Avenira Limited Overview
Avenira Limited is a Perth-based phosphate developer controlled (60%) by Chinese phosphorus-chemicals group Sichuan Hebang. Its value rests almost entirely on the 100%-owned Wonarah deposit in the Northern Territory's Georgina Basin — one of Australia's largest undeveloped phosphate resources at 812 Mt @ 18% P₂O₅ (10% cut-off), including a 66 Mt high-grade core at 30% P₂O₅. After a decade of shifting strategies — Senegalese rock phosphate, then an ambitious Darwin lithium-iron-phosphate (LFP) battery cathode plan with Taiwan's Aleees — the company reset in February 2025 to a simple, low-capex direct shipping ore (DSO) operation: blast, dig, crush, truck to Tennant Creek, rail to Darwin Port. The Mine Management Plan was approved in June 2025 and all material approvals for the initial ~1.3 Mt DSO operation are in hand. The company now faces its decisive test: funding. A three-for-two renounceable rights issue of up to A$48.9 million, open until 30 October 2026, is intended to fund fleet, camp, roads and pre-strip ahead of a targeted first shipment in H1 CY2027. A gold exploration package at Jundee South provides secondary optionality.
Company's own description
In its 2025–2026 disclosures Avenira describes itself as a fertiliser-focused project developer seeking to establish a local, integrated supply chain delivering phosphate products into agricultural and industrial chemical markets, with phosphate also positioned as an input for battery cathode manufacturing. The company states it is developing the Wonarah Phosphate Project to supply premium-quality phosphate products — initially as direct shipping ore to regional offtakers — and holds the Jundee South gold project in Western Australia (Quarterly Reports, March 2025 to June 2026; Investor Presentation, August 2026). Its stated three-stage strategy is: (1) DSO; (2) beneficiated phosphate ore (targeting operations around 2030, subject to a bankable feasibility study and Board approval); and (3) yellow phosphorus (P4), positioned for battery and electronics supply chains (Investor Presentation, August 2026).
Independent characterisation
Avenira is, functionally, a single-asset pre-production bulk-commodity developer with a strategic parent. It currently generates no operating revenue — the A$0.06M of "revenue" reported for FY2026 and A$0.08M for FY2025 consists of interest and sundry income (FY2025 Annual Report; S&P Global data). The company's economic model, if executed, would be that of a merchant phosphate rock miner selling DSO into Asian markets (most plausibly including its parent, which consumes phosphate and yellow phosphorus in its own processes, per the August 2026 presentation). Value-chain position is upstream (mining and primary processing); any downstream conversion (beneficiation, thermal phosphoric acid, yellow phosphorus, LFP) is unfunded and unapproved.
Two features distinguish the business from a generic junior: first, Hebang's 60% control, which supplies capital, technical support and a probable demand channel, but also concentrates governance and creates related-party considerations; second, unusually favourable infrastructure for a remote Northern Territory deposit — the Barkly Highway, Darwin–Adelaide railway with spare capacity from Tennant Creek, the Amadeus–Darwin gas pipeline and fibre optic cable all serve the project area (Investor Presentation, August 2026).
Revenue model and mix
| Revenue stream | Status | FY2026 contribution |
|---|---|---|
| Product sales (DSO phosphate rock) | Pre-production; first shipment targeted H1 CY2027 | 0% |
| Beneficiated phosphate concentrate | Scoping study complete; PFS decision FY2027 | 0% |
| Yellow phosphorus / downstream chemicals | Concept only | 0% |
| LFP cathode material | Abandoned February 2025 | 0% |
| Gold | Exploration only (Jundee South) | 0% |
| Interest / other income | Recurring, immaterial | 100% of reported revenue (≈A$0.06M) |
Services, subscription and licensing revenue: none.
Customer types and end-markets (prospective)
Agriculture: phosphate fertiliser manufacturers (single/triple superphosphate, MAP/DAP producers) — the dominant global use of phosphate rock.
Industrial chemicals: thermal and wet-process phosphoric acid, phosphorus chemicals (Hebang's core business).
Energy storage / EV: high-purity phosphate feedstock for LFP cathode materials (indirect, via yellow phosphorus or purified phosphoric acid; long-dated optionality).
