Ashoka Buildcon Limited Overview
Ashoka Buildcon is a mid-sized Indian infrastructure contractor and former road-asset developer. Over FY2025–FY2026 it changed from a balance-sheet-heavy BOT/HAM concessionaire into a leaner, mainly EPC (engineering, procurement and construction) business. Its core skill is highway construction: it has built more than 14,000 lane-km and electrified more than 30,000 villages through power T&D work [company data via Screener, 9M FY25]. It has added railway electrification and systems, urban flyovers and bridges, power transmission (including its first tariff-based competitive bidding, or TBCB, transmission asset) and a fast-growing overseas book in Saudi Arabia, Angola, Liberia and Guyana. Between September 2025 and November 2025 it sold five HAM and five BOT special-purpose vehicles (SPVs) for about INR 2,960 Cr and bought out SBI-Macquarie's minority stake in its concessions arm. This cut consolidated debt from about INR 4,910 Cr (Sep 2025) to about INR 2,773 Cr (Jun 2026). The stock trades below 0.5x consolidated book value. The market is pricing weak execution and a subdued domestic road-awarding cycle against a INR 15,251 Cr order book.
What the company does
Ashoka Buildcon is described as an integrated EPC, BOT (build-operate-transfer) and HAM (hybrid annuity model) infrastructure company. Its main area is roads and highways, and it is also active in power transmission and distribution, railways, buildings and urban infrastructure [TipRanks company description, Q1 FY26; Business Upturn, Q1 FY27]. Exchange-facing descriptions also list construction and maintenance of roads, toll-road operations, and sales of ready-mix concrete (RMC) and related materials [Capital Market / Business Standard boilerplate; Screener].
Business and revenue model
| Revenue stream | Nature | Model | Current relevance |
|---|---|---|---|
| Road EPC (domestic) | Fixed-price or item-rate construction contracts for NHAI, MoRTH, state agencies and municipal bodies | Service / contract revenue, recognised over time | Largest stream: 49.3% of standalone Q1 FY27 revenue [Investywise, Q1 FY27 call] |
| Road HAM construction | EPC revenue earned by building the company's own HAM SPVs; the SPVs receive 40% construction support and 60% annuity from NHAI | Contract revenue plus annuity and interest income in SPVs | Declining: 10.2% of Q1 FY27 revenue, down from 52% of revenue in FY2020 [ICRA, Oct 2025] |
| Power T&D EPC | Substations, lines, rural electrification and distribution rehabilitation, in India and overseas | Contract revenue | 18.4% of Q1 FY27 revenue; 33% of order book [PL Capital, Aug 2026] |
| Railways | Electrification (OHE/traction), new lines, and tunnel E&M systems | Contract revenue | 11.5% of Q1 FY27 revenue [Investywise] |
| Buildings / urban infrastructure | Flyovers, signature bridges, Diriyah hotel works | Contract revenue | 3.7% of FY2026 order book [ScanX, FY2026] |
| BOT toll / annuity operations | Toll collection in retained BOT SPVs (e.g., Jaora–Nayagaon, 61.17%) and annuity assets (e.g., Chennai ORR) | Concession revenue | Much smaller after the Nov 2025 sale of five BOT SPVs. Gross toll was INR 356.7 Cr in Q2 FY26 [FilingReader, Nov 2025] |
| Transmission TBCB (new) | Sakoli Power Transmission Ltd, with annual transmission charges of about INR 126.54 Cr for 35 years | Regulated, annuity-like tariff | Acquired 23 Sep 2026 [ScanX / Whalesbook, Sep 2026] |
| Sale of goods | Ready-mix concrete, processed bitumen (Pune facility dating from 2005) | Product sales | Minor |
Product vs. service vs. subscription vs. licensing mix: More than 90% of revenue is construction service and contract revenue. Product sales (RMC, bitumen) are small. Licensing and subscription revenue are nil. Concession revenue (toll and annuity) was material before FY2026 but is now marginal. The company does not disclose an exact split in the sources reviewed.
Value-chain position and customers
Ashoka sits in the construction and development layer of the infrastructure value chain. It bids for government contracts, designs and builds the asset, and historically also financed and operated assets through SPVs. Its strategy now is to recycle these assets: build, hold until commercial operation date (COD), then sell to InvITs such as Maple Infrastructure Trust or Edelweiss's Infrastructure Yield Trust.
Customers are almost entirely sovereign or quasi-sovereign:
-
NHAI and MoRTH
-
Indian Railways zones (North Western Railway, North Eastern Railway) and RVNL
-
Municipal bodies (BMC, Mumbai)
-
REC Power Development & Consultancy (transmission)
-
Foreign governments and state entities: Diriyah Company (owned by Saudi Arabia's PIF), Angola's Ministry of Water and Energy, Liberia's Ministry of Public Works, and Guyana's Central Housing & Planning Authority [exchange filings, 2026]
Independent characterisation
Ashoka is a capital-recycling EPC contractor in mid-transition. FY2026 earnings are dominated by about INR 2,144 Cr of exceptional gains from stake sales [AskFuzz citing FY2026 results], so headline P/E figures near 1.2x are meaningless as a measure of sustainable earnings. Core economics are those of a standalone EPC contractor. That business earned about INR 5,952 Cr revenue, INR 636 Cr EBITDA (10.7% margin) and INR 320 Cr PAT in FY2026 [Sharekhan, May 2026], and management now guides 9–9.5% EBITDA margins for FY2027. The investment question is whether diversification into power, rail and overseas work can replace a shrinking domestic road-award market without diluting margins or adding working-capital strain.
