BLACK ROCK MINING LIMITED Overview

Black Rock Mining is a pre-revenue, single-asset critical-minerals developer. Its only material asset is an 84% stake in the Mahenge Graphite Project in south-eastern Tanzania. Mahenge hosts a JORC Mineral Resource of 213 Mt at 7.8% total graphitic carbon (TGC) and an Ore Reserve of 70.5 Mt at 8.5% TGC, which the company describes as the world's second-largest graphite Ore Reserve. The project holds:

  • a granted 26-year Special Mining Licence;

  • a Framework Agreement with the Tanzanian Government;

  • a US$204m syndicated debt package from DBSA, IDC and CRDB;

  • long-term fines offtake and a strategic equity relationship with POSCO;

  • binding large-flake offtakes with two Chinese buyers.

Black Rock's proposition is a low-cost, hydro-powered, modular "crawl, walk, run" upstream concentrate operation that can produce both battery-anode feed and premium large flake outside China. The only missing piece is about US$100–111m of project equity. With a market capitalisation of roughly A$25–28m against a published attributable NPV of US$730m, the stock is effectively a binary financing option. The binding near-term date is the 30 November 2026 debt-facility deadline.


What the company does. Black Rock Mining is a mineral development company. Its principal and essentially only activity is advancing the Mahenge Graphite Project toward a Final Investment Decision (FID), construction and production of natural flake graphite concentrate. The company has never produced or sold graphite. Its income consists of interest on cash balances and occasional minor rental income: total income was A$15,522 in H1 FY26 versus A$39,421 in H1 FY25 (H1 FY26 Report, Note 2). Data vendors record "revenue" of about A$4.1k in FY2024 and A$12.5k in FY2025 (MarketScreener).

Company's own description. On its website (Sep 2026) the company presents itself as a "Premium Graphite Developer" with the tagline "Naturally Better Graphite". It describes its purpose as developing the world-class Mahenge Graphite Project in Tanzania, a large-scale resource able to support decades of production and meet growing global demand for natural graphite. The FY2025 Sustainability Report positions Mahenge as a critical supplier of low-carbon battery materials, contributing to decarbonisation of the transport and electricity sectors.

Intended business model (post-FID).

  • Black Rock plans to be a pure upstream miner and concentrator, not a vertically integrated anode producer.

  • Contract open-pit mining (Taifa Mining and Civils) will feed on-site crushing, milling and flotation, with dry-stack tailings.

  • Concentrate will be bagged, containerised and trucked to Dar es Salaam for export. Rail via the TAZARA line from Ifakara is an option for later modules.

  • The company deliberately avoids downstream spheronisation and purification. Breakaway (Jul 2026) characterises this as cutting out significant execution and technology risk.

Revenue model (prospective). Revenue will be 100% product sales of graphite concentrate under offtake contracts. There is no service, subscription or licensing income. The product mix is split between:

  1. Fines (-100 mesh) for lithium-ion battery anode precursor (spherical purified graphite, SPG). 100% of Module 1 and Module 2 fines are contracted to POSCO.

  2. Large flake (+100 mesh and coarser) for refractories, expandable graphite, foils, friction materials, thermal management and other industrial uses. Contracted in part to Muhui International Trade (Dalian) and Qingdao Yujinxi New Material, with a POSCO marketing agreement for large flake sold outside China.

Metallurgical testwork indicates about 59% coarse flake (+80 mesh) and 41% -80 mesh, at concentrate grades of 95–99% TGC (Breakaway, citing company data). The company's pricing assumes grade premiums of 10% for fines (96% TGC) and 25% for large flake (97.5% TGC) over standard 94–95% TGC benchmarks (company website cost-curve note).

Value chain position. Mahenge sits at stage 1 (mining and concentration) of the natural graphite chain. The next stages are SPG / purification, anode active material, battery cell, and EV / ESS. On the industrial side the chain runs through refractories and expandable-graphite producers. POSCO Future M, an associate of offtaker POSCO International, is building an SPG plant in Pohang (Breakaway cites US$277m and 37 ktpa) to support its Sejong anode plant (70 ktpa per the H1 FY26 Report). That gives Mahenge fines a captive downstream home.

