials, any new owner must invest heavily, and that value accrues to the acquirer, not existing shareholders.
Key catalysts and monitorables (next 12 months)
| # | Catalyst / monitorable | Expected timing | Impact |
|---|---|---|---|
| 1 | NCLT order on IA (IBC) PLAN/3/KB/2026 (plan sanction) | Pending; possible in H2 FY2027 | Decisive for equity value |
| 2 | Disposal of IA 930, 1272 and 1273/KB/2026 | Listed 9 Oct 2026 | Clears or complicates the approval path |
| 3 | Any NCLAT appeal against plan sanction | Within 30–45 days of sanction | Delay risk |
| 4 | Disclosure of the successful resolution applicant's identity and plan terms (equity treatment, capital reduction, delisting) | On or after sanction | Determines shareholder outcome |
| 5 | Outcome of the Sarita Steel & Power CIRP (leased land parcel) | 2026–2027 | Land perimeter clarity |
| 6 | Publication of overdue audited financials (FY2024–FY2026) | Unknown | Transparency; listing compliance |
| 7 | Exchange action on listing status (BZ series, possible suspension) | Ongoing | Liquidity risk |
Analyst verdict
Ankit Metal & Power is no longer an operating-equity story; it is a distressed-asset resolution case, and the investment question collapses into one variable: how the NCLT-sanctioned plan treats existing shareholders. The fundamentals are unambiguous. Net worth has been negative since FY2016 and stood at INR −1,032 crore in September 2023. EBITDA was negative in four of the last five audited years, including the FY2022 steel upcycle, and fell to −28% on a trailing basis before CIRP admission. Book borrowings of INR 1,105 crore are dwarfed by ACRE's contractual claim of INR 2,214 crore, before INR 934 crore of contingent liabilities.
Against those claims, the bid range referenced in NCLT records sits in the low hundreds of crores. Creditors face steep haircuts, and under the IBC waterfall equity ranks last. The CoC approved a plan with 89.79% in January 2026, and the NCLT's June 2026 ruling against the suspended CMD's locus suggests the process is nearing sanction. However, residual applications by a competing bidder kept the matter live as of October 2026.
The physical asset has genuine strategic value to a regional consolidator. It is an integrated pellet–DRI–induction furnace–rolling complex with about 45 MW of captive power and a substantial, if contested, brownfield land bank in Bankura, close to the eastern India raw-material belt. That value will accrue to the acquirer and, partially, to creditors.
For existing public shareholders, the base case is extinction or near-total dilution through capital reduction, consistent with prevailing IBC practice for deeply insolvent listed debtors. The INR 33 crore market capitalisation is best viewed as an option premium on an unlikely favourable equity carve-out. Absent disclosure of plan terms that preserve meaningful public equity, the stock is uninvestable on fundamental grounds. Monitoring should focus on the NCLT sanction order, the equity-treatment clauses and any listing-status action by the exchanges.
Data limitations:
-
No audited financials after FY2023 or interim results after Q3 FY2024 exist in the public domain.
-
The successful resolution applicant and plan value are not formally confirmed in accessible sources.
-
Auditor, executive compensation, product-wise volumes, segment and geographic splits, ESG metrics and detailed shareholder lists are not publicly disclosed in the sources reviewed.
-
All such items are marked accordingly rather than estimated.
Principal sources:
-
Screener.in (company financial database compiled from BSE/NSE filings, FY2012–Q3 FY2024; accessed 19 Oct 2026)
-
IBBI corporate process pages for CIN L27101WB2002PLC094979
-
NCLT Kolkata order of 3 May 2024 (ACRE vs AMPL)
-
NCLT Kolkata order of 20 Dec 2023 (UCO Bank vs AMPL)
-
NCLAT order of 21 Apr 2025 (CoC of AMPL vs Amit Metaliks, via Indian Kanoon)
-
IBC Laws report on IA 223/KB/2026 (10 Jun 2026)
-
NCLT cause lists dated 24 Mar 2025, 19 Jan 2026, 10 Apr 2026 and 9 Oct 2026
-
RP teasers dated 1 Jul 2024 and 16 Nov 2024 (ankitmetal.com)
-
BSE CIRP disclosures (Jan 2025 – Jan 2026)
-
Supreme Today AI report on the NCLT order of 9 Apr 2025
-
Business Standard; Simply Wall St; TipRanks; Tickertape; IndMoney; Anand Rathi; Morningstar; PitchBook; ROIC.ai; Arihant Capital; MCA extract (paperli.ai); ScanX
