Aspire Mining Limited Overview
Aspire Mining is a pre-revenue, single-asset metallurgical coal developer. Its flagship is the 100%-owned Ovoot Coking Coal Project (mining licence MV-017098) in Khuvsgul aimag, north-western Mongolia. Ovoot hosts a JORC (2012) Total Coal Resource of 219.4 Mt and a Total Coal Reserve of 130.1 Mt (marketable reserve 97.9 Mt). These support a forecast 31-year mine life producing a low-ash "fat" coking coal, classified by China's Fenwei as FM36. Fat coal is scarce in northern China. Aspire also holds 90% of the earlier-stage Nuurstei Coking Coal Project. The company is moving from permitting into construction. It has executed a USD 69.9M EPC contract with CCTEG-IEC for the coal handling and preparation plant and an Erdenet rail terminal. It is negotiating a build-operate-transfer PPP for the Murun–Uliastai Highway and is targeting first coal and exports in Q4 2027. The investment case rests on funding: management plans about USD 126M of Mongolian OTC bonds plus vendor finance.
Company's own description
In its latest annual report and quarterlies, Aspire says it is developing premium coking coal deposits in an environmentally sensitive way. It frames this as supporting global sustainable development, sharing prosperity with host communities and delivering long-term shareholder growth. The FY2025 Directors' Report states that the Group's principal activity is progressing studies, permits and approvals to develop the Ovoot Coking Coal Project (AFR FY2025, Principal Activities). The company describes Ovoot as world-class on scale, product quality and economics. It says all major approvals are in place and that the project is on a pathway to production of a sought-after fat coking coal for China and other supply-constrained markets (Quarterly Report Q3 2025, "About Aspire").
Independent characterisation
Aspire is a development-stage junior miner. It has no operating revenue, no producing assets and no debt. Its only income is interest on cash and bonds (USD 0.24M in FY2025). Its planned business model is vertically integrated:
-
Mining. Open-cut mining at Ovoot, starting from a low-ash, high-yield starter pit. Rented mining equipment will be used for the first three years under the September 2026 revised plan.
-
Processing. A modular on-site Coal Handling and Preparation Plant (CHPP) will produce washed fat coking coal. The plan uses fully enclosed coal handling and maximum water recovery so that no tailings dam is needed (2025 Annual Report sustainability disclosures).
-
Logistics. Washed coal will be trucked about 560 km by road to an Aspire-controlled Erdenet Rail Terminal (ERT). There it will be loaded onto the Trans-Mongolian Railway for delivery to northern Chinese end-users, with onward export options through Caofeidian/Tangshan ports. Road haulage will be contracted for the first five years. The Murun–Uliastai Highway, a BOT PPP, is intended to overlap much of the haul alignment.
-
Marketing. Aspire has regained exclusive marketing rights after legacy Noble/Talaxis alliance rights were extinguished in March 2026. In exchange, NordSteppe PIF receives a 0.75% gross sales royalty. Aspire can now negotiate offtake, prepayment and logistics directly with steel mills and coke makers.
Revenue model and mix
| Revenue type | Current status | Future model |
|---|---|---|
| Product sales (washed coking coal) | Nil (pre-production) | About 100% of future revenue; USD-denominated, CFR/FCA China pricing |
| Services | Nil | Not planned as a material line |
| Subscription / licensing | Nil | — |
| Interest income | USD 0.24M (FY2025); USD 0.69M (FY2024) | Incidental |
| Infrastructure (toll / rail) | Nil | Possible minority equity in the Murun–Uliastai Highway SPV, expected to dilute with third-party equity (Q2 2026 quarterly) |
Value chain position, customers and end-markets
Aspire sits upstream in the steel value chain. Its fat coal is a coking coal blend component that gives coke its strength and fluidity. Target customers are independent and state-owned coke makers and integrated steel mills in northern and north-eastern China, including Hebei, Shanxi, Inner Mongolia and Liaoning regions. In 2025 Aspire met end-users in Hebei and logistics firms such as Tangshan Caofeidian Iron and Steel Logistics ("HBIS Wharf"), which ships about 20 Mtpa of bulk commodities through Caofeidian port (Quarterly Report Q3 2025). Secondary seaborne markets, reached via Chinese ports, include Japan, Korea, Taiwan and India. Russia has historically been mentioned as a possible market (2018-era materials), but recent filings focus on China.
Strategy
Stated strategy themes (paraphrased from the 2025 Annual Report, quarterlies and investor materials)
-
Move from developer to producer. The 2025 Annual Report frames 2025 as the year Aspire moved from development into active construction, and presents the company as entering 2026 materially stronger.
-
Funding as the primary 2026 corporate priority. The Executive Chairman's letter names this explicitly. The approach is debt-led to minimise shareholder dilution.
-
Capital-light development. Rent the mining fleet (3 years), contract road haulage (5 years), defer non-critical infrastructure, and place the highway inside a government-backed PPP so Aspire is a toll-paying user, not the funder.
-
Commercial control. Use regained exclusive marketing rights to sell directly to Chinese end-users, improve price realisation and use offtake prepayments as a funding lever.
-
Responsible development and shared value. Use local contractors (Kiberjaal, Narangurt, Gurvan Maral Erdene, Gobi Infrastructure Partners), run community programmes, design for no tailings dam and enclosed handling, and plant 10 million trees by 2030.
