Antipa Minerals Limited Overview
Antipa Minerals is a Perth-based gold-copper explorer-developer that has consolidated 100% ownership of a roughly 4,500 km² tenement package — the Minyari Project — in the Paterson Province of Western Australia, a mineral belt that hosts Telfer, Havieron and Winu. Its flagship, the Minyari Dome Gold-Copper Development Project, sits about 35 km from Greatland Resources' Telfer mine and carries a total Minyari Project resource of 69 Mt at 1.33 g/t gold for 2.9 Moz gold (3.6 Moz gold-equivalent including copper, silver and cobalt), 76% Indicated. A 2024 Scoping Study outlined a standalone 3 Mtpa operation producing about 130 koz gold per year for the first decade, and a Pre-Feasibility Study (PFS) is nearing completion, with a Definitive Feasibility Study (DFS) and Final Investment Decision (FID) targeted thereafter. Antipa is debt-free, held A$39.1m cash at 30 June 2026, and is simultaneously running a 41,000 m drilling campaign aimed at resource growth and new discoveries.
Company's own description (FY2026 Annual Report, paraphrased). Antipa describes itself as a mineral exploration company with potential development assets, focused on the Paterson Province of north-west Western Australia. Its stated focus is the exploration and development of its 100%-owned Minyari Gold-Copper Project, which surrounds the flagship Minyari Dome Gold-Copper-Silver Development Project. The company frames its strategy as the "systematic advancement" of Minyari Dome towards a potential final investment decision, while continuing resource-growth drilling and testing of regional targets across the wider landholding.
What the company actually does. Antipa's activity set comprises: (1) exploration drilling (air core, reverse circulation and diamond core) to discover and delineate gold-copper mineralisation; (2) Mineral Resource estimation under the JORC Code (2012); (3) technical and economic studies (Scoping Study 2024; PFS in progress; DFS to follow) covering metallurgy, geotechnics, hydrogeology, mine planning, engineering, energy, environment, heritage and finance; and (4) stakeholder and approvals work, notably Indigenous Land Use Agreement (ILUA) negotiations with the Martu Traditional Owners.
Business model and revenue model. There is currently no revenue model in operation. Income consists only of interest on cash deposits and minor other income (FY2025 aggregator-reported "revenue" of A$0.78m is interest/other income, not sales). The company is funded by equity (placements, option exercises), historic farm-in partner spending, and asset sales (e.g., Citadel JV interest sold for A$17m). The intended future model, if Minyari Dome is built, is a conventional mine-owner/operator producing gold doré (sold to a refiner, typically Perth Mint or similar) and a copper concentrate grading about 22% Cu (sold to smelters/traders). Product mix would be gold-dominant with copper, silver and possibly cobalt by-products.
Value chain position. Upstream: exploration and pre-development of primary metals. Antipa sits at the "resource definition to feasibility" stage of the mining value chain — after discovery and before construction. The principal value-creation mechanisms at this stage are ounce growth, resource confidence conversion (Inferred → Indicated → Reserves), de-risking through studies and approvals, and securing project finance or a corporate transaction.
Customer types and end-markets. None currently. Prospective end-markets are (a) the global gold market (investment, central bank and jewellery demand, priced in US$ and realised in A$) and (b) the global copper concentrate market (smelters, driven by electrification and construction demand).
Independent characterisation. Antipa is best understood as a single-asset, district-scale gold developer with copper optionality, now one step away from a PFS-level economic case. Its distinguishing features versus most ASX gold juniors are: full (100%) ownership of a large contiguous land package in a Tier-1 province after the 2024–2025 exits of Rio Tinto (via sale), Newmont and IGO (via farm-in withdrawals); a resource now dominantly Indicated; and a demonstrably free-milling, conventional CIL metallurgy. Its key unknowns are capital intensity in a remote location (power, water, logistics), approvals and ILUA timing, and the ultimate funding route for a construction bill that the 2024 Scoping Study put at about A$306m (including pre-strip) and that will be re-estimated in the PFS.
