Australian Vanadium Limited is a Perth-based, pre-production critical minerals developer. It is building a vertically integrated "pit-to-battery" vanadium business in Western Australia. Its anchor asset is the 100%-owned Australian Vanadium Project at Gabanintha, near Meekatharra. After the 2024 merger with Technology Metals Australia, the project combines two adjoining deposits on a single orebody into one of the largest high-grade undeveloped vanadium resources globally: 395.4Mt at 0.77% V2O5. The development plan pairs an open-pit mine and concentrator at Gabanintha with a vanadium oxide processing plant at Tenindewa, near Geraldton. Midstream, AVL operates a vanadium electrolyte manufacturing facility in Perth. Downstream, its wholly owned subsidiary VSUN Energy markets and deploys vanadium flow battery (VFB) energy storage. AVL is not yet generating material revenue. Its value depends on completing the Optimised Feasibility Study, securing project finance and offtake, and winning utility-scale VFB projects such as the A$150M Kalgoorlie VBESS.
Company's own description
In its FY2026 interim financial report, AVL describes itself as a vertically integrated vanadium company. Its activities are advancing the Australian Vanadium Project, operating a Perth electrolyte manufacturing facility, and deploying utility-scale VFB energy storage through VSUN Energy. The stated aim is to build a resilient, sovereign Australian vanadium supply chain [Condensed Interim Financial Report, H1 FY2026, lodged 13 Mar 2026]. In its June 2026 quarterly, the CEO restated the objective as building a globally competitive Australian vanadium business that supports secure critical-mineral supply chains [June 2026 Quarterly Activities Report, 31 Jul 2026].
Business model
| Tier | Activity | Status (Oct 2026) | Revenue contribution |
|---|---|---|---|
| Upstream | Mining (Gabanintha), beneficiation to a vanadium-iron concentrate, roasting/leaching to high-purity vanadium pentoxide (V2O5) at Tenindewa, plus an iron-titanium co-product | Pre-development. Optimised Feasibility Study (OFS) due H2 CY2026 | Nil |
| Midstream | Manufacture of vanadium electrolyte (the energy-carrying liquid in VFBs) at its Perth facility. Development of the V-NOMAD™ electrolyte production platform. Electrolyte leasing framework | Facility commissioned; early-stage commercial | Minimal |
| Downstream | VSUN Energy: sale, integration and deployment of VFB BESS (behind-the-meter and utility scale), including the "Lumina" architecture, partnerships with Sumitomo Electric and V-Flow Tech | Early commercial; bidding Kalgoorlie VBESS | Minimal (FY2025 revenue ~A$0.62M group-wide) |
AVL organises itself around three value-chain tiers:
Revenue model and mix
Current: Group revenue is immaterial (~A$0.62M in FY2025) [StockAnalysis / FY2025 Annual Report]. It is assumed to come mainly from small VFB system sales and electrolyte supply; the split is not publicly disclosed. Operating cash flow is supported by non-revenue items: the A$49M Modern Manufacturing Initiative Collaboration (MMI-C) grant and the R&D Tax Incentive [December 2025 Quarterly Report].
Target model: 1. Product sales of high-purity V2O5 to steel, chemical, aerospace/defence and battery markets, plus an iron-titanium concentrate co-product, priced off benchmark vanadium indices.
-
Electrolyte product sales and a leasing model, in which electrolyte is leased to VFB owners and the vanadium stays on AVL's balance sheet.
-
Project and system revenue from VSUN Energy VFB deployments.
- Subscription or licensing revenue: none disclosed.
Customer types and end markets
-
Steel mills: ferrovanadium and nitrided vanadium for rebar and high-strength low-alloy steel. This is still the dominant global vanadium end use [Nasdaq/Investing News, "Vanadium Market Forecast 2026"].
-
VFB manufacturers and project developers, including Sumitomo Electric and V-Flow Tech.
-
Utilities and governments: the WA Government Kalgoorlie VBESS program.