Initiative register (last 24 months)
| Initiative | Date | Description | Status |
|---|---|---|---|
| Major approvals completion | 2,024 | FS, detailed design and DEIA for mining, CHPP and road | Complete |
| JORC Resource / Reserve update (SRK) | Nov 2024 | 219.4 Mt / 130.1 Mt; 31-year LOM | Complete |
| CHPP / ERT EPC tender and award | Mar–Dec 2025 | USD 69.9M EPC with CCTEG-IEC; effective 30 Dec 2025 | Detailed design: CHPP at 85%, ERT at 30% (mid-2026) |
| Lower-capex development plan | 2025–Sep 2026 | Rental fleet, contracted haulage, deferral of non-critical infrastructure; Phase 1 capex about USD 61.2M | Updated reserve and cost model, Sep 2026 |
| Marketing rights restructure | Sep 2025 – Mar 2026 | Legacy Contract Rights extinguished for a 0.75% royalty; NIL 20% transferred for USD 1 | Complete (20 Mar 2026) |
| Murun–Uliastai Highway PPP | Sep 2025 – ongoing | BOT, 23-year concession; Aspire is proponent and bidder | Final draft PPP Agreement in ministerial review (Q2 2026) |
| Highway SPVs | Q1–Q2 2026 | K and K Road LLC (Mongolia); Khuvsgul & Khangai Infrastructure Pte Ltd (Singapore) | Established |
| Sinosure Supplier's Credit Insurance | Q1 2026 – ongoing | Lets CCTEG-IEC finance the deferred 60% of the EPC, repayable over 2 years after commissioning | Due diligence ongoing |
| Mongolian OTC USD bond programme | Q1 2026 – ongoing | About USD 126M across tranches from Khurgatai Khairkhan LLC; Bank of Mongolia approval obtained; Tenger Capital SC LLC conducting due diligence | In preparation |
| Offtake / prepayment | 2025–2026 | Engagement with northern Chinese end-users, working toward MoUs, cooperation agreements and SPAs | No binding offtake disclosed |
| Haulage partnership (ELM / Howard Porter) | 2,025 | Bespoke trailer design and maintenance MoU | MoU stage |
| Site establishment and land permits | 2025–2026 | Camp, wells, MIA, ERT fencing; additional land-use permits; procurement of raw-water dam, grid connection and MBR wastewater plant | Advancing |
| Board renewal | Aug–Sep 2025 | Two independent NEDs; Executive Chairman | Complete |
Management targets and guidance
| Target | Value | Source |
|---|---|---|
| First coal production / export | Q4 2027 | AFR FY2025 |
| Highway commissioning | 2,027 | Quarterly Q3 2025 |
| Phase 1 pre-production capex | About USD 61.2M (excluding working capital and spend to Dec 2025) | Sharecafe, Sep 2026 |
| Debt raising | About USD 126M of OTC bonds, staged | Sharecafe, Sep 2026 |
| EPC funding split | 60% vendor-financed / 40% Aspire | AFR FY2025, going-concern note |
| Production ramp | 1.5 Mtpa to 2.5 Mtpa to up to 5.0 Mtpa ROM | GEM Wiki; AGM presentation, May 2025 |
| ESG | 10 million trees by 2030 | 2025 Annual Report |
| Financial targets (EBITDA / margins) | Not publicly disclosed beyond NPV/IRR | — |
Products & Services
Aspire has no commercial products yet. Its "portfolio" is a set of development assets and planned infrastructure services, catalogued below by asset.
Ovoot Coking Coal Project (OCCP), flagship, 100%
| Attribute | Detail | Source |
|---|---|---|
| Licence | MV-017098, valid to Aug 2042, extendable twice by 20 years | Quarterly Q1 2026 |
| Location | Tsetserleg soum, Khuvsgul aimag, north-western Mongolia | 2023 Annual Report; BCM profile |
| JORC (2012) Total Coal Resource | 219.4 Mt | ASX, 22 Nov 2024 |
| JORC (2012) Total Coal Reserve | 130.1 Mt; reconfirmed by Glogex in Sep 2026 | ASX, 22 Nov 2024; Sharecafe, 11 Sep 2026 |
| Marketable Coal Reserve | 97.9 Mt | Sharecafe, 11 Sep 2026 |
| Product | Washed low-ash "fat" coking coal, FM36 (meta-bituminous) under Chinese classification; regarded as "scarce coal" | AFR 31 Dec 2023; SmallCaps, Nov 2024 |
| Mine life | 31 years from start of production | ASX, 22 Nov 2024 |
| Production profile | Phased from 1.5 Mtpa ROM, to 2.5 Mtpa, to up to 5.0 Mtpa ROM through modular CHPP expansion | GEM Wiki; AGM presentation, May 2025 |
| Mining method | Open cut. Initial rental fleet for 3 years (Sep 2026 plan). Workshop sized for 50-tonne off-highway trucks. | Sharecafe, Sep 2026; Quarterly Q3 2025 |
| Processing | CHPP under the USD 69.9M EPC (CCTEG-IEC). Detailed design reached the 85% review after Q2 2026. Fully enclosed coal handling; water recovery to avoid a tailings dam. | Kalkine, Jul 2026; 2025 Annual Report |
| Economics (Sep 2026) | Post-tax NPV10 about USD 1.48B; post-tax real IRR about 60%; Phase 1 pre-production capex about USD 61.2M (excluding working capital and spend to Dec 2025) | Sharecafe, 11 Sep 2026 |
| Economics (Nov 2024 / Mar 2025) | NPV10 above USD 1.5B; payback within about three years; pre-production capital about USD 215M (Mar 2025 presentation) | Q3 2025 quarterly; SmallCaps; AGM presentation, May 2025 |
