ARSS Infrastructure Projects Limited Overview
ARSS Infrastructure Projects is a small Odisha-based civil EPC contractor. It began in 2000 as a stone-crushing and railway-earthwork business and grew into a mid-sized builder of railway track, bridges, road over-bridges (ROBs), state highways and irrigation works, mainly for Indian Railways zones and Odisha state agencies. Revenue peaked above INR 1,100 Cr around FY2012, three years after a 47-times-oversubscribed IPO. A decade of over-leverage, receivable disputes and losses then followed, ending in insolvency in November 2021. The NCLT-approved plan of August 2025 wrote off roughly 96% of INR 5,314 Cr of admitted claims and transferred control to Ocean Capital Market, the vehicle of iron-ore miner Dipti Ranjan Patnaik. The company now combines a small operating business (FY2026 revenue INR 146 Cr; order book about INR 952 Cr at Dec 2025) with a large portfolio of disputed arbitration claims. Its investment case rests almost entirely on whether execution and claim recoveries come through, and on governance under the new owner.
What the company does. ARSS is a construction contractor. It bids in public tenders for item-rate and EPC contracts and builds civil infrastructure for government owners. The company describes its core skill as railway construction:
-
formation earthwork
-
major and minor bridges
-
supply of ballast and sleepers
-
laying of sleepers and rails, and track linking
Around this core it has added roads and highways, bridges and flyovers, irrigation projects and EPC work for railways (Company business overview, as reproduced by Screener). Exchange-sourced profiles add more detail on railway services:
-
surveying, alignment and design of roads and railways
-
embankments and cuttings
-
road and rail bridges
-
fabrication and erection of steel girders
-
in-situ flash-butt welding of long rails
-
yard signalling and electrification
The same profiles also list urban, marine and power projects (Zonebourse/Investing.com company descriptions). An aggregator profile mentions irrigation hydro-mechanical work: design, supply and erection of radial gates and hoist bridges on trestles (Upstox profile).
Self-description in the latest filings. The FY2025 Directors' Report, issued during the insolvency process, calls the company a well-known name in Indian infrastructure. It records consolidation of a subsidiary toll company, an associate and about fifteen project joint ventures. In FY2025 XBRL filings the company reports a single segment, "Infrastructure / Constructions" (NSE XBRL, results of 28 May 2025). Infomerics (20 Mar 2026) describes ARSS as a Bhubaneswar-based infrastructure and construction company working in railways, roads, bridges and irrigation across India, supported by multiple crushers and hot-mix and wet-mix plants in Odisha.
Business model and revenue model. Revenue is almost entirely contract service revenue recognised over time on construction contracts. Morningstar notes that most revenue comes from the sale of services. The model has four parts:
Order acquisition: Competitive public tenders, standalone or through project-specific JVs. ARSS won its June 2026 Jagatsinghpur road contract at INR 21.47 Cr against a departmental estimate of INR 29.82 Cr, about 28% below estimate (Trade Brains, 24 Jun 2026). This shows the aggressive pricing typical of state-plan road tenders.
Execution: Self-perform earthwork, aggregates (captive crushers), bituminous and wet-mix works, and structures. Specialised scope is subcontracted. The forensic transaction audit showed that railway work allotted by RVNL was at one point paid directly into a subcontractor's account (NCLT order para 20).
Escalation and claims: Contracts generally carry price-variation clauses (Infomerics). Disputes over delay, scope variation and escalation have historically become arbitration claims. These claims are now the largest asset on the balance sheet.
Ancillary: Toll revenue from the subsidiary ARSS Damoh-Hirapur Tolls Pvt Ltd. Historically, crusher plants were rented to a related party (NCLT order, transaction-audit findings).
Revenue mix by type. The company does not disclose a split between product, service, subscription and licensing revenue. In substance, more than 95% is contract revenue, with small toll and other operating income.
Value-chain position. ARSS is a tier-2/tier-3 civil contractor. It sits below large EPC players and PSU project executors such as RVNL and Ircon, which often subcontract or package work to firms of its size, and above local labour contractors. It owns quarry and crusher assets in Odisha, which gives partial backward integration in aggregates and ballast.
Customer types and end-markets.
Independent characterisation. ARSS today is best seen as a post-insolvency shell rebuilding a regional EPC franchise. Three features drive the economics:
-
an operating business shrunk to about INR 15–80 Cr of quarterly revenue and still loss-making before exceptional items
-
an order book that is large relative to that revenue base, about 6x FY2025 revenue
-
a balance sheet whose equity depends mostly on arbitration receivables — the auditor disputes recognition of INR 708 Cr of them
The new owner brings capital access and political and industrial networks in Odisha. The company does not yet have an audited track record of profitable execution under that owner.
Strategy
Stated strategy themes. The approved plan and post-acquisition disclosures set out the following themes (paraphrased; no formal investor-day framework exists):
-
Going-concern revival under new ownership. OCML intends to run the company with its own new management team and to continue and grow its main businesses as a going concern (plan disclosure, 3 Sep 2025).
-
Capital and working-capital infusion. The plan budgets INR 178.33 Cr for revival: INR 45 Cr capex and INR 133.33 Cr fresh working capital, neither with a fixed timeline. It also budgets INR 62.60 Cr to secure bank guarantees (NCLT order para 46).
