BLACK ROCK MINING LIMITED Overview
Black Rock Mining is a pre-revenue, single-asset critical-minerals developer. Its only material asset is an 84% stake in the Mahenge Graphite Project in south-eastern Tanzania. Mahenge hosts a JORC Mineral Resource of 213 Mt at 7.8% total graphitic carbon (TGC) and an Ore Reserve of 70.5 Mt at 8.5% TGC, which the company describes as the world's second-largest graphite Ore Reserve. The project holds:
-
a granted 26-year Special Mining Licence;
-
a Framework Agreement with the Tanzanian Government;
-
a US$204m syndicated debt package from DBSA, IDC and CRDB;
-
long-term fines offtake and a strategic equity relationship with POSCO;
-
binding large-flake offtakes with two Chinese buyers.
Black Rock's proposition is a low-cost, hydro-powered, modular "crawl, walk, run" upstream concentrate operation that can produce both battery-anode feed and premium large flake outside China. The only missing piece is about US$100–111m of project equity. With a market capitalisation of roughly A$25–28m against a published attributable NPV of US$730m, the stock is effectively a binary financing option. The binding near-term date is the 30 November 2026 debt-facility deadline.
What the company does. Black Rock Mining is a mineral development company. Its principal and essentially only activity is advancing the Mahenge Graphite Project toward a Final Investment Decision (FID), construction and production of natural flake graphite concentrate. The company has never produced or sold graphite. Its income consists of interest on cash balances and occasional minor rental income: total income was A$15,522 in H1 FY26 versus A$39,421 in H1 FY25 (H1 FY26 Report, Note 2). Data vendors record "revenue" of about A$4.1k in FY2024 and A$12.5k in FY2025 (MarketScreener).
Company's own description. On its website (Sep 2026) the company presents itself as a "Premium Graphite Developer" with the tagline "Naturally Better Graphite". It describes its purpose as developing the world-class Mahenge Graphite Project in Tanzania, a large-scale resource able to support decades of production and meet growing global demand for natural graphite. The FY2025 Sustainability Report positions Mahenge as a critical supplier of low-carbon battery materials, contributing to decarbonisation of the transport and electricity sectors.
Intended business model (post-FID).
-
Black Rock plans to be a pure upstream miner and concentrator, not a vertically integrated anode producer.
-
Contract open-pit mining (Taifa Mining and Civils) will feed on-site crushing, milling and flotation, with dry-stack tailings.
-
Concentrate will be bagged, containerised and trucked to Dar es Salaam for export. Rail via the TAZARA line from Ifakara is an option for later modules.
-
The company deliberately avoids downstream spheronisation and purification. Breakaway (Jul 2026) characterises this as cutting out significant execution and technology risk.
Revenue model (prospective). Revenue will be 100% product sales of graphite concentrate under offtake contracts. There is no service, subscription or licensing income. The product mix is split between:
-
Fines (-100 mesh) for lithium-ion battery anode precursor (spherical purified graphite, SPG). 100% of Module 1 and Module 2 fines are contracted to POSCO.
-
Large flake (+100 mesh and coarser) for refractories, expandable graphite, foils, friction materials, thermal management and other industrial uses. Contracted in part to Muhui International Trade (Dalian) and Qingdao Yujinxi New Material, with a POSCO marketing agreement for large flake sold outside China.
Metallurgical testwork indicates about 59% coarse flake (+80 mesh) and 41% -80 mesh, at concentrate grades of 95–99% TGC (Breakaway, citing company data). The company's pricing assumes grade premiums of 10% for fines (96% TGC) and 25% for large flake (97.5% TGC) over standard 94–95% TGC benchmarks (company website cost-curve note).
Value chain position. Mahenge sits at stage 1 (mining and concentration) of the natural graphite chain. The next stages are SPG / purification, anode active material, battery cell, and EV / ESS. On the industrial side the chain runs through refractories and expandable-graphite producers. POSCO Future M, an associate of offtaker POSCO International, is building an SPG plant in Pohang (Breakaway cites US$277m and 37 ktpa) to support its Sejong anode plant (70 ktpa per the H1 FY26 Report). That gives Mahenge fines a captive downstream home.
Customer types and end-markets.
Breakaway (Jul 2026) states that about 85% of Module 1 offtake plus Module 2 fines are covered under these agreements. The company's website states ">95% contracted" for products. These two figures conflict. The difference likely reflects whether buyer options and the POSCO MoU are counted.
Independent characterisation. Black Rock is a shovel-ready but under-capitalised developer. Its technical and permitting de-risking is unusually advanced for a company of its size: an SML, Framework Agreement, resettlement completed, debt documentation signed, offtake, a mining contractor, power agreements and early works. Its equity-market position, however, is that of a micro-cap explorer. The business model's success depends almost entirely on one transaction: a project-level equity sell-down or strategic equity injection of about US$100–111m, due before 30 November 2026. Until that happens, the operating "business" is a cost centre of about A$1.5–2.5m per quarter, funded by dilutive placements.
Strategy
Stated strategy (themes from company disclosures)
-
"Crawl, walk, run" staged modular development. Four modules of about 1 Mtpa ore each. Module 1 is debt- and equity-funded; Modules 2–4 are intended to be largely funded from cash flow, with expansion timing flexible to market conditions.
-
Upstream focus, partner downstream. Black Rock sells fines to POSCO's anode supply chain rather than building its own SPG or anode capacity.
