Australian Mines Ltd. Overview
Australian Mines Limited is an ASX-listed micro-cap explorer and developer that has repositioned in the past 15 months. It was previously a single-theme nickel-cobalt-scandium battery-metals developer. It is now a twin-track gold and scandium company with an energy-storage technology option attached. The near-term value drivers are two assets. The first is the Boa Vista gold earn-in (up to 80%) in Brazil's Tapajós province, where the company is targeting a maiden JORC resource in early 2027. The second is the 100%-owned Flemington scandium project in central New South Wales, where an April 2026 SRK Scoping Study outlined a 60 tpa scandium-oxide operation, now being studied at up to 180 tpa in a fast-tracked Pre-Feasibility Study. Legacy assets are Sconi (Ni-Co, Queensland, on care-and-maintenance-style holding), early-stage Brazilian tin, lithium and rare-earth tenements, and a proprietary scandium-doped metal-hydride hydrogen-storage formulation. The company has no revenue, holds no debt and funds itself through equity placements. Its own auditor reports a going-concern material uncertainty.
Company's own description
In its H1 FY2026 interim report, the company describes itself as focused mainly on exploring and evaluating gold projects. Behind that sits a wider portfolio of critical metals and energy storage technologies. Its projects are in Australia and Brazil and target gold, scandium, nickel, cobalt, tin, lithium and rare earth elements. The financial statement notes describe the Group as a for-profit entity exploring for cobalt, nickel and scandium in Australia, and for gold, rare earths and lithium (including niobium) in Brazil.
Independent characterisation
AUZ is a pre-revenue, equity-funded project-generator and developer. It has no operating business, so its "business model" is the classic junior-resources model:
-
Acquire or earn into mineral rights cheaply. Examples are Boa Vista for scrip plus small cash, Flemington from Jervois Mining, and Sconi from Metallica Minerals.
-
Add value through drilling, resource definition and economic studies.
-
Monetise that value by financing development with strategic or offtake partners or debt, or by selling or partnering assets. The scoping-study cautionary language explicitly preserves the option of "value realisation" strategies such as a sale or partial sale.
The revenue model is 0% product, 0% service, 0% subscription and 0% licensing today. Potential future revenue streams would be:
-
Sale of high-purity scandium oxide (Sc₂O₃) and a minor nickel-cobalt mixed hydroxide precipitate (MHP) by-product from Flemington. The by-product is about 4% of Scoping Study revenue.
-
Gold doré from Boa Vista, if developed, at AUZ's earned interest of up to 80%.
-
Nickel and cobalt intermediates from Sconi, if ever financed.
-
Licensing or joint-venture income from the metal-hydride hydrogen-storage technology. This is a stated incentive milestone (a strategic partner investing at least A$1M) but has no commercial agreement today.
Value-chain position: upstream exploration and pre-development. A Flemington development would integrate mining with hydrometallurgical refining to oxide, placing AUZ one step further down the chain than a concentrate seller.
Prospective customers and end-markets:
Scandium oxide: solid oxide fuel cell (SOFC) electrolyte manufacturers, aluminium-scandium alloy producers (aerospace, defence, 3D printing), and specialty electronics. The company's thesis is tied to SOFC deployment for AI and data-centre power, citing Bloom Energy demand estimates.
Gold: global bullion market.
Nickel and cobalt: battery precursor and cathode supply chains.
Hydrogen storage: stationary, dispatchable storage including data centres and distributed power, as positioned by the company.
Strategy
Stated strategy (themes from company disclosures)
-
Gold-led growth. The company describes itself as primarily focused on gold exploration and evaluation, with Boa Vista as the cornerstone. The objective is a maiden JORC resource in early 2027 and evaluation of a potential low-cost, long-life open-pit operation, pursued through district-scale exploration across 14 satellite targets.
-
Flemington as a strategic Western scandium supplier. The company is fast-tracking the PFS (6–9 months) and testing scale-up from 60 to 180 tpa in response to a perceived supply deficit. It is engaging offtakers and strategic partners and validating pricing.
-
Energy-storage technology optionality. It is developing scandium-doped metal hydrides for solid-state hydrogen storage, positioned for data centres and AI power, and creating internal demand synergy with Flemington scandium.
-
Portfolio discipline. Sconi is held in good standing until the Ni-Co price cycle turns. Brazilian critical-minerals tenements (Resende, Jequié) are advanced at low cost.
-
Capital-markets repositioning. This covers board renewal, the 1-for-5 consolidation (stated rationale: a higher share price is more attractive to institutions, financiers and fund managers), LSP termination and new performance-based incentives.
