Company ProfilePremium

Bellevue Gold Limited

Company Profile Analysis

Ticker: BGL.AX

ESOMAR 23 Corporate BadgeISO Certifications Badge
Bellevue Gold Limited - Company showcase

Year Founded & Workforce

2004

210 Employees

Bellevue Gold Limited logo

Bellevue Gold Limited Employee Contacts

We don't hold contact details for this company yet — you can request them.

Request Employee Contacts

Bellevue Gold Limited Overview

Bellevue Gold is a single-asset, mid-tier Australian gold producer operating the 100%-owned Bellevue Gold Project, an underground mine and ~1.35 Mtpa processing plant roughly 40 km north-west of Leinster in Western Australia's Northern Goldfields. The mine is among the highest-grade underground gold operations in Australia, and the company markets itself as operating the world's first net zero (Scope 1 and 2) gold mine, powered by an off-grid hybrid solar-wind-battery station. After a difficult FY2024–FY2025 ramp-up marked by grade shortfalls, guidance cuts, a heavily discounted equity raise and a legacy hedge book, FY2026 delivered a record 143.5 koz at an AISC of A$2,827/oz, A$576.3m revenue, A$237.5m EBITDA and a A$106.4m net cash position. FY2027 is guided at 150–170 koz with the remaining 68.7 koz hedge book targeted for elimination, giving fuller spot exposure. The investment case hinges on grade consistency, reserve replacement and exploiting "green gold" premiums.


What the company does. Bellevue explores for, develops, mines and processes gold at the Bellevue Gold Project in the northern Norseman–Wiluna greenstone belt of the Yilgarn Craton, WA. The group's stated principal activities are exploration, development, mining and processing of gold at that project (Half-Year Report, Dec 2024). Output is gold doré, refined and sold as bullion; the company also sells traceable "green gold" into premium channels (jewellers, bullion, institutional/heritage customers).

Company's own description (paraphrased from FY2025 Annual Report, 28 Aug 2025). The company describes Bellevue as one of Australia's highest-grade gold mines and states its vision as building a sustainable gold mining company; it highlights the world's first net-zero (Scope 1 & 2) emissions achievement and sale of gold to jewellers and bullion buyers at a premium to spot.

Business model. 100% commodity-product revenue: physical gold sales at spot or into forward contracts (hedge book). No service, subscription or licensing revenue.

Value-chain position. Upstream miner-processor. Mining is outsourced to an underground contractor (Develop Global until 31 July 2026; Barminco/Perenti from 1 August 2026). Processing is owner-operated. Power is supplied by a leased hybrid renewable power station. Refining is third-party (ABC Refinery agreement referenced by aggregator roic.ai).

Customers and end-markets. Bullion refiners/banks; jewellery houses (French fine jeweller Messika became the first fine jeweller to use Bellevue gold); heritage/institutional users (exclusive supplier of gold for regilding St Paul's Cathedral, London, announced 30 Sep 2026). Ultimate end-markets are investment (bars/ETFs), central banks, jewellery and technology, via the global gold market.

Independent characterisation. Bellevue is best understood as a high-grade, narrow-vein, multi-lode underground mine whose economics are driven by (1) head grade (FY2026 processed grade 4.0 g/t, rising to 4.5–4.7 g/t in H2), (2) recovery (~95.5% FY2026), (3) contractor productivity, and (4) price realisation, which was suppressed by legacy hedges written during project financing. Its ESG positioning is a genuine differentiator but currently a small revenue lever. It remains a single-asset company with concentration risk.

Strategy

Stated strategic themes (paraphrased from FY2025/FY2026 reporting).

  1. Deliver consistent ~40 koz per quarter from five established long-term mining areas.

  2. De-risk the balance sheet by eliminating the hedge book (target: hedge-free during FY2027) and building cash.

  3. Grow resources and reserves via underground extensional drilling (Tribune South, Deacon, Bellevue lodes) and surface DHEM targeting.

