Artefact Projects Limited Overview
-
The company's own website timeline places the BSE listing in 1995.
-
Simply Wall St (from S&P data) shows equity listed on BSE from July 2005.
-
GuruFocus shows an "IPO date" of 11 September 2000.
The 1995 date from the company is treated as authoritative. The later dates probably reflect changes to demat or trading status.
Artefact Projects Limited is a Nagpur-headquartered infrastructure consultancy with almost four decades of corporate history. It earns essentially all of its revenue from engineering, architectural and project-management consultancy for Indian public infrastructure, mainly national highways.
The company's main franchise is in Independent Engineer (IE), Authority's Engineer (AE) and Supervision Consultant (SC) mandates from the National Highways Authority of India (NHAI). These are multi-year, fee-based contracts, typically 36–60 months, covering projects in the construction or operation-and-maintenance (O&M) phase. They are usually won in joint ventures or associations with domestic and international consultancies.
The company is very small: FY2026 revenue from operations was ₹32.25 cr and the market capitalisation is about ₹35 cr. It trades at roughly half of book value and has been consistently profitable since FY2019. Its weaknesses are concentration on a single customer, receivables that are slow to convert to cash, and persistently negative operating cash flow.
In September 2026 the company won its first railway project-management mandate, worth ₹21.13 cr, from South Central Railway. This is a strategic step toward diversifying away from highways.
The company's own description
The company's FY2025 annual report (BSE, cited via Screener) describes the business as project consultancy undertaken as consulting engineers, architects and planners.
The company's 2026 website describes Artefact as a premier infrastructure consultancy with more than three decades of work across India. It says the firm specialises in highways and transportation infrastructure, provides services spanning engineering, planning, design and project management, and serves government agencies and industry stakeholders end to end.
The company's standard press boilerplate, carried in Capital Market–Live News syndications, describes it as providing engineering, architectural and project-management services for infrastructure projects, "especially highways". The boilerplate also claims a global presence through collaboration with international consultants.
Older company profiles (MarketsMOJO "Company CV") list five service sectors:
-
Highways
-
Urban infrastructure
-
Airports
-
Mining services
-
Railways
Independent characterisation
In practice Artefact is a highway-supervision fee business. Nearly all of the order inflow disclosed between 2024 and 2026 comes from NHAI. The disclosed contracts are mostly of two kinds:
Independent Engineer (IE) services: These cover Build-Operate-Transfer (BOT) and Hybrid Annuity Model (HAM) concessions in their construction and O&M periods. The IE is a neutral engineer appointed jointly under the concession agreement who certifies milestones, completion and O&M compliance.
Supervision Consultant (SC) / Authority's Engineer services: These cover Engineering, Procurement and Construction (EPC) projects and their O&M phases, where the consultant acts for NHAI.
Contract values per mandate are small, typically ₹2.5–8 cr for Artefact's share, and run for 36–60 months. Revenue is therefore recognised as a fairly smooth stream of monthly fees. However, the stream is lumpy at the quarterly level because of milestone billing and approval cycles. Q4 is consistently the strongest quarter: ₹12.74 cr in Q4 FY2025 and ₹14.33 cr in Q4 FY2026, compared with ₹2–3 cr in Q1.
Business model and revenue model
| Dimension | Characterisation |
|---|---|
| Revenue type | 100% services. Consultancy fees are billed as man-month based or lump-sum retainers under consultancy contracts. There is no product, subscription or licensing revenue. |
| Pricing mechanism | Competitive tendering, typically Quality and Cost Based Selection (QCBS) under NHAI/MoRTH procurement rules. Artefact frequently discloses awards as H1 (highest-ranked) bidder. |
| Contract tenure | 24–60 months. Examples: 60 months for the Sethiyathope–Cholapuram and Vadodara–Kim IE mandates; 36 months for Thoppur–Erode; 24 months for the SCR railway PMS. |
| Delivery model | Often in joint venture or association with partners: Pioneer Infra Consultants, KCS Engineering, Mangalam (Manglam) Infra & Engineering, Renaissance IOT LLP, Neoteric LLP, MSV International Inc., Sunnily Consultants and Desh Upodesh. Artefact's share of fees is what it discloses. |
| Cost structure | Mainly professional staff costs and site establishment (field engineers, resident engineers, team leaders), plus sub-consultancy and travel. Gross margin (S&P definition) ranged from 27% to 36% between FY2022 and FY2026. |
| Value-chain position | Owner's-side / independent technical oversight. Artefact does not construct; it certifies, supervises and advises on construction and O&M by EPC/HAM/BOT concessionaires. |
| Customer types | Central government road-owning agencies (NHAI, and historically MoRTH and state PWDs such as PWD Rajasthan, Jaipur). Historically also Airports Authority of India (AAI, first airport PMC in 2007) and, from 2026, Indian Railways (South Central Railway). |
| End-markets | National highways (dominant), expressways (Bharatmala Pariyojana), urban infrastructure and township planning (historical), airports (historical), railways (new in 2026). |
Non-operating income
"Other income" is large relative to operating profit. It ranged from ₹3.53 cr to ₹5.51 cr a year between FY2022 and FY2026, and in FY2023 it exceeded operating profit. S&P classifies most of it as "interest and investment income" (₹38.89 M in FY2026). It most likely represents interest on deposits, retention monies and receivables, and possibly lease income from the Artefact Towers property. The breakdown is not disclosed in the sources accessed.