Initiatives announced in the last 24 months
| Date | Initiative | Detail / target |
|---|---|---|
| Jan 2025 | Flemington resource expansion | MRE doubled to 6.3 Mt at 446 ppm |
| Jul 2025 | Boa Vista earn-in | Up to 80%; ≥500 koz JORC requirement |
| Sep 2025 | Metal hydride validation | HyMARC/NREL independent test |
| Oct–Nov 2025 | Drilling at Boa Vista and Flemington | 11-hole program at VG1; Flemington anomaly drilling |
| Feb 2026 | SRK updated Flemington study commissioned | Scandium-first flowsheet |
| Apr–May 2026 | Scoping Study delivered | NPV₈ US$270M–US$860M |
| May 2026 | New hydride formulations to US national lab | Optimisation and reproducibility work towards pilot-scale evaluation |
| May 2026 | A$3.0M Tribeca-led placement | Funds PFS, Boa Vista drilling, hydride and Resende work |
| Jun 2026 | Board and capital-structure reset | MD appointment, two NEDs, consolidation, LSP termination |
| Jul 2026 | Boa Vista district targeting | 14 targets; 135 stream-sediment sites planned |
| Jul 2026 | Expanded PFS | 60 tpa → up to 180 tpa |
| Sep–Oct 2026 | Performance Rights Plan | Hurdles tied to gold resource and share price |
Sustainability / ESG commitments: a general statement of support for human rights, safe workplaces, minimising environmental harm and positive legacies. No quantified targets.
Cost programs: none with quantified targets. FY2025 austerity was achieved in practice (SG&A A$1.73M).
Management guidance and medium-term targets
| Item | Guidance |
|---|---|
| Flemington PFS | Completion in about 6–9 months from July 2026, implying roughly Q1–Q2 CY2027 |
| Boa Vista drilling | Minimum 6,000 m, up to 10,000 m, two rigs |
| Boa Vista resource | Maiden JORC (2012) MRE targeted in early 2027. An earlier target of a VG1 estimate "during Q2 2026" in the March 2026 quarterly was not met. |
| Resende | Report drill results to market (pending at cut-off) |
| Financial targets | None (pre-revenue) |
Products & Services
AUZ has no commercial products. The "portfolio" is a set of mineral projects and one technology. Each is catalogued below.
Australia segment
| Attribute | Detail |
|---|---|
| Tenure | EL 7805, EL 8546, EL 8478, EL 8855, EL 9321 (granted, 100%). EL 9562 expired in the June 2026 quarter. |
| Location | Central New South Wales, contiguous with Sunrise Energy Metals' Syerston Scandium Project |
| Mineral Resource (JORC 2012, 8 Jan 2025) | 6.3 Mt at 446 ppm Sc (300 ppm cut-off): 3.12 Mt Measured, 3.02 Mt Indicated, 0.15 Mt Inferred. This sits within 28 Mt at 217 ppm Sc (100 ppm cut-off). The estimate draws on more than 550 drillholes and more than 11,600 m of drilling. Competent Person: Rodney Brown, SRK Consulting. |
| Scoping Study (SRK, 28 Apr 2026; amended 8 May 2026) | 60 tpa Sc₂O₃. 28-year mine life. About 2.09 Mt processed (55.8% Measured, 43.6% Indicated, 0.6% Inferred). Strip ratio 1.9:1. Average feed 573 ppm Sc for the first 15 years and 529 ppm over life of mine. Three shallow free-dig open pits. Conventional hydrometallurgy with 90.8% recovery. |
| Capex | Initial capital about US$125M (Class 5 estimate, ±35%) |
| Operating cost | C1 cash cost US$561/kg Sc₂O₃; breakeven US$815/kg |
| Economics | Post-tax NPV₈ about US$270M and IRR 32% at a US$1,500/kg "mine design" price. Post-tax NPV₈ about US$860M and IRR 74% at a US$3,000/kg "market-aligned" sensitivity, which the company says is not a forecast. |
| By-products | Ni-Co mixed hydroxide precipitate, about 4% of revenue and described as not material |
| Upside | About 410 kt at 405 ppm Sc currently classified as waste. Resource extensions indicated by 2026 aircore drilling (18 m at 597 ppm; 12 m at 615 ppm). |
| Next step | PFS fast-tracked (6–9 months from July 2026), expanded to assess 60→180 tpa |
| Royalties | 1.5% gross-sales royalty to Jervois Mining |
| Target customers | SOFC manufacturers, Al-Sc alloy producers, and AUZ's own metal-hydride technology (internal synergy thesis) |
| Pricing model | Not disclosed. The scandium market is opaque, with mostly bilateral contract pricing. |
| Attribute | Detail |
|---|---|
| Tenure | Five granted Mining Leases (ML 10366, 10342, 10332, 20549, 10368), two MDLs (515, 387) and 11 EPMs, all 100% |
| Location | Near Greenvale, about 250 km west of Townsville |
| Historical BFS (Nov 2018) | Capex about A$1.35bn. Ore Reserves 33.89 Mt at 0.67% Ni, 0.10% Co, 42 ppm Sc (as of Nov 2018; NS Energy). Not re-stated in recent filings reviewed. |
| Status | The company describes it as a long-life, low-risk project in a Tier-1 jurisdiction. It is being "maintained in good standing" while nickel and cobalt prices remain subdued. Development spend in the June 2026 quarter was A$122k. |
| Encumbrances | A$6.75M landowner compensation payable on financial close. A$2.5M in shares or cash payable to Metallica Minerals on commercial production. Per-tonne royalties to International Royalty Corporation (Bell Creek) and on Minnamoolka. |
| Offtake | The company currently reports only "engagement with potential partners". |
| Attribute | Detail |
|---|---|
| Product | Scandium-doped magnesium-based ternary alloy metal hydride, "MH-May24", for solid-state hydrogen storage |
| Origin | Collaboration with Amrita Centre for Research and Development, announced 2 Nov 2018 |
| Key specifications (company-reported, isothermal, 38 bar) | Absorbs 5.2 wt% H₂ at 200°C. Absorbs 4.2 wt% in under 4 minutes at 200°C. Up to 4.7 wt% at 100°C. Absorbs at room temperature. Desorbs 5 wt% in about 3.3 hours at 250°C under vacuum (<0.5 bar). |
| Validation | Independent testing by HyMARC (US DOE Energy Materials Network) at NREL, announced 12 Sep 2025, was consistent with company data and showed repeatable cycling |
| Latest version | Follow-on formulations submitted to the "National Laboratory of the Rockies" for testing (11 May 2026) |
| Target applications | Safe, compact, dispatchable hydrogen storage for data centres, AI infrastructure and distributed power, as positioned by the company |
| Commercial status | No partner, licence or revenue. Strategic partner investment of at least A$1M is a disclosed incentive milestone. |
| Patents | — |
(a) Flemington Scandium-Nickel-Cobalt Project, central NSW (100%)
(b) Sconi Nickel-Cobalt(-Scandium) Project, North Queensland (100%)
(c) Broken Hill Project, NSW (100%) — EL 8477, EL 9300, EL 9326. Exploration-stage. June 2026 quarter spend was A$4.5k. Commodity focus was not detailed in recent filings.
