Antony Waste Handling Cell Limited Overview
Antony Waste Handling Cell is one of India's longest-operating and few listed pure-play municipal solid waste (MSW) management companies, marking 25 years of operations in FY26. It provides the full urban waste value chain — door-to-door collection and transportation (C&T), mechanised road sweeping, large-scale processing (material recovery, composting, refuse-derived fuel), bio-mining of legacy dumps, construction & demolition (C&D) waste processing and waste-to-energy (WtE) — under long-tenure concessions with urban local bodies. Its anchor assets are the Kanjurmarg integrated processing facility in Mumbai, which the company describes as the largest single-location waste processing plant in Asia, and the 14 MW Pimpri Chinchwad (PCMC) WtE plant. The company reports a record order book of about ₹18,000 Cr (March 2026), including two Andhra Pradesh WtE concessions co-invested with Japan's JFE Engineering. Near-term, the investment case is overshadowed by the fatal July 2026 incident at the PCMC WtE plant and a sharp profit compression in Q1 FY27.
What the company does
AWHCL is a B2G (business-to-government) environmental services provider. Its customers are predominantly municipal corporations and urban development authorities that outsource statutory solid-waste obligations. The company states it has worked with more than 23 municipal corporations (Q1 FY27 press release). Its service lines, as described by CARE Ratings (April 2026), comprise:
-
MSW Collection & Transportation (C&T) — door-to-door/secondary collection and haulage of municipal waste, typically billed per tonne, per trip, per shift or per household; fleets of compactors, tippers and dumpers.
-
Mechanised road sweeping — power-sweeping of city roads.
-
Waste Processing & Treatment — integrated facilities that segregate, recover recyclables, produce compost and RDF, and landfill residuals (tipping-fee model).
-
Waste-to-Energy — mass-burn/thermal conversion of MSW to grid or captive power (PCMC; Andhra Pradesh projects under development).
-
C&D waste management — launched in Q3 FY25 per management commentary on the Q3 FY25 call.
-
Bio-mining / legacy waste remediation — e.g., ~0.35 million tonnes of legacy waste under a CIDCO project (Q3 FY26 update).
-
Extended Producer Responsibility (EPR) — the company entered the EPR business and monetised credits in FY26 (Q4 FY26 business update).
Business and revenue model
| Revenue stream | Nature | Billing basis | Evidence |
|---|---|---|---|
| C&T and sweeping fees | Long-term service contracts (typically 5–10 years; BMC awards are 7 years) | Per tonne, per trip, per shift or per household; escalation clauses | Q1 FY27 commentary on tariff-linked escalation; Q4 FY26 business update footnote on billing basis |
| Tipping fees (processing) | Concession service revenue | Per tonne received at processing sites | CARE Apr 2026: tipping fee ~23% of revenue (PY 22%) |
| Sale of RDF, compost, recyclables | Commodity product sales | Market prices / offtake contracts | RDF sales ~177,000 t in FY26 (+~20%) |
| Power sales (WtE) | Energy sales under open-access arrangements | Per unit (kWh) | PCMC WtE first in Maharashtra selling under Green Energy Open Access Rules |
| Contract (construction) revenue | Ind AS 115 recognition of capex on concession assets (PCMC, Kanjurmarg, new projects) | Percentage-of-completion; largely pass-through margin | Company's "Core EBITDA excluding contract revenue" disclosures |
| EPR credits / carbon | Credit monetisation | Per credit | Q4 FY26 business update |
Revenue is overwhelmingly service/contract-based, with secondary product/commodity streams:
There is no subscription or licensing revenue of significance. Management distinguishes "core" operating revenue (C&T + processing + product sales) from "contract revenue" recognised under Ind AS on concession capex.
Value-chain position
AWHCL sits at the operating core of the urban waste value chain: from the kerbside (collection) through haulage and transfer stations to processing, resource recovery and final disposal/energy conversion. Upstream it relies on vehicle OEMs (the Antony group itself has automotive body-building heritage) and EPC/technology vendors (e.g., JFE Engineering for the AP WtE plants); downstream it sells RDF to cement and industrial kilns, compost to agricultural channels, power to municipal assets, and EPR credits to obligated producers.