Geography of demand: regional Asian offtakers via Darwin Port. No binding offtake agreement has been announced; the December 2023 Strategic Cooperation and Offtake MOU with Hebang is non-binding (ASX announcement, 6 December 2023).
Strategy
Stated strategy themes (2025–2026 disclosures, paraphrased)
-
DSO first: prioritise the low-technical-risk, low-capex DSO operation to generate early cash flow (Board decision, February 2025).
-
Disciplined, phased capital allocation: sequence beneficiation and yellow phosphorus behind DSO cash flow and further studies.
-
Execution, not study: with approvals in hand, direct funds to fleet, camp, roads and pre-strip.
-
Strategic partnership with Hebang: capital, technology, process know-how, personnel and potential demand; joint future pursuit of solar and wind with base-load storage.
-
Optionality: Jundee South gold exploration in a >20 Moz province.
Strategic initiatives — last 24 months
| Initiative | Date | Detail | Status |
|---|---|---|---|
| LFP strategy abandoned | Feb 2025 | Aleees agreements terminated; refocus on DSO | Complete |
| Phased Wonarah development pathway | Feb 2025 | DSO → beneficiation → yellow phosphorus | Ongoing |
| Mine Management Plan approval | Jun 2025 | Authorises ~1.3 Mt DSO | Approved |
| MMP Variation | 2,026 | Expand to ~2.6 Mt DSO and potentially incorporate beneficiation elements; gap analysis complete; NT regulator meeting August 2026 | In progress |
| AMC mine optimisation studies | 2,025 | Life-of-mine plan integrated into financial model | Complete |
| Beneficiation Scoping Study | 2,026 | Final study received; PFS decision FY2027 | Complete |
| Operational team build | Mar–Jun 2026 | 11 senior appointments | Substantially complete |
| Logistics chain | 2,026 | Road haul shortlisted to two tenderers; rail terms under negotiation; Darwin Port access feasibility done | Agreements targeted Q3 CY2026 (not yet executed) |
| Enabling infrastructure | 2,026 | Barkly Highway intersection tenders evaluated; haul road (heritage cleared Aug 2026); camp refurbishment and 72-room expansion | Awards targeted Q3 CY2026 |
| Fleet procurement | 2,026 | OEM tender complete; negotiating long-leads; evaluating in-country or cancelled-order units | Orders targeted Q3–Q4 CY2026 |
| Funding envelope | 2,026 | A$48.9M rights issue; equipment finance with OEMs; parallel debt finance possibly in Q4 2026 | Rights issue open to 30 Oct 2026 |
| Jundee South drilling | Jun 2026 | A$2.6M budget; 16,200 m | Mobilisation targeted end Sep 2026 quarter |
| Renewable energy | 2,026 | Solar and wind (LiDAR shows overnight wind >7 m/s) with Hebang | Concept |
Management targets / guidance (non-financial)
| Milestone | Target |
|---|---|
| Barkly Highway intersection contract award | Q3 CY2026 |
| Road haulage, rail agreements; Darwin Port access approval | Q3 CY2026 |
| Mining fleet long-lead orders | Q3–Q4 CY2026 |
| Haul road construction start; camp expansion start | Q4 CY2026 |
| Pre-strip commencement at Arruwurra | Q4 CY2026 |
| Barkly intersection and Argyle siding upgrades complete | Q1 CY2027 |
| First DSO shipment | H1 CY2027 |
| Beneficiation PFS decision | FY2027 |
| Beneficiation operations | ~2030 |
Guidance revisions: first shipment slipped from Q4 2025 (April 2025 guidance), to "DSO operations in CY2026" (March and June 2026 quarterlies), to H1 CY2027 (August 2026). No financial guidance (revenue, costs, EBITDA) is provided.
Products & Services
Avenira has no commercial products today. The catalogue below lists every product stream the company has defined, with its development status.
Wonarah segment
(a) Direct Shipping Ore (DSO) phosphate rock — Stage 1
Description: high-grade phosphate rock mined by simple open cut from the Arruwurra deposit, crushed on site and transported without beneficiation.