  4. Lower unit costs through owner-supplied infrastructure, paste fill and contractor productivity.

  5. Monetise sustainability leadership through traceable "green gold" premiums.

Initiatives in the last 24 months

Medium-term targets / guidance

FY2027 guidance uses A$5,700/oz for royalty calculation. Note: earlier messaging (Aug 2025) targeted 175–195 koz pa from FY2027; the FY2027 guide of 150–170 koz is below that former target, although media described it as an "upgrade" relative to FY2026 output. The withdrawn five-year plan to 250 koz pa (July 2024) has not been reinstated.

Products & Services

Bellevue sells one physical product. The "portfolio" is best catalogued by asset, mining area and sales channel.

Products / sales channels

OfferingDescriptionTarget customerLaunchPricing
Gold doré / refined bullionDoré poured on site, refined by third partyRefiners, bullion banksFirst pour Oct 2023Spot or forward-contract price
Traceable "green gold"Single-mine-origin, low-emission gold certified by Single Mine Origin; endorsed by The Goldsmiths' CompanyJewellers, heritage, ESG-conscious buyersc. 2025Premium to spot (amount not disclosed)
Messika partnershipFirst fine jeweller to use Bellevue goldLuxury jewellery2026 (reported)—
St Paul's Cathedral supplyExclusive supplier for regilding the Golden Gallery (last regilded 1863); >50 oz expectedHeritage/institutionalAnnounced 30 Sep 2026—

Operating asset — Bellevue Gold Project

ComponentKey specificationsSource
Underground mineFive long-term mining areas: Deacon, Deacon North, Viago, Marceline, Tribune; Armand stoping completed Jun-26 qtr; five jumbos; 16,512 m development in FY2026June 2026 Quarterly Report
Processing plant~1.35 Mtpa nameplate (aggregator); record 298,772 t processed in Jun-26 qtr at 4.5 g/t; recovery ~96% after late-FY2025 upgrades; ball mill relined July 2026June 2026 QR; roic.ai
Hybrid power stationOff-grid solar, wind, battery storage plus gas/diesel backup; 80–90% renewable target met in FY2026; 83.5% renewable in FY2025/26 per AAPJune 2026 QR; AAP
Paste plant (under construction)Built by GR Engineering Services; 2,000 m³ tailings tank; commissioning mid-FY2027; ~A$30m remaining capexJune 2026 QR
Accommodation villageUpgrade ~A$10m in FY2027June 2026 QR
Owner-supplied fixed underground infrastructureNew model: Bellevue owns fixed infrastructure (not the mobile fleet); ~A$9–12m FY2027June 2026 QR

Mineral inventory (JORC)

MetricFY2025 statement (1 Aug 2025)FY2026 statement (21 Sep 2026)
Mineral Resource (Moz)3.12.7
Mineral Resource grade (g/t)8.98.6
Indicated Resource (Moz)2.01.6
Probable Ore Reserve (Moz)1.31.0
Ore Reserve grade (g/t)4.74.5

Sources: FY2025 Annual Report; ASX Annual Resource & Reserve Statement 21 Sep 2026. The 2026 Reserve reflects ~154 koz of mining depletion and incorporates 193,000 m of grade-control drilling. Note: an InvestSMART auto-summary of the 1 Aug 2025 release cites 3.7 Moz Resource / 1.1 Moz Reserve and a 220 koz target; these conflict with the company's Annual Report figures (3.1 Moz / 1.3 Moz) and are disregarded as summary errors.

Financial Narrative

Basis: statutory figures for FY2022–FY2025 from aggregators sourcing the annual reports (TipRanks labels these "Dec" but they correspond to June fiscal years); FY2026 from company results of 22 Sep 2026 and the June 2026 Quarterly Report.

Income statement

FY2026 EPS is a dossier calculation (A$7.1m ÷ ~1.48bn shares). The FY2025 Annual Report also references a profit after income tax of A$39.0m in a context not fully visible in the excerpt (likely an underlying or segment measure) — conflicting with the A$45.9m statutory loss; treat the statutory loss as authoritative.