Strategy
Stated strategy themes
The FY2026 annual report and website set out five themes, paraphrased from the Investywise and ScanX summaries of the BSE filing and the company website:
-
Steady execution cycle. The company describes a cycle of consistently winning, executing and completing projects to secure revenue visibility.
-
Infrastructure focus with a railway extension. Continued emphasis on road and railway projects, leveraging central-government infrastructure programmes, notably Bharatmala Pariyojana and the NHAI O&M asset base.
-
Expansion into new sectors and collaborations. The FY2026 report describes a strategic roadmap for FY2026-27 that includes entering new sectors and forming collaborations. The website's 2026 milestone reads "Poised for high growth & Consolidation".
-
Technology and sustainability. The website lists sustainable, eco-friendly design, quality, client-centric execution and "AI-powered project management" as core values.
-
Quality and safety. The FY2025 Directors' Report states a prioritisation of higher quality benchmarks and safety standards across projects.
Strategic initiatives, last 24 months
| Initiative | Date | Description | Status |
|---|---|---|---|
| Railway diversification | Sep 2026 | First railway PMS contract (South Central Railway, ₹21.13 cr, 24 months) | Awarded; mobilisation expected in H2 FY2027 |
| O&M supervision franchise build-out | 2025–2026 | Systematic bidding for NHAI IE and SC mandates in the O&M phase of the expanding national-highway asset base | At least 10 awards in 2025–26 |
| Partnership network | 2024–2026 | Recurring teaming with Pioneer Infra Consultants, KCS Engineering, Mangalam Infra & Engineering, Renaissance IOT LLP and MSV International | Ongoing |
| Dividend initiation | FY2025 | First dividend (₹0.50/share) in more than a decade | Not repeated for FY2026 |
| Website and investor-relations refresh | Feb 2025 – Jul 2026 | New corporate website and a downloadable company profile (June 2026) | Completed |
Medium-term targets and guidance
Not publicly disclosed. The company does not issue numerical revenue or margin guidance, does not hold earnings calls, and does not publish investor presentations. The only forward-looking quantitative disclosure is the order book of about ₹338 cr in ongoing projects (FY2026 AR). That compares with ₹236 cr disclosed in September 2024. The order book is more than 10x FY2026 revenue, but it likely represents gross contract value, possibly including JV partners' shares, spread over multi-year tenures.
Products & Services
Artefact has no products. Its catalogue is a set of consultancy service lines, set out below by sector. Pricing for every service line is fee-based through competitive bidding; individual contract values are disclosed under SEBI LODR Regulation 30.
Highways and transportation (core)
| Service | Description and capabilities | Target customer | Flagship and recent mandates |
|---|---|---|---|
| Independent Engineer (IE) – O&M period | Neutral certifying engineer under BOT/HAM concession agreements. Monitors maintenance obligations, pavement condition, road-safety compliance and tolling, and certifies payments and penalties. | NHAI | Sethiyathope–Cholapuram four-laning, NH-36, Tamil Nadu (₹7.67 cr, 60 months, Dec 2025). Vadodara–Kim Expressway Packages VI & VII, km 190.000–254.430, eight-lane, Bharatmala (₹4.98 cr, 60 months, Jan 2026). Kashipur–Sitarganj NH-74, km 175–252.2, NHDP Phase IV, Uttarakhand/UP (₹5.07 cr, 2024). Madurai–Virudhunagar and Virudhunagar–Kayathar (₹6.57 cr, 2024). NH-53 (old NH-6) section (₹4.38 cr, 60 months, 2025). |
| Independent Engineer (IE) – construction period | Certifies design compliance, construction quality and milestones for HAM projects | NHAI | Cuttack (CRRR end, NH-16 near Tangi) – Kandarpur (SH-12): new four-lane access-controlled highway, 21.225 km, HAM. ₹5.10 cr, 48 months, JV with MSV International Inc. and Sunnily Consultants (Jul 2025). |
| Supervision Consultant (SC) – O&M of EPC projects | Owner's-side supervision of maintenance contractors on EPC-built roads | NHAI | Raisinghnagar–Poogal, Rajasthan: two-lane with paved shoulders, 162.46 km, Bharatmala Phase I Package-06, about ₹3 cr (Mar 2026). Thoppur–Mettur–Bhavani–Erode, NH-544H, 85 km, Tamil Nadu: ₹3.16 cr, 36 months (Jun/Jul 2026). Champa–Korba–Katghora, NH-149B, Chhattisgarh: ₹2.93 cr (Jul 2026). Bilaspur–Urga, NH-130A, 70.2 km, four-lane, Chhattisgarh: ₹3.08 cr, 38 months (Jul 2026). |
| Authority's Engineer / construction supervision | Supervision of EPC construction | NHAI, state PWDs | PWD Rajasthan, Jaipur project (date and value not captured). Andhra Pradesh highway projects: ₹7.77 cr NHAI consultancy (late 2025 or early 2026). |
| Detailed Project Reports (DPR), feasibility and design | Highway alignment, pavement and structure design | NHAI, MoRTH, states | Named recent DPR mandates are not publicly disclosed |
Railways and metros (emerging)
| Service | Description | Customer | Flagship |
|---|---|---|---|
| Project Management Services (PMS) | Project management and supervision for railway works | South Central Railway (Indian Railways) | First railway PMS contract: ₹21.13 cr, 24 months (BSE filing, 28 Sep 2026). Exact scope and works location are not detailed in accessible summaries. |
| Metro / rail collaborations | Teaming arrangements for rail and metro bids | — | Website records "collaborations for Railways, Metros, Urban Planning" in 2022; partners not named |
Urban infrastructure and planning (legacy)
| Service | Description | Customer | Flagship |
|---|---|---|---|
| City and township planning | Master planning of townships | Municipal and state bodies | Township planning works completed in 2005 (website) |
| Urban infrastructure engineering | Urban roads, flyovers, utilities | Urban local bodies | Specific current mandates not publicly disclosed |
Airports (legacy)
| Service | Description | Customer | Flagship |
|---|---|---|---|
| Airport terminal design and PMC | Architectural design and project-management consultancy for terminals | Airports Authority of India | First AAI airport design and PMC project in 2007 (website). No recent airport mandates disclosed in 2024–26. |
Mining services (legacy)
Listed in older company profiles (MarketsMOJO). No recent mandates or revenue are disclosed.