-
Off-grid and behind-the-meter commercial, agricultural and mining customers (VSUN Energy).
-
Aerospace, defence and advanced manufacturing: high-purity vanadium oxides, added to the OFS scope in Feb 2026 [ASX: "OFS Enhancement to Address Evolving High Purity Demand", 19 Feb 2026].
Independent characterisation
AVL is best understood as a development-stage critical-minerals optionality vehicle with an early-stage battery services arm attached. Its strategic value rests on four things:
-
Scale and grade of the consolidated Gabanintha resource.
-
Approvals already in hand: the WA Ministerial Statement 1242 for the northern development envelope, and WA "major project status".
-
Government backing: the A$49M Commonwealth grant, an EXIM letter of interest, and the WA royalty reform.
-
An unusual for a junior position: owning electrolyte manufacturing in Australia.
Against this, AVL has negligible revenue, a cash balance below one year of combined opex and study spend once debt is considered, a US$10M secured loan maturing around October 2027, and a share price that has fallen heavily from 2023 levels. The vertical-integration narrative is strategically coherent. However, the downstream and midstream businesses are sub-scale relative to the multi-hundred-million-dollar upstream capex that remains unfunded.
Strategy
Stated strategy themes
The core theme is the "pit-to-battery" vertically integrated vanadium strategy: upstream mining and processing in WA, midstream electrolyte production in Perth, and downstream VFB deployment through VSUN Energy [ASX, 4 Mar 2026; June 2026 Quarterly]. Related themes from FY2026 disclosures:
-
Building a sovereign Australian vanadium supply chain.
-
Expanding into high-purity vanadium for aerospace, defence and advanced manufacturing.
-
Positioning to supply gigawatt-hour-scale VFB deployment through cost-reduced electrolyte (V-NOMAD™).
-
Using government and allied-nation critical-minerals programs: the Commonwealth MMI-C grant, WA royalty reform, US EXIM and the US DIBC.
Initiative register (last 24 months)
| Initiative | Date | Description | Status |
|---|---|---|---|
| Optimised Feasibility Study (OFS) | Ongoing since 2024 | Integrates the ex-TMT Gabanintha project with the AVL project; Phase 2 work reported complete in the Sep 2025 quarter; high-purity integration added Feb 2026; Metso pelletising and roasting testwork May 2026 | Completion targeted H2 CY2026 |
| High-purity vanadium strategy | Feb 2026 onward | OFS enhancement; proposals under the US DIBC met Phase 1 standards | Active |
| V-NOMAD™ electrolyte platform | FY2026 | Lower-cost electrolyte production for utility-scale VFBs | Development |
| Electrolyte leasing | FY2026 | Leasing framework advanced in the Jun-26 quarter | Framework |
| Kalgoorlie VBESS bid | Jan–Jul 2026 | 50MW/500MWh VFB; WA grant of up to A$150M; Sumitomo Electric pre-bid partner | Awaiting preferred-proponent decision (WA expects later in 2026) |
| Capital structure reset | Oct–Nov 2025 | 25:1 consolidation to improve institutional appeal | Completed |
| Bridge financing | Sep 2025 – Mar 2026 | US$10M RCF loan; A$7.5M placement | Completed |
| Mineral rights consolidation | Sep 2026 | Reacquired secondary mineral rights from Albright Metals | Completed |
| WA royalty framework | FY2026 | Revised royalty framework for vanadium in WA, which management says improves project economics | Enacted by government |
Medium-term targets
AVL has not issued numerical revenue or EBITDA guidance. The stated near-term objectives are:
-
Finalise the OFS (H2 CY2026).
-
Secure offtake and project funding.
-
Advance remaining approvals, including Commonwealth EPBC and the Tenindewa approvals.
-
Secure utility-scale VFB contracts.