Margins

Revenue CAGR FY2024–FY2026: ~39.0% (statutory basis, calculated).

FY2026 hedge drag. Company states NPAT would have been ~A$205m and revenue ~A$285m higher had hedged ounces been sold at average realised spot (FY2026 results). Average realised spot in Jun-26 qtr was A$6,186/oz vs blended realised A$4,180/oz.

Balance sheet

FY2025 cash+gold derived from FY2026 increase of A$54.8m; FY2025 debt inferred from "unchanged" commentary through FY2026 — confirm against FY2025 accounts. Short/long-term debt split: not publicly disclosed in reviewed sources; no mandatory principal repayments until CY2027. Lease liabilities (hybrid power station, contractor equipment under AASB 16) are material but not quantified in reviewed sources. Net assets at 31 Dec 2024 were ~A$719.7m (unaudited, cited in APAC Resources HKEX filing).

Cash flow

FY2025 operating cash flow conflict: FinancialReports shows A$139.1m; FNArena shows A$127.9m. FY2024 equity raise refers to the July 2024 placement (announced in FY2025 calendar but at FY2024/FY2025 boundary — July 2024 falls in FY2025). Correctly, both the A$150m (Jul 2024) and A$156.5m (Apr 2025) placements fall in FY2025; the table shows the July 2024 raise in the FY2024 column for visibility only — treat FY2025 combined equity inflow as ~A$306.5m gross.

Ratios

ROIC, current ratio, interest coverage, asset turnover and cash conversion cycle: not publicly disclosed in reviewed sources. FY2025 ratios calculated from statutory net loss, equity and total assets above.

Commentary on trends and inflections

The five-year record divides cleanly into three phases. FY2022–FY2023 were pre-production years with small losses reflecting corporate and exploration expense while capital was invested in the mine and plant. FY2024 was the inflection: first gold in October 2023, commercial production in 2024, A$298.4m revenue and a maiden A$75.4m NPAT, aided by a gold price well above contracted hedge levels on unhedged ounces.

FY2025 was the crisis year. Grade under-delivery from Deacon and localised geological complexity forced two guidance cuts (to 129–134 koz from 150–165 koz). With liquidity tight (cash and gold of only A$49m at 31 March 2025), management raised A$156.5m at a 25.8% discount and spent ~A$110.8m to close CY2025 hedges. The close-out crystallised a ~A$111m loss, and higher finance and lease interest (~A$10m more) pushed the statutory result to a A$45.9m loss despite higher sales.

FY2026 marked operational normalisation. Quarterly production rose from 29.1 koz to 41.6 koz as stoping moved into Deacon, Viago and Deacon North; AISC fell from A$3,291/oz in Q1 to ~A$2,600/oz in H2. EBITDA reached A$237.5m (41% margin), operating cash flow A$252.9m and company-defined FCF A$62.6m — but NPAT was only A$7.1m because management voluntarily pre-delivered gold into below-spot hedges (83.4 koz delivered; book down from 152.0 koz to 68.7 koz). The key FY2027 driver is therefore mechanical: as the remaining 68.7 koz is extinguished, realised price should converge on spot, creating substantial statutory earnings leverage, partially offset by AISC guidance rising to A$2,800–3,100/oz as development capital is reclassified to sustaining.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Revenue by Segment and Segment Margins & Growth (%)

MetricFY2024FY2025FY2026

Bellevue Gold Project revenue — statutory, aggregator basis (AUD Mn)

298.4505.8576.3

Bellevue Gold Project gold revenue — company comparison basis (AUD Mn)

—395.0576.3

% of group revenue

100100100

YoY revenue growth, company basis (%)

——45.9

EBITDA, company-reported (AUD Mn)

——237.5

EBITDA margin (%)

——41.2

Operating Metrics (koz) and Revenue by Segment (AUD)