-
Order-book rebuilding in rail and roads. About INR 677 Cr of fresh orders under the new owner by early 2026 and INR 148 Cr more announced June–October 2026, focused on East Coast Railway ROBs and Odisha state roads.
-
Monetisation of arbitration claims. OCML is to pursue arbitration claims for five years; assenting creditors receive 50% of receipts within three years (plan clause 2.2(c)(iv)). Management recognised INR 708 Cr of new claims in FY2026, saying it is "virtually certain" of recovery based on favourable awards and legal advice. The auditor disputes this.
-
Sale of non-core assets. Disposal of non-core and obsolete assets listed in Schedule 7 of the plan.
-
Group restructuring optionality. The plan allows OCML to merge ARSS into itself or merge another investee into ARSS (reverse merger). A scheme filed within a year of the effective date was proposed to be exempt from shareholder and creditor meetings, and the NCLT approval is deemed to include in-principle approval (NCLT order para 72).
-
Minimum public shareholding compliance within three years through secondary capital infusion (plan disclosure).
-
Resolution-plan amendments. The company says it is preparing NCLT applications to amend plan provisions that are ambiguous or inconsistent with the IBC, within one year of the effective date (FY2026 auditor's Emphasis of Matter v).
Strategic initiatives in the last 24 months.
ESG / sustainability commitments. None disclosed.
Cost programmes. None with quantified targets disclosed.
Medium-term financial targets / guidance. None publicly disclosed. No revenue, margin or order-inflow guidance has been published.
Products & Services
ARSS sells construction services rather than branded products. The catalogue below lists each service line separately. Under single-segment reporting, each line maps to the one "Infrastructure" segment. Pricing for every line follows the public-tender model: item-rate or lump-sum EPC bids against a departmental estimate, usually with price-variation clauses. Launch year means the first documented year of the activity.
Order book (portfolio in execution).
The company does not disclose a full project-by-project order-book table publicly.
Product Portfolio
| # | Service line | Description & capabilities | Target customer | First documented | Flagship / named examples |
|---|---|---|---|---|---|
| 1 | Railway formation earthwork | Embankments, cuttings, blanketing for new lines and doubling | Indian Railways zones, RVNL | 2000s (founding business) | Projects across East Coast, South Eastern and South East Central Railways (company history) |
| 2 | Railway major & minor bridges | RCC/PSC and composite-girder bridges on rail alignments | Indian Railways, RVNL | 2000s | Not individually disclosed |
| 3 | Track works — ballast, sleepers, linking | Supply of ballast from captive crushers; supply and laying of sleepers and rails; track linking | Indian Railways | 2000s | — |
| 4 | Flash-butt welding of long rails (in-situ) | On-site rail welding for long-welded rail | Indian Railways | — | — |
| 5 | Yard signalling & electrification | Station-yard signalling and electrification packages | Indian Railways | — | — |
| 6 | Steel girder fabrication & erection | Fabrication and launching of steel girders, including camel-back truss spans | Indian Railways | — | INR 52.66 Cr ECoR ROB with 1 x 60 m camel-back truss and 1 x 24 m composite girder, Cuttack–Paradeep line km 491/17-19 (LoA 15 Jul 2026) |
| 7 | Road over-bridges (ROBs) | Grade separators replacing level crossings, with composite (rail) and RCC (approach) girders | East Coast Railway | — | INR 51.60 Cr ROB near Motari–Kanas Road, Khurda–Puri line, 24-month completion (LoA 29 Jun 2026) |
| 8 | Roads & highways — widening/strengthening | State-plan widening, strengthening and multi-laning | Odisha Works Department (R&B divisions) | Pre-2010 | INR 21.47 Cr Dengapola–Champahat road (14.647 km), Jagatsinghpur, 16 months; INR 22.67 Cr Cuttack City Ring Road 6-laning, 8 months |
| 9 | Bridges & flyovers (urban) | Major urban bridges | Odisha state/municipal agencies | Pre-2010 | Five major bridges in Bhubaneswar (company history) |
| 10 | Irrigation works | Canals, structures and hydro-mechanical works (radial gates, hoist bridges on trestles) | State water-resources departments | Pre-2010 | Not individually disclosed |
| 11 | Survey, alignment & design | Topographic survey and alignment design for roads/railways (EPC front-end) | EPC employers | — | — |
| 12 | Urban, marine & power civil works | Listed in exchange-sourced profiles | Government/PSU owners | — | Temporary rail connectivity to MMLP Paradip, INR 2.20 Cr (Apr 2022) |
| 13 | Aggregates & construction materials (captive) | Stone crushers (Khurda, Ganjam and others), hot-mix and wet-mix plants in Odisha | Captive use; historically rented to related parties | 2,006 | Crusher plants rented to related party SCPL (transaction-audit finding) |
| 14 | Toll operations | Toll collection via ARSS Damoh-Hirapur Tolls Pvt Ltd | Road users / concession authority | — | Damoh–Hirapur toll road |
“—” = not publicly disclosed.
| Order-book metric | Value | Date | Source |
|---|---|---|---|
Pending order book | INR 951.96 Cr | 31 Dec 2025 | Infomerics, 20 Mar & 26 May 2026 |
Order book / FY2025 revenue | 5.76x | 31 Dec 2025 | Infomerics |
Fresh orders secured under new management | ~INR 676.80 Cr | Cumulative to ~Mar/May 2026 | Infomerics |
Geographic composition | Odisha, Andhra Pradesh, Madhya Pradesh | Dec 2025 | Infomerics |
Orders announced Jun–Oct 2026 | INR 148.40 Cr (21.47 + 51.60 + 52.66 + 22.67) | 23 Jun–12 Oct 2026 | Exchange disclosures via news wires |
Financial Narrative
Basis. Consolidated figures from Screener/C-MOTS (exchange filings) unless noted. Blank cells mean not publicly disclosed or not meaningful.
