Bauba Resources Limited Overview
| Field | Supplied | Verified | Source |
|---|---|---|---|
| Legal name | Bauba Resources Limited | Bauba Resources (Pty) Ltd (current, per Raubex SENS); Bauba Resources Limited (while listed) | Raubex cautionary SENS, 20 Jan 2026; Bauba FY2022 results |
| Country | South Africa | South Africa | Bauba FY2022 results |
| Exchange | Johannesburg Stock Exchange | JSE Main Board until 23 Aug 2022; now unlisted | Joint Bauba/Raubex SENS, 22 Aug 2022 |
| Ticker | BAU.JO | JSE code BAU (inactive) | Bauba SENS filings |
| ISIN | CA09607B2021 | ZAE000145686. The supplied CA-prefix ISIN does not match this issuer | Bauba SENS filings; FTSE/JSE index notice, Aug 2022 |
| Website | baubaresources.co.za | www.baubaresources.co.za (listed in filings up to 2022) | Bauba FY2022 results |
The identification details supplied for this task contain errors. Corrections:
Core profile
| Item | Detail | Source / Year |
|---|---|---|
| Legal name (current) | Bauba Resources (Pty) Ltd | Raubex SENS, 2026 |
| Former names | Bauba Platinum Limited (until July 2019); the listed shell was previously associated with Absolute Holdings (see Section 3) | Simply Wall St company description; Miningmx |
| Company registration no. | 1986/004649/06 | Bauba SENS |
| Incorporation jurisdiction | Republic of South Africa | Bauba FY2022 results |
| Founding year | Shell registered 1986. Bauba business created around 2010 and listed on the JSE in September 2010. Profile's handbook shows "Founded 1996 / Listed 1996", which conflicts with the 2010 listing date given in its own 2021 edition | Profile's Stock Exchange Handbook 2020/2021; BusinessDay, May 2022 |
| Registered address (last disclosed) | 50 Tegel Avenue, Highgrove Office Park, Building 11, Highveld, Centurion, 0157, South Africa. This is the same office park as Raubex's registered office | Bauba FY2022 results; Raubex FY2026 AFS |
| Prior registered address | Cube Workspace, 1 Wedgewood Link, Bryanston, Johannesburg | Bauba FY2020 results |
| Exchange listing | JSE Main Board, Sept 2010 – 23 Aug 2022 | Profile's handbook 2021; Joint SENS 22 Aug 2022 |
| Index membership (historic) | FTSE/JSE Fledgling Index (J204). Deleted effective 17 Aug 2022 | FTSE Russell notice, 10 Aug 2022 |
| Fiscal year end | 28/29 February (changed from 30 June, effective 29 Jan 2022) | Bauba FY2022 results |
| Controlling shareholder | Raubex (Pty) Ltd (subsidiary of Raubex Group Ltd), 74.97% after the Aug 2022 offer | Joint SENS, 22 Aug 2022 |
| Other major shareholder | Pelagic Resources Pte Ltd (Singapore trader and marketing agent), ~22–23.1% | Profile's handbook 2021; Mining Weekly, Feb 2022 |
| Employees | Profile's handbook 2020 lists 4 direct employees, reflecting a contractor-operated model. The 2021 edition lists 470, likely including contractor and site staff. Not publicly disclosed after 2022 | Profile's handbook 2020 Issue 3; 2021 Issue 3 |
| Auditor (last as listed company) | BDO South Africa Incorporated. Bauba's statutory auditor after delisting is not publicly disclosed. The Raubex group auditor was PwC for FY2026, with Ernst & Young proposed from FY2027 | Bauba FY2022 results; Raubex FY2026 AFS |
| Sponsor / company secretary (historic) | Merchantec Capital / Merchantec (Pty) Ltd | Bauba FY2022 results |
| Transfer secretary (historic) | Computershare Investor Services | Bauba FY2022 results |
| Principal banker (historic) | Nedbank Limited | Bauba FY2022 results |
| Shares in issue at delisting | 749,817,498 ordinary no-par shares (authorised 750,000,000) | Bauba FY2022 results; Profile's handbook |
| Market capitalisation | Not applicable (unlisted). Implied 100% equity value at the final R0.42/share offer price ≈ R314.9 m (Aug 2022). Simply Wall St's last recorded market cap was R307.4 m | Joint SENS 2022; Simply Wall St |
Bauba Resources is a South African junior chrome-ore producer with a growing by-product platinum group metals (PGM) stream. It began as a PGM explorer on the eastern limb of the Bushveld Igneous Complex and pivoted to chrome when PGM prices collapsed in the mid-2010s. It now operates two chrome mines. Moeijelijk is an underground mine in Limpopo, roughly 50 km north-west of Steelpoort. Kookfontein, held through 74%-owned Nuco Chrome, is an open-pit mine near Rustenburg in North West province. A third resource, Naboom (74%), is intended to extend life of mine. Since 2022 Bauba has been a delisted subsidiary of construction and materials group Raubex, which uses its own contract-mining (SPH Kundalila) and processing (B&E International) units at Bauba's sites. All output is marketed through minority shareholder Pelagic Resources and priced off China CIF chrome benchmarks. Earnings are therefore highly sensitive to chrome prices and the rand. Bauba's future ownership is under formal review.
