Company ProfilePremium

APA Group

Company Profile Analysis

Ticker: APA.AX

ESOMAR 23 Corporate BadgeISO Certifications Badge
APA Group - Company showcase

Year Founded & Workforce

2000

2,959 Employees

APA Group logo

APA Group Employee Contacts

106 verified contactsNames, job titles, seniority and locations

View Employee Contacts

APA Group Overview

APA Group is Australia's largest listed gas transmission owner-operator and a diversified energy infrastructure business whose assets span every Australian state and territory. Its core is an interconnected gas transmission and storage network — the East Coast Gas Grid in Queensland, New South Wales, Victoria and South Australia, plus Western Australian and Northern Territory pipelines — which the company states carries roughly half of Australia's domestic gas. Around that core it has added contracted power generation (gas-fired and renewable, particularly in remote Western Australian and Queensland grids following the A$1.7bn Pilbara Energy acquisition), the Basslink interconnector, and an asset management business. Revenue is predominantly take-or-pay or regulated, inflation-linked and sourced from investment-grade counterparties, giving APA bond-like cash flows that underwrite 22 consecutive years of distribution growth. Under CEO Adam Watson the strategy has narrowed toward simplification, cost-out and a ~A$3.5bn organic pipeline in gas transmission, storage and firming generation.


What APA does

APA owns, operates and develops energy infrastructure in Australia. Its principal activities, as defined in the 1H26 Interim Report, fall into three reporting segments:

Energy Infrastructure: wholly or majority-owned assets across gas transmission, compression, processing, gas and battery storage, electricity generation (gas and renewables) and electricity transmission (Basslink).

Asset Management: provision of asset management and operating services, primarily to APA's Energy Investments (narrowed materially after the FY26 Networks divestment).

Energy Investments: APA's minority equity interests in energy infrastructure investments (reduced further by the March 2026 sale of the 20% GDI stake).

Company's own description (paraphrased from FY25/FY26 reporting)

APA describes itself as a leading ASX-listed energy infrastructure business that owns and operates a diverse portfolio of energy assets across Australia, and positions itself as "Australia's energy infrastructure partner". It emphasises its role in transporting a large share of the nation's gas, its growing contracted power generation business, and its ambition to support Australia's energy transition through firming gas generation, storage and renewables.

Business model and revenue model

Revenue characteristic (FY26 results presentation)Value
Share of Energy Infrastructure revenue that is take-or-pay or regulated~86%
Share of Energy Infrastructure revenue from investment-grade counterparties~84%
Share of business leveraged to defensive, inflation-linked revenue~90%
Underlying EBITDA margin FY2677.9%

APA's model is that of a capital-intensive infrastructure owner earning long-dated, contracted or regulated returns on invested capital. The revenue mix is overwhelmingly service-based (transport, storage, capacity and availability charges) rather than product sales; there is no meaningful licensing or subscription revenue.

Contract types. (1) Long-term firm gas transportation agreements (take-or-pay capacity reservation) on non-scheme pipelines such as the South West Queensland Pipeline (SWQP), Moomba Sydney Pipeline (MSP) and Wallumbilla Gladstone Pipeline (WGP); (2) AER-regulated reference tariffs on scheme pipelines such as the Victorian Transmission System (VTS); (3) Basslink — converted to a regulated transmission asset from 1 July 2026 under the AER 2026–30 determination; (4) long-term power purchase / energy supply agreements with mining customers in the Pilbara, Goldfields and Mount Isa remote grids; (5) hedge-offtake arrangements, such as the 25-year inflation-linked agreement underpinning the Brigalow Peaking Power Plant; (6) asset management fees.

Pass-through revenue. APA reports total revenue including "pass-through" revenue (costs recovered from customers with no margin, e.g., on managed networks). Management focuses on revenue excluding pass-through, which is the meaningful measure; the FY26 decline in total revenue (A$3,003m vs A$3,204m) largely reflects lower pass-through revenue after the Networks divestment.

Value chain position

APA sits in the midstream of the gas value chain — between upstream producers (e.g., Santos, Origin/APLNG, Shell QGC, Tamboran in the Beetaloo) and downstream users (LNG exporters at Gladstone, gas retailers, gas-fired generators, industrial users and miners). It does not own gas reserves or retail customers. In electricity it is a generator-for-contract (not a merchant generator by design) and, through Basslink, a regulated transmission owner.

Customer types and end markets

Customer typeExamples / description
Gas producers and shippersEast coast producers and aggregators shipping gas south from Queensland
LNG exportersWGP serves the QCLNG project at Gladstone (contracted)
Energy retailers and gentailersShippers on the East Coast Gas Grid and VTS
Gas-fired generatorsSnowy Hydro (Kurri Kurri Lateral), CS Energy (Brigalow pipeline and peaking plant)
Mining companiesPilbara iron ore miners, Goldfields gold miners, Mount Isa operators (Evolution Mining for Sybella Creek)
Market operators / regulated usersAEMO (VTS tariffed transmission service); Basslink users

Independent characterisation. APA is best understood as a quasi-regulated gas "toll road" with a growing contracted-power adjunct. Its earnings quality is high (FY25 EBITDA: ~84% gas transmission and storage, ~14% power generation, ~2% electricity transmission, per ASA analysis of FY25 reporting), but its equity is thin relative to debt, statutory profit is low because of heavy depreciation and interest, and long-term relevance depends on the pace of Australia's gas demand decline versus the need for gas as transition firming fuel.

Strategy

Stated strategy (themes from FY25/FY26 reporting and CEO commentary)

  1. Owner-operator focus and simplification — exit non-core activities (Networks O&M, GDI, electricity transmission bidding) to concentrate on owning and operating core energy infrastructure.

  2. Cost-out — enterprise-wide restructuring: operating model redesign, corporate function restructure, reduced external spend, streamlined IT delivery. FY26 delivered A$80m (target A$50m); A$100m annualised run-rate in FY27 (+A$20m incremental).

  3. Customer-focused organic growth — ~A$3.5bn FY27–FY29 pipeline across gas transmission (ECGG), storage and contracted power generation (Brigalow, Sybella Creek).

  4. Role of gas in the transition — positioning gas transmission, storage and gas-powered generation as essential firming for renewables, citing AEMO forecasts of large new GPG needs.

  5. Disciplined capital allocation and credit metrics — fund growth from balance sheet, operating cash flow and DRP while maintaining BBB/Baa2 ratings and growing distributions modestly.

