Atlantaa Limited (formerly Atlanta Limited)

Company Profile Analysis

Ticker: ATLANTAA.NS

ESOMAR 23 Corporate BadgeISO Certifications Badge
Atlantaa Limited - Automotive showcase

Year Founded & Workforce

1977

Industry

AutomotiveB2BB2C
Atlantaa Limited logo

Atlantaa Limited Employee Contacts

We don't hold contact details for this company yet — you can request them.

Request Employee Contacts

Atlantaa Limited Overview

Atlantaa Limited is a four-decade-old, promoter-controlled Mumbai infrastructure group that has shrunk from a mid-sized road EPC and BOT toll developer (standalone revenue of INR 496 crore in FY2015) into a small, balance-sheet-repair story with three moving parts. First, a legacy toll portfolio held through subsidiaries — principally the Nagpur–Kondhali NH-6 BOT concession — that generates most consolidated revenue at high EBITDA margins but carries most group debt. Second, a nascent real-estate business in the Mumbai Metropolitan Region, anchored by the 805-unit Atlantaa Enclave II project (saleable value INR 601 crore) and a Borivali redevelopment (GDV ~INR 500 crore). Third, an attempt to rebuild road EPC via a INR 2,485 crore sub-contract from IRCON for Package BG-03 of the Bhandara–Gadchiroli Expressway — an order roughly nine times the company's market value. The investment case therefore rests almost entirely on execution and cash conversion, which have historically been weak.


Company's own description

Atlantaa's self-description, as summarised by its credit rater, is that of an infrastructure and real-estate developer with more than three decades of execution experience, which has built a diversified presence across EPC, PPP/DBFOT, Hybrid Annuity Mode (HAM), Operate-Maintain-Transfer (OMT), infrastructure development and real-estate projects (Infomerics, 13 Oct 2026). Older exchange profiles describe the company as engaged in construction of roads, highways, bridges and runways, real-estate development, and coal and limestone mining (company summary carried by IIFL/Angel One). Atlantaa also claims to have introduced surface-miner technology for limestone mining in India in 1995.

Independent characterisation

On the evidence of FY2022–FY2026 filings, Atlantaa today is best described as:

  1. A legacy toll-asset holder (consolidated level). The gap between consolidated and standalone revenue — INR 44.3 crore in FY2024, INR 38.6 crore in FY2025 and INR 46.7 crore in FY2026 (derived) — is essentially subsidiary toll income. This business carries consolidated EBITDA margins of 40–49% but also heavy depreciation (INR 45.5 crore in FY2026) and the bulk of group borrowings (INR 317.6 crore consolidated vs INR 22.5 crore standalone at 31 March 2026).

  2. A sub-scale EPC contractor in transition. Standalone EPC revenue fell from INR 87.92 crore (FY2024) to INR 29.49 crore (FY2025) and INR 12.57 crore (FY2026) as the old order book ran off (Infomerics). The IRCON sub-contract signed 30 September 2025 is the only material new EPC work disclosed.

  3. An early-stage MMR residential developer. Real-estate revenue first appeared meaningfully in FY2026 (INR 14.30 crore) after Enclave II construction started in Q4 FY2026 (Infomerics).

  4. A claims and litigation business. A recurring and economically large part of Atlantaa's value has come from arbitration (Mumbra Bypass vs State of Maharashtra; Nagpur–Kondhali vs NHAI; Mohania–Ara termination claim) and lender settlements, which explain the extreme swings in "other income" (e.g., INR 313.94 crore in Q2 FY2024 and INR 161.47 crore in Q4 FY2024, consolidated).

Revenue model mix

Revenue streamModelRecognitionStatus FY2026
Road EPC / sub-contractingFixed-price or item-rate construction contracts with government agencies or prime contractorsMilestone / percentage-of-completionShrinking (INR 12.57 cr standalone) but large backlog from IRCON order
Toll collection (BOT / DBFOT concessions)User-fee concessions held in SPVsDaily toll receiptsMain consolidated earner; concession tail to c. 2028 for Nagpur–Kondhali (see §11/§19)
Residential real estateOwn/JDA/redevelopment projects in MMR; sold off-planInd AS 115 revenue recognitionRamp-up begun (INR 14.30 cr)
Arbitration awards / claimsContractual claims against authoritiesRecognised on award/realisation; often in other income or exceptional itemsLumpy; dominant profit driver in FY2024
Mining services (historic)Surface mining of limestone/coal on hire—No current revenue disclosed

There is no subscription or licensing revenue.

Value-chain position, customers and end-markets

Atlantaa sits in the construction/concession layer of the Indian transport-infrastructure value chain, below national/state authorities (NHAI, MSRDC, state PWDs) and — for the new order — below a prime contractor (IRCON International, a central PSU). Its real-estate customers are retail homebuyers in the Thane/Mumbai market. End-markets: (i) Indian highways and expressways (concentrated in Maharashtra); (ii) MMR residential housing; (iii) historically, Punjab and Bihar state roads, airport runways and SEZ infrastructure (Dahej).

Strategy

Stated strategy (themes)

No investor-day material or recent MD&A text was retrievable. From the company's filings, press releases and rating-agency interactions, management's stated themes are:

Rebuild EPC through partnerships with large contractors: evidenced by the IRCON BG-03 sub-contract rather than direct bidding.

Pivot to MMR residential, especially redevelopment: company commentary on the Borivali project describes a focus on high-impact redevelopment in Mumbai's land-constrained market and community-oriented, future-ready MMR developments (Business Standard, Dec 2025, paraphrased).

Monetise legacy claims and concessions: pursuing arbitration against NHAI and state authorities.

Keep the parent lightly geared: Infomerics notes no term loans have been taken for either real-estate project, which are funded through promoter contribution and customer advances.

