Australian Vanadium Limited Overview

Australian Vanadium Limited is a Perth-based, pre-production critical minerals developer. It is building a vertically integrated "pit-to-battery" vanadium business in Western Australia. Its anchor asset is the 100%-owned Australian Vanadium Project at Gabanintha, near Meekatharra. After the 2024 merger with Technology Metals Australia, the project combines two adjoining deposits on a single orebody into one of the largest high-grade undeveloped vanadium resources globally: 395.4Mt at 0.77% V2O5. The development plan pairs an open-pit mine and concentrator at Gabanintha with a vanadium oxide processing plant at Tenindewa, near Geraldton. Midstream, AVL operates a vanadium electrolyte manufacturing facility in Perth. Downstream, its wholly owned subsidiary VSUN Energy markets and deploys vanadium flow battery (VFB) energy storage. AVL is not yet generating material revenue. Its value depends on completing the Optimised Feasibility Study, securing project finance and offtake, and winning utility-scale VFB projects such as the A$150M Kalgoorlie VBESS.


Company's own description

In its FY2026 interim financial report, AVL describes itself as a vertically integrated vanadium company. Its activities are advancing the Australian Vanadium Project, operating a Perth electrolyte manufacturing facility, and deploying utility-scale VFB energy storage through VSUN Energy. The stated aim is to build a resilient, sovereign Australian vanadium supply chain [Condensed Interim Financial Report, H1 FY2026, lodged 13 Mar 2026]. In its June 2026 quarterly, the CEO restated the objective as building a globally competitive Australian vanadium business that supports secure critical-mineral supply chains [June 2026 Quarterly Activities Report, 31 Jul 2026].

Business model

TierActivityStatus (Oct 2026)Revenue contribution
UpstreamMining (Gabanintha), beneficiation to a vanadium-iron concentrate, roasting/leaching to high-purity vanadium pentoxide (V2O5) at Tenindewa, plus an iron-titanium co-productPre-development. Optimised Feasibility Study (OFS) due H2 CY2026Nil
MidstreamManufacture of vanadium electrolyte (the energy-carrying liquid in VFBs) at its Perth facility. Development of the V-NOMAD™ electrolyte production platform. Electrolyte leasing frameworkFacility commissioned; early-stage commercialMinimal
DownstreamVSUN Energy: sale, integration and deployment of VFB BESS (behind-the-meter and utility scale), including the "Lumina" architecture, partnerships with Sumitomo Electric and V-Flow TechEarly commercial; bidding Kalgoorlie VBESSMinimal (FY2025 revenue ~A$0.62M group-wide)

AVL organises itself around three value-chain tiers:

Revenue model and mix

Current: Group revenue is immaterial (~A$0.62M in FY2025) [StockAnalysis / FY2025 Annual Report]. It is assumed to come mainly from small VFB system sales and electrolyte supply; the split is not publicly disclosed. Operating cash flow is supported by non-revenue items: the A$49M Modern Manufacturing Initiative Collaboration (MMI-C) grant and the R&D Tax Incentive [December 2025 Quarterly Report].

Target model: 1. Product sales of high-purity V2O5 to steel, chemical, aerospace/defence and battery markets, plus an iron-titanium concentrate co-product, priced off benchmark vanadium indices.

  1. Electrolyte product sales and a leasing model, in which electrolyte is leased to VFB owners and the vanadium stays on AVL's balance sheet.

  2. Project and system revenue from VSUN Energy VFB deployments.

  • Subscription or licensing revenue: none disclosed.

Customer types and end markets

  • Steel mills: ferrovanadium and nitrided vanadium for rebar and high-strength low-alloy steel. This is still the dominant global vanadium end use [Nasdaq/Investing News, "Vanadium Market Forecast 2026"].

  • VFB manufacturers and project developers, including Sumitomo Electric and V-Flow Tech.

  • Utilities and governments: the WA Government Kalgoorlie VBESS program.

  • Off-grid and behind-the-meter commercial, agricultural and mining customers (VSUN Energy).

  • Aerospace, defence and advanced manufacturing: high-purity vanadium oxides, added to the OFS scope in Feb 2026 [ASX: "OFS Enhancement to Address Evolving High Purity Demand", 19 Feb 2026].

