Year Founded & Workforce

1990

AusNet Pty Ltd logo

AusNet Pty Ltd Employee Contacts

We don't hold contact details for this company yet — you can request them.

Request Employee Contacts

AusNet Pty Ltd Overview

AusNet is Victoria's largest energy delivery business and the state's only diversified owner of all three regulated network classes: it owns and operates the vast majority of Victoria's high-voltage electricity transmission network, one of the state's five electricity distribution networks (covering eastern Victoria including Melbourne's eastern suburbs), and one of three gas distribution networks (central and western Victoria). Roughly 85% of FY2025 revenue of A$2.46bn was regulated by the Australian Energy Regulator (AER), giving bond-like, inflation-linked cash flows underpinned by a regulated and contracted asset base. Its growth engine is the contestable Development & Future Networks business, which builds, owns and operates unregulated grid connections for wind farms, solar farms, batteries and hyperscale data centres. Privately owned since 2022 by a Brookfield-led consortium of infrastructure and pension investors, AusNet is a highly levered (net debt/EBITDA ≈8x), BBB+/Baa1-rated infrastructure platform whose fortunes hinge on Victorian energy-transition policy, AER determinations, bushfire risk and the managed decline of residential gas.


Company's own description (FY2025 Financial Report, paraphrased)

AusNet's FY2025 financial report describes four lines of business that became its reportable segments from 1 January 2025: (1) Electricity Distribution — a network carrying electricity from transmission connection points to end users across eastern Victoria including eastern metropolitan Melbourne, charging retailers and some large customers regulated network tariffs; (2) Gas Distribution & Metering — a network carrying natural gas to residential and commercial users in central and western Victoria, plus regulated and contestable metering services consolidated into this segment from 2025; (3) Electricity Transmission — ownership and management of the vast majority of Victoria's transmission lines and towers that form the backbone of the state grid, charging VicGrid (previously AEMO), distributors and generators for use of and connection to the network; and (4) Development & Future Networks — contracted infrastructure assets and energy services outside the regulated asset base, many provided under the Mondo brand, typically earning annuity payments over long contract terms. The report emphasises that none of the network segments buys or sells energy.

Independent characterisation

AusNet is a pure "wires and pipes" utility: it earns a regulated return on capital invested in network assets, plus contracted infrastructure returns from bespoke connections. It has no retail customers in the commercial sense; its direct counterparties are energy retailers, AEMO/VicGrid, generators, large industrial users and developers. The business model is capital-intensive: FY2025 capital expenditure of A$1,476.2m exceeded EBITDA of A$1,404.9m, and the shortfall after interest and distributions is debt-funded, a structural feature of growth-phase regulated utilities owned by long-horizon infrastructure investors.

Revenue model mix

Revenue typeFY2024FY2025
Regulated revenue1,949.32,083.7
Excluded prescribed transmission revenue36.521.3
Excluded negotiated transmission revenue28.142.6
Unregulated infrastructure revenue94.6116.6
Customer contributions109.9130.1
Service revenue44.238.0
Other revenue27.931.4
Total revenue2,290.52,463.7

Characterisation of the mix: AusNet states regulated revenue was approximately 85% of total revenue in FY2025 (85% in FY2024 on the FY2025 report's basis; the FY2024 report itself stated 87% for FY2024 and 82% for FY2023 — a definitional discrepancy between the two reports). In product/service/subscription/licensing terms the model is essentially 100% service: (a) regulated network access ("use of system") revenue recognised over the regulatory period — analogous to a regulated subscription; (b) long-term contracted infrastructure revenue (up to 30-year contracts) — annuity-like; (c) point-in-time connection, public lighting and customer contribution revenue; and (d) a small licence-style concession (the 27-year Victorian desalination plant transmission line licence).

Timing of recognition (FY2025): A$2,235.6m recognised over time and A$223.8m at a point in time (FY2025 Note B.2), confirming over 90% recurring/over-time revenue.

Value-chain position

AusNet sits in the midstream of the National Electricity Market (NEM) value chain: generation → transmission (AusNet) → distribution (AusNet in eastern Victoria) → retail → end customers. In gas it sits at the final distribution stage: production → transmission pipelines (third parties) → distribution (AusNet in central/western Victoria) → retail. It also occupies the "connection" layer between new renewable/storage generators or data centres and the shared grid through Development & Future Networks.

Customer types and end-markets

Customer / counterpartyRelationshipSegment
Electricity retailersPay regulated distribution tariffs on behalf of end usersElectricity Distribution
Gas retailersPay regulated gas network tariffsGas Distribution & Metering
VicGrid / AEMOPays for shared transmission network servicesElectricity Transmission
Distribution network service providersPay transmission connection chargesElectricity Transmission
Generators (wind, solar, BESS)Negotiated/excluded transmission connections; dedicated connection assets (finance leases)Transmission; Development & Future Networks
Data centre operators (e.g., Microsoft)Dedicated connection infrastructureDevelopment & Future Networks
Victorian Government / desalination operator27-year O&M of 87km underground HV line to Wonthaggi desalination plantDevelopment & Future Networks
Developers / councilsCustomer contributions, public lighting, connectionsDistribution
Telecoms, water and transport utilitiesAsset and utility services (Mondo)Development & Future Networks

End-markets: Victorian residential, commercial and industrial energy consumption; the renewable generation build-out in Victoria's Renewable Energy Zones; hyperscale data centre growth in Melbourne; and, declining over time, Victorian residential gas use.

Strategy

Stated strategy themes

  • Vision (paraphrased from AusNet statements, 2024): to be trusted to deliver energy today while building a cleaner energy system for tomorrow.

  • Operating model: four accountable lines of business (Electricity Transmission, Electricity Distribution, Gas & Metering, Contestable/Development & Future Networks), each tasked with performance outcomes for its customer and stakeholder groups (CEO statements via RenewEconomy and Utility Magazine).

  • Growth: connect large-scale renewables and data centres across both distribution and transmission as quickly as possible; unlock new network capacity (CEO statement).

  • Board outlook (FY2024 and FY2025 reports): steady growth in regulated electricity businesses underpinned by customer growth and stable regulation; strong growth in unregulated operations from wind/solar connections and data-centre demand; continued monitoring of gas policy.