Initiatives in the last 24 months

DateInitiativeDetailTargets disclosed
Apr 2024Subsidiary debt OTSAtlanta Infra Assets settled with UBI, BoB, DNS Bank, IIFCLSettlement amount not in sources reviewed
Sep 2024Launch of Enclave IICommencement certificate; 805 units; INR 475 crore costRERA completion 31 Dec 2028
Sep 2025Re-entry to large EPCIRCON BG-03 ~INR 2,485 croreConstruction period not disclosed
Dec 2025Redevelopment platformBorivali Bansi Nagar, GDV INR 500 croreLaunch expected Nov 2026 (Infomerics)
Sep 2026Object-clause changeApproved at 43rd AGMSpecific new objects not detailed in sources reviewed

ESG commitments, cost programmes and guidance

No sustainability targets, cost-reduction programmes or medium-term financial guidance have been published. Infomerics' rating case assumes an overall cash-flow coverage ratio of ~1.29x over FY2027–FY2029 for real estate, and says revenue visibility from the order book and projects extends to December 2030 — these are the closest available proxies for management expectations.

Products & Services

EPC / Infrastructure construction

OfferingDescription & capabilitiesTarget customerYearPricing modelFlagship / named projects
Expressway & highway constructionFour-lane access-controlled expressway works, earthwork, pavements, structuresMSRDC via prime contractor IRCONAgreement 30 Sep 2025Sub-contract value ~INR 2,485 crore; terms not disclosedBhandara–Gadchiroli Access Controlled Expressway, Package BG-03, km 34+750 (Sarandi Bk, Tq. Bhandara) to km 69+536 (Kinhi), ~34.8 km
Historic highways / bypassesBypass and NH wideningState PWDs, NHAI1998–2015EPC / BOTUdaipur Bypass (1998), Mumbra Bypass (BOT), Nagpur–Kondhali NH-6, Mohania–Ara NH-30, Ropar–Doraha
Airport runways & apronsAirfield pavementAirport authoritiesHistoricEPCNames not disclosed in sources reviewed
SEZ infrastructureSite developmentSEZ developersHistoricEPCDahej SEZ project
Other civil worksReclamation, RCC tracks, buildings, sheds, water-main laying, sewerageGovernment/local bodiesHistoricEPCNot itemised

Toll concessions (subsidiaries)

AssetSPVModeLength / scopeConcession / status
Nagpur–Kondhali section, NH-6 (Maharashtra)Atlanta Infra Assets LtdBOT (toll)Four-laning, O&MConcession agreement 9 Dec 2005; arbitration claims for extension relating to "additional tollways" (Samruddhi Expressway) and COVID; Delhi HC (2026) upheld a 53-day COVID extension award (per Rawlaw summary); court record references extension claims up to 26 Jun 2028
Ropar–Chamkaur Sahib–Neelon–Doraha (Punjab)Atlanta Ropar Tollways Pvt LtdDBFOT~54 km, 2 toll plazas; project cost ~INR 220 croreProvisional completion; historic dispute over ROB redesign at Doraha (~INR 40 crore extra cost)
Mohania–Ara section, NH-30 (Bihar)MORA Tollways LtdDBFOT (toll)116.76 kmTerminated by concessionaire 20 Feb 2015; INR 610.52 crore terminal payment demanded; current recovery status not disclosed
Mumbra Bypass (Maharashtra)Atlanta Ltd (direct)BOTkm 133/800 – 138/200Toll suspension disputes; arbitration award May 2012; SC appeals disposed Jul 2024

Real estate

ProjectLocationTypeKey specificationsStatusValue
Atlantaa Enclave II (Atlanta Enclave Phase II)Thane Municipal Corporation jurisdiction (Mumbra area, where Phase I is located; one listing portal places it at Ghansoli — discrepancy noted)Residential 1/2/3 BHK3 towers (2 × 35 floors, 1 × 30 floors); ~5,04,959 sq ft RERA area; 805 units; MahaRERA P51700077788; RERA completion 31 Dec 2028Under construction; 19.24% cost incurred (INR 91.41 cr of INR 475.07 cr) at 30 Jun 2026; 203 bookings (~25%) at 18 Sep 2026Saleable value INR 601 crore
Atlantaa Exotica—Residential—Yet to be launchedSaleable value INR 553 crore
Bansi Nagar redevelopment (Highway Milton CHS)Kulupwadi, off Western Express Highway, Borivali (East), Mumbai 400066Residential redevelopmentPlot ~4,496 sq mDevelopment agreement registered Dec 2025; approvals stage; launch expected Nov 2026Projected GDV ~INR 500 crore
Atlanta Enclave (Phase I)Mumbra, ThaneResidential—Completed—
Atlanta CenterGoregaon (East), MumbaiCommercial—Completed FY2013—
Shrikant Chambers; Olympic Lifestyles; ABT ApartmentsMumbai regionResidential/commercial—Legacy—

Note: It is unclear from public sources whether "Atlantaa Exotica" (INR 553 crore, per Infomerics) is the branded name of the Borivali redevelopment (GDV INR 500 crore, per company filing) or a separate project. Infomerics refers to "two on-going" projects and separately to a Borivali redevelopment at approval stage.

Mining services (historic)

Surface mining of limestone and coal on hire (e.g., Belpahar OCP for Mahanadi Coalfields, 2003). No current revenue disclosed.

Financial Narrative

All figures INR crore, fiscal years ended 31 March; source: Screener.in (C-MOTS) compiled from audited filings, unless stated. "EBITDA" = operating profit before other income (Screener definition). Derived ratios are this analyst's calculations.

Consolidated income statement

Gross profit is not reported separately by Atlantaa (Indian construction companies typically present expenses by nature), so gross margin is not publicly disclosed. Diluted EPS equals basic; no dilutive instruments disclosed.