-
Peer data: StockAnalysis.com, Simply Wall St, FilingReader, Angel One, Alphastreet
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Executive Leadership Team
| Name | Role | Tenure | Prior roles / notes | Source |
|---|---|---|---|---|
Sanjeev Kumar Jalan | Resolution Professional (IBBI/IPA-001/IP-P-01901/2020-2021/13053) | 12 Sep 2024 – present | Also RP of Sarita Steel & Power Ltd (Form G 30 Jan 2026). | RP Teaser Nov 2024; NCLT cause lists 2026 |
Kshitiz Chhawchharia | Interim Resolution Professional (IBBI/IPA-001/IP-P00358/2017-2018/10616) | 3 May 2024 – 12 Sep 2024 | Issued Form G in Jul 2024; firm GT Restructuring Services LLP prepared the Jul 2024 teaser | RP Teaser Jul 2024 |
Board of Directors
| Name | Title | Appointment / tenure | Notes | Source |
|---|---|---|---|---|
Subham Bhagat | Chairman & Managing Director (suspended) | Appointed Mar 2021 | Successfully appealed the first CIRP (NCLAT, 12 Mar 2024); active litigant against the RP in 2025–26 (IA 149/KB/2026, IA 223/KB/2026, IA 1273/KB/2026) | ROIC.ai; IBBI; NCLT cause lists |
Ankit Jain | Independent Director (suspended) | Re-appointed for second term to 2026 | — | ROIC.ai |
Aritro Roy | Independent Director (suspended) | Appointed 2021 | — | ROIC.ai |
Satish Kumar Singh | Non-Executive Director (suspended) | Appointed Aug 2021 | — | ROIC.ai |
Shareholding Trend
| Holder category | FY2017 | FY2018 | FY2019 | FY2020 | FY2021 | FY2022 | FY2023 | FY2024 |
|---|---|---|---|---|---|---|---|---|
Promoters and promoter group (%) | 71.02 | 71.02 | 71.02 | 71.02 | 71.02 | 71.02 | 71.02 | 71.02 |
Public (%) | 28.98 | 28.98 | 28.98 | 28.98 | 28.98 | 28.98 | 28.99 | 28.99 |
Number of shareholders | 9,748 | 9,474 | 9,545 | 9,654 | 10,051 | 31,035 | 34,864 | 33,216 |
Competitive Landscape
Key Competitors
| # | Competitor | Listing | Overlap with AMPL | Relative position |
|---|---|---|---|---|
| 1 | Shyam Metalics & Energy Ltd | NSE/BSE | Pellets, sponge iron, billets, TMT, wire rods, ferro alloys, captive power (West Bengal, Odisha) | Regional leader; FY2025 revenue about INR 15,138 crore; far larger and integrated |
| 2 | Jai Balaji Industries Ltd | NSE/BSE | Sponge iron, billets, TMT, ferro alloys, DI pipes (West Bengal, Chhattisgarh) | Turned around from its own distress; FY2025 revenue about INR 6,351–6,420 crore |
| 3 | Godawari Power & Ispat Ltd | NSE/BSE | Pellets, sponge iron, billets, wire rods, silico manganese, captive iron ore (Chhattisgarh) | Low-cost, captive-mine integrated; FY2025 EBITDA margin about 22% |
| 4 | Rashmi Metaliks / Rashmi Group | Unlisted | Pellets, DRI, billets, TMT, DI pipes (West Bengal) | Large private regional player |
| 5 | Amit Metaliks Ltd | Unlisted | DRI, billets, TMT (West Bengal) | Regional player; a bidder for AMPL |
| 6 | SRMB Srijan Ltd | Unlisted | TMT bars (West Bengal) | Strong regional TMT brand |
| 7 | Concast Steel & Power / regional IF mills | Various | Billets, TMT | Fragmented competition |
| 8 | Sarda Energy & Minerals Ltd | NSE/BSE | Pellets, sponge iron, billets, wire rods, ferro alloys (Chhattisgarh) | Integrated with captive mines and hydropower |
| 9 | Prakash Industries Ltd | NSE/BSE | Sponge iron, billets, TMT, wire rods (Chhattisgarh) | Integrated with captive coal |
| 10 | Tata Steel (long products) / JSW Steel / SAIL (TMT) | NSE/BSE | TMT bars in eastern India retail and project markets | Primary producers with national brands |
| 11 | Rungta Sons Pvt Ltd | Unlisted | Iron ore, DRI, steel (Jharkhand/Odisha) | Raw-material-integrated; bidder for AMPL |
Peer Comparison FY2025
| Company | Fiscal year | Revenue (INR Cr) | Revenue growth YoY (%) | EBITDA margin (%) | Net margin (%) | Source |
|---|---|---|---|---|---|---|
Ankit Metal & Power | FY2023 (latest audited) | 854 | 12.8 | -7.4 | -11.6 | Screener.in |
Shyam Metalics & Energy | FY2025 | 15,138 | 14.7 | 12.3 | 6.0 | StockAnalysis.com; Simply Wall St |
Jai Balaji Industries | FY2025 | 6,351 | about 0 (flat) | — | 8.7 | FilingReader; Simply Wall St |
Godawari Power & Ispat | FY2025 | — | — | 22 | 15 | Angel One (company FY2025 release) |
Recent Developments
The window covers April 2025 to October 2026. Because the company is in CIRP and does not publish results, newsflow consists almost entirely of insolvency proceedings.
Contract wins, product launches, guidance revisions and layoffs: none disclosed during CIRP.