Strategy
Stated strategy (FY2026 AR themes, paraphrased). (1) Systematically advance the wholly owned Minyari Dome Development Project towards a potential FID; (2) grow the Mineral Resource around the proposed Minyari Dome infrastructure; (3) test the wider 4,500 km² landholding for new gold and copper discoveries that add strategic value; (4) pursue a "deliberate and disciplined" project-advancement approach combining technical studies, strategic partnerships and development pathways that improve economics and optionality; and (5) build durable relationships with the Martu Traditional Owners. Management also states it will continue to assess third-party pathways that might deliver greater risk-weighted value than a standalone build (Scoping Study commentary, 2023).
Initiatives in the last 24 months.
Guidance / medium-term targets.
Products & Services
Antipa has no commercial products or services. The "portfolio" of an explorer is its project and deposit inventory. Each is catalogued below, organised under the single exploration segment.
Development asset
Minyari Dome Gold-Copper-Silver Development Project (100%).
-
Description: 12 deposits along an approximately 3.5 km mineralised corridor, containing about 88% of the Minyari Project's gold (FY2026 AR).
-
Location: ~35 km from Greatland's Telfer mine and 22 Mtpa plant; ~54 km along strike from Havieron.
-
Key specifications: 51 Mt @ 1.54 g/t Au for 2.5 Moz Au (3.2 Moz AuEq), 87 kt Cu, 730 koz Ag, 13 kt Co.
-
Development concept (Oct 2024 Updated Scoping Study, ±35% accuracy): open pit plus underground; 3 Mtpa processing; 30.2 Mt @ 1.5 g/t Au mined; ~1.3 Moz recovered; ~130 koz/yr over first 10 years; capex A$306m including A$90m pre-production mining.
-
Scoping Study economics: post-tax NPV A$598m and 46% IRR at US$2,100/oz (A$3,000/oz); pre-tax NPV A$834m and 52% IRR at A$3,000/oz; company also presents post-tax NPV7% up to ~A$1.8bn and IRR up to ~110% at A$5,000/oz; average annual post-tax free cash flow over first ten years of ~A$257m at A$4,500/oz and ~A$301m at A$5,000/oz.
-
Metallurgy (PFS, Jul 2026): conventional CIL; gold recovery ~89–98% across oxide, transitional and primary ore at 75 µm; free-milling, non-refractory primary ore; flotation of CIL residue yields ~22% Cu concentrate.
-
Target customer (future): gold refiners; copper concentrate offtakers.
-
Status: PFS technical workstreams expected to complete in Q3 CY2026 with outcomes to follow; DFS activities ramping up; earlier plan targeted FID in March 2027 (ASX release 7 Jul 2025) — current timing to be confirmed by the PFS release.
-
Pricing model: not applicable (commodity price-taker).