[Diggers & Dealers 2026 summary, Quartr]
Products & Services
Upstream
| Product / asset | Description and specifications | Target customer | Status | Pricing |
|---|---|---|---|---|
| Australian Vanadium Project (Gabanintha + Tenindewa) | Open-pit mine and concentrator at Gabanintha, about 40km SE of Meekatharra; vanadium oxide processing plant at Tenindewa, between Geraldton and Mullewa; export via Geraldton port [pv magazine, 14 Jan 2025]. Global MRE 395.4Mt at 0.77% V2O5, of which 104.5Mt at 1.12% V2O5 is Measured and Indicated [Diggers & Dealers presentation, Aug 2026] | Steel, chemical, battery and aerospace buyers | OFS due H2 CY2026 | Benchmark-linked (V2O5 indices) |
| High-purity V2O5 (planned) | High-purity vanadium oxides for aerospace, defence and advanced manufacturing; integrated into OFS scope from Feb 2026 [ASX, 19 Feb 2026] | Defence and aerospace supply chains, including the US DIBC | Study stage; DIBC Phase 1 met | — |
| Fe-Ti concentrate co-product (planned) | Iron (and titanium) concentrate produced at Tenindewa [pv magazine, Jan 2025] | Steelmakers / pigment | Study stage | — |
| Reacquired secondary mineral rights | Rights including nickel, copper and gold across key tenements, returned from Albright Metals in Sep 2026 [ASX, 16 Sep 2026] | Optionality | Not part of the current development case | — |
| Legacy exploration assets | Coates (V, PGE, Ni), Nowthanna Hill (U, V); Blesberg Li-Ta listed historically [Morningstar] | — | Non-core | — |
Midstream
| Product | Description | Target customer | Launch | Pricing |
|---|---|---|---|---|
| Vanadium electrolyte | High-purity electrolyte for VFBs from the Perth facility; first batch produced after commissioning [Australian Manufacturing] | VFB OEMs and project owners | FY2024 (commissioning) | — |
| V-NOMAD™ electrolyte production platform | Platform aimed at lowering electrolyte cost to support gigawatt-hour-scale VFB deployment [Quartr summary of Mar 2026 quarterly; Kalkine, 31 Jul 2026] | Utility-scale VFB projects | Developed FY2026 | — |
| Electrolyte leasing | Commercial framework for leasing electrolyte to VFB owners, advanced in the June 2026 quarter [June 2026 Quarterly] | VFB project developers | Framework stage | Lease model (terms not disclosed) |
Downstream (VSUN Energy Pty Ltd, 100% owned)
| Offering | Description | Target customer | Status |
|---|---|---|---|
| VFB BESS supply and integration | Long-duration VFB systems; early units sourced from V-Flow Tech (Singapore) | Off-grid, commercial, agricultural, mining | Commercial, small scale |
| Lumina architecture / Project Lumina | Utility-scale VFB architecture referenced in quarterly reporting and at Diggers & Dealers 2026 | Utilities, governments | Development |
| Kalgoorlie VBESS bid | 50MW / 500MWh (10-hour) VFB; Sumitomo Electric is exclusive VFB technology partner for the bid [ess-news, 23 Feb 2026] | WA Government | Stage Two proposal submitted Jul 2026 |
Financial Narrative
Basis: Consolidated, AUD millions, fiscal years ending 30 June. FY2022–FY2025 income statement figures are from StockAnalysis.com, which compiles them from the annual reports. FY2025 totals were cross-checked against the FY2025 Annual Report via financialfilings.com. The FY2026 net loss is from the FY2026 results summary (Quartr, 25 Sep 2026).
Income statement
Notes:
-
FY2022 shows negative revenue in the aggregator data, which likely reflects a reclassification; treat as approximately nil.
-
FY2025 EPS is from the FNArena consensus table.
-
TTM to Dec 2025 net loss was -9.58 [StockAnalysis].
-
Gross, operating, EBITDA and net margins are not meaningful: revenue is under A$1M, and reported net margins run into thousands of percent negative.