Customer types and end-markets
| Customer type | Examples (from filings/news) |
|---|---|
| Municipal corporations | Brihanmumbai MC (BMC), Pimpri Chinchwad MC (PCMC), Navi Mumbai MC (NMMC), Thane MC (TMC), Bhiwandi-Nizampur City MC (BNCMC) |
| Urban development / industrial authorities | CIDCO (legacy waste), Greater Noida (₹243 Cr contract, Aug 2026) |
| State energy agencies | New & Renewable Energy Development Corporation of Andhra Pradesh (NREDCAP) — Kadapa and Kurnool WtE |
| Industrial offtakers | Cement/industrial RDF buyers; compost buyers |
| Obligated producers | EPR credit purchasers |
Company self-description and independent characterisation
Company's description (paraphrased from the Q1 FY27 press release, 10 Aug 2026): AWHCL presents itself as a leading player in the Indian MSW management industry with 25 years in the business, offering collection, transportation, processing and disposal services across India; a pioneer of MSW C&T; operator of the largest single-location waste processing plant in Asia at Kanjurmarg; and operator of the first WtE plant in Maharashtra selling power under green open-access rules, with two new WtE projects in Andhra Pradesh.
Independent characterisation: AWHCL is best understood as a regulated-utility-like annuity business (C&T) funding a capital-intensive infrastructure transition (processing and WtE). C&T delivers recurring, escalator-linked cash flows but carries chronic municipal receivable risk (debtor days ~114 in Q1 FY27). Processing and WtE carry higher potential margins and strategic moats (scarce land, long concessions) but expose the company to technology, operational-safety and force-majeure risk — as the July 2026 PCMC incident demonstrated. The business is mid-transition: FY26 delivered record revenue but falling profit as depreciation and interest from WtE capex rose, and management itself guides that the AP WtE plants contribute meaningfully only after FY29.
Strategy
Stated strategy (themes)
From the company's press releases, business updates and earnings calls (FY25–FY27), management's strategy rests on five themes:
-
Integrated, full-value-chain MSW management — expanding from C&T into processing, bio-mining, C&D and WtE to capture higher value per tonne.
-
Waste-to-resource circularity — scaling RDF, compost and recyclables; FY26 RDF sales reached a record ~177,000 t.
-
Partnership-led capital-intensive growth — bringing in strategic co-investors (JFE Engineering) at SPV level to share capital, technology and risk.
-
Corporate simplification — merging AG Enviro into the listed parent to remove inter-company layers and pool assets.
Strategic initiatives in the last 24 months
| Initiative | Date | Description | Status |
|---|---|---|---|
| AG Enviro merger | Mar 2025 → Dec 2025 | Absorption of largest operating subsidiary into parent | Completed (effective 31 Dec 2025) |
| Andhra Pradesh WtE | Aug 2025 | Two ~15 MW plants; ~₹3,200 Cr revenue potential over 20 years | Construction 2026; COD targeted 2028 |
| JFE Engineering partnership | Apr 2026 | Signed | |
| BMC 7-ward expansion | Dec 2025 | ~₹1,330 Cr over 7 years; fleet mobilisation with new owned vehicles | Ramp-up FY27 |
| TMC pre-processing | Q3 FY26 | ~₹67 Cr reimbursable capex | Execution |
| EPR business | FY26 | Entry and first monetisation | Early stage |
| C&D waste | FY25 | New service line | Operational |
| PCMC loan refinancing | Q1 FY27 | ALREPL term loan refinanced at ~200 bps lower rate | Completed |
| Greater Noida C&T | Aug 2026 | ~₹243 Cr contract | Mobilisation |
| PCMC recovery programme | Jul 2026 → | Phased restart; ₹25 lakh compensation plus jobs for victims' kin; structural assessment | MRF/compost resumed; WtE targeted Dec 2026 |
Medium-term targets and guidance
| Guidance item | Statement | Date / source |
|---|---|---|
| Revenue CAGR | 15–20% over the next five years | Q4 FY26 / Q1 FY27 calls (Arthneeti summary) |
| Order book | All-time high ~₹18,000 Cr | March 2026 |
| Earnings shape | PAT growth constrained near-term by interest and depreciation; AP WtE contributes positively post-FY29; contract/capex revenue front-loaded FY27–FY29 | Q4 FY26 call (Arthneeti summary) |
| Earlier guidance (superseded) | FY26 revenue growth 15–18%; 25% CAGR over 3–5 years | Q3 FY25 call |
| Earlier margin framework | EBITDA margin 22–23%; order book ₹8,300 Cr; 18–25% revenue CAGR | FY24-era (TradingView summary) |
| PCMC WtE restart | Initially first week of October 2026; now December 2026 | Q1 FY27 call; Q2 FY27 update |
Assessment: guidance has been progressively moderated (25% CAGR → 15–20% CAGR), and FY26 delivered ~12.8% revenue growth versus the 15–18% guided. The order book has more than doubled in two years, but much of the increment is long-dated WtE and 7-year C&T revenue.
