Audalia Resources Limited Overview
Audalia Resources is a Perth-based, single-asset junior. It owns 100% of the Medcalf vanadium-titanium-iron project in the Lake Johnston region of Western Australia, about 470 km east-southeast of Perth. The company dropped an early, capital-heavy hydrometallurgical plan to extract vanadium pentoxide and titanium dioxide. It has rebased Medcalf as a low-complexity direct-shipping-ore (DSO) operation. The plan is to crush and screen weathered pyroxenite into High Titanium Lump Ore (HTLO) and High Titanium Fine Ore (HTFO) and sell them mainly to Chinese steelmakers, who use them to protect blast-furnace hearth refractories. The project has primary state environmental approval (Ministerial Statement 1228, 4 July 2024). In January 2026 it published a maiden Probable Ore Reserve of 11.77 Mt at 11.0% TiO2. A pre-feasibility study shows NPV10 of A$141M–227M against pre-production capex of A$31M–121M. Against that, the balance sheet is fragile, with about A$0.7M cash, about A$6M of director and private loans plus more than A$4M of accrued interest, and a going-concern emphasis of matter. Secondary mining approvals, offtake and development funding are all still outstanding.
Company's own description
In its statutory reports, Audalia describes its principal continuing activity as mineral exploration and evaluation. It reports a single operating segment, the Medcalf Project in Western Australia (H1 FY2026 Interim Report, Note 9). Its market description, carried by data vendors such as Market Index and Morningstar, says the company is working to secure the remaining permits needed to develop a mining, crushing and screening operation that would supply titanium- and vanadium-bearing ore to Asian buyers. The January 2026 PFS Update frames the products as HTLO (10–60 mm) and HTFO (3–10 mm) for refractory lining protection in blast furnaces.
Independent characterisation
What the company does today. Audalia generates no operating revenue. Its only income is small amounts of bank interest and sundry income. It spends money to advance Medcalf toward a construction decision: drilling, resource and reserve estimation, geotechnical, hydrological and metallurgical studies, approvals and financing negotiations. Development-related spending is capitalised into an exploration and evaluation (E&E) asset, which had a carrying value of A$14.70M at 31 December 2025. Corporate overheads and interest on related-party and private loans go through the profit and loss account.
Intended business model (post-development). The planned business is a contractor-operated, single-source open-pit quarry. The planned flow is:
-
Open-cut mining with conventional drill-and-blast and 100–200 t excavators, at a low strip ratio of 0.6:1 (waste to ore).
-
Two-stage crushing and screening on site. There is no chemical processing and no tailings storage facility.
-
Road-train haulage of about 220 km to the Port of Esperance.
-
Bulk export of two products, HTLO and HTFO, to steel mills in Asia, with China as the base case.
The planned output is 80,000 t per month of combined product (about 0.96 Mtpa) at a targeted 11.5% TiO2 and about 53% Fe2O3, over a 9-year life.
Revenue model. If developed, revenue would come entirely from product sales: physical bulk commodity sales priced per tonne, with penalties for silica and alumina above specification. The PFS base prices are US$100/t for HTLO and US$90/t for HTFO. There is no service, subscription or licensing component.
Value-chain position. Upstream raw-material supplier (mine-gate to FOB Esperance). The HTLO and HTFO products are consumables in the iron-making process. Titanium-bearing material is charged to the blast furnace, where titanium carbonitride deposits form in the hearth and protect eroded refractory linings. The products compete with ilmenite lump, titanium pellets and domestic Chinese high-titanium ores.
Customer types and end markets. The target customers are integrated blast-furnace steelmakers, primarily in China. Audalia commissioned Beijing Zhonglian Bona (China Market Research Net) to study the market. In November 2025 it held preliminary sales negotiations that refined the product specifications and the penalty structure. No binding offtake has been announced.
Historical pivot. The 2016 PFS by Simulus Engineers envisaged a hydrometallurgical flowsheet producing V2O5, TiO2 pigment-grade feed, iron oxide and a copperas by-product. From about 2022, the company reframed Medcalf as a titanium DSO project, which sharply cut capital intensity and technical risk. Vanadium (0.61% V2O5 in the reserve) is now largely a by-product contained in the iron-titanium ore and is not separately monetised in the PFS base case.
Strategy
Stated strategy (themes from H1 FY2026 report and 2026 ASX releases)
-
"Move toward production" in 2026. The H1 FY2026 report names two near-term objectives: obtain mining approval, and reach production in Q4 2026.
-
Simplicity and low capital intensity. The DSO crush-and-screen concept with no chemical processing and no TSF; single-source contractor model; evaluation of low-capex options.
