Barra Resources Limited

Company Profile Analysis

Ticker: MRT.AX

ESOMAR 23 Corporate BadgeISO Certifications Badge
Barra Resources Limited - Company showcase

Year Founded & Workforce

1974

Barra Resources Limited logo

Barra Resources Limited Employee Contacts

We don't hold contact details for this company yet — you can request them.

Request Employee Contacts

Barra Resources Limited Overview

Maritana Minerals is a Kalgoorlie–Coolgardie-focused emerging gold producer. It is transitioning from contract mining and ore-sale arrangements to owner-operated processing. Its strategic core is the 100%-owned Black Swan Processing Hub (BSPH), about 40 km east of Kalgoorlie, which it acquired with Poseidon Nickel in February 2025. Maritana is converting this former nickel concentrator into a gold carbon-in-leach plant, upsized in June 2026 from 2.2 Mtpa to 2.5 Mtpa, targeting first gold in H2 calendar 2027.

The hub will be fed from a hub-and-spoke portfolio:

  • gold Mineral Resources of 1.86 Moz at June 2026;

  • reported above 2.1 Moz after the September 2026 Burbanks upgrade;

  • Ore Reserves of 204 koz.

Burbanks, the asset that defined Barra Resources, is now the group's highest-grade growth engine at 755 koz. With roughly A$229M of cash, no debt and a February 2026 scoping study pointing to ~102 kozpa, Maritana is one of the better-funded WA gold developers. Execution risk remains material.


What the company does

Maritana Minerals explores for, develops and mines gold deposits in the Eastern Goldfields of Western Australia. It also holds a portfolio of non-core base-metal and silver resources. Its FY2025 Annual Financial Report described the principal activities as the exploration, development and production of gold and other mineral resources in Western Australia. The report characterised Horizon (now Maritana) as an emerging mid-tier gold producer, with Poseidon's processing infrastructure as the pathway to long-term production.

Morningstar's profile now calls the company an emerging gold producer whose cornerstone is the ~100%-owned Black Swan Processing Hub near Kalgoorlie-Boulder. It highlights the hub's sealed highway access, grid power connection and proximity to a skilled regional workforce.

Business model evolution

PhasePeriodModelRevenue mechanism
Explorer / asset accumulator2019–mid 2024Exploration, resource definition, asset trading, royalty monetisationAsset and tenement sales (e.g., A$3.1M Northern Star sale, Oct 2024); royalty sale to Vox Royalty (A$4M + A$3M deferred); equity investments
Ore-sale / JV producerJul 2024 – Feb 2026Contract mining of Boorara; ore sold to Norton Gold Fields' Paddington mill under an Ore Sale/Purchase Agreement. Phillips Find mined by BML Ventures under a 50:50 profit-share JV.Revenue recognised when the third-party mill processes ore; JV cash distributions
Owner-processor (target)From H2 CY2027Hub-and-spoke: multiple open pits and underground mines trucked to the owned BSPHDoré / bullion sales (standard gold producer model)

Revenue mix

Revenue type (AUD Mn)FY2024FY2025H1 FY2026
Gold sales (ore-sale agreement)036.5161.41
Revenue from JV asset recovery00.35—
Other income (incl. tenement/royalty sales, non-refundable deposit)6.790.6510.41

Revenue is 100% product (gold) related. There is no service, subscription or licensing revenue. Historically there were royalty-sale proceeds, which are classed as other income.

Source: FY2025 Annual Financial Report (notes 4a, 4c); HY2026 Interim Report (note 4).

Value chain position and customers

Maritana currently sits upstream: exploration, mining and ore haulage. Its only material FY2025–H1 FY2026 customer was Norton Gold Fields' Paddington mill, which bought Boorara ore. Customer concentration was therefore effectively 100%. That agreement was mutually terminated on 11 February 2026.

Once Black Swan is commissioned, Maritana will move into processing and sell doré to refiners, typically the Perth Mint or equivalent. Refiner and offtake arrangements have not been disclosed. The end market is the global gold market (investment, central bank, jewellery demand).

Independent characterisation

Maritana is a roll-up vehicle that has assembled four previously separate WA juniors:

  • Intermin;

  • MacPhersons;

  • Greenstone (ex-Barra);

  • Poseidon Nickel.

The resulting group has a fragmented, mostly sub-2 g/t resource base and, crucially, its own processing plant. In a Kalgoorlie district where toll-milling capacity is tight, owning a 2.2–2.5 Mtpa mill is the key differentiator. The investment case rests on three things:

  • converting a nickel plant to gold cheaply (A$160.5M scoping capex versus the company's cited ~A$150M replacement cost for the plant alone);

  • feeding that plant from many small deposits at high gold prices;

  • growing the higher-grade Burbanks deposit into a long-life anchor.

Strategy

Stated strategy (themes)

Management's consistent message across announcements from 2025 to 2026:

  1. Become a standalone, meaningful WA gold producer. The aspiration is about 100 kozpa. The company's own disclaimer notes this is aspirational, not a production target, although the February 2026 scoping study supports ~102 kozpa.

  2. Hub-and-spoke model. Convert the owned Black Swan plant and feed it from multiple nearby pits and undergrounds.

  3. Organic resource and reserve growth. A 60,000 m drilling programme in 2026 targets Burbanks, Boorara, Coote, Crake, Gordons Dam and Wilsons.

  4. Disciplined portfolio rationalisation. Divest non-core nickel and peripheral tenements (Lake Johnston, Lakewood, Northern Star tenements, Balagundi swap).

  5. Regional consolidation. Management has repeatedly flagged further consolidation, and Black Swan is positioned as a potential toll-treatment outlet for neighbours (e.g., Accelerate Resources).