(d) Lennard, WA (100%) — E04/2529. Early-stage. No recent work disclosed.
(e) Metal Hydride Hydrogen-Storage Technology (proprietary)
Brazil segment
| Attribute | Detail |
|---|---|
| Counterparties | Cabral Resources Limited (100% subsidiary of GoldMining Inc., TSX: GOLD / NYSE American: GLDG) and Majestic D&M Holdings LLC |
| Tenure | 3 exploration permits, about 9,201 ha, 350 km south of Itaituba. Access is via highway BR-163 or a 1.5-hour light-aircraft flight. |
| Historical foreign estimate (NI 43-101, 2013, not JORC) | VG1: 8.47 Mt at 1.23 g/t Au for about 336,000 oz (0.5 g/t cut-off). At a 0.1 g/t cut-off: 14.24 Mt at 0.87 g/t for 399,000 oz. |
| Geometry | About 700 m strike, up to 85 m wide, drill-tested to about 250 m depth, open along strike and at depth. Sits inside a gold-in-soil anomaly about 2 km long and up to 350 m wide. |
| Metallurgy | Initial testwork shows recoveries above 95%, with up to 60% gravity-recoverable and no deleterious elements identified |
| AUZ drilling highlights | VGADD0010: 29 m at 3.22 g/t (including 4 m at 18.6 g/t) plus 64 m at 1.22 g/t plus 13.6 m at 1.74 g/t, for 195.3 g·m cumulative. VGADD0002: 120 m at 1.34 g/t (160.8 g·m). VGADD0009: 82 m at 1.13 g/t. Biota channel samples: 2.0 m at 52.10 g/t Au. |
| District targets | 14 new targets. Priority targets are Baixão (grab samples to 31.0 g/t), Jair (11.1 g/t), Zé do Leicha (5.6 g/t) and Almir. |
| Next program | 6,000–10,000 m diamond drilling with two rigs, 30–40% on satellite targets. Objective: maiden JORC resource in early 2027. |
| Earn-in economics | Total consideration up to about C$7M in cash and equity (GoldMining). Initial payment C$55k plus C$250k per year over 3 years (per AUZ accounts). First option: 51% within 3 years of conditions precedent. A later option adds 10% for C$4.42M (50% cash). A JORC resource of at least 500 koz Au, with at least 50% Measured and Indicated, is a stated requirement. |
| Attribute | Detail |
|---|---|
| Tenure | 8 exploration licences, 13,314.58 ha. These are subject to acquisition terms (ASX 6 Dec 2023) and transfer from RTB Geologia e Mineração Ltda; 7 of 8 had transferred by 31 Dec 2025. |
| Geology | Along strike from AMG's Mibra mine, which produces Sn, Ta, Li and feldspar concentrates |
| Targets | Sn-Ta-Li Target Zones A, B and C. REE follow-up Area 1 (2 × 1 km) and Area 2 (3 × 1 km). |
| Status | Initial diamond drilling at Target Zone A was in progress at the time of the June 2026 quarterly. Results were promised to the market but were not located by research cut-off. |
| Attribute | Detail |
|---|---|
| Tenure | 17 licences, 33,530.74 ha |
| Results | Jequié South auger hole DAME-FT-14: 15.0 m at 1,720 ppm TREO (including 3.0 m at 3,055 ppm). Cerium depletion suggests ionic-clay style mineralisation. Jequié North best result: 9.0 m at 1,028 ppm TREO. |
| Status | Early-stage. Further mapping, sampling, auger drilling and metallurgy are contemplated. |
(f) Boa Vista Gold Project, Tapajós Province, Pará (earning up to 80%)
(g) Resende Tin-Lithium-Tantalum-REE Project, Minas Gerais
(h) Jequié Rare Earth / Niobium Project, Bahia
Financial Narrative
Basis. These are audited annual figures for FY2021–FY2025 as compiled by S&P Global Market Intelligence (via StockAnalysis, cross-checked to TipRanks and Barchart) and the company's H1 FY2026 interim report. All values are A$ millions unless stated. EPS is derived as net loss divided by weighted-average shares reported by TipRanks, in A$ cents. Because AUZ has no revenue, margin-based metrics are not meaningful and are shown only where computable.