Strategy
Stated strategic themes
From the Q3 FY26, Q4 FY26 and Q1 FY27 earnings calls and presentations (paraphrased):
-
Asset-light pivot and capital recycling. Exit capital-heavy domestic BOT and HAM assets after COD, sell them to InvITs, and use the proceeds to cut debt and fund new work. Ten HAM and BOT assets were monetised in FY2026 [AlphaSpread, Q4 call].
-
Quality and sustainability of earnings. Management describes a shift towards quality and sustainability, and a renewed but selective look at PPP models [Investywise, Q3 FY26].
-
Diversification beyond domestic roads. Expand in railways, power T&D (including TBCB ownership) and urban infrastructure.
-
International expansion. Grow from 7 to 10 countries, focusing on the Gulf and Africa, to offset weak domestic road awards [Sahi, Q1 FY27].
-
Balance-sheet discipline. Keep the AA rating, cut working-capital borrowing, and keep standalone debt at about INR 1,100–1,400 Cr.
Initiatives announced in the last 24 months
| Initiative | Date | Detail | Status |
|---|---|---|---|
| Sale of 11 HAM SPVs to Edelweiss (Infrastructure Yield Trust / Epic Concesiones 2) | Agreed Dec 2024 – Jan 2025 | INR 2,324 Cr aggregate | 5 sold (INR 1,146 Cr, Sep 2025); about 6 pending. TS-1/2/3 and BS deadlines extended to 31 Oct 2026; 2 more by Q4 FY27 |
| Sale of 5 BOT SPVs to Maple InvIT | Agreed 2024; closed 26 Nov 2025 | INR 1,814.42 Cr including shareholder loans | Closed |
| SBI-Macquarie exit from ACL | Sep and Nov 2025 | INR 882.25 Cr plus INR 667 Cr | Closed; ACL now 100% owned |
| JTCL stake increase | Q2 FY26 | 26% for INR 166.6 Cr, taking holding to 61.17% | Closed |
| Saudi subsidiary and Diriyah JV | Feb 2026 | JV with BEC Arabia | Executing |
| Entry into TBCB transmission | Aug–Sep 2026 | Sakoli Power Transmission | Acquired; construction phase |
| Gems & Jewellery Park, Raipur | Q1 FY27 | Ashoka-RDB SPV, 51% | Incorporated |
| Purestudy dilution | Q1 FY27 | Stake cut from 59% to 39.33% | Completed; now an associate |
| ESG | Jan 2026 | Unsolicited SES ESG score of 72.2 | Informational |
Cost programmes: No formal cost-reduction programme with quantified targets has been disclosed.
Medium-term guidance
| Guidance item | Original (May 2026, Q4 FY26 call) | Revised (Aug 2026, Q1 FY27 call) |
|---|---|---|
| FY2027 revenue growth | About 20% | 10–15% |
| FY2027 order inflow | INR 8,000–10,000 Cr | INR 6,000–8,000 Cr (INR 780–800 Cr booked in Q1; about INR 1,800 Cr at L1) |
| FY2027 EBITDA margin | 9.5–10.5% | 9–9.5%; H2 recovery to about 9.5% |
| FY2027 capex | — | About INR 125 Cr |
| Monetisation | 4 assets by Jun 2026, 2 by Dec 2026 | About INR 700 Cr from 4 assets by Sep 2026 (now slipped to Oct 2026); 2 by Q4 FY27 |
Sources: AlphaSpread; Investywise; PL Capital; Quartr.
Products & Services
Roads & Highways — EPC
Offering: Design-build of national and state highways, expressways, elevated corridors, bypasses and bridges.
Capability: More than 14,000 lane-km constructed [9M FY25 company data].
Customers: NHAI, MoRTH, state PWDs and road development corporations.
Pricing: Lump-sum EPC with price-variation clauses.
Flagship and current projects: - NH-66 Aroor–Thuravoor Thekku six-lane elevated corridor, Kerala (Km 366.330–379.082), the site of the Nov 2025 incident [Muthoot Securities, Nov 2025]
-
Provisional COD certificate received for an NHAI project on 10 Mar 2026 [Emkay news feed]
-
Signature bridge contract of INR 307.7–308 Cr won in Jan 2026 [IIFL; Screener]
Roads — HAM construction and development
Offering: Construction of the company's own HAM SPVs. NHAI pays 40% of project cost as construction support and the rest as semi-annual annuities with interest.
Status: The company is exiting this model. HAM SPVs are sold after COD to InvITs.
HAM assets listed as ABL-owned at 100% in FY2026: Banwara–Bettadahalli, Bettadahalli–Shivamogga, Basavantpur–Singnodi, Bowaichandi–Guskar [FY2026 presentation via Multibagg].