MetricFY2025FY2026

Gold produced (koz)

126.3143.5

Gold sold (koz)

130.0142.0

Realised gold price (A$/oz)

—4,058

Project AISC (A$/oz)

—2,827

Processed grade (g/t)

—4.0

Recovery (%)

—95.5

Income Statement and Per-Share Data

MetricFY2022FY2023FY2024FY2025FY2026

Revenue (AUD Mn)

00298.4505.8576.3

Gross profit (AUD Mn)

-1.1-1.6109.2145.0—

Operating income (AUD Mn)

-17.5-26.781.479.8—

EBITDA, statutory (AUD Mn)

-16.5-23.0111.2-0.4237.5

Pre-tax income (AUD Mn)

-17.8-24.872.2-58.9—

Net income (AUD Mn)

-17.8-24.875.4-45.97.1

EPS basic (AUD)

-0.02-0.020.07-0.040.005

EPS diluted (AUD)

-0.02-0.020.06-0.04—

Dividends per share (AUD)

00000

Weighted avg shares (M)

987.11,0901,1601,310—

Margin Analysis (%) and Margin Analysis (AUD)

MetricFY2024FY2025FY2026

Gross margin (%)

36.628.7—

Operating margin (%)

27.315.8—

EBITDA margin (%)

37.3-0.141.2

Net margin (%)

25.3-9.11.2

AISC margin (A$/oz, realised less AISC)

——1,231

Cash Flow and Key Financials (AUD)

MetricQ1 FY26Q2 FY26Q3 FY26Q4 FY26FY2026

Gold revenue (AUD Mn)

131.9136.9137.5170.0576.3

Mining (AUD Mn)

40.743.142.151.4177.3

Processing (AUD Mn)

21.121.823.722.288.8

Site services (AUD Mn)

6.95.86.87.226.7

Royalties (AUD Mn)

8.110.514.112.645.3

Cash cost (AUD Mn)

78.878.585.890.0333.1

Sustaining capital (AUD Mn)

18.816.916.715.968.3

Project AISC (AUD Mn)

97.695.4102.5105.9401.4

Project AISC (A$/oz)

3,2912,9892,5782,6042,827

Exploration (AUD Mn)

5.03.73.35.417.4

Growth capital (AUD Mn)

20.217.521.936.395.9

Corporate cost (AUD Mn)

5.95.86.05.423.1

D&A (AUD Mn)

41.747.756.657.9203.9

Free cash flow after hedge pre-deliveries (AUD Mn)

611182863

Balance Sheet and Operating Metrics (koz)

MetricFY2025FY2026

Total assets (AUD Mn)

1,250—

Cash & equivalents (AUD Mn)

—195.4

Cash + bullion + gold on hand (AUD Mn)

151.6206.4

Bank debt (AUD Mn)

100.0100.0

Net cash (AUD Mn)

51.6106.4

Total equity (AUD Mn)

820.1—

Hedge book outstanding (koz)

152.068.7

Average hedge price (A$/oz)

2,8433,004

Cash Flow

MetricFY2022FY2023FY2024FY2025FY2026

Operating cash flow (AUD Mn)

———139.1252.9

Investing cash flow (AUD Mn)

————-176.4

Non-sustaining + exploration capex (AUD Mn)

————113.3

Free cash flow, company-defined (AUD Mn)

————62.6

Dividends paid (AUD Mn)

00000

Buybacks (AUD Mn)

00000

Equity raised (AUD Mn)

——150156.50

Returns & Leverage Ratios (%) and Financial Ratios (x)

MetricFY2025FY2026

ROE (%)

-5.6—

ROA (%)

-3.7—

Net debt / EBITDA (x)

—-0.45

Debt / equity (x)

0.12—

Revenue by Region and Region Assets & Liabilities (%)

RegionFY2024FY2025FY2026

Australia — operations-based revenue (AUD Mn)

298.4505.8576.3

Australia — share of revenue by asset location (%)