Technology claims
The company's website lists "technology-driven solutions" using advanced tools and AI-powered project management as a core value. No named platform, software product or quantified technology investment is disclosed.
Financial Narrative
Basis. Standalone, INR crore, fiscal years ending 31 March.
-
Primary source is Screener (C-MOTS, compiled from BSE audited results).
-
Gross profit, EBIT and EBITDA as defined by S&P Global come via StockAnalysis.com (₹ M converted to ₹ cr).
-
Ratios are calculated by the analyst from these figures unless marked otherwise.
Income statement
Sources: Screener P&L; StockAnalysis/S&P for gross profit and EBIT. FY2023 EPS differs between Screener (₹7.34) and S&P (₹7.61) because of weighted share-count differences. The FY2026 annual report states EPS of ₹7.29 (Investywise summary of the BSE filing), against ₹7.19 on Screener and ₹7.18 on S&P. All three are shown in the text as a discrepancy, and the filing value of ₹7.29 is preferred.
Margins
Revenue CAGR. Revenue grew at about 8.2% a year from FY2022 to FY2026 (₹23.57 cr to ₹32.25 cr). It grew at about 21% a year over the three years FY2023–FY2026 (Screener), and was roughly flat over five years from FY2021 (₹32.09 cr) to FY2026.
Total income as reported (revenue plus other income, per the annual reports):
-
FY2024: ₹2,853.99 lakh (Directors' Report FY2025)
-
FY2025: ₹3,392.26 lakh
-
FY2026: ₹3,614.04 lakh (FY2026 AR, via Investywise / ScanX)
Data error in a media headline. Several aggregator headlines (ScanX, May 2026) describe FY2026 net profit as "₹522.61 crore". The annual report figure is ₹522.61 lakh (₹5.23 cr). The headline is wrong by a factor of 100.
Commentary. The five-year record has three phases:
-
Contraction, FY2021–FY2023. Revenue fell from ₹32.09 cr to ₹18.17 cr, a fall of about 43%, as older mandates completed and Covid-era award delays hit the order book. Reported profit nevertheless rose from ₹3.92 cr to ₹5.34 cr. This was flattered by record other income (₹5.51 cr in FY2023) and a one-off ₹1.81 cr gain on asset sale. Core operating profit actually fell to ₹3.45 cr.
-
Rebuild, FY2024–FY2025. Orders won in FY2024–FY2025, especially the September 2024 NHAI cluster, began billing. Revenue grew 33% and then 24%. FY2025 operating margin reached 22.0%, the highest since FY2015. The FY2025 Directors' Report attributes the roughly 19% growth in net revenue to billing from newly commenced assignments. FY2025 PAT was also helped by a low 12.9% tax rate.
-
Margin compression, FY2026. Revenue grew only 7.4%, while operating expenses rose 16%. Q4 FY2026 operating margin collapsed to 7.96%, against 41.99% in Q4 FY2025. The likely cause is up-front mobilisation costs for a batch of new projects (ScanX commentary refers to 13 new projects) incurred before full billing began. Some revenue may also have been billed at lower realisation. The effective tax rate normalised to 23.4%, which deepened the PAT decline to −29.6%.
Quarterly trend (standalone, ₹ cr)
Source: Screener quarterly results (standalone): Q1 FY2027 (quarter ended 30 June 2026).
-
Revenue: ₹316.71 lakh (₹3.17 cr), up about 43% year on year from ₹221.14 lakh. A ScanX summary misstated this as a 7.5% decline.
-
Net profit: ₹94.30 lakh, down 7.4% year on year and up 9.5% quarter on quarter.
-
Operating margin: recovered to 35.7%.
Balance sheet
Sources: Screener balance sheet. The FY2026 net worth of ₹7,061.55 lakh is confirmed by the FY2026 annual report (ScanX AGM summary), against ₹6,567.59 lakh in FY2025 (+7.5%).
Items not publicly disclosed in accessible sources:
-
Split of borrowings into short-term and long-term.
-
Cash and equivalents as a separate line. Net cash flow has been between −₹0.14 cr and +₹0.19 cr for five years, so balance-sheet cash is believed to be small (under ₹1 cr).
-
Precise working capital. Other assets net of other liabilities are a proxy: FY2026 ₹72.06 cr, FY2025 ₹66.91 cr.