Independent characterisation

AVL is best understood as a development-stage critical-minerals optionality vehicle with an early-stage battery services arm attached. Its strategic value rests on four things:

  • Scale and grade of the consolidated Gabanintha resource.

  • Approvals already in hand: the WA Ministerial Statement 1242 for the northern development envelope, and WA "major project status".

  • Government backing: the A$49M Commonwealth grant, an EXIM letter of interest, and the WA royalty reform.

  • An unusual for a junior position: owning electrolyte manufacturing in Australia.

Against this, AVL has negligible revenue, a cash balance below one year of combined opex and study spend once debt is considered, a US$10M secured loan maturing around October 2027, and a share price that has fallen heavily from 2023 levels. The vertical-integration narrative is strategically coherent. However, the downstream and midstream businesses are sub-scale relative to the multi-hundred-million-dollar upstream capex that remains unfunded.

Strategy

Stated strategy themes

The core theme is the "pit-to-battery" vertically integrated vanadium strategy: upstream mining and processing in WA, midstream electrolyte production in Perth, and downstream VFB deployment through VSUN Energy [ASX, 4 Mar 2026; June 2026 Quarterly]. Related themes from FY2026 disclosures:

  • Building a sovereign Australian vanadium supply chain.

  • Expanding into high-purity vanadium for aerospace, defence and advanced manufacturing.

  • Positioning to supply gigawatt-hour-scale VFB deployment through cost-reduced electrolyte (V-NOMAD™).

  • Using government and allied-nation critical-minerals programs: the Commonwealth MMI-C grant, WA royalty reform, US EXIM and the US DIBC.

Initiative register (last 24 months)

InitiativeDateDescriptionStatus
Optimised Feasibility Study (OFS)Ongoing since 2024Integrates the ex-TMT Gabanintha project with the AVL project; Phase 2 work reported complete in the Sep 2025 quarter; high-purity integration added Feb 2026; Metso pelletising and roasting testwork May 2026Completion targeted H2 CY2026
High-purity vanadium strategyFeb 2026 onwardOFS enhancement; proposals under the US DIBC met Phase 1 standardsActive
V-NOMAD™ electrolyte platformFY2026Lower-cost electrolyte production for utility-scale VFBsDevelopment
Electrolyte leasingFY2026Leasing framework advanced in the Jun-26 quarterFramework
Kalgoorlie VBESS bidJan–Jul 202650MW/500MWh VFB; WA grant of up to A$150M; Sumitomo Electric pre-bid partnerAwaiting preferred-proponent decision (WA expects later in 2026)
Capital structure resetOct–Nov 202525:1 consolidation to improve institutional appealCompleted
Bridge financingSep 2025 – Mar 2026US$10M RCF loan; A$7.5M placementCompleted
Mineral rights consolidationSep 2026Reacquired secondary mineral rights from Albright MetalsCompleted
WA royalty frameworkFY2026Revised royalty framework for vanadium in WA, which management says improves project economicsEnacted by government

Medium-term targets

AVL has not issued numerical revenue or EBITDA guidance. The stated near-term objectives are:

  • Finalise the OFS (H2 CY2026).

  • Secure offtake and project funding.

  • Advance remaining approvals, including Commonwealth EPBC and the Tenindewa approvals.

  • Secure utility-scale VFB contracts.

[Diggers & Dealers 2026 summary, Quartr]