Customer types and end-markets.

Breakaway (Jul 2026) states that about 85% of Module 1 offtake plus Module 2 fines are covered under these agreements. The company's website states ">95% contracted" for products. These two figures conflict. The difference likely reflects whether buyer options and the POSCO MoU are counted.

Independent characterisation. Black Rock is a shovel-ready but under-capitalised developer. Its technical and permitting de-risking is unusually advanced for a company of its size: an SML, Framework Agreement, resettlement completed, debt documentation signed, offtake, a mining contractor, power agreements and early works. Its equity-market position, however, is that of a micro-cap explorer. The business model's success depends almost entirely on one transaction: a project-level equity sell-down or strategic equity injection of about US$100–111m, due before 30 November 2026. Until that happens, the operating "business" is a cost centre of about A$1.5–2.5m per quarter, funded by dilutive placements.

Strategy

Stated strategy (themes from company disclosures)

  1. "Crawl, walk, run" staged modular development. Four modules of about 1 Mtpa ore each. Module 1 is debt- and equity-funded; Modules 2–4 are intended to be largely funded from cash flow, with expansion timing flexible to market conditions.

  2. Upstream focus, partner downstream. Black Rock sells fines to POSCO's anode supply chain rather than building its own SPG or anode capacity.

  3. Premium product strategy. The company emphasises a high large-flake proportion, low impurities, 95–99% TGC grades and the ability to "switch to higher quality product to achieve pricing premiums" (website).

  4. First-quartile cost position. This rests on hydro-dominated grid power at about US$0.08/kWh, deep-water port access and a low strip ratio. The company claims an adjusted ASIC of about US$313/t on Benchmark Mineral Intelligence's normalised cost curve (Q4 CY25).

  5. Sovereign alignment. The Government of Tanzania holds a 16% free-carried interest, the Framework Agreement is in place, local content is delivered through Taifa (a Tanzanian contractor), and power infrastructure is transferred to TANESCO.

  6. ESG differentiation. Dry-stack tailings, hydro power, IFC Performance Standards and Equator Principles compliance for lenders, and a Human Rights screening framework.

  7. Funding strategy pivot. The company has moved from a conventional corporate debt-plus-equity raise to a project-level equity sale. It now seeks to sell an interest in Mahenge "at a premium as a less dilutive pathway than a corporate equity raise" (StocksDownUnder). Breakaway indicates a sale of about 50% at fair valuation multiples would fund Black Rock's share of the upfront equity.

Strategic initiatives, last 24 months (Oct 2024 to Oct 2026)

InitiativeDate(s)DetailStatus
Debt package upsizingMay 2025US$179m to US$204m (adding a US$25m component)Signed; undrawn
TANESCO power agreements12 May 2025Implementation Agreement (build and transfer the 220 kV line and substation) plus Power Supply Agreement (tariff recoups about US$33–40m over the first 4 years)Signed
Early Works Program29 Sep 2025 onwardAccess-road upgrades, plant-site bulk earthworks, Mdindo stream diversion analysis, power-line surveysNear completion (10 Apr 2026; 30 Jul 2026); delayed by heavy rainfall
Equity raise for early worksSep–Oct 2025A$10m placement plus A$4m SPP at A$0.021 with 1:1 options at A$0.03Completed
Final RAP trancheCompleted Dec 2025US$174k compensation to PAPs in the 7.2 km access-road corridorCompleted
Bulk earthworks contract4 Feb 2026Taifa Mining and Civils, US$11.0mAwarded; works progressing
Economic re-baselining5 May 2026NPV8 US$730m, IRR 23%, basket US$1,495/t, logistics +US$46/t (trucking to Dar es Salaam now the base case)Published
Debt deadline extension1 Jul 2026Financial-close deadline moved to 30 Nov 2026Agreed with syndicate (CRDB as Facility Agent)
Project-level equity process2025–2026Sale of a project interest to fund about US$100–111m of equityOngoing; no counterparty announced as of the latest verified disclosures
Sustainability reporting26 Sep 2025Second annual Sustainability Report (FY2025)Published