-
Premium product strategy. The company emphasises a high large-flake proportion, low impurities, 95–99% TGC grades and the ability to "switch to higher quality product to achieve pricing premiums" (website).
-
First-quartile cost position. This rests on hydro-dominated grid power at about US$0.08/kWh, deep-water port access and a low strip ratio. The company claims an adjusted ASIC of about US$313/t on Benchmark Mineral Intelligence's normalised cost curve (Q4 CY25).
-
Sovereign alignment. The Government of Tanzania holds a 16% free-carried interest, the Framework Agreement is in place, local content is delivered through Taifa (a Tanzanian contractor), and power infrastructure is transferred to TANESCO.
-
ESG differentiation. Dry-stack tailings, hydro power, IFC Performance Standards and Equator Principles compliance for lenders, and a Human Rights screening framework.
-
Funding strategy pivot. The company has moved from a conventional corporate debt-plus-equity raise to a project-level equity sale. It now seeks to sell an interest in Mahenge "at a premium as a less dilutive pathway than a corporate equity raise" (StocksDownUnder). Breakaway indicates a sale of about 50% at fair valuation multiples would fund Black Rock's share of the upfront equity.
Strategic initiatives, last 24 months (Oct 2024 to Oct 2026)
| Initiative | Date(s) | Detail | Status |
|---|---|---|---|
| Debt package upsizing | May 2025 | US$179m to US$204m (adding a US$25m component) | Signed; undrawn |
| TANESCO power agreements | 12 May 2025 | Implementation Agreement (build and transfer the 220 kV line and substation) plus Power Supply Agreement (tariff recoups about US$33–40m over the first 4 years) | Signed |
| Early Works Program | 29 Sep 2025 onward | Access-road upgrades, plant-site bulk earthworks, Mdindo stream diversion analysis, power-line surveys | Near completion (10 Apr 2026; 30 Jul 2026); delayed by heavy rainfall |
| Equity raise for early works | Sep–Oct 2025 | A$10m placement plus A$4m SPP at A$0.021 with 1:1 options at A$0.03 | Completed |
| Final RAP tranche | Completed Dec 2025 | US$174k compensation to PAPs in the 7.2 km access-road corridor | Completed |
| Bulk earthworks contract | 4 Feb 2026 | Taifa Mining and Civils, US$11.0m | Awarded; works progressing |
| Economic re-baselining | 5 May 2026 | NPV8 US$730m, IRR 23%, basket US$1,495/t, logistics +US$46/t (trucking to Dar es Salaam now the base case) | Published |
| Debt deadline extension | 1 Jul 2026 | Financial-close deadline moved to 30 Nov 2026 | Agreed with syndicate (CRDB as Facility Agent) |
| Project-level equity process | 2025–2026 | Sale of a project interest to fund about US$100–111m of equity | Ongoing; no counterparty announced as of the latest verified disclosures |
| Sustainability reporting | 26 Sep 2025 | Second annual Sustainability Report (FY2025) | Published |
Medium-term targets / guidance
| Item | Guidance | Source |
|---|---|---|
| FID | After completion of equity financing and loan documentation; targeted by the 30 Nov 2026 facility deadline | 1 Jul 2026 / 30 Jul 2026 ASX releases |
| First production (Module 1) | Within about 24 months of FID (implies 2028 if FID is in late 2026) | StocksDownUnder summary of company guidance |
| Module 1 output | About 87–89 ktpa concentrate | Company / Breakaway |
| Steady state | About 340–347 ktpa by about Year 4 of the staged plan | Company / Breakaway |
| C1 cost (first 10 years) | About US$512–513/t concentrate; AISC about US$575/t | May 2026 re-run (Breakaway) |
| Capex | Module 1 plus power line US$231m; Stages 1–4 ex-power US$510m (182 + 107 + 117 + 104) | Company website; Breakaway Table 5 |
| Financial targets (revenue, EBITDA) | Not issued; only study-derived production targets, subject to ASX cautionary statements | — |
Products & Services
Black Rock has no commercial products today. Its future portfolio consists of graphite concentrate products from the Mahenge Graphite Project, organised by flake size and purity. All future production sits in the Graphite segment.