Products & Services

Upstream

Product / assetDescription and specificationsTarget customerStatusPricing
Australian Vanadium Project (Gabanintha + Tenindewa)Open-pit mine and concentrator at Gabanintha, about 40km SE of Meekatharra; vanadium oxide processing plant at Tenindewa, between Geraldton and Mullewa; export via Geraldton port [pv magazine, 14 Jan 2025]. Global MRE 395.4Mt at 0.77% V2O5, of which 104.5Mt at 1.12% V2O5 is Measured and Indicated [Diggers & Dealers presentation, Aug 2026]Steel, chemical, battery and aerospace buyersOFS due H2 CY2026Benchmark-linked (V2O5 indices)
High-purity V2O5 (planned)High-purity vanadium oxides for aerospace, defence and advanced manufacturing; integrated into OFS scope from Feb 2026 [ASX, 19 Feb 2026]Defence and aerospace supply chains, including the US DIBCStudy stage; DIBC Phase 1 met—
Fe-Ti concentrate co-product (planned)Iron (and titanium) concentrate produced at Tenindewa [pv magazine, Jan 2025]Steelmakers / pigmentStudy stage—
Reacquired secondary mineral rightsRights including nickel, copper and gold across key tenements, returned from Albright Metals in Sep 2026 [ASX, 16 Sep 2026]OptionalityNot part of the current development case—
Legacy exploration assetsCoates (V, PGE, Ni), Nowthanna Hill (U, V); Blesberg Li-Ta listed historically [Morningstar]—Non-core—

Midstream

ProductDescriptionTarget customerLaunchPricing
Vanadium electrolyteHigh-purity electrolyte for VFBs from the Perth facility; first batch produced after commissioning [Australian Manufacturing]VFB OEMs and project ownersFY2024 (commissioning)—
V-NOMAD™ electrolyte production platformPlatform aimed at lowering electrolyte cost to support gigawatt-hour-scale VFB deployment [Quartr summary of Mar 2026 quarterly; Kalkine, 31 Jul 2026]Utility-scale VFB projectsDeveloped FY2026—
Electrolyte leasingCommercial framework for leasing electrolyte to VFB owners, advanced in the June 2026 quarter [June 2026 Quarterly]VFB project developersFramework stageLease model (terms not disclosed)

Downstream (VSUN Energy Pty Ltd, 100% owned)

OfferingDescriptionTarget customerStatus
VFB BESS supply and integrationLong-duration VFB systems; early units sourced from V-Flow Tech (Singapore)Off-grid, commercial, agricultural, miningCommercial, small scale
Lumina architecture / Project LuminaUtility-scale VFB architecture referenced in quarterly reporting and at Diggers & Dealers 2026Utilities, governmentsDevelopment
Kalgoorlie VBESS bid50MW / 500MWh (10-hour) VFB; Sumitomo Electric is exclusive VFB technology partner for the bid [ess-news, 23 Feb 2026]WA GovernmentStage Two proposal submitted Jul 2026

Financial Narrative

Basis: Consolidated, AUD millions, fiscal years ending 30 June. FY2022–FY2025 income statement figures are from StockAnalysis.com, which compiles them from the annual reports. FY2025 totals were cross-checked against the FY2025 Annual Report via financialfilings.com. The FY2026 net loss is from the FY2026 results summary (Quartr, 25 Sep 2026).

Income statement

Notes:

  • FY2022 shows negative revenue in the aggregator data, which likely reflects a reclassification; treat as approximately nil.

  • FY2025 EPS is from the FNArena consensus table.

  • TTM to Dec 2025 net loss was -9.58 [StockAnalysis].

  • Gross, operating, EBITDA and net margins are not meaningful: revenue is under A$1M, and reported net margins run into thousands of percent negative.

  • A revenue CAGR is not meaningful.

Balance sheet

Notes:

  • Cash for FY2022–FY2025 is from TipRanks cash flow data. The columns are labelled "Dec" by the aggregator but correspond to June fiscal years.

  • FY2026 cash of A$17.9M includes A$2.6M of restricted MMI-C grant funds and A$0.5M of other restricted cash [June 2026 Quarterly Report].

  • The FY2025 total assets and equity figures reflect the capitalised Gabanintha/TMT acquisition value [FY2025 Annual Report via financialfilings.com].

  • The RCF loan was drawn in October 2025, so it appears only in FY2026. It carries a 24-month bullet maturity (about October 2027), interest of 8% plus 3-month Term SOFR, security over all assets, a minimum cash covenant and a 4% establishment fee [ASX, 30 Sep 2025].

  • Short- and long-term debt split, net debt and working capital for FY2026 are not publicly disclosed in the sources reviewed. Analyst estimate of FY2026 net cash/(debt): roughly A$17.9M cash less about A$15M loan equivalent leaves a small positive net cash position, before restricted cash.