Flowsheet: blast, dig, load, crush; road haul to the Argyle Rail Siding (Tennant Creek); rail to Darwin Port; export (Investor Presentation, Aug 2026).
Specifications: drawn from the high-grade resource — 66 Mt @ 30% P₂O₅ at a 27% cut-off (Measured 3.4 Mt @ 30.9%; Indicated 9.6 Mt @ 30.0%; Inferred 53 Mt @ 30%).
Capacity: initial 600,000 tpa, with option studies at 2 Mtpa and 3 Mtpa. Current Mine Management Plan authorises approximately 1.3 Mt of DSO; a variation is being prepared to lift the total to ~2.6 Mt.
Target customer: regional (Asian) phosphate consumers; Hebang has a stated procurement interest.
Launch year: first shipment targeted H1 CY2027 (revised from CY2026).
Pricing model: not publicly disclosed; expected to reference seaborne phosphate rock benchmarks.
(b) Beneficiated phosphate ore — Stage 2
Description: upgraded concentrate from lower-grade portions of the 533 Mt @ 21% P₂O₅ (15% cut-off) resource.
Status: final Beneficiation Scoping Study received; Pre-Feasibility Study decision in FY2027; operations targeted ~2030 with potentially increased tonnage to 2046. Requires successful BFS, Board approval and funding.
Target customers: agriculture, industrial and renewable industries.
(c) Yellow phosphorus (P4) — Stage 3
Description: elemental phosphorus produced thermally; a building block for high-purity phosphoric acid and phosphorus chemicals, including battery-grade materials. Company notes P4's logistical advantage (higher value per tonne) versus DSO in weak markets.
Status: feasibility study proposed only after the beneficiation plant is fully operational.
(d) Thermal phosphoric acid (TPA) and LFP cathode active material — discontinued
Description: the 2022–2024 plan envisaged an open-cut mine at Wonarah, yellow phosphorus produced on site, railed to Darwin and converted to TPA, feeding an adjacent LFP cathode plant at the Middle Arm Sustainable Development Precinct with technology licensed from Aleees (Territory Q; ASX 23 Nov 2023). Bechtel was engaged on scoping studies.
Status: Aleees agreements terminated 12 February 2025 citing evolving market conditions. LFP remains a stated long-term end-market but no active project exists.
Jundee South segment
Gold exploration (no product). Board-approved A$2.6M programme: 16,200 m of RC and aircore drilling on defined targets plus soil sampling; drilling contractor engaged with mobilisation expected before end of the September 2026 quarter (Investor Presentation, Aug 2026). No JORC gold resource exists.
Financial Narrative
Source: Avenira Annual Reports FY2022–FY2026 via S&P Global Market Intelligence (StockAnalysis, last updated 29 September 2026); FY2025 figures cross-checked to the FY2025 Annual Report (revenue A$80.83k; net loss A$4.99M; total assets A$20.40M; equity A$14.93M; operating cash flow –A$2.73M — all consistent). Ratios marked "calc." are computed by the analyst from these figures using period-end balances.
Income statement
Not publicly disclosed / not meaningful: EBITDA (D&A not separately verified; operating loss is a close proxy given negligible depreciating assets outside capitalised exploration); pre-tax income (no income tax expense recognised — pre-tax loss approximates net loss); basic/diluted EPS (consistently rounds to –A$0.00; aggregators report ≈ –0.12 cents for FY2025 and ≈ –0.1 cents TTM — the company's audited EPS in cents should be taken from the Annual Report); all margins (revenue is immaterial, producing meaningless margins of several thousand per cent negative); revenue CAGR (not meaningful).
Commentary. The P&L is a cost line. Annual net losses have ranged between A$2.9M and A$5.0M, driven by corporate overheads, study costs expensed, finance costs on shareholder and third-party loans, and share-based payments. The FY2025 peak loss (A$4.99M) coincided with the LFP termination, the strategic reset, interest on the 12% Hebang facility and the build-up of operational readiness. The FY2026 loss narrowed to A$3.34M despite increased activity, suggesting more expenditure was capitalised to the Wonarah asset as it moved from study to development. The FY2027 loss is likely to step up materially as site teams, camp operations and pre-strip costs ramp (some of which will be capitalised as mine development).