Strategic initiatives (last 24 months)

InitiativeDateDescription / target
Poseidon mergerOct 2024 – Feb 2025Acquire Black Swan plant, a fast-track route to processing
Black Swan PFS (GR Engineering)2,025Initially 1.5 Mtpa, upscaled to 2.2 Mtpa
Burbanks 30,000 m drilling (Phase 1 & 2)Jun 2025 – Sep 2026Infill and extension; MRE to 755 koz
Lower cut-off re-reporting (0.8 → 0.5 g/t)Feb 2026Reflects higher gold prices; added ounces at Coote, Crake, Golden Ridge North, Kalpini
Scoping studies and FID pathwayFeb 2026Early works approved: FEED, contractor engagement, long-lead items, water and power, workforce planning
A$175M placement + SPPFeb–Apr 2026Fund refurbishment, gold conversion, pre-production mining, contingency, working capital
BSPH capacity upgrade to 2.5 MtpaJun 2026FEED complete; owner's engineer appointed; capex deferral options
Accommodation strategyJul 2026Temporary, permanent and Kalgoorlie camps
60,000 m resource drilling programme2,026Support reserve and LOM updates; a fourth rig added in September 2026
Wilsons gold discovery programmeAug–Oct 20264,000 m aircore 400 m from BSPH, testing a 2.5 km × 1.5 km soil anomaly
ESG / social licenceDec 2025Native Title LUA covering ~240 tenements and ~90% of land package by area

Medium-term targets and guidance

ItemGuidance / targetSource
Construction startMid-2026Feb 2026 scoping release
Boorara mining restartEarly-to-mid 2027Mar 2026 / Sep 2026 updates
First processing / goldMid-2027 originally; now H2 CY2027Scoping; Sep 2026 updates
Throughput2.5 Mtpa (from 2.2 Mtpa)9 Jun 2026
Production~102 kozpa average over initial ~5 years (scoping basis, 2.2 Mtpa)17 Feb 2026
AISC~A$3,350/oz (5-year average, scoping)Media summaries of scoping study
Next resource/reserve updatesBurbanks further update in December quarter 2026; Rose Hill reserve; LOM updateAug–Sep 2026 announcements

Products & Services

Maritana sells one product, gold. Its portfolio is therefore best described deposit by deposit and infrastructure item by infrastructure item. Figures are from the June 2026 Annual Mineral Resources and Ore Reserves Statement (20 Aug 2026) unless noted; all projects are 100% owned and in WA.

Processing infrastructure

AssetDescriptionKey specsLatest milestone
Black Swan Processing Hub (BSPH)Former Poseidon Nickel concentrator ~40 km east of Kalgoorlie, being converted to gold CILExisting SAG and ball mills; nameplate 2.2 Mtpa upgraded to 2.5 Mtpa after FEED (9 Jun 2026); grid power connected; scoping pre-production capex A$160.5M (Feb 2026)FEED complete; Zeal Engineering owner's engineer; works approvals and native vegetation clearing permits in progress; long-lead items ordered
AccommodationTemporary and permanent camps supporting the hub57-room Quick Camps temporary camp (from Aug 2026); 60-room ATCO permanent camp scalable to 120 (target Jan 2027); purchased Kalgoorlie property approved for 50 roomsAnnounced 23 Jul 2026
Boorara/Nimbus site infrastructureOffices connected to mains power and water at Nimbus, 1 km from Boorara—Supports Boorara restart

Gold deposits — Mineral Resources (June 2026)

DepositClusterTonnes (kt)Grade (g/t Au)Contained (koz)Key notes
Boorara (in-situ)Kalgoorlie9,2761.26375Cornerstone open pit; depleted 53 koz to Jun 2026; 94.5% recovery from historic milling
Boorara stockpilesKalgoorlie4630.9514Measured; planned commissioning feed for BSPH
Burbanks OP (ex-Barra)Coolgardie4,8601.90298Superseded 11 Sep 2026 (combined Burbanks MRE 13.7 Mt @ 1.7 g/t for 755 koz)
Burbanks UG (ex-Barra)Coolgardie1,1934.38168Highest-grade large resource; not yet in LOM plan
KalpiniKalgoorlie2,3591.96149Maiden reserve FY2026
Jacques/PeyesKalgoorlie1,8522.22132Re-reported at 0.5 g/t cut-off
TealKalgoorlie1,8112.20128MRE dates from Intermin, 2018
Golden Ridge NorthKalgoorlie2,5320.9779Re-reported; +41% ounces at lower cut-off
CrakeKalgoorlie1,8221.2875Maiden reserve FY2026
Rose Hill UGKalgoorlie5074.6075Reserve update flagged as imminent
CooteKalgoorlie2,3210.86643x ounces at 0.5 g/t cut-off
Pennys FindKalgoorlie4294.5763PFS Dec 2024; reserve 33.4 koz
Phillips Find OP (ex-Barra)Coolgardie5052.3037Depleted by JV mining
MonumentKalgoorlie9191.1133—
Cannon UGKalgoorlie2324.2932Reserve 17.7 koz
Golden RidgeKalgoorlie5271.8131—
Gordons DamKalgoorlie6931.2428Acquired from Yandal 2025
CapricornCoolgardie6591.2025—
Baden PowellCoolgardie5961.2023—
Rose Hill OPKalgoorlie2871.9918—
PinnerKalgoorlie3301.2113—
Phillips Find UGCoolgardie32.270—
Total (Jun 2026)—34,1781.691,86144 koz Measured, 925 koz Indicated, 891 koz Inferred

Ore Reserves (June 2026)

DepositProven (kt / g/t / koz)Probable (kt / g/t / koz)Total (koz)
Boorara OP246.7 / 1.23 / 91,444 / 1.40 / 6372.0
Pennys Find—328 / 3.20 / 33.433.4
Cannon UG—135 / 4.10 / 17.717.7
Crake OP—870 / 1.23 / 3434.0
Kalpini OP—867 / 1.69 / 4747.0
Total9195.1204.1 (3.89 Mt @ 1.65 g/t)

The total is up 148% year on year after depletion. The February 2026 reserve update reported ~214 koz before 9.2 koz of Boorara depletion to June 2026.