| First coal target | Q4 2027. Earlier targets were late 2026 (May 2025 presentation) and, historically, 2017 and 2023. | AFR FY2025; AGM presentation, May 2025 |
| Pricing model | USD-denominated seaborne/China-linked coking coal pricing. The current price deck was not disclosed in sources reviewed; 2021 PFS used USD 150/t CFR China. | Mining Journal |
| Royalty burdens | Mongolian state royalty (statutory, not quantified here) plus a 0.75% gross sales royalty to NordSteppe PIF | AFR FY2025 |
Nuurstei Coking Coal Project, 90%
| Attribute | Detail | Source |
|---|---|---|
| Licence | MV-020941 (Black Rock LLC) | AFR FY2025 |
| Location | About 10 km from Murun (Khuvsgul provincial capital), about 160 km north-east of Ovoot | MarketScreener |
| Product potential | Washed hard coking coal | MarketScreener |
| Resource / reserve | No current JORC figures retrieved in this review (early stage) | — |
| Status | Early stage; exclusive marketing rights regained in Mar 2026 | Quarterly Q1 2026 |
Erdenet Rail Terminal (ERT), planned infrastructure
| Attribute | Detail |
|---|---|
| Function | Coal unloading, stockpiling and rail load-out onto the Trans-Mongolian Railway near Erdenet |
| Land | 30-hectare land-use permit, fenced in Q3 2025, with a water well installed |
| Status | ERT coal-handling 30% design review package submitted by CCTEG-IEC; statutory technical and economic feasibility study for ERT trackwork approved by the Ministry of Road and Transport (Q2 2026) |
| Source | Quarterly Q3 2025; Kalkine, 31 Jul 2026 |
Murun–Uliastai Highway Project (MUHP), proposed PPP
| Attribute | Detail |
|---|---|
| Structure | Build-Operate-Transfer PPP with a 23-year concession, with costs recovered through tolls. Aspire will be a road user, not the road owner. |
| Aspire role | Main private-sector proponent and bidder. It completed the FS, detailed design and EIA for the alignment and consulted nine baghs. |
| Status | Cabinet endorsement Sep 2025; tender submitted 6 Jan 2026; invited to negotiate 23 Mar 2026; final draft PPP Agreement in ministerial review (MED and Ministry of Finance) by end-Q2 2026; PMC and EPC tenders received |
| Financing | Third-party equity expected, diluting Aspire, plus non-recourse project debt |
| Advisers | Mayer Brown (PPP structuring); Batbayar & Partners (local legal) |
| Source | Quarterly Q3 2025, Q1 2026; Kalkine, Jul 2026 |
Coal haulage solution (developmental)
This is an MoU with ELM Equipment Pty Ltd, whose strategic partner is Howard Porter Pty Ltd. It covers the design, possible supply and maintenance of bespoke trailers for safe, efficient, lower-emission haulage of washed coal. The current plan outsources on-road haulage for the first five years (AFR FY2025; Sharecafe, Sep 2026).
Legacy: Erdenet–Ovoot Railway (Northern Railways)
This was a 547 km open-access railway concept. It held a 30-year concession granted in August 2015 and had Chinese feasibility partners (FSDI, CR20G, CGGC) and a China Development Bank LOI. The 2018 plan said Ovoot could reach up to 10 Mtpa once the railway connected. The road-based development plan has since superseded it as the primary logistics route. Its current status is not separately reported in recent filings (SmallCaps 2018; AidData).
Financial Narrative
All figures USD M unless noted. Sources: Remuneration Report five-period performance table and primary statements in AFR FY2025; AFR 31 Dec 2023; Interim Reports Dec 2020, Dec 2021 and Dec 2022. Column order: FY2022 (Jun), FY2023 (Jun), 6M Dec-2023, FY2024 (Dec), FY2025 (Dec).
Income statement
Notes. Operating expenses for FY2025 combine employee benefits USD 0.903M, share-based payment credit USD -0.096M, D&A USD 0.050M, directors' fees USD 0.713M and other expenses USD 1.363M. FY2024 operating income nets USD 0.088M of other income (farm income, gain on investment). Gross, operating, EBITDA and net margins are not meaningful because revenue is nil, so they are omitted. Revenue CAGR is not meaningful. Aggregator data (e.g., TipRanks, in AUD) shows inconsistent and apparently misaligned figures.
Half-year results (supplementary)
Source: Interim Financial Report, 30 June 2025.
Balance sheet
Notes. Cash at 30 Jun 2022 is from the Interim Report Dec 2022. Cash at 31 Dec 2023 (USD 6.98M) is the opening FY2024 balance in the AFR FY2025 cash flow statement. Equity at 31 Dec 2023 is the 1 Jan 2024 opening balance in the AFR FY2025 statement of changes in equity. Net debt for FY2024 includes bond investments as quasi-cash; on a strict cash-only basis it is -4.578. Later cash points: USD 9.43M (30 Sep 2025), USD 3.73M (31 Mar 2026), about USD 2.5M (30 Jun 2026). Historical cash points: USD 40.71M (30 Jun 2020), USD 35.14M (31 Dec 2020), USD 34.17M (30 Jun 2021), USD 32.85M (31 Dec 2021), USD 29.58M (31 Dec 2022).