Revenue CAGR (consolidated): FY2021–FY2026 five-year CAGR −3.5% (FY2021 revenue INR 88.33 crore); FY2022–FY2026 four-year CAGR −25.1% (derived; distorted by a large FY2022 base). TTM (to June 2026) revenue INR 77.72 crore, +16% (Screener).

Commentary. The consolidated P&L is dominated by non-recurring items. Stripping these out, the "core" group has run at roughly INR 33–53 crore of EBITDA on INR 52–133 crore revenue, with the toll SPV providing most of it. The FY2026 swing to a small loss is explained by (a) collapsing EPC revenue, (b) an unexplained INR 28.5 crore expense spike in Q2 FY2026 (consolidated expenses INR 28.47 crore on INR 12.11 crore revenue), partly reversed in Q4 FY2026 (negative expenses of INR 7.83 crore), and (c) interest nearly tripling to INR 10.88 crore.

Standalone income statement

The standalone entity returned to accounting profit in FY2024–FY2026, but FY2025's INR 63.49 crore profit exceeded revenue (PAT margin 103.99% per Infomerics), driven by INR 31.56 crore other income (including INR 22.50 crore in Q1 FY2025) and a tax credit. Infomerics computes FY2026 standalone interest coverage at −5.47x on negative EBITDA.

Consolidated quarterly trend (last five quarters)

Source: Screener consolidated; consistent with Business Standard (Q4 FY2026 revenue INR 30.52 crore, PBT INR 28.10 crore, PAT INR 21.61 crore). Kotak Neo cites Q4 FY2026 "revenue" of INR 34.85 crore, which matches total income (30.52 + 4.33). MarketsMojo flagged the Q4 FY2026 operating margin of 125.66% as unsustainable.

Consolidated balance sheet

Cash & equivalents (consolidated), short/long-term debt split, goodwill and working capital were not available in the sources reviewed; hence consolidated net debt is not publicly disclosed here (gross debt used instead). Fixed assets have run down rapidly (INR 192.6 crore → INR 40.3 crore), consistent with amortisation of a toll concession approaching the end of its life. Screener flags that the company "might be capitalising interest cost" (likely into real-estate inventory) and consolidated contingent liabilities of INR 234 crore.

Standalone balance sheet

Standalone liquidity per Infomerics: current ratio 12.02x and cash & equivalents INR 11.42 crore at 31 March 2026; fixed deposits of INR 40.47 crore at 31 March 2025 were fully earmarked as margin for bank guarantees. Infomerics reports standalone total debt of INR 19.67 crore and tangible net worth of INR 313.09 crore at 31 March 2026 (vs Screener borrowings of INR 22.53 crore and derived equity of INR 338.01 crore — differences reflect the agency's adjustments).

Consolidated cash flow

FY2022 "free cash flow" exceeds operating cash flow, implying Screener's FCF captured asset-disposal proceeds; the derived negative "capex" should be read as net disposals. Operating cash flow has been negative in two of the last three years as working capital (receivables and real-estate inventory) built up. Consolidated debtor days rose to 409 in FY2026; standalone debtor days to 525.

Ratios

Notes: ROE for FY2022–FY2024 and debt/equity for FY2022–FY2023 are not meaningful because equity was negative (or turned positive within the year); they are shown as 0 to keep the series chartable and should be read as "n.m." Gross debt/EBITDA for FY2022 is n.m. (negative EBITDA). Consolidated current ratio is not publicly disclosed; standalone current ratio was 12.02x at FY2026 (Infomerics). Cash conversion cycle equals debtor days because Screener shows no inventory/payable days after FY2020.

Trend synthesis. The FY2024 restructuring transformed the group from insolvent-on-paper (negative net worth of INR 385 crore) to modestly capitalised (INR 213 crore), but did not create a profitable operating franchise. Returns have since decayed toward zero, leverage at the consolidated level (≈1.5x D/E, ≈9x debt/EBITDA) is high for a business whose principal cash generator is an amortising toll asset, and working-capital intensity is rising just as the company needs cash to fund Enclave II (75%+ of cost still to be spent) and mobilise for a INR 2,485 crore EPC order.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Group Entities

EntityRelationshipActivityStatus (as available)Source

Atlantaa Limited

Parent (listed)

EPC, real estate, holding company

Operating

Filings

Atlanta Infra Assets Ltd (formerly Balaji Tollways Ltd)

Wholly owned subsidiary

Nagpur–Kondhali NH-6 BOT toll concession

Operating; OTS with lenders April 2024; arbitration won vs NHAI (Delhi HC 2026)

BSE filing Apr 2024; Rawlaw

Atlanta Ropar Tollways Pvt Ltd

Subsidiary

Ropar–Chamkaur Sahib–Neelon–Doraha DBFOT toll road (Punjab), 54 km, two plazas

Status not fully disclosed; historic disputes with Punjab PWD

NSE RPT filing May 2025; Tribune

MORA Tollways Ltd

Subsidiary

Mohania–Ara NH-30 DBFOT (Bihar)

Concession terminated Feb 2015; loans/advances written off per RPT disclosure

MoneyWorks4Me; NSE RPT filing

Atlanta NG Realty Pvt Ltd

SPV

SEZ development

Current status not publicly disclosed

IIFL summary

Prakash Atlanta (JV)

Joint venture

Construction

Status not publicly disclosed

NSE RPT filing May 2025

Atul Raj Builders

Related party (promoter-linked)

Real estate

Related-party transactions disclosed

NSE RPT filing May 2025

Revenue by Segment

SegmentFY2024FY2025FY2026

EPC – standalone (INR Cr)

87.9229.4912.57

Real estate – standalone (INR Cr)

0.600.0014.30

Standalone total operating income (INR Cr)