Strategic initiatives — last 24 months

InitiativeAnnouncedScope / targetStatus
Networks divestment19 Aug 2025Sell gas distribution O&M entities and Tamworth network to AGIG (~A$47m); <2% of EBITDACompleted ~2Q FY26
GDI 20% stake divestment18 Dec 2025Sale to Stonepeak; <1% of FY25 EBITDACompleted 25 Mar 2026 (A$62m)
Enterprise cost-outFY25 results (Aug 2025)~A$50m FY26A$80m delivered; A$100m run-rate FY27
ECGG Stage 3AFeb 2026A$260m, three new compressors and debottlenecking on SWQP/MSP for 2028FID taken
ECGG Stage 3B — Bulloo InterlinkFeb 2026A$220m early works; ~800 TJ/d pipelineEnvironmental assessment; FID expected later 2026
South West Pipeline expansion (VIC)17 Jul 2026Lift western Victoria capacityAER advance capex consultation
Brigalow Peaking Power PlantJDA 1 Dec 2025; full form Sep 2026400MW; A$1,269m total; APA ~A$1,015m for 80%Construction underway; early 2029
Brigalow PipelineAgreements Jul 2025~23 km lateral and storage; min. A$150m; 35-year GTSATargeted mid-2027
Sybella Creek Solar & BESSFID 20 Aug 2026Mount Isa; Evolution Mining ESA; ~A$259mFID taken
Sturt Plateau PipelineFY25–FY26First Beetaloo projectConstruction completed FY26
MSEP conversionFY25–FY26Repurpose ethane line to natural gasRevenue recommencing FY26
Data centre energy solutionsFY26 resultsIntegrated energy for data centresPre-feasibility
2025 Climate Transition PlanAug 2025Refreshed CTP (non-binding vote passed Oct 2025, ~10% against)Adopted

Medium-term targets and guidance

ItemGuidance / target
FY27 underlying EBITDAA$2,260m–A$2,340m (midpoint +5.4%)
FY27 distribution59.0 cps (+1.7%)
FY27 driversCPI escalation, Sturt Plateau Pipeline, Basslink regulated, annualised cost-out
Organic growth pipeline FY27–FY29~A$3.5bn (up from ~A$3.0bn for FY26–FY28)
FundingExisting balance sheet, operating cash flow and DRP (1.5% discount on FY26 final) — no equity raise flagged
CreditMaintain BBB (S&P) / Baa2 (Moody's); S&P downside threshold FFO/Net Debt 8.5%
2030 climate targets30% reduction in gas infrastructure emissions vs FY21; 35% reduction in power generation emissions intensity vs FY21; 30% methane reduction vs FY21; 100% renewable electricity (from FY23); zero direct emissions fleet

Products & Services

APA does not sell products; its "portfolio" is a set of infrastructure assets and the services they provide. Pricing is disclosed only for regulated assets (via AER determinations); contracted tariffs are confidential.

Energy Infrastructure — East Coast Gas Grid (ECGG)

Asset / serviceDescription and capabilityTarget customerStatus / latest milestonePricing model
South West Queensland Pipeline (SWQP)Bidirectional link from Wallumbilla (QLD) to Moomba (SA); ~512 TJ/d capacity (Argus, Feb 2026)East coast shippers, retailers, generatorsAER Dec 2024: remains non-scheme (light regulation); Stage 3A compressors/debottlenecking to 2028Negotiated firm capacity (take-or-pay)
Moomba Sydney Pipeline (MSP)Moomba to Sydney trunk line; ~590 TJ/d (Argus)NSW retailers and industryStage 3A works to lift north-to-south capacity for winter 2028Negotiated firm capacity
Bulloo Interlink (BIL) — proposed~335–340 km, 28-inch, up to 800 TJ/d pipeline linking SWQP to MSPSouthern states' supply securityStage 3B: A$220m early works/long-lead items; Commonwealth environmental assessment underway (Jul 2026); AER classified as light-regulation non-scheme pipeline for first 10 years after commissioning; FID expected later in 2026; construction proposed 2027; target completion 2028Negotiated (light regulation)
Roma Brisbane Pipeline (RBP)Supplies Brisbane and SE QueenslandRetailers, industrial, generatorsBrigalow lateral (~23 km) connects to RBPRegulated/negotiated
Brigalow Pipeline (lateral and storage)~23 km pipeline providing transport and line-pack storage to Brigalow Peaking Power Plant; min. ~A$150m cost; 35-year Gas Transportation & Storage Agreement with CS EnergyCS EnergyAgreements finalised Jul 2025; targeted mid-2027Long-term contracted
Wallumbilla Gladstone Pipeline (WGP)Large-diameter line supplying the QCLNG export project at Curtis IslandLNG exporterOperating; acquired 2015Long-term contracted
Carpentaria Gas PipelineSupplies Mount Isa region from BalleraMining and power customersOperatingContracted
Victorian Transmission System (VTS)Victoria's principal gas transmission networkAEMO (single "Tariffed Transmission Service")AER access arrangement 2023–27; next period from 2028AER-regulated reference tariff
South West Pipeline (VIC) expansionExpansion in western Victoria to lift capacity from Iona storage/Port Campbell region toward MelbourneVictorian market (winter security)Announced 17 Jul 2026; AER advance capex application under consultationRegulated (VTS)
Kurri Kurri Lateral PipelineLateral supplying Snowy Hydro's Hunter Power Project (NSW)Snowy HydroCompleted FY25; contributing FY26Contracted
Atlas to Reedy Creek PipelineQueensland pipeline acquired from SenexSenex/Atlas gas fieldAcquired FY25Contracted
Moomba Sydney Ethane Pipeline (MSEP)Ethane pipeline idled after single customer closed; being converted to natural gas serviceEast coast shippersImpaired A$144m (FY24); revenue expected to recommence FY26 post-conversionContracted (post-conversion)
Iona Underground Gas Storage / Dandenong LNGGas storage in VictoriaWinter peak supplyOperating (ownership per historical disclosures)Contracted/regulated

