Babylon Pump & Power Limited Overview

Babylon Pump & Power is a Perth-based micro-cap that has spent 2025–2026 turning itself from a mixed mining-services group into a pure-play specialist water management rental business serving Australia's resources sector.

What it offers: high-pressure and dewatering pump hire, aquifer test pumping, hydrotesting and technical groundwater services, plus a smaller portable power generation fleet that includes solar-battery hybrid units.

Customers: Tier 1 miners such as Newmont, Talison Lithium, BHP and Rio Tinto, mainly in Western Australia.

Scale: The August 2025 acquisitions of Blue Hire and Matrix Hydro Services lifted FY2026 rental revenue about 160% to $26.1M. Underlying rental EBITDA was about $9.1M, a margin of about 35%.

Portfolio exits: It has left water blasting (Ausblast, January 2026) and diesel engine overhaul (Primepower Queensland, July 2026).

Balance sheet: It was badly stretched, with negative equity at 30 June 2026, a going-concern material uncertainty and NAB facilities maturing on 1 July 2027. This prompted a $7.27M recapitalisation in August 2026.

The investment question: whether a ~$26M-revenue, high-margin rental platform can deleverage before the 2027 refinancing.


Company's own description (FY2026 Annual Report)

The FY2026 Annual Report describes Babylon as a provider of specialty mining services to the Australian resources sector. It says Babylon specialises in high-pressure pumping, dewatering and project water management, with decades of experience supplying and maintaining equipment in remote and offshore locations. It also offers specialty power generation solutions covering system design, installation, commissioning, operations and maintenance.

During FY2026 the group also provided maintenance and asset management for high-horsepower mobile equipment, including engines, power trains and components. The company announced its exit from that maintenance segment effective 31 July 2026.

The Board says the group will operate as a single Rental operating segment from FY2027.

Independent characterisation

Babylon is now a niche, asset-heavy equipment rental and technical services business focused on the water cycle in mining. That cycle runs as follows:

  1. Early-stage aquifer and bore-field test pumping and groundwater data services. These are delivered mainly through Matrix Hydro Services and the former Resource Water Group assets.

  2. Project dewatering and water transfer. This means high-head diesel and electric pumps, often on long-duration hire.

  3. Dry hire of pumping and hydrotesting equipment. These are delivered mainly through Blue Hire and the RBH Engineering fleet.

  4. Ancillary equipment. This includes portable diesel and hybrid power generation, sprayerless evaporators and the distribution of HIGRA Industrial pumps.

Management's stated thesis is "land and expand". Test pumping places Babylon on a mine site at the earliest stage of a project. That position then converts into downstream rental and longer-term water management revenue.

Business and revenue model

Revenue streamNatureFY2026 indicationRecognition
Equipment rental (wet and dry hire)Recurring time-based hire, often under multi-year master agreements such as Newmont (2026–2028) and TalisonMost of $26.06M Rental segment revenueOver the rental period
External equipment works and technical services by Rental personnelProject or service fees, e.g. test pumping programmes and installation$3.37MPoint in time, when the obligation is complete
Product distribution (HIGRA pumps)Product sales—Point in time
Engine overhaul and maintenance (discontinued July 2026)Project and service fees plus parts$5.93M (Maintenance segment)Point in time / over time for site services

The approximate FY2027 pro forma mix is about 85–90% rental and service, with about 10–15% technical and project works. This is an analyst estimate based on FY2026 disclosures. There is no subscription or licensing revenue.

Value chain position

Babylon sits between original equipment manufacturers and the mine owner or operator.

Upstream: pump makers such as HIGRA, for which Babylon holds an Australian distributorship. Diesel engines come mainly from Caterpillar and Cummins. Caterpillar Financial provided a supply-chain finance facility.

Downstream: it rents equipment and supplies technical crews directly to miners, and sometimes to contractors.

It competes on response time, fleet availability in remote WA locations, and hydrogeological technical capability. It does not compete on manufacturing.

Customers and end-markets

Customer types: Tier 1 and mid-tier mining companies, mining contractors, and oil and gas operators (historically).

Named customers in company releases: Newmont (Boddington, WA), Talison Lithium (Greenbushes, WA), BHP (Nickel West, Mining Area C), Rio Tinto (Pilbara repair services), Fortescue (Ausblast industrial services, now divested), Carey Mining (the original 2018 client). Primepower's historic Queensland base included Peabody, BHP Mitsubishi Alliance and Anglo American.

Commodities: gold (the standout growth area in FY2025–FY2026), lithium, iron ore, nickel, and historically Queensland coal through Primepower.

Geographies: WA (dominant), Northern Territory (expanding through test pumping) and Queensland (now largely exited).

Strategy

Stated strategy (FY2026 Annual Report, Chairman's letter and Outlook)

Paraphrasing the company's themes, management's FY2027 priorities are to:

  1. Maintain strong fleet utilisation.

  2. Deepen relationships with existing Tier 1 customers.

  3. Secure additional long-term recurring rental revenue.

  4. Deploy capital selectively into fleet where demand and returns justify it.

The Board describes the business as having a simpler corporate structure, a lower overhead base, a stronger financial position and a significantly larger rental platform. The long-standing "likely developments" statement remains unchanged: grow the rental segment by acquiring additional equipment while keeping utilisation consistent.