Comparability warning. FY2022–FY2025 accounts were prepared while the company was in CIRP under the Resolution Professional. Interest on defaulted debt was apparently not accrued: borrowings stayed flat near INR 1,630 Cr, and INR 2,237 Cr of creditor-claimed interest was later recognised as an FY2026 exceptional item. The auditor notes that FY2026 is not strictly comparable with FY2025.
Income statement
Sources: Screener consolidated (FY2022–FY2026); FY2026 basic/diluted EPS of INR -394.32 from the company's consolidated XBRL (30 May 2026). Screener's FY2026 EPS of INR -1,562.83 divides by the pre-plan share count and is not comparable. CMOTS reports FY2026 consolidated net loss of INR 3,553.57 Cr and revenue of INR 145.79 Cr (-11.85% YoY). Gross profit is not reported, because the company presents expenses by nature. EBIT is computed as EBITDA less D&A.
Margins and growth
Four-year revenue CAGR FY2022→FY2026: -15.7% (analyst computation: (146/289)^(1/4) − 1). Screener reports 5-year compounded sales growth of -10% and 10-year of -13%. Infomerics reports EBITDA margins of -14.63% (FY2024) and -8.03% (FY2025).
Quarterly trajectory (recovery under new management)
Source: Screener consolidated quarterly results. Q4 FY2026 revenue rose about 205% YoY to INR 77.45 Cr with a positive operating margin of ~11.6%, but the quarter's net loss of INR 210.53 Cr was driven by exceptional items (CMOTS, 1 Jun 2026). Q1 FY2027 (June 2026) revenue fell back to INR 15 Cr with a net loss of INR 11 Cr, after INR 6 Cr of interest on the OCML loan.
Balance sheet
Sources: Screener consolidated balance sheet. Infomerics gives total debt of INR 1,628.53 Cr (FY2024) and INR 1,628.57 Cr (FY2025), and tangible net worth of INR -167.86 Cr and INR -174.49 Cr. The NCLT disclosure gives pre-CIRP net worth of about INR -163.79 Cr and total assets of INR 1,584.49 Cr at 31 Mar 2025 (standalone). Cash and the short/long debt split were not available in the retrieved summaries (not publicly disclosed in the sources reviewed). The working-capital line is a rough analyst proxy, because the other-assets line includes non-current arbitration claims.
FY2026 standalone balance sheet and audit-qualification adjustments (INR Cr).
Source: Statement on Impact of Audit Qualifications, FY2026 (NSE filing, 17 Jul 2026).
FY2026 exceptional items (standalone, INR Cr).
Source: Notes to FY2026 audited results.
Interpretation. The headline loss of INR 3,555 Cr is not an operating loss. It is mainly an accounting catch-up. Creditor claims of about INR 3,280 Cr (unaccrued interest plus unrecorded liabilities) were booked as liabilities and then extinguished through the debt-for-equity conversion. That conversion was credited to equity, not to profit. The conversion is the main reason reserves swung from INR -192 Cr to INR +865 Cr while the P&L showed a large loss.
Cash flow
Source: Screener consolidated cash flows. Capex is derived as OCF minus FCF.
Note on FY2026 financing flow. The small FY2026 financing inflow (INR 22 Cr) looks inconsistent with the INR 207.69 Cr paid to creditors. The likely reason is that OCML made that payment directly and booked it as a loan to the company: the auditor's qualification refers to an OCML loan classified as secured borrowing. This explains why most of the restructuring did not pass through the company's cash flow statement (analyst interpretation).
Ratios
Sources and notes:
-
ROCE, debtor/inventory/payable days and CCC from Screener (consolidated).
-
FY2025 interest coverage of -29.37x from Infomerics. Other coverage figures, ROA, asset turnover and FY2026 D/E are analyst computations from the tables above.
-
ROE is not meaningful (negative equity FY2022–FY2025; FY2026 distorted by restructuring).
-
Overall gearing per Infomerics was -9.31x (FY2024) and -8.90x (FY2025).
Trend commentary
Revenue: shrinking, then a fragile rebound. Revenue fell from a FY2012 peak of about INR 1,183 Cr to INR 248 Cr in FY2021. The causes were the debt burden, disputed receivables and loss of bidding credentials. FY2023's rebound to INR 403 Cr reflected completion of legacy work during CIRP. As that work ran off, revenue fell to INR 165 Cr in FY2025 and INR 146 Cr in FY2026. Infomerics links the FY2023–FY2025 decline to limited order inflow, execution problems and liquidity constraints during CIRP. The inflection came in Q3–Q4 FY2026 (INR 38 Cr and INR 77 Cr), as the new owner restored bank-guarantee lines (ICICI BG facility of INR 62.60 Cr continued under the plan) and mobilised new orders. Q1 FY2027 revenue of INR 15 Cr shows the recovery is not yet steady; Q1 is also seasonally weak because of the monsoon.