-
A revenue CAGR is not meaningful.
Balance sheet
Notes:
-
Cash for FY2022–FY2025 is from TipRanks cash flow data. The columns are labelled "Dec" by the aggregator but correspond to June fiscal years.
-
FY2026 cash of A$17.9M includes A$2.6M of restricted MMI-C grant funds and A$0.5M of other restricted cash [June 2026 Quarterly Report].
-
The FY2025 total assets and equity figures reflect the capitalised Gabanintha/TMT acquisition value [FY2025 Annual Report via financialfilings.com].
-
The RCF loan was drawn in October 2025, so it appears only in FY2026. It carries a 24-month bullet maturity (about October 2027), interest of 8% plus 3-month Term SOFR, security over all assets, a minimum cash covenant and a 4% establishment fee [ASX, 30 Sep 2025].
-
Short- and long-term debt split, net debt and working capital for FY2026 are not publicly disclosed in the sources reviewed. Analyst estimate of FY2026 net cash/(debt): roughly A$17.9M cash less about A$15M loan equivalent leaves a small positive net cash position, before restricted cash.
FY2026 quarterly cash register (Appendix 5B)
Sources: Sep-25 from boerse-global.de, which summarises the Mar-26 quarterly. Dec-25 from the InvestSMART summary of the Dec-25 quarterly: operating inflow driven by a A$4.9M MMI-C receipt and a A$2.55M R&D Tax Incentive refund. Mar-26 and Jun-26 from the Quartr summaries of the quarterlies; Jun-26 quarter staff costs were A$1.2M and admin/corporate A$0.8M.
Commentary
Net losses rose steadily from FY2021 to a FY2024 peak of A$15.2M. That year absorbed merger costs and the full DFS/OFS workload. Losses have since narrowed to A$11.9M (FY2025) and A$9.5M (FY2026) as management cut corporate spend while study work continued [Quartr, FY2026 results].
The key inflection is the balance sheet. Cash fell from A$36.4M (FY2024) to A$11.5M (FY2025) and about A$4.6M by September 2025. That forced a sequence of measures: the RCF secured loan (US$10M), the 25:1 consolidation, and the A$7.5M placement in March 2026. Government grant inflows (MMI-C) and the R&D tax incentive now provide a meaningful share of funding.
At the June 2026 run-rate of about A$3.6M combined operating and investing outflow per quarter, unrestricted cash of about A$14.8M gives roughly four quarters of runway. The RCF loan maturity in about October 2027 is a hard constraint. A further equity or strategic funding event within the next 12 months is highly likely (analyst assessment).
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Segment Overview
| Segment | Contents | Products / services |
|---|---|---|
Upstream – Australian Vanadium Project | Gabanintha mine and concentrator; Tenindewa processing plant; resource definition; approvals; OFS | Future V2O5 (standard and high-purity), Fe-Ti concentrate |
Midstream – Electrolyte Plant | Perth vanadium electrolyte manufacturing facility; V-NOMAD™ platform | Vanadium electrolyte (sale or lease) |
Downstream – Energy Storage (VSUN Energy) | VFB BESS sales, integration, project development | VFB systems, Lumina architecture, utility-scale bids |
Corporate / unallocated | Head office, financing | — |
Revenue by Segment
| Metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Group revenue (AUD Mn) | — | 0.62 | — |
Upstream segment revenue (AUD Mn) | 0 | 0 | 0 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansIncome Statement and Per-Share Data