Energy Infrastructure — Western Australia and Northern Territory gas

Asset / serviceDescriptionTarget customerStatus
Goldfields Gas Pipeline (GGP)Pilbara to Kalgoorlie trunk lineMiners, generators100% owned after Pilbara Energy deal (previously 88.2%)
Pilbara Pipeline SystemPilbara gas transmissionIron ore miners, generatorsOperating
Northern Goldfields InterconnectConnects Pilbara/Goldfields networksGoldfields minersCommissioned ~2024
Mondarra Gas StorageUnderground storage in WAWA marketOperating
Amadeus Gas Pipeline (NT)Central Australia to DarwinNT marketOperating
Sturt Plateau Pipeline (NT)APA's first Beetaloo Basin project, connecting Beetaloo gas to the NT networkBeetaloo producers (Tamboran-led)Construction completed FY26; first Beetaloo gas reported Aug 2026; contributes to FY27 guidance
Beetaloo transmission (proposed)Longer-term pipelines to bring Beetaloo gas to the east coastEast coast marketPre-feasibility; subject of shareholder activism

Energy Infrastructure — Power generation

AssetDescriptionCustomerStatus
Pilbara Energy SystemGas-fired generation, solar, batteries and transmission acquired from Alinta Energy (A$1,722m)Pilbara iron ore minersFull-year contribution from FY25
Port Hedland Solar and BESSSolar farm plus batteryPilbara customersCompleted FY25
Diamantina Power Station (Mount Isa)Gas-fired power station serving Mount Isa gridMining customersOperating
Sybella Creek Solar Farm & BESSNew solar and battery in Mount Isa; long-term Energy Supply Agreement with Evolution Mining; ~A$259m investment (per market reports)Evolution MiningFID 20 Aug 2026
Brigalow Peaking Power Plant400MW open-cycle gas peaker (12 GE Vernova aeroderivative turbines, hydrogen-blend capable), next to Kogan Creek, QLD; APA 80%, CS Energy 20% (operator)CS Energy (25-year inflation-linked hedge offtake)Full-form agreements Sep 2026; total cost A$1,269m (APA ~A$1,015m); completion targeted early 2029
Wind and solar farms (WA/QLD)e.g., Badgingarra, Emu Downs, Darling Downs (per historical disclosures)Contracted offtakersOperating
Gas-fired remote generation (Goldfields)Remote mine powerGoldfields minersOperating

Energy Infrastructure — Electricity transmission

AssetDescriptionStatus
Basslink~370 km HVDC interconnector between Tasmania and VictoriaAER 2026–30 revenue determination (final 27 Feb 2026); regulated from 1 Jul 2026 — a FY27 earnings driver
Murraylink / DirectlinkInterconnectors (VIC–SA and NSW–QLD) held through investmentsAER consulting on Murraylink framework and approach (2026)

Asset Management and Energy Investments

OfferingDescriptionStatus
Networks O&M businessOperation of third-party gas distribution networksSold to Australian Gas Infrastructure Group (~A$47m), completed ~2Q FY26; ~725 staff transferred; included Tamworth network
Corporate services to GDIServices to Allgas ownerContinue for up to three years post-sale
GDI (EII) Pty Ltd 20% stakeAllgas gas distribution network (QLD/NSW; ~3,900 km mains, ~120,000 customers)Sold to Stonepeak; completed 25 Mar 2026; APA proceeds A$62m
Remaining Energy InvestmentsMinority stakes in energy infrastructure vehiclesEarnings ~A$15m per half

Emerging service lines

Integrated energy solutions for data centres: under pre-feasibility (FY26 results).

Contracted gas-powered generation: beyond Brigalow — pipeline opportunity.

Remote grid power: Mount Isa, Pilbara and Goldfields expansion.

Financial Narrative

Important framing: APA does not report gross profit or a conventional "operating income" line; it reports Underlying EBITDA (non-IFRS), statutory EBITDA, EBIT, NPAT and Free Cash Flow. Where a requested metric is not reported, it is marked as such.

Income statement

Notes: FY23 revenue derived from FY24 revenue (A$2,591m) and reported 7.9% growth. FY26 EPS derived (A$234m ÷ ~1,325m securities); diluted EPS not separately verified (APA has no material dilutive instruments beyond performance rights). FY25 statutory EBITDA (~A$1.89bn) per Rigzone summary of the FY25 release. Gross profit and operating income: not reported. Sources: FY23–FY26 results releases; ASA FY25 report (5-year table for NPAT, UPAT, EPS).

Margins and growth

FY24 margin derived (1,893/2,582); FY25–FY26 as reported. Net margins derived.

CAGRs (derived): Underlying EBITDA FY22–FY26: ~6.6% p.a. Revenue excl. pass-through FY23–FY26: ~4.8% p.a. Distribution FY22–FY26: ~2.3% p.a.

Commentary. EBITDA growth has been driven by four forces: (1) CPI-linked tariff escalation on most contracts; (2) acquisitions — Basslink (FY23) and Pilbara Energy (eight months FY24, full year FY25); (3) organic projects — ECGG Stages 1–2, Kurri Kurri Lateral, Northern Goldfields Interconnect, Port Hedland Solar/BESS; and (4) cost reduction — A$80m of enterprise-wide cost-out in FY26 against a A$50m target, with a 20.6% fall in corporate costs and a guided A$100m annualised run-rate in FY27. The margin expansion from ~73% to ~78% in two years is the most notable inflection, reflecting both portfolio simplification (exit of low-margin Networks O&M) and cost-out. Statutory profit is volatile and structurally low: FY24 was inflated by an A$879m after-tax favourable significant item (remeasurement of the pre-existing 88.2% GGP interest), while underlying NPAT fell from A$287m (FY23) to A$119–129m (FY24–FY25) as depreciation (Pilbara assets) and interest costs rose. FY26 statutory NPAT of A$234m (+81.4%) recovered on EBITDA growth and, in 1H26, lower net interest expense (1H25 was affected by non-cash FX losses).

Balance sheet

Notes: FY25 total assets, borrowings and equity per ASA FY25 report; FY24 total assets derived from ASA statement that FY25 assets rose 1.9%. A$12,796m is the AUD exposure of all debt capital market issuance and term loans at 31 Dec 2025 (APA debt investor page) — this is 1H26 data, shown in the FY2026 column as the latest disclosed point, and excludes the April 2026 A$1.5bn raise. Liquidity FY25 column reflects 1H25 (A$3.2bn); FY26 is 30 Jun 2026 (A$3.1bn).

Cash flow

Notes: APA defines FCF as operating cash flow adjusted for certain non-operating items (transformation, acquisition/integration/disposal costs, JV capital returns) less stay-in-business capex. FY23 "over A$1.2bn" capital investment includes Basslink acquisition. FY25 FCF/security derived (84.4c less reported 1.4c increase).