Deposits within Minyari Dome (named in company disclosures)
| Deposit / zone | Description | Status | Source |
|---|---|---|---|
| Minyari | Dominant deposit; 1.9 Moz Au, 97% Indicated | Core of PFS mine plan | FY2026 AR |
| WACA / WACA West | Satellite deposits; significant geotech-hole intercept in 2026 | In MRE; repeats targeted | FY2026 AR |
| Sundown | Small Indicated resource | In MRE | FY2026 AR |
| Minyari South | Small high-grade Inferred resource (2025 update) | In MRE | FY2026 AR |
| Minyari North | Resource from Sep 2024 | In MRE | FY2026 AR |
| GEO-01 Main Zone / Central / South | Growing lodes, open down-dip | 14,200 m growth drilling focus | FY2026 AR |
| Fiama / Fiama North | High-grade zone (33 m @ 15.8 g/t Au, Aug 2025); Fiama resource grew ~150% to 154 koz in Dec 2025; Fiama North extended to ~160 m strike | Open in all directions | FY2026 AR; ASX release 18 Dec 2025 |
| Minella | Lode within Minyari Dome | In MRE; open | FY2026 AR |
| Rizzo | Discovery 2025; maiden resource with GEO-01 South of 24 koz (Dec 2025) | May connect with Fiama | ASX release 18 Dec 2025 |
| Minyari Northern Repeat | 12.2 m @ 1.2 g/t Au, 250 m north of Minyari | New target zone | March 2026 quarterly |
| Yolanda | New copper discovery/anomaly west of WACA | Early stage | FY2026 AR |
Regional satellite and exploration assets (Minyari Project, 100%)
| Asset | Description | Status | Source |
|---|---|---|---|
| RPS (Reaper-Poblano-Serrano) | Maiden MRE 11 Mt @ 0.64 g/t for 230 koz Au | Resource | FY2026 AR |
| Tim's Dome | ~30 km SW of Minyari, along strike from Telfer; ~110 koz resource; Au-Cu-Pb-Ag mineralisation over ~1,040 m above 1.2 km AEM conductor | Diamond tails from mid-Aug 2026; EIS co-funded | FY2026 AR; Kalkine |
| Chicken Ranch | Small resource; priority target | Drilling planned | FY2026 AR |
| AL01 | ~4 km gold-copper corridor ~17 km north of Minyari; ~2 km coherent air-core anomaly | Follow-up | FY2026 AR |
| Mollie | Priority target; EIS co-funded | Drilling planned | FY2026 AR |
| Jezabeel, Judes | Regional targets (Judes copper-focused) | Drilling planned | FY2026 AR |
| Wilki area (former farm-in ground, 1,430 km²) | ~103.5 koz historic gold resource; Parklands target | 100% Antipa since Mar 2025 | Mining Technology 2025 |
| Paterson area (former IGO farm-in, 1,520 km²) | Surrounds Minyari Dome; copper-focused historic exploration | 100% Antipa since Apr 2025 | ASX release 9 Apr 2025 |
Financial Narrative
Income statement
Sources: FY2024 AR (FY2023/FY2024 other income and net loss); FY2026 AR (FY2025/FY2026 net loss; five-year EPS table restated for consolidation); KoalaGains aggregator (FY2025 other income A$0.78m); Quartr summary of FY2026 AR (weighted shares 655,112,188). Diluted EPS equals basic because options are anti-dilutive in loss years.
Half-year detail (H1 FY2026 vs H1 FY2025, six months to 31 December).
Source: H1 FY2026 Half-Year Financial Report (ASX, 13 Mar 2026).
Commentary. Losses are small relative to market capitalisation because Antipa capitalises exploration and evaluation (E&E) expenditure under AASB 6; the income statement captures mainly corporate overhead, share-based payments and one-off items. The FY2025 jump to a A$5.34m loss was driven by the A$2.43m accounting loss on the Citadel disposal. FY2026's A$5.95m loss reflects a sharp rise in non-cash share-based payments (A$3.70m in H1 alone, including A$2.17m of KMP option grants), larger corporate payroll as the team scaled for the PFS, partially offset by higher interest income on the post-placement cash balance (A$1.29m other income in H1 FY2026). Underlying cash overhead is modest: operating cash outflow was only A$1.79m in FY2026.
Balance sheet
Sources: H1 FY2026 half-year report (30 Jun 2025 comparatives); KoalaGains (FY2025 debt A$0.25m, likely lease liabilities); FY2026 AR (cash A$39,145,760); June 2026 quarterly ("zero debt"). FY2026 accumulated losses derived as 31 Dec 2025 balance (A$39.40m) plus H2 FY2026 loss (A$5.95m − A$4.97m = A$0.98m) — analyst derivation, not a reported figure.