Cash flow
Quarterly cash flow 2025–2026 (USD M, Appendix 5B):
Q4 CY2025 is implied by full-year totals: PP&E spend of about USD 3.97M in Q4, mainly the first EPC advance payment.
Ratios (analyst-computed from audited figures)
ROIC, net debt/EBITDA, interest coverage and the cash conversion cycle are not meaningful for a pre-revenue, debt-free developer.
Commentary on trends, inflections and drivers
FX dominates reported earnings. Aspire's functional currency is AUD, but it holds large USD balances and presents in USD. This creates big non-cash swings. FY2024 showed a USD 6.66M profit only because of a USD 8.66M unrealised FX gain. FY2025 showed a USD 12.85M loss, of which USD 10.16M was unrealised FX loss from AUD appreciation. Comprehensive results were much more stable: total comprehensive loss was USD 3.05M in FY2024 and USD 2.67M in FY2025, because translation differences in OCI largely offset the P&L FX. The underlying corporate cash burn is about USD 2.0–2.7M a year.
Treasury drawdown is the main balance-sheet trend. Cash plus investments fell from about USD 40.7M in mid-2020 to about USD 13.8M at end-2024, USD 5.0M at end-2025 and about USD 2.5M at end-June 2026. Total assets were cushioned by capitalised E&E (USD 29.1M) and rising PP&E (USD 1.74M in FY2025 versus 0.18M), so the decline in total assets was gentler. The structural inflection is the move from exploration accounting to development spending: the first EPC advance payment and site infrastructure.
Liquidity is tightening. At the 31 March 2026 quarter, Aspire reported about 5.3 quarters of funding under the ASX Appendix 5B metric, which excludes development capex. Cash had fallen to about USD 2.5M by 30 June 2026 against continuing EPC, design and site commitments. The FY2025 going-concern note says the 40% Aspire share of the EPC (about USD 28M) and other mine construction costs must be funded by debt raised during 2026, coal pre-sales and equity if required. The note states Aspire plans to have adequate funding before committing to construction costs. No financing facility was in place at the latest disclosure.
Capital structure. Issued capital is unchanged at USD 127.48M. Accumulated losses are USD 68.29M and the FCTR is -USD 21.08M. No shares were issued in FY2025 (AFR FY2025).
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Results by Segment
| Metric | FY2024 | FY2025 |
|---|---|---|
Australia other income (USD Mn) | 0.406 | 0.136 |
Mongolia other income (USD Mn) | 0.377 | 0.105 |
Others other income (USD Mn) | 0 | 0 |
Total other income (USD Mn) | 0.783 | 0.241 |
Results by Segment — Australia EBITDA
| Metric | FY2024 | FY2025 |
|---|---|---|
Australia EBITDA (USD Mn) | 7.276 | -8.775 |
Mongolia EBITDA (USD Mn) | -0.566 | -3.989 |
Others EBITDA (USD Mn) | -0.027 | -0.036 |
Group EBITDA incl. unrealised FX (USD Mn) | 6.683 | -12.801 |
Australia pre-tax (USD Mn) | 7.276 | -8.777 |
Mongolia pre-tax (USD Mn) | -0.587 | -4.038 |
Others pre-tax (USD Mn) | -0.027 | -0.036 |
Segment Assets & Liabilities and Revenue by Segment
| Metric | FY2024 | FY2025 |
|---|---|---|
Australia segment assets (USD Mn) | 13.483 | 5.177 |
Mongolia segment assets (USD Mn) | 29.022 | 34.796 |
Total assets (USD Mn) | 42.505 | 39.973 |
Mongolia E&E capitalised in year (USD Mn) | 1.317 | 1.648 |
Group Entities
| Entity | Jurisdiction | Role | Interest |
|---|---|---|---|
Aspire Mining Limited | Australia | Listed parent | — |
Khurgatai Khairkhan LLC | Mongolia | Holds Ovoot mining licence MV-017098; planned OTC bond issuer | 100% |
Black Rock LLC | Mongolia | Holds Nuurstei mining licence MV-020941 | 90% |
Ovoot Coking Coal Pte Ltd | Singapore | Holding entity (USD functional currency) | 100% (per consolidation note) |
Northern Railways Pte Ltd | Singapore | Rail holding entity (legacy) | Consolidated |
Northern Railways LLC | Mongolia | Legacy Erdenet–Ovoot rail concession vehicle | Consolidated (historically 80–90%) |
Northern Infrastructure Limited (NIL) | — | Infrastructure holding. A 20% interest held by Talaxis/Noble-related parties is to transfer to Aspire for USD 1. | Moving to 100% |
Coalridge Limited | — | Holding entity | Consolidated |
K and K Road LLC | Mongolia | Murun–Uliastai Highway project entity (established 2026) | Not disclosed; expected to dilute |
Khuvsgul & Khangai Infrastructure Pte Ltd | Singapore | Highway holding company (established 2026) | Not disclosed; expected to dilute |
“—” = not publicly disclosed.