-
De-risking toward a bankable reserve. Converting Inferred to Indicated, then declaring the maiden Ore Reserve, completed in January 2026.
-
Commercial validation. Continued negotiations with potential offtake partners and potential financiers for company- or project-level financing.
-
Secondary approvals. Starting the mining-proposal and secondary-approval process in H1 2026 after the PFS update; groundwater licensing; Part V works approvals.
Initiatives in the last 24 months
| Initiative | Timing | Status / targets |
|---|---|---|
| 2025 RC infill drilling at Vesuvius, Fuji, Pinatubo and Egmont (77 holes, 2,589 m) | Late 2024 – mid 2025 | Complete. Indicated resource up 35% |
| Geotechnical/metallurgical PQ drilling (10 holes; 9 geotech for 500.7 m plus 1 metallurgical) | Apr–Jun 2025 | Complete. Lump yield of about 84% in the 10–60 mm fraction from 3 holes (preliminary) |
| KeypointE sizing testwork; Manxmin geotechnical design; AEMCO hydrology review | H2 2025 | Complete. Feeds the PFS |
| Contractor pre-tender for single-source mining, crushing and haulage (4 invited; 3 submitted) | Q4 2025 | Pricing used in the PFS. No contract awarded |
| January 2026 PFS Update and maiden Ore Reserve | 30 Jan 2026 | Complete |
| Optimal development option selection (sealed vs unsealed road) | 2,026 | Ongoing. "Best low-risk option" not yet announced |
| Secondary mining approvals (mining proposal, works approvals, groundwater licence) | Planned from H1 2026 | In progress. No grant announced |
| Offtake negotiations (Chinese steel market) | Ongoing since 2022 | No binding agreement announced |
| Development funding (A$31.1M–120.9M) | 2,026 | No binding arrangement (supplementary release 6 Feb 2026) |
| Debt maturity management | Jul 2026 | A$3M facilities extended to 15 Jul 2028 |
| Tenure expansion (E63/1915, E63/2347, E63/2348, E63/2352) | Pending | Applications |
Medium-term targets and guidance
There is no earnings guidance, and none would be expected. By October 2026 the Q4 2026 production and construction target looks very difficult to meet. No secondary approvals, offtake or funding have been announced, and cash covers only 1–2 quarters.
ESG commitments: none quantified.
Products & Services
Audalia has no commercial products in market. The catalogue below lists its planned products and its core asset (mineral inventory), product by product.
High Titanium Lump Ore (HTLO): flagship planned product
| Attribute | Detail (January 2026 PFS Update) |
|---|---|
| Description | Crushed and screened weathered pyroxenite ore, direct-shipped |
| Size specification | +10 mm to –60 mm |
| Target grade | 11.5% TiO2; about 53% Fe2O3; SiO2 below 12%; Al2O3 below 10% |
| Use | Charged into blast furnaces to form protective titanium carbonitride deposits on hearth refractory linings |
| Target customer | Integrated steel mills in Asia, primarily China |
| Recovery assumption | 75% of treated ore to HTLO (scheduling basis) |
| Base price | US$100/t on specification (financial model). The optimisation used US$110/t |
| Penalties | SiO2 above 12% and up to 18%: –US$1/t, a further –US$1/t above 18%. Al2O3 above 10% and up to 15%: –US$1/t, a further –US$1/t above 15%. The PFS describes the impact as negligible |
| Launch | Not yet produced. The company targeted production in Q4 2026, subject to funding and approvals |
High Titanium Fine Ore (HTFO): secondary planned product (new in January 2026 PFS)
| Attribute | Detail |
|---|---|
| Size specification | +3 mm to –10 mm |
| Target grade | Same chemistry targets as HTLO |
| Recovery assumption | 7.5% of treated ore |
| Base price | US$90/t (financial model); US$99/t in the optimisation inputs |
| Note | Adding HTFO is a key change from the July 2022 PFS. Material finer than 3 mm (about 17.5%) is rejected because no market for it is currently identified |
Vanadium content (unmonetised by-product)
The Ore Reserve carries 0.61% V2O5. The current PFS does not separately recover or price vanadium. The company's earlier (2016–2020) studies targeted V2O5 production through beneficiation and pyrometallurgy, and those flowsheets remain technically documented (ASX releases 26 and 31 Oct 2017; 28 Sep 2020).