31 December 2025 interim balance sheet (latest fully extracted). Cash A$51.17m; total current assets A$52.31m; E&E asset A$87.72m; total assets A$140.57m; total liabilities A$2.45m; net assets A$138.12m; issued capital A$161.24m; accumulated losses A$39.40m (H1 FY2026 report). By 30 June 2026 cash had fallen to A$39.15m, consistent with ~A$12m of further exploration/study spend in H2, which would lift the E&E asset to roughly A$100m (analyst estimate, not reported).
Working capital. At 31 Dec 2025, current assets of A$52.31m against total liabilities of A$2.45m (most of which current) implies working capital of roughly A$50m. At 30 Jun 2025, current assets A$37.40m vs liabilities A$5.44m.
Cash flow
Sources: FY2024 AR (FY2023/FY2024 OCF); FY2026 AR (FY2025/FY2026 OCF); KoalaGains (FY2025 investing/financing).
Half-year cash flow (six months to 31 Dec 2025). Operating outflow A$0.62m (after A$1.16m interest received); E&E payments A$25.75m; investing outflow A$25.80m; financing inflow A$41.12m (A$40.0m placement + A$3.24m option exercises − A$2.12m costs); net cash increase A$14.69m (H1 FY2026 report).
Implied FY2026 burn. Cash moved from A$36.48m (30 Jun 2025) to A$39.15m (30 Jun 2026), a net increase of A$2.67m despite ~A$43m of gross financing inflows in H1 and ~A$1.2m of option exercises; this implies total FY2026 exploration, study and corporate cash spend of roughly A$41–42m (analyst derivation). The quarterly run-rate in H2 FY2026 was about A$4–8m per quarter (A$51.2m → A$47.7m → A$39.1m).
Ratios
Margins, ROIC, interest coverage, asset turnover and cash conversion cycle are not meaningful (no revenue, no interest-bearing debt, no inventory or receivables cycle). Ratios computed by analyst from figures above.
Trend and inflection commentary. The decisive financial inflection was FY2025–FY2026: the business moved from a cash-constrained explorer reliant on partner funding (cash around A$6m before the Citadel sale, implied by the "~A$23m after A$17m" statement in Sep 2024) to a self-funded developer, via (i) the A$17m Citadel sale, (ii) recovery of 100% of Wilki and Paterson at no cost, and (iii) the A$40m placement at A$0.60 in July 2025 plus ~A$6.5m of option exercises across FY2026–early FY2027. Spending has stepped up proportionately: H1 FY2026 E&E outflow alone (A$25.7m) exceeds total FY2025 net investing outflow. The balance sheet remains clean (no debt, minimal liabilities), but the A$39m cash balance at 30 June 2026 against a ~A$5–8m quarterly burn and an imminent DFS led the auditor to include a material-uncertainty-related-to-going-concern paragraph (unmodified opinion) in the FY2026 audit report — a standard but notable flag that new funding will be needed within roughly 12–18 months of the report date, depending on DFS scope and drilling intensity.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Results by Segment
| Metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Segment revenue — Mineral exploration (AUD Mn) | 0 | 0 | 0 |
Segment net loss — Mineral exploration (AUD Mn) | 2.44 | 5.34 | 5.95 |
Share of total revenue — Mineral exploration (%) | 0 | 0 | 0 |
Asset group (April 2026 MRE)
| Asset group (April 2026 MRE) | Tonnes (Mt) | Gold grade (g/t) | Gold (Moz) | Copper (kt) | Silver (koz) | Cobalt (kt) | AuEq (Moz) | Notes |
|---|---|---|---|---|---|---|---|---|
Minyari Dome group (12 deposits; PFS basis) | 51 | 1.54 | 2.5 | 87 | 730 | 13 | 3.2 | ~85% of gold Indicated |
— of which Minyari deposit | — | — | 1.9 | — | — | — | — | 97% (~1.8 Moz) Indicated |