The Mahenge Graphite Project (sole asset)
| Attribute | Detail | Source |
|---|---|---|
| Location | Ulanga District, Morogoro Region, south-eastern Tanzania; about 350 km SW of Dar es Salaam (about 482 km by road); 70 km south of Ifakara; 9 km from Mahenge township | Company website (Sep 2026) |
| Tenure | SML 676/2022 (34.96 km², granted 5 Sep 2022, 26-year term); PL 2139/2022 (100.42 km²); ML applications ML777 and ML778/2025 (19.91 km², 100% Mahenge Resources) | Breakaway; H1 FY26 Report |
| Geology | Eastern Granulite, Proterozoic Mozambique Belt; graphitic schists, granulites, marbles; thick, steeply to moderately east-dipping, long strike | Breakaway |
| Deposits | Ulanzi, Cascade, Epanko (the Epanko deposit within Black Rock's tenure is distinct from EcoGraf's Epanko project) | Breakaway |
| Mineral Resource (JORC 2012) | 213.1 Mt at 7.8% TGC (16.6 Mt contained graphite) | Company website; Breakaway |
| Ore Reserve (JORC 2012) | 70.5 Mt at 8.5% TGC Probable (6.0 Mt contained); described as the world's 2nd largest graphite Ore Reserve | Company website; Breakaway |
| Latest study | eDFS Update with FEED (10 Oct 2022); economics re-run and published 5 May 2026 | Company website; Breakaway |
| Development concept | 4 modules of about 1 Mtpa ore each; open pit, drill and blast, strip ratio 0.65:1; conventional crush–mill–flotation; dry-stack tailings | Breakaway |
| Production | Module 1: about 89 ktpa concentrate (website) or 87 ktpa (Breakaway). Steady state: up to about 340–347 ktpa across 4 modules. Life of mine 26 years (27 years including construction). | Company website; Breakaway |
| Power | 220 kV line Ifakara–Mahenge (about 70 km) plus substation, built by Faru and transferred to TANESCO; cost recouped via power tariffs over the first 4 years; grid tariff about US$0.08/kWh | H1 FY26 Report; Breakaway |
| Peak power demand | About 33 MW; 45 MW installed for 4 modules | Breakaway |
| Accommodation | 320-person village | Breakaway |
| Employment | More than 400 FTE (Module 1), rising to more than 900 FTE (4 modules) | H1 FY26 Report |
| Category | Tonnes (Mt) | Grade (% TGC) | Contained graphite (Mt) |
|---|---|---|---|
| Measured | 31.8 | 8.6 | 2.7 |
| Indicated | 84.6 | 7.8 | 6.6 |
| Total M&I | 116.4 | 8.0 | 9.3 |
| Inferred | 96.7 | 7.4 | 7.2 |
| Total Resource | 213.1 | 7.8 | 16.6 |
| Probable Reserve | 70.5 | 8.5 | 6.0 |
| Proved Reserve | 0 | 0 | 0 |
| Pit | Probable (Mt) | Probable grade (% TGC) | Inferred in plan (Mt) | Inferred grade (% TGC) |
|---|---|---|---|---|
| Ulanzi | 47.5 | 8.5 | 9.4 | 6.6 |
| Cascade | 23.1 | 8.6 | 5.7 | 8.7 |
| Epanko (BKT tenure) | 0 | 0 | 9.9 | 6.7 |
| Total | 70.5 | 8.5 | 25.0 | 7.1 |
Mineral Resource and Ore Reserve detail. Source: Breakaway Table 3, citing the company's 2022 MRE.
Open-pit sources in the mine plan. Source: Breakaway Table 4.
Product catalogue (prospective)
| Product | Specification | Target customer / application | Commercial status | Pricing model |
|---|---|---|---|---|
| Fines concentrate (-100 mesh, <150 µm) | About 96% TGC, shipped grade (10% premium assumed) | Anode precursor (SPG) producers; POSCO / POSCO Future M (Korea) | 100% of Module 1 and 2 fines contracted to POSCO; US$10m prepayment | Contract pricing; terms not publicly disclosed |
| Small flake (+100 mesh, 150–180 µm) | 97.5% TGC | Refractories, foundries, lubricants, expandable graphite | Covered by Muhui / Qingdao offtakes (+100#) | Indexed to published RefWin and ICCSino indices |
| Medium flake (+80 mesh, 180–300 µm) | 97.5% TGC | Refractories, foundries, lubricants, expandable graphite | As above | As above |
| Large flake (+50 mesh, 300–500 µm) | 97.5% TGC (25% premium assumed) | Refractories, expandable graphite, friction materials, EAF electrodes, graphene feedstock | As above, plus POSCO marketing (ex-China) | As above |
| Jumbo / super-jumbo flake (+32 / +20 mesh, >500 µm) | Premium purity | Expandable graphite, thermal management, specialist foils | Marketed under the same agreements | As above |
| Ultra-purity flake | 99% LOI capability (pilot-proven; +99% TGC achieved in 2018 at SGS) | High-end specialty markets | Optional / upside; not in base contracts | — |
Sources: Company website; Breakaway Table A1 (flake taxonomy); offtake terms from Breakaway, adapting the company's 27 Jun 2024 announcement.
Pricing basis in project economics. The May 2026 re-run uses a concentrate basket price of US$1,495/t, down from US$1,709/t in the 2022 eDFS Update. Breakaway notes the company's 2026 price protocol incorporates the newly introduced "FOB Africa" benchmark, which prices East African supply at a premium to Chinese benchmarks.
Launch / latest version year. Not applicable. First production is targeted within about 24 months of FID. This places initial output in the 2027–2028 window, and it slips day-for-day with FID timing.
Financial Narrative
Data provenance. FY2021–FY2025 figures come from data vendors that transcribe the company's audited annual reports (StockAnalysis, MarketScreener, Barchart, TipRanks). Where possible they are cross-checked to the company's own comparatives in the H1 FY26 Half-Year Report. Barchart labels its series "U.S. Thousands", but the values reconcile exactly to the company's A$ statements, for example total assets of A$59,418,032 at 30 June 2025. All figures are in A$.
Income statement
Sources: StockAnalysis (FY2021–FY2025 income statement); MarketScreener; Barchart. NCI first appears in FY2023, after the September 2022 SML grant and recognition of the Government of Tanzania's 16% interest in Faru.
Items not computable or not meaningful.
Balance sheet
Sources: Barchart and Stockopedia balance sheets; TipRanks (equity, liabilities). Cash and FY2025 balances were cross-checked to the H1 FY26 Report comparatives (FY2025 cash A$1,880,726; total assets A$59,418,032; total liabilities A$3,090,351; net assets A$56,327,681). Net debt is negative, meaning net cash.