Balance sheet
FY2022 total debt includes a A$0.02M lease. Goodwill: nil throughout. Accumulated losses reached A$167.22M at 30 June 2026 against contributed equity of A$167.62M, reflecting two decades of exploration, the Senegal venture and write-downs.
Commentary. Total assets have more than doubled since FY2022, almost entirely through capitalised investment in Wonarah (PP&E/mine assets rising from A$8.9M to A$24.1M). Liquidity has been chronically thin: cash at every year-end since FY2024 has been below A$1M, and working capital has been negative for four consecutive years, with the company bridging through loans from Hebang and, in 2026, MLHK Vehicle 1. Post balance date, the July 2026 Hebang placement (A$8.79M received 6 July 2026) repaid MLHK in full and left cash of A$3.26M and nil debt at 20 August 2026 (Investor Presentation). Pro forma for the placement, equity would be approximately A$28M (analyst calc., before costs).
Cash flow
Commentary. Cash burn has nearly tripled over five years (free cash outflow from A$3.3M to A$9.2M), with FY2026 capex up 62% as the company moved from studies to operational readiness. This burn has been financed entirely by equity placements (contributed equity rose A$25.2M from FY2022 to FY2026) and shareholder/related loans. The proposed A$48.9M rights issue would represent more than five times FY2026 free cash outflow and roughly 2.5x the company's entire FY2026 book equity — a step-change in scale.
Ratios (analyst calculations, period-end basis)
Not meaningful / not disclosed: ROIC (negative operating returns on a pre-production asset base), net debt/EBITDA and interest coverage (EBITDA negative), asset turnover (no sales), cash conversion cycle (no inventory or trade receivables of substance).
Interpretation. The current ratio — at or below 0.23x for three straight year-ends — is the single most telling metric: Avenira has operated on a hand-to-mouth basis, with going-concern support from its major shareholder. Leverage has been modest in absolute terms but expensive (12% p.a. on the 2025 Hebang facility).
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Segment Overview
| Segment | Contents | Stage | Products/services |
|---|---|---|---|
Wonarah (Northern Territory) | Wonarah Phosphate Project: ML33343 (Arruwurra), ML33344 (Dalmore), ML application ML33967, ELs 29840, 32359, 33062, 33192, 33193, 33610, AA33669, AA34008 | Permitted, pre-construction | Prospective DSO phosphate rock; future beneficiated ore and yellow phosphorus |
Jundee South (Western Australia) | 47 tenements (38 Exploration Licences, 9 Prospecting Licences), >1,250 km² | Early-stage exploration | Gold exploration |
Unallocated / corporate | Head office, treasury, financing | — | Interest income |
Revenue by Segment
| Metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Consolidated reported revenue incl. interest (AUD Mn) | 0 | 0.08 | 0.06 |
Wonarah segment external revenue (AUD Mn) | 0 | 0 | 0 |
Jundee South segment external revenue (AUD Mn) | 0 | 0 | 0 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansIncome Statement
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue incl. interest/other (AUD Mn) | 0 | 0.01 | 0 | 0.08 | 0.06 |
Gross profit (AUD Mn) | 0 | 0.01 | 0 | 0.08 | 0.06 |
Operating income (AUD Mn) | -2.50 | -2.99 | -3.21 | -4.79 | -3.16 |
Net income (AUD Mn) | -2.88 | -3.20 | -3.12 | -4.99 | -3.34 |
Dividends per share (AUD) | 0 | 0 | 0 | 0 | 0 |
Balance Sheet and Share Count (M)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Total assets (AUD Mn) | 12.41 | 17.36 | 21.89 | 20.40 | 26.81 |
Cash and equivalents (AUD Mn) | 1.01 | 3.27 | 0.43 | 0.52 | 0.76 |
Short-term debt (AUD Mn) | 0 | 3.46 | 0 | 2.07 | 4.09 |