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue (AUD Mn) | -0.03 | 0.03 | — | 0.62 | — |
Gross profit (AUD Mn) | -0.01 | -0.02 | -0.63 | -0.05 | — |
SG&A (AUD Mn) | 3.28 | 6.32 | 9.71 | 11.67 | — |
Total operating expenses (AUD Mn) | 5.06 | 7.54 | 15.23 | 12.80 | — |
Operating income (AUD Mn) | -5.07 | -7.56 | -15.86 | -12.84 | — |
Interest & investment income (AUD Mn) | 0.00 | 0.27 | 0.78 | 1.16 | — |
Interest expense (AUD Mn) | -0.01 | -0.09 | -0.19 | -0.23 | — |
Net income (AUD Mn) | -5.04 | -7.24 | -15.20 | -11.91 | -9.50 |
EPS basic (AUD cents, post-consolidation basis) | — | — | — | -3.5 | — |
Dividends per share (AUD cents) | 0 | 0 | 0 | 0 | 0 |
Balance Sheet
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Total assets (AUD Mn) | — | — | — | 143.50 | — |
Cash & equivalents (AUD Mn) | 26.44 | 26.87 | 36.42 | 11.49 | 17.90 |
Total equity (AUD Mn) | — | — | — | 129.88 | — |
Borrowings – US$10M RCF loan (USD Mn principal) | 0 | 0 | 0 | 0 | 10 |
Cash Flow
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Operating cash flow (AUD Mn) | -4.42 | -6.58 | -8.66 | -13.54 | — |
Investing cash flow (AUD Mn) | -4.98 | -0.35 | 3.22 | -10.97 | — |
Financing cash flow (AUD Mn) | 32.35 | 7.36 | 14.99 | -0.41 | — |
Free cash flow – StockAnalysis (AUD Mn) | -12.44 | -17.60 | -26.71 | -30.51 | — |
Free cash flow – TipRanks (AUD Mn) | -12.43 | -17.34 | -14.96 | -30.51 | — |
Dividends paid (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Buybacks (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Cash Flow (Quarterly)
| Metric | Q1 FY2026 (Sep-25) | Q2 FY2026 (Dec-25) | Q3 FY2026 (Mar-26) | Q4 FY2026 (Jun-26) |
|---|---|---|---|---|
Closing cash (AUD Mn) | 4.6 | 18.1 | 21.5 | 17.9 |
Operating cash flow (AUD Mn) | — | 5.1 | -2.4 | -2.2 |
Investing cash flow (AUD Mn) | — | — | -1.3 | -1.4 |
Financing cash flow (AUD Mn) | — | — | 7.0 | — |
Financial Analysis
| Ratio | FY2025 | Comment |
|---|---|---|
ROE / ROA / ROIC | Negative (net loss -11.91 on equity 129.88 gives ROE ≈ -9%) | Not meaningful for a developer |
Current ratio | 1.39 (FY2025 per TipRanks); 1.29 TTM | Adequate but thin |
Debt/Equity | ~0 at FY2025; about 0.1x post-loan (estimate) | Low leverage |
Net debt/EBITDA, interest coverage | Not meaningful (EBITDA negative) | — |
Revenue by Region
| Region | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Australia revenue (AUD Mn) | — | 0.62 | — |
Rest of world revenue (AUD Mn) | 0 | 0 | 0 |
Share Price
| Metric | Jul2023 | Jul2024 | Jul2025 | Jul2026 |
|---|---|---|---|---|
ATVVF adjusted price (USD) | 0.60 | 0.21 | 0.37 | 0.11 |
Valuation Snapshot
| Metric | Value | Comment |
|---|---|---|
Market cap | ~A$37M (19 Jul 2026) to ~A$51M | Multiples.vc; InvestSMART |
Enterprise value | ~A$34M (19 Jul 2026) | Multiples.vc |
P/B | ~0.3x (≈A$40M market cap vs FY2025 equity A$129.9M) | — |
Analyst Conclusions
Management guidance: OFS completion in H2 CY2026; secure offtake and project funding; progress approvals; advance VFB projects, including Kalgoorlie, where WA expects to name a preferred proponent later in 2026. Management expects vanadium market conditions to strengthen as supply and demand rebalance [Quartr summaries, Jun–Sep 2026]. There is no quantitative consensus for revenue growth.