Initiatives register (last ~24 months)

InitiativeTypeDetail / targetSource
EDPR 2026–31Regulatory/investmentProposal Jan 2025; draft Sep 2025 (A$4,428.3m, 11.3% below proposal); final Apr 2026 ≈A$4.74bn nominal smoothed; effective 1 Jul 2026; includes resilience, CER enablement, community batteriesAER
Transmission Revenue Reset 2027–32RegulatoryProposal lodged; AER issues paper 12 Dec 2025; public forum 17 Dec 2025; decision due ahead of 1 Apr 2027AER
Western Renewables LinkMajor project~A$1.52bn; EES approved Sep 2026; cost review to end-2026; A$55m benefit-sharing programMultiple
SAP S/4HANA Cloud with WiproDigital transformationAnnounced Aug 2025MarketScreener news log
Cloud migration and Asset Risk Management initiativeDigitalOngoing since 20229M2022 report
Network resilience and bushfire mitigationSafety/ESGA$331m+ spend on maintenance and vegetation management in 12 months pre-summer; 120,830 poles inspected; 50+ community resilience hubsUtility Magazine
Energy Resilience Community FundCommunity/ESGA$12m; A$7.9m distributed, A$4.1m due by 31 Dec 2026H1 2026 report
Gas transition managementRegulatoryVariation request Sep 2024 (rejected in AER draft Jan 2025); gas asset lives shortened to 2050 in H1 2026FY2024 and H1 2026 reports
Interstate/contestable bidsGrowthNew England REZ (NSW), Gippsland Offshore WindH1 2026 report
Capital structureFinancingA$950m hybrid (Feb 2025), €-senior notes A$886.7m (2025), A$1.1bn hybrid (Feb 2026), A$1.025bn syndicated facility to 2036 (Jun 2026), EUR hybrid call (Sep 2026)FY2025, H1 2026 reports
Cyber securityRiskAESCSF Security Profiles 1 and 2 achievedFY2025 report

Medium-term financial targets: AusNet does not publish numeric guidance. Its stated capital management target is credit metrics consistent with BBB+/Baa1 and 90–100% interest rate hedging (Treasury Risk Policy).

Products & Services

Electricity Distribution

OfferingDescriptionTarget customerPricing modelNotes
Standard Control Services (network use of system)Delivery of electricity from transmission connection points to premises across eastern Victoria including eastern MelbourneRetailers (on behalf of households/businesses)AER revenue cap set for five-year periods; annual tariffs2026–31 determination allows ≈A$4.74bn nominal smoothed revenue (AER, Apr 2026)
Alternative Control Services — public lightingInstallation, maintenance and replacement of public lightingCouncils, VicRoadsRegulated fixed ratesGifted public lighting assets lifted FY2025 customer contributions
Alternative Control Services — connections and cross-boundaryNew connection charges, cross-boundary network chargesDevelopers, neighbouring DNSPsFixed-rate, point-in-time—
Regulated metering (now reported in Gas & Metering)Smart meter services under AER metering determinationRetailersAER metering pricing modelSeparate metering PTRM/RFM in 2026–31 decision
Customer contributions / gifted assetsDeveloper-funded network extensionsDevelopers, medium-density housingCash or gifted assets recognised as revenueA$113.3m in FY2025 (Distribution)
Bushfire mitigation (REFCL, Powerline Replacement)Rapid Earth Fault Current Limiters; undergrounding/powerline replacementCommunity safety (regulatory obligation)Capex in RAB; government grants for powerline replacementREFCL tranche program largely complete in 2023
Solar Emergency BackstopDigital capability to curtail rooftop solar exports for system securitySystem security / AEMORegulated capexCited as FY2024 digital capex driver
Community batteries and CER enablementProposed in EDPR 2026–31 (community battery forecast; CER enablement economic model)Households with consumer energy resourcesRegulatedAER revised proposal documents, Dec 2025
Resilience programsNetwork hardening, community resilience hubs, Energy Resilience Community Fund (A$12m)Fire- and storm-exposed communitiesFund via provision; resilience capex via EDPRA$7.9m of fund distributed by Jun 2026
EnergyConnect portalOnline connection applicationsCustomers, electricians, developersFree portalListed on corporate website
myHomeEnergyHousehold energy information platformResidential customersFreeLinked from corporate website

Gas Distribution & Metering

OfferingDescriptionTarget customerPricing modelNotes
Gas network accessTransport of natural gas through low/medium/high-pressure mains in central and western VictoriaGas retailersAER Gas Access Arrangement 2023–28 (price/tariff-based with volume exposure)Accelerated depreciation approved in 2023
Gas excluded / ancillary servicesDisconnections, abolishments, special meter reads etc.Retailers, customersFixed ratesGas excluded services up A$17.9m in FY2025
Connection chargesNew gas connections; connection charge introduced 1 Jan 2025Developers, householdsFixed chargesNew-connection volumes fell after charge introduction
Low-pressure to high-pressure mains replacementNetwork safety and integrity upgrade programNetwork customersRegulated capexReprofiled lower in H1 2026
Contestable meteringCompetitive metering servicesRetailers, commercial customersContract, fixed rate over termContestable metering revenue fell in FY2025
Safeguard complianceACCU purchases to meet Safeguard baseline (220,372 tCO2e)Regulatory obligationCost recovered via tariffs (AER-approved)≈4.9% annual baseline decline to 2030
Renewable gas / hydrogen explorationFounding member of Australian Hydrogen Centre (blending feasibility studies)Future networkNot monetisedH2 Bulletin (2021)

Electricity Transmission

OfferingDescriptionTarget customerPricing modelNotes
Prescribed shared network servicesOperation of Victoria's HV backbone (220kV, 330kV, 500kV lines and terminal stations)VicGrid (AEMO pre-Nov 2025)AER Transmission Revenue Reset (current period from 1 Apr 2022; next 2027–32)Easement land tax pass-through EBITDA-neutral
Prescribed connection servicesTerminal station connections for DNSPsDistributorsRegulated—
Excluded prescribed servicesCustomer-initiated assets rolled into RAB at next resetGenerators, DNSPsContracted until roll-inA$21.3m FY2025
Excluded negotiated transmission servicesAssets outside RAB under regulated negotiating frameworkGenerators, large usersFixed fees over asset lifeA$42.6m FY2025, rising
Station rebuild programe.g., South Morang, East Rowville, Springvale, Templestowe terminal stationsNetwork reliabilityRegulated capexSouth Morang training facility proposed in EDPR