Products & Services
Collection & Transportation (C&T) segment
| Offering | Description / capabilities | Target customer | Year / status | Pricing model | Flagship |
|---|---|---|---|---|---|
| Door-to-door MSW collection | Household/commercial primary collection with dedicated fleets | Municipal corporations | Since 2001 | Per tonne / per household / per trip | Navi Mumbai, Thane-region contracts |
| Secondary C&T & transfer | Haulage from collection points/transfer stations to processing/landfill; route rationalisation; transfer-station integration | Large metros | Ongoing | Per tonne / per trip | BMC A, B, C, D wards (~650 MTPD, ₹684 Cr, 7 yrs) and N, S, T wards (~600 MTPD, ₹646 Cr, 7 yrs), awarded Dec 2025 |
| Mechanised road sweeping | Power-sweeper fleets for arterial roads | Municipal corporations | Ongoing | Per shift / per km | Not separately named |
| New-city integrated C&T | Greater Noida contract (~₹243 Cr) | Development authority | Won Aug 2026 | — | Greater Noida |
Waste Processing segment
| Offering | Description / capabilities | Target customer | Year / status | Pricing model | Flagship |
|---|---|---|---|---|---|
| Integrated processing (MRF + compost + RDF + sanitary landfill) | Segregation, recyclable recovery, windrow composting, RDF production, engineered landfill | Mega-cities | Kanjurmarg concession to 2036 | Tipping fee per tonne + product sales | Kanjurmarg, Mumbai — described as Asia's largest single-location processing plant |
| Refuse-Derived Fuel (RDF) | Combustible fraction converted to fuel for kilns | Cement/industrial buyers | Record ~177,000 t sold FY26 (+~20%); ~40,081 t in Q2 FY26 | Per tonne market price | Kanjurmarg, PCMC |
| Compost | Organic fraction to compost | Agri channels | ~9,858 t in H1 FY26 | Per tonne | Kanjurmarg, PCMC |
| Bio-mining / legacy waste remediation | Excavation and segregation of legacy dumps | Municipal/authorities | Active | Per tonne processed | CIDCO (~0.35 MMT legacy waste) |
| Pre-processing plant (TMC) | Solid-waste pre-processing; ~₹67 Cr capex fully reimbursable by TMC | Thane MC | Won Q3 FY26 | Reimbursed capex + O&M | Thane |
| 10-year design/build/operate processing contract | Processing of segregated and mixed waste, compliant legacy waste handling | Municipal client | Won Q3 FY26 (ALESPL) | — | — |
| C&D waste processing | Recycling of construction & demolition debris | Municipal corporations | Launched Q3 FY25 | Tipping fee + aggregate sales | Not named |
Waste-to-Energy segment
| Offering | Description / capabilities | Target customer | Year / status | Pricing model | Flagship |
|---|---|---|---|---|---|
| PCMC Moshi WtE | 14 MW; design inflow ~1,000 TPD (company/market reports) vs ~700 TPD dry waste actually processed per PCMC; DBOT; 21-year contract | PCMC | Commissioned Oct 2023; WtE suspended since Jul 2026; restart targeted Dec 2026 | Power sales under green open access + tipping | First WtE in Maharashtra selling under Green Energy Open Access Rules; >20 million green units generated to Jun 2026 |
| Kadapa WtE | ~15 MW; ~1,000 TPD inflow; ~750 TPD WtE processing; 20-year concession | NREDCAP / AP ULBs | Construction to start 2026; COD targeted 2028 | — | JFE Engineering India as EPC |
| Kurnool WtE | Same specification as Kadapa | NREDCAP / AP ULBs | Same | — | Same |
Adjacent offerings
| Offering | Description | Status |
|---|---|---|
| EPR credits | Monetisation of Extended Producer Responsibility credits | Entered FY26 |
| Carbon credits / hazardous & e-waste | Activities carried over from AG Enviro's object clause | Scale not disclosed |
| Recycling | Antony Recycling Pvt Ltd | Nascent (₹0.22 Cr revenue FY25) |
Financial Narrative
Income statement (₹ Cr, consolidated)
Sources and notes: FY25–FY26 from Q4 FY26 investor presentation and audited results (via ScanX/Muthoot). FY24 PAT and EBITDA (₹201.7 Cr) from Q4 FY24 and Q1 FY25 press releases; FY24 owners' PAT ₹86.21 Cr per secondary summary. FY23 EBITDA ₹167.9 Cr and PAT ₹84.6 Cr from Q4 FY23 press release. FY22 PAT ₹90.4 Cr from Q4 FY23 press release; FY22 EBITDA is derived (reported 25.0% margin × derived total income). FY22–FY24 revenue from operations and FY22 total income are derived by summing quarterly figures (Fyers/Kotak). Equitymaster reports FY23/FY24 total income as ₹875.2 Cr / ₹896.4 Cr, consistent.