RPS (Poblano-Serrano) maiden MRE | 11 | 0.64 | 0.23 | 3.6 | 150 | — | — | Maiden April 2026 |
Other satellites (Tim's Dome, Chicken Ranch, Minyari North, Minyari South etc.) | balance | — | ~0.2 | — | — | — | — | Tim's Dome ~110 koz (Diggers & Dealers 2026 summary) |
Total Minyari Project | 69 | 1.33 | 2.9 | 91 | 880 | 13 | 3.6 | 76% of gold Indicated |
Operating Metrics (Moz) and Operating Metrics (kt)
| Metric | Sep2024 | May2025 | Dec2025 | Apr2026 |
|---|---|---|---|---|
Minyari Project total gold resource (Moz) | 2.42 | 2.5 | 2.7 | 2.9 |
Minyari Project total AuEq resource (Moz) | — | — | 3.3 | 3.6 |
Minyari Project copper resource (kt) | 84 | 84 | — | 91 |
Income Statement and Per-Share Data
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue from sales (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Other income incl. interest (AUD Mn) | — | 0.22 | 0.60 | 0.78 | — |
Gross profit (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Net loss after tax (AUD Mn) | — | -3.25 | -2.44 | -5.34 | -5.95 |
EPS basic (A$ cents, post-consolidation) | -1.87 | -0.93 | -0.61 | -1.02 | -0.91 |
EPS diluted (A$ cents) | -1.87 | -0.93 | -0.61 | -1.02 | -0.91 |
Dividends per share (AUD) | 0 | 0 | 0 | 0 | 0 |
Weighted average shares (m, post-consolidation) | — | — | — | — | 655.1 |
Income Statement
| Metric | H1FY2025 | H1FY2026 |
|---|---|---|
Other income (AUD Mn) | 0.35 | 1.29 |
Administrative expenses (AUD Mn) | -0.54 | -1.00 |
Employee benefits (AUD Mn) | -0.88 | -1.48 |
Share-based payments (AUD Mn) | -1.12 | -3.70 |
Loss on disposal of JV interest (AUD Mn) | -2.43 | 0 |
Net loss after tax (AUD Mn) | -4.66 | -4.97 |
Balance Sheet
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Cash & equivalents (AUD Mn) | — | — | — | 36.48 | 39.15 |
Exploration & evaluation asset (AUD Mn) | — | — | — | 65.77 | — |
Total assets (AUD Mn) | — | — | — | 103.69 | — |
Total liabilities (AUD Mn) | — | — | — | 5.44 | — |
Total debt incl. leases (AUD Mn) | — | — | — | 0.25 | 0 |
Net debt (AUD Mn; negative = net cash) | — | — | — | -36.23 | -39.15 |
Shareholders' equity (AUD Mn) | — | — | — | 98.25 | — |
Goodwill & intangibles (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Issued capital (AUD Mn) | — | — | — | 120.11 | — |
Accumulated losses (AUD Mn) | — | — | — | -34.43 | -40.38 |
Cash Flow
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Operating cash flow (AUD Mn) | — | -2.90 | -1.84 | -2.02 | -1.79 |
Exploration & evaluation payments / capex (AUD Mn) | — | — | — | -9.49 | — |
Free cash flow (OCF + E&E capex) (AUD Mn) | — | — | — | -11.51 | — |
Financing cash flow (AUD Mn) | — | — | — | 22.72 | — |
Dividends paid (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Share buybacks (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Metric | FY2025 | FY2026 |
|---|---|---|
ROE (%; net loss / closing equity) | -5.4 | — |
ROA (%; net loss / closing total assets) | -5.2 | — |
Current ratio (x; current assets / total liabilities as proxy) | 6.9 | — |
Debt to equity (x) | 0.003 | 0 |
Geographic Revenue
| Region | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Revenue — Australia (AUD Mn) | 0 | 0 | 0 |
Revenue — Rest of world (AUD Mn) | 0 | 0 | 0 |
Share Price and Market Valuation
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Share price at 30 June (AUD) | 0.32 | 0.13 | 0.10 | 0.69 | 0.57 |
Shares on issue at 30 June (m, post-consolidation) | — | — | 471 | — | 663 |
Market capitalisation at 30 June (AUD Mn) | — | — | 47 | — | 378 |
Valuation Snapshot
| Metric | Value | Basis |
|---|---|---|