Long-term debt (AUD Mn) | 3.20 | 0 | 0 | 0 | 0 |
Total debt (AUD Mn) | 3.22 | 3.46 | 0 | 2.07 | 4.09 |
Net debt (AUD Mn) | 2.21 | 0.20 | -0.43 | 1.55 | 3.33 |
Shareholders equity (AUD Mn) | 6.34 | 10.86 | 15.81 | 14.93 | 19.44 |
Intangible assets (AUD Mn) | 0 | 0 | 4.40 | 0 | 0 |
Property plant equipment incl. mine assets (AUD Mn) | 8.94 | 12.00 | 15.36 | 18.18 | 24.05 |
Working capital (AUD Mn) | 0.39 | -0.84 | -3.47 | -2.89 | -4.12 |
Shares outstanding at period end (M) | 1,001 | 1,700 | 2,349 | 3,178 | 4,259 |
Cash Flow
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Operating cash flow (AUD Mn) | -1.60 | -1.78 | -1.20 | -2.73 | -3.24 |
Capital expenditure incl. exploration and development (AUD Mn) | -1.71 | -2.95 | -3.56 | -3.68 | -5.96 |
Free cash flow (AUD Mn) | -3.31 | -4.72 | -4.76 | -6.42 | -9.20 |
Dividends paid (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Share buybacks (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
ROE (%) | -45.4 | -29.5 | -19.7 | -33.4 | -17.2 |
ROA (%) | -23.2 | -18.4 | -14.3 | -24.5 | -12.5 |
Current ratio (x) | 1.51 | 0.81 | 0.14 | 0.20 | 0.23 |
Debt to equity (x) | 0.51 | 0.32 | 0 | 0.14 | 0.21 |
Revenue by Region
| Region | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Australia revenue incl. interest (AUD Mn) | 0 | 0.08 | 0.06 |
Rest of world revenue (AUD Mn) | 0 | 0 | 0 |
Valuation Snapshot
| Metric | Value | Source |
|---|---|---|
Last close (8 Oct 2026) | A$0.006 | StockAnalysis |
52-week range | A$0.006 – A$0.009 | StockAnalysis / Investing.com |
1-year performance | Approx. –25% to –30% (stock ~0.008 a year earlier; Stockopedia reported –27.8% over 365 days earlier in 2026) | Analyst estimate from aggregator data; not precise |
5-year performance | Negative (aggregator shows ~–0.65% average annual growth over 5 years, methodology unclear) | — |
Beta | 2.57 | StockAnalysis |
Weekly volatility | ~18–19% | Simply Wall St |
Recent placement/offer prices | 0.6c (Jul 2024), 0.7c (Mar 2025), 0.75c (Feb 2026), 0.6c (rights issue, Aug 2026) | Company announcements |
Share Count (M)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Shares outstanding at period end (M) | 1,001 | 1,700 | 2,349 | 3,178 | 4,259 |
Valuation Multiples
| Multiple | Avenira | Comment |
|---|---|---|
Market cap | ≈ A$32.6M | 5,430.1M × A$0.006 |
EV | ≈ A$29.3M | Less A$3.26M cash (20 Aug 2026), nil debt |
P/B | ≈ 1.7x reported (A$19.44M equity at 30 Jun 2026); ≈ 1.2x pro forma for July placement | — |
EV per resource tonne | ≈ A$0.036/t on 812 Mt; ≈ A$0.44/t on 66 Mt high-grade | Indicative only; resource ≠ reserve |
Capital Markets
| Item | Status |
|---|---|
Dividend history | None; no dividend policy |
Buyback authorisations | None current (a selective nil-consideration buy-back occurred in 2019 as part of the Baobab sale) |
Credit ratings (Moody's / S&P / Fitch) | Not rated |
Debt maturity profile | Nil debt at 20 Aug 2026; equipment finance and project debt being pursued (possible Q4 2026) |
Analyst consensus | No sell-side coverage (0 analysts) |
Analyst Conclusions
Management guidance
Pre-strip at Arruwurra in Q4 CY2026 and first DSO shipment in H1 CY2027, conditional on approvals, contract execution, Board approval and sufficient funding (Investor Presentation, Aug 2026). Beneficiation PFS decision in FY2027. No financial guidance.
Consensus
None — no analyst coverage.
Bull case
-
Permitted, infrastructure-served, high-grade starter pit: 66 Mt @ 30% P₂O₅ with approvals, heritage clearance and an existing road–rail–port corridor means capital, not technical risk, is the binding constraint; an EV of ~A$29M is small relative to the resource if DSO is proven.