Core asset: Medcalf mineral inventory
| Classification | Prospect | Tonnes (Mt) | TiO2 % | V2O5 % | Fe2O3 % | Al2O3 % | SiO2 % |
|---|---|---|---|---|---|---|---|
| Indicated | Vesuvius | 18.0 | 10.29 | 0.55 | 52.6 | 9.1 | 17.8 |
| Indicated | Egmont | 2.3 | 9.21 | 0.48 | 43.3 | 7.2 | 24.8 |
| Indicated | Sub-total | 20.3 | 10.17 | 0.54 | 51.5 | 8.9 | 18.6 |
| Inferred | Vesuvius | 1.7 | 7.82 | 0.35 | 38.5 | 8.3 | 30.4 |
| Inferred | Kilimanjaro | 2.1 | 7.87 | 0.41 | 46.8 | 8.5 | 25.8 |
| Inferred | Sub-total | 3.8 | 7.85 | 0.38 | 43.1 | 8.4 | 27.8 |
| Total | — | 24.2 | 9.80 | 0.52 | 50.2 | 8.8 | 20.1 |
| TiO2 cut-off (%) | Tonnes (Mt) | TiO2 % | V2O5 % | Fe2O3 % |
|---|---|---|---|---|
| 4 | 31.6 | 8.69 | 0.45 | 47.8 |
| 5 | 28.5 | 9.15 | 0.48 | 48.7 |
| 6 | 24.2 | 9.80 | 0.52 | 50.2 |
| 7 | 19.6 | 10.56 | 0.56 | 52.1 |
| 8 | 15.0 | 11.50 | 0.62 | 54.4 |
| Category | Ore (Mt) | TiO2 % | Fe2O3 % | V2O5 % | Al2O3 % | SiO2 % |
|---|---|---|---|---|---|---|
| Proved | 0 | — | — | — | — | — |
| Probable | 11.77 | 11.01 | 53.80 | 0.61 | 8.82 | 15.90 |
| Total | 11.77 | 11.01 | 53.80 | 0.61 | 8.82 | 15.90 |
September 2025 Mineral Resource Estimate (Cube Consulting; reported above a 6% TiO2 cut-off; depth-limited to 65 m)
Grade-tonnage sensitivity (Indicated + Inferred)
January 2026 Maiden Ore Reserve (Competent Person: Quinton de Klerk, Cube Consulting; 7.5% TiO2 cut-off)
The Reserve converts about 58% of Indicated tonnes. No Inferred material is included. Inferred material is treated as waste in the schedule.
Development options (January 2026 PFS Update)
| Metric | Option 1: High CAPEX / Low OPEX (sealed road) | Option 2: Low CAPEX / High OPEX (unsealed road) |
|---|---|---|
| NPV (10%, A$ M) | 226.7 | 141.2 |
| IRR (%) | 64 | 164 |
| Payback (years) | 1.0 | 0.6 |
| Total CAPEX (A$ M) | 120.9 | 31.1 |
| Mining (A$/t processed) | 15.34 | 16.65 |
| Crushing (A$/t) | 11.62 | 11.06 |
| Haulage (A$/t) | 15.25 | 46.27 |
| G&A (A$/t) | 3.86 | 3.86 |
| Port and shipping (A$/t) | 1.82 | 1.82 |
| Camp and catering (A$/t) | 1.93 | 1.93 |
| Total OPEX (A$/t processed) | 49.82 | 81.59 |
Other assumptions: exchange rate starting at 0.663 USD/AUD (XE forecasts); 9-year schedule of 36 quarters; mine closure and pre-production costs excluded from capex; 80-person camp bought as capital; diesel power under a hire agreement; financial model by Red Rock Engineering and Mining Administrative Services. In the high-capex option the 74 km access road makes up about 65% of capex. The PFS states that a price fall of more than 25% pushes the high-capex option's IRR below 10%.
Financial Narrative
Basis: A$ millions unless stated. FY2022–FY2026 annual figures are from S&P Global Market Intelligence (StockAnalysis), last updated 29 September 2026. H1 FY2026 figures are from the reviewed Interim Report (13 March 2026). Nothing has been estimated to fill them.
Income statement
Notes:
-
EBITDA: depreciation is negligible (about A$1K–A$11K a year), so EBITDA is approximately equal to operating income. The FY2022–FY2024 values are from TipRanks; FY2025–FY2026 are taken as equal to operating income.
-
Finance costs are derived as net loss minus operating loss. H1 FY2026 reported interest expense was A$450,461, against A$367,088 in H1 FY2025.
-
EPS for FY2022–FY2024 is derived from the 692.14M weighted shares. H1 FY2026 reported EPS was –0.08 cents (weighted shares 804.1M).