100100100

Share Price History

DatePrice (AUD)Context

26 Mar 2025

1.145

Pre-suspension

Apr 2025

0.85

Placement price

4 Aug 2025

0.775

Near cycle low

2 Sep 2025

0.885—

20 Oct 2025

1.30—

21 Jan 2026

1.93

Recent high zone

10 Apr 2026

1.87—

13 May 2026

1.685

Barminco award

10 Jul 2026

1.315—

2 Oct 2026

1.58

Latest

Valuation Snapshot

MetricValue

Market cap (AUD Bn)

~2.34

Enterprise value (AUD Bn)

~2.23

EV / FY2026 EBITDA (x)

~9.4

EV / FY2026 sales (x)

~3.9

P / FY2026 statutory EPS (x)

~330 (distorted by hedges)

Analyst Ratings & Targets

BrokerRatingTarget (AUD)Date

Moelis

Buy

2.10

Sep 2026

Macquarie

Outperform

1.20—

Jarden

Not stated

—

FY27 EPS forecast 14.8c

Analyst Conclusions

Management guidance FY2027: 150–170 koz; AISC A$2,800–3,100/oz (lower in H2); non-sustaining capex A$90–100m; exploration A$25–30m; corporate A$20–22m; hedge book (68.7 koz @ A$3,004/oz) to be eliminated.

Bull case

  1. Hedge roll-off: at Jun-26 qtr spot (A$6,186/oz) vs AISC guidance midpoint (A$2,950/oz), unhedged margin exceeds A$3,000/oz — statutory earnings could rise by an order of magnitude from A$7.1m.

  2. Proven ramp: four straight quarters of growth and record ~41 koz quarters support the ~40 koz/qtr run-rate.

  3. Exploration optionality: Tribune South and multiple open lodes could reverse the Reserve decline; budget nearly doubles.

Bear case

  1. Reserve depletion: 1.0 Moz Reserve at 4.5 g/t is thin for a single-asset company producing ~160 koz pa.

  2. Contractor change risk during the Barminco ramp-up in a period of WA cost inflation.

  3. History of grade misses and guidance cuts (FY2025) means execution risk remains priced in.

Catalysts and monitorables (next 12 months): Sep-26 qtr report (late Oct 2026) — first Barminco quarter; AGM 19 Nov 2026; paste plant commissioning (mid-FY2027); final hedge deliveries; H1 FY2027 result (Feb 2027); Tribune South drilling results; potential dividend policy; any renewed M&A interest; FY2028 guidance and 2027 Resource/Reserve update.

Analyst verdict.

Bellevue Gold has moved from a balance-sheet repair story to a cash-flow story. FY2026 was the year the mine finally behaved as designed: production rose every quarter, AISC fell by more than A$600/oz from Q1 to Q4, recovery stabilised near 96%, and the company ended the year with A$106m net cash despite pre-delivering 83 koz into hedges priced roughly half of spot. The headline A$7.1m profit therefore understates underlying earning power by close to A$200m, and FY2027 should be the first year in which statutory results more fully reflect the asset's economics.

The case is not without real flaws. The September 2026 Reserve fell to 1.0 Moz at 4.5 g/t, meaning the market is underwriting mine life on Resource conversion and exploration that has only just restarted after a long grade-control-only period. The FY2027 production range sits below the 175–195 koz pa previously targeted, and AISC is guided higher as development is reclassified to sustaining capital, while WA cost inflation persists. The switch to Barminco in August 2026 introduces execution risk at precisely the moment investors expect clean delivery, and the company's FY2025 history of guidance cuts means the market will not extend much benefit of the doubt.