FY2026 quarterly cash register (Appendix 5B)

Sources: Sep-25 from boerse-global.de, which summarises the Mar-26 quarterly. Dec-25 from the InvestSMART summary of the Dec-25 quarterly: operating inflow driven by a A$4.9M MMI-C receipt and a A$2.55M R&D Tax Incentive refund. Mar-26 and Jun-26 from the Quartr summaries of the quarterlies; Jun-26 quarter staff costs were A$1.2M and admin/corporate A$0.8M.

Commentary

Net losses rose steadily from FY2021 to a FY2024 peak of A$15.2M. That year absorbed merger costs and the full DFS/OFS workload. Losses have since narrowed to A$11.9M (FY2025) and A$9.5M (FY2026) as management cut corporate spend while study work continued [Quartr, FY2026 results].

The key inflection is the balance sheet. Cash fell from A$36.4M (FY2024) to A$11.5M (FY2025) and about A$4.6M by September 2025. That forced a sequence of measures: the RCF secured loan (US$10M), the 25:1 consolidation, and the A$7.5M placement in March 2026. Government grant inflows (MMI-C) and the R&D tax incentive now provide a meaningful share of funding.

At the June 2026 run-rate of about A$3.6M combined operating and investing outflow per quarter, unrestricted cash of about A$14.8M gives roughly four quarters of runway. The RCF loan maturity in about October 2027 is a hard constraint. A further equity or strategic funding event within the next 12 months is highly likely (analyst assessment).

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Segment Overview

SegmentContentsProducts / services

Upstream – Australian Vanadium Project

Gabanintha mine and concentrator; Tenindewa processing plant; resource definition; approvals; OFS

Future V2O5 (standard and high-purity), Fe-Ti concentrate

Midstream – Electrolyte Plant

Perth vanadium electrolyte manufacturing facility; V-NOMAD™ platform

Vanadium electrolyte (sale or lease)

Downstream – Energy Storage (VSUN Energy)

VFB BESS sales, integration, project development

VFB systems, Lumina architecture, utility-scale bids

Corporate / unallocated

Head office, financing

—

Revenue by Segment

MetricFY2024FY2025FY2026

Group revenue (AUD Mn)

—0.62—

Upstream segment revenue (AUD Mn)

000

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Income Statement and Per-Share Data

MetricFY2022FY2023FY2024FY2025FY2026

Revenue (AUD Mn)

-0.030.03—0.62—

Gross profit (AUD Mn)

-0.01-0.02-0.63-0.05—

SG&A (AUD Mn)

3.286.329.7111.67—

Total operating expenses (AUD Mn)

5.067.5415.2312.80—

Operating income (AUD Mn)

-5.07-7.56-15.86-12.84—

Interest & investment income (AUD Mn)

0.000.270.781.16—

Interest expense (AUD Mn)

-0.01-0.09-0.19-0.23—

Net income (AUD Mn)

-5.04-7.24-15.20-11.91-9.50

EPS basic (AUD cents, post-consolidation basis)

———-3.5—

Dividends per share (AUD cents)

00000

Balance Sheet

MetricFY2022FY2023FY2024FY2025FY2026

Total assets (AUD Mn)

———143.50—

Cash & equivalents (AUD Mn)

26.4426.8736.4211.4917.90

Total equity (AUD Mn)

———129.88—

Borrowings – US$10M RCF loan (USD Mn principal)

000010

Cash Flow

MetricFY2022FY2023FY2024FY2025FY2026

Operating cash flow (AUD Mn)

-4.42-6.58-8.66-13.54—

Investing cash flow (AUD Mn)

-4.98-0.353.22-10.97—

Financing cash flow (AUD Mn)

32.357.3614.99-0.41—

Free cash flow – StockAnalysis (AUD Mn)

-12.44-17.60-26.71-30.51—

Free cash flow – TipRanks (AUD Mn)

-12.43-17.34-14.96-30.51—

Dividends paid (AUD Mn)

00000

Buybacks (AUD Mn)

00000

Cash Flow (Quarterly)

MetricQ1 FY2026 (Sep-25)Q2 FY2026 (Dec-25)Q3 FY2026 (Mar-26)Q4 FY2026 (Jun-26)

