Artson Limited Overview
Artson Limited is a micro-cap Indian engineering, manufacturing and construction (EMC) contractor, 75% owned by Tata Projects Limited. It has spent four decades building large-diameter bulk liquid storage tanks for refineries, terminals and airports. It is now turning itself into a three-engine business: precision process-equipment manufacturing at Nashik, heavy structural and modular fabrication at Parli (Raigad), and shipbuilding / hull-block fabrication for yards such as GRSE and Mazagon Dock.
FY2026 revenue of INR 163.58 Cr was the highest in the decade. It nonetheless produced a INR 10.88 Cr net loss, because management chose to write down legacy projects and rebuild its factories.
The balance sheet is thin, with near-zero net worth and about INR 53 Cr of borrowings, much of it interest-free parent debt. That makes TPL's support the central credit and equity variable. The investment case depends on three things: converting new capability into profitable throughput, recovering legacy claims, and executing on India's shipbuilding and industrial capex cycle. Execution consistency has historically been weak.
Company's own description (FY2026 Annual Report, paraphrased)
The FY2026 Board's Report describes the core business as:
-
manufacturing process plant equipment;
-
fabricating structures;
-
fabricating and erecting hull blocks and shipbuilding with associated works;
-
constructing storage tanks.
It states that this basic nature of business did not change during FY2026.
Since FY2026, management runs the company as three empowered Strategic Business Units (SBUs):
Manufacturing: Nashik process equipment and Parli multimodal structural fabrication.
Projects, Tankage & EPC: - Shipbuilding.
Three corporate functions and a six-member executive committee support the SBUs. The Whole-Time Director & CEO also holds the Chief Operating Officer remit (FY2026 AR, CEO letter).
Independent characterisation
| Revenue model element | Characterisation | Evidence |
|---|---|---|
| Product (engineered-to-order manufacturing) | Growing; Nashik and Parli deliveries billed per item or tonne | Item-rate orders: Deepak Chem Tech, L&T-MHI, Anuppur (2026 filings) |
| Service / construction contracts | Historically dominant (tankage LSTK/EPC); now deliberately capped | CEO letter: prefers 4–5 live projects of INR 30–150 Cr |
| Subscription / licensing | None today. Management is pursuing inbound manufacturing licences from European/North American OEMs. | FY2026 AR, "New Product & Licensing Initiatives" |
| Claims revenue | Material and lumpy, e.g. INR 9.92 Cr claim revenue recognised in Q2 FY27 | Q2 FY27 results, 16 Oct 2026 |
Artson is a project-based, order-driven fabricator and contractor. Revenue comes from fixed-price or item-rate contracts, recognised over time as work progresses. It is not a product company in the catalogue sense. Nearly all output is bespoke and engineered-to-order: pressure vessels, heat exchangers, storage tanks, steel structures, pontoon panels and hull blocks.
Value-chain position. Artson sits at the tier-2 fabricator / tier-1 package-contractor level:
Upstream: buys steel plate, pipe and consumables. Management cites supply-chain synergies with Tata Steel.
Downstream: sells to EPC majors such as TPL, L&T-MHI Power Boilers, TKIL Industries, Danieli Corus and Andritz. It also sells to owners and operators: IOCL, Reliance, Hindalco, Adani Power, Deepak group, Navin Fluorine, Shell India, GMR/Guwahati airport, and shipyards GRSE, Mazagon Dock and Sadhav Offshore.
End-markets served:
-
oil refining and petrochemicals;
-
fertiliser and chemicals (ammonia);
-
power (thermal coal-handling plants, boiler vessels);
-
metals (blast furnaces, aluminium);
-
airports (aviation fuel farms);
-
defence and research shipbuilding;
-
infrastructure (ports, airports, data centres as a target);
-
emerging energy-transition demand (green hydrogen and ammonia storage, as a stated target).
Customer types:
-
the related-party parent (TPL), which places EPC and structural orders;
-
public-sector undertakings (IOCL, GRSE, Mazagon Dock);
-
large private industrials;
-
global EPC/OEM contractors.
TPL dependence is structural. Shareholders approved related-party transactions with TPL of up to INR 320 Cr a year (INR 300 Cr for goods, services, loans and credit; INR 20 Cr for property) at the 47th AGM on 25 Sep 2026.
Strategy
Stated strategy themes (FY2026 AR, paraphrased)
-
Capability before backlog. FY2026 was framed as the year the company paid for rebuilding capacity, layouts and approvals rather than chasing order volume.
-
Settle the past. Every project started before 2023 has been commissioned, settled or fully provisioned. Claims are pursued through contract and arbitration, and recoveries are booked only when concluded.
-
Three SBUs with commercial discipline. Management's three operating principles: no scale without margin, no order outside the core, no backlog that cannot be funded.
-
Bespoke to structured. Move from one-off engineered jobs to repeatable products: containers, standardised components, licensed equipment. Management says this mix shift is needed to lift EBITDA margins to 20%+ over the planning period.
-
Asset-light growth. Prefer partnerships, third-party yards and targeted capacity additions over greenfield capex.
-
Group integration. Stay closely integrated with TPL and draw on Tata Steel supply-chain synergies.