Strategic initiatives in the last 24 months

InitiativeDateDescriptionStatus / targets
NAB trade facility refinancingJan 2025$3M of revolving trade facilities converted into a 4-year term loan at BBSY + 1.45%Superseded by the 2025–2026 facility changes
"Entire water cycle" strategyFY2025Use test pumping as an entry point to capture downstream dewatering and rental workCore strategy
HIGRA distributorshipEarly FY2025Australian distribution of HIGRA pumpsOngoing
Emissions-reducing specialty rentalFY2024–FY2025Hybrid solar-battery power units and sprayerless evaporatorsOngoing; fleet size not disclosed
Matrix Hydro Services acquisitionAnnounced 14 May 2025; completed 1 Aug 2025Aquifer testing and groundwater technical servicesIntegrated
Blue Hire acquisitionAnnounced 2 Jun 2025; completed 1 Aug 2025WA pumping and hydrotesting dry hireIntegrated; founder now on the Board
Portfolio simplification: Ausblast exitJan 2026Sold for $2.8M (~5.6x EBITDA)Complete
Transformational water pumping and storage acquisitionApr–May 2026Target unnamed; associated ~$60M institutional raiseTerminated 19 May 2026
Recapitalisation and NAB resetMay–Sep 2026$7.27M equity; NAB covenant reset; maturity extended to 1 Jul 2027; $1.2M permanent debt reductionComplete
Maintenance exitJul 2026Primepower Queensland sold to Westralian DieselComplete
Overhead reduction programmeAug 2026"Proactive cost reductions" to right-size overheads after the Maintenance saleQuantified savings not disclosed
Fleet growth capexFY2027Recapitalisation intended partly to fund growth capex; cross-hire in FY2026 indicated demand above fleet capacityCapex budget not disclosed

Medium-term guidance and targets

ItemDisclosure
FY2026 guidance (delivered)Revenue $30–32M (actual $31.99M); underlying EBITDA $4.2–4.6M (actual $4.13M per the directors' review, or $4.9M per the Chairman). Earlier Q3 guidance was revenue of $27–28M.
Implied FY2027 run-rateThe rental business was described as generating about $9M EBITDA on about $26M revenue (July 2026). No formal FY2027 group guidance has been issued.
NAB minimum EBITDA covenant (rolling 12 months)$3.0M at December 2026; $4.0M at March 2027
Goodwill VIU budget assumptionFY2027 budgeted EBITDA margin of 37.7%; capex at 30% of EBITDA
Medium-term financial targets—

Products & Services

The company does not publish a priced product catalogue. The table below lists every offering identifiable from filings and releases. Pricing is not publicly disclosed for any line; all rental is quoted per contract.

Rental segment (continuing)

OfferingDescription / capabilityTarget customerOrigin / yearFlagship evidence
High-pressure and dewatering pump hire (wet hire)Diesel-driven and electric pumps for pit dewatering, bore-field dewatering and water transfer in remote locations; includes installation and commissioningOpen-pit and underground miners (gold, lithium, iron ore, nickel)Core business since 2017–2018BHP Nickel West Mt Keith dewatering (longest-held contract; site moved to care and maintenance in FY2025)
Dry hire pumping equipment and associated maintenanceEquipment supplied without operators, with Babylon maintaining the fleetMine owners with in-house operations teamsExpanded through RBH Engineering (2023) and Blue Hire (2025)Newmont 3-year contract (1 Jan 2026 – 31 Dec 2028, ~A$3M a year); Talison Lithium extension (~A$3M a year, Q3 FY2026)
Hydrotesting and pumping solutions (Blue Hire)Hydrostatic pressure testing and specialised pumping hire in WAMining, construction and pipeline contractorsBlue Hire, acquired 1 Aug 2025Founder Byron Ynema joins the Board on 1 Sep 2026
Aquifer test pumping and groundwater technical services (Matrix Hydro Services)Aquifer testing, bore development, groundwater data collection; enters a project at the exploration and feasibility stageMine developers, hydrogeology consultantsMatrix, acquired 1 Aug 2025Positions Babylon "earlier in the project lifecycle" (FY2025 Chairman's letter)
Bore-field test pumping and project water management (ex-RWG)Test pumping equipment, data logging and water management disciplinesGold and lithium developers in WA and NTRWG assets acquired Aug 2022 for $3.0MUnderpins the gold-sector test-pumping growth in H2 FY2025
Portable diesel power generationMobile generators (e.g. 1.5MW mobilised to an iron ore site in Q3 FY2025), with design, installation, commissioning and O&MRemote mine sites, shutdown supportSince 2018BHP Mining Area C power generation contract extensions
Stand-alone portable hybrid power unitsSolar plus battery with backup generator; first unit ran on solar and battery about 21 hours a day, with the generator about 3 hours a nightMiners with emissions-reduction targetsFirst commissioned Nov 2023; additional units FY2024–FY2025Commissioned at a major WA gold mine (unnamed)
Sprayerless evaporatorsWater evaporation units for disposal of excess mine waterMiners with water-balance surplusIntroduced FY2025Cited as an emissions-reducing specialty rental line
HIGRA Industrial pumps (distribution)Australian distributorship of the Brazilian pump manufacturerMiners, agriculture, industrial usersSigned early FY2025"Continued to provide new orders" (FY2025 Annual Report)