-
Gross, operating and EBITDA margins are not meaningful because the denominator is interest income.
-
Revenue CAGR is not meaningful (no operating revenue).
Commentary. The P&L of a pre-production developer is mainly a record of the cost of carrying the project. Two features stand out.
First, cash overheads are tightly controlled. Corporate and administration costs held at about A$0.35M–0.40M a year throughout FY2022–FY2026, and H1 FY2026 corporate and admin was A$170,553, down from A$215,269. That restraint is partly artificial: a large share of executive remuneration is accrued rather than paid.
Second, and more important, the loss is growing because of interest, not activity. Derived finance costs almost doubled from about A$0.49M in FY2022 to about A$0.96M in FY2026. Interest is now about 73% of the annual loss. Interest compounds on the A$3M private investor loans at 8–10%, compounded daily, and accrues at 5% on A$2M of director loans. The interest-free director loan also creates a notional fair-value unwind under AASB 9. Because no interest is paid in cash, the P&L loss far exceeds operating cash burn, and accrued interest builds up as a liability (A$4.20M at 31 December 2025).
Balance sheet
Notes:
-
Total debt is stated at amortised cost; the principal is A$6.0M.
-
The A$3.84M of accrued interest at FY2025 sat in non-current "other payables" (S&P "other long-term liabilities"). S&P shows A$3.20M in FY2024 and A$2.09M in FY2022.
Interim checkpoint (31 Dec 2025, reviewed):
-
Assets: total A$15.48M; cash A$0.62M; E&E A$14.70M.
-
Liabilities: total A$11.94M, including current borrowings of A$5.90M, interest payable of A$4.20M and other payables and accruals of A$1.10M (of which A$0.95M is accrued directors' salaries and fees).
-
Equity: A$3.54M (issued capital A$14.85M; accumulated losses A$11.52M; reserves A$0.21M).
-
Working capital deficiency: A$11.20M. The loans had become current because of their July 2026 maturities.
-
June-quarter 2026 report: the A$3M private loan facilities' repayment date was extended to 15 July 2028, which should move that debt back to non-current at 30 June 2026.
Commentary. The balance sheet is the main issue in the Audalia story. The E&E asset grew from A$11.58M (FY2022) to A$14.70M (December 2025). Funded borrowings stayed at A$6M principal, while unpaid interest rose to A$4.2M. On top of that sit about A$1.3M of unpaid director remuneration and fees.
Total creditor claims ranking ahead of equity were therefore about A$11.9M at December 2025. Those claims would need to be refinanced or capitalised before any project-level lending could take a senior position. The working-capital line swings sharply depending on whether the loans are classified as current (FY2023, December 2025) or non-current (FY2024, FY2025). Those swings reflect rolling maturity extensions, not changes in operations.
Cash flow
Commentary. The funding mix changed in FY2025. Up to FY2024 the company was funded almost entirely by director loans (A$1.03M, A$0.62M and A$0.33M drawn in FY2022–FY2024). Once primary environmental approval arrived in July 2024, Audalia switched to equity: a A$2.0M placement in FY2025, then about A$1.94M in FY2026 through four small single-investor placements of A$0.45M–0.54M each.
Spending followed the funding. E&E outlays roughly tripled from A$0.46M (FY2024) to A$1.31M (FY2025) and A$1.54M (FY2026). That paid for the 2025 drilling, the geotechnical and metallurgical programs and the PFS update.
Operating cash burn stays low (A$0.25M–0.40M) because salaries and interest are accrued. The June 2026 quarterly report estimated only about 1.9 quarters of funding available, which explains the further A$0.45M placement announced on 17 August 2026.
Ratios
Notes:
-
ROE and ROA are derived as net loss over average equity or average total assets from the S&P balance sheets (FY2021 equity A$4.74M; FY2021 total assets A$11.00M).
-
Debt/equity is computed on S&P total debt, which excludes accrued interest. Including accrued interest, FY2025 leverage is about 3.1x.
-
ROIC, net debt/EBITDA, interest coverage, asset turnover and cash conversion cycle are not meaningful: EBITDA is negative and there is no revenue, inventory or receivables cycle.