What the company does
Bauba mines and beneficiates chromite ore from the Bushveld Complex's chromitite layers (LG/MG, UG1 and UG2 seams). It sells three main chrome products into the export market:
Metallurgical-grade chrome concentrate: Benchmarked against 40–42% Cr₂O₃ concentrate, CIF China.
Foundry-grade chrome: Higher-priced speciality product, mainly from Moeijelijk's own underground ore.
Run-of-mine (RoM) ore: Sold directly in some periods.
Since August 2025 it has also produced a PGM concentrate from a dedicated plant at Kookfontein. The plant captures PGMs from UG2 and chrome tailings, and PGM sales began in the second half of FY2026 (Raubex 1H2026 interim results; Raubex trading update, Oct 2025).
The company's own self-description changed with its strategy:
2020: A junior mining company focused on chrome-ore mining and PGM exploration. It explained that it had shifted to chrome because of persistently low PGM prices and the acquisition of the Moeijelijk chrome resource (Profile's Stock Exchange Handbook 2020, Issue 3).
2021: A mining and exploration company listed on the JSE since September 2010 and fully compliant with the Mining Charter (Profile's handbook 2021, Issue 3).
Current (Raubex disclosures): Raubex describes its investment in Bauba as "specialised resource ownership". This is one of four disciplines in its MHM division, alongside contract crushing, materials handling and mineral processing, and contract mining (Raubex 1H2026 interim results).
Business model and revenue model
| Dimension | Characterisation | Evidence |
|---|---|---|
| Revenue type | 100% product sales (commodity ore and concentrate). No service, subscription or licensing revenue | Bauba FY2022 results, note 5: revenue consists entirely of "sale of chrome ore" |
| Customer concentration | One external customer in FY2022 (all revenue). After 2022, sales go to Pelagic Resources, which markets all chrome and PGM output under an evergreen supply contract | Bauba FY2022 results, note 12; Mining Weekly, 15 Feb 2022 |
| Pricing | Market-linked to China CIF benchmark for 42% concentrate, net of freight. Exposed to the USD/ZAR rate. Raubex accounts for some sales as provisionally priced arrangements | Bauba FY2020/FY2022 results; Raubex FY2026 AFS, note 2 |
| Operating model | Contractor-operated. Underground mining at Moeijelijk is outsourced (contractor changed several times). Open-pit fleet at Kookfontein is supplied by Raubex's SPH Kundalila. Both processing plants are run by Raubex's B&E International | Raubex 1H2026 interim results |
| Value-chain position | Upstream: mining, crushing, gravity-spiral beneficiation, and since 2025 PGM flotation. No downstream smelting. Marketing is outsourced | Raubex/Bauba filings |
| Capital model | As a listed junior, relied on offtake prepayments, USD term loans, contractor-financed equipment, shareholder loans and rights issues. After 2022, funded within the Raubex group | Bauba FY2019–FY2022 cash-flow statements |
Customer types and end-markets
The ultimate end-market is stainless-steel production, mainly in China, via ferrochrome smelting. The CIF China pricing basis and Bauba's commentary on Chinese port stocks and stainless-steel demand reflect this (Bauba FY2022 results). Foundry-grade chrome serves the foundry-sand market, a premium niche. PGM concentrate serves PGM smelter and refiner offtakers. The PGM counterparty is not publicly disclosed, though Bauba was negotiating with a nearby PGM concentrator in 2021 (Engineering News, 5 Jul 2021).
Independent characterisation
Bauba is a price-taking, high-operating-leverage junior miner that has passed through several funding crises. It survived as a listed company only through repeated external rescues: offtake prepayments, contractor financing, and finally a takeover by Raubex. Under Raubex, operational integration (in-group mining and processing contractors) has scaled production. Revenue reached about R2.6 bn in FY2025 against R0.28 bn in its last full listed year. However, this has not insulated earnings from the chrome cycle. A R350.5 m operating loss in 2H FY2025 was followed by a R243.7 m full-year operating profit in FY2026 (Raubex 1H2026 interim results; Raubex FY2026 results commentary). The asset base now combines underground chrome, open-pit chrome/UG2, PGM by-product recovery and an undeveloped PGM exploration project. That mix makes it a more saleable package than the business Raubex acquired, which is consistent with the parent's decision to test the market.
Strategy
Stated strategy themes
2019–2021 (listed): Shift from PGM exploration to chrome mining. Sell more premium speciality concentrate to cushion margins. Replace depleted opencast with underground mining at Moeijelijk. Diversify into PGMs through Kookfontein UG2 and a possible PGM flotation plant funded by Kookfontein cash flows (Bauba FY2020 results; Engineering News, 5 Jul 2021).
2022 delisting rationale: The board concluded the listing could no longer justify its cost and administrative burden. It cited share illiquidity and the poor prospects for a junior counter raising public capital in its sector (Bauba/Raubex SENS, 21 Jun 2022).
Raubex rationale for acquiring: Raubex said owning mining companies positions it to win long-term contracts at new mines, and that its open-cast mining expertise could unlock Bauba's potential (Engineering News, 3 Feb 2022; Mining Weekly, 15 Feb 2022).
2025–2026 (Raubex): Lower the cost base, run the plants closer to full capacity, raise Kookfontein plant capacity to 90 kt/month, start PGM sales, bring Naboom into production to extend life of mine, and lift the foundry-grade mix at Moeijelijk (Raubex 1H2026 interim results). In parallel, Raubex is evaluating the asset's long-term place in the group (cautionary announcements, December 2025 onward).