Monetised in Sep 2025: Includes Ashoka Kharar Ludhiana Road Ltd and Ashoka Ranastalam Anandapuram Road Ltd [FilingReader, Sep 2025].
Contracted for sale: Ashoka Khairatunda Barwa Adda Road, Ankleshwar Manubar Expressway, Kandi Ramsanpalle Road, Karadi Banwara Road, Mallasandra Karadi Road, Banwara Bettadahalli Road and Baswantpur Singnodi Road [Business Upturn, Jun 2026].
COD milestones: - Kandi–Ramsanpalle (NH-161) completion certificate [Q2 FY25 presentation]
-
Baswantpur–Singnodi COD from 15 Sep 2024 for a 39.07 km stretch
-
Karadi–Banwara COD from 11 Feb 2025 for 8.595 km, in addition to 41.61 km from 8 Sep 2023 [Directors' Report FY2025 via IIFL]
Roads — BOT toll and annuity (retained)
Jaora–Nayagaon Toll Road (Madhya Pradesh): 61.17% effective holding via Viva Highways after a further 26% bought for INR 166.6 Cr [Angel One; FilingReader].
- Chennai Outer Ring Road (annuity), Bagewadi–Saundatti and Hungud–Talikot: held by ABL [FY2026 presentation].
Divested in Nov 2025: Ashoka Highways (Bhandara), Ashoka Highways (Durg), Belgaum–Dharwad Tollway, Sambalpur–Baragarh Tollway and Dhankuni–Kharagpur Tollway [Business Standard, Nov 2025].
Power Transmission & Distribution EPC
Offering: Substations, HT/LT lines, rural electrification, and distribution-network rehabilitation.
Track record: More than 30,000 villages electrified [9M FY25 company data].
Customers: State distribution companies, central schemes and overseas utilities.
Flagship: Luanda (Angola) distribution-network rehabilitation, $72.36 m, Ministry of Water and Energy, Angola (Apr 2026), covering design, supply, installation and commissioning [HDFC Sky, Apr 2026].
Order book: INR 5,066 Cr at Jun 2026.
Power Transmission — TBCB asset ownership (new)
Sakoli Power Transmission Ltd: Establishment of the Sakoli substation in Bhandara district, Maharashtra. Won through tariff-based competitive bidding (TBCB) with annual transmission charges of about INR 126.54 Cr for 35 years. Letter of intent (LoI) received Aug 2026 and SPV acquired for INR 3.06 Cr on 23 Sep 2026 [AskFuzz; Sahi; ScanX].
Significance: This is a shift from pure contracting to regulated-return asset ownership in transmission.
Railways
Traction and electrification upgrades: North Western Railway LOAs of INR 499.95 Cr and INR 539.35 Cr, each with a 24-month timeline (Q2 FY26) [FilingReader, Nov 2025].
Tunnel electro-mechanical systems: - Client and project: RVNL, Rishikesh–Karnprayag new BG line, Package-3 under E-4, tunnels T-13 to T-16 [Angel One; JKBFSL, Aug 2026]
-
Value: INR 602.16 Cr including GST
-
Scope: GIS substations, cabling, DG sets, lighting, UPS, ventilation and fire-fighting
-
Terms: 30-month execution, INR 25.51 Cr performance guarantee, 2-year defect liability period
North Eastern Railway: INR 290.23 Cr order, about mid-October 2026 [ScanX news feed].
Buildings & Urban Infrastructure
BMC Sion–Panvel flyover: Additional order of INR 447.21 Cr (Dec 2025) [IIFL].
BMC flyover project in JV: INR 1,041 Cr (Dec 2025) [IIFL].
Diriyah II, Saudi Arabia: Main construction works for a hotel ("Delivery Partner for One Hotel"), JV with BEC Arabia, client Diriyah Company (PIF) [BSE filing, Feb 2026]. A further Diriyah LOA worth INR 846.4 Cr followed in May 2026 [Sahi]. On the Q4 FY26 call, management cited Saudi contracts of about INR 1,800 Cr [GuruFocus transcript summary].
International road EPC
Liberia: Upgrade of roads from Nrowkia Sasstown Junction to Barclayville, to Sasstown, and part of Nipleppo road. $45,276,621; 24 months; Ministry of Public Works (Feb 2026) [NSE filing].
Guyana: Highway project from the Central Housing & Planning Authority. GYD 7.455 bn (about $35.42 m, about INR 334 Cr); item-rate contract; 20 months (Jun 2026) [ScanX; Sahi].
- ICRA also cites past overseas work in the Maldives and Bangladesh [ICRA, CP rating].
Materials and other
Ready-mix concrete and processed bitumen: Pune facility since 2005.
Gems & Jewellery Park, Raipur: Ashoka-RDB SPV, 51% stake. Management's wording implies an earlier park also exists.
Ashoka Purestudy Technologies: Education-technology venture, now an associate at 39.33%.
Financial Narrative
Income statement (consolidated, INR Cr)
Notes:
-
The FY2026 filing reports consolidated PAT of INR 2,575.80 Cr including exceptional gains of INR 2,143.67 Cr from stake sales [AskFuzz citing FY2026 results]. StockAnalysis shows INR 2,550 Cr net income to common shareholders. The difference is likely minority interest and other comprehensive income.