-
Strategic parent as backstop and buyer: Hebang's repeated support (four placements since 2023, rising price discipline at 0.6c–0.75c) and its stated need for phosphate and yellow phosphorus imply both funding resilience and a natural offtake channel.
-
Optionality layered on DSO: expanded MMP (2.6 Mt), 2–3 Mtpa scale options, beneficiation from ~2030, yellow phosphorus, plus Jundee South gold drilling — each a re-rating catalyst if the company transitions to producer.
Bear case
-
Funding gap: three offer extensions, a share price sitting at the offer price, and Hebang's 60% cap (which makes its contribution contingent on minority take-up) suggest a materially under-subscribed raise; a partial raise forces re-scoping and further delay.
-
Thin-margin product: sub-scale 600 ktpa DSO hauled ~1,000 km by road and rail competes against low-cost Moroccan and Middle Eastern rock; without disclosed offtake pricing, margins are unproven and potentially negative in weak markets.
-
Governance and dilution: a controlling shareholder with combined Chair/CEO, related-party financing history and serial dilution (1.0B shares in FY2022 to potentially 13.6B) leaves minorities exposed to transfer-pricing and creeping-control risk.
Catalysts and monitorables (next 12 months)
| Timing | Catalyst |
|---|---|
| 30 Oct / 6 Nov 2026 | Rights issue close and results — quantum raised and Hebang's resulting stake |
| Q4 CY2026 | September 2026 quarterly report (due late October 2026) |
| Q4 CY2026 | Execution of road, rail and Darwin Port agreements |
| Q4 CY2026 | Fleet orders, haul road construction, camp expansion award |
| Q4 CY2026 | Pre-strip commencement; possible equipment finance / debt facility |
| Late 2026 | AGM; any board independence changes |
| Q4 CY2026 – Q1 CY2027 | Jundee South drill results; Manda forfeiture outcome |
| Q1 CY2027 | Barkly intersection and Argyle siding completion |
| H1 CY2027 | First DSO shipment; first offtake/pricing disclosure |
| FY2027 | MMP Variation lodgement; beneficiation PFS decision |
Analyst verdict
Avenira is a binary, funding-gated development story wrapped around a genuinely substantial phosphate deposit. Wonarah's credentials are real: a JORC resource of 812 Mt at 18% P₂O₅, a 66 Mt high-grade core at 30%, approvals in place for an initial 1.3 Mt DSO operation, heritage clearance for the haul road, and a transport corridor that already exists. After years of strategic wandering — Senegal, then a Darwin LFP vision that collapsed with the Aleees termination in February 2025 — management has finally narrowed the plan to something a micro-cap can plausibly execute: dig, crush, truck, rail and ship.
The problem is capital and alignment. The company ended FY2026 with A$0.76M of cash, negative working capital and a five-year history of rising cash burn funded by its parent and expensive bridge loans. The A$48.9M rights issue is the hinge on which every 2026–2027 milestone turns, and the market signal so far is poor: repeated extensions and a share price sitting on the 0.6c offer price. Critically, Hebang's commitment is capped at 60%, which means its money follows minority money rather than replacing it. Unless the shortfall is placed or alternative finance (OEM equipment funding, project debt) arrives, the DSO programme will be re-scoped and the H1 CY2027 shipment target — already slipped twice — is at risk.
Even if funded, DSO economics are undisclosed and exposed to freight and rock prices; offtake is effectively a non-binding MOU with the controlling shareholder. Governance — a combined Executive Chairman/CEO and a 60% foreign parent — tilts outcomes toward Hebang's interests.
Verdict: Speculative / high risk. The equity is best viewed as an option on successful funding and first shipment, with Hebang the likely ultimate owner of the upside. Monitor the 6 November 2026 rights issue result as the decisive datapoint; a full or near-full raise would materially de-risk the 2027 production case.