Commentary. FCF has been almost flat at ~A$1.07–1.12bn for five years even as EBITDA rose ~29%, because higher interest costs, resumption of cash tax (from FY24) and stay-in-business capex absorbed the uplift. This is the central tension in the APA equity story: distributions (58c in FY26 ≈ A$770m) are covered by FCF but growth capex must be funded by debt, hybrids and the DRP.

Credit and return ratios

Notes: FFO ratios and interest data per APA debt investor page (historical ratios revised to S&P's methodology; at 31 Dec 2025 FFO/Net Debt was 10.4%, FFO/interest 2.9x, average rate 5.3%, average maturity 6.3 years). FY26 FFO/Net Debt 11.2% per FY26 results presentation coverage. ROIC, current ratio, asset turnover and cash conversion cycle: not publicly disclosed in comparable form / not meaningful for an infrastructure owner. APA's LTI uses an internal "Return on Capital" metric whose values are not publicly broken out.

Commentary. The credit story improved materially in FY26: S&P (Dec 2025) cut APA's BBB downside FFO/Net Debt threshold from 9.5% to 8.5%, and Moody's (Apr 2026) cut its Baa2 downside FFO/Debt threshold from 8% to 7% — together adding roughly A$1bn of debt capacity, per company commentary. With FFO/Net Debt at 11.2% against an 8.5% S&P threshold, APA has headroom to fund the ~A$3.5bn FY27–FY29 pipeline without equity, though the trend of total equity declining (FY24 A$3.25bn to FY25 A$2.67bn) reflects distributions exceeding statutory profit, which is a recurring governance observation by the ASA.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Segment Overview

SegmentWhat it containsKey assets / services

Energy Infrastructure

Wholly/majority-owned gas transmission, compression, processing, gas and battery storage, gas and renewable power generation, electricity transmission

East Coast Gas Grid (SWQP, MSP, Roma Brisbane Pipeline, Carpentaria Gas Pipeline, VTS, WGP and laterals), WA pipelines (Goldfields Gas Pipeline, Pilbara Pipeline System, Mondarra storage and others), NT pipelines (Amadeus Gas Pipeline, Sturt Plateau Pipeline), Pilbara Energy System, Diamantina Power Station, wind and solar farms, Basslink

Asset Management

Operating and maintenance services, chiefly for APA's Energy Investments

Narrowed after FY26 Networks sale; residual corporate services to GDI for up to three years

Energy Investments

Minority equity stakes in energy infrastructure entities

Interests in Energy Infrastructure Investments-type vehicles; GDI (20%) sold Mar 2026

Corporate (unallocated)

Group costs

Corporate costs fell 20.6% in FY26

Revenue by Segment and Segment Margins & Growth (%)

MetricFY2024FY2025FY2026

Segment revenue excl. pass-through (AUD Mn)

2,5822,7162,803

Statutory revenue excl. pass-through (AUD Mn)

2,5912,7132,764

Underlying EBITDA (AUD Mn)

1,8932,0152,183

YoY growth segment revenue (%)

9.75.23.2

Results by Segment and Segment Assets & Liabilities

Metric1H20251H2026

Energy Infrastructure segment revenue excl. pass-through (AUD Mn)

1,2851,333

Energy Infrastructure underlying EBITDA (AUD Mn)

1,0481,115

Asset Management segment revenue excl. pass-through (AUD Mn)

6364

Asset Management underlying EBITDA (AUD Mn)

3332

Energy Investments earnings (AUD Mn)

1515

Corporate costs (AUD Mn)

-81-70

Group underlying EBITDA (AUD Mn)

1,0151,092

Segment Overview — Energy Infrastructure

SegmentRevenue share of segment total (%)EBITDA margin (%)YoY revenue growth (%)

Energy Infrastructure

95.483.63.7

Asset Management

4.650.01.6

Energy Investments

n/a (equity-accounted earnings)

—0.0

Activity Details

ActivityShare of FY25 underlying EBITDA (%)

Gas transmission and storage

84

Power generation (gas and renewable, incl. Pilbara)

14

Electricity transmission (mainly Basslink)

2

Income Statement and Per-Share Data

MetricFY2022FY2023FY2024FY2025FY2026

Statutory revenue excl. pass-through (AUD Mn)

—2,4012,5912,7132,764

Total revenue incl. equity-accounted share (AUD Mn)

———3,2043,003

Underlying EBITDA (AUD Mn)

1,6921,7251,8932,0152,183

Statutory EBITDA (AUD Mn)

———1,890—

Statutory NPAT incl. significant items (AUD Mn)

260287998129234

NPAT excl. significant items (AUD Mn)

240287119129—

Statutory EPS (A cents)

22.124.378.99.917.7

Distribution per security (A cents)

53.055.056.057.058.0

Margin Analysis (%)

MetricFY2022FY2023FY2024FY2025FY2026

Underlying EBITDA margin on segment revenue (%)

——73.374.277.9

Statutory net margin on revenue excl. pass-through (%)

—12.038.54.88.5

Underlying EBITDA growth (%)

—2.09.76.48.3

Distribution growth (%)

3.93.81.81.81.8

Balance Sheet

MetricFY2024FY2025FY2026

Total assets (AUD Mn)

19,53019,900—

Total borrowings (AUD Mn)

12,92013,980—

Total equity (AUD Mn)

3,2502,670—

Liquidity — cash and undrawn facilities (AUD Mn)

—3,2003,100

Debt capital markets and term loans outstanding, AUD exposure (AUD Mn)

——12,796

Cash Flow and Per-Share Data

MetricFY2022FY2023FY2024FY2025FY2026

Free Cash Flow (AUD Mn)

1,0811,0701,0731,0831,118

FCF per security (A cents)

———83.084.4

Growth capex / capital investment in growth (AUD Mn)

—1,200—655546

Distribution payout of FCF (%)

———69—

Divestment proceeds (AUD Mn)

————101

Margin Analysis (%) and Financial Ratios (x)

MetricFY2023FY2024FY2025FY2026

FFO / Net Debt — S&P methodology (%)

10.910.110.411.2

FFO / Interest coverage (x)

3.33.22.9—

Average interest rate on drawn debt (%)

4.44.85.1—

Interest rate exposure fixed or hedged (%)

100100100—

Average maturity of drawn senior facilities (years)

5.75.36.6—

ROE — statutory NPAT / closing equity (%)

—30.74.8—

ROA — statutory NPAT / total assets (%)

—5.10.6—

Borrowings / equity (x)

—4.05.2—

Borrowings / underlying EBITDA (x)

—6.86.9—

Revenue by Region

RegionFY2024FY2025FY2026

Australia — revenue excl. pass-through (AUD Mn)