-
Goodwill and intangibles: none identified.
Commentary. The balance sheet is equity-heavy, with gross debt/equity of about 0.22x, and asset-light: fixed assets of ₹12 cr are mainly the Artefact Towers office property. It is, however, dominated by working capital. "Other assets" rose from ₹57 cr to ₹101 cr over FY2022–FY2026, growing faster than revenue. This reflects trade receivables, unbilled revenue, retention monies and deposits with government clients. The ₹12.9 cr fall in investments during FY2025 coincided with a CFI inflow of ₹16.00 cr and a CFO outflow of ₹19.02 cr. This implies that proceeds from liquidating investments were absorbed into working capital, as a sharp build-up of receivables or unbilled revenue, during the FY2025 growth phase.
Cash flow
Sources: Screener cash flows; S&P FCF via StockAnalysis: Notes on the cash-flow table.
-
Screener's own FCF series includes asset-sale proceeds; for example, it shows +₹3.97 cr in FY2023 against S&P's −₹1.24 cr. The S&P definition is used here.
-
FY2026 dividends paid are derived from ₹0.50 × about 72.75 lakh shares, paid after the 12 Sep 2025 ex-date.
Commentary. This is the most important analytical finding of the dossier. Artefact has reported positive net profit every year since FY2019, but operating cash flow has been negative in every one of the last six fiscal years (FY2021–FY2026). The cumulative six-year CFO is −₹31.69 cr, against cumulative PAT of about ₹31.3 cr over the same period. In effect, none of the reported profit has turned into cash. Instead, the profit has accumulated as receivables and unbilled work on government contracts, funded by liquidating investments, asset sales and moderate debt. Screener's CFO/EBITDA conversion metric was −287% in FY2025 and −6% in FY2026. FY2026 shows stabilisation (CFO close to break-even) but no reversal.
Ratios
Ratio definitions and data gaps.
-
ROE and ROA are calculated on average balances; the FY2022 opening balance is FY2021 (equity ₹47.00 cr; total assets ₹82.39 cr).
-
ROIC proxy = EBIT × (1 − 25%) ÷ (equity + debt), using S&P EBIT, which excludes other income.
-
Interest coverage = (PBT + interest) ÷ interest.
-
Asset turnover = revenue ÷ average total assets.
-
Net debt/EBITDA cannot be computed precisely because cash is not separately disclosed in the sources; gross debt/EBITDA is shown instead.
Current ratio: not publicly disclosed in accessible sources (n.d.).
Cash conversion cycle: for a services firm this is best approximated by debtor days. Screener's FY2026 entries for inventory and payable days (446.8 and 1,319.5 days) appear to be data artefacts and are disregarded.
Commentary. Returns are mediocre. ROE has stayed in single digits to low teens throughout, because operating profit is modest and the equity base is inflated by working capital. Debtor days improved meaningfully in FY2025 (to 149 from 238) but slipped back to 186 in FY2026. Leverage is low and coverage comfortable; financial risk lies in liquidity (cash conversion), not solvency.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Results by Segment and Revenue by Segment (%)
| Metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Project Consultancy revenue (INR Cr) | 24.17 | 30.04 | 32.25 |
Project Consultancy share of total revenue (%) | 100 | 100 | 100 |
Project Consultancy YoY revenue growth (%) | 33.0 | 24.3 | 7.4 |
Segment operating profit before other income (INR Cr) | 2.88 | 6.62 | 5.03 |
Segment operating margin (%) | 11.9 | 22.0 | 15.6 |
Segment pre-tax income (INR Cr) | 5.21 | 8.54 | 6.81 |
Mandate Type Details
| Mandate type | Description | Share of disclosed new orders, 2024–26 |
|---|---|---|
IE services – O&M period | Independent Engineer for BOT/HAM concessions in operation | Majority by count |
IE services – construction period | IE for new HAM projects (e.g. Cuttack–Kandarpur) | Minority |
SC services – O&M of EPC projects | Supervision Consultant for O&M of EPC-built two-lane and four-lane highways | Growing in 2026 (Raisinghnagar–Poogal, Thoppur–Erode, Champa–Korba, Bilaspur–Urga) |
Railway PMS | Project Management Services for Indian Railways | New from Sep 2026 (₹21.13 cr, single order) |
Other / small domestic assignments | e.g. a ₹40.74 lakh domestic assignment with a 300-day term (2025) | Marginal |
Group Entities