88.5229.4927.23

Subsidiaries incl. toll, net of eliminations – derived (INR Cr)

44.2538.6146.67

Consolidated revenue (INR Cr)

132.7768.1073.90

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Revenue by Segment (%)

SegmentFY2024FY2025FY2026

EPC share of consolidated revenue (%)

66.243.317.0

Real estate share of consolidated revenue (%)

0.50.019.4

Subsidiary/toll share of consolidated revenue (%)

33.356.763.2

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Segment Margins & Growth (%)

SegmentFY2025FY2026

EPC revenue growth (%)

-66.5-57.4

Subsidiary/toll revenue growth (%)

-12.720.9

Consolidated revenue growth (%)

-48.78.5

Income Statement and Per-Share Data

MetricFY2022FY2023FY2024FY2025FY2026

Revenue (INR Cr)

234.5051.65132.7768.1073.90

Operating expenses (INR Cr)

522.0431.9879.5335.3737.71

EBITDA excl. other income (INR Cr)

-287.5419.6753.2432.7336.19

Other income (INR Cr)

-14.318.13479.8031.4419.65

Depreciation (INR Cr)

25.1430.8935.7942.5545.54

EBIT incl. other income – derived (INR Cr)

-326.99-3.09497.2521.6210.30

Interest (INR Cr)

63.686.124.443.8310.88

Pre-tax income (INR Cr)

-390.67-9.21492.8117.79-0.58

Net income (INR Cr)

-402.47-32.40467.8642.57-1.71

EPS basic (INR)

-49.38-3.9857.415.22-0.21

EPS diluted (INR)

-49.38-3.9857.415.22-0.21

Dividend per share (INR)

00000

EBITDA margin (%)

-122.6238.0840.1048.0648.97

Net margin – derived (%)

-171.6-62.7352.462.5-2.3

Income Statement and Per-Share Data — Revenue

MetricFY2022FY2023FY2024FY2025FY2026

Revenue (INR Cr)

196.5914.0688.5229.4927.23

EBITDA excl. other income (INR Cr)

0.96-10.4369.7711.40-3.75

Other income (INR Cr)

-174.023.887.6531.5613.11

Interest (INR Cr)

26.924.581.320.440.69

Depreciation (INR Cr)

1.431.582.093.803.45

Pre-tax income (INR Cr)

-201.41-12.7174.0138.725.22

Net income (INR Cr)

-197.92-31.7949.0763.494.08

EPS (INR)

-24.28-3.906.027.790.50

EBITDA margin (%)

0.49-74.1878.8238.66-13.77

Income Statement

MetricQ1FY2026Q2FY2026Q3FY2026Q4FY2026Q1FY2027

Revenue (INR Cr)

14.5412.1116.7330.5218.36

EBITDA (INR Cr)

8.00-16.366.2238.353.89

Other income (INR Cr)

4.584.066.674.333.88

Interest (INR Cr)

2.792.472.553.082.85

Pre-tax income (INR Cr)

-1.52-26.09-1.0628.09-5.40

Net income (INR Cr)

-1.71-20.81-0.8021.61-5.06

Balance Sheet and Per-Share Data

MetricFY2022FY2023FY2024FY2025FY2026

Total assets (INR Cr)

569.06518.26470.37572.23565.90

Net fixed assets incl. concession intangibles (INR Cr)

192.61164.00128.7888.4740.29

Investments (INR Cr)

0.280.230.380.392.91

Other assets incl. receivables, inventory, cash (INR Cr)

375.48353.34341.21483.37522.70

Total borrowings (INR Cr)

823.05819.55247.54314.24317.62

Other liabilities (INR Cr)

77.3483.3065.0447.6335.70

Share capital (INR Cr)

16.3016.3016.3016.3016.30

Reserves (INR Cr)

-347.63-400.89141.49194.06196.28

Shareholders' equity – derived (INR Cr)

-331.33-384.59157.79210.36212.58

Book value per share – derived (INR)

-40.65-47.1919.3625.8126.08

Balance Sheet and Per-Share Data — Total assets

MetricFY2022FY2023FY2024FY2025FY2026

Total assets (INR Cr)

289.10233.17292.50342.75371.49

Borrowings (INR Cr)

24.872.8815.540.6822.53

Shareholders' equity – derived (INR Cr)

243.94222.36271.32334.73338.01

Other assets (INR Cr)

254.62198.21259.46311.13343.30

Book value per share – derived (INR)

29.9327.2833.2941.0741.47

Cash Flow

MetricFY2022FY2023FY2024FY2025FY2026

Operating cash flow (INR Cr)

109.1645.75-34.6854.69-33.25

Investing cash flow (INR Cr)

243.310.70-4.80-102.2529.95

Financing cash flow (INR Cr)

-344.60-0.99-8.6663.70-9.68

Net cash flow (INR Cr)

7.8845.45-48.1316.14-12.98

Free cash flow per Screener (INR Cr)

352.1543.47-35.1652.36-38.91

Implied capex – derived (INR Cr)

-242.992.280.482.335.66

Dividends paid (INR Cr)

00000

Buybacks (INR Cr)

00000

Returns & Leverage Ratios (%) and Financial Ratios (x)

RatioFY2022FY2023FY2024FY2025FY2026

ROE consolidated – derived (%)

00023.1-0.8

ROA consolidated – derived (%)

-62.1-6.094.78.2-0.3

ROCE consolidated (%)

-40.12-0.677.944.621.94

ROCE standalone (%)

6.34-3.2929.3812.571.12

Debt/equity consolidated – derived (x)

001.571.491.49

Gross debt/EBITDA consolidated – derived (x)

041.74.69.68.8

Interest coverage EBIT/interest consolidated – derived (x)

-5.1-0.5112.05.60.9

Asset turnover consolidated – derived (x)