Strategic initiatives (last 24 months)
| Initiative | Date | Description | Status |
|---|---|---|---|
| Name change to Artson Limited | Aug–Nov 2024 | Rebrand away from an "engineering-only" identity | Completed 5 Nov 2024 |
| Nagpur Division sale to TPL | Aug–Dec 2024 | Monetise the non-core Umred unit for liquidity, capex and debt reduction (guided INR 20–25 Cr) | Completed 1 Dec 2024 |
| Parli Unit ramp-up | 2024–2026 | Throughput to about 1,000 MT/month; new contractors; added working space | Ongoing |
| Nashik rebuild | H2 FY2026 | Deliberate under-loading to re-lay out and re-equip; plate above 100 mm opens the blast-furnace segment | Completed per AR; benefits expected progressively |
| Shipbuilding SBU | FY2025 onward | GRSE hull blocks, Sadhav floating dry dock, Mazagon Dock pontoons | Scaling |
| Artson–MCL Joint Venture (Kochi) | JV formed 12 Feb 2026 | 7-acre waterfront yard at Mattancherry Wharf; target markets Water Metro, ferries, river cruises; INR 70,000 contributed after FY2026 year-end | Pre-operational |
| ECHT Marine understanding | FY2026 | Design, brand and market access in small commercial, recreational, green and hybrid craft | Early-stage |
| Green fishing boats | FY2026 | Engagement with state governments | Exploratory |
| Container manufacturing | FY2026 plan | Phased entry targeting India's 8 lakh TEU/year localisation aim; outreach to Maersk | Pre-launch; no orders disclosed |
| OEM licensing | FY2026 plan | Licence high-value imported equipment designs from European/North American OEMs | Under negotiation |
| Vendor qualifications | FY2026 | EIL and PDIL approvals; Andritz and Sulzer engagement | Achieved |
| Balance-sheet support | Mar–Oct 2026 | INR 9.59 Cr payables converted to a 10-year interest-free loan; INR 40.30 Cr loan extended to 2042 | Completed |
| ESG / safety | FY2026 | Zero lost-time injuries and zero fatalities; 5 million safe man-hours at GRSE, 2 million at Nashik, 1 million at the dry dock, 0.5 million at Guwahati | Achieved |
Management guidance (FY2026 AR)
| Horizon | Guidance |
|---|---|
| FY2027 | Double-digit YoY revenue growth; gross margin expansion from manufacturing scale, mix shift and operating leverage; continued progress toward sustainable profitability |
| 3–5 years | Structural ROIC expansion; EBITDA margin above 20% on the bespoke-to-structured shift; 2–3 additional shipyards accessed |
| Explicit caveat | The CEO declined to give a numeric target he could not yet stand behind |
Tracking against guidance. H1 FY27 revenue is down 30% YoY. Delivering double-digit full-year growth would require H2 FY27 revenue of roughly INR 115 Cr or more, against INR 70.7 Cr in H2 FY26. Hitting the guidance is therefore at material risk.
Products & Services
Artson does not publish list prices. The pricing model is contract-specific: lump-sum turnkey (LSTK), item-rate or per-tonne. Launch years are given where known.
Manufacturing SBU: Nashik Unit (D-5, MIDC Ambad)
| Product line | Description / capability | Target customers | Flagship / named references | Pricing model |
|---|---|---|---|---|
| Pressure vessels | ASME Section VIII, PED, API 620/650 designs; carbon steel, stainless steel, low-temperature carbon steel (LTCS); IBR-certified where required | Refineries, petrochemicals, chemicals, power | 74 refinery vessels (56 IBR) for Mundra Petrochem (FY2026); LTCS vessel for Navin Fluorine (FY2026 order); 24 vessels for L&T-MHI Power Boilers, NTPC Nabinagar Units 4–6 (Sep 2026, INR 7.17 Cr) | Item rate |
| Heat exchangers | Shell-and-tube and in-bed exchangers; SS 316L; mirror finish Ra 0.2 μm; 100% radiography of tube-to-tube welds | Global process-technology OEMs | 24 in-bed heat exchangers for Andritz Germany. Artson was selected from eight Indian competitors after a technical audit, and redesigned the assembly to cut weld joints from 4,896 to 3,140. | Item rate |
| Ammonia / chemical storage tanks (shop-built) | CCOE/PESO-compliant; 435 m³ class | Fertiliser, chemicals, green ammonia | 4 × 435 m³ ammonia tanks for Deepak Nitrite (FY2026) | Item rate |
| Process vessels, tanks and drums | Small-to-medium process equipment packages | Specialty chemicals | 15 vessels, tanks and drums for Deepak Chem Tech D3 project, Dahej (Jun 2026, INR 5.40 Cr; phases to Jun 2027 and Mar 2028) | Item rate |
| Cryogenic and spherical storage (capability listed) | Cryogenic tanks (LIN, LOX, LNG, LCO2, LH2); spheres (LPG, ammonia, propane) | Industrial gases, LPG, hydrogen | Capability listed on industry directory; FY2026 AR cites cryogenic metallurgy as a growth enabler | Contract-specific |
| Blast-furnace and metals equipment | Downcomer piping, large spherical vessels in 50 mm plate; plate above 100 mm thickness | Steel, aluminium | Tata Steel BF-2 (Certificate of Appreciation; site erection in three days); selenium furnace for Hindalco (FY2026 order); conditioning tower and bag-house modules ×5 for Danieli Corus (FY2026 order) | Item rate / lump sum |
| Skid-mounted units and prefabricated piping | Modular skids, prefabricated tanks and piping | EPC contractors | Historical capability | Item rate |
| Air storage vessels | High-pressure air receivers | Space / defence (via TPL) | 6 sets for TPL's ISRO project (3 delivered in FY2020) | Item rate |
Vendor approvals obtained in FY2026: Engineers India Ltd (EIL) and Projects & Development India Ltd (PDIL). The company also reports deeper engagement with Andritz and Sulzer.