| Entity | Relationship | Notes | Source |
|---|---|---|---|
Artefact Projects Limited | Listed parent | Operating company | — |
Artefact Infrastructure Ltd | Related party; historically a subsidiary, acquired 11 Nov 2010 | Provides engineering services. Related-party service transactions under "Artefact Projects JV" structures are disclosed in the FY2019 AR. Current shareholding status is not publicly confirmed. Non-current investments fell from ₹13.06 cr (FY2024) to ₹0.16 cr (FY2025), which suggests divestment or restructuring of a holding, but the counterparty is not confirmed in accessible sources. | Zonebourse; BSE AR 2018-19; Screener |
Contract JVs / associations | Unincorporated project JVs | e.g. "Artefact Projects Limited (JV)" with Malaysian partner ("Bhd.") disclosed in the FY2019 AR | BSE AR 2018-19 |
Income Statement and Margin Analysis (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue from operations (INR Cr) | 23.57 | 18.17 | 24.17 | 30.04 | 32.25 |
Revenue growth YoY (%) | -26.5 | -22.9 | 33.0 | 24.3 | 7.4 |
Total operating expenses (INR Cr) | 18.63 | 14.72 | 21.29 | 23.42 | 27.22 |
Gross profit, S&P definition (INR Cr) | 8.16 | 6.54 | 6.60 | 10.87 | 10.83 |
Operating profit / EBITDA excl. other income (INR Cr) | 4.94 | 3.45 | 2.88 | 6.62 | 5.03 |
Operating income / EBIT, S&P (INR Cr) | 4.37 | 2.95 | 2.50 | 6.19 | 4.60 |
Other income (INR Cr) | 3.53 | 5.51 | 4.38 | 4.01 | 3.85 |
Interest expense (INR Cr) | 2.39 | 1.98 | 1.66 | 1.67 | 1.64 |
Depreciation (INR Cr) | 0.57 | 0.50 | 0.39 | 0.42 | 0.43 |
Profit before tax (INR Cr) | 5.51 | 6.48 | 5.21 | 8.54 | 6.81 |
Effective tax rate (%) | 25.1 | 17.6 | -0.4 | 12.9 | 23.4 |
Net profit (INR Cr) | 4.14 | 5.34 | 5.23 | 7.43 | 5.23 |
EPS basic (INR) | 5.69 | 7.34 | 7.19 | 10.21 | 7.19 |
EPS diluted (INR) | 5.69 | 7.34 | 7.19 | 10.21 | 7.19 |
Dividend per share declared (INR) | 0 | 0 | 0 | 0.50 | 0 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansMargin Analysis (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Gross margin, S&P (%) | 34.6 | 36.0 | 27.3 | 36.2 | 33.6 |
EBITDA margin excl. other income (%) | 21.0 | 19.0 | 11.9 | 22.0 | 15.6 |
EBIT / operating margin, S&P (%) | 18.5 | 16.3 | 10.4 | 20.6 | 14.3 |
PBT margin on revenue (%) | 23.4 | 35.7 | 21.6 | 28.4 | 21.1 |
Net margin on revenue (%) | 17.6 | 29.4 | 21.6 | 24.7 | 16.2 |
Other income as % of PBT (%) | 64.1 | 85.0 | 84.1 | 47.0 | 56.5 |
Income Statement and Margin Analysis (%) (Quarterly)
| Metric | Q1FY24 | Q2FY24 | Q3FY24 | Q4FY24 | Q1FY25 | Q2FY25 | Q3FY25 | Q4FY25 | Q1FY26 | Q2FY26 | Q3FY26 | Q4FY26 | Q1FY27 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sales (INR Cr) | 4.23 | 6.44 | 6.38 | 7.12 | 3.12 | 6.85 | 7.33 | 12.74 | 2.21 | 8.97 | 6.74 | 14.33 | 3.17 |
Operating profit (INR Cr) | 0.66 | 1.30 | 1.21 | -0.27 | 0.87 | 1.47 | 1.97 | 5.35 | 0.57 | 1.73 | 1.58 | 1.14 | 1.13 |
OPM (%) | 15.6 | 20.2 | 19.0 | -3.8 | 27.9 | 21.5 | 26.9 | 42.0 | 25.8 | 19.3 | 23.4 | 8.0 | 35.7 |
Other income (INR Cr) | 1.00 | 1.08 | 1.09 | 1.20 | 1.21 | 1.25 | 0.26 | 1.16 | 1.31 | 1.04 | 1.13 | 0.37 | 0.64 |
PBT (INR Cr) | 1.32 | 1.71 | 1.82 | 0.36 | 1.58 | 2.20 | 1.70 | 5.94 | 1.35 | 2.24 | 2.22 | 1.01 | 1.26 |
Net profit (INR Cr) | 1.27 | 1.91 | 1.82 | 0.22 | 1.44 | 1.78 | 1.24 | 5.80 | 1.02 | 1.67 | 1.77 | 0.86 | 0.94 |
EPS (INR) | 1.75 | 2.63 | 2.50 | 0.30 | 1.98 | 2.45 | 1.70 | 7.97 | 1.40 | 2.30 | 2.43 | 1.18 | 1.29 |
Balance Sheet and Per-Share Data
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Equity share capital (INR Cr) | 7.28 | 7.28 | 7.28 | 7.28 | 7.28 |
Reserves (INR Cr) | 42.84 | 48.38 | 52.01 | 58.40 | 63.34 |
Shareholders' equity / net worth (INR Cr) | 50.12 | 55.66 | 59.29 | 65.68 | 70.62 |
Total borrowings (INR Cr) | 18.35 | 11.80 | 10.08 | 14.64 | 15.22 |
Other liabilities (INR Cr) | 17.65 | 24.01 | 28.80 | 22.24 | 28.66 |
Total assets (INR Cr) | 86.12 | 91.47 | 98.17 | 102.56 | 114.50 |
Net fixed assets (INR Cr) | 15.71 | 11.82 | 11.52 | 12.22 | 12.02 |
Capital work in progress (INR Cr) | 0 | 0 | 0.35 | 1.03 | 1.67 |
Investments (INR Cr) | 13.19 | 13.06 | 13.06 | 0.16 | 0.09 |
Other assets incl. receivables & cash (INR Cr) | 57.22 | 66.59 | 73.24 | 89.15 | 100.72 |
Goodwill & intangibles (INR Cr) | 0 | 0 | 0 | 0 | 0 |
Book value per share (INR) | 68.9 | 76.5 | 81.5 | 90.3 | 97.1 |