Margins: structurally negative. EBITDA has been negative in every year since FY2020. Three factors explain this:
-
under-absorbed fixed site and head-office costs at low volumes
-
write-downs of inventory/WIP and receivables (the INR 115 Cr operating loss in Q1 FY2026 on INR 19 Cr revenue suggests clean-up charges)
-
unreliable contract accounting — the auditor has qualified non-compliance with construction-contract revenue standards since FY2013-14 and says contract-wise surplus or deficit is not determined
Q4 FY2026's 11.6% operating margin is the first clearly positive quarter in the series. The lowest-cost bids now being won, about 28% below estimate in the Jagatsinghpur road tender, make it harder to sustain such margins.
Balance sheet: rebuilt, but resting on claims. The plan cut borrowings from INR 1,632 Cr to INR 264 Cr and turned net worth from about INR -169 Cr to about INR +955 Cr (consolidated). Without the arbitration claims the auditor disputes, standalone net worth would be about INR 263 Cr. Fixed assets are only INR 35 Cr, and land and buildings were valued at about INR 12 Cr average fair value during CIRP. So nearly all remaining equity depends on collecting arbitration and contract receivables. The resolution plan gives assenting creditors 50% of arbitration receipts within three years of the effective date, with INR 10 Cr already advanced against that share. Shareholders are therefore entitled to only part of any recovery.
Cash generation: negative. Operating cash flow was negative in FY2025 and FY2026 (about INR -30 Cr each year). With receivable days now about 150 and new projects needing performance guarantees (for example INR 5.26 Cr for the July 2026 ECoR order), growth will consume working capital. The INR 250 Cr preference-share programme approved in July 2026, priced to give OCML a 12% IRR, is the planned funding source.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Results by Segment and Segment Margins & Growth (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Infrastructure/Construction segment revenue (INR Cr) | 289 | 403 | 321 | 165 | 146 |
Segment revenue YoY growth (%) | 16.5 | 39.4 | -20.3 | -48.6 | -11.8 |
Segment share of total revenue (%) | 100 | 100 | 100 | 100 | 100 |
Segment operating profit / EBITDA (INR Cr) | -122 | -8 | -46 | -13 | -113 |
Segment operating margin (%) | -42.0 | -2.0 | -14.0 | -8.0 | -78.0 |
Segment pre-tax income (INR Cr) | -108 | 8 | -33 | -7 | -3,551 |
Group Entities
| Entity | Relationship | Notes |
|---|---|---|
ARSS Infrastructure Projects Ltd | Parent | Listed EPC company |
ARSS Damoh-Hirapur Tolls Pvt Ltd | Subsidiary | Toll road SPV, presumably in Madhya Pradesh (Damoh district) given the name. Avisek Agarwalla appointed CEO effective 1 Jul 2026 |
ARSS Developers Ltd | Associate | Fully consolidated per Infomerics |
Atlanta-ARSS JV | Project JV | — |
ARSS-SCPL JV; SCPL-ARSS JV | Project JVs | SCPL was also a related-party subcontractor flagged by the transaction auditor |
ARSS-LGPPL JV; ARSS-BDPL JV; ARSS-Thakur JV; ARSS-SNKI JV; ARSS-Royal JV; ARSS-SIPS JV; ARSS-BMS JV; ARSS-Technocom Priyashi Aashi JV (Kamrup, Assam address); ARSS-KKMPL JV; ARSS-NTLLP JV | Project JVs | Unincorporated JVs/AOPs for specific tenders |
HCIL-Adhikarya-ARSS JV | Project JV | Listed in the FY2025 Directors' Report |
Income Statement and Per-Share Data
| Metric (INR Cr) | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue from operations | 289 | 403 | 321 | 165 | 146 |
Total operating expenses | 411 | 411 | 367 | 178 | 259 |
EBITDA (operating profit) | -122 | -8 | -46 | -13 | -113 |
Other income incl. exceptional items | 17 | 18 | 15 | 8 | -3,425 |
Finance costs | 2 | 1 | 1 | 1 | 12 |
Depreciation & amortisation | 1 | 1 | 1 | 1 | 1 |
Pre-tax income | -108 | 8 | -33 | -7 | -3,551 |
Pre-tax income before exceptional items | -108 | 8 | -33 | -7 | -117 |
Net income | -110 | 6 | -35 | -8 | -3,554 |
Basic EPS (INR, company-reported basis for FY2026) | -48.56 | 2.60 | -15.32 | -3.42 | -394.32 |
Diluted EPS (INR) | -48.56 | 2.60 | -15.32 | -3.42 | -394.32 |
Dividend per share (INR) | 0 | 0 | 0 | 0 | 0 |