0.360.100.270.130.13

Debtor days consolidated

172.57359.21348.75340.45408.96

Cash conversion cycle consolidated (days)

172.57359.21348.75340.45408.96

Revenue by Region

RegionFY2024FY2025FY2026

India – consolidated revenue (INR Cr)

132.7768.1073.90

Outside India (INR Cr)

000

Growth (%)

Growth (%)FY2025FY2026

India revenue growth (%)

-48.78.5

Segment Overview

SegmentMaharashtraPunjabBihar

Toll

Nagpur–Kondhali NH-6 (main asset)

Ropar–Doraha (status unclear)

Mohania–Ara (terminated 2015)

EPC

Bhandara–Gadchiroli BG-03 (Vidarbha)

——

Real estate

Enclave II (Thane), Borivali (Mumbai)

——

Capital Markets

MeasureValueSource

Last close (19 Oct 2026)

INR 34.7

Screener

1-year return

−31%

Screener (as of 19 Oct 2026)

3-year price CAGR

+31%

Screener

5-year price CAGR

+22%

Screener

10-year price CAGR

−8%

Screener

All-time high (reported)

INR 290

Business Standard (2024)

52-week range

INR 31.5 – 52.0

Screener

Valuation Snapshot

MultipleValueBasis

P/B consolidated

1.33x

INR 34.7 / BVPS INR 26.1

P/B standalone

0.84x

INR 34.7 / BVPS INR 41.5 (Screener)

EV (gross-debt basis)

~INR 601 crore

Mcap 283 + consolidated borrowings 317.6 (cash not deducted: not disclosed)

EV/EBITDA FY2026

~16.6x

601 / 36.19

EV/EBITDA TTM

~18.7x

601 / 32.10

EV/Sales TTM

~7.7x

601 / 77.72

Order book / market cap

~8.8x

2,485 / 283

Margin Analysis (%) and Operating Metrics (number)

MetricFY2022FY2023FY2024FY2025FY2026

Promoter holding (%)

63.2471.9272.1874.6774.67

Public holding (%)

36.7428.0827.8125.3225.32

Shareholders (number)

22,43125,02023,03223,52823,528

Consolidated book value per share – derived (INR)

-40.65-47.1919.3625.8126.08

Capital Markets — Dividend history

ItemDetail

Dividend history

Last dividend INR 0.30/share declared July 2018 (INDmoney); none since. Payout ratios FY2015 5.06%, FY2017 8.18% (consolidated, Screener)

Dividend policy

No payout despite profitable years (Screener flag)

Buybacks

None authorised or executed

Credit ratings

Infomerics: IVR BB+/Stable (LT), IVR A4+ (ST) on INR 100 crore proposed BG — assigned 23 Jul 2025, reaffirmed 13 Oct 2026. Brickwork rated the company 2019–2023; the 14 Jul 2023 Brickwork action appears (from the URL) to be a withdrawal — unconfirmed. Moody's / S&P / Fitch: not rated

Debt maturity profile

Parent: no scheduled term-debt repayments (Infomerics). Consolidated INR 317.6 crore borrowings: maturity schedule not publicly disclosed in sources reviewed

Analyst Conclusions

Guidance and consensus

Atlantaa provides no formal guidance and has no sell-side consensus. The only forward-looking third-party view is Infomerics' Stable outlook, premised on EPC order-book visibility and the two residential projects, with upgrade triggers tied to scale, margins, real-estate sales velocity (cash-flow coverage above 40% for both projects) and working-capital improvement, and downgrade triggers tied to execution delays, weak collections and rising working-capital needs.

Bull case

  1. Order book is transformational: if BG-03 is executed over ~3 years, annualised EPC revenue of ~INR 800 crore (derived: 2,485/3) would be more than ten times FY2026 consolidated revenue; even single-digit EPC margins would dwarf current earnings.

  2. Real-estate value unlocking: INR 1,154 crore combined saleable value of Enclave II and Exotica plus a ~INR 500 crore Borivali GDV, against a market cap of INR 283 crore, offers significant embedded value if sold through.

  3. Clean parent balance sheet and arbitration optionality: near-zero standalone gearing, a 2026 court win for the toll SPV, and legacy claims (e.g., the INR 610.52 crore Mohania–Ara demand) provide asymmetric upside.

Bear case

  1. Capacity mismatch: a company with INR 11.4 crore standalone cash, a INR 100 crore BB+ guarantee line and FY2026 EPC revenue of INR 12.6 crore is unlikely to execute a INR 2,485 crore package on schedule without large external funding or margin give-ups to IRCON.

  2. Cash burn and funding gap: negative operating cash flow (−INR 33 crore FY2026), a 24.55% cash-flow adequacy ratio on Enclave II and only ~25% bookings point to promoter funding or debt needs ahead.

  3. Shrinking cash engine and poor earnings quality: the toll asset funding the group is amortising toward expiry, while reported profits have relied on other income and expense reversals (Q4 FY2026 negative expenses), and the stock already trades at ~17–19x EV/EBITDA on a gross-debt basis.

Catalysts and monitorables (next 12 months)

MonitorableWhy it mattersTiming
Confirmation of MSRDC award to IRCON and BG-03 mobilisationConverts order book from contingent to executableOngoing
Quarterly EPC revenue run-rateEvidence of executionQ2 FY2027 results (~Nov 2026)
Borivali redevelopment launch and approvalsPipeline conversionExpected Nov 2026
Enclave II bookings vs 805 units; construction %RERA deadline Dec 2028; liquidityQuarterly
Bank-guarantee and funding arrangementsRequired for EPC scale-upNext 2–4 quarters
Toll concession end-date and any extension awardsGroup cash flow and debt servicingOngoing
Use of new object clausePossible strategic pivotPost-AGM Sept 2026
Board stability and complianceGovernance qualityOngoing

Analyst verdict

Atlantaa Limited is no longer the road EPC and BOT developer that listed in 2006; it is a promoter-controlled micro-cap in the middle of a fragile, two-pronged reinvention, financed by the dwindling cash flows of a single legacy toll road. The FY2024 settlements repaired the balance sheet on paper — consolidated net worth swung from roughly −INR 385 crore to +INR 158 crore — but they did not create a durable earnings base. Since then, core revenue has stagnated around INR 70 crore, operating cash flow has turned negative, receivable days have lengthened past 400, and FY2026 ended in a small loss that would have been considerably larger without a fourth-quarter expense reversal.