Maintenance segment (fully exited by 31 July 2026)

OfferingDescriptionDisposal
Diesel engine overhaul and rebuild (Primepower Queensland)Cummins (and other) high-horsepower engine rebuilds in Mackay, Queensland, for coal and metals minersSold to Westralian Diesel (Maximor Nominees Pty Ltd), completed 31 Jul 2026, for $150k initial consideration
WA diesel maintenance and field serviceRebuild of large diesel-driven equipment (>2,000HP), power trains and components; Caterpillar expertise; offsite repair contracts with Rio TintoCeased with the Maintenance exit, as overheads were right-sized in August 2026
High-pressure water blasting and industrial services (Ausblast)Pilbara-based high-pressure (incl. 1,000HP) water blasting for iron ore and lithium clientsSold to Sandgroper Group Holdings for $2.8M, completed 21 Jan 2026, at ~5.6x EBITDA
Engine and parts tradingEngine trading stock and parts and component salesStock written down by $4.91M in FY2026

Financial Detail

Income Statement and Per-Share Data

MetricFY2022FY2023FY2024FY2025FY2026

Revenue (AUD Mn)

27.5232.5041.7431.7631.99

Contribution after materials and inventory change (AUD Mn, derived)

——18.6317.0917.87

EBITDA reported (AUD Mn)

——6.125.81-5.18

EBITDA underlying (AUD Mn)

——6.125.814.13

Depreciation and amortisation (AUD Mn)

——3.973.725.07

Operating income / EBIT incl. one-offs (AUD Mn, derived)

——2.152.09-17.65

Net finance expense (AUD Mn)

——1.641.312.45

Pre-tax income (AUD Mn)

-5.21-1.490.510.79-20.10

Income tax (AUD Mn)

00000

Net income (AUD Mn)

-5.21-1.490.510.79-20.10

Basic EPS restated (A$ cents)

-13.50-1.800.600.95-15.99

Diluted EPS restated (A$ cents)

———0.87-15.99

Dividends per share (A$ cents)

00000

Key Financials (AUD)

ItemFY2026

Underlying EBITDA (directors' review)

4.13

Less: Maintenance segment EBITDA loss

-0.82

Less: deferred consideration expensed as employee benefits

-9.31

Other reconciling items (derived balancing figure)

0.82

Reported EBITDA

-5.18

Less: D&A

-5.07

Less: net finance costs

-2.45

Less: loss on disposal of Ausblast

-2.46

Less: Maintenance impairment (inventory $4.91M; PP&E $0.04M)

-4.95

Statutory net loss

-20.10

Margin

MarginFY2022FY2023FY2024FY2025FY2026

Contribution margin (%)

——44.653.855.8

EBITDA margin reported (%)

——14.718.3-16.2

EBITDA margin underlying (%)

——14.718.312.9

EBIT margin (%)

——5.26.6-55.2

Net margin (%)

-18.9-4.61.22.5-62.8

Balance Sheet

MetricFY2023FY2024FY2025FY2026

Total assets (AUD Mn)

—33.4137.0638.64

Cash and equivalents (AUD Mn)

1.560.373.070.94

Trade receivables (AUD Mn)

—4.636.833.78

Inventories (AUD Mn)

—6.086.721.72

Property, plant and equipment (AUD Mn)

14.0713.7813.1218.39

Goodwill (AUD Mn)

—3.773.7711.23

Short-term borrowings (AUD Mn)

—8.088.066.59

Long-term borrowings (AUD Mn)

—2.264.2614.97

Total borrowings (AUD Mn)

—10.3412.3221.56

Lease liabilities (AUD Mn)

—4.463.342.63

Net debt excl. leases (AUD Mn, derived)

—9.979.2520.62

Net debt incl. leases (AUD Mn, derived)

—14.4312.5923.25

Trade and other payables (AUD Mn)

—6.785.4514.34

Total equity (AUD Mn)

10.3311.0915.23-0.99

Working capital, current assets less current liabilities (AUD Mn)

—-5.002.07-15.86

Cash Flow

MetricFY2022FY2023FY2024FY2025FY2026

Operating cash flow (AUD Mn)

0.272.287.552.146.49

Capex on plant and equipment (AUD Mn)

1.292.343.062.051.68

Free cash flow, OCF less capex (AUD Mn, derived)

-1.02-0.064.490.094.81

Business acquisitions (AUD Mn)

——2.500.0619.09

Proceeds from business and asset sales (AUD Mn)

——0.420.102.80

Equity raised, gross (AUD Mn)

——03.500

Dividends paid (AUD Mn)

00000

Share buybacks (AUD Mn)

00000

Returns & Leverage Ratios (%) and Financial Ratios (x)

RatioFY2024FY2025FY2026

ROE on average equity (%)

4.76.0—

ROA on average assets (%)

1.52.2-53.1

ROIC, EBIT / (equity + debt + leases − cash) (%)

8.47.5-79.3

Current ratio (x)

0.701.140.30

Debt to equity, borrowings only (x)

0.930.81—

Net debt to reported EBITDA (x)