Operating income (EBIT) | -123 | -9 | -47 | -14 | -114 |
Margin Analysis (%)
| Metric (%) | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue growth YoY | 16.5 | 39.4 | -20.3 | -48.6 | -11.8 |
EBITDA margin | -42.0 | -2.0 | -14.0 | -8.0 | -78.0 |
Operating (EBIT) margin | -42.6 | -2.2 | -14.6 | -8.5 | -78.1 |
Net margin | -38.1 | 1.5 | -10.9 | -4.8 | -2,434.2 |
Income Statement
| Metric (INR Cr) | Q1FY25 | Q2FY25 | Q3FY25 | Q4FY25 | Q1FY26 | Q2FY26 | Q3FY26 | Q4FY26 | Q1FY27 |
|---|---|---|---|---|---|---|---|---|---|
Revenue | 87 | 34 | 20 | 25 | 19 | 11 | 38 | 77 | 15 |
EBITDA | 1 | -2 | -1 | -11 | -115 | -5 | -2 | 9 | -6 |
Finance costs | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 11 | 6 |
Net income | 1 | 1 | 0 | -10 | -116 | -3,227 | 0 | -211 | -11 |
Balance Sheet
| Metric (INR Cr) | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Total assets | 1,588 | 1,592 | 1,602 | 1,580 | 1,274 |
Fixed assets (net) | 35 | 37 | 36 | 36 | 35 |
Investments | 2 | 2 | 2 | 4 | 8 |
Other assets (receivables, claims, inventory, cash) | 1,551 | 1,554 | 1,563 | 1,540 | 1,230 |
Total borrowings | 1,628 | 1,626 | 1,632 | 1,632 | 264 |
Other liabilities | 93 | 93 | 132 | 117 | 55 |
Equity share capital | 23 | 23 | 23 | 23 | 90 |
Reserves & surplus | -156 | -150 | -184 | -192 | 865 |
Total equity (net worth) | -133 | -127 | -161 | -169 | 955 |
Working capital (other assets less other liabilities) | 1,458 | 1,461 | 1,431 | 1,423 | 1,175 |
Financial Analysis
| Item | As reported | Adjusted for auditor qualifications | Difference |
|---|---|---|---|
Total income | 153.26 | 153.26 | 0 |
Total expenditure | 271.73 | 260.51 | -11.23 (disputed OCML interest) |
Net profit / (loss) | -3,554.98 | -4,252.08 | -697.10 |
EPS (INR) | -394.48 | -471.83 | -77.35 |
Total assets | 1,277.31 | 568.99 | -708.32 (arbitration claims) |
Total liabilities | 317.63 | 306.40 | -11.23 |
Net worth | 959.68 | 262.59 | -697.09 |
Components
| Component | Amount |
|---|---|
(a) Extinguishment of operational creditor and government dues (gain) | -50.39 |
(b) Interest payable to financial creditors as per claims filed | 2,237.24 |
(c) Financial-creditor liability not previously recorded | 1,042.87 |
Sub-total A — plan-related charge | 3,229.71 |
(d) Arbitration claims written off (to award/expected realisation) | 912.74 |
(e) New arbitration claims recognised (gain) — qualified by auditor | -708.32 |
Sub-total B — arbitration re-measurement | 204.42 |
Net exceptional loss (A+B) | 3,434.13 |
Cash Flow
| Metric (INR Cr) | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Operating cash flow | -1 | 9 | 28 | -30 | -29 |
Investing cash flow | -3 | -4 | -2 | -3 | 4 |
Financing cash flow | -1 | -1 | 0 | 0 | 22 |
Net cash flow | -6 | 4 | 26 | -33 | -3 |
Capital expenditure (derived) | 3 | 3 | 0 | 0 | 3 |
Free cash flow | -4 | 6 | 28 | -30 | -26 |
Dividends paid | 0 | 0 | 0 | 0 | 0 |
Share buybacks | 0 | 0 | 0 | 0 | 0 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
ROA (%) | -6.9 | 0.4 | -2.2 | -0.5 | -279.0 |
ROCE (%) | -7 | 1 | -2 | -1 | -8 |
Debt / equity (x) | — | — | — | — | 0.28 |
Interest coverage (EBITDA / interest, x) | -61.0 | -8.0 | -46.0 | -29.37 | -9.4 |
Asset turnover (x) | 0.18 | 0.25 | 0.20 | 0.10 | 0.11 |
Debtor days | 13 | 11 | 10 | 20 | 150 |
Inventory days | 94 | 205 | 385 | 1,120 | 418 |
Payable days | 74 | 164 | 417 | 646 | 134 |
Cash conversion cycle (days) | 32 | 51 | -22 | 494 | 433 |
Revenue by Region and Region Margins & Growth (%)
| Region | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
India revenue (INR Cr) | 289 | 403 | 321 | 165 | 146 |
Outside India revenue (INR Cr) | 0 | 0 | 0 | 0 | 0 |
India revenue growth YoY (%) | 16.5 | 39.4 | -20.3 | -48.6 | -11.8 |
State Details
| State | Evidence | Direction |
|---|---|---|
Odisha | Registered office, crusher/hot-mix plants, land parcels, and all four orders announced Jun–Oct 2026 (ECoR ROBs, Jagatsinghpur and Cuttack roads) | Core and growing — new owner's home state |
Andhra Pradesh | Part of Dec 2025 order book (Infomerics) | Continuing, size not disclosed |