Strategic initiatives in the last 24 months (Oct 2024 – Oct 2026)
| Initiative | Date | Detail | Status | Source |
|---|---|---|---|---|
| New Moeijelijk underground contractor | Apr 2025 | Contractor change. Performing in line with plan; full capacity expected 2H FY2026 | Ramping | Raubex 1H2026 results |
| Kookfontein plant optimisation | 1H FY2026 | Modifications to raise capacity from 80,000 t to 90,000 t | In progress / completed (final status not disclosed) | Raubex 1H2026 results |
| Kookfontein PGM plant | Aug 2025 | First full month of production; sales from 2H FY2026 | Operating | Raubex trading update, Oct 2025 |
| Naboom resource development | 2H FY2026 | Expected to start contributing to earnings | Not confirmed in public updates | Raubex 1H2026 results |
| Strategic review / potential disposal | Nov 2025 – present | Transaction adviser appointed. Partial or full disposal under consideration | Ongoing as of 26 Aug 2026 | Raubex SENS |
| Cost-base reduction | FY2026 | Measures to lower costs and improve returns | Not quantified | Raubex 1H2026 results |
Medium-term targets and guidance
Bauba has no standalone guidance. Raubex management expects continued improvement at Bauba and roughly a doubling of PGM sales (Financial Mail, 28 May 2026). Quantified production, cost or return targets are not publicly disclosed.
ESG commitments
No Bauba-specific emissions or ESG targets are publicly disclosed.
Products & Services
Products
| Product | Description | Source asset | Target customer | Pricing basis | Status / latest | Source |
|---|---|---|---|---|---|---|
| Metallurgical-grade chrome concentrate (40–42% Cr₂O₃) | Gravity-spiral concentrate for ferrochrome smelting | Moeijelijk, Kookfontein | Ferrochrome and stainless producers, mainly China, via Pelagic | China CIF 42% benchmark less freight; USD | Core product. Dominated Moeijelijk output in 1H FY2026 because externally sourced feed was unsuitable for foundry grade | Raubex 1H2026 results |
| Foundry-grade chrome | Higher-specification chrome sand/concentrate | Mainly Moeijelijk's own underground ore | Foundry-sand market | Premium to metallurgical grade | Expected to rise once the contractor reaches full capacity in 2H FY2026. Four-month foundry-chrome sales contract with a leading trader reported in the Bauba Platinum era (date not stated in source) | Raubex 1H2026 results; Miningmx |
| Speciality-grade / premium concentrate | Higher-value concentrate grades | Moeijelijk | Speciality buyers | Premium | Higher proportion sold in FY2020 and the 8M to Feb-22 | Bauba FY2020 and FY2022 results |
| Run-of-mine chrome ore | Unprocessed ore | Moeijelijk (2017 restart) | Traders | Per-tonne contract | Sold under 2017 offtake (R40.3 m for January 2017 RoM) | Bauba SENS, 24 Feb 2017 |
| UG2 ore / PGM-bearing ore | UG2 opencast ore with PGM content | Kookfontein phase 1 (~400,000 t target) | Nearby PGM concentrator | PGM basket pricing | Initial UG2 phase (2021–2023), followed by the transition to primary chrome pits | Bauba FY2022 results; Raubex 1H2024 results |
| PGM concentrate | Flotation concentrate recovered from chrome/UG2 tailings | Kookfontein PGM plant | PGM smelter/refiner (not publicly disclosed) | PGM basket | First full month August 2025. Sales from 2H FY2026. Management expects PGM sales to roughly double | Raubex trading update Oct 2025; Financial Mail, 28 May 2026 |
Processing infrastructure
| Facility | Specification | Year | Operator | Source |
|---|---|---|---|---|
| Moeijelijk wash plant | Chrome spiral wash plant. Additions of R20.8 m in FY2019 and R4.0 m in FY2020 | Built c. 2017–2019 | B&E International (Raubex) | Bauba FY2020 results; Raubex 1H2026 results |
| Kookfontein ore wash plant and crushing circuit | 80,000 t/month, being upgraded to 90,000 t/month in FY2026 | Construction 2023; contributing from mid-July 2024 | B&E International | Raubex 1H2024 and 1H2026 results; Business Report |
| Kookfontein PGM plant | PGM flotation from tailings | Commissioned August 2025 | Not stated (B&E oversees chrome plants) | Raubex 1H2026 results |
Pricing model
Bauba sells at prevailing market rates through Pelagic Resources. Invoices are raised per order with varying terms and settled within about 15 days on average (Raubex 1H2026 interim results, related-party note). Contract-specific pricing terms are not publicly disclosed.
Financial Narrative
Basis of presentation
Bauba's last five reporting periods as a standalone filer were FY2019–FY2021 (12 months to June) and FY2022 (8 months to February). After that, only partial Raubex-level data exists. The tables below use Bauba's audited or reviewed results. FY2021 is shown as restated in the FY2022 results. FY2020 is shown as originally reported in the FY2020 reviewed provisional results. FY2022 covers eight months and is not comparable to 12-month periods. Revenue for FY2016–FY2018 comes from an aggregator (S&P Global Market Intelligence via Simply Wall St) and is not primary-filing verified.