2,5912,7132,764

Rest of world — revenue (AUD Mn)

000

State / Territory Details

State / territoryPrincipal APA activitiesRecent growth vector

Queensland

SWQP, RBP, WGP, Carpentaria, Atlas–Reedy Creek, Diamantina, Brigalow (from 2029), Sybella Creek

Fastest-growing: ECGG Stage 3, Brigalow, Sybella Creek, Mount Isa remote grid

New South Wales

MSP, Kurri Kurri Lateral, Central West/Central Ranges pipelines

Growth: Kurri Kurri (FY25), Bulloo Interlink (proposed)

Victoria

VTS, South West Pipeline, storage, Basslink (Vic end)

Growth: South West Pipeline expansion; regulatory: VTS 2028+ reset; Victorian Energy Security Requirement policy

South Australia

Moomba end of SWQP/MSP

Stable

Tasmania

Basslink (Tas end)

Regulated from Jul 2026

Western Australia

GGP, Pilbara Energy System, Mondarra, Goldfields generation, wind/solar

Grew strongly FY24–FY25 via Pilbara acquisition; now steady

Northern Territory

Amadeus Gas Pipeline, Sturt Plateau Pipeline

Emerging: Beetaloo

Share Price and Per-Share Data

MetricFY2021FY2022FY2023FY2024FY2025FY2026

Closing price at 30 June (AUD)

8.9011.279.697.998.1710.14

Distribution (A cents)

51.053.055.056.057.058.0

Simple TSR (%)

-15.532.6-9.1-11.89.4—

Price Performance Details

Price performance (price only, to 30 Jun 2026)Value

1-year

+24.1%

3-year

+4.6%

5-year

+13.9%

Calendar 2025

+28.1%

Calendar 2026 YTD (to mid-Aug)

+12.2%

52-week range (approx., to Aug 2026)

A$7.75–A$11.10

Valuation Snapshot

MultipleValueBasis

P/E (statutory FY26)

~57x–59x

Price ÷ derived FY26 EPS 17.7c

Distribution yield (FY27 guidance)

~5.6%–5.8%

59c ÷ price (Motley Fool/Market Matters cite ~5.8%)

P/FCF (FY26)

~12.0x–12.4x

Price ÷ FCF/security 84.4c

EV/EBITDA (FY26)

~12x–13x

—

EV/Sales

~10x

EV ÷ revenue excl. pass-through

P/B

~5x

Market cap ÷ FY25 equity A$2.67bn

Credit Ratings

AgencyRatingOutlookSinceRecent action

S&P Global

BBB

Stable

Jun 2009

Dec 2025: downside FFO/Net Debt threshold cut 9.5% → 8.5%

Moody's

Baa2

Stable

Apr 2010

Apr 2026: downside FFO/Debt threshold cut 8% → 7%

Fitch

Not rated / not disclosed

———

Maturity Year Details

Maturity year (calendar)InstrumentsAUD exposure (AUD Mn)
2027

EUR MTN €650m (Mar 2027); US 144A US$447m (Jul 2027)

1,621
2029

EUR MTN €600m (Mar 2029); EUR hybrid €500m (first call Feb 2029)

1,756
2030

GBP MTN £600m (Mar 2030); EUR MTN €600m (Jul 2030)

2,346
2031

Syndicated term loans A$1,000m (Jul 2031); GBP MTN £400m (Jul 2031)

1,742
2032

Syndicated term loan A$750m (Jul 2032)

750
2033

Syndicated term loan A$500m (Oct 2033); EUR MTN €500m (Mar 2033)

1,274
2034

JPY MTN ¥10bn (Jun 2034); US 144A US$750m (Sep 2034)

1,260
2035

Bilateral term loan A$300m (Mar 2035); US 144A US$300m (Mar 2035)

750
2036

GBP MTN £250m (Mar 2036)

452

2041–2046

NAIF A$70m (2041); US 144A US$500m (2044); ARENA A$24m (2046)

846

Total

—12,796

Analyst Conclusions

Management guidance

ItemFY2026 actualFY2027 guidance
Underlying EBITDA (A$ m)2,1832260–2340
Distribution (A cents)58.059.0
Organic growth pipeline (A$ bn)~3.0 (FY26–28)~3.5 (FY27–29)
Annualised cost-out run-rate (A$ m)80 delivered100

Guidance is subject to asset performance, macroeconomic factors and regulatory changes and excludes acquisitions/divestments.

Consensus expectations

Pre-result consensus FY27 EBITDA of ~A$2.28bn sat inside the guidance range. Consensus capex is expected to step up materially over FY27–FY29 (Market Matters), consistent with the ~A$3.5bn pipeline and the A$1.0bn Brigalow commitment.

Bull case

  1. Contracted growth at scale without equity: ~A$3.5bn pipeline (ECGG Stage 3, Brigalow, Sybella Creek) is funded by balance sheet and DRP, with ~A$1bn of extra debt capacity from rating-threshold changes and FFO/Net Debt at 11.2% versus an 8.5% threshold.

  2. Structural east coast scarcity: AEMO-flagged southern shortfalls and coal retirements make APA's north-to-south capacity and firming GPG strategically indispensable; regulatory decisions (SWQP, Bulloo Interlink, Basslink) have consistently gone APA's way.

  3. Operating leverage from simplification: margin up ~460bps in two years to 77.9%; A$100m cost run-rate and new assets should finally convert EBITDA growth into FCF growth as interest normalises.

Bear case

  1. FCF stagnation: five years of essentially flat FCF (A$1.07–1.12bn) while EBITDA grew ~29% shows that debt-funded growth largely accrues to lenders and the tax office; rising capex intensity may extend this.

  2. Policy risk is binary: the Bulloo Interlink FID hinges on the Gas Market Review; a tougher regulatory outcome or Victorian/federal electrification push could impair the growth narrative and long-term asset values.

  3. Balance-sheet fragility: equity of ~A$2.7bn against ~A$14bn of borrowings, distributions persistently exceeding statutory earnings, and concurrent multi-billion-dollar construction leave little room for cost overruns or a rates shock.