1.631.59—

Net debt to underlying EBITDA (x)

1.631.594.99

EBITDA interest coverage (x)

3.74.41.7

Asset turnover (x)

1.250.900.85

Days sales outstanding (days)

407943

Days inventory on materials cost (days)

9616744

Days payables, ex-earn-out accrual (days)

107136156

Cash conversion cycle (days, indicative)

29110-69

Revenue by Region

Region (as reported)FY2024FY2025FY2026

Australia total revenue (AUD Mn)

41.7431.7631.99

Segment Overview

SegmentPrimary geographyEvidence

Rental

WA (dominant), with an expanding NT presence

Customer base: Newmont, Talison, BHP WA, Rio Tinto Pilbara; Blue Hire and Matrix are WA-based; FY2025 report notes footprint expansion in WA and NT

Maintenance – Primepower

Queensland (Mackay; Bowen Basin coal)

Queensland engine-overhaul downturn cited as the driver of the FY2026 Maintenance collapse

Maintenance – WA diesel / Ausblast

WA (Pilbara)

Fortescue industrial services curtailment (FY2025)

Share Price and Margin Analysis (%)

MetricFY2022FY2023FY2024FY2025FY2026

Share price at start of year (AUD)

0.510.150.180.150.18

Share price at end of year (AUD)

0.150.180.150.180.077

Annual share price change (%)

-70.620.0-16.720.0-57.2

Valuation Multiples

MultipleBabylonBasis

Market cap (AUD Mn)

~13.6

~272.4M shares × $0.05

Pro forma net debt incl. leases (AUD Mn)

~21–22

30 Jun 2026 net debt of $23.25M, less $1.2M NAB paydown, plus net cash from the raise; deferred consideration excluded

Enterprise value (AUD Mn)

~35

—

EV / underlying EBITDA FY2026 (x)

~8.5

On $4.13M

EV / Rental underlying EBITDA less FY2026 corporate costs (x)

~7.0

($9.10M − ~$4.16M unallocated) ≈ $4.94M

EV / Sales FY2026 (x)

~1.1

On $31.99M

P/B pro forma (x)

~2.2

Pro forma equity of about $6.3M

Capital Markets

ItemDisclosure

Analyst consensus

No sell-side coverage identified; consensus is not publicly available

Dividend history and policy

No dividends paid or declared in any year since relisting (2018–2026); no formal policy disclosed

Credit ratings (Moody's, S&P, Fitch)

Not rated

Shares on issue

126,959,537 at 30 Jun 2026; ~272.4M after 28 Aug 2026 (derived). Performance rights outstanding: 6,975,865 (30 Jun 2026).

Capital raises (last 24 months)

$3.5M (May–Jun 2025, $0.004 pre-consolidation, equal to $0.12 post-consolidation); $7.27M (Aug 2026, $0.05)

Index membership

None (micro-cap)

Debt Facilities

FacilityBalance 30 Jun 2026 (AUD Mn)TermsMaturity

NAB term loans (incl. Corporate Markets Loan)

18.00 (current 4.23; non-current 13.77)

Variable (8.67% at execution); secured by a GSA

All NAB facilities to expire 1 Jul 2027 (varied)

Invoice finance facility

1.36

Rolling; NAB daily rate + 1.50%

Cancelled under the NAB variation

Asset finance facilities

1.97 (current 0.77; non-current 1.20)

Fixed 4.54–9.32%

1–5 year amortisation

Supply chain finance (Caterpillar Financial)

0.10

5.29% fixed

Short term

Insurance premium funding

0.14

12 months

FY2027

Lease liabilities

2.63

Premises and equipment

Current 0.78; non-current 1.85

Convertible loans (post year end)

0.4–1.0

11% p.a.; unsecured; convertible at $0.05

Repayable 3 Jul 2027 if not converted. Conversion is believed to be part of the $4.77M debt-to-equity component (unconfirmed).

Analyst Conclusions

Management guidance

FY2027 guidance: none issued. Management priorities are utilisation, Tier 1 customer depth, recurring contracts and selective fleet capex.

Rental baseline: the most recent run-rate is about $26M revenue and about $9M EBITDA (June–July 2026).

Bank covenants: these impose an effective EBITDA floor of $3.0M (Dec 2026) and $4.0M (Mar 2027), measured on a rolling 12-month basis.

Consensus: there is no sell-side consensus.

Bull case

  1. Pure-play rental earnings power. If corporate costs normalise towards about $2.5M, from about $4.2M unallocated in FY2026, rental EBITDA of about $9–10M implies group EBITDA of $6.5–7.5M. At the recapitalisation price, that is an EV/EBITDA of about 5x.

  2. Demand above capacity. FY2026 cross-hire and record quarterly rental revenue suggest new fleet capex could earn high returns. The acquired assets generated about 45% EBITDA margins.

  3. Contracted base and founder alignment. Newmont (to 2028) and Talison anchor about $6M a year of revenue. Byron Ynema converting up to $3.77M into equity at $0.05 and joining the Board aligns the key operator with shareholders.

Bear case

  1. Refinancing wall. NAB facilities (about $18M of term debt), the convertible loans and the deferred Blue Hire cash consideration all crystallise around 1 July 2027. A covenant miss or weak utilisation could force further dilutive equity.