At roughly 9–10x trailing EBITDA on a hedge-depressed base, the shares appear to discount a good part of the operational risk but only part of the hedge roll-off uplift. On balance, Bellevue screens as an improving, de-risking mid-tier producer with high gold-price leverage and credible ESG differentiation, but whose re-rating depends on two observable proofs over the next 12 months: steady ~40 koz quarters under the new contractor, and drilling that rebuilds Reserves. Delivery on both would also sharpen its appeal as a consolidation target in a crowded WA gold sector.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Executive Leadership Team

NameTitleTenureBackground / educationSource

Darren Stralow

Managing Director & CEO

CEO since Dec 2021; MD since 1 Mar 2023

BEng (Mining); GAICD; MAusIMM; age ~45 (Simply Wall St)

ASX; Simply Wall St

Guy Moore

Chief Financial Officer

~4 years (Simply Wall St)

Not detailed in sources

Morningstar via Motley Fool

Duncan Hughes

Chief Corporate Development Officer

~1.2 years

Not detailed

ASX contact block, Jul 2026

Chief Operating Officer (appointed Oct 2025)

COO

<1 year

—

Sept-25 QR summary

Sam Brooks

Chief Geologist

<1 year in role

—

Morningstar

Michael Naylor

Former CFO / Company Secretary; later Executive then Non-Executive Director (transitioned Dec 2021)

Since Dec 2017

Resources finance

MarketScreener

Board of Directors

DirectorRoleAppointedCommittees / notes

Kevin Tomlinson

Independent Non-Executive Chair

Sep 2019

40 years international mining finance experience

Darren Stralow

Managing Director & CEO

Mar 2023 (MD)

Executive

Fiona Robertson

Independent NED

May 2020

Chairs Risk Management and HSS committees (per Morningstar)

Shannon Coates

Independent NED

May 2020

Corporate lawyer/company secretary background; Risk Committee member

Leigh Junk

Independent NED

3 Sep 2025

Mining engineer; ex-MD Karora Resources (merged with Westgold ~A$1.2bn), Dacian Gold, Doray Minerals

Steve Parsons

NED (former MD)

—

Founder-era MD; Gryphon Minerals

Directors' Remuneration

ExecutiveSalary share (%)Total compensation (AUD Mn)Basis

Darren Stralow

32.52.46

Simply Wall St (FY2025 remuneration report basis)

CFO

—1.08

Simply Wall St

Competitive Landscape

Key Competitors

CompetitorOverlapRelative positioning

Gold Fields (Agnew, nearby)

Same district; labour/contractors

Global major; far larger scale

Northern Star Resources

WA Goldfields; regional consolidator

Australia's largest gold producer

Genesis Minerals

Leonora district; similar ramp-up story

Growth-focused mid-tier; consolidator

Westgold Resources

Underground WA producer (merged with Karora)

Multi-mine, larger output

Ramelius Resources

WA mid-tier

Multi-asset, strong balance sheet

Regis Resources

WA mid-tier (Duketon)

Larger, open-pit/underground mix

Vault Minerals

WA mid-tier

Multi-asset

Capricorn Metals

WA mid-tier (Karlawinda)

Low-cost open pit

Pantoro

WA (Norseman)

Smaller underground/open-pit producer

Ora Banda Mining

WA underground

Smaller, growth-oriented

Recent Developments

--

Company Snapshot

$371.8M

Revenue

210

Employees

2004

Founded

West Perth, Australia

Headquarters

SWOT Analysis

Strengths

  • High grade: Resource 2.7 Moz @ 8.6 g/t (Sep 2026) — among Australia's highest underground grades.
  • Operational momentum: four consecutive quarterly production increases in FY2026 (29.1 → 41.6 koz).
  • Recovery: ~96% in Jun-26 qtr following late-FY2025 plant investment.
  • Balance sheet: A$206.4m cash and gold; net cash A$106.4m (30 Jun 2026).
  • ESG: world's first net-zero (Scope 1 & 2) gold mine with reasonable assurance for CY2025.
  • Cash generation: FY2026 operating cash flow A$252.9m; EBITDA margin 41%.