Income statement (R m)
Sources: Bauba FY2020 and FY2022 results. Derived lines: operating profit = gross profit + other income − operating and administrative expenses. Net finance cost includes FX, and a negative value means net income. FY2021 EPS is restated for the November 2021 rights issue (−5.26c before adjustment). No dividends appear in any cash-flow statement reviewed.
Sources: FY2016 from Business Report (6 Jan 2017). FY2017–FY2018 from S&P Global via Simply Wall St (aggregator). FY2019–FY2021 from Bauba filings.
Margins and growth
Revenue CAGRs (derived): FY2019→FY2021 −4.2% a year. FY2018→FY2021 about +5.8% a year (FY2018 base from aggregator). FY2016→FY2021 about +28.5% a year, driven by the 2017 restart from care and maintenance. Post-acquisition, Bauba's ore sales of R2.61 bn in FY2025 were roughly 9.4 times its FY2021 revenue. This reflects Kookfontein's ramp-up under Raubex, but the two figures sit on different consolidation bases and should not be read as organic growth.
Balance sheet (R m, period-end)
Sources: Bauba FY2020 results (FY2019 and FY2020 as originally reported) and FY2022 results (FY2021 restated, FY2022). The fall in intangibles from FY2020 to FY2021 is the reclassification of chrome mineral rights in production (cost R156.9 m) to PPE, not an impairment. Goodwill: none recognised. The remaining intangible is platinum mineral rights carried at R20.2 m.
Cash flow (R m)
Sources: Bauba FY2020 and FY2022 results, cash-flow statements. Note that the FY2020 cash-flow statement shows R73.5 m of prepayment proceeds and R60.1 m repaid in FY2019 (net R13.4 m), with the balance repaid in FY2020.
Ratios
Notes: All ratios are derived from the figures above. FY2022 ratios use eight-month flows and are not annualised. Interest coverage was about 590x in FY2019 (finance cost R0.07 m) and is not meaningful in loss years. Net debt/EBITDA is not meaningful with negative or near-zero EBITDA. A full cash conversion cycle cannot be computed because trade payables are not separated from other payables in all years. FY2022 inventory days are annualised.
Commentary on trends, inflections and drivers
FY2019: peak of the opencast era. Bauba earned a 37% gross margin and R33.0 m net profit. Moeijelijk's shallow, low-strip opencast ore coincided with chrome prices averaging about US$167/t CIF China in calendar 2019 (Bauba FY2020 results). The balance sheet carried no debt, and a R73.5 m offtake prepayment funded working capital.
FY2020: a collision of geology, prices and COVID. Revenue fell 14% to R260.4 m and gross margin collapsed to 4.3%. Three factors combined:
-
The opencast was exhausted in December 2019.
-
Its final tonnes were sold into a weak Chinese market in early 2020. The 42% concentrate averaged about US$129/t in Q1 2020, the third-lowest quarter since 2011.
-
Underground mining was halted from March to June 2020 during lockdown.
Saleable tonnes actually rose to 218,214 t (FY2019: 202,002 t) with a richer speciality mix, but price declines outweighed the volume gain (Bauba FY2020 results). This was the first year of external debt (US$5 m loan) and of a going-concern material uncertainty.
FY2021: building the underground mine on borrowed money. Capex more than tripled to R151.1 m as Moeijelijk was developed underground. Debt including leases rose to R186.9 m, and cash fell to R4.8 m. Gross margin partly recovered to 19.1%. However, operating costs and depreciation of new infrastructure kept the company loss-making (net loss R31.4 m restated).
FY2022 (8 months): a balance-sheet crisis resolved by a change of control. Production improved sharply:
-
RoM up 16% to 205,940 t.
-
Concentrate up 40% to 138,053 t.
-
Yield improved from 55.5% to 67.0%.
Despite this, losses widened to R52.3 m. Freight cost inflation offset higher US$ prices. Geological problems and safety stoppages cost about a month of production between October and December 2021. Concentrate cost per tonne rose 26.8%. Net debt reached R429.9 m, including R185.3 m of subordinated shareholder loans, and current liabilities exceeded current assets by R87.8 m. The auditor's review conclusion again carried a going-concern material uncertainty (Bauba FY2022 results, notes 1.1 and 15).