Commentary. All return metrics are negative, as expected for a developer. ROE is deteriorating because equity is being eroded by interest-driven losses faster than placements can rebuild it. The FY2024 low point (equity A$2.06M) came just before primary approval. On a market basis, the A$21.6M–21.9M market capitalisation is roughly 6x book equity, so the market is ascribing value to Medcalf's approvals and reserve beyond its accounting cost.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Segment Overview
| Segment | Contents | Products / services | Status |
|---|---|---|---|
Medcalf Project (WA) | M63/656 (mining lease); E63/1855 (exploration licence); L63/75 and L63/94 (miscellaneous licences); G63/10 and G63/12 (general purpose licences); exploration licence applications E63/1915, E63/2347, E63/2348 and E63/2352 | Planned HTLO and HTFO DSO products | Pre-development; no sales |
Results by Segment
| Metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Medcalf segment / company other income (AUD Mn) | 0.004 | 0.013 | 0.003 |
Net loss (AUD Mn) | -0.94 | -1.13 | -1.31 |
% of total income from Medcalf segment | 100 | 100 | 100 |
Licence Details
| Licence | Type | Location | Status | Interest |
|---|---|---|---|---|
M63/656 | Mining lease | Medcalf | Granted | 100% |
E63/1855 | Exploration licence | Bremer Range | Granted | 100% |
L63/75 | Miscellaneous licence (haul road) | Bremer Range | Granted | 100% |
L63/94 | Miscellaneous licence | Lake Johnston | Granted | 100% |
G63/10 | General purpose licence | Lake Johnston | Granted | 100% |
G63/12 | General purpose licence | Lake Johnston | Granted | 100% |
E63/1915 | Exploration licence | Bremer Range | Application | 0% |
E63/2347 | Exploration licence | Lake Johnston | Application | 0% |
E63/2348 | Exploration licence | Lake Johnston | Application | 0% |
E63/2352 | Exploration licence | Lake Johnston | Application | 0% |
Income Statement and Per-Share Data
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue / other income (AUD Mn) | 0 | 0.018 | 0.004 | 0.013 | 0.003 |
Gross profit (AUD Mn) | 0 | 0.018 | 0.004 | 0.013 | 0.003 |
Operating income (AUD Mn) | -0.35 | -0.38 | -0.40 | -0.39 | -0.35 |
EBITDA (AUD Mn) | -0.35 | -0.38 | -0.39 | -0.39 | -0.35 |
Finance costs, derived (AUD Mn) | 0.49 | 0.53 | 0.54 | 0.74 | 0.96 |
Pre-tax income (AUD Mn) | -0.84 | -0.90 | -0.94 | -1.13 | -1.31 |
Net income (AUD Mn) | -0.84 | -0.90 | -0.94 | -1.13 | -1.31 |
Basic/diluted EPS (A cents) | -0.12 | -0.13 | -0.14 | — | — |
Dividends per share (A cents) | 0 | 0 | 0 | 0 | 0 |
Net margin (%) | — | -4,989 | -26,308 | -8,860 | -41,785 |
Balance Sheet
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Total assets (AUD Mn) | 11.88 | 12.16 | 12.40 | 14.59 | — |
Cash and equivalents (AUD Mn) | 0.18 | 0.41 | 0.02 | 0.59 | 0.72 |
E&E asset (AUD Mn) | 11.58 | 11.64 | 12.25 | 13.83 | — |
Short-term debt (AUD Mn) | 1.70 | 5.33 | 0 | 0 | — |
Long-term debt (AUD Mn) | 3.00 | 0 | 5.61 | 5.81 | — |
Total debt (AUD Mn) | 4.70 | 5.33 | 5.61 | 5.81 | 5.99 |
Net debt (AUD Mn) | 4.52 | 4.92 | 5.59 | 5.22 | 5.27 |
Accrued interest payable (AUD Mn) | — | — | 3.20 | 3.84 | — |
Total liabilities (AUD Mn) | 7.97 | 9.16 | 10.33 | 11.47 | — |
Shareholders' equity (AUD Mn) | 3.90 | 3.00 | 2.06 | 3.12 | — |
Goodwill and intangibles (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Working capital (AUD Mn) | -2.62 | -8.67 | -1.40 | -1.08 | — |
Cash Flow
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Operating cash flow (AUD Mn) | -0.24 | -0.26 | -0.26 | -0.40 | -0.25 |
Capex / E&E spend (AUD Mn) | -1.01 | -0.59 | -0.46 | -1.31 | -1.54 |
Free cash flow (AUD Mn) | -1.25 | -0.86 | -0.72 | -1.71 | -1.79 |
R&D incentive / other investing inflow (AUD Mn) | 0.35 | 0.46 | 0 | 0 | 0 |
Equity issued (AUD Mn) | 0 | 0 | 0 | 2.00 | 1.94 |
Debt drawn (AUD Mn) | 1.03 | 0.62 | 0.33 | 0.29 | 0 |