Medium-term targets / guidance

ItemGuidanceSource
FIDAfter completion of equity financing and loan documentation; targeted by the 30 Nov 2026 facility deadline1 Jul 2026 / 30 Jul 2026 ASX releases
First production (Module 1)Within about 24 months of FID (implies 2028 if FID is in late 2026)StocksDownUnder summary of company guidance
Module 1 outputAbout 87–89 ktpa concentrateCompany / Breakaway
Steady stateAbout 340–347 ktpa by about Year 4 of the staged planCompany / Breakaway
C1 cost (first 10 years)About US$512–513/t concentrate; AISC about US$575/tMay 2026 re-run (Breakaway)
CapexModule 1 plus power line US$231m; Stages 1–4 ex-power US$510m (182 + 107 + 117 + 104)Company website; Breakaway Table 5
Financial targets (revenue, EBITDA)Not issued; only study-derived production targets, subject to ASX cautionary statements—

Products & Services

Black Rock has no commercial products today. Its future portfolio consists of graphite concentrate products from the Mahenge Graphite Project, organised by flake size and purity. All future production sits in the Graphite segment.

The Mahenge Graphite Project (sole asset)

AttributeDetailSource
LocationUlanga District, Morogoro Region, south-eastern Tanzania; about 350 km SW of Dar es Salaam (about 482 km by road); 70 km south of Ifakara; 9 km from Mahenge townshipCompany website (Sep 2026)
TenureSML 676/2022 (34.96 km², granted 5 Sep 2022, 26-year term); PL 2139/2022 (100.42 km²); ML applications ML777 and ML778/2025 (19.91 km², 100% Mahenge Resources)Breakaway; H1 FY26 Report
GeologyEastern Granulite, Proterozoic Mozambique Belt; graphitic schists, granulites, marbles; thick, steeply to moderately east-dipping, long strikeBreakaway
DepositsUlanzi, Cascade, Epanko (the Epanko deposit within Black Rock's tenure is distinct from EcoGraf's Epanko project)Breakaway
Mineral Resource (JORC 2012)213.1 Mt at 7.8% TGC (16.6 Mt contained graphite)Company website; Breakaway
Ore Reserve (JORC 2012)70.5 Mt at 8.5% TGC Probable (6.0 Mt contained); described as the world's 2nd largest graphite Ore ReserveCompany website; Breakaway
Latest studyeDFS Update with FEED (10 Oct 2022); economics re-run and published 5 May 2026Company website; Breakaway
Development concept4 modules of about 1 Mtpa ore each; open pit, drill and blast, strip ratio 0.65:1; conventional crush–mill–flotation; dry-stack tailingsBreakaway
ProductionModule 1: about 89 ktpa concentrate (website) or 87 ktpa (Breakaway). Steady state: up to about 340–347 ktpa across 4 modules. Life of mine 26 years (27 years including construction).Company website; Breakaway
Power220 kV line Ifakara–Mahenge (about 70 km) plus substation, built by Faru and transferred to TANESCO; cost recouped via power tariffs over the first 4 years; grid tariff about US$0.08/kWhH1 FY26 Report; Breakaway
Peak power demandAbout 33 MW; 45 MW installed for 4 modulesBreakaway
Accommodation320-person villageBreakaway
EmploymentMore than 400 FTE (Module 1), rising to more than 900 FTE (4 modules)H1 FY26 Report
CategoryTonnes (Mt)Grade (% TGC)Contained graphite (Mt)
Measured31.88.62.7
Indicated84.67.86.6
Total M&I116.48.09.3
Inferred96.77.47.2
Total Resource213.17.816.6
Probable Reserve70.58.56.0
Proved Reserve000
PitProbable (Mt)Probable grade (% TGC)Inferred in plan (Mt)Inferred grade (% TGC)
Ulanzi47.58.59.46.6
Cascade23.18.65.78.7
Epanko (BKT tenure)009.96.7
Total70.58.525.07.1

Mineral Resource and Ore Reserve detail. Source: Breakaway Table 3, citing the company's 2022 MRE.

Open-pit sources in the mine plan. Source: Breakaway Table 4.