Non-gold resources (non-core)

ResourceContained metalNotes
Nickel (Black Swan, Silver Swan, Golden Swan, tailings, stockpiles, Mt Windarra)293 kt Ni (33.3 Mt @ 0.88% Ni)A$7.0M impairment booked FY2025 on nickel E&E; Lake Johnston divested
Cobalt (subset of nickel)5,800 t Co—
Copper (subset)13,200 t Cu—
Nimbus silver-zinc20.2 Moz Ag, 104 kt Zn, 77 koz Au (12.08 Mt)High-grade core 0.26 Mt @ 774 g/t Ag

Study and "product" milestones

StudyDateHeadline outputs
Black Swan Plant & Mine Planning Scoping Studies17 Feb 20262.2 Mtpa; 546 koz over initial 5-year life (~102 kozpa); mine grade 1.65 g/t; ~74% M&I resources in plan; pre-production capex A$160.5M; pre-tax NPV ~A$631M; IRR >80%; AISC ~A$3,350/oz; pre-tax FCF approaching A$1bn; gold price A$5,500/oz (per media summaries)
BSPH FEED / capacity update9 Jun 2026Capacity to 2.5 Mtpa; capex management including deferral options under review
Pennys Find PFS & Ore Reserve18 Dec 2024Reserve 328 kt @ 3.20 g/t for 33.4 koz
Cannon UG Feasibility update29 Mar 2022Reserve 135 kt @ 4.10 g/t for 17.7 koz

Pricing model: gold is sold at spot. No hedging programme has been disclosed. H1 FY2026 realised price averaged A$5,778/oz on 10,239 oz sold from Boorara (HY2026 Interim Report).

Financial Narrative

Sources and basis:

FY2024–FY2025: audited FY2025 Annual Financial Report (PKF).

FY2021–FY2023: StockAnalysis/Kalkine aggregations of Horizon filings. These cover the pre-Greenstone Horizon group, before the Barra assets joined in June 2024.

H1 FY2026: KPMG-reviewed interim report.

FY2026 full year: not yet located.

Income statement

Notes: - FY2025 EBITDA is derived as loss before net finance (-21.58) plus depreciation and amortisation (10.92). It includes a A$7.0M nickel E&E impairment; underlying EBITDA excluding impairment was about -A$3.7M.

  • FY2024 EBITDA is derived as -1.91 + 0.07.

  • Post-consolidation EPS is calculated as pre-consolidation EPS × 15.

  • Weighted shares: FY2025 1,611.3M; FY2024 713.6M (pre-consolidation).

  • Revenue CAGR is not meaningful because the base moves from near-zero to production.

Half-year comparison (A$ M):

Source: HY2026 Interim Report (13 Mar 2026). Other income includes the A$10M non-refundable Lake Johnston deposit. No tax is recognised because of carried-forward losses of A$112.8M at 31 Dec 2025.

Commentary. FY2025 was the inflection from explorer to producer. Boorara (from July 2024) and the Phillips Find JV generated A$36.5M of gold sales. The year still produced a gross loss of A$5.3M because of three factors:

  • front-loaded waste stripping amortisation of A$10.5M;

  • third-party processing costs of A$18.3M;

  • an early-stage grade/tonnage ramp-up.

The A$23.8M net loss was swollen by the A$7.0M impairment of the newly acquired Poseidon nickel exploration assets, A$1.8M of mark-to-market losses on listed investments, and A$2.4M of finance costs (Nebari note, foreign exchange and rehabilitation unwind).

H1 FY2026 swung to a A$15.9M profit. The drivers were higher realised gold prices (A$5,778/oz), lower amortisation per ounce as Boorara matured, and the A$10M Lake Johnston deposit recognised as other income. Excluding that deposit, H1 FY2026 pre-tax profit was about A$5.9M. This is a genuine but modest operating profit from a third-party-processing model with thin margins.

Balance sheet

Notes: FY2021 and FY2022 cash are derived from reported net cash flows and should be treated as approximate. Net debt for FY2021–FY2023 is per Kalkine. Working capital equals current assets less current liabilities.

Commentary. The Poseidon merger transformed the balance sheet. It added A$41.8M of plant and equipment (Black Swan and Lake Johnston) and A$47.5M of exploration assets. It also added a very large A$64.2M rehabilitation liability, which drove total rehabilitation provisions to A$82.1M at 30 June 2025.

The Lake Johnston sale (completed 13 February 2026) transferred about A$30.8M of rehabilitation liability to Forrestania. That sale was strategically as valuable for liability reduction as for the A$35M consideration.

Nebari's conversions between September and November 2025 extinguished all interest-bearing debt. Combined with the A$175M placement, cash reached A$229.5M at 30 June 2026 (June 2026 Appendix 5B), with no debt facilities.

Cash flow

Notes: - FY2025 capex (A$10.50M) = mine properties 5.03 + PP&E 0.52 + capitalised E&E 4.95, per the AFR cash flow statement.

  • StockAnalysis reports FY2025 capex of A$5.47M using a narrower definition; treat this as a source discrepancy.

  • FY2021–FY2023 capex is per StockAnalysis.

Source: HY2026 Interim Report. FY2026 12-month gold sales receipts were A$74.7M per the June 2026 Appendix 5B (via Kalkine summary); June 2026 quarter exploration investment was A$6.1M.

Ratios

Notes: - ROE and ROA use average balances.

  • ROIC, net debt/EBITDA and cash conversion cycle are not meaningful given negative EBITDA and the ore-sale model.

  • Current ratio at 31 Dec 2025 was 1.67x.

Trend commentary. Every profitability ratio is negative or not meaningful for FY2021–FY2025. Maritana's value lies in its asset base and future processing cash flows, not in historical earnings.

Two inflections are observable:

  • H1 FY2026 produced the first meaningful operating profit (an annualised ~8% ROE excluding the one-off deposit).

  • The balance sheet de-risked sharply: net cash went from A$7.6M (June 2025) to about A$229M (June 2026).