-
EPS in the table is net income divided by shares and may differ slightly from the reported figure.
-
Screener reports no dividend payouts in recent years. Eulerpool's "0.66% yield" contradicts this and is treated as unreliable. The Q1 FY27 filing confirms no dividend for that quarter [Multibagg].
Margins (consolidated, %)
Revenue CAGR: 5.8% over FY2022–FY2026 (four years). It was 18.7% over FY2022–FY2025, before deconsolidation of the sold SPVs.
Commentary:
Consolidated vs. core margins: Consolidated margins look high (20–30% EBITDA) because they include high-margin concession revenue from toll and annuity SPVs. The core EPC margin is much lower: standalone EBITDA was 9.4% in FY2025 and 10.7% in FY2026 [Sharekhan, May 2026].
FY2023 dip: Net margin fell in FY2023 because of one-off charges ("other unusual items" of about INR -72 Cr) and rising interest costs.
FY2025–FY2026 jump: The increase is non-operating. It comes from stake-sale gains and deferred tax credits. FY2025 PAT of INR 1,694 Cr exceeded PBT of INR 1,555 Cr because of a tax write-back.
Quarterly trend: The quarterly run-rate has been falling. Consolidated EBITDA margin was 28.84% in Q4 FY25, 13.48% in Q4 FY26 [AskFuzz] and 19.0% in Q1 FY27 [Investywise].
Standalone (core EPC) performance (INR Cr)
Source: Sharekhan summary of the FY2026 press release (22 May 2026). FY2025 values are back-calculated from the stated percentage changes (-17% revenue, -6% EBITDA, +63% PAT) and the stated 9.4% FY2025 margin. FY2026 standalone debt of INR 1,127 Cr comprised INR 70 Cr equipment loans, INR 757 Cr working-capital loans and INR 300 Cr NCDs [AskFuzz].
Separately, an aggregator (Finology) shows FY2025 standalone revenue of about INR 7,727 Cr, computed as expenditure of 7,150 plus operating profit of 576. That figure conflicts with the back-calculated INR 7,171 Cr. The gap probably reflects different treatment of other income or revenue definitions. The company-sourced figure is preferred here.
Q1 FY27 standalone vs. consolidated:
Standalone: Total income INR 1,320.4 Cr (-1% YoY); revenue from operations INR 1,287.9 Cr; EBITDA INR 125.5 Cr (9.5%, down 180 bps); PBT INR 43 Cr; PAT INR 31.5 Cr (+3%) [Investywise; Multibagg]. PL Capital calculates core EBITDA excluding other income at INR 92.9 Cr (7.2% margin), held back by mobilisation costs on new projects.
Consolidated: Revenue from operations INR 1,499.61 Cr (-20.5%); total income INR 1,533.7 Cr; EBITDA INR 292 Cr (-55%); PAT INR 127.77 Cr (-41% to -44%, depending on the comparison base) [Sahi; Univest; Quartr].
Balance sheet (consolidated, INR Cr)
Source: StockAnalysis balance sheet (INR mn converted to Cr), FY2022–FY2026.
The jump in intangibles in FY2023–FY2024 and the fall in FY2025 reflect reclassification of concession intangibles to held for sale. They do not reflect impairment.
Table 6.5 — Company-reported consolidated debt (INR Cr)
Sources: Business Standard (Dec 2022, Jun 2024); FilingReader (Sep 2025); Q3 FY26 call (Dec 2025); Business Standard via AskFuzz (Jun 2026). Standalone debt at Mar 2026 was INR 1,127 Cr. Consolidated debt-to-equity was 0.45x at Jun 2026 [Sahi].
Cash flow (consolidated, INR Cr)
Sources: StockAnalysis (free cash flow); Craytheon (operating, investing and financing cash flow FY2024–FY2025: investing +258 / -626 Cr, financing -407 / -1,052 Cr).
Capex guidance for FY2027 is about INR 125 Cr, with INR 25 Cr spent in Q1 [Investywise, Q1 FY27 call]. No buyback has been authorised (the share count fell by only 0.05 mn in FY2026, which is immaterial).
Ratios (consolidated; analyst-computed, year-end basis)
Trend commentary:
-
Growth phase, FY2021–FY2024. Revenue rose from about INR 4,992 Cr (FY2021) to INR 9,799 Cr, driven by HAM construction for the company's own SPVs. Debt rose with it, to about INR 7,000 Cr consolidated.
-
Monetisation phase, FY2025–FY2026. SPV sales released capital, improved book value (common equity up 4.8x in four years) and cut debt by more than 60%. They also removed concession revenue, so consolidated revenue fell 25% in FY2026.
-
Execution trough, FY2026–Q1 FY27. Standalone revenue fell 17% in FY2026 because of a weak domestic award cycle, slow-moving projects and the NHAI suspension overhang. The Q1 FY27 margin dipped because of mobilisation costs. The key question for FY2027 is whether H2 delivers revenue growth.
Quarterly consolidated revenue (INR Cr)
Source: Fyers quarterly P&L series.