Development & Future Networks (incl. Mondo)

Project / offeringTypeStatus / yearSource
Western Renewables Link (WRL)190km, 500kV double-circuit overhead line, Bulgana–Sydenham, >3,000MW capacity; contracted by AEMOEES approved Sep 2026; independent cost review to end-2026; target completion 2029 (AIP plan: 30 Nov 2029)AusNet; Planning Panels Victoria; AIP plan
Golden Plains Wind Farm connectionDedicated renewable connectionPractical completion 2024/25; A$13.5m incremental revenue FY2025FY2025 report
Ryan Corner Wind Farm connectionDedicated connectionCompleted in 2024FY2025 report
Delburn Wind Farm connectionDedicated connectionCompleted 2025FY2025 report
Koorangie BESS connectionBattery connection (Edify; 125MW SSA with AEMO)Completed 2024/25FY2025 report; ESC application
Mornington BESS connectionBattery connectionCompleted 2025FY2025 report
Mortlake BESS connectionBattery connectionPractical completion H1 2026H1 2026 report
Pine Lodge BESS connectionBattery connectionPractical completion H1 2026H1 2026 report
Goorambat Solar Farm / Goorambat East Solar FarmSolar connections2025 / H1 2026FY2025, H1 2026 reports
Carwarp Solar FarmSolar connectionPractical completion H1 2026H1 2026 report
Hawkesdale connectionRenewable connectionDelivered 2024FY2024 report
Microsoft Francis Street data centre (Stages 1 and 2)Hyperscale data centre connectionStage 1 2024; Stage 2 H1 2026FY2025, H1 2026 reports
Ballarat Energy Storage SystemGrid battery asset (government grant recognised over life)OperatingFY2025 report
Phillip Island BESS (with Mondo)Proposed community/network batteryProposalESD News
Wonthaggi desalination transmission line87km underground HV line O&M; 27-year licence from Dec 2012Operating; A$38.2m revenue FY2025FY2025 report
New England REZ (NSW) bidMajor project bidBid costs A$4.0m capitalised at Jun 2026H1 2026 report
Gippsland Offshore Wind Farm bidOffshore wind transmission bidBid costs A$1.5m capitalisedH1 2026 report
Gippsland REZ developmentREZ transmission developmentWritten off (A$15.0m) in 2025 after VicGrid changed delivery approachFY2025 report
Mondo asset and utility servicesVegetation management, asset inspection, condition monitoring, testing, telecom and utility servicesUtilities, telecoms, water, transportFY2024 report risk section

Pricing for contestable projects is not disclosed individually; dedicated connections are structured as finance leases (net investment A$631.3m at 30 Jun 2026; undiscounted future receipts A$1,461.2m at 31 Dec 2025).

Financial Narrative

All figures A$m unless stated. Sources: FY2022 and 9M2022 from the Financial Report for the period ended 31 Dec 2022; FY2023 and FY2024 from the FY2024 Financial Report; FY2025 from the FY2025 Financial Report. 9M2022 is a nine-month period.

Income statement

Notes: Gross profit is not reported — AusNet presents expenses by nature with no cost-of-goods concept. EPS and DPS are not reported (unlisted); derived values use 3,835,799,900 shares on issue (H1 2026 Note D.3), constant since Dec 2022. The FY2022 figure of A$362.5m was paid to former ASX shareholders. The 9M2022 period additionally included a A$329.0m return of capital.

Margins and growth

Revenue CAGR FY2023→FY2025 (two calendar years): 5.8%. Approximate annualised growth from FY2022 (year to Mar-2022) to FY2025 (year to Dec-2025, ≈3.75 years): ≈6.4%. Growth is not computed for 9M2022 or FY2023 because of the non-comparable transition period.

Commentary — income statement. Revenue rose from A$1.95bn (FY2022) to A$2.46bn (FY2025), driven by the regulated price path (with CPI indexation of regulated revenues during the 2022–24 inflation surge), incentive revenues in transmission, customer contributions from medium-density housing and public lighting, and new contracted D&FN projects. EBITDA margins are structurally high (56–61%) but sensitive to storm and bushfire costs: FY2024 EBITDA dipped 0.4% despite 4.1% revenue growth because of A$41.9m of severe-weather restoration costs, the A$12.0m community fund, and higher outsourced maintenance prices under the Operations and Maintenance Services Agreement. FY2025 recovered (+10.2% EBITDA) as those one-offs fell away and service level payments dropped from A$36.2m to A$9.5m, partly offset by a A$15.0m Gippsland REZ write-off. Reported net income is dominated by tax accounting: the acquisition-driven tax base reset produced a A$1,472.5m tax benefit in 9M2022 and a A$596.2m deferred tax asset remeasurement benefit in FY2023, while FY2024 carried A$90.1m of prior-year adjustments that pushed its effective tax rate to 58%. Underlying pre-tax profit has been stable-to-rising (A$309m → A$391m). Net finance costs climbed from A$300.5m (FY2022) to A$450.1m (FY2025) as debt rose to fund capex and refinancing occurred at higher rates.

Balance sheet

Notes: Net debt for FY2022 and 9M2022 as reported by the company (Mar-2022 used cash of A$270.8m in its own calculation). Borrowings include hybrid securities at carrying value (A$2.0bn face at Dec 2025, which attract partial rating-agency equity credit) and are shown before cross-currency swap derivatives.

Latest balance sheet (30 June 2026, H1 2026 Interim Report): total assets A$17,824.4m; cash A$442.8m (boosted by pre-funding from the A$1.1bn hybrid); borrowings A$11,831.5m (current A$914.4m — a EUR senior note maturing 2027 — and non-current A$10,917.1m); equity A$4,356.1m; undrawn committed facilities A$1,452.5m; working capital −A$510.0m.