The key forward driver is the transition from the ore-sale model to owner-processing. Paddington captured the processing margin in FY2025–FY2026; at Black Swan, Maritana keeps it.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Revenue by Segment and Revenue by Segment (%)

Metric (AUD Mn)FY2023FY2024FY2025

Gold exploration & mining – revenue

0.08036.85

Gold exploration & mining – pre-tax result

-1.01-3.46-23.85

Segment share of group revenue (%)

100100100

Cluster Details

ClusterKey assetsStatus (Oct 2026)

Processing

Black Swan Processing Hub (ex-nickel concentrator, SAG + ball mill)

Refurbishment and gold conversion; FEED complete; first ore processing targeted H2 CY2027

Kalgoorlie feed

Boorara (incl. 463 kt stockpiles), Crake, Kalpini, Coote, Teal, Jacques-Peyes, Golden Ridge, Golden Ridge North, Cannon UG, Pennys Find, Rose Hill, Monument, Gordons Dam, Wilsons (exploration)

Boorara mining finished Dec 2025, restart planned mid-2027; maiden Crake/Kalpini reserves; drilling ongoing

Coolgardie feed (ex-Barra/Greenstone)

Burbanks (open pit + underground, Birthday Gift), Phillips Find, Baden Powell, Capricorn, Pinner

Burbanks MRE 755 koz (Sep 2026); Phillips Find JV mining complete Nov 2025

Non-core

Black Swan / Silver Swan / Golden Swan nickel; Mt Windarra nickel; Nimbus silver-zinc; listed equity stakes

Held. Lake Johnston sold Feb 2026; Lakewood sold to Black Cat for A$0.2M (Dec 2025).

Group Entities

EntityTypeNotes

Maritana Minerals Limited (formerly Horizon)

Parent

ASX-listed

Black Mountain Gold Ltd

Direct subsidiary

100%

MacPhersons Resources Limited

Direct subsidiary

100%; parent of Kalgoorlie Ore Treatment Company Pty Ltd (Boorara/Nimbus tenements) and Polymetals (WA) Pty Ltd

Gordon Sirdar Gold Mine Pty Ltd

Direct subsidiary

100%

Mining and Milling Services Pty Ltd

Direct subsidiary

100%

Charter Minerals Pty Ltd

Direct subsidiary

100%

Greenstone Resources Limited (ex-Barra Resources)

Direct subsidiary

100%; parent of Coolgardie Mining Company Pty Ltd (Birthday Gift / M15/161)

Poseidon Nickel Limited (now Pty Ltd)

Direct subsidiary

100%; parent of Poseidon Nickel Atlantis Operations Pty Ltd and Western Nickel Limited

Income Statement and Per-Share Data

MetricFY2021FY2022FY2023FY2024FY2025

Revenue (AUD Mn)

18.193.320.08036.85

Cost of sales (AUD Mn)

12.902.060042.13

Gross profit (AUD Mn)

5.291.260.080-5.27

Operating result before net finance (AUD Mn)

———-1.91-21.58

EBITDA – derived (AUD Mn)

———-1.84-10.67

Pre-tax income (AUD Mn)

2.45-28.03-1.01-3.46-23.85

Net income (AUD Mn)

2.45-28.03-1.01-3.46-23.85

EPS basic, pre-consolidation (A$ cents)

———-0.48-1.48

EPS basic, post-consolidation equivalent (A$ cents)

———-7.20-22.20

Dividends per share (A$ cents)

00000

Gross margin (%)

29.138.01000-14.3

Net margin (%)

13.5-844.3-1,262.50-64.7

Income Statement and Per-Share Data (Half-Yearly)

MetricH1 FY2025H1 FY2026

Sales revenue (AUD Mn)

0.6361.41

Cost of sales (AUD Mn)

0.7248.98

Gross profit (AUD Mn)

-0.0912.43

Other income (AUD Mn)

0.5010.41

Profit before net finance & tax (AUD Mn)

-2.3817.45

Net finance expense (AUD Mn)

-1.95-1.53

Net profit after tax (AUD Mn)

-4.3315.92

Basic EPS post-consolidation (A$ cents)

-5.448.12

Gross margin (%)

-13.820.2

Balance Sheet

MetricFY2021FY2022FY2023FY2024FY2025

Total assets (AUD Mn)

———58.93195.01

Cash & equivalents (AUD Mn)

11.315.405.624.2915.70

Short-term debt incl. convertible & leases (AUD Mn)

———8.237.91

Long-term debt incl. leases (AUD Mn)

———00.20

Net debt (AUD Mn; negative = net cash)

-11.18-5.321.343.94-7.60

Total equity (AUD Mn)

——35.2946.2784.07

Goodwill & intangibles (AUD Mn)

00000

Capitalised exploration & evaluation (AUD Mn)

——29.7346.5498.89

Rehabilitation provisions (AUD Mn)

——1.601.8482.14

Working capital (AUD Mn)

———-5.744.33

Balance Sheet (30 Jun 2025–31 Dec 2025)

Balance sheet at (AUD Mn)30 Jun 202531 Dec 2025

Cash (AUD Mn)

15.7037.49

Inventories – current + non-current (AUD Mn)

14.0122.42

Assets held for sale – Lake Johnston (AUD Mn)

022.84

Property, plant & equipment (AUD Mn)

46.3833.11

Exploration & evaluation (AUD Mn)

98.8998.45

Total assets (AUD Mn)

195.01223.88

Convertible note & derivative (AUD Mn)

7.750

Rehabilitation provisions – non-current (AUD Mn)

82.1451.32

Liabilities held for sale (AUD Mn)

030.82

Total liabilities (AUD Mn)

110.9496.35

Total equity (AUD Mn)

84.07127.53

Cash Flow

MetricFY2021FY2022FY2023FY2024FY2025

Operating cash flow (AUD Mn)

6.05-2.39-6.81-4.30-15.17

Capex incl. capitalised exploration & mine development (AUD Mn)

-13.14-10.33-6.23-2.90-10.50

Free cash flow (AUD Mn)

-7.09-12.72-13.04-7.20-25.67

Equity raised, gross (AUD Mn)

———035.44

Dividends paid (AUD Mn)

00000

Buybacks (AUD Mn)

00000

Cash flow (AUD Mn)