Gross profit and operating income (EBIT): not disclosed on a consistent annual basis in sources reviewed. MarketsMojo reports a gross-profit margin of 18.35% in Q4 FY26 versus 27.44% in Q4 FY25, and Q1 FY27 EBIT margin fell to 8.5% from 16.3%.
Margins and growth (%)
Revenue-from-operations CAGR FY22–FY26 (derived): ~13.0%. EBITDA CAGR FY22–FY26 (derived): ~9.1%. Total PAT CAGR: ~0.4%.
Per-share data (₹)
Notes: FY25 EPS is the sum of reported quarterly basic EPS (Kotak: 6.17 + 4.26 + 5.56 + 14.10). FY24 and FY26 EPS are derived (owners' PAT ÷ ~2.84 crore shares). Diluted EPS not disclosed in sources reviewed (ESOP dilution immaterial). The FY26 final dividend of ₹0.50 (10% of face value; record date 13 Aug 2026) was described as the company's maiden dividend (ScanX, Aug 2026).
Quarterly trajectory (₹ Cr)
Sources: Q1 FY27 and Q4 FY26 presentations; Muthoot Securities (Q2 FY26 owners' PAT ₹13.65 Cr); MarketsMojo (Q3 FY26 ₹11.50 Cr); Fyers (Q3 FY26 revenue, rounded). Note: Q1 FY27 EBITDA is ₹45.0 Cr on the company's presentation basis versus ₹37.2 Cr reported by Multibagg from the results statement (different definitions; the latter implies a 14.3% margin).
Balance sheet
Short-term vs long-term debt split and the debt maturity profile are not publicly disclosed in sources reviewed. Rated bank facilities at the parent are small (₹13.5 Cr long-term; ₹22.0 Cr short-term per CARE Apr 2026); most project debt sits in subsidiaries (e.g., ALREPL's PCMC WtE term loan, refinanced in Q1 FY27 at ~200 bps lower interest).
Cash flow
Source: Muthoot Securities summary of FY26 audited results. Capex, free cash flow, dividends paid and buybacks are not disclosed in sources reviewed; no buyback has been reported. FY26 operating cash flow fell 24% despite higher EBITDA — consistent with working-capital absorption (receivables) and the company's long debtor cycle.
Commentary on trends and inflections
FY22 → FY23 (scale-up, margin reset). Revenue from operations jumped ~32% as Kanjurmarg volumes and PCMC construction revenue were recognised, but EBITDA margin fell from 25.0% to 19.2%. Two drivers: low-margin Ind AS contract revenue inflated the denominator, and receivable provisions of ₹22.3 Cr across Q3–Q4 FY23 hit EBITDA (management estimated adjusted FY23 EBITDA at ~₹188.7 Cr).
FY24 (recovery). Margin recovered to 22.5% and PAT rose 18% to ₹99.9 Cr as provisions normalised, RDF sales scaled, and the PCMC WtE began contributing power revenue from late 2023. Management reported core EBITDA of ₹198 Cr (+29%) with a 23% core margin.
FY25 (plateau). Revenue from operations grew 7% and EBITDA 9%, but owners' PAT slipped to ₹85.4 Cr; H1 FY25 was weak (EBITDA −4% YoY) before a strong Q4 (owners' PAT ₹40.0 Cr).
FY26 (record revenue, weaker earnings). Revenue from operations reached ₹1,053 Cr (+12.8%), MSW handled 5.69 MMT (+15%) and RDF sales hit a record. Yet EBITDA margin compressed 120 bps to 21.8% and owners' PAT fell 11.6% to ₹75.5 Cr. MarketsMojo highlighted that Q4 FY26 was flattered by a negative tax charge (₹6.06 Cr credit) and that other income was ~34% of Q4 PBT — i.e., earnings quality weakened.