Catalysts and monitorables (next 12 months)

TimingCatalyst
22 Oct 2026AGM: chair succession signals, requisitioned climate resolutions, remuneration vote
Late 2026Bulloo Interlink FID decision (conditional on Gas Market Review and approvals)
Late 2026 – 2027Federal Gas Market Review final response; Victorian Energy Security Requirement implementation
Feb 20271H27 result: first regulated Basslink contribution, Sturt Plateau ramp, cost-out run-rate
2,027Refinancing of €650m EUR MTN (Mar 2027) and US$447m 144A (Jul 2027)
2,027VTS 2028–32 access arrangement proposal and AER process
Mid-2027Brigalow Pipeline completion target
OngoingBrigalow construction progress (early 2029), ECGG Stage 3A compressors (2028), Sybella Creek delivery
Aug 2027FY27 result vs A$2,260–2,340m guidance; FY28 guidance

Analyst verdict

APA enters FY27 in its strongest strategic position since the 2015 WGP acquisition. Management under Adam Watson has executed a credible reset: it walked away from electricity transmission tenders that the market viewed as value-dilutive, sold the Networks business and the GDI stake, overdelivered on cost-out (A$80m versus A$50m) and pushed the underlying EBITDA margin to 77.9%. Regulators have repeatedly delivered constructive outcomes — the SWQP remains lightly regulated, the Bulloo Interlink has secured a decade of light-handed treatment, and Basslink has moved onto a regulated revenue stream — while both rating agencies loosened their FFO thresholds, effectively pre-approving roughly A$1bn of additional debt capacity. The growth pipeline (~A$3.5bn) is now anchored by contracted, inflation-linked counterparties such as CS Energy and Evolution Mining rather than speculative acquisitions.

The investment case nonetheless remains fundamentally that of a levered, inflation-linked income vehicle. Free cash flow has barely moved in five years, statutory earnings cover only a fraction of distributions, and equity has been eroded as payouts exceed profit. The next three years require simultaneous delivery of Brigalow (A$1.27bn), ECGG Stage 3 and potentially the Bulloo Interlink, against a policy backdrop — the Gas Market Review and state electrification agendas — that could shift quickly.

On balance, at roughly 12–13x EV/EBITDA and a ~5.7% forward yield, APA offers a defensible, growing income stream with genuine organic upside if the Bulloo Interlink proceeds on favourable terms. We would characterise the security as a core defensive holding with moderate growth optionality, with the key swing factors being the Gas Market Review outcome, construction cost discipline and whether FY27–FY28 finally demonstrates conversion of EBITDA growth into per-security free cash flow growth. Investors should treat the 22nd-year distribution streak as reliable but modest, and the real upside as contingent on policy.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Executive Leadership Team

NameTitleAPA tenurePrior roles / education

Adam Watson

CEO & Managing Director

CFO from Nov 2020; CEO since 19 Dec 2022

Senior roles at Transurban, Melbourne Airport, BlueScope Steel; BBus, FCPA, GAICD; member, Champions of Change

Garrick Rollason

Chief Financial Officer

Since 2023

CFO Victoria Power Networks (CitiPower/Powercor) and United Energy; Director, Investment Banking, Credit Suisse; BComArts, MAppFin, ICAEW. Also oversees strategy, technology, capital markets, corporate development, procurement, property, transformation

Petrea Bradford

Group Executive Operations

Since Aug 2023

25 years in oil and gas, renewables, aviation; BEng, GAICD

Beth Griggs

Group Executive Legal, Governance and Regulatory

Joined 2023; Strategy & Corporate Development from Oct 2024

20+ years in gas/electricity infrastructure, legal, regulatory; BA, LLB, GAICD

Rob Evans

Group Executive Infrastructure Delivery

Since 2025

Executive roles at John Holland, Lendlease, Thiess, Transfield Services; FICE, CPEng

Elizabeth (Liz) McNamara

Group Executive Sustainability and Corporate Affairs

Since 2022

25 years corporate affairs across energy, mining, banking, FMCG, transport; BEc (Hons)

Darren Rogers

Group Executive Energy Solutions

Joined 2017 (previously GE Operations)

~30 years energy sector; BEng, MEng, MBA, GAICD

Jane Thomas

Group Executive People, Safety and Culture

—

30 years in energy, mining, banking, retail, manufacturing; BBus, LLB (Hons), MPsychol (Org)

“—” = not publicly disclosed.

Board & Management Changes

DateChangeContext

Dec 2022

Adam Watson appointed CEO

Followed Rob Wheals' departure

2023

Garrick Rollason appointed CFO

Backfilled Watson's CFO role

Oct 2024

Ross Gerbach (GE Strategy) retired; Beth Griggs took strategy role

Strategy reset

Jun 2025

Kevin Lester (GE Infrastructure Delivery) retired; Rob Evans appointed

Delivery capability for growth pipeline

Aug 2025

Company Secretary Amanda Cheney ceased (effective 31 Aug 2025); Bronwyn Weir continues

Governance

Oct 2025

Vin Vassallo departed

Followed decision not to tender for major east coast electricity transmission projects

Directors' Remuneration

MetricFY2021FY2022FY2023FY2024FY2025

CEO total remuneration, actual (AUD Mn)

2.793.062.412.833.68

Directors' Remuneration — Fixed remuneration

FY26 CEO remuneration frameworkTarget (AUD Mn)Maximum (AUD Mn)

Fixed remuneration

1.7001.700

STI — cash

1.0201.530

STI — deferred equity

0.5100.765

LTI (performance rights, face value)

2.8902.890

Total

6.1206.885

Board of Directors

DirectorRoleAppointedCommitteesBackground

Michael Fraser

Independent Chair

Director 1 Sep 2015; Chair 27 Oct 2017

Chair Nomination; Safety & Sustainability

Ex-MD & CEO AGL Energy (7 years to Feb 2015); Director Orora; ex-Chair Clean Energy Council

Adam Watson

CEO & MD

19 Dec 2022

—

See above

James Fazzino

Independent

21 Feb 2019

Chair Safety & Sustainability; Audit & Finance; Risk; Nomination

Ex-MD & CEO Incitec Pivot; Chair Manufacturing Australia, Rabobank Australia, Amotiv

Rhoda Harrington

Independent

1 Jun 2020

Chair Risk Management; Audit & Finance; People & Remuneration; Nomination

Ex-MD Lumo Energy; Director Dexus Funds Mgmt, Waveconn, Dalrymple Bay Infrastructure Mgmt

Nino Ficca

Independent

1 Sep 2023

People & Remuneration; Safety & Sustainability; Risk; Nomination

Ex-MD AusNet Services (2001–2019); Director AEMO; Chair Horizon Roads

Samantha (Sam) Lewis

Independent

1 Oct 2024

Chair Audit & Finance; Risk; Nomination

24 years Deloitte (14 as Partner); Director CSL, Australia Pacific Airports Corp

David Lamont

Independent

1 Oct 2024

Chair People & Remuneration; Safety & Sustainability; Audit & Finance; Nomination