Income statement
Commentary. Losses have narrowed for three consecutive years, from A$5.79M in FY2022 to A$1.88M in FY2025. The drivers were:
-
SG&A was cut sharply, from A$4.49M to A$1.73M, after the end of the capital-intensive Sconi pre-development phase.
-
Interest expense disappeared after a short-term debt balance of A$2.83M carried at 30 June 2023 was cleared during FY2024. The nature of that debt was not detailed in sources reviewed.
-
Non-operating losses fell away. FY2021 included a A$1.14M loss on sale of investments and a A$0.32M equity-accounted loss.
The run-rate in H1 FY2026 (A$1.0M loss for the half) is broadly flat on H1 FY2025, despite a much busier exploration year. This is because AUZ capitalises most exploration and evaluation under AASB 6. Gross, operating, EBITDA and net margins, and revenue CAGR, are not meaningful because revenue is nil or immaterial interest-like income.
Balance sheet
Interim and latest balance sheet points:
31 Dec 2025: cash A$4.802M; E&E A$46.174M; total assets A$51.218M; total liabilities A$0.207M; equity A$51.011M; working capital surplus A$4.685M; issued capital A$121.555M; accumulated losses A$76.179M.
30 Jun 2026 (Appendix 5B, unaudited): cash A$5.238M; no financing facilities.
Commentary. The balance sheet is almost entirely capitalised exploration and evaluation assets, about 90% of total assets at 31 December 2025. It carries no goodwill and effectively no liabilities. Book equity of about A$51M was close to or above market capitalisation for much of 2024–2025. Shareholders publicly questioned that gap at the August 2025 EGM (The Mayne Report). The carrying value of Sconi within E&E is the key impairment sensitivity given depressed nickel and cobalt prices. A per-project breakdown of E&E was not disclosed in the interim report.
Cash flow
Commentary. FY2026 was a step-change in activity:
-
Total outflows (operating plus investing) were about A$5.0M, versus about A$3.0M in FY2025.
-
Gross equity raised was A$9.5M across three placements (A$2.5M July 2025, A$4.0M October 2025, A$3.0M May 2026), plus about A$1.0M of scrip consideration for Boa Vista.
-
At the June 2026 quarterly burn of about A$1.0M (operating plus E&E), the company reported 5.19 quarters of funding.
-
However, the planned 6,000–10,000 m Boa Vista program and the expanded Flemington PFS will lift burn materially. Investors should expect a further equity raise within 6–12 months unless a strategic partner funds part of the work.
Ratios
Ratios not meaningful or not applicable: net debt/EBITDA (net cash, negative EBITDA), interest coverage (no interest-bearing debt in FY2025), asset turnover (no revenue), cash conversion cycle (no revenue or inventory). ROIC is approximated as net loss divided by (equity plus debt).
Trend synthesis
FY2021–FY2022: peak Sconi-era spending, with FY2022 FCF of -A$9.65M funded by A$10.9M of equity.
FY2023: bridged with short-term debt of A$2.83M, carrying interest expense of A$0.8M.
FY2024: recapitalised. Share count more than doubled, from 620M to 1,399M.
FY2025: austerity, with a A$1.88M loss and cash down to A$1.45M.
FY2026: reinvention through the Boa Vista entry, three placements, a Scoping Study and board renewal.
The inflection is strategic rather than financial. The value narrative has shifted from a capital-heavy (about A$1.35bn) Ni-Co development to two far cheaper potential developments: about US$125M at Flemington, and a still-undefined gold project.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Segment Overview
| Segment | Contents | "Products" | Notes |
|---|---|---|---|
Australia | Corporate head office (Brisbane/Perth); Flemington (Sc-Ni-Co, NSW); Sconi (Ni-Co-Sc, QLD); Broken Hill (NSW exploration licences); Lennard (WA exploration licence); metal-hydride R&D | None (pre-revenue) | Carries almost all corporate overhead |
Brazil | Boa Vista gold earn-in (Pará); Resende Sn-Li-Ta-REE (Minas Gerais); Jequié REE-Nb (Bahia), held via Ecometals Brazil Ltda and EM1 Brazil Ltda | None (pre-revenue) | Most E&E spend is capitalised, so segment P&L losses are small |
Results by Segment
| Metric | H1FY2025 | H1FY2026 |
|---|---|---|
Australia segment revenue (AUD K) | 0 | 0 |