Q1 FY27 (inflection down). EBITDA margin collapsed to 16.8% (company basis) and PAT to ₹0.7 Cr, attributed to cost inflation, one-time charges and the PCMC WtE disruption; finance costs rose despite the refinancing. The July incident, an expected impairment discussion, and PCMC penalties make FY27 a trough year on current evidence.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Group Entities
| Entity | Relationship | Role | Source |
|---|---|---|---|
Antony Waste Handling Cell Ltd | Listed parent | C&T, sweeping; since 31 Dec 2025 also absorbs AG Enviro's municipal, hazardous-waste, WtE and carbon-credit activities | NCLT order; FilingReader |
AG Enviro Infra Projects Pvt Ltd | Former wholly owned material subsidiary — merged into parent effective 31 Dec 2025 (appointed date 1 Apr 2025) | Largest C&T vehicle; FY25 revenue ₹528.1 Cr (FY24: ₹480.1 Cr); 51% partner in BMC consortium | FY25 Directors' Report; Q3 FY26 update |
Antony Lara Enviro Solutions Pvt Ltd (ALESPL) | Material subsidiary (non-controlling interest exists) | Kanjurmarg integrated processing (concession to 2036); holds 75% of AP WtE SPVs | CARE; JFE filings |
Antony Lara Renewable Energy Pvt Ltd (ALREPL) | Material subsidiary | PCMC Moshi WtE (14 MW) | CARE; NSE filings |
Kadapa Renew Energy Pvt Ltd | SPV — 75% ALESPL / 25% JFE | ~15 MW Kadapa WtE | Iamrenew |
Kurnool Renew Energy Pvt Ltd | SPV — 75% ALESPL / 25% JFE | ~15 MW Kurnool WtE | Iamrenew |
Varanasi Waste Solutions Pvt Ltd | Subsidiary | Varanasi operations (details not disclosed in sources reviewed) | FY25 Directors' Report |
Antony Recycling Pvt Ltd | Subsidiary | Recycling; FY25 revenue ₹0.22 Cr (FY24: nil) | FY25 Directors' Report |
AL Waste Bio Remediation LLP | Group LLP | Bio-remediation/bio-mining | FY25 Directors' Report |
BMC consortium | AG Enviro (now AWHCL) 51%, Jigar Transport Co. 29%, M.K. Enterprises 20% | Seven BMC wards C&T | Muthoot Securities, Dec 2025 |
Revenue by Segment
| Segment (INR Cr) | FY25 | FY26 |
|---|---|---|
MSW C&T revenue | 580.6 | 646.4 |
MSW Processing revenue | 260.9 | 273.7 |
Total operating revenue (core) | 841.5 | 920.0 |
Contract & others (derived: revenue from operations minus core) | 92.1 | 133.2 |
Revenue from operations | 933.6 | 1,053.2 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansSegment Margins & Growth (%) and Revenue by Segment (%)
| Metric (%) | FY25 | FY26 |
|---|---|---|
MSW C&T YoY growth | — | 11.3 |
MSW Processing YoY growth | — | 4.9 |
MSW C&T share of core operating revenue | 69.0 | 70.3 |
MSW Processing share of core operating revenue | 31.0 | 29.7 |
“—” = not publicly disclosed.
Revenue by Segment (Quarterly)
| Segment (INR Cr) | Q1FY26 | Q1FY27 |
|---|---|---|
MSW C&T revenue | 151.4 | 166.3 |
MSW Processing revenue | 72.2 | 74.7 |
Other operating income | 22.4 | 19.1 |
Total operating revenue | 246.0 | 260.1 |
Income Statement
| Metric (INR Cr) | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue from operations | 646.9 | 855.2 | 872.1 | 933.6 | 1,053.2 |
Total income | 666.9 | 875.2 | 896.4 | 958.8 | 1,084.1 |
EBITDA (company-reported) | 166.7 | 167.9 | 201.7 | 220.2 | 236.3 |
Profit before tax | — | — | — | 118.4 | 89.7 |
PAT (total, incl. NCI) | 90.4 | 84.6 | 99.9 | 100.6 | 91.8 |
PAT attributable to owners | — | — | 86.2 | 85.4 | 75.5 |
“—” = not publicly disclosed.
Margin Analysis (%)
| Metric (%) | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
EBITDA margin (company basis) | 25.0 | 19.2 | 22.5 | 23.0 | 21.8 |
PAT margin (total PAT / total income) | 13.6 | 9.7 | 11.1 | 10.5 | 8.5 |
Revenue from operations growth YoY | — | 32.2 | 2.0 | 7.1 | 12.8 |
“—” = not publicly disclosed.
Per-Share Data
| Metric (INR) | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Basic EPS | — | — | 30.4 | 30.1 | 26.6 |
Dividend per share | 0 | 0 | 0 | 0 | 0.5 |
“—” = not publicly disclosed.
Income Statement (Quarterly)
| Metric (INR Cr) | Q1FY26 | Q2FY26 | Q3FY26 | Q4FY26 | Q1FY27 |
|---|---|---|---|---|---|
Revenue from operations | 247.3 | 257.7 | 262.0 | 285.8 | 261.0 |
EBITDA (company basis) | 62.1 | 57.1 | — | 67.5 | 45.0 |
PAT attributable to owners | 17.8 | 13.7 | 11.5 | 32.5 | 0.8 |
“—” = not publicly disclosed.