Notes on the balance sheet.
Goodwill and intangibles: nil.
Debt: The US$204m facility is undrawn. Lease liabilities were A$0.39m at FY2025 and A$0.30m at 31 Dec 2025. A "financial liabilities" line of A$0.15m is also carried.
E&E asset: At 30 June 2025 it was A$55.94m, the carrying value of Mahenge. Its recoupment depends on successful development or sale (Note 3).
Cash flow
Source: Barchart "Net Cash Flow". The vendor's figures differ slightly from simple balance-to-balance cash changes because of FX translation.
Partially disclosed cash-flow items.
Latest interim: H1 FY2026 (six months to 31 Dec 2025, reviewed by Deloitte)
Balance sheet at 31 Dec 2025 (A$ M): total assets 67.64; E&E asset 57.05; total liabilities 2.59; net assets 65.05; equity attributable to owners 66.60; NCI -1.55; issued capital 141.79; accumulated losses -77.78. Source: H1 FY26 Half-Year Report.
Quarterly cash runway, FY2026
Sources: InvestSMART (Oct 2025 quarterly); H1 FY26 Report; Breakaway (31 Mar 2026); June 2026 Quarterly.
June 2026 quarter: operating cash outflow A$1.77m; investing outflow A$0.53m.
FY2026 financing inflow: A$13.18m, reported by Quartr. This is consistent with the year-to-date Appendix 5B column (A$14m raise less costs), not a single-quarter inflow.
Implied FY2026 operating cash burn (not audited): about A$4.0m in H1 plus roughly A$3.5–4.0m in H2 (derived from the quarterly cash moves), giving about A$7.5–8m in total. This is an estimate only.
Ratios (computed from the vendor and company data above)
ROE and ROA use attributable net loss. MarketScreener's liabilities-to-assets series (1.39 / 4.2 / 6.24 / 5.68 / 5.2) matches the computed figures. Simply Wall St reports ROE of -16.88%.
The following ratios are not meaningful for a pre-revenue developer with no debt and no sales: ROIC, net debt/EBITDA, interest coverage, asset turnover and cash conversion cycle.
Commentary on trends, inflections and drivers
-
Losses. Losses scaled from A$2.85m in FY2021 to a peak of A$10.6m in FY2024 (including NCI) as the company moved from study phase into financing, offtake and permitting. That period carried heavy consulting, legal and lender due-diligence costs and higher share-based payments (A$1.35m in FY2024). FY2025 eased to A$9.51m, and H1 FY26 fell further to A$4.02m from A$5.55m. The main drivers were roughly halved consulting expense (A$1.13m vs A$2.10m) and much lower share-based payments (A$0.21m vs A$0.97m).
-
Balance sheet. Total assets have been broadly flat at A$57–63m since FY2022. Growth in the E&E asset (A$22m to A$57m) has been funded by equity, while cash has been drawn down. Cash peaked at A$26.1m in June 2022 and fell to A$1.88m in June 2025, a near-term liquidity squeeze. The A$14m raise of September–October 2025 temporarily restored A$9.5m, which had declined to A$4.9m by June 2026.
-
Equity funding dependence. Issued capital rose from A$122.9m (July 2024) to A$141.8m (December 2025). Shares on issue rose 72%, from 1,251m to 2,148m, over the same 18 months, while placement prices fell from A$0.065 (March 2024) to A$0.023 (March 2025) and then A$0.021 (September 2025).
-
Going concern. The H1 FY26 Report's going-concern note discloses two scenarios. In the first, FID and full funding proceed. The second assumes no development before 31 March 2027. Directors concluded the group can meet its debts for 12 months, but explicitly link all three funding agreements (US$204m debt, US$40m POSCO equity, US$10m POSCO prepayment) to raising project equity of about US$111m. Quartr's summary of the FY2025 annual report also highlights "going concern uncertainty".
-
Inflection. The decisive financial inflection is FID. On financial close, the balance sheet would transform:
-
drawdown of up to US$138m term debt;
-
US$40m POSCO equity (subject to the 19.99% cap);
-
project-level equity proceeds. On the published capex profile, total assets would rise roughly fourfold within 24 months.