Cash flow (AUD Mn)H1 FY2025H1 FY2026

Operating cash flow (AUD Mn)

-6.392.21

Investing cash flow (AUD Mn)

-0.382.85

Financing cash flow (AUD Mn)

12.6716.73

Capitalised exploration (AUD Mn)

-1.12-9.20

Returns & Leverage Ratios (%) and Financial Ratios (x)

RatioFY2024FY2025

ROE (%)

-8.5-36.6

ROA (%)

-6.1-18.8

Current ratio (x)

0.461.15

Debt / equity (x)

0.180.10

Interest coverage (EBIT / interest, x)

-1.2-14.7

Asset turnover (x)

00.29

Revenue by Region

RegionFY2023FY2024FY2025

Australia – Western Australia (AUD Mn)

0.08036.85

Americas (AUD Mn)

000

EMEA (AUD Mn)

000

Rest of APAC (AUD Mn)

000

Asset Portfolio

AssetFY2025H1 FY2026

Boorara ore sales to Paddington (AUD Mn)

36.5159.10

Phillips Find JV recognised revenue (AUD Mn)

0.35—

Valuation Snapshot

MetricValueSource / date

Last verified price

A$0.74

Fintel, 29 Sep 2026

52-week range

A$0.575 – A$1.56

StockLight / MarketScreener, Sep 2026

YTD 2026

about -37%

MarketScreener (at A$0.76)

3-month

about -38%

MarketScreener

3-year range (adjusted)

A$0.42 – A$1.56

MarketScreener

Placement reference price

A$1.08 (Feb 2026)

Company

Share Price

MetricFY2024FY2025FY2026

Share price at period end (AUD)

0.480.690.65

Valuation Snapshot by Multiple

MultipleValueBasis / source

Market cap

~A$274–283M

Fintel / StockLight, Sep 2026

Enterprise value

~A$45–55M (derived: market cap less ~A$229M cash)

Analyst derivation. Third-party EV figures (A$296–309M) appear to use stale balance sheets and should be disregarded.

P/E FY2026e

4.4x

MarketScreener consensus (1 analyst)

P/E FY2027e

-26.6x (loss)

MarketScreener

EV/Sales FY2026e

1.96x (stale-EV basis)

MarketScreener

P/B

~0.8x (derived: ~A$280M market cap / ~A$300M+ post-raise equity, estimated)

Analyst estimate

EV per resource ounce

~A$22–26/oz (derived: ~A$50M EV / 2.1 Moz)

Analyst derivation

Capital Markets

ItemStatus

Dividend history

None paid; directors recommended no dividend (FY2025)

Dividend policy

None stated

Buybacks

None authorised. Barra operated an unmarketable parcel sale facility in October 2021.

Credit ratings (Moody's, S&P, Fitch)

Not rated

Debt maturity profile

No debt. Nebari convertible (maturity Nov 2025) fully converted. Only leases (~A$0.25M) remain.

Balance Sheet (FY2024–FY2026)

RaiseFY2024FY2025FY2026

Equity raised, gross (AUD Mn)

035.44197.83

Analyst Conclusions

Management guidance

ItemGuidance
BSPH2.5 Mtpa gold CIL; construction during 2026; commissioning H2 CY2027 using Boorara stockpiles (463 kt @ 0.95 g/t)
MiningBoorara restart in mid-2027 ahead of commissioning
Production~102 kozpa average (2.2 Mtpa scoping basis); upside from 2.5 Mtpa and Burbanks
Next 6 monthsWilsons assays (Oct 2026); Rose Hill reserve; Burbanks further MRE (Dec quarter 2026); updated LOM / reserve; FY2026 annual report

Consensus growth

Coverage is a single analyst with conflicting aggregator outputs: a FY2026e P/E of 4.4x versus a FY2027e loss. The data shape is clear even so. FY2026 benefited from Boorara sales (A$74.7M receipts) and one-off gains. FY2027 will be a low-revenue construction year. FY2028 should be the first full owner-processing year.

Bull case

  1. Cash plus mill roughly equals market cap. At ~A$274M market cap against ~A$229M of cash, the market is paying ~A$45–55M for a 2.1 Moz resource and a mill the company says would cost ~A$150M to replace. Execution to first gold should re-rate the stock toward producer multiples.

  2. Burbanks is a genuine growth engine. Resources grew 62% to 755 koz in one drilling phase, with the high-grade underground (4.38 g/t) still excluded from the LOM. Its inclusion could lift both head grade and mine life well beyond the 5-year scoping case.

  3. Scale economics at high gold prices. At 2.5 Mtpa and A$5,500/oz+, the scoping metrics (NPV ~A$631M, IRR >80%, AISC ~A$3,350/oz) imply substantial free cash flow. Spare capacity can be monetised through toll treatment in a capacity-starved district.

Bear case

  1. Execution and capex risk. The June 2026 update moved to "managing" capex and considering deferrals within four months of the scoping study. Plant conversions routinely overrun, and a 2.2 → 2.5 Mtpa upsizing raises scope.

  2. Quality of feed. Only 204 koz is in reserves against 546 koz needed for the 5-year plan; 26% of the plan is Inferred; average grade is 1.65 g/t. A gold price fall or grade under-delivery would compress margins quickly.

  3. Gap year and dilution. Revenue largely stops until H2 2027. The share price sits ~30% below the A$1.08 placement price. Any capex overrun would likely be funded by further dilutive equity.

Key catalysts and monitorables (next 12 months)

Catalyst / monitorableExpected timingWhy it matters
Wilsons first aircore assaysOct 2026Potential near-mill discovery
FY2026 Annual ReportSep–Oct 2026Audited FY2026 profit, governance, top holders
September 2026 quarterlyLate Oct 2026Capex spend, construction progress
Formal FID / updated capex at 2.5 MtpaH2 2026Confirms the funding envelope
Works approval and clearing permitsH2 2026Critical-path permitting
Rose Hill reserve; Burbanks further MRE; updated LOMQ4 2026 – Q1 2027Mine-life extension
AGM~Nov 2026Board renewal; committee structure
Boorara mining restartMid-2027Start of feed stockpiling
BSPH commissioning / first goldH2 CY2027Transformational event

Analyst verdict

The Barra Resources story no longer exists in isolation. What began as a single-project Coolgardie explorer built around Burbanks is now the high-grade crown jewel inside Maritana Minerals. Maritana is a four-way roll-up whose strategic logic is credible: own a mill in a district where milling capacity is scarce, then fill it.