FY2023–FY2026 under Raubex: scale and volatility. Kookfontein's north and south pits came online at the start of FY2024, and Raubex's MHM division revenue rose 39.6% to R4.02 bn that year, mainly from Bauba volumes (Engineering News, 13 May 2024). By FY2025 Bauba's ore sales were R2.61 bn. Then the chrome price fell sharply in 2H FY2025. Bauba lost R350.5 m at operating level in that half and R235.8 m for the year, pulling the MHM division's restated operating profit down to R4.2 m. FY2026 reversed this: operating profit of R243.7 m, a 203.4% swing, helped by price recovery, PGM sales and plant optimisation (Raubex FY2026 results; Financial Mail, 28 May 2026). The pattern of the listed era repeats at a larger scale: earnings are dominated by chrome price and rand movements rather than by volume.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Group Entities
| Entity | Bauba interest | Asset / role | Source |
|---|---|---|---|
Bauba Resources (Pty) Ltd | Holding company. Raubex 74.97%; Pelagic ~22–23%; small residual minorities (exact current split not publicly disclosed) | Corporate, management fees | Joint SENS Aug 2022; Profile's handbook 2021 |
Bauba A Hlabirwa Mining Investments (Pty) Ltd | Majority-owned. 60% of the Moeijelijk/Waterkop rights per the 2014 structure; current percentage not publicly disclosed | Moeijelijk chrome mine (Limpopo) | Mining Weekly, Oct 2014; Bauba FY2022 results, note 9 |
Nuco Chrome Bophuthatswana (Pty) Ltd | 74% | Kookfontein chrome/UG2 open pit and PGM plant (North West) | Bauba FY2022 results, note 14 |
Naboom Mining Company | 74% | Chrome/PGM resource to extend life of mine | Engineering News, 13 May 2024 |
Bauba platinum project | Not specified in sources | Eight properties, ~14,390 ha, eastern limb of the Bushveld Complex. Exploration stage | Simply Wall St company description |
Hartebeesfontein prospecting rights | Not specified | Exploration, executed FY2020 | Bauba FY2020 results |
Segment revenue (ZAR Mn)
| Segment revenue (ZAR Mn) | FY2019 | FY2020 | FY2021 | FY2022 |
|---|---|---|---|---|
Moeijelijk / Chrome projects (ZAR Mn) | 302.122 | 260.394 | 277.100 | 253.461 |
Kookfontein (ZAR Mn) | 0 | 0 | 0 | 2.709 |
Platinum exploration (ZAR Mn) | 0 | 0 | 0 | 0 |
Group external revenue (ZAR Mn) | 302.122 | 260.394 | 277.100 | 256.170 |
Segment profit/(loss) before tax (ZAR Mn)
| Segment profit/(loss) before tax (ZAR Mn) | FY2019 | FY2020 | FY2021 | FY2022 |
|---|---|---|---|---|
Moeijelijk / Chrome projects PBT (ZAR Mn) | 48.885 | -54.303 | -32.490 | -39.676 |
Kookfontein PBT (ZAR Mn) | 0 | 0 | 0 | -4.496 |
Corporate PBT (ZAR Mn) | -1.136 | -5.192 | -4.382 | -20.362 |
Group PBT (ZAR Mn) | 47.749 | -59.495 | -36.872 | -64.534 |
Segment margin and mix (%)
| Segment margin and mix (%) | FY2019 | FY2020 | FY2021 | FY2022 |
|---|---|---|---|---|
Moeijelijk PBT margin (%) | 16.2 | -20.9 | -11.7 | -15.7 |
Moeijelijk share of group revenue (%) | 100.0 | 100.0 | 100.0 | 98.9 |
Kookfontein share of group revenue (%) | 0.0 | 0.0 | 0.0 | 1.1 |
Revenue by Segment
| Bauba line items disclosed by Raubex (ZAR Mn) | FY2025 | FY2026 |
|---|---|---|
Bauba revenue / sale of ore (ZAR Mn) | 2,610.877 | — |
Bauba operating profit (ZAR Mn) | -235.8 | 243.7 |
Ore sales to Pelagic Resources, related party (ZAR Mn) | 2,548.853 | — |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansRevenue by Segment and Segment Margins & Growth (%)
| Bauba half-year disclosures (ZAR Mn) | 1H FY2025 | 2H FY2025 | 1H FY2026 | 2H FY2026 |
|---|---|---|---|---|
Bauba revenue (ZAR Mn) | 1,530 | — | 934.5 | — |
Bauba operating profit (ZAR Mn) | 114.8 | -350.5 | -7.6 | 251.3 |
Bauba operating margin (%) | 7.5 | — | -0.8 | — |
Sales to Pelagic Resources (ZAR Mn) | 1,482.017 | — | 915.730 | — |
Revenue by Segment and Segment Margins & Growth (%) (Annual)
| Raubex MHM division (ZAR Mn), basis as reported each year | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|
MHM revenue (ZAR Mn) | 2,878.0 | 4,017.9 | 4,263.7 | 4,127.5 |
MHM operating profit (ZAR Mn) | — | 584.7 | 4.2 | 444.9 |
MHM operating margin (%) | — | 14.6 | 0.1 | 10.8 |
MHM capital expenditure (ZAR Mn) | — | — | 636.9 | 509.4 |
Income Statement and Per-Share Data
| Metric | FY2019 | FY2020 | FY2021 | FY2022 |
|---|---|---|---|---|
Revenue (ZAR Mn) | 302.122 | 260.394 | 277.100 | 256.170 |
Cost of sales (ZAR Mn) | 190.475 | 249.325 | 224.259 | 218.359 |
Gross profit (ZAR Mn) | 111.647 | 11.069 | 52.841 | 37.811 |
Operating and admin expenses (ZAR Mn) | 67.834 | 69.390 | 90.943 | 83.621 |
Operating profit, derived (ZAR Mn) | 43.884 | -58.321 | -38.102 | -45.031 |
Depreciation and amortisation (ZAR Mn) | 9.036 | 14.252 | 41.880 | 38.495 |