Against that backdrop, the INR 2,485 crore IRCON sub-contract and the MMR residential pipeline are genuinely large relative to the company's INR 283 crore valuation, which explains the stock's episodic surges. Yet size is precisely the problem: management must scale execution, guarantees and working capital by an order of magnitude while simultaneously funding a 805-unit tower project that is only one-fifth built and one-quarter sold. Nothing in the disclosed financials — an INR 100 crore BB+ guarantee line, roughly INR 11 crore of parent cash, no term funding for real estate — demonstrates that capacity yet. Disclosure is thin, there are no earnings calls, institutional ownership is nil, and the promoter group already holds the maximum 75% permitted.

Our assessment is that Atlantaa is a high-risk, binary, execution-dependent special situation rather than an investable compounder. On current evidence the risk-reward is unattractive at ~1.3x consolidated book and ~17–19x gross-debt EV/EBITDA. The thesis would improve materially only on hard evidence: confirmed BG-03 award and quarterly EPC billing of INR 100 crore-plus, Enclave II bookings rising toward the 40% cash-flow-coverage threshold Infomerics highlights, and transparent disclosure of the toll concession's remaining life and debt schedule. Until then, investors are essentially underwriting promoter execution with limited information.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Board of Directors

NameRoleBoard since / tenureNotesSource

Rajhoo (Rajoo) Ambalal Bbarot

Chairman & Whole-time Director; Promoter

Director since incorporation 1984 (MD until 22 Mar 2016; WTD from 23 Mar 2016)

Founder; 40+ years in infrastructure (Infomerics)

Zauba/Tofler; IIFL; Infomerics

Rickiin (Rikiin) Bbarot

Managing Director; Promoter

WTD 2011–2013; Joint MD (by 2012); MD since 23 Mar 2016; re-appointed for 5 years w.e.f. 31 Dec 2025

Son of founder (relationship per public profiles; not confirmed in filings reviewed)

Zauba; Reuters via Zerodha (13 Aug 2025); NSE board outcome 13 Aug 2025

Dr. Samir Omprakash Degan

Independent Non-Executive Director

Since 28 Sep 2018 (also on board ~2011–2012 per old directors' reports)

—

Zauba; Goodreturns

Anil Sunderrao Dighe

Independent Non-Executive Director

Since 28 Sep 2018

—

Zauba

Bhumika Anuj Pandey

Independent Non-Executive Director

Since 30 Sep 2021

—

Zauba

Mangala Radhakrishna Prabhu

Independent Director

Appointed for 5 years from 12 Aug 2026 (approved at AGM 29 Sep 2026)

—

BSE filing 30 Sep 2026

Meeta Arpan Brahmbhatt

Former Independent Director

23 Oct 2024 – 1 Oct 2026

Resigned citing health reasons

BSE filing 1 Oct 2026

Dipesh Shantilal Gogri

Chief Financial Officer

Since 4 Dec 2017

—

Zauba

Prathmesh Pradeep Gaonkar

Company Secretary (listed as KMP)

Date not disclosed

—

Zauba

Board & Management Changes

DateChangeContext

13 Aug 2025

Board approved re-appointment of Rickiin Bbarot as MD for 5 years w.e.f. 31 Dec 2025

NSE board outcome; Reuters

12 Aug 2026

Mangala Prabhu appointed Independent Director

Shareholder approval at 43rd AGM, 29 Sep 2026

29 Sep 2026

AGM approved director re-appointment and object-clause amendment

Scrutinizer report

1 Oct 2026

Meeta Brahmbhatt resigned as Independent Director

Health reasons

Shareholding Trend

Holder categoryMar 2022Mar 2023Mar 2024Mar 2025Mar 2026

Promoters (%)

63.2471.9272.1874.6774.67

FIIs (%)

0.020.000.000.000.00

DIIs (%)

0.000.000.000.000.00

Government (%)

0.000.010.010.010.01

Public (%)

36.7428.0827.8125.3225.32

Number of shareholders

22,43125,02023,03223,52823,528

Competitive Landscape

Competitors by Segment

SegmentCompetitors (named)Relative positioning of Atlantaa

Road EPC / HAM (Maharashtra and national)

Larsen & Toubro; IRB Infrastructure Developers; PNC Infratech; KNR Constructions; G R Infraprojects; H.G. Infra Engineering; Dilip Buildcon; Ashoka Buildcon; J. Kumar Infraprojects; Sadbhav Engineering

Atlantaa is a sub-contractor with FY2026 EPC revenue of INR 12.57 crore — a fraction of one percent of peers' scale; it competes for sub-contracts rather than prime bids

Toll / BOT asset ownership

IRB Infrastructure; Ashoka Buildcon; Sadbhav Infrastructure; GMR (road SPVs)

Single mature asset in tail phase; no growth pipeline

Large PSU EPC (also partners)

IRCON International; Rail Vikas Nigam

Partner/client rather than competitor

MMR residential (Thane/Mumbai suburbs)

Godrej Properties; Lodha (Macrotech); Oberoi Realty; Kalpataru; Raymond Realty; Puravankara; Sunteck Realty; and numerous unlisted redevelopment specialists

Micro-scale entrant; single launched project

Peer Comparison FY2026

DimensionAtlantaa (FY2026, consolidated)Typical listed road-EPC peerComment

Revenue (INR Cr)

73.90

Thousands of crore (verify per peer filings)

Not comparable in scale

EBITDA margin (%)

48.97 (toll-driven)

Low-to-mid teens for EPC (industry norm; verify)

Atlantaa's margin reflects toll mix, not EPC efficiency

R&D intensity (%)

—

Typically nil/not disclosed

—

Order book / revenue (x)

~33.6 (2,485 / 73.90, derived)

Typically 2–4x (industry norm; verify)

Extreme ratio implies execution-capacity risk

“—” = not publicly disclosed.