Commentary — balance sheet. The equity line jumped from A$1.87bn to A$3.34bn in 9M2022 not because of new capital but because of the tax-base reset benefit; the A$2.0bn acquisition bridge pushed into the group in March 2022 was recorded directly against reserves, which explains the deeply negative restructure reserve (−A$3,501.9m). Asset growth (PP&E +A$2.2bn since FY2022) has been matched almost dollar-for-dollar by borrowing growth (+A$2.0bn). Persistently negative working capital reflects short-dated debt maturities rather than operational stress, and the company relies on committed undrawn facilities (A$1.45bn) and continuous debt-market access. Goodwill is now nil after the A$12.0m impairment of water/gas field services and thermal testing goodwill in FY2023; remaining intangibles are A$354.5m of perpetual distribution licences and software.

Cash flow

H1 2026: operating cash flow A$461.9m (H1 2025: A$333.1m); cash capex A$720.0m (A$605.1m); dividends A$10.1m (A$9.2m).

Commentary — cash flow. AusNet has moved from roughly cash-neutral (FY2022) to a sustained free cash flow deficit of over A$400m a year in FY2024–25 as capex accelerated (+68% cash capex since FY2022). The new owners cut cash distributions sharply after the initial post-acquisition payouts (A$601m of dividends plus capital return in 9M2022, A$149m in FY2023) to around A$19m a year from FY2024, effectively retaining cash to fund growth — though shareholder-level returns may also flow through shareholder loans at holding-company level (the ATO is auditing shareholder loan interest deductibility, per the H1 2026 report). Operating cash flow is depressed by interest paid of ~A$457m in FY2025, roughly a third of EBITDA.

Ratios

Notes and discrepancies: 9M2022 ROE/ROA are distorted by the A$1.47bn tax benefit and nine-month period; ROIC for 9M2022 is unannualised (≈4.4% annualised); 9M2022 net debt/EBITDA uses annualised EBITDA. DSO for 9M2022 uses annualised revenue. Cash conversion cycle is not meaningful for a network utility (inventories ~A$93m; payables mostly accruals) and is not disclosed. Net debt to Regulated & Contracted Asset Base (R&CAB) — conflicting definitions: the 9M2022 report states 84.1% excluding hybrid equity credit; the FY2024 report states 66.5% (FY2023: 66.4%) "excluding equity credit for the $1.7bn of hybrid instruments"; the FY2025 report states 77.2% "including equity credit for the $2.0bn of hybrid instruments" with an FY2024 comparative of 79.0%. Including equity credit should produce a lower ratio, not a higher one, so the FY2024 and FY2025 reports appear to use inconsistent bases or R&CAB definitions. Investors should treat the time series as non-comparable.

Commentary — ratios. AusNet's returns profile is typical of a regulated network acquired at a premium: ROIC sits around 3.7–3.9% after notional tax, roughly in line with a real regulated WACC plus inflation-indexed asset growth (the RAB indexation component of return is not captured in accounting EBIT). Leverage is high and stable at 8–8.6x net debt/EBITDA — above the 6–7x range typical of listed Australian network peers — and consistent with a BBB+/Baa1 rating only because of the regulated nature of cash flows and hybrid equity credit. EBITDA interest cover of ~3x has compressed from 3.6x in FY2022 because of rising rates; AusNet's policy of hedging 90–100% of interest rate risk (aligned to the AER's trailing-average cost of debt) limits P&L volatility but not the gradual repricing.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Income Statement and Per-Share Data

Metric (AUD Mn)FY20229M2022FY2023FY2024FY2025

Revenue

1,953.41,554.52,201.12,290.52,463.7

Total opex excl. D&A

860.4609.7920.81,015.91,058.8

EBITDA

1,093.0944.81,280.31,274.61,404.9

EBITDA after lease income

1,118.8964.01,305.91,310.31,449.1

Depreciation and amortisation

483.5371.9525.2516.8563.5

Operating income (EBIT)

609.5572.9755.1757.8841.4

Net finance costs

300.5277.5427.4413.4450.1

Pre-tax income

309.0295.4327.7344.4391.3

Income tax expense (benefit negative)

91.8-1,472.5-492.8200.8122.1

Net income

217.21,767.9820.5143.6269.2

Distributions/dividends declared and paid

362.5274.6149.818.819.0

EPS derived (A cents; NPAT ÷ 3,835.8m shares)

046.0921.393.747.02

DPS derived (A cents)

07.163.910.490.50

Margin Analysis (%)

Metric (%)FY20229M2022FY2023FY2024FY2025

EBITDA margin

55.9560.7858.1755.6557.02

Operating (EBIT) margin

31.2036.8534.3133.0834.15

Pre-tax margin

15.8219.0014.8915.0415.88

Net margin

11.12113.7337.286.2710.93

Revenue growth YoY

0004.067.56

Balance Sheet

Metric (AUD Mn)FY20229M2022FY2023FY2024FY2025

Total assets

13,703.214,554.615,503.016,221.617,144.3

Property, plant and equipment

11,603.711,876.812,370.913,051.213,808.4

Goodwill and intangibles

560.4553.2520.5512.9573.6

of which goodwill

12.012.0000

Cash and equivalents

272.816.55.62.97.4

Current borrowings

338.30775.6767.5385.2

Non-current borrowings

9,183.29,802.19,529.410,196.011,110.1

Total borrowings (carrying)

9,521.59,802.110,305.010,963.511,495.3

Net debt (carrying, borrowings less cash)

9,250.79,785.610,299.410,960.611,487.9

Total liabilities

11,834.211,214.111,679.212,316.712,880.1

Total equity

1,869.03,340.53,823.83,904.94,264.2

Working capital (current assets less current liabilities)

-340.8-224.8-1,002.4-952.6-455.2

Undrawn committed bank facilities

0802.51,550.71,032.41,067.8

Cash Flow

Metric (AUD Mn)FY20229M2022FY2023FY2024FY2025

Operating cash flow

821.0596.1893.3830.2868.5

Net interest paid (within OCF)

304.2286.5404.7409.8456.6

Payments for PP&E (cash capex)

771.0590.1985.71,250.11,299.6

Free cash flow (OCF less cash capex)

50.06.0-92.4-419.9-431.1

Dividends paid (cash)

313.1272.1149.417.919.0

Return of capital

0329.0000

Share buybacks

00000

Proceeds from borrowings

500.02,175.01,534.01,570.12,674.7

Repayment of borrowings

1,506.81,835.01,307.21,182.72,223.4

Segment capex (accrual basis)

819.2646.31,086.91,323.71,476.2

Returns & Leverage Ratios (%) and Financial Ratios (x)