-
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Group Entities
| Entity | Jurisdiction | Ownership | Role |
|---|---|---|---|
Black Rock Mining Limited | Australia | Listed parent (ASX: BKT) | Corporate HQ, financing, governance |
Mahenge Resources Limited | United Kingdom | 100% (Black Rock) | Intermediate holding company; holds 84% of Faru; holds 100% of ML applications ML777/2025 and ML778/2025 (19.91 km²) |
Mahenge Resources Ltd (Tanzania branch / office, Box 11, Mahenge-Ulanga) | Tanzania | Group | Local operating presence (as shown on quarterly report letterhead) |
Faru Graphite Corporation Limited | Tanzania | 84% Mahenge Resources Ltd (UK); 16% Government of Tanzania (free carried) | Project company; holder of SML 676/2022 and PL 2139/2022; borrower under the US$204m facilities; offtake contracting party |
Results by Segment
| Metric | H1FY2025 | H1FY2026 |
|---|---|---|
Graphite segment total income (AUD Mn) | 0.008 | 0 |
Corporate segment total income (AUD Mn) | 0.031 | 0.016 |
Graphite segment loss before tax (AUD Mn) | -1.987 | -1.305 |
Corporate segment loss before tax (AUD Mn) | -3.561 | -2.718 |
Consolidated loss before tax (AUD Mn) | -5.547 | -4.023 |
Graphite E&E additions (AUD Mn) | 1.994 | 1.906 |
Segment Assets & Liabilities
| Metric | Jun2025 | Dec2025 |
|---|---|---|
Graphite segment assets (AUD Mn) | 58.26 | 57.60 |
Corporate segment assets (AUD Mn) | 2.46 | 10.04 |
Graphite segment liabilities (AUD Mn) | 2.10 | 1.62 |
Corporate segment liabilities (AUD Mn) | 0.71 | 0.97 |
Segment Revenue
| Metric | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Graphite segment sales revenue (AUD Mn) | 0 | 0 | 0 |
Corporate segment sales revenue (AUD Mn) | 0 | 0 | 0 |
Income Statement
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Sales revenue (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Reported other revenue per vendors (AUD Mn) | 0 | 0 | 0 | 0.004 | 0.012 |
SG&A expense (AUD Mn) | 1.91 | 4.93 | 8.67 | 8.56 | 8.09 |
Total operating expenses (AUD Mn) | 3.13 | 6.50 | 9.80 | 10.67 | 9.63 |
Operating income (AUD Mn) | -3.13 | -6.50 | -9.80 | -10.66 | -9.62 |
Share-based payment expense (AUD Mn) | 0.952 | 0.542 | 0.502 | 1.35 | 0.740 |
FX gain (AUD Mn) | 0.23 | 0.42 | 0.41 | 0.07 | 0.09 |
Net loss incl. NCI (AUD Mn) | -2.85 | -6.08 | -9.35 | -10.60 | -9.51 |
Net loss attributable to owners (AUD Mn) | -2.85 | -6.08 | -9.05 | -10.08 | -8.93 |
Financial Analysis
| Item | Status |
|---|---|
Gross profit | Nil / not meaningful (no sales) |
EBITDA | Not separately disclosed. It approximates the operating loss plus minor depreciation (H1 FY26 D&A was A$0.15m). Not meaningful as a valuation metric. |
Pre-tax income | Equal to net loss (no income tax expense recognised in any year) |
EPS basic / diluted | FY2023 about -0.9 cents and FY2024 about -0.9 cents (InvestSMART). H1 FY25 -0.42 cents; H1 FY26 -0.21 cents (company). |
Dividends per share | Nil in all years |
Gross / operating / EBITDA / net margins | Not meaningful (vendors show operating margins of about -77,000% to -259,000% on token income) |
Balance Sheet
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Cash and equivalents (AUD Mn) | 11.30 | 26.09 | 11.46 | 8.90 | 1.88 |
Total current assets (AUD Mn) | 11.44 | 27.09 | 13.26 | 9.56 | 2.50 |
E&E asset plus PP&E, net (AUD Mn) | 22.19 | 30.34 | 48.06 | 53.54 | 56.69 |
Total assets (AUD Mn) | 33.63 | 57.43 | 61.32 | 63.11 | 59.42 |
Total current liabilities (AUD Mn) | 0.47 | 1.81 | 3.29 | 3.23 | 1.69 |
Total liabilities (AUD Mn) | 0.47 | 2.41 | 3.82 | 3.59 | 3.09 |
Total equity incl. NCI (AUD Mn) | 33.16 | 55.02 | 57.49 | 59.52 | 56.33 |
Working capital (AUD Mn) | 10.97 | 25.28 | 9.97 | 6.33 | 0.81 |
Borrowings (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Net debt (AUD Mn) | -11.30 | -26.09 | -11.46 | -8.90 | -1.88 |
Cash Flow
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Net change in cash (AUD Mn) | 10.81 | 14.37 | -15.03 | -2.61 | -7.14 |
Dividends paid (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Share buybacks (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Financial Analysis — FY2025 cash paid for E&E
| Item | Value | Source |
|---|---|---|
FY2025 cash paid for E&E (capex proxy) | A$2.78m | H1 FY26 Report, Note 3 comparative |
FY2025 E&E additions at cost | A$2.70m | H1 FY26 Report, Note 3 |
Q1 CY24 to Q1 CY26 (27 months) project spend | A$10.76m | Breakaway |
Q1 CY24 to Q1 CY26 (27 months) staff and admin spend | A$14.69m | Breakaway |
Cash Flow (H1FY2025–H1FY2026)
| Metric | H1FY2025 | H1FY2026 |
|---|---|---|
Interest income (AUD Mn) | 0.031 | 0.016 |
Employee benefits expense (AUD Mn) | 1.610 | 1.410 |
Consulting expense (AUD Mn) | 2.104 | 1.129 |
Share-based payments expense (AUD Mn) | 0.969 | 0.209 |
Impairment of contract asset (AUD Mn) | 0 | 0.231 |
Loss for the period (AUD Mn) | -5.547 | -4.023 |
Loss attributable to owners (AUD Mn) | -5.245 | -3.847 |