Bull case
-
Kalgoorlie win: A$150M of state funding for a 500MWh VFB would validate the pit-to-battery model. It would create a captive electrolyte demand of about 4kt of vanadium, materially larger than AVL's current market value.
-
Strategic re-rating: P/B of about 0.3x against A$129.9M of book equity, with the sell-side target at A$1.39 against a A$0.14–0.16 share price, means any OFS or funding success could re-rate sharply.
-
Allied critical-minerals pull: EXIM interest, DIBC Phase 1 and the WA royalty reform could lower the cost of capital for a high-purity, non-Chinese supplier.
Bear case
-
Funding cliff: About A$14.8M of unrestricted cash, about A$3.6M of quarterly outflows and a secured loan due around Oct 2027 point to near-certain dilution at depressed prices.
-
Technology substitution: Lithium-ion's cost advantage may limit VFB uptake to subsidised niches.
-
Execution and price risk: The OFS has been extended several times. The upstream project needs large capex in a market where Chinese supply sets prices.
Catalysts and monitorables (next 12 months)
-
OFS release (capex, NPV, IRR).
-
Kalgoorlie VBESS preferred-proponent decision.
-
Funding: strategic investor, debt or refinancing of the RCF loan.
-
US DIBC Phase 2.
-
Remaining approvals (EPBC, Tenindewa).
-
V2O5 price trend.
-
First electrolyte lease or offtake contracts.
-
AGM outcomes and any further capital raising.
Analyst verdict
Australian Vanadium Limited has assembled the core ingredients of a strategically valuable Western Australian vanadium platform. These are a consolidated, high-grade, multi-decade resource; state environmental approval for the core development envelope; WA major project status; a Commonwealth grant; and an unusual, if still small, midstream and downstream presence through its Perth electrolyte facility and VSUN Energy. The 2024 TMT merger and the September 2026 reacquisition of secondary mineral rights have removed the main structural complications around the orebody. The company now controls one simplified asset.
The investment case, however, is constrained by capital rather than geology. FY2026 brought a narrower loss of A$9.5M, but only through a sequence of defensive financing steps: a secured US$10M loan from its cornerstone holder, a 25:1 consolidation after the share count passed 8 billion, and a A$7.5M placement. With A$17.9M of cash (including restricted grant funds) and a secured bullet loan due around late 2027, AVL must turn study-stage optionality into a funded pathway within roughly twelve months.
The next two binary events dominate the outlook: the OFS (H2 CY2026) and the Kalgoorlie VBESS preferred-proponent decision (later in 2026). A Kalgoorlie award alongside Sumitomo Electric would provide external validation of the pit-to-battery thesis, demand for AVL's electrolyte, and a credible narrative for strategic funders. A loss would leave AVL reliant on a weak vanadium price, equity markets and slow-moving allied-government programs.
On balance, AVL is a high-risk, event-driven special situation. At an EV of roughly A$34M, the market is pricing a significant probability of further heavy dilution or project deferral. The upside skew is real if catalysts land, but investors should expect a capital raise regardless of outcome and should size positions accordingly. Monitoring priority: OFS economics, Kalgoorlie, and refinancing of the RCF facility.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Executive Leadership Team
| Name | Title | Tenure | Background |
|---|---|---|---|
Graham Tyler Arvidson | Chief Executive Officer (also executive director) | CEO since Oct 2022 | About 18 years in minerals covering feasibility, development and operations across vanadium, lithium and nickel [AVL Board & Management page] |
Louis Mostert | Chief Legal and Commercial Officer; Joint Company Secretary | — | Legal and commercial |
Sarah Wilson | Joint Company Secretary | — | Listed-company secretarial practice |
| — | Chief Operating Officer | — | Leads project delivery across mining, processing and electrolyte [AVL website] |
“—” = not publicly disclosed.