Brazil segment revenue (AUD K) | 0 | 0 |
Australia segment EBITDA (AUD K) | -899 | -971 |
Brazil segment EBITDA (AUD K) | -27 | -31 |
Total EBITDA (AUD K) | -926 | -1,002 |
Australia loss before tax (AUD K) | -897 | -969 |
Brazil loss before tax (AUD K) | -27 | -31 |
Project Portfolio
| Project | E&E (AUD) | Development (AUD) | Total (AUD) | Share of total (%) |
|---|---|---|---|---|
Brazil projects (Boa Vista, Resende, Jequié) | 667,897 | 0 | 667,897 | 64.8 |
Flemington (NSW) | 236,094 | 0 | 236,094 | 22.9 |
Sconi (QLD) | 0 | 121,951 | 121,951 | 11.8 |
Broken Hill (NSW) | 4,465 | 0 | 4,465 | 0.4 |
Total | 908,455 | 121,951 | 1,030,406 | 100.0 |
Income Statement and Share Count (M)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Revenue / other revenue (AUD Mn) | 0.06 | 0 | 0.05 | 0.14 | 0 |
Gross profit (AUD Mn) | 0.06 | 0 | 0.05 | 0.14 | 0 |
SG&A (AUD Mn) | 2.52 | 4.49 | 2.62 | 1.89 | 1.73 |
Total operating expenses (AUD Mn) | 3.10 | 5.76 | 2.88 | 3.25 | 1.89 |
Operating income (AUD Mn) | -3.04 | -5.76 | -2.83 | -3.11 | -1.89 |
EBITDA (AUD Mn) | -3.94 | -5.56 | -3.17 | -3.49 | -1.88 |
Depreciation & amortisation (AUD Mn) | 0.24 | 0.19 | 0.14 | 0.01 | 0 |
Interest expense (AUD Mn) | 0 | 0.04 | 0.80 | 0.31 | 0 |
Pre-tax income (AUD Mn) | -4.49 | -5.79 | -4.11 | -3.80 | -1.88 |
Net income (AUD Mn) | -4.49 | -5.79 | -4.11 | -3.80 | -1.88 |
Weighted avg shares (M) | 394.59 | 432.04 | 518.68 | 974.35 | 1,400 |
EPS basic, derived (A$ cents) | -1.14 | -1.34 | -0.79 | -0.39 | -0.13 |
Dividends per share (A$ cents) | 0 | 0 | 0 | 0 | 0 |
Key Financials and Per-Share Data
| Metric | H1FY2025 | H1FY2026 |
|---|---|---|
Corporate overheads (AUD K) | 442 | 471 |
Personnel expenses (AUD K) | 352 | 409 |
Share-based payments (AUD K) | 61 | 53 |
Exploration expensed (AUD K) | 71 | 69 |
Loss before tax (AUD K) | -924 | -1,000 |
EPS basic (A$ cents) | -0.07 | -0.05 |
Balance Sheet and Share Count (M)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Cash & equivalents (AUD Mn) | 3.64 | 3.99 | 4.63 | 4.49 | 1.45 |
Total current assets (AUD Mn) | 3.67 | 4.17 | 4.68 | 4.50 | 1.47 |
E&E and PP&E (AUD Mn) | 33.54 | 38.06 | 40.61 | 42.43 | 43.58 |
Intangibles (AUD Mn) | 0.01 | 0.02 | 0.03 | 0.05 | 0.06 |
Goodwill (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Total assets (AUD Mn) | 37.23 | 42.25 | 45.32 | 46.98 | 45.10 |
Short-term debt incl. leases (AUD Mn) | 0.16 | 0.18 | 2.83 | 0 | 0 |
Long-term debt incl. leases (AUD Mn) | 0.18 | 0 | 0 | 0 | 0 |
Total debt (AUD Mn) | 0.35 | 0.18 | 2.83 | 0 | 0 |
Net debt (AUD Mn, negative = net cash) | -3.30 | -3.81 | -1.80 | -4.49 | -1.45 |
Total liabilities (AUD Mn) | 0.85 | 1.28 | 3.85 | 0.26 | 0.18 |
Shareholders' equity (AUD Mn) | 36.38 | 40.97 | 41.47 | 46.72 | 44.93 |
Issued capital (AUD Mn) | 91.90 | 102.12 | 105.60 | 114.49 | 114.49 |
Accumulated losses (AUD Mn) | -59.61 | -65.39 | -69.50 | -73.30 | -75.18 |
Working capital (AUD Mn) | 3.01 | 2.89 | 0.84 | 4.24 | 1.30 |
Shares outstanding, period end (M) | 396.15 | 468.71 | 620.49 | 1,399 | 1,398 |
Cash Flow
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Operating cash flow (AUD Mn) | -1.77 | -4.25 | -2.40 | -1.48 | -1.71 |
Capex incl. capitalised E&E (AUD Mn) | -3.17 | -5.40 | -3.52 | -2.40 | -1.29 |
Free cash flow (AUD Mn) | -4.93 | -9.65 | -5.92 | -3.87 | -3.00 |
Equity issued (AUD Mn) | 5.90 | 10.91 | 7.34 | 5.69 | 0 |
Debt repaid (AUD Mn) | -0.22 | -0.20 | -0.15 | 0 | 0 |
Dividends paid (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Buybacks (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Net change in cash (AUD Mn) | 0.40 | 0.35 | 0.64 | -0.14 | -3.04 |
Stock-based compensation (AUD Mn) | 0.03 | 0.17 | 0.10 | 0.07 | 0.12 |
Balance Sheet
| Metric | FY2026 |
|---|---|
Net operating cash flow (AUD K) | -2,255 |
of which development payments (AUD K) | -625 |
of which staff costs (AUD K) | -709 |
of which admin & corporate (AUD K) | -833 |
Payments for E&E, investing (AUD K) | -2,429 |
Payments for tenements (AUD K) | -319 |
Net investing cash flow (AUD K) | -2,762 |
Gross equity proceeds (AUD K) | 9,500 |
Equity raising costs (AUD K) | -697 |
Net financing cash flow (AUD K) | 8,803 |
Closing cash (AUD K) | 5,238 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