Operating cash flow (AUD Mn) | -4.861 | -4.014 |
E&E payments, investing (AUD Mn) | -2.028 | -1.555 |
Financing cash flow (AUD Mn) | -0.119 | 13.152 |
Closing cash (AUD Mn) | 1.951 | 9.461 |
Key Financials
| Metric | Sep2025 | Dec2025 | Mar2026 | Jun2026 |
|---|---|---|---|---|
Quarter-end cash (AUD Mn) | 3.6 | 9.46 | 7.24 | 4.9 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
ROE on closing total equity (%) | -8.6 | -11.1 | -15.7 | -16.9 | -15.9 |
ROA on closing total assets (%) | -8.5 | -10.6 | -14.8 | -16.0 | -15.0 |
Current ratio (x) | 24.3 | 15.0 | 4.0 | 3.0 | 1.5 |
Total liabilities to total assets (%) | 1.4 | 4.2 | 6.2 | 5.7 | 5.2 |
Debt to equity (x) | 0 | 0 | 0 | 0 | 0 |
Geographic Revenue
| Region | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Australia sales revenue (AUD Mn) | 0 | 0 | 0 |
Tanzania sales revenue (AUD Mn) | 0 | 0 | 0 |
Rest of world sales revenue (AUD Mn) | 0 | 0 | 0 |
Region Assets & Liabilities
| Region | Jun2025 | Dec2025 |
|---|---|---|
Tanzania segment assets (AUD Mn) | 58.26 | 57.60 |
Australia segment assets (AUD Mn) | 2.46 | 10.04 |
Change by Period
| Period | Change | Basis |
|---|---|---|
1 year | About -32% | Oct 2025 A$0.019 to Sep 2026 A$0.013 |
2026 calendar YTD | -31.25% at A$0.011 | MarketScreener |
About 2.5 years | About -80% | Mar 2024 A$0.065 to Sep 2026 A$0.013 |
About 5–6 years | About -84% | Dec 2020 A$0.083 to Sep 2026 A$0.013 |
Valuation Snapshot
| Multiple | Value | Basis |
|---|---|---|
Market cap | About A$27m | 2,148m shares at A$0.013 |
Enterprise value | About A$22m | Market cap less A$4.9m cash (30 Jun 2026); no debt |
P/B | About 0.41x | A$27m against A$66.6m attributable equity (31 Dec 2025) |
EV / attributable post-tax NPV8 | About 2% | A$22m against about A$1.05bn (US$730m); Breakaway cites about 2% at A$18.5m EV |
EV per tonne of contained reserve graphite | About A$4 per tonne | A$22m / 6.0 Mt × 84% |
Firm Details
| Firm | Date | Rating | Target | Note |
|---|---|---|---|---|
Breakaway Research (Mark Gordon) | Jul 2026 | Speculative Buy | No per-share target ("any attempt will be misleading") | Company-commissioned research |
Debt Facilities
| Facility | Amount (USD Mn) | Terms | Status |
|---|---|---|---|
Construction Term Loan | 138 | 8.5-year tenor; repayments begin 4.5 years after FID; SOFR+8% (about 11% all-in); target gearing about 50% | Undrawn |
Working-capital Revolving Credit Facility | 20 | SOFR plus margin | Undrawn |
Cost Overrun Facility | 20 | SOFR plus margin | Undrawn |
Bank Guarantee Facility (environmental bonding) | 26 | — | Undrawn |
Total | 204 | Financial-close deadline 30 Nov 2026 | Signed Sep 2024; upsized May 2025; extended Jul 2026 |
Securities on Issue
| Security | Number |
|---|---|
Ordinary shares | 2,147,724,265 |
Listed options (BKTOE, A$0.03, expire 24 Oct 2027) | 666,666,510 |
Unlisted options (incl. 108.7m at A$0.035 expiring 29 Jul 2028; balance ZEPOs) | 120,860,337 |
Performance rights (nil-priced) | 62,112,555 |
Fully diluted (approximate) | About 2,997m |
Analyst Conclusions
Management guidance. Management's stated priority is to secure the remaining equity investment, achieve financial close and reach a fully funded FID within the extended 30 November 2026 facility deadline (June 2026 quarterly). Early works are described as near complete, which positions the project for rapid construction ramp-up once funded. First Module 1 production would follow about 24 months after FID. No revenue or earnings guidance exists, and there are no consensus forecasts.
Bull case
-
Optionality at a deep discount. EV of about A$22m against about A$1.05bn of attributable post-tax NPV8. Even Breakaway's conservative two-module case (NPV about US$350m) implies an order-of-magnitude re-rating if a project sell-down prices at 30–40% of NPV.
-
De-risking that peers lack. The SML, Framework Agreement, completed RAP, US$204m signed debt, POSCO strategic and offtake support, a contracted miner and power agreements mean equity is the only missing building block.
-
Structural tailwinds. Ex-China sourcing pressure, Chinese export controls, POSCO's anode expansion and an emerging FOB Africa premium all favour a large, low-cost, hydro-powered East African supplier with a large-flake bias.
Bear case
-
Binary funding cliff. If no project-level partner or equity is secured by 30 Nov 2026, the debt package may lapse or require renegotiation, and the company would need further dilutive raises from a A$4.9m cash base (June 2026).
-
Market scepticism is evidence-based. Placement prices have collapsed (A$0.065 to A$0.021), NPV has nearly halved (US$1,376m to US$730m), and the sector has a record of failures. Breakaway acknowledges the company is "cum raise" with about US$100m outstanding.
-
Value capture risk. A distressed-timing sell-down or opportunistic takeover could crystallise value well below NPV. Further share issuance, with about 787m options outstanding, would dilute any upside.