Manufacturing SBU: Parli Multimodal Unit (Village Parli, Sudhagad, Raigad)
| Product line | Description | Named references | Pricing |
|---|---|---|---|
| Heavy structural steel | Fabricated structures for power plants, steel plants, airports, industrial parks; throughput reached about 1,000 MT/month in FY2026 | Adani Power Anuppur, 3,600 MT order (FY2026); Anuppur Thermal Energy CHP structures, INR 42.22 Cr (Mar 2026); AMNS Odisha; Noida International Airport; TPL finished structures, INR 11.09 Cr (amended Feb 2026); TKIL / JSW Jaigarh Port, INR 14.63 Cr LoI (Jul 2026) | Per tonne / item rate |
| Modular / block fabrication | Dry-dock pontoon panels, hull blocks, CNC plate cutting | About 1,600 MT pontoon panels for Sadhav floating dry dock | Per tonne |
| Pipe spools | Industrial piping prefabrication | Over 10,000 inch-dia for Shell India (FY2026) | Per inch-dia |
| Precision industrial structures | Complex fabrication for MRO and battery facilities | Air India MRO; Agratas (Tata battery business) | Item rate |
| Container manufacturing (planned) | ISO shipping containers under a phased plan | Outreach to Maersk and Indian logistics aggregators (FY2026 AR); no order disclosed | Not yet launched |
Projects, Tankage & EPC SBU
| Offering | Description | Named references | Pricing |
|---|---|---|---|
| Large-diameter bulk liquid storage tanks | Design, supply, fabrication, erection, testing and commissioning; cone/floating-roof tanks; diameters of 79–81 m | IOCL Paradip crude tanks (INR 109.89 Cr, LSTK; final tank Dec 2025); IOCL Dhumad (INR 95.8 Cr, 2018); BPCL Haveli, Pune; HMEL Bathinda (2008) | LSTK |
| Aviation fuel farms and hydrant systems | ATF storage tanks and hydrant pipelines for airports | GMR Hyderabad (FY2020; further FY2025 works); Guwahati International Airport (hydrotests complete FY2026) | LSTK |
| Tank supply packages | Supply of storage tanks to owner-operators | Reliance Industries, 3 tanks, INR 13.20 Cr (Feb 2026) | Lump sum |
| Site structural fabrication and erection | Remit extended in FY2026 | — | Item rate |
| Gas / process plant mechanical packages | Piping and equipment erection | Tail-gas recovery project for PPL Goa (completed FY2025) | Lump sum |
Bid filter, as stated in the FY2026 AR: cash-flow positive; at least half the scope within core competence; 4–5 live projects of INR 30–150 Cr; no pure EPC or civil-heavy work.
Shipbuilding SBU
| Offering | Description | Named references | Pricing |
|---|---|---|---|
| Hull-block fabrication and erection | Blocks for defence and research vessels at partner yards | GRSE: DNV-classed multi-purpose vessel, DRDO/NPOL acoustic research ship, NCPOR ocean research vessel; follow-on hull erection order; 5 million safe man-hours certificate | Per tonne / item rate |
| Floating dry docks | 130 m × 31 m floating dry dock, Konkan Barges facility, Alibaug | Sadhav Offshore (maiden direct shipbuilding order, started FY2025) | Lump sum |
| Pontoons | Manufacture and supply | Mazagon Dock Shipbuilders (first order, FY2026) | Item rate |
| Small commercial / recreational / green craft (planned) | Water Metro boats, ferries, river cruise vessels, green fishing boats; design and brand access via ECHT Marine | Artson–MCL JV yard, Mattancherry Wharf, Kochi (7 acres; customs de-bonding complete) | Not yet launched |
Financial Narrative
Basis and sources.
-
FY2025 and FY2026 come from the FY2026 AR Board's Report (INR lakh, converted to Cr).
-
FY2022–FY2024 come from Screener (C-MOTS standalone data, rounded to whole crore for some line items), cross-checked against thecompanycheck.com and the FY2025 AR.
-
Gross profit is not publicly disclosed: the P&L presents expenses by nature (materials, project execution, employee costs), not cost of sales. It is therefore excluded from the tables.
Income statement
Notes:
-
FY2022–FY2024 tax expense is derived as PBT minus PAT on rounded Screener figures and is approximate.
-
FY2026 operating EBITDA excluding other income is derived as EBITDA including other income (-5.40) minus other income (0.10).
-
The FY2026 Board's Report "EBIDTA" is computed on gross turnover including other income.
Margins and growth
-
Revenue CAGR FY2022–FY2026 (4 years): -1.3% a year (INR 172.64 Cr to INR 163.58 Cr).
-
Screener's compounded sales growth: 10-year 4%, 5-year 2%, 3-year 8%.