Cash Flow
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Cash from operating activities (INR Cr) | -3.92 | -1.24 | -0.44 | -19.02 | -0.29 |
Cash from investing activities (INR Cr) | 4.14 | 8.95 | 3.83 | 16.00 | 1.43 |
Cash from financing activities (INR Cr) | -0.32 | -7.52 | -3.39 | 2.89 | -1.05 |
Net cash flow (INR Cr) | -0.11 | 0.19 | 0.00 | -0.14 | 0.09 |
Capex, derived as CFO minus S&P FCF (INR Cr) | 0.02 | 0.00 | 0.44 | 1.79 | 0.88 |
Free cash flow, S&P (INR Cr) | -3.94 | -1.24 | -0.88 | -20.81 | -1.17 |
Dividends paid (INR Cr) | 0 | 0 | 0 | 0 | 0.36 |
Share buybacks (INR Cr) | 0 | 0 | 0 | 0 | 0 |
Returns & Leverage Ratios (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
ROE on average equity (%) | 8.5 | 10.1 | 9.1 | 11.9 | 7.7 |
ROA on average total assets (%) | 4.9 | 6.0 | 5.5 | 7.4 | 4.8 |
ROCE, Screener (%) | 12.0 | 9.8 | 10.0 | 13.5 | 10.2 |
ROIC, proxy (%) | 4.5 | 2.9 | 2.8 | 6.1 | 4.1 |
Current ratio
| Current ratio | n.d. | n.d. | n.d. | n.d. | n.d. |
|---|---|---|---|---|---|
Gross debt to equity (x) | 0.37 | 0.21 | 0.17 | 0.22 | 0.22 |
Gross debt to EBITDA excl. other income (x) | 3.7 | 3.4 | 3.5 | 2.2 | 3.0 |
Interest coverage (x) | 3.3 | 4.3 | 4.1 | 6.1 | 5.2 |
Asset turnover (x) | 0.28 | 0.20 | 0.25 | 0.30 | 0.30 |
Debtor days | 210 | 296 | 238 | 149 | 186 |
Working capital days | 377 | 675 | 474 | 229 | 279 |
Revenue by Region and Revenue by Region (%)
| Region | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
India revenue (INR Cr) | 24.17 | 30.04 | 32.25 |
India share of total (%) | 100 | 100 | 100 |
Rest of world revenue (INR Cr) | 0 | 0 | 0 |
Region Margins & Growth (%)
| Metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
India revenue growth YoY (%) | 33.0 | 24.3 | 7.4 |
State / Union Territory Details
| State / Union Territory | Disclosed new order value (INR Cr) | Mandates |
|---|---|---|
Telangana / Andhra Pradesh (South Central Railway zone) | 21.13 | SCR railway PMS (Sep 2026). The SCR zone headquarters is at Secunderabad; exact works location not disclosed. |
Tamil Nadu | 17.40 | Sethiyathope–Cholapuram NH-36 (7.67); Madurai–Virudhunagar–Kayathar (6.57); Thoppur–Erode NH-544H (3.16) |
Andhra Pradesh | 7.77 | NHAI consultancy, AP highway projects |
Chhattisgarh | 6.01 | Champa–Korba–Katghora NH-149B (2.93); Bilaspur–Urga NH-130A (3.08) |
Uttarakhand / Uttar Pradesh | 5.07 | Kashipur–Sitarganj NH-74 |
Odisha | 5.10 | Cuttack–Kandarpur HAM IE |
Gujarat | 4.98 | Vadodara–Kim Expressway Packages VI–VII |
Rajasthan | about 3.00 | Raisinghnagar–Poogal (Bharatmala Package-06) |
Not specified / other | about 21+ | ₹14.7 cr of multiple NHAI awards (5 Sep 2024); NH-53 ₹4.38 cr (state not captured; NH-53 old NH-6 passes through Maharashtra, Chhattisgarh and Odisha); ₹2.56 cr NHAI LoA (Feb 2025); ₹0.41 cr domestic assignment |
Valuation Snapshot
| Metric | Value | Source |
|---|---|---|
Last close (19 Oct 2026) | ₹48.50 | Screener |
52-week high / low | ₹70.0 / ₹47.8 | Screener |
1-year price return | −25% | Screener |
3-year price CAGR | −7% | Screener |
5-year price CAGR | −4% | Screener |
10-year price CAGR | +7% | Screener |
All-time reference high (recent cycle) | ₹89.74 (30 Dec 2024) | Investment Guru India |
Share Price
| Metric | May2025 | Aug2025 | Dec2025 | Mar2026 | Jul2026 | Oct2026 |
|---|---|---|---|---|---|---|
Share price (INR) | 54.18 | 80.16 | 60.40 | 62.00 | 52.83 | 48.50 |
Valuation Multiples
| Multiple | Artefact (Oct 2026) | Peer median (Value Research, Apr 2026) | Source / basis |
|---|---|---|---|
P/E (TTM) | 6.70x | 22.26x | Screener; Value Research |
P/B | 0.50x | 2.28x | Screener; Value Research |
EV/EBITDA (TTM, approximate) | About 9.0x | — | Analyst calculation (see below) |
EV/Sales (TTM, approximate) | About 1.5x | — | EV ÷ TTM sales of ₹33.21 cr. GuruFocus EV/Revenue is 1.58x. |
Dividend yield | 0% trailing on FY2026; about 1% on the FY2025 dividend | — | Screener; GuruFocus |
Per-Share Data and Returns & Leverage Ratios (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Dividend per share (INR) | 0 | 0 | 0 | 0.50 | 0 |
Dividend payout (%) | 0 | 0 | 0 | 4.9 | 0 |
Analyst Conclusions
Management guidance
There is no quantitative guidance. Management's qualitative stance (FY2026 AR) is:
-
Sustain the execution cycle on an order book of about ₹338 cr.