Madhya Pradesh | Part of Dec 2025 order book; Damoh–Hirapur toll SPV | Continuing |
Tamil Nadu | Land at Tipampatti; Royapettah sales-tax claim (CIRP) | Legacy |
West Bengal, Assam | West Bengal commercial-tax claim; Kamrup-based JV | Legacy |
Monthly Close Details
| Monthly close (INR, BSE) | Dec-24 | Jan-25 | Feb-25 | Mar-25 | Apr-25 | May-25 | Jun-25 | Jul-25 | Aug-25 | Sep-25 |
|---|---|---|---|---|---|---|---|---|---|---|
Close price | 25.60 | 30.03 | 26.19 | 34.39 | 38.64 | 57.43 | 54.56 | 55.75 | 47.39 | 54.84 |
Return measure
| Return measure | Value | Source / note |
|---|---|---|
1-year (to last trade, 3 Sep 2025) | 52-week range INR 16.00 – INR 60.33/60.45, so roughly +200% from the low | Upstox, Torus, Arihant |
3-year | ~+161% (Anand Rathi, Sep 2026); 3-year price CAGR ~40% (Screener) | Aggregators; sources differ |
5-year | Price CAGR ~12–14% | Screener |
10-year | Price CAGR about -4% to -5% | Screener |
Since IPO (INR 450, Mar 2010) | About -88% | Analyst computation |
Valuation Multiples
| Multiple | ARSS | Basis |
|---|---|---|
Market cap (INR Cr) | 489 | 9,01,18,498 shares × INR 54.27 |
Enterprise value (INR Cr) | ~753 | Market cap + INR 264 Cr borrowings (cash not disclosed, so not deducted) |
EV/Sales (x) | ~5.2 | EV / FY2026 revenue of INR 146 Cr |
P/B on reported book (x) | ~0.51 | Standalone net worth INR 959.68 Cr |
P/B on qualification-adjusted book (x) | ~1.86 | Adjusted net worth INR 262.59 Cr |
Margin Analysis (%) — Promoter holding
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Promoter holding (%) | 46.70 | 46.70 | 46.70 | 46.70 | 84.89 |
Public holding (%) | 53.30 | 53.30 | 53.30 | 53.26 | 15.10 |
Number of shareholders | 16,923 | 15,898 | 15,420 | 14,776 | 13,768 |
Shares outstanding (Cr) | 2.27 | 2.27 | 2.27 | 2.27 | 9.01 |
Capital Markets
| Item | Status |
|---|---|
Sell-side analyst coverage / consensus | None identified |
Dividend history | Nil dividends in every year shown (FY2015–FY2026) |
Dividend policy | No dividends expected; NCRPS carry only a 0.01% dividend |
Credit Ratings
| Agency | Facility | Rating | Outlook | Date | Status |
|---|---|---|---|---|---|
Infomerics | LT fund-based INR 10 Cr (TL INR 5 Cr maturing Mar 2031; CC INR 5 Cr) | IVR BB | Stable | 20 Mar 2026; reaffirmed 26 May 2026 | Withdrawn 26 May 2026 at company request |
Infomerics | ST non-fund-based INR 90 Cr (BG INR 15 Cr + INR 75 Cr) | IVR A4 | — | Same | Withdrawn |
CRISIL | Bank facilities | — | — | 19 Nov 2013 | Historic |
Moody's / S&P / Fitch | — | Not rated | — | — | — |
Debt instrument | Amount (INR Cr) | Cost | Maturity | Source | — |
Loan from OCML (classified as secured; security not registered at FY2026 year-end) | ~208 (plan upfront amount), within total borrowings of INR 264 Cr | 9% p.a. (per sanction letter; disputed by auditor) | — | FY2026 audit qualification | — |
Bank term loan | 5 | — | Mar 2031 | Infomerics | — |
Cash credit | 5 (limit) | — | Revolving | Infomerics | — |
Bank guarantees (non-fund) | 90 rated; ICICI INR 62.60 Cr continued | BG commission | Rolling | Infomerics; NCLT order | — |
NCRPS to OCML (proposed) | 250 | 12% IRR via redemption premium | — | Board outcome 23 Jul 2026 | — |
“—” = not publicly disclosed.
Analyst Conclusions
Management guidance. None published. Management's only quantified forward-looking statements are the claim-recovery assertions in the FY2026 audit-qualification response and the funding provisions of the plan (INR 133.33 Cr working capital and INR 45 Cr capex, untimed). Plan sources of funds assumed INR 100 Cr of bank cash credit and INR 30 Cr of bank term loans; only INR 5 Cr and INR 5 Cr respectively appear in the rated facilities.
Consensus expectations. No consensus exists. Infomerics expected gradual scale-up from the order book over about three years, subject to timely execution and mobilisation.
Bull case.
-
Order book converts. INR 952 Cr pending at Dec 2025 plus about INR 148 Cr of new 2026 orders, executed over about three years, implies run-rate revenue of roughly INR 300–400 Cr. That is 2–3x FY2026 revenue and enough to absorb overheads, as Q4 FY2026's 11.6% operating margin suggests is possible.