Product catalogue (prospective)

ProductSpecificationTarget customer / applicationCommercial statusPricing model
Fines concentrate (-100 mesh, <150 µm)About 96% TGC, shipped grade (10% premium assumed)Anode precursor (SPG) producers; POSCO / POSCO Future M (Korea)100% of Module 1 and 2 fines contracted to POSCO; US$10m prepaymentContract pricing; terms not publicly disclosed
Small flake (+100 mesh, 150–180 µm)97.5% TGCRefractories, foundries, lubricants, expandable graphiteCovered by Muhui / Qingdao offtakes (+100#)Indexed to published RefWin and ICCSino indices
Medium flake (+80 mesh, 180–300 µm)97.5% TGCRefractories, foundries, lubricants, expandable graphiteAs aboveAs above
Large flake (+50 mesh, 300–500 µm)97.5% TGC (25% premium assumed)Refractories, expandable graphite, friction materials, EAF electrodes, graphene feedstockAs above, plus POSCO marketing (ex-China)As above
Jumbo / super-jumbo flake (+32 / +20 mesh, >500 µm)Premium purityExpandable graphite, thermal management, specialist foilsMarketed under the same agreementsAs above
Ultra-purity flake99% LOI capability (pilot-proven; +99% TGC achieved in 2018 at SGS)High-end specialty marketsOptional / upside; not in base contracts—

Sources: Company website; Breakaway Table A1 (flake taxonomy); offtake terms from Breakaway, adapting the company's 27 Jun 2024 announcement.

Pricing basis in project economics. The May 2026 re-run uses a concentrate basket price of US$1,495/t, down from US$1,709/t in the 2022 eDFS Update. Breakaway notes the company's 2026 price protocol incorporates the newly introduced "FOB Africa" benchmark, which prices East African supply at a premium to Chinese benchmarks.

Launch / latest version year. Not applicable. First production is targeted within about 24 months of FID. This places initial output in the 2027–2028 window, and it slips day-for-day with FID timing.

Financial Narrative

Data provenance. FY2021–FY2025 figures come from data vendors that transcribe the company's audited annual reports (StockAnalysis, MarketScreener, Barchart, TipRanks). Where possible they are cross-checked to the company's own comparatives in the H1 FY26 Half-Year Report. Barchart labels its series "U.S. Thousands", but the values reconcile exactly to the company's A$ statements, for example total assets of A$59,418,032 at 30 June 2025. All figures are in A$.

Income statement

Sources: StockAnalysis (FY2021–FY2025 income statement); MarketScreener; Barchart. NCI first appears in FY2023, after the September 2022 SML grant and recognition of the Government of Tanzania's 16% interest in Faru.

Items not computable or not meaningful.

Balance sheet

Sources: Barchart and Stockopedia balance sheets; TipRanks (equity, liabilities). Cash and FY2025 balances were cross-checked to the H1 FY26 Report comparatives (FY2025 cash A$1,880,726; total assets A$59,418,032; total liabilities A$3,090,351; net assets A$56,327,681). Net debt is negative, meaning net cash.

Notes on the balance sheet.

Goodwill and intangibles: nil.

Debt: The US$204m facility is undrawn. Lease liabilities were A$0.39m at FY2025 and A$0.30m at 31 Dec 2025. A "financial liabilities" line of A$0.15m is also carried.

E&E asset: At 30 June 2025 it was A$55.94m, the carrying value of Mahenge. Its recoupment depends on successful development or sale (Note 3).

Cash flow

Source: Barchart "Net Cash Flow". The vendor's figures differ slightly from simple balance-to-balance cash changes because of FX translation.

Partially disclosed cash-flow items.

Latest interim: H1 FY2026 (six months to 31 Dec 2025, reviewed by Deloitte)

Balance sheet at 31 Dec 2025 (A$ M): total assets 67.64; E&E asset 57.05; total liabilities 2.59; net assets 65.05; equity attributable to owners 66.60; NCI -1.55; issued capital 141.79; accumulated losses -77.78. Source: H1 FY26 Half-Year Report.