EBITDA, derived (ZAR Mn) | 52.920 | -44.069 | 3.778 | -6.536 |
Net finance cost incl. FX (ZAR Mn) | -3.865 | 1.120 | -1.749 | 19.503 |
Profit before tax (ZAR Mn) | 47.749 | -59.495 | -36.872 | -64.534 |
Income tax (charge negative) (ZAR Mn) | -14.718 | 14.219 | 5.475 | 12.264 |
Net profit (ZAR Mn) | 33.031 | -45.276 | -31.397 | -52.270 |
Net profit to equity holders (ZAR Mn) | 17.930 | -30.592 | -24.357 | -40.136 |
Basic EPS (ZAR cents) | 4.73 | -8.07 | -5.12 | -5.92 |
Diluted EPS (ZAR cents) | 4.71 | -8.07 | -5.12 | -5.92 |
Dividends per share (ZAR cents) | 0 | 0 | 0 | 0 |
Revenue, extended history (ZAR Mn)
| Revenue, extended history (ZAR Mn) | FY2016 | FY2017 | FY2018 | FY2019 | FY2020 | FY2021 |
|---|---|---|---|---|---|---|
Revenue (ZAR Mn) | 78.7 | 205 | 234 | 302.122 | 260.394 | 277.100 |
Margin Analysis (%)
| Metric | FY2019 | FY2020 | FY2021 | FY2022 |
|---|---|---|---|---|
Gross margin (%) | 37.0 | 4.3 | 19.1 | 14.8 |
Operating margin (%) | 14.5 | -22.4 | -13.8 | -17.6 |
EBITDA margin (%) | 17.5 | -16.9 | 1.4 | -2.6 |
Net margin (%) | 10.9 | -17.4 | -11.3 | -20.4 |
Revenue growth YoY (%) | 29.1 | -13.8 | 6.4 | — |
Balance Sheet
| Metric | FY2019 | FY2020 | FY2021 | FY2022 |
|---|---|---|---|---|
Total assets (ZAR Mn) | 415.898 | 460.504 | 609.912 | 926.091 |
Property, plant and equipment (ZAR Mn) | 139.829 | 180.621 | 462.690 | 717.975 |
Intangible assets / mineral rights (ZAR Mn) | 145.315 | 141.838 | 20.161 | 20.161 |
Inventory (ZAR Mn) | 87.033 | 64.985 | 85.997 | 126.234 |
Cash and equivalents (ZAR Mn) | 32.822 | 48.514 | 4.812 | 1.490 |
Borrowings, short-term (ZAR Mn) | 0 | 24.059 | 63.171 | 81.438 |
Borrowings, long-term (ZAR Mn) | 0 | 46.578 | 69.461 | 74.106 |
Shareholder loans (ZAR Mn) | 0 | 10.194 | 20.677 | 185.266 |
Lease liabilities (ZAR Mn) | 0 | 5.075 | 33.588 | 90.536 |
Total debt incl. leases and shareholder loans (ZAR Mn) | 0 | 85.906 | 186.897 | 431.346 |
Net debt (ZAR Mn) | -32.822 | 37.392 | 182.085 | 429.856 |
Total equity (ZAR Mn) | 321.019 | 278.371 | 329.933 | 309.303 |
Non-controlling interest (ZAR Mn) | 70.024 | 55.340 | 48.300 | 33.922 |
Working capital, CA minus CL (ZAR Mn) | 73.271 | 28.150 | -50.260 | -87.831 |
Environmental rehabilitation provision (ZAR Mn) | 6.650 | 5.794 | 5.078 | 23.809 |
Cash Flow
| Metric | FY2019 | FY2020 | FY2021 | FY2022 |
|---|---|---|---|---|
Operating cash flow (ZAR Mn) | 4.627 | 6.503 | -29.806 | 43.770 |
Capital expenditure, PPE (ZAR Mn) | 59.185 | 45.673 | 151.138 | 234.433 |
Free cash flow, derived (ZAR Mn) | -54.558 | -39.170 | -180.944 | -190.663 |
Proceeds from share issues (ZAR Mn) | 0 | 0 | 89.932 | 33.884 |
Net borrowings raised (ZAR Mn) | 0 | 68.853 | 66.080 | 15.154 |
Net shareholder loans raised (ZAR Mn) | 0 | 10.000 | 10.500 | 161.597 |
Offtake prepayment received/(repaid), net (ZAR Mn) | 13.364 | -13.364 | 0 | 0 |
Dividends paid (ZAR Mn) | 0 | 0 | 0 | 0 |
Share buybacks (ZAR Mn) | 0 | 0 | 0 | 0 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2019 | FY2020 | FY2021 | FY2022 |
|---|---|---|---|---|
ROE on closing equity (%) | 10.3 | -16.3 | -9.5 | -16.9 |
ROA on closing assets (%) | 7.9 | -9.8 | -5.1 | -5.6 |
ROIC, EBIT after 28% tax over (equity + net debt) (%) | 10.9 | -13.3 | -5.4 | -4.4 |
Current ratio (x) | 2.27 | 1.28 | 0.70 | 0.68 |
Debt to equity (x) | 0.00 | 0.31 | 0.57 | 1.39 |
Asset turnover (x) | 0.73 | 0.57 | 0.45 | 0.28 |
Inventory days on cost of sales (days) | 167 | 95 | 140 | 141 |
Revenue by Region and Revenue by Region (%)
| Region | FY2019 | FY2020 | FY2021 | FY2022 | FY2025 |
|---|---|---|---|---|---|
South Africa revenue (ZAR Mn) | 302.122 | 260.394 | 277.100 | 256.170 | 2,610.877 |
Rest of world revenue (ZAR Mn) | 0 | 0 | 0 | 0 | 0 |
South Africa share (%) | 100 | 100 | 100 | 100 | 100 |
Key Events
| Event | Date | Price (ZAR) | Source |
|---|---|---|---|
Claw-back offer | Nov 2021 | 0.31 | Bauba FY2022 results |
Raubex block purchase | Feb 2022 | 0.36 | Engineering News, Feb 2022 |
Mandatory offer | Mar–Jun 2022 | 0.42 | SENS |
General offer (final) | Jul–Aug 2022 | 0.42 | SENS |
Share Count (millions) and Per-Share Data
| Metric | FY2019 | FY2020 | FY2021 | FY2022 |
|---|---|---|---|---|
Shares in issue at period-end (millions) | 379.020 | 379.020 | 640.515 | 749.817 |
Weighted average shares (millions) | 379.020 | 379.020 | 476.090 | 677.702 |
Equity per share (ZAR cents) | 84.7 | 73.4 | 51.5 | 41.3 |
Analyst Conclusions
Management guidance (via Raubex)
Bauba's operating outlook: Raubex expects Bauba's operations to run closer to full capacity, the cost base to fall, the PGM plant to lift profitability, Naboom to contribute from 2H FY2026, and Moeijelijk to process only its own ore with more foundry grade (Raubex 1H2026 results).
