Anson Resources Limited Overview
Anson Resources is a pre-revenue critical-minerals developer listed in Australia but operating mainly in the United States. Its value rests on lithium-bearing brines in Utah's Paradox Basin. The flagship Green River Lithium Project holds a JORC (2012) Mineral Resource of 773,000 t LCE (183,000 t Indicated; 590,000 t Inferred). A Burns & McDonnell scoping study for a 10,000 tpa battery-grade lithium carbonate plant estimated capex of US$569m, C1 opex of US$3,837/t and a post-tax NPV8 of US$896m. The company has several third-party endorsements:
-
a definitive offtake with LG Energy Solution (up to 4,000 tpa);
-
a binding POSCO Holdings agreement to fund and operate a DLE demonstration plant on site;
-
a non-binding US EXIM Letter of Interest for up to US$330m;
-
Utah incentive approvals of about US$406m (undiscounted, post-performance).
It also holds the earlier-stage Paradox Lithium Project (1.5 Mt LCE; 7.6 Mt bromine), the Yellow Cat uranium-vanadium project, and Western Australian base-metal optionality. The main offsets are a sub-A$100m market value, recurring dilution, a cash balance below A$10m, and contested governance.
Company's own description. Across its 2025–2026 ASX releases, Anson calls itself an ASX-listed mineral resources company with a portfolio of projects in demand-driven commodities. Its core assets are the Green River and Paradox lithium projects in Utah, which it aims to develop into significant lithium-producing operations. Its stated goal is long-term shareholder value through discovering, acquiring and developing resources for new-energy and technology markets.
The FY2025 AR lists two principal activities:
-
Mineral exploration in the USA and the mid-west of Western Australia.
-
Exploration of the Paradox and Green River lithium projects, mainly for extracting lithium and bromine from brine.
Independent characterisation. Anson is a single-asset, pre-FID development company. It has been through three phases:
Before 2016: iron-oriented junior explorer (as Mayan Iron).
2016–2023: Paradox Basin brine explorer. This phase produced a Definitive Feasibility Study in September 2022 for a Sunresin-based DLE flowsheet.
2023 onwards: focus shifted to Green River, a deeper Mississippian (Leadville Limestone) brine play next to a 147-acre private industrial parcel the company bought in September 2023.
Capital allocation and partner attention now sit overwhelmingly with Green River. Paradox, Yellow Cat and the WA tenements are optionality.
Business model and revenue model.
Value-chain position. Anson plans to integrate from brine extraction (pressured wells; reservoir pressure 4,500–6,000 psi naturally lifts brine) through pre-treatment, DLE and refining to finished battery-grade lithium carbonate on site. Spent brine would be reinjected. It would sit upstream of cathode and cell makers.
Customer types and end-markets. Intended customers are cell makers (LG Energy Solution), cathode or advanced-materials buyers (Nusano is a non-binding counterparty for high-purity lithium eluate), and potentially defence-industrial users. A1 Lithium was admitted to the US Defense Industrial Base Consortium in May 2026. End-markets are EV batteries and stationary storage, positioned as US-domestic supply aligned with the Inflation Reduction Act and foreign-entity-of-concern sourcing rules.
Strategy
Stated strategy themes (FY2025 AR Chairman's letter; NoM Jul 2026; Investor update Aug 2026).
-
Become a supplier of 100% US-sourced battery-grade lithium into North America, in step with US supply-chain independence policy.
-
Advance Green River to a Final Investment Decision in 2027, with first carbonate in 2029. The company targets about 10% of North American lithium demand by 2029 (company claim).
-
Use partner validation (POSCO, LGES) and government finance (EXIM, ECAs, DOE grants, Utah incentives) to limit dilution.
-
Grow the resource through new tenure rather than drilling. The 13 May 2026 release had to retract a "1 million tonnes" ambition.
-
Impose capital discipline after the Strategic Review: leaner organisation and overhead cuts.
2027 goals set out in the July 2026 Notice of Meeting.
-
Increase the JORC resource.
-
Complete the Green River DFS to ±25% accuracy.
-
Sign more offtake agreements.
-
Start construction of the POSCO demonstration plant.
-
Finalise the capital structure for FID.
Initiative register (last 24 months).
Medium-term financial targets / guidance. No revenue or earnings guidance is given. Project-level targets come from the scoping study (10,000 tpa, US$569m capex, C1 US$3,837/t, first production 2029).
Products & Services
Anson has no commercial products. Its "portfolio" is a set of mineral projects plus process know-how, catalogued below.