Quarterly cash runway, FY2026

Sources: InvestSMART (Oct 2025 quarterly); H1 FY26 Report; Breakaway (31 Mar 2026); June 2026 Quarterly.

June 2026 quarter: operating cash outflow A$1.77m; investing outflow A$0.53m.

FY2026 financing inflow: A$13.18m, reported by Quartr. This is consistent with the year-to-date Appendix 5B column (A$14m raise less costs), not a single-quarter inflow.

Implied FY2026 operating cash burn (not audited): about A$4.0m in H1 plus roughly A$3.5–4.0m in H2 (derived from the quarterly cash moves), giving about A$7.5–8m in total. This is an estimate only.

Ratios (computed from the vendor and company data above)

ROE and ROA use attributable net loss. MarketScreener's liabilities-to-assets series (1.39 / 4.2 / 6.24 / 5.68 / 5.2) matches the computed figures. Simply Wall St reports ROE of -16.88%.

The following ratios are not meaningful for a pre-revenue developer with no debt and no sales: ROIC, net debt/EBITDA, interest coverage, asset turnover and cash conversion cycle.

Commentary on trends, inflections and drivers

  1. Losses. Losses scaled from A$2.85m in FY2021 to a peak of A$10.6m in FY2024 (including NCI) as the company moved from study phase into financing, offtake and permitting. That period carried heavy consulting, legal and lender due-diligence costs and higher share-based payments (A$1.35m in FY2024). FY2025 eased to A$9.51m, and H1 FY26 fell further to A$4.02m from A$5.55m. The main drivers were roughly halved consulting expense (A$1.13m vs A$2.10m) and much lower share-based payments (A$0.21m vs A$0.97m).

  2. Balance sheet. Total assets have been broadly flat at A$57–63m since FY2022. Growth in the E&E asset (A$22m to A$57m) has been funded by equity, while cash has been drawn down. Cash peaked at A$26.1m in June 2022 and fell to A$1.88m in June 2025, a near-term liquidity squeeze. The A$14m raise of September–October 2025 temporarily restored A$9.5m, which had declined to A$4.9m by June 2026.

  3. Equity funding dependence. Issued capital rose from A$122.9m (July 2024) to A$141.8m (December 2025). Shares on issue rose 72%, from 1,251m to 2,148m, over the same 18 months, while placement prices fell from A$0.065 (March 2024) to A$0.023 (March 2025) and then A$0.021 (September 2025).

  4. Going concern. The H1 FY26 Report's going-concern note discloses two scenarios. In the first, FID and full funding proceed. The second assumes no development before 31 March 2027. Directors concluded the group can meet its debts for 12 months, but explicitly link all three funding agreements (US$204m debt, US$40m POSCO equity, US$10m POSCO prepayment) to raising project equity of about US$111m. Quartr's summary of the FY2025 annual report also highlights "going concern uncertainty".

  5. Inflection. The decisive financial inflection is FID. On financial close, the balance sheet would transform:

    • drawdown of up to US$138m term debt;

    • US$40m POSCO equity (subject to the 19.99% cap);

    • project-level equity proceeds. On the published capex profile, total assets would rise roughly fourfold within 24 months.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Group Entities

EntityJurisdictionOwnershipRole

Black Rock Mining Limited

Australia

Listed parent (ASX: BKT)

Corporate HQ, financing, governance

Mahenge Resources Limited

United Kingdom

100% (Black Rock)

Intermediate holding company; holds 84% of Faru; holds 100% of ML applications ML777/2025 and ML778/2025 (19.91 km²)

Mahenge Resources Ltd (Tanzania branch / office, Box 11, Mahenge-Ulanga)

Tanzania

Group

Local operating presence (as shown on quarterly report letterhead)

Faru Graphite Corporation Limited

Tanzania

84% Mahenge Resources Ltd (UK); 16% Government of Tanzania (free carried)

Project company; holder of SML 676/2022 and PL 2139/2022; borrower under the US$204m facilities; offtake contracting party

Results by Segment

MetricH1FY2025H1FY2026

Graphite segment total income (AUD Mn)

0.0080

Corporate segment total income (AUD Mn)