ROE (%) | -12.3 | -14.1 | -9.9 | -8.1 | -4.2 |
ROA (%) | -12.1 | -13.7 | -9.1 | -8.1 | -4.2 |
ROIC (%) | -12.2 | -14.1 | -9.3 | -8.1 | -4.2 |
Current ratio (x) | 5.5 | 3.3 | 1.2 | 17.3 | 8.2 |
Debt / equity (x) | 0.01 | 0.00 | 0.07 | 0 | 0 |
Equity / total assets (%) | 97.7 | 97.0 | 91.5 | 99.4 | 99.6 |
Cash burn cover (cash ÷ annual FCF burn, years) | 0.74 | 0.41 | 0.78 | 1.16 | 0.48 |
Revenue by Region
| Region | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Australia revenue (AUD Mn) | 0.05 | 0.14 | 0 |
Brazil revenue (AUD Mn) | 0 | 0 | 0 |
Total revenue (AUD Mn) | 0.05 | 0.14 | 0 |
Share Price and Share Count (M)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Closing share price 30 June (AUD) | 0.022 | 0.060 | 0.016 | 0.008 | 0.011 |
Shares outstanding (M) | 396.15 | 468.71 | 620.49 | 1,399 | 1,398 |
Implied market cap 30 June (AUD Mn) | 8.7 | 28.1 | 9.9 | 11.2 | 15.4 |
Share Price & Returns
| Horizon | From (AUD) | Approx. return (%) |
|---|---|---|
1-year (vs 30 Jun 2025 A$0.011) | 0.011 | 109 to 191 |
3-year (vs 30 Jun 2023 A$0.016) | 0.016 | 44 to 100 |
5-year (vs 30 Jun 2021 A$0.022) | 0.022 | 5 to 45 |
Valuation Snapshot
| Metric | Value | Basis |
|---|---|---|
Market cap | A$50M–A$70M | 2,187.5M shares × A$0.023–0.032 |
Enterprise value | A$45M–A$65M | Less A$5.24M cash; no debt |
P/E | n/m | Loss-making |
EV/EBITDA | n/m | Negative EBITDA |
EV/Sales | n/m | No sales |
P/B | About 1.0x–1.4x | Book equity about A$51M at Dec 2025 plus about A$2.8M net raise |
EV / Flemington post-tax NPV₈ (US$270M ≈ A$410M at an assumed 0.66 AUD/USD) | About 0.11x–0.16x | Analyst calculation; FX assumption not sourced. Typical scoping-stage discount. |
Securities on Issue
| Security | Number | Exercise (AUD) | Expiry | Post-consolidation (indicative) |
|---|---|---|---|---|
Ordinary shares | 2,187,477,854 | — | — | 418374695 (after 95.6M LSP cancellation) |
AUZOA listed options | 278,515,183 | 0.022 | 2 Feb 2027 | 55703036 at A$0.11 |
AUZOB listed options | 305,139,739 | 0.032 | 6 May 2027 | 61027948 at A$0.16 |
Unlisted sign-on options | 25,000,000 | 0.03 | 30 Jul 2029 | 5000000 at A$0.15 |
Proposed post-consolidation options | — | — | 30 Jul 2029 | 10960000 at A$0.15 |
Proposed performance rights | — | nil | 30 Jul 2031 | 24000000 (plus up to 24M plan capacity) |
Analyst Conclusions
Management guidance
| Item | Guidance |
|---|---|
| Flemington | PFS within 6–9 months (from July 2026). Workstreams: mine optimisation, metallurgy, geotechnical, hydrogeology, environmental baseline, infrastructure, marketing and pricing validation, offtake engagement, funding pathways. |
| Boa Vista | 6,000–10,000 m diamond program with two rigs. Maiden JORC MRE in early 2027. |
| Resende | Drill results to be reported |
| Hydride | Independent testing at the US national laboratory; partner search |
| Capital structure | 1-for-5 consolidation (effective about 14 Oct 2026 if approved); new Performance Rights Plan |
| Consensus growth expectations | None (no coverage) |
Bull case
-
Flemington is mispriced. An enterprise value of A$45M–65M is about 0.11–0.16x the conservative-case NPV₈. A PFS that confirms costs and lifts throughput towards 180 tpa, combined with a binding offtake from an SOFC or alloy customer, could re-rate the stock towards 0.3–0.5x NPV, as is typical at the PFS/DFS stage.
-
Boa Vista becomes a resource story in 2027. Multiple holes exceed 100 g·m, the historical base is 336 koz, and the system is open along strike and at depth. Fourteen satellites add optionality, and gold-price strength supports a maiden 0.5–1.0 Moz JORC resource.
-
Balance-sheet and governance reset unlocks institutional demand. Consolidation, LSP cancellation, Tribeca sponsorship and option-exercise potential of about A$15.9M could fund the 2027 work program with less dilution than in the past.
Bear case
-
Scandium demand thesis is fragile. Pricing is opaque. The bull demand case leans on a single customer (Bloom Energy) and a third-party media estimate. New supply from Rio Tinto, NioCorp and Sunrise, plus Flemington itself at 60–180 tpa, could swamp a market of about 80 tpa and depress prices towards the US$815/kg breakeven.