Board of Directors
| Name | Role | Appointed | Independence | Other roles / background |
|---|---|---|---|---|
Cliff (Mark Clifford) Lawrenson | Non-Executive Chair | 9 Oct 2020 | Independent | Non-Executive Chair, Paladin Energy (ASX: PDN); former MD of Atlas Iron, which he led through its acquisition by Hancock Prospecting [AVL website; InvestSMART] |
Graham Arvidson | CEO / Executive Director | 2022 | Not independent | See above |
Anna Sudlow | Non-Executive Director | FY2023 | Independent | CFO of Paladin Energy [Annual Report 2023; AVL website] |
| — | Non-Executive Director | — | Independent | Chair of GESB; NED of DevelopmentWA and Chalice Mining (ASX: CHN) [AVL website] |
Daniel Harris | Non-Executive Director | — | — | Listed on AVL Board & Management page |
Major Shareholders
| Holder | Stake (approx.) | Basis |
|---|---|---|
RCF Management LLC (RCF Private Equity Fund I L.P. / Resource Capital Fund Cardinal) | ~10.6–10.7% (before the Mar 2026 placement; RCF added A$1M in the placement) | Simply Wall St register data; ASX, 4 Mar 2026 |
Leendert Hoeksema | ~4.5% | Simply Wall St |
Mathew Walker | ~2.0% | Simply Wall St |
Adel Morsi | ~0.9% | Simply Wall St |
Keming He | ~0.8% | Simply Wall St |
Epic Capital Invest Pty Ltd | ~0.8% | Simply Wall St |
Philip Ward | ~0.75% | Simply Wall St |
Kenneth Hall | ~0.6% | Simply Wall St |
Atasa Holdings Pty Ltd | ~0.6% | Simply Wall St |
Dimensional Fund Advisors LP | ~0.5% | Simply Wall St |
Competitive Landscape
Key Competitors
| Competitor | Segment overlap | Geography | Position |
|---|---|---|---|
Pangang Group Vanadium Titanium & Resources | Upstream (V2O5, FeV) | China | Global leader; vanadium-titanium magnetite co-production |
HBIS Chengsteel | Upstream | China | Major Chinese slag-based producer |
Largo Inc. | Upstream (primary V) + VFB (Largo Clean Energy) | Brazil (Maracás Menchen) | Leading primary producer outside China; Q1 2025 revenue US$28.2M, net loss US$9.2M [Business Wire, 14 May 2025] |
Glencore (Rhovan) | Upstream | South Africa | Major co-product producer |
Bushveld Minerals | Upstream + electrolyte | South Africa | — |
EVRAZ | Upstream | Russia | Major slag-based producer; subject to sanctions |
Richmond Vanadium Technology (ASX: RVT) | Upstream developer | Queensland, Australia | FY2025 net loss A$1.87M; cash A$8.9M; net assets A$41.0M [RVT Annual Report 2025] |
Vanadium Resources (ASX: VR8) | Upstream developer | South Africa | Steelpoortdrift project |
Atlantic / Windimurra (WA) | Upstream (historic producer) | WA | Plant partly destroyed by fire in 2014 [RenewEconomy] |
Sumitomo Electric; Rongke Power; Invinity Energy Systems | Downstream VFB | Japan; China; UK | Sumitomo is AVL's partner; Rongke is the global scale leader; Invinity is an AVL competitor for VFB deployment |
Peer Comparison FY2025
| Metric | AVL | Largo | RVT | VR8 |
|---|---|---|---|---|
Stage | Developer | Producer | Developer | Developer |
Latest annual revenue | A$0.62M (FY2025) | Not compiled here (Q1 2025: US$28.2M) | Nil (FY2025) | Nil |
Latest net result | A$-9.5M (FY2026) | US$-9.2M (Q1 2025) | A$-1.87M (FY2025) | Not compiled |
Cash | A$17.9M (Jun 2026) | Not compiled | A$8.9M (Jun 2025) | Not compiled |
R&D intensity | n/m | n/m | n/m | n/m |
Recent Developments
--