0.0310.016

Graphite segment loss before tax (AUD Mn)

-1.987-1.305

Corporate segment loss before tax (AUD Mn)

-3.561-2.718

Consolidated loss before tax (AUD Mn)

-5.547-4.023

Graphite E&E additions (AUD Mn)

1.9941.906

Segment Assets & Liabilities

MetricJun2025Dec2025

Graphite segment assets (AUD Mn)

58.2657.60

Corporate segment assets (AUD Mn)

2.4610.04

Graphite segment liabilities (AUD Mn)

2.101.62

Corporate segment liabilities (AUD Mn)

0.710.97

Segment Revenue

MetricFY2023FY2024FY2025

Graphite segment sales revenue (AUD Mn)

000

Corporate segment sales revenue (AUD Mn)

000

Income Statement

MetricFY2021FY2022FY2023FY2024FY2025

Sales revenue (AUD Mn)

00000

Reported other revenue per vendors (AUD Mn)

0000.0040.012

SG&A expense (AUD Mn)

1.914.938.678.568.09

Total operating expenses (AUD Mn)

3.136.509.8010.679.63

Operating income (AUD Mn)

-3.13-6.50-9.80-10.66-9.62

Share-based payment expense (AUD Mn)

0.9520.5420.5021.350.740

FX gain (AUD Mn)

0.230.420.410.070.09

Net loss incl. NCI (AUD Mn)

-2.85-6.08-9.35-10.60-9.51

Net loss attributable to owners (AUD Mn)

-2.85-6.08-9.05-10.08-8.93

Financial Analysis

ItemStatus

Gross profit

Nil / not meaningful (no sales)

EBITDA

Not separately disclosed. It approximates the operating loss plus minor depreciation (H1 FY26 D&A was A$0.15m). Not meaningful as a valuation metric.

Pre-tax income

Equal to net loss (no income tax expense recognised in any year)

EPS basic / diluted

FY2023 about -0.9 cents and FY2024 about -0.9 cents (InvestSMART). H1 FY25 -0.42 cents; H1 FY26 -0.21 cents (company).

Dividends per share

Nil in all years

Gross / operating / EBITDA / net margins

Not meaningful (vendors show operating margins of about -77,000% to -259,000% on token income)

Balance Sheet

MetricFY2021FY2022FY2023FY2024FY2025

Cash and equivalents (AUD Mn)

11.3026.0911.468.901.88

Total current assets (AUD Mn)

11.4427.0913.269.562.50

E&E asset plus PP&E, net (AUD Mn)

22.1930.3448.0653.5456.69

Total assets (AUD Mn)

33.6357.4361.3263.1159.42

Total current liabilities (AUD Mn)

0.471.813.293.231.69

Total liabilities (AUD Mn)

0.472.413.823.593.09

Total equity incl. NCI (AUD Mn)

33.1655.0257.4959.5256.33

Working capital (AUD Mn)

10.9725.289.976.330.81

Borrowings (AUD Mn)

00000

Net debt (AUD Mn)

-11.30-26.09-11.46-8.90-1.88

Cash Flow

MetricFY2021FY2022FY2023FY2024FY2025

Net change in cash (AUD Mn)

10.8114.37-15.03-2.61-7.14

Dividends paid (AUD Mn)

00000

Share buybacks (AUD Mn)

00000

Financial Analysis — FY2025 cash paid for E&E

ItemValueSource

FY2025 cash paid for E&E (capex proxy)

A$2.78m

H1 FY26 Report, Note 3 comparative

FY2025 E&E additions at cost

A$2.70m

H1 FY26 Report, Note 3

Q1 CY24 to Q1 CY26 (27 months) project spend

A$10.76m

Breakaway

Q1 CY24 to Q1 CY26 (27 months) staff and admin spend

A$14.69m

Breakaway

Cash Flow (H1FY2025–H1FY2026)

MetricH1FY2025H1FY2026

Interest income (AUD Mn)

0.0310.016

Employee benefits expense (AUD Mn)

1.6101.410

Consulting expense (AUD Mn)

2.1041.129

Share-based payments expense (AUD Mn)