  2. Credibility gap. Repeated misses against internal targets (FY2025 EBITDA target $8.0M vs $5.8M; FY2026 target $13.5M vs $4.1M underlying), an abandoned transformational deal, and inconsistent cash-flow and EBITDA figures across documents undermine forecast reliability.

  3. Cyclical, concentrated exposure. Revenue is concentrated in WA gold and lithium with a handful of Tier 1 clients. Nickel and lithium have already caused contract losses, and a gold downturn would remove the current growth driver. The safety record (TRIFR 15.72) also risks Tier 1 pre-qualification.

Key catalysts and monitorables (next 12 months)

TimingCatalyst / monitorable
Sep–Oct 2026Confirmation of ASX reinstatement and the first trading price discovery after suspension
Late Oct 2026Q1 FY2027 Appendix 4C: first quarter as a pure-play; overhead savings; cash balance
31 Oct 2026Convertible loans' early-repayment trigger if not converted
Nov 20262026 AGM: any FY2027 guidance; remuneration vote after missed hurdles; board renewal and independence
Dec 2026First NAB minimum EBITDA covenant test ($3.0M, rolling 12 months)
Feb 2027H1 FY2027 results: rental margin, utilisation, net debt trajectory
Mar 2027Second covenant test ($4.0M)
H1 CY2027Refinancing or extension of NAB facilities ahead of the 1 Jul 2027 expiry; Blue Hire deferred cash settlement mechanics
OngoingNew multi-year contract wins; fleet capex announcements; safety (TRIFR) recovery; any renewed M&A

Analyst verdict

Babylon Pump & Power exits 2026 as a fundamentally different and better business than the one that entered it, with a balance sheet that remains its defining weakness.

What has changed. The diesel engine overhaul and water-blasting operations have been sold. Those businesses supplied about 70% of revenue as recently as FY2025 and collapsed in FY2026. What remains is a roughly $26M-revenue specialist water management rental platform. It generated about $9.1M of underlying EBITDA at a margin near 35% in its first year of combination with Blue Hire and Matrix.

What it is worth if it works. On disclosed numbers, the core asset is attractive. Tier 1 clients are on multi-year terms, demand forced the company into cross-hire, and the acquired businesses run at mid-40s margins. At the $0.05 recapitalisation price, the group trades at an estimated EV of about 8.5x FY2026 underlying EBITDA. That multiple compresses quickly if overhead cuts and fleet investment deliver.

Why it is still high-risk. The FY2026 accounts show:

  • negative equity

  • net current liabilities of $15.9M

  • a going-concern material uncertainty

  • net debt of about 5x underlying EBITDA before the raise

The $7.27M recapitalisation buys time rather than certainty. Every material obligation converges around July 2027: the NAB facilities, the convertible loans and the deferred vendor cash. Management's forecasting record is weak, with internal EBITDA targets missed by wide margins in both FY2025 and FY2026. Governance is thin, with one clearly independent director among five, and safety performance deteriorated sharply.

Overall assessment. Babylon is a speculative, binary micro-cap turnaround. The upside case depends on three things over the next three quarters:

  1. holding rental utilisation

  2. demonstrably cutting corporate cost

  3. passing the December 2026 and March 2027 covenant tests

If all three happen, a pure-play rental re-rating and an orderly 2027 refinancing are plausible. If any one fails, further dilution at depressed prices is the more likely path. Investors should treat the H1 FY2027 result and the refinancing outcome as the decisive evidence points.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Board of Directors

NameRoleAppointedBackgroundIndependence

James (Jamie) Cullen

Non-Executive Chairman

18 May 2022

Chartered Accountant. Past CEO of PCH Group (1995–2007), Resource Equipment (2008–2014) and Pacific Energy (2015–2025), all micro-caps later taken over. Executive Chairman of Frontier Energy; NED of Australia Silica Quartz Group; incoming NED of Duratec (from 1 Oct 2026); board member of Ear Science Institute Australia.

Non-executive. He held large performance rights until 30 Jun 2026 and provided a convertible loan in July 2026, so independence is questionable.

Michael Shelby

Managing Director and CEO

1 Mar 2017

BSc Chemical Engineering (Louisiana State University); Senior Executive MBA (Melbourne Business School); AICD course. Ex-General Manager Oil & Gas at Resource Equipment; about 19 years in Australian mining and oil and gas services. Co-founder.

Executive

Patrick Maingard

Non-Executive Director; Remuneration Committee Chair

18 Dec 2017 (NED from 1 Sep 2022)

MSc Management (Oxford); GAICD. Former co-owner and MD of Omni Manufacturing. Co-founder.

Not independent: co-founder, with related-party purchases from Mindustry Solutions ($29k FY2026; $378k FY2025)

Chris Radin

Independent NED; Audit & Risk Committee Chair

1 Mar 2023

Ex-MD of Goodyear & Dunlop Tyres ANZ; ex-MD of STIHL Australia; ex-GM Sales & Marketing at Coates Hire

Independent

Byron Ynema

Executive Director

1 Sep 2026

Founder of Blue Hire (acquired Aug 2025); 8.7% shareholder before the recapitalisation; converting up to $3.77M of deferred consideration into equity

Executive

Louise Bower

Independent NED (former)

1 Nov 2021 – ceased 10 Dec 2025

Chartered Accountant; NED of DUG Technology and Lycopodium. Received $147k of consulting fees in FY2026.