Recent quarterly trajectory
Source: Screener quarterly results (standalone), cross-checked to BSE filings for Q1 and Q2 FY27.
H1 FY27 vs H1 FY26.
-
Revenue: INR 64.81 Cr vs INR 92.86 Cr (-30.2%).
-
Net profit: INR 1.60 Cr vs -INR 2.02 Cr.
TTM to Q2 FY27.
- Revenue INR 135.52 Cr; net loss INR 7.26 Cr; TTM EPS -INR 1.97.
Balance sheet
Source: Screener (rounded INR Cr), except FY2025 total equity (INR 46.84 million per the FY2025 AR summary on financialfilings.com) and FY2026 borrowings (FY2026 AR).
Balance-sheet notes:
FY2026 net worth reconciliation: Net worth fell less than the INR 10.88 Cr loss would imply, from INR 4.68 Cr to about INR 0.7 Cr. This is consistent with an equity credit from fair-valuing interest-free TPL loans, including the 31 Mar 2026 conversion of INR 9.59 Cr of payables into a long-term loan.
Sep 2026 book value: Screener shows INR 0.61 per share, implying net worth of about INR 2.25 Cr.
Cash: Cash and equivalents are negligible: INR 0.20 lakh at 30 Sep 2026 (ScanX, from the Q2 FY27 statement). Net debt of INR 53.34 Cr at Mar 2026 (Zerodha/Tijori) therefore roughly equals gross debt.
Short-term vs long-term debt split: Not publicly disclosed in the materials retrieved. Known components:
-
INR 40.30 Cr TPL loan, interest-free for 20 years, maturity extended from 2037 to 2042;
-
INR 9.59 Cr TPL payables-conversion loan, interest-free for ten years;
-
working-capital facilities from banks (CSB, IndusInd, DCB, Kotak, Federal, Union Bank).
Goodwill and intangibles: None material (no acquisitions).
Working capital: Structurally negative. Screener working-capital days: FY2022 -29, FY2023 -53, FY2024 -18, FY2025 10, FY2026 -6. This reflects heavy reliance on supplier and parent credit.
Cash flow
Source: Screener (rounded INR Cr). FY2025 CFO is INR 20.44 Cr per the FY2025 AR summary.
FY2025 investing inflow of INR 7 Cr is consistent with Nagpur Division sale proceeds. Capex is not separately disclosed in the retrieved data; it is implied at about INR 2–3 Cr a year (CFO minus FCF).
Ratios
Analyst computations use the tables above. ROE and debt/equity are not meaningful when equity is near zero.
Further ratio notes:
ROE: Screener reports -429% for FY2026. It is not meaningful on a near-zero equity base.
ROIC: Not computed: invested capital is unstable and claims-driven.
Current ratio: Not publicly disclosed in the retrieved data.
Debt/equity: About 10.5x at FY2025 (INR 49 Cr / INR 4.68 Cr); not meaningful at FY2026.
Net debt / EBITDA: About 2.9x at FY2025 (EBITDA including other income, which is inflated by the divestment gain). Negative EBITDA in FY2026 makes the ratio not meaningful.
Commentary: trends, inflections and drivers
Revenue: volatile, without a structural trend. Revenue peaked at INR 172.64 Cr in FY2022, when the IOCL Dhumad and Paradip tankage projects were in full swing. It fell to INR 113.55 Cr by FY2025. Over that period management stopped bidding open-market EPC, legacy sites stalled, and the Nagpur Division left the perimeter in December 2024.
FY2026's 44% rebound to INR 163.58 Cr came from three sources:
-
the start of manufacturing and shipbuilding work: Andritz exchangers, Sadhav dry dock, GRSE blocks;
-
tankage close-out billing;
-
structural tonnage at Parli.
The first half of FY2027 has fallen sharply (-30% YoY). That is consistent with the CEO's disclosure that Nashik and Parli were deliberately run light during their rebuild. It also reflects the end of Paradip billing.
Profitability: lumpy, driven by legacy provisioning and claims. Over five years the company booked cumulative net losses of about INR 29.9 Cr, against only two profitable years. Both profitable years leaned on non-core items:
FY2024: a tax credit of about INR 4 Cr lifted PAT above PBT.
FY2025: INR 19.5 Cr of other income, largely the Nagpur sale, turned an operating loss into a INR 4.80 Cr PBT.
FY2026 shows the underlying drag. A INR 14.35 Cr operating loss in Q3 FY26 reflected full provisioning of legacy disputes: the Paradip time and cost overruns, exit from the onerous GRSE mechanical contract, and reconciliation of balances with TPL. Recovery is being pursued through arbitration, and the AR says upside will be recognised only on conclusion.
Balance sheet: the parent is the lender of last resort. About INR 50 Cr of the INR 53 Cr of debt is interest-free TPL money. Finance costs have still not fallen below about INR 7–8 Cr a year, which implies meaningful costed bank working-capital lines.
Negative working-capital days look favourable on paper. In practice they signal stretched supplier credit:
-
Payable days reached 756 in FY2025.
-
Tracxn records 26 delayed MSME payments between Oct 2025 and Mar 2026.