All figures in AUD unless stated.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Appointed / tenure | Background (as disclosed) |
|---|---|---|---|
John He | Executive Chairman and CEO | October 2025 (~1 year) | Strategic, operational and financial experience across corporate finance, investment and resources development |
Brett Clark | Deputy Chairman; investor relations contact | Long-serving; Chairman by 2019 and Chairman/CEO through 2023–2024 | ~30 years in mining and energy across funding, operations, project development and advisory |
Jason He | Executive Director | — | Director of a commercial property investment fund; led industrial property transactions in Australia |
Eddy Cheng | Non-Executive Director | — | Senior management professional |
Stephanie Yuan | Non-Executive Director | — | Company secretary and board roles within the Hebang Group's Australian and international subsidiaries |
Roger Harris | Non-Executive Director | — | Founder of a service business in WA and SE Asia; runs a family office investing in mining |
Graeme Smith | Company (Board) Secretary | — | — |
Ran Mo | Finance Manager | Stepped down from Board Oct 2025, remained as executive | — |
Sean Buxton | Resident Manager (Wonarah) | 2026 | — |
Andrew McEwan | Mining Manager | 2026 | — |
“—” = not publicly disclosed.
Board & Management Changes
| Date | Change | Context |
|---|---|---|
1 Jul 2019 | Farouk Chaouni and David Mimran resign; Timothy Cotton to resign on completion | Baobab divestment to major shareholders |
30 Jul 2024 | Mr Mo Yang announced as incoming Executive Chairman and CEO (Hebang nominee); Brett Clark moves from Chairman/CEO | Hebang strategic investment |
Oct 2025 | John He appointed Executive Chairman and CEO; the prior executive chair continued as a non-executive director; Ran Mo and Shixing Zhang leave the Board | Board refresh ahead of execution phase |
Mar–Jun 2026 | 11 senior operational appointments (HSE, maintenance, contracts, logistics, mining engineering, survey, exploration) | Transition to construction readiness |
Major Shareholders
| Holder | Shares | % (pre-rights issue) | Source |
|---|---|---|---|
Hebang Biotechnology (Hong Kong) Investment Ltd (Sichuan Hebang) | 3,258,053,817 | 60.00 | Investor Presentation, Aug 2026 |
Free float (approx.) | ~2,172M | ~40.0 | Analyst calc. |
Competitive Landscape
Key Competitors
| Company | Listing | Segment | Relevance | Scale |
|---|---|---|---|---|
OCP Group | Private (Moroccan state) | Phosphate rock and fertilisers | World's largest phosphate rock exporter; price setter | — |
The Mosaic Company | NYSE: MOS | Phosphate and potash | Major integrated producer | Approx. US$11B revenue (FY2024, approx.) |
Ma'aden (Saudi Arabian Mining Co.) | Tadawul | Phosphate and fertilisers | Major Middle East exporter to Asia | — |
PhosAgro | MOEX | Phosphate rock and fertilisers | Large exporter of high-grade rock | — |
Nutrien | NYSE/TSX: NTR | Phosphate, potash, nitrogen | Integrated producer | — |
Yunnan Yuntianhua | SHSE | Phosphate chemicals | Chinese integrated phosphate | — |
Hubei Xingfa Chemicals | SHSE | Yellow phosphorus, phosphorus chemicals | Leader in P4 — relevant to Stage 3 | — |
Centrex Limited | ASX: CXM | Australian phosphate rock (Ardmore, Qld) | Closest Australian listed peer; producer that has faced operational and funding stress | — |
Phosphate Hill (Queensland) | — | Integrated Australian phosphate fertiliser | Domestic incumbent | — |
Arianne Phosphate | TSXV: DAN | Canadian phosphate developer | Peer developer targeting LFP/fertiliser | Pre-revenue |
First Phosphate | CSE: PHOS | Canadian phosphate developer targeting LFP | Peer on LFP narrative | Pre-revenue |
Northern Star Resources (Jundee), other Yandal explorers | ASX: NST | Gold | Land-holders around Jundee South | Large-cap producer |
Peer Comparison FY2026
| Metric | Avenira | Centrex | Mosaic | OCP |
|---|---|---|---|---|
Stage | Pre-production | Small producer | Major producer | Global leader |
Revenue | ~A$0.06M (FY2026, interest) | — | ~US$11B (2024, approx.) | — |