-
Funding treadmill. A burn of about A$1.0M per quarter is set to rise sharply with two rigs and a PFS. Cash of A$5.24M likely funds well under a year of the full program. Further placements at micro-cap discounts are probable, and the auditor flags going-concern uncertainty.
-
Execution and earn-in risk at Boa Vista. The resource timetable has already slipped (Q2 2026 → early 2027). Failure to reach the 500 koz (≥50% M&I) requirement or to meet payments could forfeit or dilute AUZ's interest. Remote Tapajós logistics and artisanal mining add cost and timing risk.
Key catalysts and monitorables (next 12 months)
| Timing | Catalyst / monitorable |
|---|---|
| Oct 2026 | General Meeting outcome; consolidation implementation (about 14–26 Oct 2026) |
| Late Oct 2026 | FY2026 Annual Report and September quarterly (cash runway; Boa Vista drill start) |
| Q4 CY2026 | Resende first drill results; Boa Vista drilling mobilisation and first assays |
| Q4 CY2026 – Q1 CY2027 | Hydride testing results from the US national laboratory; any partner MoU |
| H1 CY2027 | Flemington PFS (60–180 tpa); offtake or strategic-partner announcements |
| Early CY2027 | Boa Vista maiden JORC MRE |
| By Feb / May 2027 | AUZOA and AUZOB option expiries (potential A$15.9M inflow if in the money) |
| Ongoing | Next capital raise (size and price); substantial-holder movements (Huang, Yu, Tribeca, GoldMining); nickel and cobalt prices for Sconi carrying value |
Analyst verdict
Australian Mines has spent the past 15 months converting a stranded battery-metals story into a two-asset development and exploration vehicle that is more financeable. The quality of the underlying assets is better than the company's history and share-price chart suggest.
Flemington is the more advanced and more distinctive asset. A Measured and Indicated-dominated, high-grade scandium resource and a US$125M capex scoping case give it a credible pathway that few primary scandium projects outside China can match. At a US$1,500/kg design price it still produces a US$270M post-tax NPV₈ with an 8–9 year margin cushion over breakeven.
Boa Vista supplies the near-term newsflow and the gold-price leverage that generalist investors want. Its drill results to date point to a bulk-tonnage, near-surface system with district-scale upside.
The investment case is constrained by three things:
Market depth: The scandium market is small, opaque and potentially oversupplied if several Western projects proceed. The bull-case pricing therefore cannot be relied on.
Funding: The company is perpetually equity-dependent. The FY2026 program will require further capital well before any asset is cash-generative.
Ownership: Boa Vista is an earn-in with demanding resource conditions, and the company has already slipped one resource timeline.
On balance, AUZ screens as a speculative, catalyst-rich micro-cap trading at a deep discount to its scoping-stage NPV. That discount is warranted until three things happen: an offtake or strategic partner validates scandium pricing, the PFS confirms capital and operating costs, and Boa Vista delivers a JORC resource. The board reset, cancellation of the underwater loan-funded incentives, an institutional cornerstone and insider buying by a new director all improve alignment. Investors should weight the stock primarily on (i) PFS and offtake outcomes at Flemington and (ii) the size and grade of the 2027 Boa Vista resource, and should expect further dilution along the way. The risk-reward is asymmetric but binary. It suits risk-tolerant capital with a 12–24 month horizon, and is not suitable for income or capital-preservation mandates.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Appointed / tenure | Background (as disclosed) | Current package (A$, per Notice of GM Table 13) |
|---|---|---|---|---|
Michael Ramsden | Non-Executive Chairman | Director since at least 2014 (LSP approval 28 Nov 2014) | Long-serving chair. Prior roles, education and age not detailed in sources reviewed. | Fees 93,750 + super 11,250 + SBP 25,941 = 130,941 |
Andrew Nesbitt | Managing Director (CEO from 23 Sep 2023; MD from 23 Jun 2026) | About 3 years | Succeeded CEO Michael Holmes. Prior roles, education and age not detailed in sources reviewed. | Salary 222,430 + super 26,458 + SBP 77,823 = 326,503. Also received a A$38,250 STI in shares (Dec 2025). |
Dominic Marinelli | Non-Executive Director | Since at least 2014 | Signed the H1 FY2026 directors' report | 62,500 + 7,500 + 25,941 = 95,941 |
Cristian Moreno | Non-Executive Director | 23 Jun 2026 | Described as bringing natural-resources and corporate-finance expertise. Bought 1.46M shares on market in June 2026. | 62,500 + 7,500 = 70,000 per annum (package) |
Michael McNeilly | Non-Executive Director | 23 Jun 2026 | Described as bringing corporate transaction and investment experience. Market Index lists him as "David McNeilly", a naming discrepancy; company documents say Michael. | 62,500 + 7,500 = 70,000 per annum (package) |