0.9690.209

Impairment of contract asset (AUD Mn)

00.231

Loss for the period (AUD Mn)

-5.547-4.023

Loss attributable to owners (AUD Mn)

-5.245-3.847

Operating cash flow (AUD Mn)

-4.861-4.014

E&E payments, investing (AUD Mn)

-2.028-1.555

Financing cash flow (AUD Mn)

-0.11913.152

Closing cash (AUD Mn)

1.9519.461

Key Financials

MetricSep2025Dec2025Mar2026Jun2026

Quarter-end cash (AUD Mn)

3.69.467.244.9

Returns & Leverage Ratios (%) and Financial Ratios (x)

MetricFY2021FY2022FY2023FY2024FY2025

ROE on closing total equity (%)

-8.6-11.1-15.7-16.9-15.9

ROA on closing total assets (%)

-8.5-10.6-14.8-16.0-15.0

Current ratio (x)

24.315.04.03.01.5

Total liabilities to total assets (%)

1.44.26.25.75.2

Debt to equity (x)

00000

Geographic Revenue

RegionFY2023FY2024FY2025

Australia sales revenue (AUD Mn)

000

Tanzania sales revenue (AUD Mn)

000

Rest of world sales revenue (AUD Mn)

000

Region Assets & Liabilities

RegionJun2025Dec2025

Tanzania segment assets (AUD Mn)

58.2657.60

Australia segment assets (AUD Mn)

2.4610.04

Change by Period

PeriodChangeBasis

1 year

About -32%

Oct 2025 A$0.019 to Sep 2026 A$0.013

2026 calendar YTD

-31.25% at A$0.011

MarketScreener

About 2.5 years

About -80%

Mar 2024 A$0.065 to Sep 2026 A$0.013

About 5–6 years

About -84%

Dec 2020 A$0.083 to Sep 2026 A$0.013

Valuation Snapshot

MultipleValueBasis

Market cap

About A$27m

2,148m shares at A$0.013

Enterprise value

About A$22m

Market cap less A$4.9m cash (30 Jun 2026); no debt

P/B

About 0.41x

A$27m against A$66.6m attributable equity (31 Dec 2025)

EV / attributable post-tax NPV8

About 2%

A$22m against about A$1.05bn (US$730m); Breakaway cites about 2% at A$18.5m EV

EV per tonne of contained reserve graphite

About A$4 per tonne

A$22m / 6.0 Mt × 84%

Firm Details

FirmDateRatingTargetNote

Breakaway Research (Mark Gordon)

Jul 2026

Speculative Buy

No per-share target ("any attempt will be misleading")

Company-commissioned research

Debt Facilities

FacilityAmount (USD Mn)TermsStatus

Construction Term Loan

138

8.5-year tenor; repayments begin 4.5 years after FID; SOFR+8% (about 11% all-in); target gearing about 50%

Undrawn

Working-capital Revolving Credit Facility

20

SOFR plus margin

Undrawn

Cost Overrun Facility

20

SOFR plus margin

Undrawn

Bank Guarantee Facility (environmental bonding)

26—

Undrawn

Total

204

Financial-close deadline 30 Nov 2026

Signed Sep 2024; upsized May 2025; extended Jul 2026

Securities on Issue

SecurityNumber

Ordinary shares

2,147,724,265

Listed options (BKTOE, A$0.03, expire 24 Oct 2027)

666,666,510

Unlisted options (incl. 108.7m at A$0.035 expiring 29 Jul 2028; balance ZEPOs)

120,860,337

Performance rights (nil-priced)

62,112,555

Fully diluted (approximate)

About 2,997m

Analyst Conclusions

Management guidance. Management's stated priority is to secure the remaining equity investment, achieve financial close and reach a fully funded FID within the extended 30 November 2026 facility deadline (June 2026 quarterly). Early works are described as near complete, which positions the project for rapid construction ramp-up once funded. First Module 1 production would follow about 24 months after FID. No revenue or earnings guidance exists, and there are no consensus forecasts.

Bull case

  1. Optionality at a deep discount. EV of about A$22m against about A$1.05bn of attributable post-tax NPV8. Even Breakaway's conservative two-module case (NPV about US$350m) implies an order-of-magnitude re-rating if a project sell-down prices at 30–40% of NPV.