Weaknesses

  • Single-asset concentration — all revenue from one mine.
  • Reserve decline: 1.3 Moz → 1.0 Moz and grade 4.7 → 4.5 g/t (Aug 2025 → Sep 2026).
  • Hedge legacy cost ~A$200m of FY2026 NPAT.
  • Credibility deficit: multiple guidance cuts in FY2025 and withdrawn 250 koz plan.
  • AISC guidance rising to A$2,800–3,100/oz in FY2027.
  • Dilution: two placements totalling ~A$306.5m in FY2025, including one at a 25.8% discount.

Opportunities

  • Hedge-free status in FY2027 delivering full spot exposure.
  • Tribune South extensions (3.5 m @ 44.96 g/t) and multiple lodes open down-plunge.
  • Exploration budget increased to A$25–30m.
  • Paste fill enabling higher extraction and lower dilution from H2 FY2027.
  • Green-gold premium channels (Messika, St Paul's, Goldsmiths' endorsement).
  • Potential first dividend — Macquarie forecasts 4c DPS in FY2027 (broker estimate).

Threats

  • Contractor transition execution (Barminco ramp-up through Sep-26 qtr).
  • Grade variability — flagged by analysts as a recurrent feature.
  • Safety incidents (Dec 2025 suspension of development).
  • Gold price reversal from record levels.
  • WA labour and contractor cost inflation.
  • Takeover at an inopportune valuation (unsolicited approaches disclosed 2025).

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
14 Apr 2025Mar-25 qtr 25,146 oz; FY25 guidance cut to 129–134 koz; A$156.5m placement at A$0.85; strategic review; unsolicited approaches; COO departureLow point; dilution; covenant review event waived by Macquarie
Apr 2025Near-term hedges (A$110.8m) closed; 5,725 oz remained for Dec-25Spot exposure through CY2025
6 Jul 2025Jun-25 qtr production 38,941 ozRecovery begins
Jul 2025Acting COO appointed; plant upgrade nearing completionOperational reset
1 Aug 2025FY26 guidance 130–150 koz at A$2,600–2,900/oz; Resource 3.1 Moz, Reserve 1.3 MozCredibility rebuild
27 Aug 2025FY25 statutory net loss A$45.9mHedge close-out loss
28 Aug 20252025 Annual Report and Sustainability Report; net zero H1 CY25ESG milestone
3 Sep 2025Leigh Junk joins BoardOperating depth
9 Sep 2025Colorado Gold Conferences presentationInvestor outreach
13 Oct 2025Citi resources conference presentationInvestor outreach
20 Oct 2025Fourth Sail Capital ceases substantial holdingRegister change
22–23 Oct 2025Sep-25 qtr 29,120 oz; A$4,443/oz; strategic review concluded; new COO; net zero achievedReview closes with no deal
27 Oct 2025Develop Global contract extended 7 monthsBridge to new contractor
26 Nov 2025Development resumes in Deacon North area; ore from Deacon North expected Jun-26 qtrGrade pipeline
Late Dec 2025Safety incident suspends development in Deacon and ViagoOperational risk
7 Jan 2026Dec-25 qtr 32.0 koz; development resumed 4 Jan; hedge cut by 18,345 oz; cash & gold A$165mBack on track
19 Jan 2026Dec-25 qtr report; shares +3%—
17 Feb 2026Paste plant approval; further hedge reductionCapex commitment
23 Feb 2026Half-year report (H1 FY26 gold revenue A$268.7m)Interim result
8 Apr 2026Mar-26 qtr update: 40.7 koz at 4.7 g/t; record underlying FCF ~A$158mStep-change
29 Apr 2026Mar-26 quarterly: AISC A$2,578/oz; hedge 91.65 koz; cash & gold A$181mRecord quarter
13 May 2026Barminco awarded ~A$850m contractContractor change
16 Jun 2026Tribune South underground drilling commenced; 3.5 m @ 44.96 g/tExploration restart
7 Jul 2026Preliminary Jun-26 qtr beats guidance midpoint—
28 Jul 2026Jun-26 QR: record FY26 143,539 oz; FY27 guidance 150–170 koz; hedge 68.7 koz; net cash A$106.4mGuidance set
Jul–Aug 2026Diggers & Dealers presentation; ball mill reline shutdown—
1 Aug 2026Barminco commencesExecution risk window
21 Sep 2026Resource 2.7 Moz @ 8.6 g/t; Reserve 1.0 Moz @ 4.5 g/tReserve decline after depletion
22 Sep 2026FY26 results: revenue A$576.3m; EBITDA A$237.5m; NPAT A$7.1m; 2026 Annual ReportReturn to profit
25 Sep 2026Moelis lifts target to A$2.10 (Buy)Broker support
28 Sep 2026Mining Forum Americas presentationUS investor outreach
30 Sep 2026Exclusive gold supplier for St Paul's Cathedral regildingGreen-gold profile
8 Oct 2026Notice of AGM (AGM 19 Nov 2026; director nominations closed 1 Oct 2026)Governance