Table 6.9 — Quarterly consolidated PAT (INR Cr)
Sources: Business Standard; IIFL; AskFuzz; Sahi. Sahi gives Q4 FY26 as INR 143 Cr against AskFuzz's INR 146.80 Cr; the difference is likely reported PAT vs. PAT attributable to owners. Q1 FY26 is shown as INR 217.39 Cr (Sahi); Univest gives INR 226 Cr.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Revenue by Segment
| Segment | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Total consolidated revenue from operations (INR Cr) | 9,799 | 10,037 | 7,520 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansBusiness Lines
| Business line | Q3 FY26 | Q1 FY27 |
|---|---|---|
Road EPC (%) | 51.9 | 49.3 |
Road HAM (%) | 13.2 | 10.2 |
Power T&D (%) | 21.9 | 18.4 |
Railways (%) | 9.0 | 11.5 |
Others incl. buildings (%) | 4.0 | 10.6 |
Revenue by Segment (%)
| Segment | Dec 2024 | Mar 2026 |
|---|---|---|
Road EPC (%) | 58.0 | 46.3 |
Power T&D (%) | 23.0 | 30.2 |
Road HAM (%) | 13.0 | 10.6 |
Railways (%) | 3.0 | 9.3 |
Building EPC (%) | 3.0 | 3.7 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansRevenue by Segment (Jun 2024–Jun 2026)
| Metric | Jun 2024 | Sep 2024 | Dec 2024 | Jun 2025 | Sep 2025 | Dec 2025 | Mar 2026 | Jun 2026 |
|---|---|---|---|---|---|---|---|---|
Total order book (INR Cr) | 10,356 | 11,104 | 16,457 | 15,886 | 14,888 | 15,927 | 15,312 | 15,251 |
Income Statement and Margin Analysis (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue from operations (INR Cr) | 5,999 | 8,101 | 9,799 | 10,037 | 7,520 |
Revenue growth YoY (%) | 20.2 | 35.0 | 21.0 | 2.4 | -25.1 |
Gross profit (aggregator, INR Cr) | 2,379 | 2,677 | 3,167 | 3,807 | 2,604 |
Operating income (aggregator EBIT, INR Cr) | 1,451 | 1,628 | 1,886 | 2,630 | 1,722 |
EBITDA (Screener operating profit, INR Cr) | 1,789 | 1,969 | 2,235 | 2,920 | — |
Interest expense (INR Cr) | 646 | 725 | 822 | 862 | 912 |
Profit before tax (INR Cr) | 932 | 588 | 870 | 1,555 | — |
Net income attributable (INR Cr) | 779 | 292 | 503 | 1,694 | 2,550 |
EPS basic (INR, analyst-computed on 28.07 Cr shares) | 27.7 | 10.4 | 17.9 | 60.3 | 90.8 |
Dividend per share (INR) | 0 | 0 | 0 | 0 | 0 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansMargin Analysis (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Gross margin (%) | 39.7 | 33.0 | 32.3 | 37.9 | 34.6 |
Operating margin (%) | 24.2 | 20.1 | 19.3 | 26.2 | 22.9 |
EBITDA margin (%) | 29.8 | 24.3 | 22.8 | 29.1 | — |
Net margin (%) | 13.0 | 3.6 | 5.1 | 16.9 | 33.9 |
Income Statement and Margin Analysis (%) (FY2025–FY2026)
| Metric | FY2025 | FY2026 |
|---|---|---|
Standalone revenue (INR Cr) | 7,171 | 5,952 |
Standalone EBITDA (INR Cr) | 677 | 636 |
Standalone EBITDA margin (%) | 9.4 | 10.7 |
Standalone PAT (INR Cr) | 196 | 320 |
Standalone debt, year-end (INR Cr) | — | 1,127 |
Balance Sheet
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Total assets (INR Cr) | 15,465 | 17,145 | 19,124 | 20,770 | 13,050 |
Cash & equivalents (INR Cr) | 370 | 198 | 459 | 167 | 663 |
Cash & short-term investments (INR Cr) | 404 | 680 | 917 | 619 | 674 |
Total debt, aggregator basis (INR Cr) | 3,635 | 5,509 | 5,450 | 1,988 | 1,609 |
Net debt, aggregator basis (INR Cr) | 3,231 | 4,829 | 4,533 | 1,369 | 934 |
Shareholders' equity incl. minorities (INR Cr) | 1,600 | 1,896 | 2,425 | 4,159 | 6,576 |
Common equity (INR Cr) | 1,381 | 1,676 | 2,220 | 3,915 | 6,579 |
Intangible assets incl. concession rights (INR Cr) | 855 | 6,600 | 6,313 | 721 | 671 |
Total current assets (INR Cr) | 11,364 | 9,188 | 11,031 | 17,758 | 10,142 |
Total current liabilities (INR Cr) | 10,159 | 7,841 | 9,412 | 14,438 | 4,557 |
Working capital (INR Cr) | 1,205 | 1,347 | 1,619 | 3,320 | 5,585 |
Key Financials
| Metric | Dec 2022 | Jun 2024 | Sep 2025 | Dec 2025 | Jun 2026 |
|---|---|---|---|---|---|
Consolidated debt (INR Cr) | 6,987 | 7,183 | 4,910 | 2,722 | 2,773 |
Standalone debt (INR Cr) | 846 | 1,410 | 1,362 | — | — |
Cash Flow
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Operating cash flow (INR Cr) | — | — | 749 | 1,673 | — |
Capex, derived as OCF minus FCF (INR Cr) | — | — | 146 | 118 | — |
Free cash flow (INR Cr) | 208 | 313 | 603 | 1,555 | 537 |
Dividends paid (INR Cr) | 0 | 0 | 0 | 0 | 0 |