Cash flow: weak and episodic. FCF was positive in FY2022 and FY2025, the latter helped by customer advances and divestment-era collections, and negative in the other years. The company cannot self-fund growth capex. Management has explicitly prioritised "targeted capacity expansion and strategic partnerships" over greenfield investment.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Sbu Details
| SBU (management structure, FY2026) | What it contains | Representative FY2026 work | Revenue / margin disclosure |
|---|---|---|---|
Manufacturing – Nashik Unit | Process equipment: pressure vessels, heat exchangers, ammonia tanks, refinery vessels, blast-furnace components, LTCS vessels | 24 SS 316L in-bed heat exchangers (Andritz); 4 × 435 m³ ammonia tanks (Deepak Nitrite); 74 refinery vessels, 56 IBR-certified (Mundra Petrochem); BF-2 downcomer and 6.5 m spherical vessel (Tata Steel) | — |
Manufacturing – Parli Multimodal Unit | Heavy structural fabrication, modular fabrication, pipe spools, dry-dock pontoon panels, block fabrication | About 1,600 MT pontoon panels; about 1,000 MT structures (AMNS, Noida International Airport); over 10,000 inch-dia pipe spools (Shell India); Air India MRO, Agratas | — |
Projects, Tankage & EPC | Large-diameter storage tanks (LSTK), aviation fuel farms, hydrant pipelines, site structural fabrication and erection | IOCL Paradip close-out; Guwahati International Airport fuel farm; Shell India tankage; RIL tanks | — |
Shipbuilding | Hull-block fabrication and erection, floating dry dock, pontoons, small craft (planned) | GRSE hull blocks (DNV-classed MPV, DRDO/NPOL acoustic research ship, NCPOR ocean research vessel); 130 m × 31 m floating dry dock (Sadhav, Alibaug); Mazagon Dock pontoons | Not publicly disclosed; CEO calls it the fastest-growing vertical |
“—” = not publicly disclosed.
Revenue by Segment and Segment Margins & Growth (%)
| Metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Revenue from operations (INR Cr) | 128.12 | 113.55 | 163.58 |
YoY growth (%) | -2.5 | -11.4 | 44.1 |
Income Statement and Per-Share Data
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue from operations (INR Cr) | 172.64 | 131.42 | 128.12 | 113.55 | 163.58 |
Other income (INR Cr) | 0.9 | 1.0 | 0.7 | 19.5 | 0.1 |
Total income (INR Cr) | 173.5 | 132.4 | 128.8 | 133.02 | 163.69 |
Operating EBITDA excl. other income (INR Cr) | 7 | -11 | 14 | -2 | -5.5 |
EBITDA incl. other income (INR Cr) | 8 | -10 | 15 | 16.97 | -5.40 |
Finance costs (INR Cr) | 11 | 10 | 10 | 9.78 | 8.27 |
Depreciation and amortisation (INR Cr) | 1 | 1 | 2 | 2.40 | 2.52 |
Profit before tax (INR Cr) | -4 | -21 | 2 | 4.80 | -16.19 |
Tax expense (INR Cr) | 1.0 | 2.5 | -4.0 | 1.31 | -5.31 |
Net profit (INR Cr) | -5.03 | -23.51 | 6.05 | 3.48 | -10.88 |
EPS basic and diluted (INR) | -1.36 | -6.37 | 1.64 | 0.94 | -2.95 |
Dividend per share (INR) | 0 | 0 | 0 | 0 | 0 |
Margin Analysis (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Operating EBITDA margin (%) | 3.9 | -8.0 | 11.0 | -2.2 | -3.4 |
Net margin (%) | -2.9 | -17.9 | 4.7 | 3.1 | -6.7 |
Revenue YoY growth (%) | 14.9 | -23.9 | -2.5 | -11.4 | 44.1 |
Income Statement and Margin Analysis (%)
| Metric | Q3FY25 | Q4FY25 | Q1FY26 | Q2FY26 | Q3FY26 | Q4FY26 | Q1FY27 | Q2FY27 |
|---|---|---|---|---|---|---|---|---|
Revenue (INR Cr) | 17.81 | 51.26 | 44.74 | 48.12 | 31.96 | 38.75 | 26.13 | 38.68 |
Operating profit (INR Cr) | -7.24 | 3.93 | 3.34 | -0.03 | -14.35 | 5.55 | 1.19 | 5.00 |
OPM (%) | -40.65 | 7.67 | 7.47 | -0.06 | -44.90 | 14.32 | 4.55 | 12.93 |
Other income (INR Cr) | 19.11 | 0.07 | 0.01 | 0.04 | 0.02 | 0.04 | 0.41 | 0.21 |
PBT (INR Cr) | 8.86 | 0.80 | 0.47 | -3.04 | -16.91 | 3.30 | -0.77 | 2.72 |
Net profit (INR Cr) | 6.38 | 0.60 | 0.22 | -2.24 | -12.22 | 3.36 | -0.41 | 2.01 |
EPS (INR) | 1.73 | 0.16 | 0.06 | -0.61 | -3.31 | 0.91 | -0.11 | 0.54 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansBalance Sheet
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Equity share capital (INR Cr) | 3.69 | 3.69 | 3.69 | 3.69 | 3.69 |