USA — Lithium Brine
| Category | Aquifer vol. (km³) | Brine vol. (km³) | Li (mg/L) | Contained Li (t) | LCE (t) |
|---|---|---|---|---|---|
| Indicated | 4.482 | 0.269 | 127.8 | 34,000 | 183,000 |
| Inferred | 14.467 | 0.868 | 127.8 | 111,000 | 590,000 |
| Total | 18.949 | 1.137 | 127.8 | 145,000 | 773,000 |
| Category | Brine (Mt) | Li (ppm) | Br (ppm) | LCE ('000 t) | Br ('000 t) |
|---|---|---|---|---|---|
| Indicated | 562 | 123 | 3,398 | 367 | 1,910 |
| Inferred | 1,954 | 109 | 2,915 | 1,138 | 5,699–6,699* |
| Total | 2,516 | 112 | 3,023 | 1,504 | 7,609 |
(a) Green River Lithium Project (flagship), Emery and Grand Counties, Utah
Tenure: - 728 BLM placer claims (about 14,385–14,731 acres).
-
21 SITLA lease blocks under one Other Business Agreement (about 6,505–6,795 acres).
-
7 private parcels (about 140–148 acres) housing the Bosydaba #1 well, office, storage tanks and a pilot DLE unit.
-
FFSL mineral rights won August 2026 (about 1,175 acres).
-
Application for 17 more SITLA blocks (3,958 acres) lodged July 2026. Board decision was expected in August 2026; outcome not located.
Resource (JORC 2012, 13 May 2026): Basis: 50 mg/L Li cut-off; 6% porosity; 100% brine in pore space. Competent Person: D. Roy Eccles (APEX Geoscience).
Engineering (Scoping/FEP-1) study — Burns & McDonnell (ASX 16 Jun 2026)
-
10,000 tpa LCE, 20-year life, first battery-grade carbonate targeted in 2029.
-
Capex US$569m, including 25% contingency; capital intensity US$56,800/t.
-
C1 opex US$3,837/t (energy US$1,518/t; chemicals US$1,433/t).
-
Base case: pre-tax NPV8 US$1,373m, IRR 27.5%; post-tax NPV8 US$896m, IRR 21.7%; payback 4.44 years.
-
Upside case: pre-tax NPV8 US$2,690m.
-
Price deck: Benchmark Q1 2026 base case, US$16,465/t in 2029 rising to US$30,123/t by 2040.
Process: - Proprietary chemical-free iron-removal pre-treatment.
-
DLE: six technologies tested. Koch Li-Pro LSS pilot gave 98% recovery and produced 43,500 gallons of lithium chloride; POSCO's proprietary DLE will be demonstrated next.
-
JordProxa non-thermal downstream test work exceeded design expectations (Investor update, Aug 2026).
-
99.4% lithium carbonate confirmed by SGS (Feb 2026).
Permitting: - Brine extraction and waste-brine disposal permits granted by Utah.
-
UIC approval secured (FY2025).
-
SMO Notice of Intent approved 10 July 2026; it becomes active once a bond is posted.
Royalty: Utah sliding scale of 1–5%, replacing a flat 5% (FY2025 AR). The SITLA lease carries a 5% gross-value production royalty under its base terms.
Target customers: LG Energy Solution (definitive offtake, up to 4,000 tpa, about 40% of start-up capacity, five years from Jan 2028, conditional on production and qualification). Nusano (non-binding MoU, up to 300 tpa high-purity lithium eluate).
Pricing model: not disclosed. Offtake pricing terms are confidential.
(b) Paradox Lithium Project, Grand County, Utah (A1 Lithium)
Tenure: over 1,600 placer claims (ULI, CLOUD, CANE, CLOUDIII, ULI2, SM, GE series), 3 SITLA potash/mineral-salts leases and 2 SITLA industrial permits. 87 ULI claims are 50% held via an earn-in JV.
Resource (16 Oct 2023): *The Inferred bromine figure is 5,699 in the FY2025 AR and H1 FY2026 tables but 6,699 in the June 2026 Quarterly. The total of 7,609 reconciles with 5,699, so the 6,699 figure appears to be a typographical error.
DFS (8 Sep 2022, Worley Class III; Sunresin DLE costs): - Up to 13,074 tpa lithium carbonate; production life up to 23 years.
-
Capex US$495.1m; C1 opex US$4,368/t.
-
Base case: pre-tax NPV7 US$1,306m, IRR 47%; post-tax NPV7 US$922m, IRR 37%; average EBITDA US$153m p.a. at 69% margin.
Status: the company still states the DFS applies and has not materially changed. Development attention has moved to Green River. BLM Plan of Operations approved for "Western Strategy" re-entry drilling (Mineral Canyon Fed 1-3, Sunburst 1), not yet executed. Requisitioning shareholders note that no substantive Paradox development update has been published since the 2022 DFS.