Income Statement and Per-Share Data
| Metric | FY2022 | FY2023 | 6M2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Operating revenue (USD Mn) | 0 | 0 | 0 | 0 | 0 |
Interest income (USD Mn) | — | — | — | 0.695 | 0.241 |
Unrealised FX gain/(loss) (USD Mn) | — | — | — | 8.663 | -10.159 |
Gross profit (USD Mn) | 0 | 0 | 0 | 0 | 0 |
Operating expenses ex-FX (USD Mn) | — | — | — | 2.785 | 2.933 |
Operating income ex-finance (USD Mn) | — | — | — | -2.697 | -2.933 |
EBITDA incl FX (USD Mn) | — | — | — | 6.683 | -12.801 |
Pre-tax income (USD Mn) | 0.311 | -0.377 | -3.364 | 6.661 | -12.851 |
Net income (USD Mn) | 0.311 | -0.377 | -3.364 | 6.661 | -12.851 |
Net income attributable to owners (USD Mn) | — | — | — | 6.665 | -12.848 |
Underlying result ex-unrealised FX (USD Mn) | — | — | — | -2.002 | -2.691 |
EPS basic (US cents) | 0.06 | -0.07 | -0.66 | 1.31 | -2.53 |
EPS diluted (US cents) | — | — | — | 1.30 | -2.53 |
Dividends per share (US cents) | 0 | 0 | 0 | 0 | 0 |
Income Statement
| Metric | H1CY2024 | H1CY2025 |
|---|---|---|
Net profit/(loss) attributable (USD Mn) | 2.740 | -9.571 |
Balance Sheet
| Metric | FY2022 | FY2023 | 6M2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Total assets (USD Mn) | 48.566 | 45.519 | 45.206 | 42.505 | 39.973 |
Cash & equivalents (USD Mn) | 31.990 | — | 6.982 | 4.578 | 5.041 |
Bond investments, current (USD Mn) | — | — | — | 9.206 | 0 |
Trade & other receivables, current (USD Mn) | — | — | — | 1.020 | 3.754 |
Property, plant & equipment (USD Mn) | — | — | — | 0.177 | 1.743 |
Capitalised E&E (USD Mn) | — | — | — | 27.432 | 29.127 |
Goodwill & intangibles (USD Mn) | 0 | 0 | 0 | 0 | 0 |
Total debt short-term (USD Mn) | 0 | 0 | 0 | 0 | 0 |
Total debt long-term (USD Mn) | 0 | 0 | 0 | 0 | 0 |
Net debt (USD Mn) | — | — | -6.982 | -13.784 | -5.041 |
Total liabilities (USD Mn) | — | — | — | 0.443 | 0.679 |
Total equity (USD Mn) | — | — | 44.994 | 42.062 | 39.294 |
Working capital (USD Mn) | — | — | — | 14.361 | 8.117 |
Cash Flow
| Metric | FY2024 | FY2025 |
|---|---|---|
Operating cash flow (USD Mn) | -1.535 | -2.481 |
Capex PP&E (USD Mn) | 0.013 | 4.681 |
Exploration & evaluation payments (USD Mn) | 1.779 | 1.455 |
Total capex incl E&E (USD Mn) | 1.792 | 6.136 |
Free cash flow (USD Mn) | -3.327 | -8.617 |
Net bond proceeds (USD Mn) | 0.906 | 9.054 |
Financing cash flow (USD Mn) | 0 | 0 |
Dividends paid (USD Mn) | 0 | 0 |
Buybacks (USD Mn) | 0 | 0 |
Cash Flow (Quarterly)
| Metric | Q3CY2025 | Q1CY2026 | Q2CY2026 |
|---|---|---|---|
Operating cash flow (USD Mn) | -0.771 | -0.388 | — |
E&E payments (USD Mn) | 0.401 | 0.316 | 0.319 |
Development / PP&E payments (USD Mn) | 0.678 | 0.596 | 0.280 |
Related party payments (USD Mn) | 0.148 | 0.166 | — |
Closing cash (USD Mn) | 9.430 | 3.732 | 2.500 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Metric | FY2024 | FY2025 |
|---|---|---|
ROE (%) | 15.3 | -31.6 |
ROA (%) | 15.2 | -31.2 |
ROE ex-unrealised FX (%) | -4.6 | -6.6 |
Current ratio (x) | 33.5 | 13.0 |
Debt / equity (x) | 0 | 0 |
Asset turnover (x) | 0 | 0 |
Revenue by Region
| Region | FY2024 | FY2025 |
|---|---|---|
Australia income (USD Mn) | 0.406 | 0.136 |
Mongolia income (USD Mn) | 0.377 | 0.105 |
Other income (USD Mn) | 0 | 0 |
Region | YoY growth FY2025 (%) | — |
Australia | -66.4 | — |
Mongolia | -72.1 | — |
Share Price
| Metric | FY2022 | FY2023 | 6M2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Share price at period end (USD) | 0.06 | 0.05 | 0.08 | 0.16 | 0.17 |
Valuation Snapshot
| Metric | Value | Source |
|---|---|---|
2026 opening price | AUD 0.26 | InvestSMART |
2026 high / low (to late Jul) | AUD 0.315 / AUD 0.18 | InvestSMART |
Last observed price | AUD 0.195–0.20 (late Jul 2026) | InvestSMART |
YTD change to late Jul 2026 | About -23% to -25% | InvestSMART |
Liquidity | Thin; many zero-volume days; typical daily volume in the thousands to tens of thousands of shares | InvestSMART |
Share Price & Returns
| Horizon | Return | Basis |
|---|---|---|
1-year | On available data, roughly flat to modestly negative versus about AUD 0.23–0.25 in Sep–Oct 2025. | InvestSMART announcement-day prices |
~2.5-year (Jun 2023 to Dec 2025, USD) | About +240% (USD 0.05 to USD 0.17) | Remuneration Report |
Valuation Snapshot by Multiple
| Multiple | Value | Comment |
|---|---|---|
Market cap | About AUD 100–110M (about USD 67M per Stoxray) | ~507.6M shares |
P/E | Not meaningful (FY2025 loss). MarketScreener shows 12.1x for 2024 (FX-driven profit) and -6.59x for 2025. | MarketScreener |