RatioFY20229M2022FY2023FY2024FY2025

ROE (%, NPAT ÷ average equity)

8.267.922.93.76.6

ROA (%, NPAT ÷ average assets; FY2022 closing)

1.5912.515.460.911.61

ROIC (%, EBIT×(1−30%) ÷ average net debt+equity; FY2022 closing)

3.843.313.883.663.85

Current ratio (x)

0.610.640.330.360.60

Debt/equity (x, total borrowings ÷ equity)

5.092.932.692.812.70

Net debt/EBITDA (x)

8.467.778.048.608.18

Net debt/EBITDAaL (x)

8.277.617.898.367.93

Interest coverage (x, EBITDA ÷ net finance costs)

3.643.403.003.083.12

Interest coverage (x, EBIT ÷ net finance costs)

2.032.061.771.831.87

Asset turnover (x, revenue ÷ average assets; FY2022 closing)

0.1430.1100.1460.1440.148

Receivables days (DSO, period-end receivables ÷ revenue × 365)

3432364641

Net debt to R&CAB (%, company-reported)

84.584.166.466.577.2

Geographic revenue (AUD Mn)

Geographic revenue (AUD Mn)FY20229M2022FY2023FY2024FY2025

Australia (Victoria)

1,953.41,554.52,201.12,290.52,463.7

Rest of world

00000

Geographic revenue growth (%)

Geographic revenue growth (%)FY2024FY2025

Australia (Victoria)

4.067.56

Segment Overview

SegmentService area within Victoria

Electricity Distribution

Eastern Victoria, including eastern metropolitan Melbourne, Yarra Ranges, Gippsland and north-east Victoria

Gas Distribution

Central and western Victoria (including western Melbourne and regional centres)

Electricity Transmission

State-wide HV backbone

D&FN

State-wide, focused on Renewable Energy Zones (western Victoria, Gippsland), Melbourne data-centre precincts; bidding interstate (New England REZ, NSW)

Valuation Snapshot

MultipleValueBasis

EV/EBITDA (x)

16.3

EV A$17.8bn ÷ FY2022 EBITDA A$1,093.0m

EV/Sales (x)

9.1

EV ÷ FY2022 revenue A$1,953.4m

P/E (x)

47.0

Equity A$10.2bn ÷ FY2022 NPAT A$217.2m

P/B (x)

2.97

Equity value ÷ Mar-2021 book equity A$3,434.9m

Dividends & Capital Returns

Metric (AUD Mn)FY20229M2022FY2023FY2024FY2025

Dividends declared/paid

362.5274.6149.818.819.0

Return of capital

0329.0000

Credit Ratings

AgencyRatingOutlookSource

S&P Global

BBB+

Not stated in filings

FY2025 and H1 2026 reports

Moody's

Baa1

Not stated in filings

FY2025 and H1 2026 reports

Fitch

Not rated / not disclosed

——

Capital Instruments

InstrumentMaturityCarrying value (AUD Mn)

EUR senior notes (current)

2027914.4

HKD senior notes

2027–2034

560.2

Domestic medium-term notes

2027–2043

3,678.4

Syndicated bank debt facilities

2029–2036

1,188.3

EUR senior notes (non-current)

2030–2035

1,754.9

JPY senior notes

203882.0

NOK senior notes

2027–2029

473.1

AUD hybrid securities (calls Feb 2031 and Feb 2036)

2055–2056

2,031.4

EUR hybrid securities (redeemed 11 Sep 2026)

20811,148.8

Total

—11,831.5

Analyst Conclusions

Management guidance

AusNet provides only qualitative guidance: the Board expects steady growth in electricity distribution and transmission (customer growth, stable regulation) and strong growth in unregulated operations from renewable connections and data centres, while monitoring gas policy (FY2025 report). No numeric earnings guidance exists, and there is no sell-side consensus.

Analyst framing of growth

  • Regulated distribution: new 2026–31 determination effective 1 Jul 2026, broadly flat-to-modestly higher in nominal terms relative to the prior period's indexed revenue (AER estimates distribution charges for residential customers fall by A$6–38 a year on average across the five Victorian networks).

  • Transmission: next reset from 1 April 2027; station rebuild capex (FY2025 transmission capex +29.5%) supports RAB growth.

  • Gas: revenue supported to 2028 by the current access arrangement, but medium-term volume and asset-life risk rising.

  • D&FN: lumpy but rising contracted earnings; H1 2026 EBITDAaL A$72.5m (+66%).

Bull case

  1. Regulated cash flows are locked in and indexed: with the EDPR final decision done and ~85% of revenue regulated, earnings visibility to mid-2031 is high, while H1 2026 EBITDA grew 7% even with bushfire costs.

  2. Transition capex compounds the asset base: capex of ~A$1.4–1.5bn a year (vs ~A$560m D&A) grows the RAB and contracted base, and WRL alone adds ~A$1.5bn of long-dated contracted transmission assets if it proceeds.

  3. Balance sheet is actively de-risked: a 2036-dated syndicated facility, hybrid refinancing ahead of calls, A$1.45bn undrawn liquidity and stable BBB+/Baa1 ratings indicate strong market access.

Bear case

  1. Leverage leaves little cushion: net debt/EBITDA above 8x and FCF of −A$431m mean any adverse regulatory outcome, rating methodology change on hybrids, or uninsured bushfire event could pressure ratings.

  2. Gas is a slow-motion stranding problem: Victorian electrification laws from 2027 and the shortening of gas asset lives to 2050 imply rising depreciation and declining customer numbers, with AER protection only partial (2025 variation rejected).

  3. Growth projects face political and contestability risk: the WRL cost review, Gippsland REZ write-off and VicGrid's centralised planning show AusNet's incumbency does not guarantee project awards or timelines.