Dividends paid (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Buybacks (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Net change in cash (AUD Mn) | 0.13 | 0.23 | -0.39 | 0.57 | 0.13 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|
ROE (%) | -19.4 | -26.1 | -37.2 | -43.6 |
ROA (%) | -7.3 | -7.5 | -7.7 | -8.4 |
Current ratio (x) | 0.08 | 0.05 | 0.06 | 0.39 |
Debt / equity (x) | 1.21 | 1.78 | 2.72 | 1.86 |
Book value per share (A cents) | 0.56 | 0.43 | 0.30 | 0.39 |
Results by Region
| Region | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Australia other income (AUD Mn) | 0.004 | 0.013 | 0.003 |
Asia sales revenue (AUD Mn) | 0 | 0 | 0 |
Rest of world (AUD Mn) | 0 | 0 | 0 |
Share Price
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Share price at 30 June (AUD) | 0.025 | 0.012 | 0.011 | 0.020 | 0.023 |
Share Price & Returns
| Period | Approximate performance | Basis |
|---|---|---|
1-year | About 0% to +9% | Oct 2025 trades at A$0.023–0.026 vs A$0.025 now |
3-year | About +127% | 30 Jun 2023 A$0.011 vs A$0.025 |
5-year | About 0% | 30 Jun 2021 A$0.025 vs A$0.025 |
Valuation Multiples
| Multiple | Audalia | Comment |
|---|---|---|
P/E | n/m | Loss-making |
EV/EBITDA | n/m | Negative EBITDA |
EV/Sales | n/m | No sales |
P/B | about 6.2x | A$21.9M market cap / A$3.54M equity (Dec 2025) |
EV (approx.) | about A$27M–31M | Market cap plus A$6.0M principal less A$0.7M cash, plus up to A$4.2M accrued interest |
EV / NPV10 (high-capex option) | about 0.12–0.14x | Against A$226.7M pre-tax, pre-funding NPV10 |
EV / NPV10 (low-capex option) | about 0.19–0.22x | Against A$141.2M |
Market cap / tonne of Reserve | about A$1.9/t | A$21.9M / 11.77 Mt |
Capital Markets
| Item | Status |
|---|---|
Analyst coverage / consensus | None (0 analysts) |
Dividend history and policy | No dividends ever paid. None expected before production and debt repayment |
Credit ratings (Moody's / S&P / Fitch) | Not rated |
Capital-raising pattern | Placements under LR 7.1A at A$0.025–0.03 to single sophisticated investors (Sep 2025, Dec 2025, Apr 2026, Jun 2026, Aug 2026) |
Debt Facilities
| Facility | Principal (AUD Mn) | Rate | Maturity |
|---|---|---|---|
Private investor loan A | 2.0 | 8%, compounded daily, interest at maturity | 15 Jul 2028 (extended) |
Private investor loan B | 1.0 | 10%, compounded daily | 15 Jul 2028 (extended) |
Ong interest-free facility | 1.0 | 0% (AASB 9 notional 10%) | 15 Jul 2026 per H1 FY2026; current status not confirmed |
Ong interest-bearing facility | 2.0 | 5%, accruing daily | 31 Jul 2026 per H1 FY2026; extendable by mutual agreement; current status not confirmed |
Analyst Conclusions
Management guidance
-
Obtain mining approval and move to production in Q4 2026 (H1 FY2026 Directors' Report).
-
Construction from Q4 2026, subject to funding, approvals and market conditions (supplementary release, 6 February 2026).
-
Continue offtake and financing negotiations.
-
Select the lowest-risk development option.
No financial guidance has been given. There is no consensus.
Bull case
-
Approved, reserved and cheap. Audalia holds primary environmental approval and a JORC Reserve. Its EV is about 0.12–0.22x PFS NPV10. Any binding offtake or funding announcement could re-rate the stock sharply from a low base.
-
Low-capex entry. The A$31.1M unsealed-road option, with a 0.6-year payback in the PFS, is within reach of a strategic offtaker prepayment or equipment and contractor financing. That would limit equity dilution relative to typical developers.
-
Supportive, patient capital. The anchor holder and lenders have rolled maturities repeatedly. In July 2026 they extended A$3M of loans to 2028, which shows tolerance and creates room for a debt-to-equity clean-up.
Bear case
-
Funding gap versus balance sheet. Even the low-capex option needs about 1.4x the market capitalisation. Total liabilities of about A$11.9M (December 2025) rank ahead of new equity. Sub-A$0.5M placements show no institutional appetite so far.