-
Claims are monetised. If even a fraction of the INR 708 Cr of newly recognised claims and the remaining award receivables is collected (management cites favourable awards in a significant portion), the cash would far exceed the INR 489 Cr implied market value, even after creditors' 50% share.
-
Sponsor funding removes the liquidity constraint. INR 250 Cr of NCRPS, together with the continued ICICI BG lines, would let ARSS bid for larger railway packages funded by record railway capex (INR 2.93 lakh Cr, FY2027).
Bear case.
-
Equity is mostly disputed paper. Excluding the qualified claims, net worth is about INR 263 Cr. With FY2026 OCF of INR -29 Cr and 9–12% sponsor capital accruing, losses before exceptional items (INR 117 Cr in FY2026, INR 11 Cr in Q1 FY2027) can erode that base quickly.
-
Governance and legal overhangs are getting worse. Since August 2026: the MD has resigned, the CMD role has been combined, the ED has searched the registered office, and the nominee of 81.56% has withdrawn. The auditor also found a related-party loan without demonstrated prior approvals. Each development raises the risk of bank or employer caution and of delayed or contested listing of plan shares.
-
Low-margin, concentrated growth. New orders are small (INR 21–53 Cr), won at steep discounts (about 28% below estimate), and concentrated in Odisha. This limits operating leverage, while the contract-accounting weakness qualified for 13 years means reported margins may not be reliable.
Key catalysts and monitorables (next 12 months).
Concluding analyst verdict.
ARSS Infrastructure Projects is not an operating-company investment in the usual sense. It is a special situation that combines a small regional EPC business, a disputed claims portfolio and an unsettled ownership structure. The insolvency outcome was decisive for the company: about INR 5,000 Cr of liabilities were removed for about INR 218 Cr of cash, liquidation was avoided, and a well-resourced Odisha industrial family took control. Early operating signals are encouraging. Revenue tripled year-on-year in Q4 FY2026, East Coast Railway has awarded two technically demanding ROBs, and the order book is about six times FY2025 revenue in a market supported by record railway capex.
The investment case, however, depends on evidence the company has not yet produced. Its auditor rejects recognition of INR 708 Cr of claims, which would leave net worth near INR 263 Cr rather than INR 960 Cr. It has not generated operating cash in two years, and its new capital comes from its own sponsor at 9–12%. Within six weeks in autumn 2026, the Enforcement Directorate searched its head office and the fund holding 81.56% of its shares withdrew as nominee. Combined with the MD's exit and the merger of the chair and CEO roles, these events raise the governance-risk premium at exactly the point when the company needs bank guarantees and employer confidence to grow.
Shares have not traded since September 2025. Any re-listed price will depend mainly on how these questions are resolved, not on near-term earnings. Until there is a clean audit, a named and stable controlling holder, clarity on the ED matter, and two or more quarters of positive operating cash flow, ARSS should be treated as highly speculative. The asymmetric upside from claim recoveries is real but unproven. The downside — further dilution, plan litigation or regulatory action — remains material. Rating stance (analyst, not a recommendation): High risk / Monitor; insufficient information for a fundamental valuation.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Since | Background (as disclosed) | Age |
|---|---|---|---|---|
Dipti Ranjan Patnaik (DIN 00600887) | Chairman & Managing Director. Executive Chairman 29 Sep 2025; CMD for five years from 14 Aug 2026 (approved at AGM 29 Sep 2026) | Sep 2025 | Promoter of Ocean Capital Market Ltd and the Altrade group (mining, iron & steel, hospitality, healthcare, exports, cement, infrastructure). With his wife Indrani Patnaik, described as among India's largest iron-ore mine owners, with combined net worth of about INR 4,000 Cr. Group previously revived Maithan Ispat. Over 40 years of experience (NCLT order; Infomerics). Wikipedia lists him as a brother of Odisha politicians Niranjan Patnaik and Soumya Ranjan Patnaik | — |
T. K. (Thirumalisai Krishnamachari) Padmanaban | Non-executive independent director | Sep 2025 | Not disclosed in retrieved sources | — |
Payal Agarwal | Non-executive independent woman director | Sep 2025 | Not disclosed in retrieved sources. | — |
Manoranjan Panigrahy | Independent director | 2025 | — | — |
Rajendra Biswal (ACS A76448) | Company Secretary & Compliance Officer | 23 Jul 2026 | — | — |
Avisek Agarwalla | CEO, ARSS Damoh-Hirapur Tolls Pvt Ltd (subsidiary) | 1 Jul 2026 | Commerce graduate with about eight years' experience in crusher plants and road/rail project execution | ~29 |
CFO | Not identified in retrieved filings | — | — | — |
“—” = not publicly disclosed.