Buybacks (INR Cr) | 0 | 0 | 0 | 0 | 0 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
ROE on year-end common equity (%) | 56.4 | 17.4 | 22.7 | 43.3 | 38.8 |
ROA on year-end total assets (%) | 5.0 | 1.7 | 2.6 | 8.2 | 19.5 |
ROIC, post-tax EBIT at 25% tax over equity plus debt (%) | 21.0 | 16.5 | 16.0 | 32.0 | 15.7 |
Current ratio (x) | 1.12 | 1.17 | 1.17 | 1.23 | 2.23 |
Debt / equity, aggregator debt (x) | 2.27 | 2.91 | 2.25 | 0.48 | 0.24 |
Net debt / EBITDA (x) | 1.81 | 2.45 | 2.03 | 0.47 | — |
Interest coverage, EBIT / interest (x) | 2.25 | 2.25 | 2.30 | 3.05 | 1.89 |
Asset turnover (x) | 0.39 | 0.47 | 0.51 | 0.48 | 0.58 |
Cash conversion cycle, Screener (days) | -52 | -28 | -49 | -46 | — |
Income Statement
| Metric | Q1 FY24 | Q2 FY24 | Q3 FY24 | Q4 FY24 | Q1 FY25 | Q2 FY25 | Q3 FY25 | Q4 FY25 | Q1 FY26 | Q2 FY26 | Q3 FY26 | Q4 FY26 | Q1 FY27 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Consolidated revenue (INR Cr) | 1,935 | 2,154 | 2,657 | 3,052 | 2,465 | 2,489 | 2,388 | 2,694 | 1,887 | 1,851 | 1,827 | 1,954 | 1,500 |
Key Financials (Quarterly)
| Metric | Q2 FY25 | Q3 FY25 | Q1 FY26 | Q2 FY26 | Q3 FY26 | Q4 FY26 | Q1 FY27 |
|---|---|---|---|---|---|---|---|
Consolidated PAT (INR Cr) | 462 | 662 | 217 | 91 | 2,111 | 147 | 128 |
Revenue by Region
| Region | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Total consolidated revenue (INR Cr) | 9,799 | 10,037 | 7,520 |
Country Overview
| Country | Client | Segment | Value | Date | Source |
|---|---|---|---|---|---|
Saudi Arabia | Diriyah Company (PIF), in JV with BEC Arabia | Buildings (hotel) | Part of about INR 1,800 Cr Saudi wins cited on the Q4 call | Feb 2026 | BSE filing; GuruFocus |
Saudi Arabia | Diriyah Company | Buildings | INR 846.4 Cr | May 2026 | Sahi |
Liberia | Ministry of Public Works | Road EPC | $45.28 m | Feb 2026 | NSE filing |
Angola | Ministry of Water & Energy | Power distribution | $72.36 m | Apr 2026 | HDFC Sky |
Guyana | Central Housing & Planning Authority | Highway | GYD 7.455 bn (about $35.42 m) | Jun 2026 | ScanX |
Valuation Snapshot
| Metric | Value | Date / source |
|---|---|---|
Last verified price | INR 101.40 | 8 Oct 2026, Value Research |
52-week high / low | INR 214.35 / INR 101.00 | Anand Rathi, Sep 2026 |
All-time high | INR 319 | Equentis / Anand Rathi |
1-year return | About -42% | Anand Rathi, 21 Sep 2026 (-41.8%) |
3-year return | About +7% (cumulative) | Anand Rathi, Sep 2026 |
5-year return | About +11% (cumulative) | Equentis, Apr 2026 (dated) |
Biggest recent move | +15% on 31 Aug 2026 | AskFuzz |
Share Price
| Metric | Nov 2025 | Jan 2026 | Mar 2026 | May 2026 | Jun 2026 | Aug 2026 | Sep 2026 | Oct 2026 |
|---|---|---|---|---|---|---|---|---|
Share price (INR) | 178.50 | 149.99 | 110.74 | 123.20 | 131.03 | 112.92 | 112.35 | 101.40 |
Valuation Snapshot by Multiple
| Multiple | Value | Basis |
|---|---|---|
P/E (trailing, reported) | About 1.2x | Distorted by exceptional gains [Value Research] |
P/E on FY2026 standalone PAT | About 8.9x | INR 2,849 Cr / INR 320 Cr |
P/B (consolidated) | About 0.43x | Consolidated equity of about INR 6,576 Cr. Anand Rathi quotes 0.83x, which is likely a standalone basis |
EV / Sales (trailing) | About 0.7x | EV of about INR 4,960 Cr (market cap + INR 2,773 Cr debt − about INR 663 Cr cash) / trailing revenue of INR 7,132 Cr |
Credit Ratings
| Agency | Instrument | Rating | Outlook / watch | Date |
|---|---|---|---|---|
CARE Ratings | Long-term bank facilities (INR 200 Cr) and NCDs (INR 300 Cr) | AA- | Rating Watch Positive | 9–13 Jan 2026 |
CARE Ratings | Short-term | A1+ | Rating Watch Positive | 9–13 Jan 2026 |
Rating revision (agency per Feb filing) | Long-term | AA, as cited on the Q4 FY26 call | Stable | 25 Feb 2026 |
ICRA | CP (INR 100 Cr) | A1+ | Reaffirmed | 30 Oct 2025; 17 Dec 2025 |
Moody's / S&P / Fitch | — | Not rated | — | — |
Analyst Conclusions
Guidance and consensus
Management guidance (Aug 2026): FY2027 revenue growth of 10–15%, EBITDA margin of 9–9.5% (recovering to about 9.5% in H2), order inflow of INR 6,000–8,000 Cr, and capex of about INR 125 Cr. Remaining HAM monetisation: about INR 700 Cr from four assets (now targeted for 31 Oct 2026) and two more by Q4 FY27.