Reserves and surplus (INR Cr) | -3 | -19 | -3 | 1 | -3 |
Total equity / net worth (INR Cr) | 0.7 | -15.3 | 0.7 | 4.68 | 0.7 |
Total borrowings (INR Cr) | 53 | 59 | 64 | 49 | 53.35 |
Other liabilities (INR Cr) | 87 | 112 | 86 | 118 | 69 |
Total assets (INR Cr) | 141 | 156 | 151 | 172 | 123 |
Net fixed assets (INR Cr) | 11 | 12 | 17 | 14 | 14 |
Capital work in progress (INR Cr) | 0 | 0 | 0 | 0 | 3 |
Net debt (INR Cr) | 53 | 59 | 64 | 49 | 53.34 |
Cash Flow
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Cash from operations (INR Cr) | 14 | -4 | -4 | 20 | -5 |
Cash from investing (INR Cr) | -2 | -2 | -1 | 7 | 5 |
Cash from financing (INR Cr) | -16 | 7 | 5 | -23 | -4 |
Net cash flow (INR Cr) | -4 | 0 | 0 | 5 | -5 |
Free cash flow (INR Cr) | 12 | -7 | -7 | 18 | -8 |
Dividends paid (INR Cr) | 0 | 0 | 0 | 0 | 0 |
Buybacks (INR Cr) | 0 | 0 | 0 | 0 | 0 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
ROCE (%, Screener) | 12 | -22 | 23 | 25 | -15 |
ROA (%, net profit / total assets) | -3.6 | -15.1 | 4.0 | 2.0 | -8.8 |
Asset turnover (x) | 1.22 | 0.84 | 0.85 | 0.66 | 1.33 |
Interest coverage (x, (PBT + interest) / interest) | 0.64 | -1.10 | 1.20 | 1.49 | -0.96 |
Debtor days | 121 | 149 | 129 | 199 | 76 |
Inventory days | 47 | 245 | 182 | 302 | 103 |
Payable days | 354 | 551 | 401 | 756 | 326 |
Cash conversion cycle (days) | -187 | -157 | -91 | -256 | -148 |
Revenue by Region
| Metric | FY2025 | FY2026 |
|---|---|---|
Overseas revenue proxy: forex earnings (INR Cr) | 0.23 | 0 |
Domestic revenue (INR Cr, total less forex earnings) | 113.32 | 163.58 |
Forex outgo (INR Cr) | 0.79 | 0.05 |
Valuation Snapshot
| Metric | Value | Source |
|---|---|---|
Last close | INR 149 (19 Oct 2026) | Screener |
Market cap | about INR 549 Cr | Screener |
52-week high / low | INR 227.50 (19 Jun 2026) / INR 125.30 | Business Standard; Upstox |
All-time low | INR 0.85 (12 Feb 2003) | Business Standard |
Enterprise value | about INR 602 Cr (market cap plus net debt of INR 53.3 Cr) | Analyst computation |
P/E (TTM) | Not meaningful (TTM EPS -INR 1.97) | Screener |
P/B | about 245x (book value INR 0.61/share) | Screener |
EV/Sales | 3.7x FY2026; 4.4x TTM (INR 135.5 Cr) | Analyst computation |
EV/EBITDA | Not meaningful (negative FY2026 and TTM EBITDA) | Analyst computation |
Analyst consensus | No sell-side coverage identified | — |
Surveillance | Tagged GSM (Trendlyne) | Trendlyne |
Share Price & Returns
| Period | Return (%) |
|---|---|
1 year | -20 |
3 years (annualised) | -3 |
5 years (annualised) | 16 |
10 years (annualised) | 10 |
Capital Markets
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Dividend per share (INR) | 0 | 0 | 0 | 0 | 0 |
Buyback (INR Cr) | 0 | 0 | 0 | 0 | 0 |
Credit Ratings
| Agency | Rating | Outlook | Date |
|---|---|---|---|
India Ratings & Research (Fitch group) | IND A+ (issuer); IND A+/IND A1+ (bank facilities) | Stable | Affirmed 4 Aug 2026 |
Moody's / S&P / Fitch international | Not rated | — | — |
Capital Instruments
| Instrument | Amount (INR Cr) | Terms | Maturity |
|---|---|---|---|
TPL long-term loan | 40.30 | Interest-free | Extended from 2037 to 2042 (16 Oct 2026) |
TPL payables-conversion loan | 9.59 | Interest-free, ten years | About 2036 (inferred) |
Bank working-capital facilities | Balance of total borrowings (about INR 3–4 Cr implied) | Costed | Short-term (rolling) |
Total borrowings at 31 Mar 2026 | 53.35 | — | — |
Analyst Conclusions
Guidance and consensus
Management guidance (FY2026 AR): double-digit FY2027 revenue growth with gross-margin expansion; 20%+ EBITDA margin ambition over three to five years.
Consensus: none (no coverage).
Run-rate test: H1 FY27 revenue is INR 64.8 Cr. Meeting guidance on INR 163.58 Cr requires FY2027 revenue of at least about INR 180 Cr, so H2 must deliver about INR 115 Cr. That would be a near-record half-year, against INR 70.7 Cr in H2 FY26.
Bull case
-
The clean-up is done and capacity is rebuilt. Q4 FY26 delivered 14.3% OPM and Q2 FY27 12.9% OPM, showing that the rebuilt Nashik/Parli mix can earn double-digit margins once loaded.