By-products: bromine (zinc-bromine storage), boron, iodine, caustic soda. None are included in base economics.
USA — Uranium / Vanadium
(c) Yellow Cat Project, Thompson District, Grand County, Utah (UV1 Minerals LLC)
-
151 lode claims (Yellow Cat and Yellow Cat West). Historical mines include Windy Point, Mineral Treasure, Cactus Rat and McCoy Group.
-
Historical intercepts include hole 533 (0.3 ft at 37,500 ppm U3O8 and 3.34% V2O5). Surface samples reach 10.33% U3O8 and 25.6% V2O5.
-
23-hole air-core program on the Eastern Block completed April 2026; assays for U, V, Ga and REE pending as of the June 2026 Quarterly.
-
Western Block program announced 29 July 2026, aiming for a JORC resource by Q1 2027 (Investor update).
-
Positive US Government "Met" assessment received May 2026.
Western Australia (non-core)
(d) Ajana Project (Zn-Pb-Ag plus critical minerals), Northampton
-
Tenements E66/89, E66/94, ELA66/131.
-
Surprise inferred resource: 103,000 t at 2.7% Pb, 0.45% Zn, 1.3 g/t Ag (8 Oct 2024). Mineralisation is open along strike and down dip.
-
Gallium, indium and germanium assays not yet in the resource.
-
Historical Mary Springs resource: 390,000 t at 6.5% Pb (FY2023 AR).
(e) The Bull Ni-Cu-PGE Project
-
E70/5420, 35 km from Perth, along strike from Chalice's Julimar discovery.
-
5-year extension approved (Q4 FY2026); ELA70/5619 still pending; no drilling to date.
(f) Hooley Well Ni-Co laterite (and REE) Project
-
E9/2218, E9/2219, E9/2462.
-
Heritage surveys pending under the Wajarri Yamaji framework.
Process IP and Know-How
-
Proprietary chemical-free iron-removal pre-treatment (patent status not publicly disclosed).
-
Lithium Innovation Centre and Sample Demonstration Plant in Florida, used to make customer samples.
Financial Narrative
Basis of preparation.
-
FY2022 figures are the restated comparatives in the FY2023 AR. That year the accounting policy changed to capitalise exploration and evaluation (E&E) spending under AASB 6. The FY2022 loss was restated from A$6.75m to A$3.55m.
-
FY2021 balance-sheet figures come from data aggregators (Stockopedia, Barchart) on the old expensing basis. They are not strictly comparable.
-
FY2026 audited statements were not located (see the Data-integrity note).
-
Ratios marked "n/m" are not meaningful because the company has no revenue.
Income Statement
Sources: FY2023 AR (FY2022 restated, FY2023); FY2025 AR (FY2024, FY2025).
Gross profit, gross margin, operating margin, EBITDA margin, net margin and revenue CAGR are all n/m (no revenue).
Supplementary multi-year net loss (A$'000), including FY2021 on the old basis. FY2021 from Barchart; FY2022 restated; FY2026 is the half-year only.
Commentary.
FY2023 was the inflection: The loss jumped to A$12.4m after the A$50m raise funded a 150% headcount expansion and FEED work. It also carried a non-cash A$4.17m derivative loss tied to a convertible note that converted into A$8.1m of equity that year.
FY2024–FY2025 show a slow climb-down: Pre-tax loss fell 13.6% in FY2025, driven by lower consultancy (–38%) and corporate costs (–25%) and an FX swing. These were partly offset by higher employee costs, which peaked at A$5.07m in FY2025.
Interest income tracks the cash balance: It peaked at A$0.70m in FY2024 on the remainder of the 2022 raise.
H1 FY2026 continued the trend: Pre-tax loss was A$3.36m versus A$4.85m (–30%). Director and employee costs fell to A$1.95m (–24%) and consultancy to A$0.42m (–49%).
Balance Sheet
Notes:
-
FY2022 total debt excludes a A$2.69m derivative financial liability linked to the convertible note.
-
Goodwill and intangibles have been nil since the FY2023 policy change reclassified A$5.56m of intangibles into E&E.
Interim balance sheet, 31 December 2025 (H1 FY2026, reviewed by EY).
Commentary. The balance sheet is dominated by capitalised E&E: A$41.1m at FY2025, which is 78% of total assets. This rises to A$43.3m at H1 FY2026. Its recoverability depends on Green River reaching development.
There is almost no financial debt; leases and a sub-A$0.5m convertible note are the only borrowings. The capital structure is therefore entirely equity-funded, and cumulative losses reached A$64.8m at December 2025.