-
Commercial opacity. HTLO/HTFO pricing rests on preliminary negotiations. A 25% price drop pushes the high-capex option's IRR below 10%, and haulage is the largest cost in the low-capex option.
-
Execution and approval slippage. No groundwater licence. Exclusion zones for flora and troglofauna. Mine closure and pre-production costs excluded from capex. Secondary approvals not granted. The Q4 2026 production target appears unattainable, which repeats the pattern of milestones slipping since the 2016 PFS.
Catalysts and monitorables (next 12 months)
| Catalyst / monitorable | Expected timing | Why it matters |
|---|---|---|
| September-quarter 2026 report (Appendix 5B) | 23 Oct 2026 | Cash runway; approvals progress |
| FY2026 Annual Report contents (audit opinion, going concern, debt classification, remuneration) | Lodged about late Sep 2026 | Confirms creditor position under the new auditor |
| AGM (auditor confirmation; LR 7.1A capacity renewal) | About Nov 2026 | Funding flexibility |
| Mining proposal / secondary approval submissions and grants | 2026–27 | Critical path to construction |
| Groundwater licence application | 2026–27 | Water supply certainty |
| Binding offtake or MOU | Unscheduled | Commercial validation; possible prepayment |
| Development funding package (debt, equity, offtake prepay) | Unscheduled | Go / no-go |
| Development option selection | 2026–27 | Capex definition |
| Debt-to-equity conversion or restructure | Unscheduled | Balance sheet repair |
| Further metallurgical assays (lump vs fines chemistry) | 2,026 | Product specification compliance |
Analyst verdict
Audalia Resources is a classic micro-cap "approved but unfunded" developer. On paper the technical case has improved materially in the past 18 months. Infill drilling lifted the Indicated resource 35% to 20.3 Mt. The January 2026 PFS Update produced a JORC Probable Reserve of 11.77 Mt at 11.0% TiO2. Both development options show attractive headline economics: NPV10 of A$141M–227M and IRRs of 64–164%. With primary environmental approval secured in July 2024, Medcalf is further along the regulatory path than many ASX vanadium-titanium peers. At about A$22M of market capitalisation, the market prices only a small fraction of study NPV.
That discount is rational, not an oversight. The company has funded itself for more than five years with director and private loans and accrued remuneration. As a result it carries about A$11.9M of liabilities against about A$0.7M of cash and equity of about A$3.5M, and the half-year accounts carry a going-concern emphasis of matter. Interest now makes up most of the annual loss. Recent raises have been repeated A$0.45M–0.54M single-investor placements, a pattern that buys time rather than funding development. The end market is a niche, opaque Chinese blast-furnace additive trade with no published benchmark, and pricing rests on preliminary negotiations. The economics are most sensitive to exactly the inputs the company controls least: product price, haulage and diesel. The governance structure, with a three-person board, related-party lending and long tenure, is also an obstacle for institutional investors.
Verdict: Speculative, binary and catalyst-dependent. The investment case depends on Audalia converting the November 2025 sales discussions into a binding offtake, ideally with prepayment, that funds the low-capex option and lets creditors restructure. Until secondary approvals, offtake and funding are announced, the shares are best viewed as a low-probability, high-payoff option on Medcalf. The main near-term risk is continued dilution at around current prices.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Title | Tenure | Background | Age / born |
|---|---|---|---|---|
Datuk Siew Swan Ong | Executive Director | Since 9 Oct 2010 (about 16 years) | Malaysian advocate and solicitor with more than 25 years' practice in banking, commercial, land and mining law. Business interests in property development, hotel management and sanitary landfill/waste management. Largest individual shareholder and principal lender | Born 1972 (Yahoo Finance) |
Mr Brent Butler, B.Sc. (Geology), FAusIMM | CEO and Executive Director | CEO since 20 Apr 2015 (about 11.5 years) | Geologist with more than 40 years' experience. Competent Person for exploration results. Also President/CEO of Superior Mining International Corp (since 2011), independent director of Power Metals Corp (since 2022) and director of ATW Gold Corp Australia. Former director at Kinross Gold Corp entities and former independent director of Millennial Lithium (2012–17). Executive education with Columbia Business School and INSEAD; AICD | Born 1960; about 65–66 |
Mr Xu (Geoffrey) Han | Non-Executive Director | Since 30 Jun 2016 (about 10 years) | Engineer. His associated company HQ Tech Pty Ltd has provided engineering consulting to Audalia | Age 51 per FY2024 Annual Report |
Mr Craig McNab | Company Secretary | Current per H1 FY2026 report | — | — |
“—” = not publicly disclosed.