Market cap | ~A$380–400m | 669.0m shares × A$0.57–0.60 |
Enterprise value | ~A$340–360m | Market cap less A$39.1m cash, nil debt |
EV per resource ounce (gold) | ~A$120/oz | EV ~A$350m / 2.9 Moz |
EV per resource ounce (AuEq) | ~A$97/oz | EV ~A$350m / 3.6 Moz |
P/NAV (Scoping) | ~0.2–0.6x | EV vs post-tax NPV A$598m (A$3,000/oz) to ~A$1.8bn (A$5,000/oz); pre-PFS |
P/B | ~2.8x | Market cap ~A$390m / equity A$138m (31 Dec 2025) |
Analyst Conclusions
Management guidance. PFS technical work complete in Q3 CY2026 with outcomes thereafter; DFS ramping up; resource-growth and discovery drilling continuing through CY2026 (41,000 m); ILUA and environmental approvals progressing; project-finance preparation underway. The July 2025 plan referenced an FID in March 2027; that date has not been reaffirmed in sources reviewed and should be treated as at risk given the PFS slip.
Consensus growth expectations. No meaningful consensus (pre-revenue; one or two covering analysts).
Bull case
-
Resource-led NPV uplift: the PFS will incorporate ~600 koz more gold than the 2024 Scoping Study, a dominantly Indicated resource and steeper pit slopes — all likely to improve mine life and/or throughput versus the 130 koz/yr base case.
-
Price leverage: at an EV of ~A$350m, the stock trades at a fraction of the Scoping NPV at current A$ gold prices (up to ~A$1.8bn at A$5,000/oz), leaving room for re-rating as the PFS converts resources to reserves.
-
Strategic optionality: 100% ownership of a province-scale package 35 km from Telfer's 22 Mtpa plant, amid regional consolidation by Greatland and Rio Tinto, creates credible M&A or toll-treatment pathways; Tim's Dome adds blue-sky Telfer-style upside.
Bear case
-
Funding and dilution: a going-concern flag at A$39m cash, plus DFS, drilling and pre-FID spending, implies another raise within 12–18 months, and construction equity on a likely A$300m+ capex would be highly dilutive absent a partner.
-
Capex and grade: moderate grades (1.33–1.54 g/t) in a remote location with self-supplied power and water expose returns to WA cost inflation; the PFS capex could exceed the A$306m Scoping figure materially.
-
Timeline risk: PFS has already slipped; ILUA negotiations began formally only in March 2026; environmental approvals in WA can take years — pushing first gold out and eroding NPV, particularly if gold retreats from current levels.
Key catalysts and monitorables (next 12 months).
Analyst verdict. Antipa has executed one of the cleaner junior-mining transformations on the ASX over the past two years. It sold a non-controlling stake it could not control for A$17m, recovered two large farm-in areas at no cost when its partners retreated, consolidated its capital, and raised A$40m at A$0.60 to fund a full PFS. The result is a debt-free company owning 100% of a 2.9 Moz gold (3.6 Moz AuEq) resource, three-quarters Indicated, with simple free-milling metallurgy and a saleable copper by-product — in a Tier-1 province where the remaining independent alternatives have largely been absorbed by Rio Tinto and Greatland.
The investment case now pivots from geology to engineering and finance. The upcoming PFS is the single most important event in the company's history: it will either validate a robust standalone operation at today's gold prices — in which case an EV of roughly A$120 per resource ounce looks undemanding against WA developer precedents — or reveal capital and operating intensity that pushes the company towards a partner or sale. Either outcome can create value, but the paths differ sharply in dilution.