Key catalysts and monitorables (next 12 months)
| Catalyst | Expected timing | Watch for |
|---|---|---|
| Announcement of project-level equity partner or sell-down | Before 30 Nov 2026 | Price, stake (about 50%?), identity (strategic vs financial), conditions |
| Financial close and FID | Q4 CY2026 (if funded) | Satisfaction of conditions precedent; POSCO US$40m tranches |
| Debt facility status after 30 Nov 2026 | Late Nov / Dec 2026 | Further extension, renegotiation or lapse |
| FY2026 Annual Report / AGM (expected Nov 2026) | Oct–Nov 2026 | Going-concern language; remuneration; impairment testing of the A$57m E&E asset |
| September 2026 quarterly (due by 31 Oct 2026) | Late Oct 2026 | Cash runway; equity-process update |
| GoT ownership structure | Ongoing | Any change to the 84/16 split |
| Graphite prices and FOB Africa benchmark | Continuous | Basket versus the US$1,495/t assumption |
| Construction mobilisation (220 kV line, plant earthworks) | Post-FID | Contract awards; EPC selection |
| ESG and community | Continuous | Follow-up to the Ulanga allegations; lender E&S monitoring |
Analyst verdict
Black Rock Mining is a textbook case of a fully de-risked asset trapped inside an under-capitalised vehicle. On every technical, permitting and commercial dimension that normally separates real projects from promotional ones, Mahenge has done the work:
-
a JORC Reserve of 70.5 Mt at 8.5% TGC;
-
a 26-year SML and a sovereign Framework Agreement;
-
completed resettlement;
-
a signed US$204m DFI and commercial bank package reviewed by an independent technical expert;
-
binding offtake from POSCO and two Chinese large-flake buyers;
-
a local mining contractor and a power solution that puts it toward the bottom of the cost curve.
Very few undeveloped graphite projects outside China can claim this combination.
Yet the equity market values the company at roughly A$25–28 million, about 2% of the attributable NPV. That valuation is not irrational. It is a rational discount for a single binary event: whether roughly US$100–111 million of project equity can be secured before the debt facility's 30 November 2026 deadline. The company's own going-concern note makes the dependency explicit, because every financing agreement is conditional on that equity. A shrinking cash balance (A$4.9 million at June 2026), a heavily diluted register and the May 2026 NPV reset to US$730 million explain why public markets will not fund it directly.
The investment proposition therefore reduces to the terms of a project-level transaction. A sell-down near Breakaway's 30–40% of NPV benchmark would likely re-rate the shares by multiples. A distressed sale, a further extension without a partner, or a lapse of the debt facility would likely leave equity holders with heavy dilution or residual value only.
On balance, Black Rock is a high-risk, high-convexity special situation suitable only for speculative capital. Position sizing should assume the downside scenario is real. Conviction should be revisited immediately on any announcement concerning a project partner or the November 2026 facility deadline.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Tenure / appointment | Prior roles | Education / credentials | Other current roles |
|---|---|---|---|---|---|
Richard Crookes | Non-Executive Chair | — | Chief Geologist and Mining Manager, Ernest Henry Mining; Executive Director, Macquarie Bank Metals, Energy & Capital (principal investments, project finance origination); Investment Director, EMR Capital | BSc (Geology), Grad Dip (Applied Finance); MAusIMM; Fellow CISI | Partner (Managing Partner per Breakaway), Lionhead Resources (critical minerals fund); Chair, Brightstar Resources (ASX: BTR) |
John de Vries | Managing Director and CEO | CEO since 2017 | WMC Resources (1984 onward: Underground Manager, Manager Mining); Principal Mining Engineer, AMC Consultants (1998); Global Business Manager, Orica Mining Services (2003); Manager Strategic Mine Planning, BHP Billiton (2007); GM Technical Services, St Barbara (2011–2015) | B Eng (Mining), M Sc (Mineral Economics), Grad Dip (Economic Geology), Grad Dip (Financial Markets); WA First Class Mine Manager's Certificate; MAusIMM; FFINSIA; Member SME | Advisory Committee Member–Mining, MRIWA (per Breakaway) |
Ian Murray | Independent Non-Executive Director | — | Executive Chair and MD, Gold Road Resources (delivered the Gruyere gold mine); CFO then CEO, DRDGOLD (1997–2005); director of Rand Refinery and GoldMoney.com; KPMG, Price Waterhouse, Bioclones | B Com (University of Cape Town); Oxford Saïd Advanced Management; FCA (CA ANZ); SAICA; FAICD | Non-Executive Chair, Jupiter Mines (ASX: JMS); NED, Arafura Rare Earths (ASX: ARU) |
Ursula Phillips | Independent Non-Executive Director | — | CTO, Tattarang (owner of Wyloo Metals, Squadron Energy); CIO, PepsiCo ANZ; CIO and CRO, Real Pet Food Company | BA Hons (Politics), University of Newcastle upon Tyne; GAICD | Co-Founder and Executive Director, Batea Consulting (digital, risk, cyber) |
Dongjoo (DJ) Kim | Non-Executive Director (POSCO nominee; not independent of a substantial shareholder) | — | POSCO International since 2010; more than 15 years in raw-materials investment, purchasing and sales | BA | Senior Manager, POSCO International (Sydney office) |
Executive Leadership Team
| Name | Title | Joined | Background |
|---|---|---|---|
John de Vries | MD and CEO | 2017 | See above |
Paul Sims | Chief Financial Officer | 2022 | More than 40 years in resources finance; ERA, BHP, WMC Resources; Commercial Manager and Acting CFO, Minara Resources (Murrin Murrin turnaround); B Acc & Fin (Curtin) |
Daniel Pantany | GM Engineering & Technical | — | More than 28 years in project development across Australia and Africa (EPCM, EP, lump-sum EPC); CPC Engineering, including secondment as Project Engineering Manager for Syrah Resources' Balama graphite project (Mozambique); B Eng (Civil), UWA |
Rae Wyatt | Chief People & Sustainability Officer | — | About 20 years in HR and stakeholder engagement: Iluka Resources, Clean TeQ, Gold Road Resources, Evolution Mining, Norton Goldfields, BHP Nickel West; B Com (HR & IR), Curtin; GAICD |
Harry Miller | Company Secretary | 15 Dec 2025 | Experienced ASX company secretary (replaced James Doyle) |
“—” = not publicly disclosed.