Valuation Snapshot
| Metric | Value | Period | Source |
|---|---|---|---|
Gross debt | ₹431 Cr | 31 Dec 2024 | Q3 FY25 earnings call |
Net debt | ~₹366 Cr | 31 Dec 2024 | Q3 FY25 earnings call |
Net debt / equity | 0.3x | 30 Jun 2026 | Q1 FY27 presentation |
Debt / equity (gross, aggregator) | 0.62x | Latest (2026) | Univest |
Book value per share (implied) | ~₹244 | Dec 2025 (derived from P/B 2.11 at ₹513.95) | ICICIdirect; derived |
Cash Flow
| Metric (INR Cr) | FY2025 | FY2026 |
|---|---|---|
Net cash from operating activities | 184.0 | 139.4 |
Financial Analysis
| Ratio | Value | Period / basis | Source |
|---|---|---|---|
ROE | ~10.0% | Latest | Tapetide |
ROE trend | Declining; ROCE and ROE flagged as deteriorating | FY26 | MarketsMojo |
Debtor days | ~114 | Q1 FY26 and Q1 FY27 | Q1 FY27 presentation (AskFuzz) |
Finance cost (quarterly) | ₹14.5 Cr (Q3 FY26) → ₹21.4 Cr (Q1 FY27) | Quarterly | AskFuzz summary of presentation |
Revenue by Region
| Region (INR Cr) | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
India (revenue from operations) | 872.1 | 933.6 | 1,053.2 |
Outside India | 0 | 0 | 0 |
State / Region Details
| State / region | Key operations | Trend |
|---|---|---|
Maharashtra — Mumbai (BMC) | Kanjurmarg processing; BMC C&T expanding from 2 to 7 wards | Growing (BMC awards ramp from FY27) |
Maharashtra — Pune (PCMC) | C&T; Moshi WtE, MRF, composting | Disrupted (WtE suspended since July 2026) |
Maharashtra — Thane / Navi Mumbai / Bhiwandi | C&T; TMC pre-processing plant | Stable to growing; BNCMC dispute resolved in company's favour (May 2026) |
Maharashtra — CIDCO | Legacy waste bio-mining | Project-based |
Uttar Pradesh — Greater Noida; Varanasi | New C&T contract (₹243 Cr); Varanasi subsidiary | Growing |
Andhra Pradesh — Kadapa, Kurnool | WtE under construction (COD targeted 2028) | Pre-revenue (construction revenue may be recognised FY27–FY29) |
Valuation Snapshot — Last close
| Metric | Value | Source |
|---|---|---|
Last close | ₹332.85 (16 Oct 2026) | StockInvest.us |
52-week range | ₹326.70 (19 Oct 2026 intraday) – ~₹605–616 | MarketsMojo; StockInvest.us; Tapetide |
1-year return | ~−36.7% (vs Sensex ~−11.3%) | MarketsMojo, 19 Oct 2026 |
Key moves | +17% (18 Dec 2025, BMC wins); +5.8% (8 Apr 2026, JFE); −2.4% (13 Jul 2026, incident) | Samco; HDFC Sky; AskFuzz |
Share Price
| Date reference | Apr2024 | Dec2025 | Jun2026 | Aug2026 | Oct2026 |
|---|---|---|---|---|---|
Share price (INR) | 507.3 | 513.95 | 476.15 | 383.3 | 332.85 |
Valuation Snapshot by Multiple
| Multiple | Value | Basis |
|---|---|---|
Market cap | ~₹945 Cr | ~2.84 crore shares |
P/E (trailing, owners' PAT) | ~16.2x | TTM owners' PAT ~₹58.5 Cr (FY26 ₹75.5 Cr − Q1 FY26 ₹17.8 Cr + Q1 FY27 ₹0.8 Cr) |
P/E (FY26) | ~12.5x | FY26 owners' PAT ₹75.5 Cr |
P/B | ~1.4x | Implied BVPS ~₹244 (Dec 2025) |
EV/EBITDA (TTM) | ~6x | EV ≈ market cap + last disclosed net debt (₹366 Cr, Dec 2024; excludes NCI); TTM EBITDA ~₹219 Cr (company basis) |
EV/Sales (TTM) | ~1.2x | TTM revenue from operations ~₹1,067 Cr |
Per-Share Data — Dividend per share
| Metric (₹ per share) | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Dividend per share | 0 | 0 | 0 | 0 | 0.5 |
Credit Ratings
| Agency | Rating | Outlook | Date | History |
|---|---|---|---|---|
CARE Ratings | BBB+ (LT, ₹13.5 Cr) / A3+ (ST, ₹22.0 Cr) | Stable | 10 Apr 2026 | BBB- (Feb 2021) → BBB (Apr 2022) → BBB+ (Apr 2023) → reaffirmed Mar 2024, Apr 2025, Apr 2026 |
Moody's / S&P / Fitch | Not rated | — | — | — |
Analyst Conclusions
Management guidance
-
Revenue CAGR of 15–20% over five years, supported by an ~₹18,000 Cr order book (Mar 2026).