Oliver Carton | Company Secretary | Since at least March 2024 | — | Not disclosed separately |
Michael Elias | Former NED | Resigned 23 Jun 2026 | Long-serving director | 95,941 (FY2025 basis) |
Governance Overview
| Attribute | Status |
|---|---|
Board size | 5 (4 non-executive, 1 executive) |
Independence | Ramsden, Marinelli, Moreno and McNeilly are non-executive. Long tenure (10+ years) for Ramsden and Marinelli may weigh on independence under ASX Principle 2. |
Chair / CEO separation | Yes. The Chair is non-executive and the MD is separate. |
Committees | Not publicly disclosed in sources reviewed. Micro-caps commonly run audit and remuneration as full-board functions. |
Gender diversity | 0 of 5 directors are women, based on names disclosed. |
Board & Management Changes
| Date | Change |
|---|---|
23 Jul 2024 | Tim MacLean resigned as director |
23 Sep 2023 | Andrew Nesbitt appointed CEO (succeeding Michael Holmes) |
23 Jun 2026 | Nesbitt appointed MD; Moreno and McNeilly appointed NEDs; Elias resigned |
Major Shareholders
| Holder | Shares | % | Last notice |
|---|---|---|---|
Flynn (Fefe) Huang | 135,823,947 | 6.17 | 23 Sep 2026 |
Mr Yonglu Yu | 102,973,727 | 5.02 | 10 Apr 2026 |
Citicorp Nominees Pty Limited (nominee; includes Tribeca-related holdings per the Notice of GM context) | Not stated | 7.3 | 28 Aug 2026 (Notice of GM) |
Major Shareholders by Rank
| Rank | Holder | Shares | % |
|---|---|---|---|
| 1 | Mr Yonglu Yu | 86,171,695 | 4.76 |
| 2 | GoldMining Inc | 84,429,563 | 4.66 |
| 3 | BNP Paribas Nominees <Clearstream> | 79,317,591 | 4.38 |
| 4 | Whale Watch Holdings Limited | 45,000,099 | 2.48 |
| 5 | Mr Rafael Viola Mottin | 32,300,000 | 1.78 |
| 6 | BNP Paribas Noms Pty Ltd | 30,296,322 | 1.67 |
| 7 | Citicorp Nominees Pty Limited | 26,573,456 | 1.47 |
| 8 | BNP Paribas Nominees <IB AU Noms Retail> | 23,430,794 | 1.29 |
| 9 | Mark R Jones & Margaret Tai <Tai-Jones S/F> | 21,000,000 | 1.16 |
| 10 | Mr Jinhua Guan | 20,600,000 | 1.14 |
Directors' Shareholdings
| Director | Direct shares | Indirect shares | Notes |
|---|---|---|---|
Andrew Nesbitt | 38,390,625 | — | Includes 36M LSP shares proposed for cancellation |
Michael Ramsden | 18,053,510 | 7,620,960 | Includes LSP shares proposed for cancellation |
Dominic Marinelli | 18,889,103 | 3,967,217 | Includes LSP shares proposed for cancellation |
Cristian Moreno | — | 1,464,926 | Plus 12.5M sign-on options |
Competitive Landscape
Key Competitors
| Competitor | Asset / location | Stage | Relative positioning vs AUZ |
|---|---|---|---|
Sunrise Energy Metals (ASX: SRL) | Syerston (Sunrise) Sc-Ni-Co, NSW, contiguous with Flemington | Advanced (historical DFS for Ni-Co; scandium focus) | Most direct regional competitor and potential consolidation counterparty. Larger resource base. |
Rio Tinto (ASX/LSE: RIO) | Scandium oxide by-product at Rio Tinto Fer et Titane, Sorel-Tracy, Québec | Producing | Incumbent Western supplier with very low marginal cost as a by-product |
NioCorp Developments (NASDAQ: NB) | Elk Creek Nb-Sc-Ti, Nebraska, USA | Development / financing | US-domiciled scandium source; competes for US strategic offtake |
Scandium International Mining (TSX: SCY) | Nyngan scandium project, NSW | Feasibility-stage (historical) | Another NSW primary scandium project |
Chinese producers (various) | By-product of TiO₂/REE processing | Producing | Dominant global supply; price setter |
Russian supply (e.g., from uranium/alumina residues) | By-product | Producing | Supply affected by sanctions and geopolitics |
Key Competitors by Competitor / Peer
| Competitor / peer | Asset | Stage | Relevance |
|---|---|---|---|
GoldMining Inc. (TSX: GOLD) | São Jorge, about 80 km from Boa Vista | Resource / drilling | Partner and peer |
G Mining Ventures (TSX: GMIN) | Tocantinzinho, Tapajós | — | Regional benchmark for development |
Cabral Gold (TSXV: CBR) | Cuiú Cuiú, Tapajós | Resource / PFS | Peer for investor capital |
Serabi Gold (AIM: SRB) | Palito / Coringa, Tapajós | Producing | Regional producer |
Key Competitors — GKN Hydrogen
| Competitor | Technology | Relevance |
|---|---|---|
GKN Hydrogen (private/corporate) | Metal-hydride stationary storage systems | Commercial-stage competitor in solid-state storage |
Academic and national-lab programs (HyMARC members) | Advanced hydride research | Benchmark set, not commercial rivals |
Peer Comparison FY2026
| Metric | AUZ | Sunrise Energy Metals | NioCorp | Rio Tinto |
|---|---|---|---|---|
Revenue | Nil | — | — | n/d for scandium (immaterial within group) |
Growth | n/m | n/m | n/m | n/m |
Margins | n/m | n/m | n/m | — |
Primary vs by-product scandium | Primary | Primary / co-product | Co-product | By-product |
Scoping-level capex for scandium | About US$125M (60 tpa) | — | — | Sunk |