Liquidity is volatile. Cash went from A$38.6m (FY2023) to A$2.4m (FY2025), back up to A$14.0m (Dec 2025) after A$19m of placements, then down to A$4.06m at 30 June 2026. That rose to about A$7.97m pro forma after POSCO's tranche-1 payment in July 2026.
The FY2025 AR and H1 FY2026 review report both include a material uncertainty related to going concern (emphasis of matter; opinion not modified).
Cash Flow
FY2026 cash flow — Appendix 5B, 12 months to 30 June 2026 (unaudited). In the Appendix 5B, E&E payments are classified within operating activities. In the statutory accounts they are classified as investing.
Commentary. Total cash burn (operating plus E&E) was about A$12–31m a year in FY2023–FY2025 and about A$15.7m in FY2026.
-
FY2024 was the heaviest year: A$19.4m E&E (Bosydaba #1, Green River land, Legacy acquisition costs) and A$4.3m PPE.
-
FY2026's A$9.2m E&E reflects the Mt Fuel sidetrack, the JORC update and the engineering study.
At the Q4 FY2026 run-rate of A$5.38m per quarter, pro forma cash of A$7.97m covers about 1.5 quarters. That excludes the remaining POSCO fee (about A$3.3m, timing not disclosed) and the A$30m Long State facility, which dilutes shareholders when drawn. Management guides to lower spending in FY2027 as drilling and resource work wind down. Forecast corporate and admin savings are A$1.14m a year (–21.68%).
Ratios
Notes:
-
FY2022 ROE and ROA use an FY2021 opening balance prepared on the old accounting basis.
-
The burn-cover ratio is year-end cash divided by one quarter of annual (operating + PPE + E&E) outflow.
-
ROIC, interest coverage, net debt/EBITDA, asset turnover and the cash conversion cycle are n/m: EBIT is negative, revenue is nil, and the company holds net cash.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Group Entities
| Entity | Jurisdiction | Function / assets |
|---|---|---|
Anson Resources Limited | Australia | Listed parent; holds WA tenements E66/94, ELA66/131, E9/2219, E9/2462, ELA70/5619 |
A1 Lithium Inc. | USA (Utah operations) | Paradox Lithium Project placer claims, SITLA leases and permits. Named by UIPA and GOED as the developer of the Green River plant. |
Blackstone Minerals NV LLC | USA | Holds Green River placer claims (628 GR, 44 GFU, 56 GRU), SITLA OBA lease, FFSL rights and Bosydaba #1 well |
UV1 Minerals LLC | USA (Utah) | Yellow Cat uranium-vanadium lode claims (151) |
Paradox Lithium LLC | USA | Joint-venture vehicle for the 87 ULI placer claims (Anson 50%; transfer formalities incomplete) |
Rhodes Resources Pty Ltd | Australia | Holds E66/89 (Ajana) |
Western Cobalt Pty Ltd | Australia | Holds E9/2218 (Hooley Well) |
State Exploration Pty Ltd | Australia | Holds E70/5420 (The Bull) |
Segment Revenue
| Segment | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Revenue USA (AUD K) | 0 | 0 | 0 |
Revenue Australia (AUD K) | 0 | 0 | 0 |
Revenue Group total (AUD K) | 0 | 0 | 0 |
Segment Assets & Liabilities and Revenue by Segment
| Segment metric | H1FY2025 | H1FY2026 |
|---|---|---|
Segment assets USA (AUD K) | 49,101 | 54,013 |
Segment assets Australia (AUD K) | 9,436 | 11,907 |
Segment assets Other (AUD K) | 59 | 46 |
Segment liabilities USA (AUD K) | 2,795 | 3,020 |
Segment liabilities Australia (AUD K) | 840 | 951 |
E&E additions USA (AUD K) | 2,329 | 3,099 |
E&E additions Australia (AUD K) | 87 | 43 |
Income Statement and Per-Share Data
| Metric | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|
Revenue (AUD K) | 0 | 0 | 0 | 0 |
Interest income (AUD K) | 1 | 301 | 697 | 53 |
Director and employee benefits (AUD K) | -766 | -4,305 | -4,786 | -5,075 |
Operations costs (AUD K) | -84 | -1,007 | -566 | -339 |
Consultancy legal and professional (AUD K) | -452 | -1,074 | -1,902 | -1,177 |
Corporate and administrative (AUD K) | -850 | -1,612 | -2,068 | -1,541 |