PGM volumes: Management expects ongoing improvement and roughly a doubling of PGM sales (Financial Mail, 28 May 2026).
Production and financial guidance: No quantified production or financial guidance has been published, and no consensus estimates exist.
Bull case
-
Earnings momentum. The FY2026 operating swing of +R479.5 m (from −R235.8 m to +R243.7 m), with an implied 2H FY2026 operating profit of about R251.3 m, shows strong earnings power at recovered prices (Raubex FY2026 results).
-
Diversified earnings base. PGM sales (from August 2025), Naboom (2H FY2026) and the 90 kt/month plant add volume and by-product credits, reducing reliance on chrome alone (Raubex 1H2026 results).
-
Supportive sale process. A process described as "advanced" in a recovering earnings year improves the chance of a value-accretive exit or partnership (Raubex SENS, Aug 2026).
Bear case
-
Price-taker economics. Chrome price and rand moves dominate results. A single half-year (2H FY2025) erased more than a year of profit (R350.5 m operating loss) (Raubex 1H2026 results).
-
Concentration risk. Effectively one customer (Pelagic, about 98% of FY2025 ore sales), which is also a shareholder. This complicates pricing transparency and any sale (Raubex 1H2026 results).
-
Execution history. Repeated contractor changes, geological setbacks and cost inflation recur across both the listed era and Raubex ownership (Bauba FY2022 results; Raubex 1H2025/1H2026 results).
Catalysts and monitorables (next 12 months)
| Catalyst | Expected timing | What to watch |
|---|---|---|
| Raubex interim results (6 months to 31 Aug 2026) | ~November 2026 (typical timetable) | Bauba revenue and operating profit, PGM sales, Naboom contribution |
| Outcome of strategic review | Uncertain | Firm intention / sale announcement, buyer identity, price, partial or full exit |
| Chrome price (42% CIF China) and USD/ZAR | Continuous | Margin sensitivity |
| Moeijelijk contractor at full capacity | 2H FY2026 onward | Foundry-grade share, yields |
| South African ferrochrome / export policy | Ongoing | Export tax or beneficiation measures |
| Raubex FY2027 results | ~May 2027 | Full-year Bauba disclosure under new auditor (EY, if approved) |
Analyst verdict
Bauba Resources is best understood not as an independent company but as a cyclical chrome-and-PGM asset package. The package has passed through three owners' strategies in a decade: PGM explorer, listed junior chrome miner, and construction-group diversification play. The listed era (FY2019–FY2022) shows the limits of a sub-scale, single-mine junior. One good year (FY2019 profit R33.0 m) was followed by three loss-making periods, an underground mine built on expensive and partly unrecognised debt, a restatement, repeated going-concern warnings, and a delisting at R0.42 per share. That price valued the equity at roughly book value.
Raubex added what Bauba lacked: capital, open-pit expertise, in-house processing and fleet, and patience. The asset base is now materially larger and more diversified. It comprises two operating chrome mines, an expanding plant, a PGM recovery circuit and a life-extension resource. FY2026's R243.7 m operating profit shows earnings capacity at supportive prices.
The FY2025 collapse shows equally clearly that integration did not change the underlying economics. Bauba is a price-taker with very high operating leverage, heavy dependence on one marketing counterparty, and recurring operational instability at Moeijelijk.
Raubex's decision to seek a buyer just as earnings recover is rational portfolio management. Mining sits awkwardly in an infrastructure group, and selling into a recovery maximises value. For any acquirer, value will hinge on four things:
-
Durable chrome pricing.
-
PGM volumes meeting the expected doubling.
-
Naboom's ramp-up.
-
The terms of the Pelagic marketing arrangement.