Company Snapshot

$8.5M

Revenue

1977

Founded

SWOT Analysis

Strengths

  • Large order backlog relative to size: INR 2,485 crore unexecuted EPC order at 30 June 2026 vs market cap of INR 283 crore (Infomerics, Oct 2026; Screener).
  • Real-estate pipeline: Enclave II saleable value INR 601 crore and Exotica INR 553 crore provide visibility to December 2030 (Infomerics).
  • Lightly geared parent: standalone gearing 0.07x and current ratio 12.02x at 31 March 2026 (Infomerics).
  • Cleaned-up group balance sheet: consolidated net worth moved from −INR 384.6 crore (FY2023) to +INR 212.6 crore (FY2026) after the FY2024 settlements (Screener).
  • High-margin toll cash flow: consolidated EBITDA margin of 49% in FY2026, mainly from subsidiary toll income (Screener; derived).
  • Legal track record: favourable arbitral outcomes (Mumbra award 2012; Delhi HC 2026 upholding award for Atlanta Infra Assets).

Weaknesses

  • Earnings volatility and quality: consolidated net income swung −402 / −32 / +468 / +43 / −2 crore over FY2022–FY2026; FY2024 profit came almost entirely from INR 479.8 crore of other income (Screener).
  • Collapsing EPC execution: EPC revenue down from INR 87.92 crore (FY2024) to INR 12.57 crore (FY2026) (Infomerics).
  • Working-capital strain: consolidated debtor days of 409 and standalone of 525 in FY2026; standalone working-capital days of 2,189 (Screener).
  • Negative operating cash flow: consolidated CFO of −INR 33.25 crore in FY2026 (Screener).
  • Group leverage: consolidated borrowings INR 317.6 crore, ~8.8x FY2026 EBITDA (derived).
  • Thin disclosure: no earnings calls since February 2018; no investor presentations (Screener concalls list).

Opportunities

  • BG-03 execution: if executed over a typical 2.5–3 year period, annual EPC revenue could be many multiples of FY2026 total revenue (MSRDC's BG-01 package carried a 2.5-year deadline, per Metro Rail Guy).
  • State expressway pipeline: further Vidarbha packages (INR 32,478 crore civil works across four corridors) offer sub-contract opportunities alongside IRCON (Swarajya).
  • Mumbai redevelopment: Borivali project (GDV ~INR 500 crore) could be the template for an asset-light pipeline.
  • Arbitration recoveries: outstanding claims, including the historic Mohania–Ara terminal payment demand of INR 610.52 crore (2015), represent optionality if any portion is realised (MoneyWorks4Me).
  • Toll concession extensions: arbitral findings supporting extensions for Nagpur–Kondhali could lengthen the cash tail (Delhi HC 2026).
  • Object-clause change (Sept 2026) may enable entry into new business lines (details not disclosed).

Threats

  • Execution capacity: BG-03 requires bank guarantees and working capital far beyond a INR 100 crore BG line and INR 11.4 crore standalone cash (Infomerics).
  • Real-estate funding gap: Enclave II cash-flow adequacy ratio only 24.55% with ~81% of cost still to be spent (Infomerics).
  • Sales velocity: ~25% bookings (203/805) two years after commencement (Infomerics, Sept 2026).
  • Concession run-off: consolidated fixed assets fell to INR 40.3 crore (FY2026) from INR 192.6 crore (FY2022), signalling the toll asset's approaching end (Screener).
  • Contingent liabilities: INR 234 crore consolidated / INR 120 crore standalone (Screener).
  • Counterparty/award conditionality: the IRCON agreement was signed in anticipation of MSRDC's award; formal award status unconfirmed (NSE filing, Sept 2025).