—

Executive Leadership Team

NameTitleTenureNotes

Michael Shelby

Managing Director

Since Mar 2017

Also Company Secretary from 3 Sep 2024 to 10 Nov 2025

Lawrence Phillips

Chief Operating Officer

Since 1 Nov 2022

Base salary $256,818 plus $20k vehicle allowance

Paul Connolly

Chief Financial Officer

Since 2 Feb 2026

Base salary $310,000; fills a CFO vacancy that existed since Matthew Goldfinch left on 3 Sep 2024

Frank Ashe

Corporate Business Development Manager

Since 1 Jul 2023

Founder of Resource Water Group; holds 3,358,209 shares post-consolidation

Kate Stoney and Josh Merriman

Joint Company Secretaries

From late 2025

Per the FY2026 corporate directory; exact appointment date not disclosed

Directors' Remuneration

NameSalary and feesSTI accruedSuperannuationPerformance rights expenseTotal FY2026Total FY2025

James Cullen

50,00000164,400214,40082,200

Michael Shelby

355,00051,97530,00090,665527,640603,324

Patrick Maingard

55,00006,60012,89374,49373,611

Louise Bower (to 10 Dec 2025)

171,37202,91016,716190,99873,611

Chris Radin

55,00006,60012,89374,49373,611

Lawrence Phillips

256,81832,59230,00088,881408,291393,052

Frank Ashe

257,19531,61730,00089,769408,581379,341

Paul Connolly (from 2 Feb 2026)

129,16715,61413,7000158,4810

Total KMP

1,329,552131,798119,810476,2172,057,3771,678,750

Competitive Landscape

Key Competitors

CompetitorSegment overlapOwnershipRelative positioning vs Babylon

Coates (Seven Group Holdings)

General equipment hire incl. pumps and power

ASX-listed parent (SVW)

National scale and balance sheet; generalist; much larger fleet. Cited by Babylon management as a rental competitor.

Kennards Hire

General hire incl. pumps and generators

Private

National network; less mining-site specialist

Aggreko

Temporary power, and some water and temperature control

Private (TDR/I Squared)

Global leader in temporary power; overlaps the power generation line

Xylem (Godwin / Flygt rental)

Dewatering pump rental and sales

NYSE-listed parent

OEM-backed product depth; direct dewatering rival

Sykes Group

Pump hire, sales and dewatering

—

Strong Australian dewatering brand

Cleanaway

Industrial services, vacuum and water

ASX-listed (CWY)

Cited by Babylon management as a competitor in water services; much larger

Veolia

Water services and industrial

Euronext-listed parent

Integrated water treatment; overlaps project water management

Agreco Services

Dewatering and power generation

Private

Cited by management as a direct dewatering and power competitor

Hydrogeology consultancies (e.g. GHD and specialist test-pumping contractors)

Aquifer testing

Various

Compete with the Matrix and RWG services

Westralian Diesel; CAT / Cummins dealers

Engine maintenance (historic)

Private / dealer networks

Now the acquirer of Babylon's Queensland business; no longer a competitor

Competitor Detail

MetricBabylon (FY2026)

Revenue (AUD Mn)

31.99 group / 26.06 rental

Revenue growth (%)

1 group / 160 rental

EBITDA margin (%)

-16 reported / 35 rental underlying

R&D intensity (%)

Not disclosed (nil)

Recent Developments

28 August 2026 release: $2.5M cash plus $4.77M debt converted.

FY2026 Chairman's letter: about $3.5M cash plus $3.77M debt converted.

The ~$1.0M difference appears to relate to how the July convertible loans are classified (cash raised before conversion versus debt converted).

Company Snapshot

$20.6M

Revenue

2017

Founded

High Wycombe, Australia

Headquarters

SWOT Analysis

Strengths

  • High-margin rental platform. Underlying FY2026 rental EBITDA was $9.10M on $26.06M revenue, a 34.9% margin. The acquired businesses ran at about 45% (FY2026 Annual Report Note 12.1).
  • Rapid scaling. Rental revenue rose 160% year on year, and the legacy rental business grew about 20% organically (derived).
  • Tier 1 contracted revenue. The Newmont 3-year contract (2026–2028, ~$3M a year) and the Talison extension (~$3M a year) together cover about 23% of FY2026 rental revenue (derived).
  • Strong cash conversion in Rental. FY2026 operating cash flow was $6.49M despite the Maintenance losses, a 157% conversion of underlying EBITDA. This was flattered by working capital release.
  • Demonstrated deal sourcing at low multiples. Blue Hire and Matrix were bought at 2.5–3.8x EBITDA; RWG at about 3x; Ausblast was sold at about 5.6x EBITDA.
  • Experienced industrial chair and director. Cullen has three micro-cap-to-takeover outcomes; Radin brings Coates Hire experience. Founders are aligned through equity (Ynema conversion).