Depreciation (AUD K) | -128 | -286 | -652 | -652 |
FX gain or loss (AUD K) | -79 | 2 | -439 | 384 |
Loss on derivative at FVTPL (AUD K) | -984 | -4,167 | 0 | 0 |
Finance costs (AUD K) | -205 | -259 | -121 | -151 |
Operating loss before interest (AUD K) | -3,343 | -12,472 | -10,413 | -8,399 |
EBITDA (AUD K) | -3,215 | -12,186 | -9,761 | -7,747 |
Pre-tax loss (AUD K) | -3,547 | -12,430 | -9,837 | -8,497 |
Net loss (AUD K) | -3,547 | -12,430 | -9,837 | -8,497 |
EPS basic and diluted (A cents) | -0.36 | -1.09 | -0.77 | -0.62 |
Dividends per share (A cents) | 0 | 0 | 0 | 0 |
Key Financials
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Net loss (AUD K) | -4,521 | -3,547 | -12,430 | -9,837 | -8,497 |
Balance Sheet
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Total assets (AUD K) | 6,085 | 16,303 | 59,733 | 54,598 | 52,660 |
Cash and equivalents (AUD K) | 2,233 | 5,731 | 38,645 | 8,215 | 2,447 |
Total current assets (AUD K) | 2,342 | 5,879 | 40,680 | 9,097 | 2,703 |
Total current liabilities (AUD K) | 2,930 | 5,065 | 1,544 | 3,006 | 1,951 |
Working capital (AUD K) | -588 | 814 | 39,136 | 6,091 | 752 |
Total liabilities (AUD K) | 3,233 | 5,558 | 3,236 | 4,938 | 3,706 |
Total equity (AUD K) | 2,852 | 10,744 | 56,497 | 49,659 | 48,955 |
Balance Sheet (FY2022–FY2025)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|
Exploration and evaluation assets (AUD K) | 8,928 | 15,278 | 36,737 | 41,131 |
Property plant and equipment incl ROU (AUD K) | 450 | 2,233 | 6,694 | 6,477 |
Goodwill and intangibles (AUD K) | 0 | 0 | 0 | 0 |
Convertible note current (AUD K) | 909 | 0 | 361 | 421 |
Lease liabilities current (AUD K) | 108 | 458 | 526 | 517 |
Lease liabilities non-current (AUD K) | 169 | 1,018 | 539 | 314 |
Total debt incl leases (AUD K) | 1,186 | 1,476 | 1,426 | 1,252 |
Net debt negative equals net cash (AUD K) | -4,545 | -37,169 | -6,789 | -1,195 |
Contributed equity (AUD K) | 37,061 | 94,857 | 97,539 | 105,048 |
Accumulated losses (AUD K) | -30,238 | -42,439 | -52,276 | -60,773 |
Financial Analysis
| Item | A$ |
|---|---|
Cash | 14,002,791 |
E&E assets | 43,272,058 |
PPE | 6,233,978 |
Total assets | 65,966,521 |
Total liabilities | 3,984,698 (includes convertible note A$394,737; leases A$545,059) |
Equity | 61,981,823 |
Issued capital | 122,232,703 |
Accumulated losses | (64,798,265) |
Cash Flow
| Metric | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|
Operating cash flow (AUD K) | -1,224 | -9,917 | -7,022 | -8,198 |
Capex PPE (AUD K) | -89 | -10 | -4,311 | -306 |
Payments for E&E assets (AUD K) | -6,129 | -6,350 | -19,350 | -3,711 |
Net investing cash flow (AUD K) | -6,206 | -6,060 | -22,964 | -3,963 |
Free cash flow op plus PPE plus E&E (AUD K) | -7,442 | -16,277 | -30,683 | -12,215 |
Equity issued incl options (AUD K) | 11,538 | 52,280 | 36 | 7,210 |
Net financing cash flow (AUD K) | 10,913 | 48,931 | -451 | 6,383 |
Dividends paid (AUD K) | 0 | 0 | 0 | 0 |
Share buybacks (AUD K) | 0 | 0 | 0 | 0 |
Net change in cash (AUD K) | 3,482 | 32,954 | -30,437 | -5,778 |
Balance Sheet (Q4 FY2026–FY2026 YTD)
| Item (AUD K) | FY2026 YTD | Q4 FY2026 |
|---|---|---|
E&E payments | (9,222) | (3,619) |
Staff costs | (4,016) | (1,236) |
Administration and corporate | (2,527) | (589) |
Interest received / (paid) | 95 / (70) | 69 / (8) |
Net operating (including E&E) | (15,740) | (5,382) |
Equity issued (net of A$1,149k costs) plus options | 17,855 | 0 |
Lease repayments | (528) | (93) |
Net financing | 17,327 | (93) |
Closing cash | 4,062 | 4,062 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|
ROE on average equity (%) | -52.2 | -37.0 | -18.5 | -17.2 |
ROA on average assets (%) | -31.7 | -32.7 | -17.2 | -15.8 |
Current ratio (x) | 1.16 | 26.35 | 3.03 | 1.39 |
Debt to equity incl leases (x) | 0.11 | 0.03 | 0.03 | 0.03 |
Cash to quarterly op plus E&E burn (quarters) | 3.1 | 9.5 | 1.1 | 0.8 |