- Available broker targets (INR 183–214) imply 80–110% upside, but most predate the August guidance cut.
Bull case
-
Valuation floor. At about 0.43x consolidated book and about 9x standalone earnings, with consolidated debt down about 60% in two years, the market is pricing a far worse outcome than the INR 15,251 Cr order book suggests.
-
Mix shift. About 40% of the order book is now power T&D and rail, plus a TBCB annuity of about INR 126.54 Cr a year. This should cushion the domestic road downturn and lift earnings quality.
-
Monetisation cash. Completing the six-SPV sale (about INR 1,150 Cr) would leave standalone net debt close to zero and free capital for growth or shareholder returns.
Bear case
-
Execution. Revenue fell 17% in FY2026 and was flat in Q1 FY27, and growth guidance was cut within one quarter. Core EBITDA of 7.2% in Q1 FY27 points to structural margin pressure.
-
Monetisation slippage. Repeated deadline extensions suggest problems with lender or NHAI approvals. Any value cut would hurt book value and credibility.
-
Reputation and client concentration. The NHAI suspension and the ongoing CBI case could weigh on domestic tenders, while overseas work brings unfamiliar payment and currency risks.
Catalysts and monitorables (next 12 months)
-
Closing of the TS-1/2/3 and BS HAM SPV sales by 31 Oct 2026, and the remaining two by Q4 FY27
-
Q2 FY27 results (expected November 2026): standalone revenue growth and recovery in core EBITDA margin
-
Order inflow against the INR 6,000–8,000 Cr guidance, including conversion of about INR 1,800 Cr of L1 positions
-
Financial close and construction progress at Sakoli
-
Diriyah and Angola execution milestones and cash collection
-
Any development in the CBI investigation
-
Use of capital: dividend initiation, debt repayment or new PPP or TBCB bids
-
Credit rating actions after the monetisation
Analyst verdict
Ashoka Buildcon has finished the hardest part of a multi-year balance-sheet repair. Between September and November 2025 it sold ten road SPVs for about INR 2,960 Cr. It took full ownership of its concessions arm and cut consolidated debt from more than INR 7,000 Cr to about INR 2,773 Cr. The result is a business that, for the first time in a decade, can be valued mainly as an EPC contractor rather than a leveraged developer.
The weakness is in operations. Standalone revenue fell 17% in FY2026. The first quarter of FY2027 showed no growth and core margins near 7%. Management cut its own growth guidance by a quarter to a half within three months. Much of the INR 15,251 Cr order book depends on slow domestic road awards and on new overseas markets where the company has no long record of collecting payment. The NHAI suspension has been settled, and the cost was trivial. The episode, together with the CBI matter, is still a reminder that its largest client has considerable power over it.
Valuation already prices in much of this. At about 0.43x consolidated book and under 9x standalone earnings, the stock implies either that monetisation receivables will be impaired or that the EPC franchise is in lasting decline. Neither is clearly supported by the filings. Upside depends on three things that can be checked within two quarters:
-
Closing the six remaining HAM SPV sales.
-
A visible H2 recovery to 9–9.5% EBITDA margins with low-teens revenue growth.
-
Order inflow tracking the INR 6,000–8,000 Cr range without margin dilution.
If all three happen, a move towards book value is plausible. If monetisation slips past FY2027 or margins stay near 7%, the discount is justified.
Overall stance: speculative value with execution risk. The investment case is attractive on asset value, conditional on delivery, and should be sized to reflect high near-term earnings uncertainty.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Title | Tenure / notes | Prior roles / education | Compensation (latest disclosed) |
|---|---|---|---|---|
Ashok Motilal Katariya | Chairman (promoter) | Group founder. Board approved a further Chairman term from 1 Feb 2026, on the Nomination & Remuneration Committee's recommendation [BSE filing, 30 Jan 2026] | — | — |
Satish Dhondulal Parakh | Managing Director (promoter) | MD since Apr 2006 [Simply Wall St] | B.E. (Civil) | About INR 5.4 Cr total for FY2025, including about INR 4.8 Cr salary [Simply Wall St, FY2025] |
Sanjay Prabhakar Londhe (DIN 00112604) | Joint Managing Director; formerly Whole-time Director and CEO | Re-designated JMD on 11 Aug 2026. Listed as CEO in the Dec 2025 CP offer document | — | — |
Ashish Ashok Kataria (DIN 00580763) | Joint Managing Director (promoter family) | Re-designated JMD on 11 Aug 2026; term runs to 31 Mar 2027 [Investywise] | — | A whole-time director (unnamed) received about INR 2.66 Cr in FY2025 [Simply Wall St] |
Paresh Mehta | Chief Financial Officer | Speaks on earnings calls; in role since at least FY2025 | — | — |
Manoj Kulkarni | Company Secretary | Signatory on exchange filings | — | — |
“—” = not publicly disclosed.