The key risks are real but conventional: the going-concern paragraph reflects a known funding need rather than distress; the PFS slip is about one quarter; and approvals and ILUA timing, while uncertain, are being worked on with specialist advisers. Governance is acceptable for a company of this size but would benefit from an independent chair, gender diversity and less reliance on director-related consultancies as the project scales.
On balance, Antipa offers high-quality, leveraged exposure to the gold price with a credible strategic endgame, tempered by near-term dilution risk. We view it as a constructive, event-driven holding into the PFS, with position sizing that anticipates a capital raise in the following six to twelve months and a re-rating contingent on PFS capex landing near the Scoping range.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Appointed / tenure | Background (summary) | Education / qualifications |
|---|---|---|---|---|
Roger Mason | Managing Director & CEO | MD since ASX listing, Apr 2011 (~15 years) | Geologist, 39+ years; WMC (from 1987), Forrestania Gold, LionOre (GM Geology), Norilsk Nickel Australia; consulted to Integra Mining. Led discoveries including Calibre. NED of Caprice Resources (from Sep 2024) | BSc (Hons), University of Tasmania (1986); MAusIMM |
Mark Rodda | Executive Chairperson | — | Lawyer/corporate adviser, 30+ years; former General Counsel & Corporate Secretary of LionOre Mining International (taken over by Norilsk for US$6bn+). NED of Lepidico (entered administration Dec 2024; creditors resolved to wind up May 2025) | BA, LLB |
Peter Buck | Non-Executive Director (independent) | — | Geologist, 49+ years; WMC (23 yrs), Forrestania, LionOre Director of Exploration (Thunderbox, Emily Ann discoveries), Breakaway MD, PMI Gold Chair, IGO NED (2014–2022); AMEC life member | MSc; MAusIMM; FAIG |
Gary Johnson | Non-Executive Director | — | Metallurgist, 45+ years; former MD Norilsk Nickel Australia; director of Tati Nickel (Botswana); runs Strategic Metallurgy Pty Ltd (PFS metallurgical consultant — related party). NED of Lepidico | MAusIMM, MTMS, MAICD |
Stephen Power | Non-Executive Director | — | Commercial lawyer, 42 years in energy/resources (farm-ins, JVs, M&A); former NED of Karoon Energy | LLB |
Neil Warburton | Non-Executive Director | 13 Aug 2025 | Mining engineer; WMC (from 1980), Coolgardie Gold, Barminco CEO 2007–2012; Creasy Group (Sirius sale to IGO, A$1.8bn); former IGO NED; Chair of Nimy Resources and Vantage Metals; Honorary Doctorate (Curtin, 2022); GJ Stokes Award (2023) | Assoc. MinEng (WASM); MAusIMM; FAICD |
Luke Watson | CFO & Company Secretary (KMP) | Jul 2020 | Chartered Accountant; CFO/CoSec of Mantra Resources (IPO to ~A$1bn ARMZ takeover), OreCorp, OmegaCorp | B.Bus, CA, CS, F Fin |
Directors' Remuneration
| Name | Cash salary/fees | Superannuation | Accrued leave | STI bonus (paid) | Value of options granted | Total | % performance-related |
|---|---|---|---|---|---|---|---|
Roger Mason (MD/CEO) | 386,093 | 30,000 | 45,976 | 105,930 | 519,000 | 1,086,999 | 57.5 |
Mark Rodda (Exec Chair) | 348,266 | 30,000 | 2,283 | 96,300 | 467,100 | 943,949 | 59.7 |