-
Pursue road and railway opportunities.
-
Expand into new sectors and collaborations during FY2026-27.
Consensus expectations
None; the stock has no analyst coverage.
Bull case
-
The order book converts. An order book of about ₹338 cr against ₹32 cr of annual revenue, together with the ₹21.13 cr railway PMS (billed over 24 months, so about ₹10 cr a year at run-rate), could lift revenue toward ₹40–45 cr in FY2028 if mobilisation proceeds smoothly. Q1 FY2027 revenue growth of 43% is an early sign.
-
Margins normalise after mobilisation. FY2025 showed that the business can earn a 22% operating margin once new mandates are billing. Q1 FY2027 operating margin of 35.7% suggests the Q4 FY2026 trough (8.0%) was a timing effect.
-
Deep value with an asset backstop. The stock trades at 0.50x book (₹97.1 per share) and 6.7x earnings, against peer medians of 2.28x and 22.3x. Even modest improvement in cash collection could drive a re-rating.
Bear case
-
Profits do not turn into cash. Six straight years of negative CFO (cumulative −₹31.7 cr) mean that reported book value is largely receivables from government clients. Its real worth depends on collection that has not yet happened.
-
Low-quality earnings. Other income has been 47–85% of PBT. Core operating profit of ₹5.03 cr in FY2026 is lower than in FY2020 (₹5.80 cr) despite similar revenue, so there is no evidence of operating leverage.
-
Structural limits. The company is concentrated on NHAI, sub-scale in a fragmented QCBS market, has no institutional investors, a falling promoter stake (from 58.6% to 39.1%) and thin trading. Together these cap the re-rating potential and the capacity to raise capital.
Catalysts and monitorables (next 12 months)
| Catalyst / monitorable | Expected timing | What to watch |
|---|---|---|
| Q2 FY2027 results | November 2026 | Revenue growth on the new mandates; whether operating margin holds above 15% |
| Mobilisation of the SCR railway PMS | H2 FY2027 | Revenue contribution and margins on railway work |
| FY2027 cash flow | FY2027 annual report (mid-2027) | Turn to positive CFO; trend in debtor days below 150 |
| New NHAI and railway awards | Ongoing | Order inflow above ₹40 cr a year; any second railway order |
| Q4 FY2027 results and dividend decision | May 2027 | Resumption of dividends as a signal of confidence in cash |
| Promoter holding changes | Quarterly | Stabilisation or any increase (signal) versus further sell-down (risk) |
Analyst verdict
Artefact Projects Limited is a sub-scale but durable niche player in Indian highway supervision consultancy. It has survived nearly four decades, through an early life as an NBFC and software firm, a near-collapse in FY2018, and a revenue contraction in FY2021–FY2023. It has rebuilt itself around a steady flow of NHAI Independent Engineer and Supervision Consultant mandates. Its income statement has been profitable for eight years, its balance sheet carries little debt, and its order book is about ten times annual revenue. The September 2026 South Central Railway mandate is the most meaningful strategic development in years: it adds a second public-sector client and roughly two-thirds of a year's revenue in a single award.
The investment case, however, rests on a question the financial statements have not yet answered: whether this business can convert its profits into cash. Operating cash flow has been negative for six consecutive years and cumulatively negative by more than the profit reported over the same period. Receivables and unbilled work have absorbed the earnings, the proceeds of investment liquidations and an increase in borrowings. More than half of pre-tax profit typically comes from other income, not operations. The FY2026 margin compression showed how sensitive a business with ₹32 cr of revenue is to mobilisation timing.
The market has clearly priced this scepticism. The stock trades at half of book value and below seven times earnings, near its 52-week low, with no institutional holders and a promoter stake that has fallen by a third since 2021. The valuation offers a margin of safety only if the receivables are collectable.
Verdict: this is a speculative deep-value micro-cap. A positive re-rating requires two or more consecutive halves of positive operating cash flow, debtor days sustainably below 150, and clean execution of the railway mandate. Until these appear, the discount looks justified rather than anomalous. Position size should reflect the very low liquidity of the stock.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Title | Tenure on board | Background | Age | Source |
|---|---|---|---|---|---|
Siddharth Pankaj Shah (DIN 05304116) | Whole-Time Director (executive head; treated as CEO by data providers); chaired the 38th AGM | Executive Director from FY2014; Whole-Time Director since 6 Jul 2019. CEO tenure of about 12.3 years per Simply Wall St (2025). | B.E. (Civil). Also acted as Company Secretary and Compliance Officer from 17 Nov 2022 (interim). Promoter family member, son of founder Pankaj B. Shah. | About 34 (Simply Wall St, 2025) | Simply Wall St; BSE AR 2018-19; ScanX |
Ankita Shah (DIN 06772621) | Non-Executive Woman Director (promoter group) | Appointed 28 Mar 2015; Whole-Time Director until 30 Jun 2019; non-executive since. Retired by rotation and was reappointed at the 2026 AGM. | Expertise in architectural design and infrastructure project management. Also a director of Artefact Infrastructure Ltd. | — | BSE AR 2018-19; Zonebourse; ScanX |
Kaustubh Paunikar | Independent Director | — | — | — | ScanX (AGM attendance, Sep 2026) |
Priti Agrawal | Independent (Woman) Director | — | — | — | ScanX (AGM attendance, Sep 2026) |
“—” = not publicly disclosed.