Closing cash (AUD Mn)

4.618.121.517.9

Operating cash flow (AUD Mn)

—5.1-2.4-2.2

Investing cash flow (AUD Mn)

——-1.3-1.4

Financing cash flow (AUD Mn)

——7.0—

Financial Analysis

RatioFY2025Comment

ROE / ROA / ROIC

Negative (net loss -11.91 on equity 129.88 gives ROE ≈ -9%)

Not meaningful for a developer

Current ratio

1.39 (FY2025 per TipRanks); 1.29 TTM

Adequate but thin

Debt/Equity

~0 at FY2025; about 0.1x post-loan (estimate)

Low leverage

Net debt/EBITDA, interest coverage

Not meaningful (EBITDA negative)

—

Revenue by Region

RegionFY2024FY2025FY2026

Australia revenue (AUD Mn)

—0.62—

Rest of world revenue (AUD Mn)

000

Share Price

MetricJul2023Jul2024Jul2025Jul2026

ATVVF adjusted price (USD)

0.600.210.370.11

Valuation Snapshot

MetricValueComment

Market cap

~A$37M (19 Jul 2026) to ~A$51M

Multiples.vc; InvestSMART

Enterprise value

~A$34M (19 Jul 2026)

Multiples.vc

P/B

~0.3x (≈A$40M market cap vs FY2025 equity A$129.9M)

—

Analyst Conclusions

Management guidance: OFS completion in H2 CY2026; secure offtake and project funding; progress approvals; advance VFB projects, including Kalgoorlie, where WA expects to name a preferred proponent later in 2026. Management expects vanadium market conditions to strengthen as supply and demand rebalance [Quartr summaries, Jun–Sep 2026]. There is no quantitative consensus for revenue growth.

Bull case

  1. Kalgoorlie win: A$150M of state funding for a 500MWh VFB would validate the pit-to-battery model. It would create a captive electrolyte demand of about 4kt of vanadium, materially larger than AVL's current market value.

  2. Strategic re-rating: P/B of about 0.3x against A$129.9M of book equity, with the sell-side target at A$1.39 against a A$0.14–0.16 share price, means any OFS or funding success could re-rate sharply.

  3. Allied critical-minerals pull: EXIM interest, DIBC Phase 1 and the WA royalty reform could lower the cost of capital for a high-purity, non-Chinese supplier.

Bear case

  1. Funding cliff: About A$14.8M of unrestricted cash, about A$3.6M of quarterly outflows and a secured loan due around Oct 2027 point to near-certain dilution at depressed prices.

  2. Technology substitution: Lithium-ion's cost advantage may limit VFB uptake to subsidised niches.

  3. Execution and price risk: The OFS has been extended several times. The upstream project needs large capex in a market where Chinese supply sets prices.

Catalysts and monitorables (next 12 months)

  • OFS release (capex, NPV, IRR).

  • Kalgoorlie VBESS preferred-proponent decision.

  • Funding: strategic investor, debt or refinancing of the RCF loan.

  • US DIBC Phase 2.

  • Remaining approvals (EPBC, Tenindewa).

  • V2O5 price trend.

  • First electrolyte lease or offtake contracts.

  • AGM outcomes and any further capital raising.

Analyst verdict

Australian Vanadium Limited has assembled the core ingredients of a strategically valuable Western Australian vanadium platform. These are a consolidated, high-grade, multi-decade resource; state environmental approval for the core development envelope; WA major project status; a Commonwealth grant; and an unusual, if still small, midstream and downstream presence through its Perth electrolyte facility and VSUN Energy. The 2024 TMT merger and the September 2026 reacquisition of secondary mineral rights have removed the main structural complications around the orebody. The company now controls one simplified asset.

The investment case, however, is constrained by capital rather than geology. FY2026 brought a narrower loss of A$9.5M, but only through a sequence of defensive financing steps: a secured US$10M loan from its cornerstone holder, a 25:1 consolidation after the share count passed 8 billion, and a A$7.5M placement. With A$17.9M of cash (including restricted grant funds) and a secured bullet loan due around late 2027, AVL must turn study-stage optionality into a funded pathway within roughly twelve months.