Geographic Revenue
| Region | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Revenue Americas USA (AUD K) | 0 | 0 | 0 |
Revenue APAC Australia (AUD K) | 0 | 0 | 0 |
Revenue EMEA (AUD K) | 0 | 0 | 0 |
Share Price
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|---|
ANSNF June month-end price (USD) | 0.05 | 0.07 | 0.09 | 0.08 | 0.03 | 0.03 |
Share Price & Returns
| Period | Return | Source |
|---|---|---|
1-year | –5.77% | Simply Wall St, date of snapshot unclear |
3-year | –72.00% | Simply Wall St |
5-year | –39.51% | Simply Wall St |
From 2022 peak | Down more than 80% | Requisitioning shareholders, Jun 2026 |
6 months to 1 Jul 2026 | –32% | Anson NoM |
Share Count (millions)
| Metric | FY2018 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|
Shares on issue (millions) | 415.2 | 1,290.5 | 1,386.7 | 1,618.5 |
Valuation Snapshot
| Metric | Value |
|---|---|
Market capitalisation | About A$73–94m (1.62bn shares) |
Enterprise value | About A$65–86m (less about A$8m pro forma cash; negligible debt) |
P/E; EV/EBITDA; EV/Sales | n/m (losses; nil revenue) |
P/B | About 1.2–1.5x on H1 FY2026 equity of A$62.0m |
EV per tonne of resource, Green River only | About A$84–111/t LCE (on 773kt) |
EV per tonne of resource, Green River plus Paradox | About A$29–38/t LCE (on 2.277 Mt) |
Market cap / post-tax project NPV | About 0.06–0.07x the scoping post-tax NPV8 of US$896m (about A$1.3bn at an assumed 0.68 A$/US$) |
Capital Instruments
| Instrument | Amount | Maturity | Notes |
|---|---|---|---|
Convertible note (Aquatech, ex-Koch) | US$250k principal; A$394,737 carrying value (Dec 2025) | 31 Mar 2026 | Settlement after maturity not disclosed |
Lease liabilities | A$545k (Dec 2025) | 1–2 years | Repayments A$528k in FY2026 |
Prospective project debt | EXIM LOI up to US$330m | Not applicable | Non-binding |
Analyst Conclusions
Management guidance.
-
No financial guidance.
-
Operational guidance: JORC update in Q3 2026; DFS to ±25% under way; FID targeted for 2027; POSCO demonstration plant operating 2027–2028; first battery-grade carbonate in 2029.
-
Lower cash spending in FY2027; corporate and admin costs down 21.68%.
-
Yellow Cat JORC by Q1 2027.
Consensus growth expectations. None available.
Bull case
-
Unusually de-risked for its size. Fully permitted brownfield site, binding POSCO agreement, definitive LGES offtake and about US$406m of approved Utah incentives. All this for an EV of about A$65–86m, roughly 0.06x the scoping post-tax NPV. Each financing milestone could re-rate the stock sharply.
-
Resource growth without drilling. New SITLA and FFSL tenure could push the resource toward the scale needed for a long-life, possibly expanded operation (UIPA paperwork references a US$1.3bn future expansion). Higher measured porosity (8.8% vs the 6% used) suggests upside in the model.
-
Policy tailwinds. US critical-mineral policy, DIBC access and ECA appetite (EXIM, Korea) could produce a largely non-dilutive capital stack. That is especially likely if POSCO converts its demonstration work into project equity.
Bear case
-
Funding arithmetic is daunting. About US$568m is needed. Cash is about A$8m, quarterly burn about A$5m, and the share price is near cycle lows. More discounted placements, or draws on the Long State facility, look likely before any FID. Utah incentives are post-performance and do not fund construction.
-
Thin geological base. 76% of the resource is Inferred and relies on one producing well plus a sidetrack that recovered only drilling fluids. The selected grade (127.8 mg/L) excludes lower 2024 and CP-collected assays (84–92 mg/L). The production target appears to need near-total recovery of the Indicated in-situ tonnage over 20 years. Downgrades in a DFS or reserve process are a real possibility.