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

5 charts
Revenue by Segment: Bellevue Gold Project revenue — statutory, aggregator basis rose from AUD 298.4 Mn in FY2024 to AUD 576.3 Mn in FY2026.
Bellevue Gold Limited — Revenue by Segment
Series (AUD Mn)FY2024FY2025FY2026
Bellevue Gold Project revenue — statutory, aggregator basis298.4505.8576.3
Bellevue Gold Project gold revenue — company comparison basis—395576.3
% of group revenue100100100
EBITDA, company-reported——237.5

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Sources

Sources

  1. ASX: Bellevue Gold June 2026 Quarterly Report (28 Jul 2026) (announcements.asx.com.au)
  2. ASX: March 2026 Quarterly Report (29 Apr 2026) (announcements.asx.com.au)
  3. ASX: December 2025 production update (7 Jan 2026) (announcements.asx.com.au)
  4. ASX: Half-Year Report Dec 2025 (23 Feb 2026) (announcements.asx.com.au)
  5. ASX: 2025 Annual Report (28 Aug 2025) (announcements.asx.com.au)
  6. ASX: FY26 Guidance and Resource & Reserve Statement (1 Aug 2025) (announcements.asx.com.au)
  7. ASX: Production update, placement and strategic review (14 Apr 2025) (announcements.asx.com.au)
  8. ASX: Appointment of Leigh Junk (3 Sep 2025) (announcements.asx.com.au)
  9. ASX: Half-Year Report Dec 2024 (announcements.asx.com.au)
  10. Perenti ASX: Barminco awarded A$850m contract (13 May 2026) (announcements.asx.com.au)
  11. Annual Resource & Reserve Statement (21 Sep 2026) via InvestorPA (investorpa.com)
  12. Kalkine: FY26 result coverage (kalkine.com.au)
  13. Grafa: FY26 record cash flow (grafa.com)
  14. Motley Fool AU: FY27 guidance (28 Jul 2026) (fool.com.au)
  15. ad-hoc-news: share price, ISIN, Moelis target (ad-hoc-news.de)
  16. Capital Brief: April 2025 placement and hedge close-out (capitalbrief.com)
  17. King & Wood Mallesons: placement advisory (mallesons.com)
  18. AAP (via The Senior): St Paul's Cathedral supply (thesenior.com.au)
  19. TipRanks: income statement history (tipranks.com)
  20. Simply Wall St: management and FY25 result (simplywall.st)
  21. MarketScreener: key events and insider history (ca.marketscreener.com)
  22. FNArena: broker forecasts (fnarena.com)
  23. ListCorp: announcements and price history (listcorp.com)
  24. Canaccord Genuity: 2019 and 2020 raises (canaccordgenuity.com)
  25. Australian Resources & Investment: 2023 executive changes (australianresourcesandinvestment.com.au)

Unlock Company Contacts

Connect with Key Decision-Makers

Access verified employee contacts and decision-maker information from this company to support your sales, lead generation, and business development efforts.