EV/Sales | Not meaningful (no sales) | — |
P/B | About 1.7x (USD 67M market cap / USD 39.3M book equity at Dec 2025) | Analyst calculation |
P/NAV | About 0.05x versus the stated post-tax NPV10 of USD 1.48B (unrisked; indicates deep market discount for funding and execution risk) | Analyst calculation |
Capital Markets
| Item | Status |
|---|---|
Sell-side coverage / consensus | None identified |
Dividend history | None paid, recommended or declared (AFR FY2025) |
Dividend policy | Not disclosed (pre-revenue) |
Credit ratings (Moody's / S&P / Fitch) | Not rated |
Debt outstanding | Nil (30 Jun 2026) |
Debt maturity profile | Not applicable. The prospective structure is: OTC USD bonds of about USD 126M in tranches (tenor not disclosed); EPC supplier credit for 60% of USD 69.9M, repayable over 2 years after commissioning. |
Analyst Conclusions
Management guidance
| Item | Guidance |
|---|---|
| First coal / export | Q4 2027 |
| 2026 priorities | Secure construction funding; finalise the highway PPP Agreement; complete CHPP/ERT design; start construction and pre-stripping |
| Phase 1 capex | About USD 61.2M |
| Funding | About USD 126M OTC bonds; Sinosure-insured EPC supplier credit; coal pre-sales; equity "if required" |
Consensus growth expectations: none available because there is no sell-side coverage.
Bull case
-
Infrastructure arrives off-balance-sheet. Signing the Murun–Uliastai PPP (final draft in ministerial review) would transfer road capex and risk to a concessionaire. That would leave Aspire with a Phase 1 capex of only about USD 61.2M against a stated NPV10 of about USD 1.48B.
-
Scarcity pricing. FM36 fat coal fills a documented northern-China deficit forecast to reach 18.1 Mt by 2029. Regained marketing rights let Aspire monetise this through direct offtake and prepayments.
-
Asymmetric re-rating. At about 0.05x P/NAV and a market cap of about AUD 100M, each de-risking step (PPP signature, bond close, Sinosure approval, binding offtake) could re-rate the stock materially.
Bear case
-
Funding cliff. Cash of about USD 2.5M at June 2026 must cover the 40% EPC share (about USD 28M) and broader construction costs. If the OTC bond is delayed or undersubscribed, highly dilutive equity becomes likely, and the going-concern basis would rest on that funding plan.
-
Execution track record. The production date has slipped repeatedly over more than a decade (2017, 2023, 2026, 2027). The schedule is now tied to a third-party PPP road that has not yet reached financial close.
-
Structural headwinds. A 560 km haul, dependence on Trans-Mongolian rail, a China-concentrated customer base, Mongolian sovereign risk and coal-transition finance exclusion could compress realised margins below the cost model.
Key catalysts and monitorables (next 12 months)
| Catalyst | Expected timing | Watch for |
|---|---|---|
| Murun–Uliastai PPP Agreement signature | H2 2026 | Ministerial and Cabinet approval; concession terms; Aspire's equity share |
| OTC USD bond first tranche | H2 2026 – 2027 | Size, coupon, tenor, security, investor base |
| Sinosure Supplier's Credit Insurance approval | H2 2026 | Unlocks the deferred 60% EPC finance |
| Half-year report (30 Jun 2026) and Q3 quarterly (Oct 2026) | Sep–Oct 2026 | Cash runway; commitments; going-concern language |
| Binding offtake / prepayment | 2026–2027 | First SPA with a Chinese end-user |
| CHPP 100% design and construction start | 2026–2027 | Foundations; equipment delivery |
| CFO appointment | Any time | Finance leadership ahead of debt raising |
| Pre-stripping mobilisation | 2027 construction season | Rental fleet contract |
| Coking coal prices (China fat coal) | Ongoing | Realised versus model price deck |
Analyst verdict
Aspire Mining offers an unusually stark risk-reward profile. On asset quality, the case is strong. Ovoot is a large, fully permitted, long-life deposit of a coking coal rank that northern Chinese coke makers lack. The September 2026 reserve and cost-model refresh reaffirmed reserves of 130.1 Mt. Its capital-light reset (rented fleet, contracted haulage, PPP-funded highway) reduced Phase 1 capex to about USD 61.2M and kept post-tax NPV10 near USD 1.48B. Over 2025–2026 the company also removed real obstacles. It converted burdensome legacy marketing rights into a 0.75% royalty, fixed processing capex through a USD 69.9M EPC with vendor finance, and moved from proponent to preferred negotiator on the highway PPP.