-
Governance discount. An all-executive board, two remuneration strikes, an ASX-prompted retraction and a hard-fought EGM all weaken the credibility institutional investors and project lenders require. A third strike at the 2026 AGM could re-open a spill.
Key catalysts and monitorables (next 12 months).
-
September 2026 Quarterly / Appendix 5B (due 30 Oct 2026): cash, burn and any raise.
-
Audited FY2026 Annual Report: going-concern language, E&E impairment review.
-
Upgraded JORC estimate including SITLA and FFSL tenure.
-
2026 AGM (around 19 Nov 2026): remuneration vote, TSR-linked incentive proposal, possible new independent director.
-
POSCO: remaining fee instalments, start of demonstration plant construction, any equity term sheet.
-
DOE grant decisions; progress converting the EXIM LOI.
-
Green River DFS release; Yellow Cat assays.
-
Lithium carbonate price direction.
Concluding analyst verdict.
Anson Resources has moved, in about three years, from a Paradox-focused explorer with a DFS but no partners to the owner of one of the better-documented early-stage US lithium-brine development packages. Green River now has a 773,000 t LCE resource, a scoping study with credible low-cost metrics, essentially all key state permits, a binding POSCO demonstration programme, a definitive LG Energy Solution offtake, and about US$406m of approved post-performance Utah incentives. On paper, the market values this at a fraction of even heavily risked project NPV.
That discount is not irrational. It reflects three overlapping risks.
First, financing. A company with about A$8m of cash and a sub-A$100m market cap must assemble a US$569m capital stack. The incentives help project returns but not upfront capex, and further dilution is close to certain.
Second, geology and process. The resource rests on very limited well control, a single brine-producing well and a grade choice the CP reached by excluding lower-grade data. DLE on this brine has not yet run continuously at scale; POSCO's 2027–2028 programme is the critical test.
Third, governance. The three-person executive board without independent oversight, recurring remuneration dissent and disclosure corrections raise the cost of capital at exactly the stage where trust matters most.
Our synthesis: Anson is a high-risk, high-optionality special situation whose value depends on sequencing.
-
If the next 12 months bring a larger JORC estimate, a POSCO equity commitment, DOE grant success and a refreshed independent board, the gap to intrinsic value could narrow rapidly.
-
If instead the company must raise equity at depressed prices before those catalysts arrive, much of the project's value may accrue to new capital providers rather than existing holders.
Position sizing should reflect a binary outcome distribution. Investors should watch the October 2026 quarterly cash report and the November 2026 AGM most closely.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Executive Leadership Team
| Name | Role | Tenure | Background / education |
|---|---|---|---|
Bruce Andrew Richardson | Executive Chairman and CEO | Director since 30 Apr 2009. CEO since 2018 (Managing Director from incorporation per requisitioners). Combined Chair/CEO since Oct 2018. | B.A. (Hons). About 10 years as Australian Trade Commissioner (Beijing; Taipei). WA Government Manager China (2006–07). Says he has raised over A$225m for projects. Mandarin speaker. US-based; paid in USD. |
Peter (Greg) Knox | Executive Director and Chief Geologist | Director since 22 Sep 2011 | B.Sc (Geology). Member AusIMM. Over 30 years in exploration, mine development and operations. JORC Competent Person for exploration targets. US-based; paid in USD. |
Timothy (Tim) Murray | Executive Director and Chief Operating Officer | Director since 3 May 2024. Employed since 15 Jan 2024 (COO hire noted in FY2023 AR). | Co-founder and MD of a US-regulated financial services firm focused on lithium and mining research. Commercial negotiator. Mandarin speaker. |
Michael van Uffelen | Former Non-executive Director (only NED) | 18 Oct 2018 – retired 26 Nov 2025 | B.Comm (UWA), Chartered Accountant; former Anson CFO and Company Secretary |
Matthew Beattie | Chief Financial Officer (KMP from 1 Apr 2025) | Employed since 15 Jan 2024 | Not disclosed. Status in 2026 not re-confirmed in sources reviewed. |
Nicholas Ong | Company Secretary | Since 30 Nov 2020 | B.Comm, MBA, GradDipAppFin, GradDipACG. Former ASX Principal Adviser. FGIA and FCIS. |
Will Maze | Head of Investor Relations | — | — |
“—” = not publicly disclosed.