Weaknesses

  • Negative equity of -$0.99M and net current liabilities of $15.86M at 30 June 2026. The audit report includes a going-concern material uncertainty (FY2026 Annual Report Note 2f).
  • High leverage. Net debt was $20.6M excluding leases, about 5.0x underlying EBITDA.
  • Execution and forecasting misses. The FY2026 STI EBITDA target was $13.46M against an actual reported -$5.2M and underlying $4.1M. FY2026 revenue guidance moved from $27–28M to $30–32M within one quarter. The FY2025 STI target of $8.0M EBITDA was also missed (actual $5.8M).
  • Safety deterioration. TRIFR was 15.72 in FY2026, against 0 in FY2025 and a 2.6 target.
  • Governance gaps. One independent director out of five; committees without an independent majority; no female directors; CFO vacancy from September 2024 to February 2026.
  • Historic loss-making record. Accumulated losses were $58.7M at 30 June 2026. Six-year cumulative NPAT (FY2021–FY2026) is about -$31.9M (derived).

Opportunities

  • Fleet expansion into demonstrated excess demand. Cross-hire was required in FY2026, and the recapitalisation explicitly targets growth capex.
  • Land-and-expand from test pumping into dewatering contracts at gold mines in WA and NT (FY2025 Annual Report).
  • Low-emission rental products. Hybrid power and evaporators address miners' Scope 1 reduction goals.
  • Overhead reduction. Head-office employee costs were $2.98M in FY2026, more than double FY2025's $1.36M, so the post-Maintenance right-sizing offers margin upside.
  • Industry consolidation. Management pursued a much larger water pumping and storage target in 2026. A repaired balance sheet could revive bolt-on M&A.
  • Re-rating on reinstatement and simplification as a pure-play rental business. The recapitalisation price of $0.05 implies an EV of about 8x FY2026 underlying EBITDA (analyst estimate).

Threats

  • NAB facility maturity cliff on 1 July 2027. Minimum EBITDA covenants are $3.0M (December 2026) and $4.0M (March 2027).
  • Deferred cash consideration to the Blue Hire vendors falls due after 1 July 2027 and coincides with the refinancing. The convertible loans are also repayable by 3 July 2027 if not converted.
  • Commodity cyclicality. Nickel care-and-maintenance and the lithium slump have already hit revenue (FY2025). A gold price reversal would hit the current growth engine.
  • Customer credit events. A $0.44M credit loss arose from a customer in administration (FY2026).
  • Larger, better-capitalised competitors (Coates, Xylem, Aggreko) could price aggressively for long-term contracts.
  • Further dilution risk. The share count roughly doubled in August 2026 at $0.05, about 37.5% below the pre-suspension VWAP. More equity may be needed for fleet growth or refinancing.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
22 Apr 2025Q3 FY2025 quarterly: Maintenance margins above historical levels; 1.5MW portable power mobilised to an iron ore site; a further hybrid unit deployedRental utilisation recovering
14 May 2025Announces Matrix Hydro Services acquisition and a $3.5M accelerated non-renounceable entitlement offer at $0.004Start of the water-management pivot
16 May 2025Institutional component raises $1.08MFunding progress
2 Jun 2025Announces intent to acquire Blue Hire; retail offer extendedLarger, debt-funded deal
17 Jun 2025Retail entitlement raises $1.60M–
19 Jun 2025Shortfall placed, raising $0.81M; total $3.5MEquity raise complete
15 Jul 2025General meeting approves both acquisitions–
1 Aug 2025Blue Hire and Matrix completed; $18.5M NAB Corporate Markets Loan drawnLeverage step-up; covenants imposed
22 Aug 2025FY2025 results: revenue $31.76M, EBITDA $5.81M, NPAT $0.79M (+55%)Second consecutive profit
Oct 2025Q1 FY2026 quarterly update; plans for a further capital raise referenced–
16 Oct 2025Additional Class G and H performance rights issued–
10 Nov 2025Shelby ceases as Company SecretaryGovernance change
27 Nov 2025AGM approves 30:1 consolidation; remuneration report 98.27% for–
8 Dec 2025Share consolidation completedShare count falls from ~3.8bn to ~127M
10 Dec 2025Louise Bower ceases as directorBoard loses its only female director and its Audit & Risk chair
22 Dec 2025Three-year Newmont pump hire and maintenance contract (~$3M a year, ~10% of FY2025 revenue)Recurring revenue visibility
19–21 Jan 2026Ausblast sold for $2.8MPortfolio simplification
27 Jan 2026Cessation of securities noticeAdministrative
2 Feb 2026Paul Connolly appointed CFOFills a 17-month CFO gap
26 Feb 2026H1 FY2026: revenue $17.6M; Rental revenue $14.2M (+212%); underlying EBITDA $3.0M; statutory loss $7.16M; Newmont Boddington contract highlightedDivergence between statutory and underlying results
20 Apr 2026Trading halt over media speculation on a material transaction–
22 Apr 2026Voluntary suspension; on 27 Apr, ASX extends the suspension (advanced negotiations to buy a water pumping and storage business with a ~$60M raise)Shares untradeable
29 Apr 2026Q3 FY2026: record rental revenue; Talison extension (~$3M a year); cash $0.6M; undrawn facilities $3.7M; FY2026 revenue guidance $27–28MLiquidity tight
19 May 2026Proposed transactions discontinued; NAB agrees revised terms with conditionsStrategic reset
24 Jun 2026Update: FY2026 rental revenue ~$26M (+~160%); NAB extends to Jul 2027 and waives the June and September 2026 principal paymentsPath to reinstatement
1 Jul 2026Cessation of securities noticeAdministrative
9 Jul 2026Suspension extended pending the capital raise–
13 Jul 2026$0.4M convertible loans from entities linked to Cullen and Ynema (11% interest; up to $1.0M total)Bridge funding
21 Jul 2026Prospectus for a 2-for-1 rights issue at $0.05 (up to $12.7M; minimum $7.27M); NAB variation formalised; Blue Hire deferred consideration renegotiatedRecapitalisation launched
29 Jul 2026Primepower Queensland sale agreed with Westralian Diesel (completed 31 Jul)Maintenance exit
30 Jul 2026Investor presentation and Chairman's letter; Ynema to convert up to $3.77M via sub-underwritingInsider support
31 Jul 2026Q4 FY2026 4C: FY2026 revenue guidance $30–32M; underlying EBITDA $4.2–4.6M; full-year operating inflow $5.9MGuidance upgrade
21 Aug 2026General meeting approves recapitalisation resolutions–
28 Aug 2026Minimum subscription achieved: $7.27M ($2.5M cash plus $4.77M debt-to-equity); Ynema appointed Executive Director from 1 SepBalance sheet repaired
31 Aug 2026FY2026 results and Annual Report: statutory loss $20.1M; net liabilities $0.99M; going-concern material uncertaintyStatutory low point
3 Sep 2026NAB confirms all variation conditions satisfiedRefinancing risk deferred to Jul 2027
7 Sep 2026Pre-reinstatement disclosures: working capital sufficient; Listing Rule 3.1 and 12.2 compliance confirmedReinstatement imminent
1 Oct 2026Chairman Cullen joins the Duratec board as NED (scheduled per the FY2026 Annual Report)Time-commitment monitorable