The market's roughly 95% discount to stated NPV is nonetheless rational. Aspire is now a funding-and-execution story, not a geology story. Cash fell to about USD 2.5M by mid-2026, and no debt facility, binding offtake or signed PPP has yet been announced. The going-concern note depends on raising debt during 2026. The company has repeatedly pushed out production dates over more than a decade. Logistics remain the structural weakness: a 560 km road haul to rail, then reliance on Mongolian rail and border capacity, in a market where South Gobi producers enjoy shorter routes. A thinly traded, concentrated share register, an executive chair, and no disclosed CFO add governance and liquidity discounts.
Verdict. Speculative, catalyst-driven, high-risk. The equity behaves like a call option on three binary events in the next 6–12 months: PPP signature, first bond tranche, and Sinosure approval. If all three land, the valuation gap could narrow sharply. If any slips materially, dilution risk dominates. Investors should size positions accordingly and track quarterly cash and commitment disclosures closely.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Title | Appointed | Background | Education | Committees | Shares | Perf. rights |
|---|---|---|---|---|---|---|---|
Achit-Erdene Darambazar | Executive Chairman | ED 7 Dec 2018; MD 5 Dec 2019; ED 17 May 2023; Exec Chair 8 Sep 2025 | Founding and financing of Mongolian mining, exploration and mining-services companies; capital raising in Canada, Australia and the UK; advises the Mongolian Government on privatisations | B.Ec, MIA | Remuneration | Nil | 2,500,000 |
Boldbaatar Bat-Amgalan | Non-Executive Director | 7 Dec 2018 | Ex-director of Erdenet Mining Company; ex-State Secretary, Ministry of Foreign Affairs; ex-Chairman, Communication Regulatory Commission | B.S, MSc | Audit & Risk | Nil | 500,000 |
Michael Ross Avery | Independent NED (Chair Mar 2023 – Sep 2025) | 29 Nov 2022 | 30+ years in mining (Rio Tinto, BHP Billiton, Brambles); qualified Australian Coal Mine Manager; MAusIMM | B.E. Mining (UNSW), MBA (UQ) | Audit & Risk; Remuneration | 267,113 | 500,000 |
Gregory James Millen | Independent NED | 4 Aug 2025 | 30+ years in engineering and project delivery; Founding MD of Karli Holdings; co-founder of Wave International (prior Mongolian project experience); The Right Water Company | BEng (Hons) Mech, UWA | Remuneration (Chair from 22 Oct 2025) | Nil | Nil |
Zoljargal Dashnyam | Independent NED | 15 Sep 2025 | 20+ years in corporate law, banking, energy and minerals; recognised by Chambers, Legal 500, IFLR and Asia Law; Mongolian securities law licence | LL.M, MBA | Audit & Risk (Chair from 22 Oct 2025) | Nil | Nil |
Russell Alan Taylor | Former Executive Director | NED to Sep 2024; ED 18 Sep 2024; resigned 2 Sep 2025 | — | — | — | — | 2,500,000 forfeited |
Executive Leadership Team
| Name | Title | Tenure | Prior roles |
|---|---|---|---|
Samuel (Sam) Bowles | Chief Executive Officer | COO from Oct 2019; CEO from about 15–16 May 2023 | Country director at TerraCom Ltd (Baruun Noyon Uul coal operation); former COO of Mongolian Mining Corp; mining engineer resident in Mongolia for more than 12 years (as at 2019). Age 43 per MarketScreener. |
Tristan Garthe | Former CFO | Late 2024 – resigned 2 Sep 2025 | — |
Emily Austin | Company Secretary | 6 Dec 2022 – present | Corporate governance adviser across ASX/NSX companies; member, Governance Institute of Australia |
Batkhuu Ts. | Head of Sustainability | — | Named in Q3 2025 quarterly |
CFO (current) | — | — | Role apparently vacant or unannounced after Sep 2025 |
“—” = not publicly disclosed.