Luke Watson (CFO/CoSec) | 310,263 | 30,000 | 15,985 | 86,625 | 280,000 | 722,873 | 50.7 |
Stephen Power (NED) | 75,000 | 9,000 | 0 | 0 | 207,600 | 291,600 | 71.2 |
Peter Buck (NED) | 75,000 | 9,000 | 0 | 0 | 207,600 | 291,600 | 71.2 |
Gary Johnson (NED) | 75,000 | 9,000 | 0 | 0 | 207,600 | 291,600 | 71.2 |
Neil Warburton (NED, from Aug 2025) | 66,369 | 7,964 | 0 | 0 | 277,200 | 351,533 | 78.9 |
Total KMP | 1335991 | 124964 | 64244 | 288855 | 2166100 | 3980155 | — |
Directors' Remuneration (Annual)
| Metric | FY2025 | FY2026 |
|---|---|---|
Total KMP remuneration (AUD K) | 2,124 | 3,980 |
KMP option value expensed (AUD K) | 693 | 2,166 |
KMP STI cash bonuses (AUD K) | 108 | 289 |
MD/CEO total remuneration (AUD K) | 646 | 1,087 |
Major Shareholders
| Holder | Stake | Date / basis | Source |
|---|---|---|---|
Newmont Corporation (via Newcrest Operations) | — | Jul 2024 | ASX release 5 Jul 2024 |
Other substantial holders | — | 2026 | InvestSMART announcement list |
Directors (combined) | 15,575,744 shares (~2.3% of 669.0m) plus 19.8m options | 17 Sep 2026 | FY2026 AR |
— Stephen Power | 6,940,992 shares | 17 Sep 2026 | FY2026 AR |
— Mark Rodda | 3,907,999 shares | 17 Sep 2026 | FY2026 AR |
— Roger Mason | 1,861,736 shares; 6.0m options | 17 Sep 2026 | FY2026 AR |
— Peter Buck | 1,754,083 shares | 17 Sep 2026 | FY2026 AR |
— Gary Johnson | 1,110,934 shares | 17 Sep 2026 | FY2026 AR |
— Neil Warburton | 0 shares; 0.9m options | 17 Sep 2026 | FY2026 AR |
CFO Luke Watson | 451,830 shares | 30 Jun 2026 | FY2026 AR |
Competitive Landscape
Key Competitors
| Company | Relationship to Antipa | Relevant asset(s) | Positioning (qualitative) |
|---|---|---|---|
Greatland Resources | Paterson neighbour; producer | Telfer mine and 22 Mtpa plant; Havieron development | Potential toll-treatment partner, acquirer, or competitor for infrastructure/labour |
Rio Tinto | Former JV partner; neighbour | Winu (with Sumitomo); Calibre/Magnum (100% since 2024) | Major with regional ambitions |
Sumitomo Metal Mining | Winu partner | Winu Cu-Au-Ag | Major copper player |
Newmont | Former partner; shareholder (8.6% as of 2024) | Exited Paterson in 2024–25 | Signal of majors rotating away |
IGO | Former farm-in partner | Exited Paterson farm-in 2025 | Copper/nickel focus |
Cyprium Metals | Paterson neighbour | Nifty copper mine | Competes for regional infrastructure/services |
Northern Star Resources | WA gold major | — | Benchmark for WA gold development and M&A |
Astral Resources | WA gold developer peer | Mandilla (Goldfields) | Competing for development capital |
Saturn Metals | WA gold developer peer | Apollo Hill | Competing for capital |
Brightstar Resources | WA gold developer peer | Menzies/Laverton | Competing for capital |
Peer Comparison FY2026
| Metric | Antipa | Greatland Resources | Rio Tinto | Cyprium Metals |
|---|---|---|---|---|
Stage | PFS (pre-development) | Producer | Diversified major | Restart/producer |
Revenue FY2026 | 0 | — | — | — |
Gold resource | 2.9 Moz Au (3.6 Moz AuEq) | — | — | — |
Recent Developments
Discrepancy note: Tim's Dome strike was reported as ~500 m (3 Aug 2026, Batch 2) and ~1,040 m in the FY2026 AR (incorporating Batch 3). Both are company figures at different dates.*