The financial transformation since mid-2025 is real:

  • debt extinguished;

  • non-core nickel liabilities shed through the A$35M Lake Johnston sale, which also transferred ~A$31M of rehabilitation obligations;

  • ~A$229M of cash raised;

  • Burbanks grown to 755 koz.

On paper, the company is funded to first gold.

The market's verdict is far more sceptical. At roughly A$0.74, Maritana trades at a modest premium to cash, implying an EV of perhaps A$50M for a 2.1 Moz resource, an owned mill and a scoping-level pre-tax NPV north of A$600M. That discount reflects four things:

  • the inherent risk of converting a nickel concentrator to gold;

  • the thinness of the reserve base relative to the mine plan;

  • a fragmented, low-grade feed portfolio;

  • early warning signs on capex discipline after the 2.5 Mtpa upsizing.

Governance is also light for the company's new scale. A four-person board with no stand-alone audit committee holds A$229M of shareholder funds.

Our synthesis: Maritana is a high-torque, asymmetric development play. The downside is cushioned by cash, and the upside depends on three deliverables:

  1. capex holding near the A$160.5M scoping envelope, or transparently re-based at FID;

  2. reserve conversion, especially Burbanks open pit and underground;

  3. on-time commissioning in H2 CY2027.

Investors should treat the next two to three quarters, covering the FID capex figure, permits and Burbanks/Rose Hill reserve updates, as the decisive evidence window. Positive delivery would justify a re-rating toward developer peers. A capex blow-out would likely mean further dilution and confirm the market's discount.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Board of Directors

NameRoleAppointedBackgroundEducation / credentials

Ashok Parekh

Non-Executive Chairman

Director 14 Jun 2019; Chair 1 Jul 2020

Chartered accountant with 40+ years' experience; runs a large Kalgoorlie accounting practice; long-standing adviser to Goldfields miners; Centenary Medal (2003). Other boards: Kingwest Resources, OzAurum Resources.

B.Bus, AIMM, CTA, FNTAA, FTIA, FCA

Grant Haywood

Managing Director & CEO

CEO 1 Jul 2023; MD 18 Jun 2024

Mining engineer with 30+ years in WA Goldfields; senior roles at Phoenix Gold, Saracen Mineral Holdings and Gold Fields

BEng (Mining) Hons, MSc (Mineral Economics), WASM; WA First Class Mine Manager's Certificate; GAICD; FAusIMM

Warren Hallam

Independent Non-Executive Director

1 Sep 2024

Metallurgist; former MD of Metals X, Millennium Minerals and Capricorn Metals; ex-Poseidon director. Other boards: St Barbara, Aurora Energy Metals, Kingfisher Mining.

BSc (Env Sci), Grad Dip (Extractive Metallurgy), MSc (Mineral Economics), FAusIMM

Robert Waugh

Independent Non-Executive Director

1 May 2025

Geologist; ex-WMC and BHP Billiton exploration; former MD of Musgrave Minerals (sold to Ramelius for ~A$200M, 2023). Other boards: Caprice Resources, Future Battery Minerals.

BSc (Geology), MSc (Mineral Economics), FAusIMM, MAIG

Executive Leadership Team

NameRoleSinceNotes

Grant Haywood

MD & CEO

Jul 2023

See above

Brendan Shalders

CFO & Joint Company Secretary

CFO Jan 2026; Joint CoSec 2 Feb 2026

Replaced Julian Tambyrajah (CFO/CoSec Dec 2020 – Sep 2025)

Isabel Macchia

Company Secretary

2 Feb 2026

Daniel Coletta (CoSec Sep 2025 – Feb 2026) resigned 28 Feb 2026

Christian Price

GM Corporate Development

Dec 2025

—

Stephen Godfrey

Resource Development Manager (Competent Person)

—

FAusIMM, MAIG

Adrianna Skok-Muir

Group Mining Engineer (Competent Person)

—

MAusIMM

BSPH project executive

Senior project leadership

Q1 CY2026

—

Directors' Remuneration

KMPSalary / feesShare-basedSuperTotalPerformance-related %

Ashok Parekh (Chair)

84,00009,66093,6600

Grant Haywood (MD & CEO)

388,12555,58230,000473,70711.73

Warren Hallam (NED)

55,66706,40262,0690

Robert Waugh (NED)

11,66701,34213,0090

Julian Tambyrajah (CFO, former)

344,08221,79230,000395,8745.50

Total KMP

906,04177,37478,6301,062,045—

Major Shareholders

HolderShares (post-consolidation basis)Stake (pre-Feb 2026 raise)Type

Cindy Deng

19,224,806

~7.4%

Individual

Guangping He

18,910,422

~7.3%

Individual (participated in 2025 placements)

Shipbark Pty Ltd

4,948,291

~1.9%

Private company

Nebari Partners LLC

4,001,723

~1.5%

Institution (ex-convertible lender)

Ashok Parekh (director)

~1.69M (25.35M pre-consolidation)

<1%

Insider

Grant Haywood (director)

~0.22M plus rights

<0.1%

Insider

Competitive Landscape

Key Competitors

Competitor (ticker)Segment overlapRelative positioning vs Maritana

Northern Star Resources (NST)

Kalgoorlie production (KCGM Super Pit, Kalgoorlie Operations)

Tier-1 major; buyer of Maritana tenements (2024); far larger scale

Norton Gold Fields (Paddington; Zijin-owned)

Processing and mining near Kalgoorlie

Former customer; owns established mill capacity

Black Cat Syndicate (BC8)