BHP CFO 2020–2024; ex-CFO CSL, OZ Minerals; Director Telstra

Varya Davidson

Independent

1 Mar 2025

Safety & Sustainability; People & Remuneration; Nomination

17 years Partner Strategy& (PwC); Director Dexus Funds Mgmt

Major Shareholders

HolderLatest disclosed stakeBasis

State Street Corporation and subsidiaries

~7.22% (85.2m securities)

Substantial holder data as at 30 Jun 2023 (aggregator)

BlackRock Group

~7.02% (82.8m securities)

Substantial holder data as at 30 Jun 2023 (aggregator)

UniSuper

Sold ~5.3% of securities via ~A$500m block trade (2025, at ~A$7.23–7.43)

Press reports (AFR/The Australian via Capital Brief)

Other notices (various dates)

Australian Retirement Trust, Australian Ethical, First Sentier, Mitsubishi UFJ, JPMorgan, Morgan Stanley have filed substantial holder notices at various times

—

Competitive Landscape

Competitors by Segment

SegmentCompetitorOwnershipOverlap / positioning

East coast gas transmission

Jemena

State Grid Corp of China / Singapore Power (unlisted)

Eastern Gas Pipeline (Gippsland–Sydney), Northern Gas Pipeline (NT–QLD), Queensland Gas Pipeline; competes for north-to-south and NT gas haulage

Gas transmission and distribution

Australian Gas Infrastructure Group (AGIG)

CK Group (unlisted)

Dampier Bunbury Pipeline (WA), large distribution networks; now buyer of APA's Networks business

South Australian transmission

Epic Energy

Unlisted

Moomba–Adelaide Pipeline System

Tasmanian gas

Tasmanian Gas Pipeline

Palisade (unlisted)

Bass Strait gas link

Gas storage / LNG import

Venice Energy, Squadron Energy, Viva Energy (proposed import terminals)

Various

Alternative southern supply to APA's north-to-south pipelines

Remote power (WA/QLD)

Zenith Energy

Unlisted

Off-grid mine power

Remote power

Pacific Energy

Unlisted (Pacific Equity/OPTrust)

Off-grid mine power

Remote and landfill power

EDL

Unlisted

Remote hybrid power

Firming generation (NEM)

AGL Energy, Origin Energy, Snowy Hydro, EnergyAustralia

Listed/state/unlisted

GPG and battery firming; Snowy also a customer

Electricity transmission

Transgrid, AusNet, ElectraNet, Powerlink

Unlisted / state

APA exited bidding for new east coast transmission in 2025

Competitor Detail

Metric (latest FY)APA Group

Revenue

A$2,764m excl. pass-through (FY26)

Revenue growth

+1.9% (FY26)

EBITDA margin

77.9% (FY26)

Listed?

Yes (ASX)

Company Snapshot

2,959

Employees

2000

Founded

Sydney, Australia

Headquarters

SWOT Analysis

Strengths

  • Dominant gas transmission franchise — transports roughly half of Australia's domestic gas (company claim); interconnected ECGG enables incremental expansions.
  • High-quality, inflation-linked revenue — ~86% of Energy Infrastructure revenue take-or-pay or regulated; ~84% investment-grade counterparties (FY26 presentation).
  • Margin expansion — underlying EBITDA margin up from ~73.3% (FY24, derived) to 77.9% (FY26).
  • Distribution record — 22 consecutive years of distribution growth; FY27 guidance 59c.
  • Credit standing — BBB/Baa2 unchanged since 2009/2010; FFO/Net Debt 11.2% vs 8.5% S&P threshold (FY26).
  • Execution on cost-out — A$80m delivered vs A$50m target; corporate costs −20.6% (FY26).
  • Favourable regulatory outcomes — SWQP non-scheme (Dec 2024); Bulloo Interlink 10-year light regulation; Basslink regulated revenue from Jul 2026.

Weaknesses

  • Thin equity / high leverage — FY25 borrowings A$13.98bn against equity A$2.67bn (ASA); equity fell 17.9% in FY25.
  • Flat free cash flow — FCF only rose from A$1,081m (FY22) to A$1,118m (FY26) despite ~29% EBITDA growth, as interest and tax absorbed gains.
  • Low statutory earnings — FY25 EPS 9.9c vs 57c distribution; underlying NPAT fell ~54% over five years (ASA).
  • Acquisition missteps — MSEP impairment A$144m (FY24); Orbost plant problems and impairment; investor criticism of debt-funded diversification.
  • Rising cost of debt — average interest rate 4.4% (FY23) → 5.3% (Dec 2025); FFO/interest 3.3x → 2.9x.
  • Single-country, single-currency earnings with significant foreign-currency debt requiring hedging (100% hedged/fixed).

Opportunities

  • ECGG Stage 3 and Bulloo Interlink — up to 800 TJ/d new capacity; A$480m already committed across 3A/3B early works.
  • Contracted GPG — Brigalow (A$1,015m APA share, 25-year offtake) is a template amid AEMO's projected ~13 GW GPG need.
  • Beetaloo Basin — Sturt Plateau Pipeline completed; first Beetaloo gas (Aug 2026) supports larger east coast pipelines over time.
  • Remote grids — Sybella Creek and Mount Isa diversification; Pilbara decarbonisation demand from miners.
  • Victorian security of supply — South West Pipeline expansion; supportive Energy Security Requirement proposal.
  • Data-centre energy solutions — pre-feasibility under way.