Key catalysts and monitorables (next 12 months)

CatalystExpected timingWhy it matters
WRL independent cost review findingsBy end-2026Determines whether the ~A$1.52bn project proceeds on schedule
AER draft/final 2027–32 transmission determinationLate 2026 – early 2027Sets transmission revenue from 1 Apr 2027
AER decision on Jan 2026 bushfire cost pass-through2026–27Tests cost recovery for climate events
FY2026 results~Mar–Apr 2027First half-year of new distribution determination
Gas policy implementation (1 Jan and 1 Mar 2027)2,027Begins structural decline in new connections and appliance replacements
ATO audit outcomes (shareholder loans, GST)UnscheduledPotential tax cash costs
New contestable project awards (New England REZ, offshore wind, data centres)OngoingD&FN growth validation
Summer 2026–27 bushfire seasonDec 2026 – Mar 2027Physical risk and service level payments
Any consortium stake sale or recapitalisationUnconfirmedOwnership change would affect strategy and leverage

Analyst verdict

AusNet is best understood today not as the ASX-listed utility named in the identification details but as a privately held, bond-financed regulated infrastructure platform whose investors are pension funds and Brookfield. On that basis the credit and asset quality are sound: roughly 85% regulated revenue, a fresh five-year distribution determination of about A$4.74bn, a dominant position in Victoria's transmission backbone, and a demonstrable ability to refinance at scale through hybrids, euro bonds and a ten-year bank facility. Underlying operating performance is improving — FY2025 EBITDA rose 10.2% to A$1.40bn and H1 2026 EBITDA rose 7% despite a costly bushfire season.

The counterweights are equally clear. Leverage above 8x EBITDA, sustained negative free cash flow of more than A$400m a year and negative working capital make AusNet structurally dependent on capital markets and on rating agencies continuing to grant hybrid equity credit. The gas network is entering a policy-driven decline that management is already recognising through shorter asset lives, and the AER has so far declined to reopen the gas access arrangement. The contestable growth story is real — more than ten connection projects delivered since 2024 and a growing finance-lease annuity book — but the flagship Western Renewables Link has just been placed under an independent cost review by the Premier, and the loss of the Gippsland REZ development shows VicGrid will not automatically favour the incumbent.

Net assessment: a stable, investment-grade network credit with modest equity-like upside from transition capex, constrained by high gearing, gas stranding and Victorian political risk. For bondholders the profile is robust at BBB+/Baa1; for a hypothetical equity investor, value creation depends on WRL proceeding, a constructive 2027–32 transmission decision and disciplined management of the gas run-off. The next six months — the WRL review and the transmission determination — are the decisive monitorables.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Executive Leadership Team

NameTitleTenurePrior roles / background

David Smales

Chief Executive Officer; director of AusNet Pty Ltd

Since 15 Nov 2023

COO of China Light and Power (Hong Kong); inaugural CEO of Energy Queensland; 40+ years in energy (Australia, Asia, UK)

Charlie Boyes

Chief Financial Officer; director

Since 14 Aug 2025

Previously at Essential Energy; earlier Deputy CFO of AusNet

Jon D'Sylva

Chief Development Officer (leads D&FN); director

Director throughout FY2024–H1 2026

Leads contestable business and WRL

Andrew Linnie

EGM Distribution

Joined 2020

Leadership roles at CitiPower and Powercor; 20+ years major projects

Elizabeth Ryan

EGM Transmission

—

Previously led AusNet Strategy, Regulation and Corporate Affairs

Fran Duiker

EGM Gas and Metering

Joined 2019 (Mondo); Head of Customer 2020

Local government, water sector, KPMG

Bridget Cairns

EGM People and Safety

—

Senior HR roles at Siemens and Transport for London

Amanda Robertson

EGM Compliance, Risk & Corporate Affairs

Joined 2024

16+ years in energy

Chris Galland

Chief Technology Officer

Joined 2024

Relocated from France; responsible for digital and cybersecurity

“—” = not publicly disclosed.

Board & Management Changes

DateChangeContext

Nov 2020

Nino Ficca retires as MD; Tony Narvaez becomes CEO

End of 18-year tenure

15 Nov 2023

David Smales succeeds Tony Narvaez

Narvaez stepped down for family reasons (AusNet release)

16 Jan 2024

Smales appointed director of AusNet Pty Ltd

FY2024 report

18 Mar 2024

Steven Neave (EGM Network Management & Digital) resigns as director

Restructure to line-of-business model

2024

New operating model: four lines of business with dedicated leaders

FY2024 report; Utility Magazine

4 Jul 2025

CFO Mark Ellul resigns

FY2025 report

14 Aug 2025

Charlie Boyes appointed CFO

FY2025 report

Major Shareholders

HolderStake (%)Type

Brookfield Infrastructure-managed entities (incl. Brookfield Super-Core Infrastructure Partners)

45.4

Global alternative asset manager

Australian Retirement Trust (formerly Sunsuper)

15.0

Australian superannuation fund

Alberta Investment Management Corporation (AIMCo)

9.9

Canadian public pension manager

Investment Management Corporation of Ontario (IMCO)

9.9

Canadian public pension manager

Healthcare of Ontario Pension Plan (HOOPP)

9.9

Canadian pension plan

Public Sector Pension Investment Board (PSP Investments)

9.9

Canadian federal pension investor

Competitive Landscape

Competitors by Segment

SegmentCompetitor / peerOwnershipRelationship to AusNet

Electricity distribution (Victoria)

Powercor

CK Infrastructure / Power Assets / Spark-legacy investors (Victoria Power Networks)

Benchmark peer; largest Victorian DNSP

Electricity distribution (Victoria)

CitiPower

Same group as Powercor

Benchmark peer (Melbourne CBD)

Electricity distribution (Victoria)

United Energy

CKI-led group

Benchmark peer (south-east Melbourne)

Electricity distribution (Victoria)

Jemena Electricity Networks

State Grid Corporation of China / Singapore Power

Benchmark peer (north-west Melbourne)

Gas distribution (Victoria)

Multinet Gas

Australian Gas Infrastructure Group (AGIG)

Benchmark peer; electrification exposure

Gas distribution (Victoria)

Australian Gas Networks

AGIG

Benchmark peer

Transmission / contestable transmission

Transgrid

Consortium (incl. CDPQ, OMERS, ADIA, Spark-legacy investors)

Competes for interconnector/REZ projects (e.g., VNI West partner role)

Transmission / contestable transmission

APA Group

ASX-listed

Contestable Victorian transmission and rival 2021 bidder

Contestable connections

Zinfra, Downer Utilities and EPC contractors

Various

Compete to build/own/operate generator connections

Interstate transmission

Powerlink, ElectraNet, TasNetworks

Govt / State Grid–YTL / Govt

Peers in TNSP benchmarking

Interstate distribution

Ausgrid, Endeavour Energy, Essential Energy, Energy Queensland, SA Power Networks