The next two binary events dominate the outlook: the OFS (H2 CY2026) and the Kalgoorlie VBESS preferred-proponent decision (later in 2026). A Kalgoorlie award alongside Sumitomo Electric would provide external validation of the pit-to-battery thesis, demand for AVL's electrolyte, and a credible narrative for strategic funders. A loss would leave AVL reliant on a weak vanadium price, equity markets and slow-moving allied-government programs.

On balance, AVL is a high-risk, event-driven special situation. At an EV of roughly A$34M, the market is pricing a significant probability of further heavy dilution or project deferral. The upside skew is real if catalysts land, but investors should expect a capital raise regardless of outcome and should size positions accordingly. Monitoring priority: OFS economics, Kalgoorlie, and refinancing of the RCF facility.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Executive Leadership Team

NameTitleTenureBackground

Graham Tyler Arvidson

Chief Executive Officer (also executive director)

CEO since Oct 2022

About 18 years in minerals covering feasibility, development and operations across vanadium, lithium and nickel [AVL Board & Management page]

Louis Mostert

Chief Legal and Commercial Officer; Joint Company Secretary

—

Legal and commercial

Sarah Wilson

Joint Company Secretary

—

Listed-company secretarial practice

—

Chief Operating Officer

—

Leads project delivery across mining, processing and electrolyte [AVL website]

“—” = not publicly disclosed.

Board of Directors

NameRoleAppointedIndependenceOther roles / background

Cliff (Mark Clifford) Lawrenson

Non-Executive Chair

9 Oct 2020

Independent

Non-Executive Chair, Paladin Energy (ASX: PDN); former MD of Atlas Iron, which he led through its acquisition by Hancock Prospecting [AVL website; InvestSMART]

Graham Arvidson

CEO / Executive Director

2022

Not independent

See above

Anna Sudlow

Non-Executive Director

FY2023

Independent

CFO of Paladin Energy [Annual Report 2023; AVL website]

—

Non-Executive Director

—

Independent

Chair of GESB; NED of DevelopmentWA and Chalice Mining (ASX: CHN) [AVL website]

Daniel Harris

Non-Executive Director

——

Listed on AVL Board & Management page

Major Shareholders

HolderStake (approx.)Basis

RCF Management LLC (RCF Private Equity Fund I L.P. / Resource Capital Fund Cardinal)

~10.6–10.7% (before the Mar 2026 placement; RCF added A$1M in the placement)

Simply Wall St register data; ASX, 4 Mar 2026

Leendert Hoeksema

~4.5%

Simply Wall St

Mathew Walker

~2.0%

Simply Wall St

Adel Morsi

~0.9%

Simply Wall St

Keming He

~0.8%

Simply Wall St

Epic Capital Invest Pty Ltd

~0.8%

Simply Wall St

Philip Ward

~0.75%

Simply Wall St

Kenneth Hall

~0.6%

Simply Wall St

Atasa Holdings Pty Ltd

~0.6%

Simply Wall St

Dimensional Fund Advisors LP

~0.5%

Simply Wall St

Competitive Landscape

Key Competitors

CompetitorSegment overlapGeographyPosition

Pangang Group Vanadium Titanium & Resources

Upstream (V2O5, FeV)

China

Global leader; vanadium-titanium magnetite co-production

HBIS Chengsteel

Upstream

China

Major Chinese slag-based producer

Largo Inc.

Upstream (primary V) + VFB (Largo Clean Energy)

Brazil (Maracás Menchen)

Leading primary producer outside China; Q1 2025 revenue US$28.2M, net loss US$9.2M [Business Wire, 14 May 2025]

Glencore (Rhovan)

Upstream

South Africa

Major co-product producer

Bushveld Minerals

Upstream + electrolyte

South Africa

—

EVRAZ

Upstream

Russia

Major slag-based producer; subject to sanctions

Richmond Vanadium Technology (ASX: RVT)

Upstream developer

Queensland, Australia

FY2025 net loss A$1.87M; cash A$8.9M; net assets A$41.0M [RVT Annual Report 2025]

Vanadium Resources (ASX: VR8)