Executive Leadership Team
| Name | DIN | Date of birth / age | Appointed | Notes |
|---|---|---|---|---|
Mahendra Mehta | 07,745,442 | 13 Jan 1963 (63) | 1 Apr 2020; second term from 1 Apr 2025 | Non-executive independent director |
Mario Nazareth | 00,013,337 | 5 Jun 1954 (72) | 7 Feb 2024 | Non-executive independent director |
Nikhilesh Panchal | 00,041,080 | 21 Jun 1967 (59) | 7 Feb 2024 | Holds other directorships, including other listed companies |
Board & Management Changes
| Date | Change | Context |
|---|---|---|
1 Feb 2026 | Chairman term renewed (board approval 30 Jan 2026) | Continuity of founder leadership |
11 Aug 2026 | Londhe and Kataria elevated from Whole-time Directors to Joint MDs | Succession planning and broader executive bandwidth during the international expansion |
2024–2025 | New independent directors (Nazareth, Panchal); Mehta re-appointed | Board refresh |
Shareholding Trend
| Holder category | Mar 2025 | Jun 2025 | Sep 2025 | Dec 2025 | Mar 2026 |
|---|---|---|---|---|---|
Promoters (%) | 54.48 | 54.48 | 54.48 | 54.48 | 54.48 |
Mutual funds (%) | 14.93 | 14.16 | 14.06 | 14.43 | 14.37 |
FIIs / FPIs (%) | 7.48 | 7.29 | 7.45 | 7.46 | 5.90 |
Retail & others (%) | 23.11 | 24.07 | 24.01 | 23.62 | 25.25 |
Major Shareholders
| # | Holder | Stake (%) | As of | Source |
|---|---|---|---|---|
| 1 | Shobha Satish Parakh (promoter) | 13.55 | Mar 2026 | Emkay |
| 2 | Asha Ashok Katariya (promoter) | 7.11 | May 2020 disclosure | NSE SAST filing |
| 3 | HDFC Trustee – HDFC Balanced Advantage Fund | 5.98 | Mar 2026 | MarketsMojo |
| 4 | Ashok Motilal Katariya (promoter) | 5.43 | May 2020 | NSE SAST filing |
| 5 | Ashok M. Katariya HUF (promoter) | 5.18 | May 2020 | NSE SAST filing |
| 6 | Ashish Ashok Katariya (promoter) | 4.88 | May 2020 | NSE SAST filing |
| 7 | Ashish A. Katariya HUF (promoter) | 4.44 | May 2020 | NSE SAST filing |
| 8 | Astha Ashish Katariya (promoter) | 4.00 | Mar 2026 | Emkay |
| 9 | Satish D. Parakh (promoter) | 2.10 | Mar 2026 | Emkay |
| 10 | Satish D. Parakh HUF (promoter) | 1.92 | Mar 2026 | Emkay |
Competitive Landscape
Competitors by Segment
| Segment | Competitors |
|---|---|
Road EPC / HAM (domestic) | PNC Infratech, KNR Constructions, H.G. Infra Engineering, G R Infraprojects, Dilip Buildcon, IRB Infrastructure Developers (BOT/InvIT-led), Larsen & Toubro (large projects), NCC, J Kumar Infraprojects (urban flyovers, Mumbai), Afcons Infrastructure (bridges, tunnels, overseas) |
Power T&D EPC | KEC International, Kalpataru Projects International, L&T Power T&D, Techno Electric & Engineering, Transrail Lighting |
TBCB transmission ownership | Power Grid Corporation, Adani Energy Solutions, Sterlite Power / Resonia, Kalpataru (selective) |
Railways (electrification, systems, new lines) | RVNL, IRCON International, KEC International, Kalpataru, Texmaco Rail (systems) |
Overseas EPC (Gulf / Africa) | L&T, Afcons, Kalpataru, KEC, plus local and Chinese contractors |
Peer Comparison FY2027
| Metric | Ashoka Buildcon | PNC Infratech |
|---|---|---|
Consolidated revenue FY2026 (INR Cr) | 7,520 | 5,368 |
Standalone revenue FY2026 (INR Cr) | 5,952 | 4,633 |
Standalone EBITDA margin FY2026 (%) | 10.7 | 12.6 |
Consolidated PAT FY2026 (INR Cr) | 2,576 | 832 |
Order book, latest (INR Cr) | 15,251 | 19,100 |
FY2027 revenue growth guidance (%) | 12.5 | 30.0 |