-
Near-term PAT constrained by WtE-related interest and depreciation; contract/capex revenue front-loaded FY27–FY29; AP WtE accretive post-FY29.
-
PCMC WtE full restart expected December 2026 (revised from early October).
Consensus expectations
Not publicly available. On current evidence, FY27 earnings are likely to be well below FY26 given Q1's ₹0.8 Cr owners' PAT, the PCMC outage through at least November, and daily penalties — this is an analyst inference, not guidance.
Bull case
-
Order-book-backed growth: ~₹18,000 Cr order book (~17x FY26 revenue) with BMC, Greater Noida and AP contracts provides multi-year revenue visibility; volumes grew 15% in FY26.
-
Cheap on normalised earnings: at ~₹945 Cr market cap the stock trades at ~12.5x FY26 owners' PAT and ~6x TTM EBITDA (indicative), near the low end of its listed history, while the core C&T franchise remains intact (C&T revenue +10% in Q1 FY27).
-
De-risked WtE pipeline: JFE's equity and EPC role reduce technology and capital risk for the AP plants, and the PCMC restart in December 2026 would restore power and tipping revenue.
Bear case
-
Earnings deterioration predates the incident: owners' PAT fell in both FY25 and FY26 despite record revenue, and EBITDA margins have trended down — structural, not one-off.
-
PCMC liability tail: nine fatalities, potential investigations, compensation, penalties (₹50,000/day), possible impairment, and a contract that obliges capacity expansion PCMC says has not occurred.
-
Cash conversion and leverage: operating cash flow −24% in FY26, ~114 debtor days, rising finance costs, and heavy AP capex ahead with returns only post-FY29.
Catalysts and monitorables (next 12 months)
-
Q2 FY27 results (expected early-to-mid November 2026): quantification of PCMC impairment, insurance recoveries and penalties.
-
PCMC WtE restart (December 2026 target) and PCMC's contractual stance.
-
Any statutory investigation findings related to the July incident.
-
CARE rating surveillance (next annual review ~April 2027).
-
BMC 7-ward ramp-up and margin profile of the consortium contracts.
-
AP WtE financial closure, construction start, and capex funding mix.
-
Receivable days and operating cash flow trend.
-
Further contract wins in legacy waste and EPR.
Analyst verdict
Antony Waste Handling Cell enters late 2026 as a company whose franchise and financial performance have decoupled. On the franchise side the evidence is strong: twenty-five years of municipal execution, volumes up 15% in FY26 to 5.69 million tonnes, a record ~177,000 tonnes of RDF sold, a seven-ward BMC expansion, new geographies such as Greater Noida, and a strategic WtE partnership with JFE Engineering that few domestic peers could attract. The order book of roughly ₹18,000 crore offers revenue visibility most small-cap industrials would envy.
The financial record, however, has been moving the other way for two years. Owners' profit declined in FY25 and FY26 even as revenue reached a record ₹1,053 crore; margins slipped; operating cash flow fell by almost a quarter; and Q4 FY26 earnings leaned on a tax credit and other income. Q1 FY27's near-zero profit and the July 2026 PCMC tragedy then converted a slow-burn margin story into an acute one, adding liability, penalty and impairment uncertainty that the company has not yet quantified. Management's own framing — earnings acceleration only after FY28–FY29 — asks investors to underwrite a long, capital-intensive bridge.