Board & Management Changes
| Date | Change | Context |
|---|---|---|
29 Sep 2025 | Monitoring Committee appoints D.R. Patnaik as Executive Director and Chairman, G.K. Dash (DIN 10776309) as MD, and new independent directors including Payal Agarwal and T.K. Padmanaban | Plan implementation; suspended (erstwhile) board replaced |
Dec 2025 | EGM approves remuneration of Chairman (from 29 Sep 2025) and MD, including minimum remuneration if profits are inadequate. 58 shareholders holding 1,254 shares attended by video conference | BSE filing 22 Dec 2025 |
23 Jul 2026 | Rajendra Biswal appointed CS | — |
11 Aug 2026 | G.K. Dash resigns as MD; board accepts | Under one year in office; no reason in retrieved summaries |
14 Aug 2026 | D.R. Patnaik re-designated CMD | Combines chair and CEO roles |
29 Sep 2026 | AGM approves CMD designation among six resolutions | — |
Board of Directors — Subash Agarwal
| Name | Role | Status |
|---|---|---|
Subash Agarwal | Chairman & whole-time director | Removed; promoter shares extinguished |
Rajesh Agarwal | Managing Director | Removed |
Sunil Agarwal | President & CEO | Removed |
Janhabi Deo | Woman independent director | Replaced |
Bhushan Kumar Makhija | Independent director (ex-RITES Director Projects) | Historic |
Rajender Parshad Indoria | Independent director (from Jan 2021) | Historic |
Uday Narayan Mitra | IRP/RP (Nov 2021–Aug 2025); chaired 25th AGM | Discharged 29 Aug 2025 |
Prakash Chhajer | Company Secretary during CIRP | Historic |
Directors' Remuneration
| Executive | Total remuneration, FY2026 (as presented; likely INR Lakh) |
|---|---|
Dipti Ranjan Patnaik | 300.00 |
Gopal Krishna Dash | 12.00 |
Governance Overview
| Attribute | Status |
|---|---|
Board size | 4 directors after the MD's exit (CMD + 3 independents), per MCA/Tracxn and filings |
Independence | 3 of 4 independent (75%) |
Women directors | 1 (Payal Agarwal) |
Chair / CEO separation | None since 14 Aug 2026 — Chairman is also MD |
Related-party oversight | Auditor found that prior Audit Committee and Section 188 approvals for the OCML loan had not been demonstrated. Management says approval was given before the FY2026 accounts were finalised |
Major Shareholders
| Holder | Shares | % | Category | Notes |
|---|---|---|---|---|
Roger Bravo Secured Development Fund (managed by Roger Bravo AIF, SEBI Reg. IN/AIF2/21-22/0878) | 7,35,00,000 | 81.56 | Promoter group (OCML nominee) | 100% locked in for 3 years. Withdrew as nominee 6 Oct 2026; listing application for these shares pending; demat credit not completed |
Ocean Capital Market Ltd | 30,00,000 | 3.33 | Promoter | Subscribed for INR 3 Cr; 18-month lock-in |
CFM Asset Reconstruction Pvt Ltd | 11,70,012 | 1.30 | Public (assenting FC) | Part of the 15 lakh shares allotted to assenting financial creditors |
Other assenting financial creditors | 3,29,988 | 0.37 | Public | Balance of the 15 lakh creditor shares |
Resident individuals > INR 2 lakh share capital (85 holders) | 54,76,776 | 6.08 | Public | Mar 2026 |
Other public | ~66,41,722 | ~7.37 | Public | Residual (analyst computation) |
Total | 9,01,18,498 | 100.00 | — | — |
Competitive Landscape
Peer Comparison FY2026
| # | Competitor | Segment overlap | Market cap (INR Cr) | P/E (x) | Positioning vs ARSS |
|---|---|---|---|---|---|
| 1 | Larsen & Toubro | Rail, roads, bridges (large-ticket) | 543,950 | 50.3 | Tier-1 EPC; competes only for large packages; vastly larger |
| 2 | Rail Vikas Nigam Ltd (RVNL) | Railway projects; also an ARSS customer | 49,822 | 62.2 | PSU executor and package awarder; both rival and customer |
| 3 | IRB Infrastructure Developers | Roads (BOT/TOT/EPC) | 25,726 | 25.7 | National highways scale; little overlap with small state roads |
| 4 | Kalpataru Projects International | Railways, B&F, T&D | 21,957 | 20.6 | Diversified EPC with railway vertical |
| 5 | Cemindia Projects (formerly ITD Cementation) | Marine, urban, rail civil | 17,598 | 29.6 | Heavy civil/marine specialist |
| 6 | KEC International | Railways (civil, electrification), T&D | 13,258 | 38.9 | Strong in railway electrification and civil works |
| 7 | Engineers India | Consultancy/EPC | 12,820 | 20.1 | Limited direct overlap |
| 8 | Ircon International | Railway construction (domestic and overseas) | 12,739 | 20.6 | Railway PSU with direct overlap in track and bridges |
| 9 | PNC Infratech | Roads, highways | — | — | Bid for ARSS in CIRP; mid-cap road EPC |
| 10 | Regional Odisha contractors (unlisted) | State roads, ROBs | Not applicable | Not applicable | Most direct price competitors in ARSS's current order mix |
Peer Comparison FY2026 (Annual)
| Metric | ARSS (FY2026) | RVNL | Ircon | KEC International |
|---|---|---|---|---|
Market cap (INR Cr) | ~489 (post-plan shares at last price) | 49,822 | 12,739 | 13,258 |
P/E (x) | n.m. (loss) | 62.2 | 20.6 | 38.9 |
Revenue (INR Cr) | 146 | — | — | — |
Revenue growth (%) | -11.8 | — | — | — |
EBITDA margin (%) | -78 | — | — | — |