Threats

  • Policy/regulatory change — Gas Market Review could tighten pipeline regulation; Bulloo FID explicitly conditional on it.
  • Long-run gas demand erosion from electrification and net-zero policy.
  • Climate activism and capital access — 2025 requisitioned resolutions backed by CalPERS, NYC pension funds, KLP, Storebrand (reported); new requisitions for 2026 AGM.
  • Construction risk — A$1.27bn Brigalow and ECGG works concurrent; cost overruns would pressure FFO metrics.
  • Interest-rate and refinancing risk — €650m EUR MTN (Mar 2027) and US$447m 144A (Jul 2027) maturities in FY27–FY28.
  • Alternative supply — LNG import terminals in southern states could reduce north-to-south pipeline utilisation.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
Jun 2025Kevin Lester retires; Rob Evans joins as GE Infrastructure DeliveryDelivery capability for pipeline
Jul 2025Brigalow Pipeline Project Development and GTS agreements finalised with CS EnergyLocks in 35-year contracted revenue
19 Aug 2025Agreement to divest Networks business to AGIG (~A$47m; ~725 staff)Simplification
20 Aug 2025FY25 result: EBITDA A$2,015m (+6.4%), NPAT A$129m, FCF A$1,083m, DPS 57c; FY26 guidance EBITDA A$2,120–2,200m, DPS 58c; cost-out target ~A$50mTop-end of guidance
Aug 20252025 Climate Transition Plan releasedESG positioning
31 Aug 2025Amanda Cheney ceases as Company SecretaryGovernance
Oct 2025Vin Vassallo departs after exit from electricity transmission biddingStrategic narrowing
22 Oct 2025AGM: remuneration, CTP, director elections and CEO LTI pass; Market Forces resolutions defeated (~89% against)Investor support
1 Dec 2025JDA with CS Energy for 400MW Brigalow Peaking Power PlantGPG growth
Dec 2025S&P lowers FFO/Net Debt downside threshold to 8.5% (BBB stable confirmed)>A$1bn funding capacity
18 Dec 2025Agreement to sell 20% GDI stake to Stonepeak (~A$64m est.); shares +2.6% to A$9.38Exit gas distribution ownership
19 Feb 20261H26 result: EBITDA A$1,092m (+7.6%), NPAT A$95m (+179%), FCF A$556m; FY26 expected above guidance midpointPositive guidance bias
19 Feb 2026ECGG Stage 3: 3A FID (A$260m); 3B early works (A$220m); pipeline lifted to ~A$3.0bnMajor organic growth
Feb 2026AER greenfields incentive decision: Bulloo Interlink light-regulation non-scheme for 10 yearsRegulatory certainty
27 Feb 2026AER final Basslink 2026–30 transmission determinationRegulated revenue from Jul 2026
25 Mar 2026GDI divestment completed (A$62m)Simplification complete
Apr 2026Moody's lowers FFO/Debt downside threshold to 7%Funding capacity
23 Apr 2026A$1.5bn raise: A$1bn hybrids (incl. 30-year/7.5-year-call tranche at 6.77%) and A$500m 10-year senior notes (6.42%); ~4x oversubscribedPre-funds growth
19 Jun 2026Estimated final distribution announcedRoutine
9 Jul 2026Bulloo Interlink enters Commonwealth environmental assessment; FID expected later 2026Catalyst
17 Jul 2026South West Pipeline (Victoria) expansion announcedVictorian winter security
27 Jul 2026APA welcomes proposed Victorian Energy Security Requirement policySupportive policy
17 Aug 2026Requisitioned securityholder resolutions (0.01482% of securities) received for 22 Oct 2026 AGMClimate activism continues
20 Aug 2026FY26 result: EBITDA A$2,183m (+8.3%), margin 77.9%, NPAT A$234m, FCF A$1,118m, DPS 58c (22nd consecutive rise); FY27 guidance; pipeline ~A$3.5bnStrong result; FCF far ahead of consensus
20 Aug 2026Sybella Creek Solar & BESS FID (Evolution Mining ESA)Remote-grid growth
21 Aug 2026First gas from the Beetaloo reported in media coverageValidates Sturt Plateau Pipeline
16 Sep 2026FY26 final distribution (30.5c) paid; DRP at 1.5% discountCapital retention
~30 Sep 2026Brigalow full-form agreements: A$1,269m total, APA ~A$1,015m, completion early 2029Largest single organic commitment
22 Oct 2026 (scheduled)Annual MeetingChair succession, climate resolutions, remuneration

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

3 charts
Revenue by Segment: Segment revenue excl. pass-through rose from AUD 2,582 Mn in FY2024 to AUD 2,803 Mn in FY2026.
APA Group — Revenue by Segment
Series (AUD Mn)FY2024FY2025FY2026
Segment revenue excl. pass-through2,5822,7162,803
Statutory revenue excl. pass-through2,5912,7132,764
Underlying EBITDA1,8932,0152,183

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Sources

Sources

  1. APA Group, "APA delivers strong FY26 results and exceeds cost-out target, with further momentum on growth strategy", ASX release, 20 Aug 2026 (apa.com.au)
  2. APA Group, FY26 Appendix 4E summary and Results Presentation (as reported by Kalkine, Investing.com, StockWireX, Market Matters, Rivkin, Motley Fool AU, Yahoo Finance), 20 Aug 2026
  3. APA Group, 1H26 Appendix 4D and Interim Report and results release, 19 Feb 2026 (via Listcorp, InvestorPA, apa.com.au)
  4. APA Group, FY25 results release, 20 Aug 2025: FY24 results release, 28 Aug 2024 · FY23 results release, 23 Aug 2023; 1H25 and 1H24 releases
  5. APA Group, Debt investors information page (data at 31 Dec 2025), accessed Oct 2026
  6. APA Group, Board of Directors and Executive Leadership Team pages, accessed Oct 2026
  7. APA Group ASX releases: Networks divestment (19 Aug 2025) · GDI divestment (18 Dec 2025, 25 Mar 2026) · Brigalow JDA (1 Dec 2025); debt raises (8 Nov 2024, 23 Apr 2026) · Bulloo Interlink update (9 Jul 2026); s252L resolutions (17 Aug 2026); board changes (28 Aug 2024, 26 Sep 2024, 6 Mar 2024)
  8. Australian Energy Regulator: SWQP form-of-regulation final decision (6 Dec 2024) · Basslink 2026–30 final determination (27 Feb 2026) · Bulloo Interlink greenfields incentive decision · South West Pipeline advance capex consultation
  9. Australian Shareholders' Association: APA FY25 voting-intention report and 2025 AGM report (Oct 2025)
  10. Queensland Government ministerial statement on Brigalow (1 Dec 2025): ShareCafe, Motley Fool AU and StockWireX coverage of Brigalow full-form agreements (Sep 2026)
  11. Argus Media, Petroleum Australia, Pipeline & Gas Journal coverage of ECGG Stage 3 (Feb–Jul 2026)
  12. Capital Brief coverage of divestments, UniSuper block trade, Brigalow negotiations and 2025 AGM
  13. InvestSmart / Market Index / Zonebourse market data (share price, substantial holders, ISIN)

Unlock Company Contacts

Connect with Key Decision-Makers

Access verified employee contacts and decision-maker information from this company to support your sales, lead generation, and business development efforts.