Kal East / Coyote; mill ownership

Similar "junior with mill" model; bought Lakewood ground

Ora Banda Mining (OBM)

Davyhurst mill, Goldfields

Owner-operator producer; illustrates a restart path

Vault Minerals (ex-Silver Lake / Red 5)

Goldfields mills

Larger mid-tier processor

Westgold Resources (WGX)

Goldfields mills

Mid-tier; regional toll and consolidation competitor

Ramelius Resources (RMS)

WA mid-tier

Acquirer of Musgrave; potential consolidator

Genesis Minerals (GMD)

Leonora hub

Successful hub-and-spoke comparator

Focus Minerals (FML)

Coolgardie gold

Neighbour of the Coolgardie assets

Forrestania Resources (FRS)

Converting Lake Johnston to gold

New regional processor (using the ex-Maritana plant)

Brightstar Resources (BTR); Meeka Metals (MEK); Polymetals (POL)

WA juniors moving to production

Peer group per Simply Wall St

Auric Mining (AWJ)

Adjacent Burbanks tenure

Neighbour and potential collaborator

Peer Comparison FY2026

AttributeMaritana (MRT)Ora Banda (OBM)Genesis (GMD)

Owns mill

Yes (BSPH, converting)

Yes

Yes

Producing from own mill

No (target H2 2027)

Yes

Yes

Gold resource

~2.1 Moz (Sep 2026)

——

Net cash

~A$229M (Jun 2026)

——

R&D intensity

Nil (exploration proxy)

Nil

Nil

Recent Developments

--

Company Snapshot

$23.8M

Revenue

1974

Founded

West Perth, Australia

Headquarters

SWOT Analysis

Strengths

  • Owned processing plant. The 100%-owned Black Swan plant has existing SAG and ball mills. Capacity was upgraded to 2.5 Mtpa after FEED (9 Jun 2026) at a scoping capex of only A$160.5M.
  • Fortress balance sheet for a developer. Cash was A$229.5M at 30 June 2026 with no debt facilities (June 2026 Appendix 5B).
  • Large, growing inventory. Gold resources were 1.86 Moz in June 2026 (+6.3% after depletion), reported above 2.1 Moz after the Burbanks upgrade (11 Sep 2026).
  • High-grade Burbanks upside. The Burbanks MRE is 755 koz (+62%). Drill hits include 0.96 m @ 1,762 g/t Au, and the UG resource is 1.19 Mt @ 4.38 g/t.
  • Operating experience. The company delivered Boorara mining safely (476 kt @ 1.08 g/t in H1 FY2026) and the Phillips Find JV (14,095 oz).
  • Land access certainty. The Native Title LUA covers ~240 tenements and ~90% of the land package (Dec 2025).
  • Experienced board. Hallam (ex-Capricorn and Metals X MD) and Waugh (Musgrave sale to Ramelius) bring development and exit experience.

Weaknesses

  • Low-grade, dispersed resource base. The average grade is 1.69 g/t across 22 deposits, which requires complex multi-pit scheduling.
  • Short initial mine life. The scoping study supports an initial ~5-year LOM (546 koz).
  • Inferred material in the plan. About 26% of the scoping mine plan is Inferred.
  • Weak earnings history. Net losses in FY2022–FY2025, including A$23.8M in FY2025. H1 FY2026 profit relied partly on a A$10M one-off deposit.
  • Legacy rehabilitation burden. The provision is A$51.3M non-current at 31 Dec 2025 (after transferring A$30.8M with Lake Johnston).
  • Thin governance structures. The full board acts as remuneration committee, and no separate audit committee was disclosed in FY2025.
  • Customer concentration and revenue gap. 100% of FY2025–H1 FY2026 revenue came from one customer (Paddington), and that agreement has been terminated. Little revenue is expected before H2 2027.

Opportunities

  • Burbanks underground. It is not yet in the LOM plan and is the highest-grade resource. Inclusion could extend mine life and raise head grade.
  • Debottlenecking beyond 2.5 Mtpa and toll treatment for neighbours (e.g., Accelerate's toll-treatment pathway, May 2026).
  • Wilsons discovery. A 2.5 km × 1.5 km soil anomaly sits 400 m from BSPH; first assays are due in October 2026.
  • Reserve conversion. The 60,000 m programme targets Coote, Crake, Gordons Dam and Boorara; the Rose Hill reserve update is pending.
  • Further regional consolidation. Strong cash supports more acquisitions.
  • Non-core monetisation. Options include 20.2 Moz of Nimbus silver, 293 kt of nickel, and listed stakes (Richmond Vanadium, Forrestania).