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
4 Apr 2025Regulation 31(4) SAST disclosure (promoter encumbrance declaration) Arihant (NSE list)Routine annual promoter disclosure
28 Apr 2025Exchange sought clarification on significant price movement ArihantSpeculative trading flagged
7 May 2025Company filed clarification letter ArihantResponse to exchange query
15 May 2025FY2025 audited results; auditor's unmodified opinion Screener; BSEConsolidated PAT INR 42.57 crore; standalone PAT INR 63.49 crore
27 Jun 2025Annual secretarial compliance report (FY2025) ScreenerReported full SEBI compliance
23 Jul 2025Infomerics assigns IVR BB+/Stable & IVR A4+ on INR 100 crore proposed BGFirst rating by Infomerics; sub-investment grade
13 Aug 2025Q1 FY2026 results (consolidated loss INR 1.71 crore); MD re-appointed; internal auditor appointed; FY2025 annual report and 42nd AGM date (29 Sep 2025) approved NSE filingWeak start to FY2026
2 Sep 2025FY2025 annual report and AGM notice filed TipRanksDisclosure
17 Sep 2025Maharashtra cabinet approves revised Bhandara–Gadchiroli alignment (94.2 km) and INR 931.15 crore for land acquisition and related expenditure SwarajyaDe-risks the corridor on which Atlantaa's order sits
29 Sep 202542nd AGM NSE filingRoutine
30 Sep 2025Agreement with IRCON for BG-03 (~INR 2,485 crore) NSE filingTransformational relative to size (order ≈5.45x market cap at the time per ScanX)
2–3 Oct 2025Shares hit 20% upper circuit on two consecutive sessions (to ~INR 22.65 per Business Standard; note: this price is inconsistent with other price data around INR 40+, possibly a reporting error) Business Standard; ScanXMarket re-rating
14 Nov 2025Q2 FY2026 results: consolidated loss INR 20.81 crore on unexplained expense spike NSE filing; Kotak NeoNegative earnings surprise
16–17 Nov 2025Newspaper publication of Q2 results JKBFSL (NSE)Routine
15–16 Dec 2025Development agreement registered for Bansi Nagar, Borivali (GDV ~INR 500 crore); stock up 5% to INR 43.55 Business StandardExpands real-estate pipeline
9–10 Feb 2026Q3 FY2026 results: consolidated loss INR 0.80 crore Arihant; Kotak NeoLoss narrowed
12 Mar 2026Board meeting outcome (agenda not detailed in sources) Arihant—
25 Mar 2026Trading window closure ArihantRoutine
15 May 2026Maharashtra infrastructure committee gives administrative approval to four Vidarbha expressways (combined cost INR 51,906 crore) incl. Bhandara–Gadchiroli (~94 km) SwarajyaPositive for BG-03 timeline
18 May 2026FY2026 audited results; Q4 FY2026 consolidated PAT INR 21.61 crore; FY2026 consolidated loss INR 1.71 crore Screener; Business StandardMixed; Q4 boosted by expense reversal
May–Jul 2026MarketsMojo repeatedly rates stock "Strong Sell"Negative quant sentiment
Jul 2026Delhi HC dismisses NHAI's Section 34 petition against award to Atlanta Infra Assets (COVID extension; NHAI INR 18.75 crore counterclaim rejected) Rawlaw; LiveLawSupports toll-concession tail
Aug 2026Q1 FY2027 results: consolidated loss INR 5.06 crore (revenue INR 18.36 crore) Screener; INDmoneyLoss widens YoY
12 Aug 2026Mangala Prabhu appointed Independent Director BSEBoard refresh
18 Sep 2026Enclave II bookings reach 203 of 805 units (~25%) Infomerics (Oct 2026)Sales velocity a key monitorable
29 Sep 202643rd AGM; 5 resolutions passed incl. object-clause change BSEPossible business-scope expansion
1 Oct 2026Meeta Brahmbhatt resigns as ID (health) BSEBoard change
13 Oct 2026Infomerics reaffirms IVR BB+/Stable, IVR A4+Rating stable despite FY2026 weakness
19 Oct 2026Rating disclosure filed with BSE, five days late Screener (BSE)Minor compliance lapse

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

4 charts
Income Statement: Revenue & Gross Profit: Revenue fell from INR 2,345 Mn in FY2022 to INR 739 Mn in FY2026.
Atlantaa Limited — Income Statement: Revenue & Gross Profit
Series (INR Mn)FY2022FY2023FY2024FY2025FY2026
Revenue2,345516.51,327.7681739

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Sources

  1. Screener.in — Atlantaa Ltd standalone and consolidated pages (financials FY2015–FY2026, quarterly results, shareholding, announcements): and · screener.in
  2. Infomerics Valuation and Rating — Press release, Atlantaa Limited, 13 October 2026
  3. Infomerics Valuation and Rating — Press release, Atlantaa Limited, 23 July 2025
  4. NSE filing — IRCON agreement, 30 Sep 2025
  5. NSE filing — Board outcome Q1 FY2026, 13 Aug 2025
  6. NSE filing — Board outcome Q2 FY2026, 14 Nov 2025
  7. NSE filing — Commencement certificate, 3 Sep 2024
  8. NSE filing — Related party transactions, 15 May 2025
  9. BSE filing — One Time Settlement of Atlanta Infra Assets, 8 Apr 2024
  10. BSE filing — FY2023 Annual Report / 40th AGM notice
  11. Business Standard — IRCON contract upper circuit (Oct 2025)
  12. Business Standard — Borivali redevelopment (Dec 2025)
  13. Business Standard — Enclave Phase II commencement certificate (Sep 2024)
  14. Business Standard — Quarterly results page
  15. ScanX — IRCON contract and FY2026 results coverage
  16. Kotak Neo — Quarterly result summaries Q1–Q4 FY2026
  17. MarketsMojo — Q4 FY2026 results analysis
  18. Swarajya — Bhandara–Gadchiroli cabinet approval (Sep 2025) and Vidarbha expressways approval (May 2026)
  19. The Metro Rail Guy — Bhandara–Gadchiroli BG-01 bidding (May 2024)
  20. MoneyWorks4Me — MORA Tollways termination (Feb 2015)
  21. Moneylife — Mohania–Ara and Ropar contract wins
  22. The Tribune — Ropar–Doraha toll plaza dispute
  23. Supreme Court of India — Executive Engineer, Road Development Division vs Atlanta Ltd (2014)
  24. Legistify — SC civil appeals 1539/2020 and 1540–1541/2020 case records
  25. Lawtext — Bombay High Court Mumbra Bypass arbitration judgments
  26. LiveLaw / Rawlaw — NHAI vs Atlanta Infra Assets, Delhi High Court (2026)
  27. Aditya Birla Money, ICICIdirect, IIFL, Angel One, Arihant Capital, Nirmal Bang, Upstox, Investing.com, Wright Research, Tofler, Tracxn, Zauba Corp — company profiles, management lists, price data
  28. INDmoney — dividend history and Q1 FY2027 summary
  29. Housiey — Atlanta Enclave II RERA listing

Unlock Company Contacts