The stock's ~37% one-year decline to around ₹333, roughly 12.5x FY26 and ~16x trailing owners' earnings, already discounts much of this. Our synthesis is that the shares screen inexpensive on historical earnings but not on near-term earnings, and that a re-rating requires three verifiable events: a safe and sustained PCMC restart, a clean quantification of incident-related costs in the Q2/Q3 FY27 results, and evidence that BMC and other new C&T contracts lift consolidated margins back toward the low-20s. Until then, the risk-reward is best characterised as a cautious, evidence-dependent "watch" stance — the strategic assets are real, but the burden of proof has shifted firmly onto execution and disclosure.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Title | Tenure / background |
|---|---|---|
Jose Jacob Kallarakal | Chairman & Managing Director; Promoter | With the group since inception; leads strategy and municipal relationships |
Shiju Jacob Kallarakal | Executive Director & Chief Risk Officer; Promoter | With the company since 2001; formerly ED & CFO; re-appointed for 5 years from 28 Jul 2026 to 27 Jul 2031 (subject to shareholder ratification); oversees enterprise risk, technology adoption, operational efficiency; brother of Jose Jacob |
Shiju Antony Kallarakkal | Non-Executive Director / Chief Sustainability Officer; Promoter | Appointed to board Nov 2021; led construction of PCMC Moshi WtE; whole-time director at material subsidiaries |
Mahendra Ananthula | Group President | Appointed Aug 2022; previously at an international water/waste management firm; public spokesperson on the July 2026 incident |
Subramanian N.G. | Group Chief Financial Officer | Group CFO since at least FY23 (named on Q1 FY23 and Q1 FY27 calls) |
Harshada Rane | Company Secretary & Compliance Officer | — |
Ajit Kumar Jain | Independent Director | Chaired Nomination & Remuneration Committee (2022) |
Suneet K. Maheshwari | Independent Director | Chaired Audit Committee (2022) |
Priya Balasubramanian | Independent Director | Chaired a board committee (2022 AGM record; committee name truncated in source) |
Board & Management Changes
| Date | Change | Context |
|---|---|---|
Nov 2021 | Shiju Antony Kallarakkal joins board (NED) | Promoter overseeing WtE build |
Aug 2022 | Mahendra Ananthula appointed Group President | Professionalisation of management |
| — | Shiju Jacob Kallarakal moves from CFO to Chief Risk Officer; Subramanian N.G. serves as Group CFO | Separation of finance and risk roles |
28 Jul 2026 | Shiju Jacob Kallarakal re-appointed ED for five years | Approved at board; ratified at 25th AGM (Aug 2026) |
Shareholding Trend
| Holder category (%) | Mar-2025 | Jun-2025 | Sep-2025 | Dec-2025 | Mar-2026 |
|---|---|---|---|---|---|
Promoters | 46.09 | 46.09 | 46.09 | 46.09 | 46.08 |
Foreign institutions (FII/FPI) | 10.99 | 13.09 | 12.81 | 11.78 | not split |
Mutual funds | 1.83 | 2.25 | 2.25 | 2.25 | not split |
Other domestic institutions | 2.87 | 1.43 | 1.43 | 1.47 | not split |
Total institutions | 15.68 | 16.77 | 16.49 | 15.50 | 18.17 |
Retail and others | 38.23 | 37.14 | 37.42 | 38.41 | 35.70 |
Major Shareholders
| Holder | Stake | Date / note | Source |
|---|---|---|---|
Jose Jacob Kallarakal (promoter) | ~18.4% | Date not specified | MarketsMojo |
Massachusetts Institute of Technology | ~6.93% | Date not specified; may be dated | MarketsMojo |
Miri Strategic Emerging Markets Fund (Miri Capital) | Acquired additional 0.72% at ₹589.37 | Reported by CB Insights as 27 Jan (year attribution uncertain) | CB Insights |
Shiju Antony Kallarakkal | Identified as promoter with highest holding as of Mar 2026 (conflicts with the 18.4% figure for Jose Jacob) | Mar 2026 | MarketsMojo Company CV |
Competitive Landscape
Key Competitors
| Competitor | Listed? | Segment overlap | Notes |
|---|---|---|---|
Re Sustainability Ltd (formerly Ramky Enviro Engineers) | Unlisted | C&T, integrated MSW, WtE, hazardous waste | — |
Jindal Urban Infrastructure / Jindal ITF (Timarpur-Okhla WtE) | Unlisted (group listed) | WtE | Major Delhi WtE operator |
Ecogreen Energy | Unlisted | C&T, WtE | Named by CB Insights as a competitor |
BVG India | Unlisted | C&T, facility services | Municipal services rival in Maharashtra |
Zigma Global Environ Solutions | Unlisted | Bio-mining, legacy waste | Specialist remediation competitor |
Saahas Zero Waste; Nepra Resource Management | Unlisted | Dry-waste recycling, MRF | Resource-recovery competitors |
EcoReco (Eco Recycling Ltd) | Listed (BSE) | E-waste/recycling | Listed environmental-services peer |
Namo eWaste Management | Listed (NSE SME) | E-waste recycling | Small listed peer |
Felix Industries; Race Eco Chain | Listed (SME) | Recycling / waste-related | Small listed peers |
Refex Industries | Listed | Ash/coal handling, green mobility | Listed "environmental services" comparable |
VA Tech Wabag; Ion Exchange | Listed | Water/wastewater (adjacent municipal infrastructure) | Listed municipal-infrastructure comparables |
Peer Comparison FY2026
| Company | Price (INR) | Market cap (INR Cr) | P/E | Annual PAT (INR Cr) |
|---|---|---|---|---|
VA Tech Wabag | 2,011.7 | 12,567 | 31.8 | 371 |
Ion Exchange | 395.2 | 5,612 | 57.2 | 143 |
Refex Industries | 280.75 | 3,829 | 15.6 | 204 |
Antony Waste Handling Cell | 372.6 | 1,055 | 18.1 | 75 |
EcoReco | 465.75 | 898 | 37.4 | 23 |