Threats

  • Capex overrun and schedule slip. The June 2026 update introduced capex management and deferral options. The first-gold timing has moved from mid-2027 to H2 CY2027.
  • Gold price reversal. The scoping study assumes A$5,500/oz while AISC is ~A$3,350/oz, so margin compression risk is material.
  • Permitting delays. Works approvals and native vegetation clearing permits were still in progress in June 2026.
  • Labour and contractor inflation in Kalgoorlie. The company is building its own camps to secure workforce accommodation.
  • Share price weakness and dilution fatigue. The shares were down ~37% YTD 2026 at A$0.76, below the A$1.08 placement price.
  • Plant conversion technical risk. Repurposing a nickel flotation plant for gold CIL has not been proven by this team.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
Apr 2025Boorara and Phillips Find in steady production; quotation of option-exercise sharesProduction ramp
26 May 2025A$30M two-tranche placement at A$0.043 (Petra Capital)Funds Black Swan studies and drilling
Late Jun 2025Burbanks infill and extensional drilling starts (~30,000 m planned)Resource growth
10 Jul 2025General meeting approves Tranche 2 (A$18.2M)Funding secured
17 Jul 2025Tranche 2 shares issued; directors and Guangping He participateInsider alignment
5 Aug 2025Binding agreement to buy Gordons Dam from YandalBolt-on near Black Swan
27 Aug 2025Black Swan PFS update (1.5 Mtpa basis)Study progress
4 Sep 2025Daniel Coletta replaces Julian Tambyrajah as Company SecretaryLeadership change
5 & 19 Sep 2025Nebari converts US$1.96M and US$0.66M of convertible noteDeleveraging
10–11 Sep 2025FY2025 Annual Financial Report: A$36.9M revenue, A$23.8M lossFirst production year
22 Sep 2025Added to S&P/ASX Emerging Companies Index; CFO Brendan Shalders appointment announcedMarket profile
6 Oct 2025Burbanks drilling: 1.55 m @ 99.65 g/t AuHigh-grade confirmation
20 Oct 2025Updated Boorara MRE (398 koz) and reserve (31.2 koz)Reserve base
27 Oct 202515:1 consolidation proposedCapital structure
4 Nov 2025Nebari converts remaining US$1.29M; debt extinguishedBalance-sheet clean-up
14 Nov 2025Lake Johnston sale to Forrestania for A$35MNon-core divestment
19 Nov 2025Phillips Find JV mining completedEnd of JV production
28 Nov 2025AGM approves all resolutions including consolidationGovernance
8 Dec 2025Native Title LUA with Marlinyu Ghoorlie groupSocial licence
11 Dec 2025Consolidation complete (205.5M shares)Capital structure
12 Dec 2025Lakewood tenements sold to Black Cat (A$0.2M)Rationalisation
17 Dec 2025Burbanks: 0.96 m @ 1,762 g/t AuExceptional grade
Dec 2025Boorara mining completed; Black Swan study timeline revisedProduction pause
28 Jan 2026Burbanks Phase 1 diamond drilling 75% complete; shares hit 3-year highMomentum
2 Feb 2026Isabel Macchia appointed CoSec; Shalders Joint CoSecLeadership
11 Feb 2026Paddington Ore Purchase Agreement mutually terminatedShift to owner-processing
13 Feb 2026Lake Johnston completion (A$20M cash + A$5M FRS shares); group MRE 1.88 MozFunding; resource
17 Feb 2026Scoping studies (2.2 Mtpa, ~102 kozpa, A$160.5M capex); reserves up ~160% to ~214 kozDevelopment case
19 Feb 2026A$175M placement at A$1.08 + SPPFully funds BSPH (scoping basis)
10 Mar 2026Phillips Find: 14,095 oz total; A$10M JV distribution receivedCash
13 Mar 2026HY2026 results: A$15.9M NPAT; Boorara stockpiles (460 kt, 14.2 koz) for BSPH commissioningFirst profit
17 Mar 2026SPP raises A$4.65MFunding
7 Apr 2026EGM approves Tranche 2 (A$120M) and name changeCorporate
13 Apr 2026Renamed Maritana Minerals (ASX: MRT)Rebrand
29 Apr 2026March quarterly: joins All Ordinaries; BSPH early worksIndex inclusion
11 May 2026Agreement to acquire Nano Metals gold and nickel tenementsBolt-on
14 May 2026Phase 2 Burbanks drilling beginsResource growth
19 May 2026Tenement swap with Accelerate ResourcesRationalisation / toll feed
9 Jun 2026BSPH capacity to 2.5 Mtpa; FEED complete; Zeal appointed; cash ~A$229MProject de-risking; capex review
25 Jun 2026Resource conversion drilling commencesReserve growth
22–23 Jul 2026June quarterly; accommodation strategyExecution
7 Aug 2026Wilsons aircore programme beginsDiscovery
20 Aug 2026Annual MRE 1.86 Moz; reserves 204 koz (+148%)Inventory growth
27 Aug 2026Phase 2 drilling extends high-grade Burbanks mineralisationResource growth
3 Sep 2026Phase 2 Burbanks and Wilsons complete; fourth rig added; Coote/Crake drillingActivity
11 Sep 2026Burbanks MRE up 62% to 755 koz; group above 2.1 MozMajor upgrade
Oct 2026 (expected)First Wilsons assays; September quarterly; FY2026 annual reportNear-term catalysts

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

3 charts
Revenue by Segment: Gold exploration & mining – revenue rose from AUD 0.1 Mn in FY2023 to AUD 36.9 Mn in FY2025.
Barra Resources Limited — Revenue by Segment
Series (AUD Mn)FY2023FY2024FY2025
Gold exploration & mining – revenue0.1036.9
Gold exploration & mining – pre-tax result-1-3.5-23.9

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Sources

Sources

  1. Barra Resources ASX announcements (2006 Burbanks drilling; 13 Nov 2017 Birthday Gift acquisition; 10 Sep 2018 MinRes placement; 10 Sep 2020 placement), via InvestSMART and ASX
  2. Horizon Minerals / Greenstone Resources joint announcements (13 Feb 2024; 18 Jun 2024 scheme implementation): Mining Weekly, Mining Technology, Stockhead, Business News coverage
  3. Horizon Minerals Annual Report 2024 (30 Sep 2024): Annual Financial Report 2025 (11 Sep 2025, audited by PKF Perth)
  4. Horizon / Poseidon scheme documents (25 Oct 2024; 19 Feb 2025 implementation): Argonaut deal summary
  5. Horizon Interim Financial Report for the half-year ended 31 Dec 2025 (13 Mar 2026, reviewed by KPMG)
  6. Horizon announcements: consolidation (Oct–Dec 2025), Lake Johnston (14 Nov 2025, 31 Dec 2025, 13 Feb 2026), Scoping Studies and A$175M placement (17–19 Feb 2026), SPP results (17 Mar 2026), name change (10 Apr 2026)
  7. Maritana announcements: March 2026 quarterly (29 Apr 2026), BSPH update (9 Jun 2026), accommodation (23 Jul 2026), Wilsons (7 Aug 2026), Annual MRE/ORE Statement (20 Aug 2026), drilling update (3 Sep 2026), Burbanks MRE (11 Sep 2026) · June 2026 Appendix 5B (via Kalkine)
  8. Market data: Fintel, StockLight, MarketScreener, Simply Wall St, StockAnalysis, Kalkine, TipRanks, Morningstar, Market Index (aggregators; used for prices, consensus and FY2021–FY2023 history)