-
Claims are a free option. The full downside was expensed in FY2026. Each recovery, such as Q2 FY27's INR 9.92 Cr, flows almost entirely to profit and can rebuild net worth quickly on a INR 3.7 Cr capital base.
-
The parent is leaning in, not out. The loan was extended to 2042, payables were converted into a long-term loan, and TPL's MD & CEO (Hebbar) plus its growth/M&A head (Patel) joined the board. With A+ rating support, that points to Artson being positioned as TPL's manufacturing and shipbuilding platform.
Bear case
-
The growth guidance is already slipping. H1 FY27 revenue fell 30%, and new 2026 order disclosures total only about INR 82 Cr: RIL 13.20, Anuppur 42.22, Deepak Chem Tech 5.40, TKIL 14.63, L&T-MHI 7.17. Most are small and short-cycle.
-
Earnings quality is low. In five years the only profitable years came from tax credits and divestment gains. Q2 FY27 profit relied on claim revenue. The new auditor may take a different view on claim recognition.
-
The valuation discounts an outcome the numbers have never shown. At INR 549 Cr market cap, about 245x book and 4.4x TTM EV/Sales, with no dividend possible until about 2042, the minority holder carries all the pivot risk and has no income.
Catalysts and monitorables (next 12 months)
| Monitorable | Why it matters | Timing |
|---|---|---|
| Q3 and Q4 FY27 revenue run-rate vs double-digit guidance | Validates the capability rebuild | Jan / Apr 2027 |
| Further claim recoveries and arbitration awards | Net worth and cash | Ongoing |
| Operationalisation of the Artson–MCL Kochi yard | Shipbuilding scale | FY2027 (guided "later this year") |
| First container or licensed-product order | Proof of the "structured product" thesis | FY2027 |
| Large orders (INR 30–150 Cr band) in tankage, airports or green hydrogen | Backlog visibility | Ongoing |
| Walker Chandiok's first audit (FY2027) and any changes in accounting judgement | Earnings quality | Apr–May 2027 |
| Strategic direction under new chairman Hebbar | Group role of Artson | Ongoing |
| Shareholder approval of the Hebbar / Patel appointments | Governance | Next general meeting |
| Ind-Ra annual review | Credit standing | Mid-2027 |
| MSME payment behaviour and payable days | Working-capital stress | Semi-annual |
Analyst verdict
Artson Limited is a Tata-backed micro-cap trying to turn a history of loss-making tankage EPC into a manufacturing-and-shipbuilding growth story. The evidence supports the claim that capability has improved:
-
an Andritz qualification won against eight domestic rivals;
-
EIL and PDIL approvals;
-
heavier plate handling;
-
active work at GRSE, Mazagon Dock and a large floating dry dock;
-
a flawless FY2026 safety record.
The evidence does not yet support the claim that this capability earns sustainable money. Over FY2022–FY2026 the company lost about INR 30 Cr cumulatively. Its two profitable years were flattered by a tax credit and a related-party divestment gain. Net worth is close to zero, interest coverage has not exceeded 1.5x, and suppliers, including MSMEs, appear to be financing the business.
FY2026's record revenue came with a INR 10.88 Cr loss. FY2027 began with revenue down 42% in Q1 and a Q2 profit that leaned on INR 9.92 Cr of claim revenue.
The decisive variable is Tata Projects. The parent has repeatedly socialised Artson's liabilities through interest-free loans, payables conversion and maturity extension to 2042. It now places its own MD & CEO in the chair. That support underwrites the A+ credit rating and, in practice, solvency.
Equity holders face an asymmetry. The parent's support is structured as debt with a dividend lock, while the 25% public float trades at roughly 245x book and 4.4x trailing EV/Sales on no forecastable earnings.
Verdict. The operating thesis is credible and the credit is supported; the equity is a speculative option on execution. Near-term evidence to watch:
-
H2 FY27 revenue above INR 100 Cr;
-
a disclosed backlog;
-
an operational Kochi yard;
-
at least one large private-sector order.
Without these, the investment case should be treated as unproven, and the guided double-digit FY2027 growth should be treated as unlikely.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Since / tenure | Background | Notes |
|---|---|---|---|---|
Sukumar Hebbar | Chairman, Additional Non-Executive Director | 12 Oct 2026 | MD & CEO, Tata Projects Limited | Appointment subject to shareholder approval at the next general meeting |
Shashank Jha (DIN 10116448) | Whole-Time Director & CEO (also COO remit) | Board since Apr 2023 (inferred from 19 Apr 2026 re-appointment for a further three years) | Over two decades in field service, business analysis, project management, sales and marketing; oil and gas domain | Re-appointed for three years from 19 Apr 2026 (postal ballot 22 May 2026) |
Subhra Gourisaria (DIN 11284765) | Non-Executive Director; Audit Committee chair | 15 Sep 2025 | Chartered Accountant (ICAI); ACCA Dip-IFRS; over 20 years in business finance, controllership, tax and audit. Born 17 Sep 1980 (age 46). Director at TP Luminaire, TQ Cert Services, TCC Construction, TPL Services, Ujjwal Pune; TPL Finance Committee member. | Remuneration nil; retired by rotation and offered herself for re-appointment at the 2026 AGM |
Neeraj Agrawal (DIN 08839302) | Non-Executive Director | 25 Mar 2026 | COO, Tata Projects (joined Oct 2022); former MD, McDermott India; BE Mechanical (AMU Aligarh), M.Tech Fluid Mechanics (IIT Delhi) | Approved by postal ballot 22 May 2026 |
Priti Patel | Additional Non-Executive Director | 12 Oct 2026 | Leads growth strategy, M&A, JVs and policy advocacy at Tata Projects | Subject to shareholder approval |
Jyotisman Dasgupta (DIN 10116452) | Independent Director; SRC chair | First term from Apr 2021 (inferred); second five-year term from 19 Apr 2026 | Not detailed in sources reviewed | — |
Priya Kher | Independent Director; NRC chair | — | Not detailed | — |
Ashish Kulkarni | Independent Director; CSR Committee chair | — | Not detailed | — |
“—” = not publicly disclosed.