Verdict: an operationally improved but cyclically exposed asset whose near-term value is defined by the sale process rather than by its fundamentals. Evidence quality after 2022 is limited to parent-level disclosure, so conclusions about cost structure, reserves and balance-sheet health should be treated as provisional until a transaction circular or standalone financials become available.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Executive Leadership Team
| Name | Role at Raubex | Relevance to Bauba | Source |
|---|---|---|---|
Felicia Msiza | CEO, Raubex Group | Public spokesperson on Bauba performance and strategic review | Raubex FY2026 AFS; Engineering News, May 2026 |
DC Lourens | COO, Raubex Group | Group operations | Raubex FY2026 AFS |
SJ Odendaal | Financial Director, Raubex Group | Group finance; responsible for the AFS | Raubex FY2026 AFS |
RJ Fourie | Non-executive Chairman, Raubex | Group board | Raubex FY2026 AFS |
Board of Directors
| Name | Role | Category | Notes | Source |
|---|---|---|---|---|
Sean Edwards | Chairperson (from 10 Aug 2021) | Independent non-executive | Appointed 5 Aug 2021 | Bauba FY2022 results |
Dr NM Phosa | Director | Independent non-executive | Long-serving director (on board in FY2020) | Bauba FY2020/FY2022 results |
Eugene Nel | Director | Independent non-executive | Appointed 5 Aug 2021 | Bauba FY2022 results |
Thomas Baring | Director | Non-executive | Gary Baumgarten as alternate from 9 May 2022 | Bauba FY2022 results |
Robert Shedlock | Director | Non-executive | Appointed 2 Apr 2021 | Bauba FY2022 results |
Jurie Hendrik Wessels | Director | Non-executive | Appointed 7 Apr 2021 | Bauba FY2022 results |
Terence Jordaan | Director | Non-executive | Appointed 9 May 2022; Johan Le Roux became his alternate | Bauba FY2022 results |
Jonathan A. Knowlden CA(SA) | CEO | Executive | Former FD; acting CEO from 15 Sept 2021; CEO from 9 May 2022 | Bauba FY2022 results |
Berrangé (DFB) Nelson | Financial Director | Executive | Appointed 9 May 2022 | Bauba FY2022 results |
Board of Directors — NPJ (Nico) van der Hoven
| Name | Role | Tenure end | Source |
|---|---|---|---|
NPJ (Nico) van der Hoven | Chairperson | Resigned 30 Jul 2021 | Bauba FY2020/FY2022 results |
NW (Nick) van der Hoven | CEO | Resigned 15 Sept 2021 | Bauba FY2022 results |
Martin Luyt | Lead independent non-executive | Resigned 30 Jul 2021 | Profile's handbook 2021; Bauba FY2022 results |
Damian Smith | Independent non-executive | Resigned 30 Jul 2021 | Bauba FY2022 results |
Thabile Makgala | Independent non-executive | Resigned 1 Oct 2021 | Bauba FY2022 results |
King TV Thulare | Alternate director | Not stated | Bauba FY2020 results |
Sholto Dolamo | Independent non-executive | Resigned 5 Dec 2019 | Bauba FY2020 results |
Thinus Slabber | Non-executive | Appointed 5 Aug 2021; resigned 29 Oct 2021 | Bauba FY2022 results |
Fred Geldenhuys | Independent non-executive | Appointed 5 Aug 2021; resigned 15 Sept 2021 | Bauba FY2022 results |
Major Shareholders
| Holder | Stake (%) | Date / basis | Source |
|---|---|---|---|
Raubex (Pty) Ltd | 74.97 | After 19 Aug 2022 offer close | Joint SENS, 22 Aug 2022 |
Pelagic Resources Pte Ltd | ~22–23.1 | Concert party to Raubex's offers | Profile's handbook 2021; Mining Weekly, Feb 2022 |
Others | ~2 (residual, derived) | Post-delisting | Derived |
Government Employees Pension Fund (PIC) | 15.50 | 2020 (historic; exited in the 2021–2022 consolidation) | Profile's handbook 2020 |
Competitive Landscape
Key Competitors
| Competitor | Segment overlap | Relative positioning vs Bauba (qualitative) |
|---|---|---|
Samancor Chrome | Chrome ore and ferrochrome | Integrated major; far larger scale |
Glencore-Merafe Chrome Venture | Chrome ore and ferrochrome | Integrated major; captive smelting |
Assmang Chrome (ARM/Assore) | Chrome ore | Large, diversified owners |
Tharisa plc | PGM and chrome co-production (western limb) | Closest business-model analogue at larger scale |
Sylvania Platinum | PGM recovery from chrome tailings | Benchmark for Bauba's new PGM-from-tailings stream |
Jubilee Metals Group | Chrome and PGM tailings processing | Tailings-processing peer |
Sibanye-Stillwater / UG2 PGM miners | By-product UG2 chrome supply | By-product supply affects chrome prices |
Eastern Platinum (Eastplats) | PGM and chrome, eastern limb | Similar geology and region |
Independent junior chrome miners (eastern and western limbs) | Chrome ore | Direct peers on scale and cost structure; names and data not compiled |
Peer Comparison FY2025
| Metric | Bauba | Peer A | Peer B | Peer C |
|---|---|---|---|---|
Revenue | R2,610.9 m ore sales (FY2025, Raubex disclosure) | Not compiled | Not compiled | Not compiled |
Growth | 1H FY2026 revenue −38.9% YoY | Not compiled | Not compiled | Not compiled |
Operating margin | ~−9% FY2025 (derived: −R235.8 m / R2,610.9 m); 1H FY2026 −0.8% | Not compiled | Not compiled | Not compiled |
R&D intensity | 0% | Not compiled | Not compiled | Not compiled |
Recent Developments
Because Bauba is unlisted, newsflow appears only through Raubex disclosures and trade press. All located items are listed below.
Not found in this window: * Bauba-specific litigation, regulatory sanctions, layoffs, leadership appointments or contract wins.