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

2 charts
Income Statement: Revenue & Gross Profit: Revenue rose from AUD 27.5 Mn in FY2022 to AUD 32 Mn in FY2026.
Babylon Pump & Power Limited — Income Statement: Revenue & Gross Profit
Series (AUD Mn)FY2022FY2023FY2024FY2025FY2026
Revenue27.532.541.731.832

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Sources

Sources

  1. Babylon Pump & Power Limited, 2026 Annual Report (year ended 30 June 2026), lodged 31 August / 1 September 2026 (investorpa.com)
  2. Babylon Pump & Power Limited, Appendix 4E FY2026 (announcements.asx.com.au)
  3. Babylon Pump & Power Limited, 2025 Annual Report (year ended 30 June 2025) (announcements.asx.com.au)
  4. Babylon Pump & Power Limited, Appendix 4E FY2024 (announcements.asx.com.au)
  5. Babylon H1 FY2026 Half Year Results (26 February 2026) (announcements.asx.com.au)
  6. Babylon March 2026 Quarterly Update and Appendix 4C (29 April 2026) (data-api.marketindex.com.au)
  7. Babylon July 2026 Quarterly Update and Appendix 4C (31 July 2026) (investorpa.com)
  8. Update on Recapitalisation and Strategic Focus (24 June 2026) (investorpa.com)
  9. Rights Issue launch announcement (21 July 2026) (investorpa.com)
  10. Entitlement Offer Results and $7.27M Recapitalisation (28 August 2026) (bulletin.webull.com)
  11. Pre-Reinstatement Disclosures (7 September 2026) (investorpa.com)
  12. Babylon Signs Multi-Year Pump Hire and Maintenance Contract with Newmont (22 December 2025) (bulletin.webull.com)
  13. Positive Trading Update and Variation of Agreement (21 December 2023) (announcements.asx.com.au)
  14. BPP Half Year Results H1 FY2022 (28 February 2022) (asx.com.au)
  15. ASX Notice 0028.18.01, reinstatement of Babylon Pump & Power (formerly IM Medical), January 2018 (asxonline.com)
  16. InvestSMART BPP announcements register (investsmart.com.au)
  17. MarketIndex BPP corporate overview (marketindex.com.au)
  18. StockWireX, recapitalisation coverage: and: stockwirex.com · stockwirex.com
  19. Kalkine Media, Ynema conversion and Primepower sale coverage (July 2026): and: kalkinemedia.com · kalkinemedia.com
  20. Grafa, Newmont contract and recapitalisation coverage (grafa.com)
  21. IM Mining, Primepower Queensland acquisition (2019) and RWG acquisition (2022): im-mining.com · im-mining.com · im-mining.com
  22. Finance News Network, "Babylon Pump & Power eyes lucrative rental sector" (26 July 2022) (finnewsnetwork.com.au)
  23. Argonaut, Ausblast transaction note (argonaut.com)
  24. SmallCaps, H1 FY2023 acquisitions coverage (smallcaps.com.au)
  25. Stockopedia, BPP cash flow statement (aggregator; used only for FY2022–FY2023 cash flow) (stockopedia.com)

Unlock Company Contacts

Connect with Key Decision-Makers

Access verified employee contacts and decision-maker information from this company to support your sales, lead generation, and business development efforts.