Various

National benchmarking peers

Competitor Detail

DNSPAllowed revenue 2026–31 (AUD Mn)

Powercor

5,335.4

AusNet (distribution)

4,745.7

United Energy

2,319.2

CitiPower

2,039.0

Jemena

2,000.0

Competitor Detail (AusNet (FY2025))

MetricAusNet (FY2025)

Revenue

A$2,463.7m

Revenue growth

7.6%

EBITDA margin

57.0%

Network classes in Victoria

Transmission + electricity distribution + gas distribution

Recent Developments

--

Company Snapshot

$1,589.5M

Revenue

1990

Founded

Victoria, Australia

Headquarters

SWOT Analysis

Strengths

  • Highly regulated, inflation-linked revenue: ~85% of FY2025 revenue (A$2,083.7m) was regulated (FY2025 report).
  • Dominant transmission incumbency: owns the vast majority of Victoria's transmission network (FY2025 Note B.1), generating A$777.6m revenue in FY2025.
  • Visible regulated revenue to 2031: AER final determination allows ≈A$4.74bn distribution revenue over 2026–31 (AER, Apr 2026).
  • Growing contracted annuity book: finance lease receivables rose from A$322.3m (Dec 2022) to A$631.3m (Jun 2026); undiscounted future receipts A$1,461.2m (Dec 2025).
  • Strong funding access: raised A$950m hybrid (2025), A$886.7m EUR senior notes (2025), A$1.1bn hybrid (2026); A$1.45bn undrawn facilities at Jun 2026; BBB+/Baa1 maintained.
  • Cost recovery mechanisms work: AER approved A$30.1m (Feb 2024 storms) and A$12.9m (Sept 2024 storms) pass-throughs; Safeguard compliance costs recovered via tariffs.
  • Diversified across three network types: gas EBITDA margin 77.6% and distribution margin 58.8% in FY2025 provide cash-flow balance.

Weaknesses

  • High leverage: net debt/EBITDA 8.2x (FY2025) and EBITDA interest cover 3.1x.
  • Persistent negative free cash flow: −A$431.1m in FY2025 after cash capex of A$1,299.6m.
  • Negative working capital and refinancing dependence: current liabilities exceeded current assets by A$510.0m at 30 Jun 2026.
  • Earnings volatility from tax accounting: NPAT swung from A$1,767.9m (9M2022) to A$143.6m (FY2024) largely on deferred tax remeasurements.
  • Weather/bushfire cost sensitivity: FY2024 distribution EBITDA fell 9.9% on A$41.9m storm costs; Jan 2026 bushfires cost A$40.7m.
  • Reduced transparency: no equity disclosure, no remuneration report, board composition confidential.
  • Inconsistent leverage KPI disclosure: net debt/R&CAB reported at 66.5% (FY2024 report) vs 79.0% for the same year (FY2025 report).

Opportunities

  • Western Renewables Link: ~A$1.52bn, 3,000MW+ line with target completion 2029 (AIP plan; RenewEconomy).
  • Data-centre connections: Microsoft Francis Street stages delivered; Board cites rising data-centre demand (FY2025 report).
  • Renewable/BESS connection pipeline: five projects reached practical completion in H1 2026 alone.
  • Transmission Revenue Reset 2027–32: opportunity to grow transmission RAB through station rebuilds (South Morang etc.).
  • Interstate expansion: bids in NSW New England REZ and Gippsland offshore wind (capitalised bid costs A$5.5m).
  • Electrification of Victoria: gas-to-electric switching shifts load onto AusNet's electricity network.

Threats

  • Gas network stranding: Victorian all-electric new homes from 1 Jan 2027 and gas appliance replacement rules from 1 Mar 2027; gas asset lives cut to 2050 (H1 2026).
  • WRL political risk: independent cost review ordered by the Premier immediately after EES approval (Sep 2026).
  • Contestability of transmission: A$15.0m Gippsland REZ write-off after VicGrid changed delivery approach (FY2025).
  • Regulatory cuts: AER draft EDPR was 11.3% below AusNet's proposal.
  • Bushfire liability and insurance: pass-through for residual bushfire liability remains untested (FY2025 report); insurers withdrawing.
  • Tax disputes: ATO auditing shareholder loan interest, thin capitalisation and transfer pricing; GST on gifted assets (H1 2026).
  • Competition-law scrutiny: ACCC found Brookfield staff received sensitive third-party connection information (2023).