Executive Leadership Team
| Name | Role | Source |
|---|---|---|
Siddharth P. Shah | Whole-Time Director | As above |
Chandrashekar Baseshankar | Chief Financial Officer | BFSL / Vogue Stock profile |
Rani Maheshwari | Company Secretary & Compliance Officer | BFSL / Vogue Stock profile |
Directors' Remuneration
| Name | Salary FY2025 (INR Mn) | Bonus | Stock | Total FY2025 (INR Mn) | Source |
|---|---|---|---|---|---|
Siddharth Shah | 2.1 | 0 | 0 | 2.1 | Simply Wall St (from FY2025 AR) |
Other directors | Sitting fees only; amounts not captured | — | — | — | — |
Board & Management Changes
| Date | Change | Source |
|---|---|---|
6 Jul 2019 | Siddharth Shah appointed Whole-Time Director | Simply Wall St |
30 Jun 2019 | Ankita Shah re-designated Non-Executive | BSE AR 2018-19 |
17 Nov 2022 | Siddharth Shah additionally designated CS/Compliance Officer | Simply Wall St |
25 Jan 2023 | New Company Secretary & Compliance Officer appointed by the Board | BSE filing |
24 Sep 2026 | Ankita Shah reappointed on retirement by rotation | ScanX |
Shareholding Trend
| Holder category | Mar2022 | Mar2023 | Mar2024 | Mar2025 | Mar2026 |
|---|---|---|---|---|---|
Promoters (%) | 43.71 | 39.09 | 39.09 | 39.09 | 39.09 |
FIIs (%) | 0.69 | 0.41 | 0.69 | 0 | 0 |
DIIs (%) | 0 | 0 | 0 | 0 | 0 |
Public (%) | 55.60 | 60.51 | 60.22 | 60.92 | 60.91 |
Number of shareholders | 2,349 | 2,639 | 5,078 | 5,541 | 5,344 |
Major Shareholders
| Holder | Stake (%) | As of | Source |
|---|---|---|---|
Pankaj Balkrishna Shah (promoter) | 13.37 | Recent (date not specified) | MarketsMOJO |
Pankaj B. Shah (promoter) | 16.83 | Feb 2021 | Trendlyne |
Promoter group total (8 holders as of Feb 2021) | 39.09 | Jun 2026 | Screener |
Public non-institutional | 60.91 | Jun 2026 | Screener |
Competitive Landscape
Key Competitors
| # | Competitor | Type | Overlapping segment | Relative positioning vs Artefact |
|---|---|---|---|---|
| 1 | RITES Ltd | Listed PSU (NSE/BSE) | Highways, railways, urban, airports | Much larger, diversified, with a strong railway incumbency. A direct rival in Artefact's new railway PMS entry. |
| 2 | LEA Associates South Asia Pvt Ltd | Private (Canadian-origin) | NHAI IE/AE, DPR | Much larger NHAI supervision franchise |
| 3 | Intercontinental Consultants & Technocrats (ICT) | Private | NHAI AE/IE, DPR | Larger; a top-tier NHAI consultant |
| 4 | Theme Engineering Services | Private | NHAI AE/IE | Larger |
| 5 | Consulting Engineers Group (CEG) | Private | Highways, urban | Larger |
| 6 | Aarvee Associates | Private | Highways, structures | Larger |
| 7 | Feedback Infra | Private | Highways, transport | Larger |
| 8 | SA Infrastructure Consultants | Private | NHAI IE/AE | Comparable to larger |
| 9 | Voyants Solutions | Private | Highways, rail, urban | Larger |
| 10 | MSV International Inc. (India operations) | Foreign private | NHAI IE | A JV partner of Artefact on Cuttack–Kandarpur; a competitor elsewhere |
| 11 | Mangalam (Manglam) Infra & Engineering Ltd | Listed (NSE Emerge SME) | NHAI IE/AE | Comparable scale; both collaborator and competitor |
| 12 | Pioneer Infra Consultants, KCS Engineering | Private | NHAI SC/IE | Comparable scale; both collaborators and competitors |
Peer Comparison FY2026
| Metric | Artefact Projects FY2026 | RITES | Mangalam Infra & Engineering | LEA Associates |
|---|---|---|---|---|
Revenue | ₹32.25 cr | — | — | — |
Revenue growth | 7.4% | — | — | — |
EBITDA margin (excl. other income) | 15.6% | — | — | — |
R&D intensity | None disclosed | None disclosed separately | None disclosed | — |
Listing | BSE only | NSE + BSE | NSE Emerge | Unlisted |
“—” = not publicly disclosed.
Recent Developments
Not identified in the period: * layoffs, litigation, regulatory actions, guidance revisions and restructurings.