Upstream developer

South Africa

Steelpoortdrift project

Atlantic / Windimurra (WA)

Upstream (historic producer)

WA

Plant partly destroyed by fire in 2014 [RenewEconomy]

Sumitomo Electric; Rongke Power; Invinity Energy Systems

Downstream VFB

Japan; China; UK

Sumitomo is AVL's partner; Rongke is the global scale leader; Invinity is an AVL competitor for VFB deployment

Peer Comparison FY2025

MetricAVLLargoRVTVR8

Stage

Developer

Producer

Developer

Developer

Latest annual revenue

A$0.62M (FY2025)

Not compiled here (Q1 2025: US$28.2M)

Nil (FY2025)

Nil

Latest net result

A$-9.5M (FY2026)

US$-9.2M (Q1 2025)

A$-1.87M (FY2025)

Not compiled

Cash

A$17.9M (Jun 2026)

Not compiled

A$8.9M (Jun 2025)

Not compiled

R&D intensity

n/m

n/m

n/m

n/m

Recent Developments

--

Company Snapshot

$0.4M

Revenue

1998

Founded

West Perth, Australia

Headquarters

SWOT Analysis

Strengths

  • A large, high-grade resource: 395.4Mt at 0.77% V2O5, including 104.5Mt at 1.12% V2O5 Measured and Indicated [Diggers & Dealers 2026].
  • Key state environmental approval: Ministerial Statement 1242 covers mine, concentrator, processing plant, borefield and camp for the northern envelope [EPA WA, Jan 2025].
  • WA Government major project status (Jan 2025).
  • A$49M Commonwealth MMI-C grant, with A$4.9M received Oct 2025 and A$2.6M of grant cash held at 30 Jun 2026.
  • Operating Perth electrolyte facility, a rare midstream capability among peers.
  • Supportive cornerstone investor: RCF holds about 10.6%, lent US$10M and joined the 2026 placement.
  • Tier-1 VFB partner: exclusive Sumitomo Electric pre-bid agreement.

Weaknesses

  • Negligible revenue (A$0.62M in FY2025) and persistent losses (A$9.5M in FY2026).
  • Cash of A$17.9M against about A$14–15M of secured debt maturing around Oct 2027.
  • Large funding gap for upstream construction (OFS capex not yet published).
  • Heavy historical dilution: more than 8 billion shares before the 25:1 consolidation.
  • Share price down sharply. The adjusted ATVVF price fell from about US$0.60 (Jul 2023) to about US$0.11 (Jul 2026) [Digrin].
  • Thin disclosure: no segment revenue split, small team.

Opportunities

  • Kalgoorlie VBESS: up to A$150M state grant; 500MWh needs about 4kt of vanadium.
  • High-purity vanadium for defence and aerospace via the US DIBC (Phase 1 met).
  • Electrolyte leasing could unlock VFB economics and create recurring revenue.
  • Reacquired Ni-Cu-Au rights add by-product and exploration optionality.
  • Revised WA vanadium royalty framework.
  • Forecast vanadium deficit and price recovery from late 2026.