Directors' Remuneration
| Executive | Salary/fees (AUD) | Bonus (AUD) | Equity (AUD) | Total (AUD) | Source / year |
|---|---|---|---|---|---|
Brent Butler (CEO/ED) | about 159,000–160,000 | 0 | 0 | about 159,000–160,000 | Simply Wall St / Yahoo (FY2025) |
Siew Swan Ong (ED) | about 95,340 | 0 | 0 | about 95,340 | Yahoo Finance (FY2025) |
Xu (Geoffrey) Han (NED) | — | 0 | 0 | — | — |
Board & Management Changes
| Date | Change | Context |
|---|---|---|
5 Jan 2026 | Auditor change: BDO resigns, Moore Australia Audit (WA) appointed | Board cited Moore's experience with similar-sized companies. To be confirmed at the next AGM |
Company secretary | Karen Logan (earlier filings) replaced by Craig McNab (H1 FY2026) | — |
Major Shareholders
| Rank | Holder | Shares | % |
|---|---|---|---|
| 1 | Citicorp Nominees Pty Limited | 101,155,875 | 12.77 |
| 2 | Siew Swan Ong | 96,200,000 | 12.14 |
| 3 | TLM Holdings (M) Sdn Bhd | 96,000,000 | 12.12 |
| 4 | Jefri Ahmad Nawawi | 82,000,000 | 10.35 |
| 5 | Ms Moi Moi Chua | 79,333,348 | 10.02 |
| 6 | Ming Hwai Tan | 57,000,000 | 7.20 |
| 7 | Newforest Equity Sdn Bhd | 50,000,000 | 6.31 |
| 8 | Yekyek Ong | 37,500,000 | 4.73 |
| 9 | Mr Swee Lim Chong | 35,670,000 | 4.50 |
| 10 | Poo Lian Tan | 24,500,000 | 3.09 |
| 11 | Mr Sean Lian Siong Lim | 18,750,000 | 2.37 |
| 12 | Mr Scott Lian Hing Lim | 18,198,069 | 2.30 |
| 13 | CME Group Berhad | 11,600,000 | 1.46 |
| 14 | Mr Wei Han | 10,000,000 | 1.26 |
| 15 | Megan Holdings Pty Ltd (The Butler Investment A/C) | 9,000,000 | 1.14 |
| 16 | Mr Tiong Sen Ngu | 7,595,324 | 0.96 |
| 17 | Mr Chin Ee Tan | 7,563,005 | 0.95 |
| 18 | Ms Nicola Lian Li Lim | 7,010,000 | 0.88 |
| 19 | Beng Hong Tan | 4,320,000 | 0.55 |
| 20 | Mr Zhangjin Zhu | 4,000,000 | 0.51 |
Competitive Landscape
Key Competitors
| # | Competitor | Segment overlap | Relative positioning (qualitative) |
|---|---|---|---|
| 1 | Pangang Group Vanadium Titanium & Resources (China) | Domestic Chinese V-Ti magnetite and Ti products | Integrated incumbent with large scale and cost advantages in the target market |
| 2 | Chengde-region V-Ti magnetite producers (Hebei, China) | Domestic high-Ti ores for furnace protection | Close to customers with no seaborne freight; a structural competitor |
| 3 | Iluka Resources (ASX: ILU) | Ilmenite and Ti feedstocks | Major producer with diversified products; ilmenite is a substitute furnace additive |
| 4 | Tronox Holdings | Ilmenite / TiO2 chain | Vertically integrated global major |
| 5 | Rio Tinto Iron & Titanium | Ti slag / ilmenite | Major producer |
| 6 | Kenmare Resources | Ilmenite | Large seaborne ilmenite supplier |
| 7 | Australian Vanadium Ltd (ASX: AVL) | WA V-Ti-Fe magnetite developer | Larger, vanadium-focused developer competing for the same pool of capital |
| 8 | Tivan Ltd (ASX: TVN) | V-Ti-Fe developer | Capital competitor |
| 9 | Richmond Vanadium Technology (ASX: RVT) | Vanadium developer (Qld) | Capital competitor |
| 10 | Surefire Resources (ASX: SRN) | WA V-Ti magnetite (Victory Bore) | Capital competitor of similar scale |
Competitor Detail
| Metric | Audalia (FY2026) |
|---|---|
Revenue (AUD Mn) | 0.003 |
Stage | Pre-development (PFS + Reserve) |
Net loss (AUD Mn) | -1.31 |
Market cap (AUD Mn) | about 21.6–21.9 |
R&D intensity | n/m |