Executive Leadership Team (Annual)
| Executive | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|
B Richardson total remuneration (AUD) | 495,694 | 1,829,747 | 1,183,705 | 1,340,115 |
P G Knox total remuneration (AUD) | 189,814 | 688,467 | 423,416 | 476,351 |
T Murray total remuneration (AUD) | 0 | 0 | 60,225 | 448,575 |
M van Uffelen total remuneration (AUD) | 131,054 | 353,352 | 86,929 | 72,125 |
M Beattie total remuneration (AUD) | 0 | 0 | 85,978 | 393,178 |
Total KMP remuneration (AUD) | 816,562 | 2,871,566 | 1,840,253 | 2,730,344 |
Directors' Remuneration
| Name | Salary & fees | Cash bonus | Non-cash | Super | STI shares | SBP | Total |
|---|---|---|---|---|---|---|---|
Richardson | 1,144,146 | 41,143 | 96,896 | 0 | 0 | 57,929 | 1,340,115 |
Knox | 425,990 | 41,143 | (14,781) | 0 | 0 | 23,999 | 476,351 |
Murray | 317,568 | 30,189 | 15,066 | 36,653 | 0 | 49,100 | 448,575 |
van Uffelen | 67,568 | 2,940 | 0 | 7,799 | 0 | (6,182) | 72,125 |
Beattie | 290,000 | 0 | 19,707 | 33,471 | 50,000 | 0 | 393,178 |
Governance Events
| Event | Outcome |
|---|---|
2024 AGM | Remuneration report: 36.1% against (first strike) |
2025 AGM (26 Nov 2025) | 39.00% against (second strike). Spill resolution 27.22% for; not carried. |
17 Jun 2026 requisition | Gabriel Nominees Pty Ltd, on behalf of holders of 5.22%, sought removal of Richardson and Knox and appointment of Andrew Woskett (Executive Chair, A$330k plus 15m performance rights) and Erle Spratt (NED, A$200k plus 9m performance rights) |
14 Aug 2026 EGM | All seven resolutions defeated on a poll. Removal of Richardson: 33.32% for / 66.68% against. Removal of Knox: 38.23% / 61.77%. Votes cast about 690–700m shares (about 43% of issued capital). |
Directors' Shareholdings
| Insider | Shares (FY2025 AR date) | Approx. % of 1.62bn shares | Performance rights |
|---|---|---|---|
B Richardson | 31,475,868 | 1.9% | 12,600,000 |
P G Knox | 18,642,087 | 1.2% | 4,400,000 |
T Murray | 795,663 | 0.05% | 3,100,000 |
M Beattie | 898,182 | 0.06% | — |
Competitive Landscape
Key Competitors
| Competitor | Ticker | Asset / segment | Relative positioning vs Anson |
|---|---|---|---|
Standard Lithium (with Equinor) | NYSE American / TSXV: SLI | South West Arkansas Smackover brine, DLE | More advanced on US DLE financing. Capital intensity US$64,400/t vs Anson's US$56,800/t (Anson, citing NI 43-101). |
Lithium Americas | NYSE: LAC | Thacker Pass, Nevada (claystone) | Under construction with large federal backing. Capital intensity US$73,250/t (Anson citation). |
Vulcan Energy Resources | ASX: VUL | Upper Rhine geothermal brine, Germany | DLE peer. Share count up 1,261% (2018–2025) vs Anson +334%. Six-month share price –30% vs Anson –32% (Anson NoM). |
Lake Resources | ASX: LKE | Kachi, Argentina (DLE) | Six-month share price –64%. Share count +590%. |
Argosy Minerals | ASX: AGY | Rincon, Argentina | Six-month share price –60%. Share count +167%. |
E3 Lithium | TSXV: ETL | Alberta Leduc brine, DLE | Comparable deep-carbonate brine and DLE thesis. |
ExxonMobil (Mobil Lithium) | NYSE: XOM | Arkansas Smackover DLE | Very well-funded entrant into US brine. |
Albemarle | NYSE: ALB | Silver Peak NV brine; Magnolia AR | Incumbent US producer; scale and qualification advantage |
ioneer | ASX: INR | Rhyolite Ridge, Nevada | US lithium development peer competing for federal finance |
POSCO (also a partner) | KRX: 005490 | About 93,000 tpa capacity (Argentina, Korea) | Partner today; could be competitor or acquirer |
Other Paradox Basin claimholders | — | Utah brine | Not reliably identified in sources reviewed |
Peer Comparison FY2026
| Metric | Anson (Green River) | Standard Lithium SWA | Lithium Americas Thacker Pass | Vulcan Energy |
|---|---|---|---|---|
Capital intensity (US$/t capacity) | 56,800 | 64,400 | 73,250 | Not disclosed by Anson |
Share count growth 2018–2025 | +334% | — | — | +1,261% |
Share price, 6 months to 1 Jul 2026 | –32% | — | — | –30% |
R&D intensity | n/m | n/m | n/m | n/m |
“—” = not publicly disclosed.
Recent Developments
--