Directors' Remuneration
| Name | Cash salary & fees | Bonus | Annual leave | Other benefits | Super | Share-based (lapsed) | Total |
|---|---|---|---|---|---|---|---|
Samuel Bowles (CEO) | 363,000 | 0 | 11,169 | 0 | 0 | -625 | 373,544 |
Achit-Erdene Darambazar (Exec Chair) | 258,833 | 0 | 29,535 | 0 | 0 | -1,822 | 286,546 |
Russell Taylor (ED, to 2 Sep 2025) | 222,133 | 0 | 0 | 3,647 | 24,276 | -80,060 | 169,996 |
Tristan Garthe (CFO, to 2 Sep 2025) | 146,249 | 0 | 0 | 3,647 | 15,931 | -14,474 | 151,353 |
Boldbaatar Bat-Amgalan (NED) | 95,071 | 0 | 0 | 0 | 0 | -364 | 94,707 |
Michael Avery (NED) | 64,071 | 0 | 0 | 0 | 6,270 | 1,185 | 71,526 |
Gregory Millen (NED, from Aug 2025) | 23,963 | 0 | 0 | 0 | 2,179 | 0 | 26,142 |
Zoljargal Dashnyam (NED, from Sep 2025) | 16,836 | 0 | 0 | 0 | 0 | 0 | 16,836 |
Total KMP | 1,190,156 | 0 | 40,704 | 7,294 | 48,656 | -96,160 | 1,190,650 |
Directors' Remuneration (Annual)
| Metric | FY2024 | FY2025 |
|---|---|---|
Total KMP remuneration (USD) | 1,161,528 | 1,190,650 |
Cash bonuses paid (USD) | 20,000 | 0 |
Governance Overview
| Metric | Value |
|---|---|
Board size | 5 |
Independent directors | 3 (Avery, Millen, Dashnyam). Bat-Amgalan has been a NED since 2018; his independence classification should be confirmed in the Corporate Governance Statement. |
Chair / CEO separation | Separate roles, but the Chair is executive (Executive Chairman plus a separate CEO) |
Committees | Audit & Risk (Chair: Dashnyam); Remuneration (Chair: Millen). There is no separate risk or nomination committee; the full Board handles risk. |
Board meetings FY2025 | 10, with full attendance by continuing directors |
Gender diversity | 1 of 5 directors is female (20%) |
Major Shareholders
| Holder | Stake | Notes / Source |
|---|---|---|
Talaxis Ltd (ex-Noble Group) | 13.08% (66,401,758 shares), sold in full | Sold to NordSteppe PIF for USD 13.5M (about USD 0.20 / AUD 0.31 per share); completed 20 Mar 2026 (Quarterly Q3 2025, Q1 2026) |
NordSteppe Private Investment Fund LLC (managed by Ashid Asset Management LLC) | Acquired 13.08%, then traded the shares off-market to other investors; keeps the 0.75% royalty | Quarterly Q1 2026 |
Substantial holder notices | "Becoming" and "ceasing" substantial holder notices (16 Feb 2026); "change in substantial holding" (23 Apr 2026). | InvestSMART announcements list |
Top-10 holders | The register is believed to be concentrated in Mongolian investors (free float about 21.1% per MarketScreener). | — |
Insider ownership | Directors hold 267,113 shares directly (Avery). Performance rights outstanding to KMP: 5.5M. | AFR FY2025 |
Institutional ownership | Not publicly disclosed; no meaningful index or institutional coverage identified | — |
Competitive Landscape
Key Competitors
| Competitor | Listing | Segment / asset | Relative positioning vs Aspire |
|---|---|---|---|
Erdenes Tavan Tolgoi JSC | Mongolian Stock Exchange (ETT) | State-controlled Tavan Tolgoi coking coal, South Gobi; dominant Mongolian exporter | Huge scale, state backing, short route to China via Gashuunsukhait; mainly hard and semi-soft products |
Mongolian Mining Corporation (MMC) | HKEX: 975 | Ukhaa Khudag and Baruun Naran washed coking coal, South Gobi | Established producer and washplant operator; Bowles is ex-COO |
SouthGobi Resources | TSX-V / HKEX | Ovoot Tolgoi coal mine, South Gobi (note: a different "Ovoot") | Producer of mostly lower-value coal near the Chinese border |
Mongolia Energy Corporation | HKEX: 276 | Khushuut coking coal, western Mongolia (Khovd) | Closest analogue: remote western Mongolian coking coal with long-haul road logistics |
TerraCom Ltd | ASX: TER | Formerly Baruun Noyon Uul (Mongolia); now Australia/South Africa thermal coal | Historical Mongolian peer |
Shanxi Coking Coal Energy Group | SZSE: 000983 | Chinese domestic coking coal including fat coal (Shanxi) | Incumbent domestic supplier to Aspire's target customers |
Pingdingshan Tianan Coal Mining | SSE: 601666 | Chinese domestic coking coal (Henan) | Domestic competitor |
Shanxi Lu'an Environmental Energy | SSE: 601699 | Chinese coal including coking and PCI coal | Domestic competitor |
BHP (BHP Mitsubishi Alliance) | ASX / NYSE / LSE: BHP | Seaborne premium hard coking coal (Queensland) | Global price-setter; competes in seaborne blends |
Coronado Global Resources | ASX: CRN | Seaborne met coal (US / Australia) | Seaborne competitor |
Stanmore Resources | ASX: SMR | Seaborne met coal (Queensland) | Seaborne competitor |
Russian coking coal exporters (e.g., Mechel, Raspadskaya) | MOEX | Rail-borne supply to China | Direct overland competitor in northern China |
Peer Comparison FY2025
| Dimension | Aspire (AKM) | Erdenes Tavan Tolgoi | Mongolian Mining Corp | Mongolia Energy Corp |
|---|---|---|---|---|
Stage | Pre-construction / early works | Producer | Producer | Producer / restart history |
Revenue FY2025 | 0 (interest income USD 0.24M) | — | — | — |
Product | Fat coal FM36 (scarce) | Hard / semi-soft coking | Washed hard / semi-soft coking | Coking coal |
Logistics to China | About 560 km road to Erdenet, then rail (long) | Short road/rail to the southern border | Short road/rail to the southern border | Long road haul |
Balance sheet | Debt-free; cash about USD 2.5M (Jun 2026) | State-backed | Leveraged producer | — |
Recent Developments
--