Threats

  • Lithium-ion dominance in grid storage.
  • Chinese supply and price-setting power.
  • Bid risk: the company itself states there is no certainty of Kalgoorlie success.
  • Loan covenants and security over all assets.
  • Capex and permitting delays: Tenindewa and Commonwealth approvals.
  • Further dilution at depressed prices.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
30 Apr 2025March 2025 quarterly reportRoutine
9 May 2025—
30–31 Jul 2025June 2025 quarterly: integrated supply and battery strategyRoutine
21 Aug 2025—
30 Sep 2025US$10M secured loan with RCF; 24-month bullet; 8% + SOFR; options equal to 5% of capitalBridge funding with dilution and security
30 Sep 2025FY2025 Annual Report: net loss A$11.91M; total assets A$143.5MResults
8 Oct 2025A$4.9M received under the federal MMI-C grantNon-dilutive funding
Oct 2025US$10M loan funds receivedLiquidity restored
21 Oct 202525:1 share consolidation proposed (more than 8 billion shares on issue)Capital structure reset
31 Oct 2025Sep 2025 quarterly: Phase 2 feasibility work complete; Tenindewa regulatory approvals; electrolyte capacity expansion stepsProject progress
20 Nov 2025AGM approves consolidationGovernance
24 Nov 2025WA Government opens Kalgoorlie VBESS EOI (A$150M)Market catalyst
26 Nov 2025Consolidation completed: 346.8M sharesCapital structure
15 Dec 2025Shaw and Partners Buy rating, A$1.39 target priceSell-side support
2 Jan 2026Kalgoorlie VBESS Stage One EOI submission announcedDownstream catalyst
28 Jan 2026Dec 2025 quarterly: operating inflow A$5.1M (grant + R&D refund); cash A$18.1MLiquidity
12 Feb 2026Response to ASX price queryUnusual trading
19 Feb 2026Sumitomo Electric pre-bid agreement; OFS enhanced for high-purity demandPartnership; scope expansion
2 Mar 2026Trading halt for capital raising—
4 Mar 2026A$7.5M placement (RCF A$1M); estimated cash about A$23MEquity funding
13 Mar 2026H1 FY2026 Interim Financial ReportResults
Mar–Apr 2026WA revised royalty framework for vanadiumProject economics
30 Apr 2026Mar 2026 quarterly: cash A$21.5M; DIBC proposalLiquidity; US channel
May 2026Metso roasting testworkOFS technical
8 Jun 2026WA opens Stage Two of the Kalgoorlie VBESS EOI (closes 20 Jul 2026)Process
27 Jul 2026Stage Two Kalgoorlie VBESS proposal submittedKey bid
31 Jul 2026Jun 2026 quarterly: cash A$17.9M; DIBC Phase 1 met; electrolyte leasing frameworkLiquidity; US channel
5 Aug 2026Diggers & Dealers presentation: MRE 395.4Mt at 0.77% V2O5Resource scale
16–17 Sep 2026Gabanintha mineral rights reacquired from Albright MetalsTenure simplification
18 Sep 2026Section 708A cleansing notice–
23 Sep 2026AGM noticeGovernance
25 Sep 2026FY2026 Annual Report, Appendix 4G and Corporate Governance Statement: after-tax loss A$9.5MResults

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

2 charts
Revenue by Segment: Group revenue was AUD 0.6 Mn in FY2025.
Australian Vanadium Limited — Revenue by Segment
Series (AUD Mn)FY2025
Group revenue0.6

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Sources

Sources

  1. ASX announcements via InvestSMART, StockLight, MarketIndex and InvestorPA: 30 Sep 2025 (loan · Annual Report), 21 Oct 2025 (consolidation), 31 Oct 2025, 28 Jan 2026, 12 Feb 2026, 2 and 4 Mar 2026, 30 Apr 2026, 27 Jul 2026, 31 Jul 2026, 16–17 Sep 2026.
  2. AVL June 2026 Quarterly Activities Report (australianvanadium.com.au).
  3. AVL Interim Financial Reports: Mar 2023, Mar 2024, Mar 2025, Mar 2026 · Annual Report 2023.
  4. Quartr event summaries: Q3/Q4 FY2026, Diggers & Dealers 2026, FY2026 results.
  5. FilingReader (consolidation completion, 26 Nov 2025): Financialfilings.com (FY2025 key figures · FY2026 filing dates).
  6. StockAnalysis.com (income statement): TipRanks (cash flow, ratios) · Simply Wall St (ownership) · Multiples.vc (valuation) · FNArena (consensus, Shaw and Partners) · Digrin (ATVVF price history).
  7. EPA WA Ministerial Statement 1242; pv magazine Australia: Mining Technology · Australian Manufacturing · ESS News · ProcessOnline · Energy-Storage.news · WA Government Kalgoorlie VBESS pages · Allens · Creamer Media (EXIM LOI) · SmallCaps · Crux Investor (TMT merger) · Investing News/Nasdaq (vanadium market 2026) · Business Wire (Largo Q1 2025) · RVT Annual Report 2025.

Unlock Company Contacts

Connect with Key Decision-Makers

Access verified employee contacts and decision-maker information from this company to support your sales, lead generation, and business development efforts.