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
Feb 2025 (context)A$950m hybrid notes issued; A$516.7m older hybrids repaidRefinanced 2025 hybrid call
7 Mar 2025 (context)Full Federal Court dismisses AusNet tax appeal on 2015 restructureNo P&L impact (uplift never recognised)
21 Mar 2025AER approves A$12.9m cost pass-through for Sept 2024 storms (recovered 2025–27)Validates storm cost recovery mechanism
28 Mar 2025FY2024 Financial Report authorised; A$4.9m distribution approvedAnnual disclosure
30 Jun – 25 Aug 2025WRL EES and draft Planning Scheme Amendment on public exhibitionKey approval milestone
4 Jul 2025CFO Mark Ellul resignsLeadership change
11 Aug 2025AusNet and Wipro announce SAP S/4HANA Cloud implementationDigital transformation
14 Aug 2025Charlie Boyes appointed CFOLeadership change
Sep 2025AER draft EDPR 2026–31: A$4,428.3m, 11.3% below proposalRevenue headwind vs ask
Sep 2025H1 2025 results (revenue A$1,202.4m; EBITDA A$666.5m incl. A$15.1m Gippsland REZ write-off)Results
14 Oct 2025AER online public forum on Victorian draft decisionsRegulatory process
27 Oct 2025 – 5 Mar 2026WRL joint Inquiry and Advisory Committee public hearing (15 weeks)Approval process; strong landholder opposition
1 Nov 2025VicGrid assumes Victorian transmission planning responsibilities from AEMOChanges counterparty for shared transmission
Nov 2025A$55m WRL Benefit Sharing Program announcedSocial licence measure
Pre-summer 2025–26A$331m+ invested in maintenance/vegetation over 12 months; 120,830 poles inspectedBushfire readiness
Dec 2025ATO issues position paper on GST treatment of gifted assetsTax matter; no material net liability expected
Dec 2025Revised EDPR proposal and supporting models lodgedRegulatory
12 & 17 Dec 2025AER issues paper and public forum on 2027–32 transmission revenue proposalNext transmission reset underway
Jan 2026Severe bushfires damage distribution network; >10,000 customers affected; A$40.7m costs; pass-through applied forPhysical climate risk materialisation
27 Jan 2026US$ senior notes (A$107m) repaid; A$120m bank debt drawnRefinancing
4 Feb 2026A$1.1bn AUD hybrid securities issued (first calls Feb 2031 / Feb 2036)Pre-funds EUR hybrid call; supports rating
24–27 Mar 2026FY2025 Financial Report authorised (NPAT A$269.2m); A$4.8m distribution approvedAnnual results
29 Apr 2026Annual ring-fencing compliance reports (transmission and distribution) with EY assessments lodgedRegulatory compliance
30 Apr 2026AER final EDPR 2026–31 decision (≈A$4.74bn nominal smoothed)Sets revenue to Jun 2031
1 May 2026WRL Australian Industry Participation plan approved; construction CY26/27, completion 30 Nov 2029Project scheduling
18–20 May 2026AER approves AusNet 2026–27 distribution pricing proposalTariffs from 1 Jul 2026
8 Jun 2026AER republishes final decision documents correcting conductor capex errorMinor revenue adjustment
Jun 2026Syndicated facility with ANZ refinanced to A$1.025bn, maturity 2036; A$18.5m modification gainLiquidity extension
1 Jul 20262026–31 distribution determination takes effectNew revenue path
17 Jul 2026Notice to redeem A$1,081.9m EUR hybrid securities at first callCapital management
24 Aug 2026H1 2026 interim results: revenue A$1,239.3m (+3%), EBITDA A$713.8m (+7%), NPAT A$132.2m (+19%)Results
H1 2026Practical completion of Mortlake BESS, Pine Lodge BESS, Carwarp SF, Goorambat East SF, Microsoft Francis St Stage 2 connectionsContracted growth
H1 2026Gas network asset useful lives shortened from 2060 to 2050 (+A$8.7m depreciation in H1)Gas stranding risk recognition
11 Sep 2026EUR hybrid redemption dateCapital structure simplification
~14 Sep 2026WRL EES approved by Planning Minister Sonya Kilkenny; Premier Ben Carroll orders independent cost review (due end-2026), no compulsory acquisitions during reviewKey project uncertainty

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

3 charts
Income Statement: Revenue & Gross Profit: Revenue rose from AUD 1,554.5 Mn in 9M 2022 to AUD 2,463.7 Mn in FY2025.
AusNet Pty Ltd — Income Statement: Revenue & Gross Profit
Series (AUD Mn)9M 2022FY2022FY2023FY2024FY2025
Revenue1,554.51,953.42,201.12,290.52,463.7

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Sources

Sources

  1. AusNet Pty Ltd Financial Report, year ended 31 Dec 2025 (ausnetservices.com.au)
  2. AusNet Pty Ltd Interim Financial Report, six months to 30 Jun 2026 (ausnetservices.com.au)
  3. AusNet Pty Ltd Financial Report, year ended 31 Dec 2024 (ausnetservices.com.au)
  4. AusNet Pty Ltd Financial Report, 1 Apr – 31 Dec 2022 (ausnetservices.com.au)
  5. AusNet debt investors page (ausnetservices.com.au)
  6. AusNet executive team (ausnetservices.com.au)
  7. AusNet — David Smales appointed CEO (ausnetservices.com.au)
  8. AusNet — Western Renewables Link project page (ausnetservices.com.au)
  9. AER — Final decision, AusNet distribution determination 2026–31 (aer.gov.au)
  10. AER — Final revenue decisions for Victorian networks (media release) (aer.gov.au)
  11. AER — Draft decisions Victorian DNSPs 2026–31 (aer.gov.au)
  12. AER — AusNet 2026–27 pricing approval (aer.gov.au)
  13. AER — Ring-fencing compliance 2025 (aer.gov.au)
  14. AER — Public forum, AusNet 2027–32 transmission revenue proposal (aer.gov.au)
  15. AER — AusNet transmission entity page (aer.gov.au)
  16. ACCC — Witness statement (Brookfield/Origin), ownership of AusNet (accc.gov.au)
  17. ASX announcement, Scheme Implementation Deed with Brookfield (1 Nov 2021) (asx.com.au)
  18. AIMCo — Acquisition of AusNet closes (17 Feb 2022) (aimco.ca)
  19. RenewEconomy — Brookfield $9.6bn bid (reneweconomy.com.au)
  20. RenewEconomy — APA rival bid (reneweconomy.com.au)
  21. RenewEconomy — ACCC questions Brookfield over AusNet control (reneweconomy.com.au)
  22. RenewEconomy — AusNet restructure (reneweconomy.com.au)
  23. RenewEconomy — WRL environmental approval and cost review (reneweconomy.com.au)
  24. ESD News — Premier orders WRL cost review (esdnews.com.au)
  25. ESD News — Brookfield seals AusNet deal (esdnews.com.au)
  26. Planning Panels Victoria — WRL Inquiry and Advisory Committee (planningpanels.vic.gov.au)
  27. Australian Industry Participation plan summary — WRL (industry.gov.au)
  28. Utility Magazine — AusNet $331m summer readiness (utilitymagazine.com.au)
  29. Utility Magazine — $55m WRL benefit sharing (utilitymagazine.com.au)
  30. Utility Magazine — New executive leadership team (utilitymagazine.com.au)
  31. MarketScreener — AusNet news and segment history (zonebourse.com)
  32. ESC Victoria — AusNet Infrastructure transmission licence application (esc.vic.gov.au)
  33. IBISWorld — Australian Energy Holdings No 1 Pty Ltd (ibisworld.com)
  34. Energy Magazine — CFO Adam Newman resignation (energymagazine.com.au)
  35. RenewEconomy — Nino Ficca (AEMO interim CEO) (reneweconomy.com.au)

Unlock Company Contacts

Connect with Key Decision-Makers

Access verified employee contacts and decision-maker information from this company to support your sales, lead generation, and business development efforts.