Share-Based Incentives
| Plan | Instrument | Granted in H1 FY26 | Vesting assessment | KPIs |
|---|---|---|---|---|
STI | Nil-priced performance rights | 10,981,394 | 30 Jun 2026 | Deliver early works; retain social licence; retain support of banking syndicate and POSCO; fully fund the project and implement the Project Execution Plan; personal KPIs |
LTI | Nil-priced performance rights | 31,541,684 | 30 Jun 2028 | Growth project selected; absolute 3-year TSR |
Total outstanding performance rights (31 Dec 2025) | — | 62,112,555 | Weighted average remaining life 2.6 years | — |
Governance Overview
| Attribute | Status |
|---|---|
Board size | 5 |
Independent NEDs | 3 (Crookes, Murray, Phillips). |
Non-independent | 2 (de Vries as executive; Kim as POSCO nominee) |
Chair / CEO separation | Yes; Non-Executive Chair (Crookes) is separate from MD and CEO (de Vries) |
Gender diversity | 1 of 5 directors female (20%) |
Governance framework | ASX Corporate Governance Principles reporting (Appendix 4G) expected |
AGM | 24 Nov 2025; all resolutions carried on a poll |
Board & Management Changes
| Date | Change | Context |
|---|---|---|
15 Dec 2025 | Harry Miller appointed Company Secretary; James Doyle resigned | Routine secretarial change |
| 2022 | Paul Sims joined as CFO | Build-out of financing capability ahead of debt process |
Major Shareholders
| Holder | Stake (%) | Date | Source |
|---|---|---|---|
Copulos Group | 16.8 | Jul 2026 | Breakaway (company data) |
POSCO Group (POSCO Holdings / POSCO International) | 8.6 | Jul 2026 | Breakaway |
Turner Group | 6.9 | Jul 2026 | Breakaway |
Board and management | 1.2 | Jul 2026 | Breakaway |
Top 20 holders combined | 36.6 | Jul 2026 | Breakaway |
Competitive Landscape
Key Competitors
| Competitor | Asset / location | Stage | Relevance to Black Rock |
|---|---|---|---|
EcoGraf Limited (ASX: EGR) | Epanko Graphite Project, Ulanga District, Tanzania (84% EcoGraf / 16% GoT) | Developer | Contiguous neighbour; competes for the same Tanzanian financing, infrastructure and community; uses a higher US$1,746/t basket price |
Armadale Capital (LSE: ACP) | Mahenge Liandu Graphite Project, Ulanga, Tanzania | Developer (open pit) | Same district; shared ESG and community scrutiny |
Syrah Resources (ASX: SYR) | Balama, Mozambique; Vidalia anode facility (USA) | Producer / integrated | Largest ex-China natural flake producer; price-setter for African flake |
Walkabout Resources (ASX: WKT) | Lindi Jumbo, Tanzania | Small producer / early-stage | — |
Magnis Energy Technologies | Nachu, Tanzania | Development stalled (corporate distress reported in 2024; verify) | Illustrates sector funding risk |
Triton Minerals | Ancuabe, Mozambique | Developer | East African flake competitor |
NextSource Materials (TSX: NEXT) | Molo, Madagascar | Producer / developer | Large-flake competitor |
Tirupati Graphite | Madagascar / Mozambique | Small producer | Specialty flake competitor |
Talga Group (ASX: TLG) | Sweden (Vittangi / Talnode) | Developer (integrated anode) | Ex-China anode-feed competitor (Europe) |
Renascor Resources (ASX: RNU) | Siviour, South Australia | Developer (integrated PSG) | Ex-China battery-grade competitor |
Nouveau Monde Graphite (TSX/NYSE: NOU) | Matawinie, Québec | Developer (integrated) | North American ex-China competitor |
Chinese producers (Heilongjiang, Inner Mongolia, Shandong) | China | Dominant producers (about 80% of natural flake, per Breakaway) | Price-setters; policy risk |
Synthetic graphite producers (China-dominated) | Global | About 70% of anode graphite supply (Breakaway) | Substitute for fines; not a substitute for large flake |
Peer Comparison FY2025
| Metric | Black Rock (BKT) | EcoGraf (EGR) | Syrah (SYR) | Armadale (ACP) |
|---|---|---|---|---|
Revenue | Nil | Nil (developer) | — | Nil (developer) |
Project stage | Permitted, debt documented, early works near complete | Permitted developer | Producing (Balama) | Developer |
Debt package | US$204m signed (undrawn) | — | — | — |
Strategic offtaker | POSCO (Korea) plus 2 Chinese buyers | — | Various | — |
R&D intensity | No R&D line | — | — | — |