Executive Leadership Team
| Name | Role | Since | Notes |
|---|---|---|---|
Shashank Jha | Whole-Time Director & CEO | See above | — |
Manoj Shah | Chief Financial Officer | 7 Apr 2025 | Succeeded Siva Rama Krishna Kambhampati, who resigned 29 Nov 2024 |
Deepak Tibrewal | Company Secretary & Compliance Officer | — | FCS 8925 |
“—” = not publicly disclosed.
Directors' Remuneration
| Component (FY2021, INR) | Amount |
|---|---|
Basic salary | 1,899,035 |
HRA | 759,614 |
Leave fare concession | 158,253 |
Other allowances | 2,799,056 |
Retirals | 626,682 |
Performance-linked reward | 2,440,600 |
Total | 8,683,240 |
Directors' Remuneration — Board size
| Item | Detail |
|---|---|
Board size | 8 after 12 Oct 2026: 1 executive, 4 TPL-nominee non-executives, 3 independents |
Independence | 3 of 8 (37.5%). Regulation 17 (half independent where the chair is promoter-linked) is not applicable: Regulations 17–27 do not apply because paid-up capital is under INR 10 Cr and net worth under INR 25 Cr (FY2026 AR, item 33). |
Chair / CEO separation | Yes: non-executive promoter-nominee chairman; separate WTD & CEO |
Board meetings FY2026 | 7 (2 Apr, 24 Apr, 22 Jul, 16 Oct, 1 Nov 2025; 13 Jan, 25 Mar 2026) |
Audit Committee | Gourisaria (chair, NED), Dasgupta (ID), Kulkarni (ID); 5 meetings in FY2026 |
Nomination & Remuneration | Kher (chair, ID), Pai (NED; replaced on reconstitution in Oct 2026), Dasgupta (ID); 3 meetings |
Stakeholders' Relationship | Dasgupta (chair), Kher, Jha; 3 meetings |
CSR Committee | Kulkarni (chair), Gourisaria, Jha; no meeting (CSR spend not applicable) |
Other committees | Project Review Committee (risk); Executive Committee; ESG Committee referenced |
Shareholding Trend
| Holder category | Jun 2026 (%) | Sep 2026 (%) |
|---|---|---|
Promoter: Tata Projects Limited | 75.00 | 75.00 |
FIIs | 0.00 | 0.00 |
DIIs | 0.01 | 0.01 |
Public / retail | 24.99 | 24.98 |
Metric | Mar 2022 | Mar 2023 |
Number of shareholders | 18,445 | 21,150 |
Competitive Landscape
Competitors by Segment
| Segment | Competitor | Listed? | Relative positioning vs Artson |
|---|---|---|---|
Tankage EPC | Larsen & Toubro (Energy / Heavy Engineering) | Yes | Orders of magnitude larger; competes for mega LSTK tank farms |
Tankage EPC | Vijay Tanks & Vessels (Vadodara) | No | Specialist tank contractor; direct competitor on refinery and terminal tanks |
Tankage EPC | Shapoorji Pallonji (SPCL) / Gammon-type civil-EPC players | Partly | Larger balance sheets; civil-heavy EPC that Artson avoids |
Tankage / process EPC | McDermott (CB&I) India | No | Global tank-technology heritage; cryogenic and spherical storage |
Process equipment | ISGEC Heavy Engineering | Yes | Much larger; pressure vessels, heat exchangers, boilers |
Process equipment | Godrej Enterprises (Process Equipment) | No (Godrej & Boyce) | Scale leader in critical vessels and reactors |
Process / cryogenic equipment | Inox India | Yes | Cryogenic tanks; strong margins; export-led |
Piping / pipe spools | DEE Development Engineers | Yes | Piping prefabrication specialist |
Structural fabrication | Pennar Industries; regional fabricators (e.g. Nagpur / Raigad clusters) | Pennar yes | Price-competitive tonnage players |
Hull blocks / modular shipbuilding | Titagarh Rail Systems (naval), Swan Defence, private block fabricators; shipyards' in-house shops | Partly | Shipyard partners can insource |
Small vessels | Cochin Shipyard (Water Metro builder), Goa Shipyard, regional yards | Partly | Incumbents in Water Metro and ferries; Artson is a new entrant |
Competitor Detail
| Metric | Artson |
|---|---|
Revenue | INR 163.58 Cr |
Revenue growth (FY2026) | 44.1% |
Operating EBITDA margin | -3.4% |
Net margin | -6.7% |