  2. De-risking that peers lack. The SML, Framework Agreement, completed RAP, US$204m signed debt, POSCO strategic and offtake support, a contracted miner and power agreements mean equity is the only missing building block.

  3. Structural tailwinds. Ex-China sourcing pressure, Chinese export controls, POSCO's anode expansion and an emerging FOB Africa premium all favour a large, low-cost, hydro-powered East African supplier with a large-flake bias.

Bear case

  1. Binary funding cliff. If no project-level partner or equity is secured by 30 Nov 2026, the debt package may lapse or require renegotiation, and the company would need further dilutive raises from a A$4.9m cash base (June 2026).

  2. Market scepticism is evidence-based. Placement prices have collapsed (A$0.065 to A$0.021), NPV has nearly halved (US$1,376m to US$730m), and the sector has a record of failures. Breakaway acknowledges the company is "cum raise" with about US$100m outstanding.

  3. Value capture risk. A distressed-timing sell-down or opportunistic takeover could crystallise value well below NPV. Further share issuance, with about 787m options outstanding, would dilute any upside.

Key catalysts and monitorables (next 12 months)

CatalystExpected timingWatch for
Announcement of project-level equity partner or sell-downBefore 30 Nov 2026Price, stake (about 50%?), identity (strategic vs financial), conditions
Financial close and FIDQ4 CY2026 (if funded)Satisfaction of conditions precedent; POSCO US$40m tranches
Debt facility status after 30 Nov 2026Late Nov / Dec 2026Further extension, renegotiation or lapse
FY2026 Annual Report / AGM (expected Nov 2026)Oct–Nov 2026Going-concern language; remuneration; impairment testing of the A$57m E&E asset
September 2026 quarterly (due by 31 Oct 2026)Late Oct 2026Cash runway; equity-process update
GoT ownership structureOngoingAny change to the 84/16 split
Graphite prices and FOB Africa benchmarkContinuousBasket versus the US$1,495/t assumption
Construction mobilisation (220 kV line, plant earthworks)Post-FIDContract awards; EPC selection
ESG and communityContinuousFollow-up to the Ulanga allegations; lender E&S monitoring

Analyst verdict

Black Rock Mining is a textbook case of a fully de-risked asset trapped inside an under-capitalised vehicle. On every technical, permitting and commercial dimension that normally separates real projects from promotional ones, Mahenge has done the work:

  • a JORC Reserve of 70.5 Mt at 8.5% TGC;

  • a 26-year SML and a sovereign Framework Agreement;

  • completed resettlement;

  • a signed US$204m DFI and commercial bank package reviewed by an independent technical expert;

  • binding offtake from POSCO and two Chinese large-flake buyers;

  • a local mining contractor and a power solution that puts it toward the bottom of the cost curve.

Very few undeveloped graphite projects outside China can claim this combination.

Yet the equity market values the company at roughly A$25–28 million, about 2% of the attributable NPV. That valuation is not irrational. It is a rational discount for a single binary event: whether roughly US$100–111 million of project equity can be secured before the debt facility's 30 November 2026 deadline. The company's own going-concern note makes the dependency explicit, because every financing agreement is conditional on that equity. A shrinking cash balance (A$4.9 million at June 2026), a heavily diluted register and the May 2026 NPV reset to US$730 million explain why public markets will not fund it directly.

The investment proposition therefore reduces to the terms of a project-level transaction. A sell-down near Breakaway's 30–40% of NPV benchmark would likely re-rate the shares by multiples. A distressed sale, a further extension without a partner, or a lapse of the debt facility would likely leave equity holders with heavy dilution or residual value only.

On balance, Black Rock is a high-risk, high-convexity special situation suitable only for speculative capital. Position sizing should assume the downside scenario is real. Conviction should be revisited immediately on any announcement concerning a project partner or the November 2026 facility deadline.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Board of Directors

NameRoleTenure / appointmentPrior rolesEducation / credentialsOther current roles

Richard Crookes

Non-Executive Chair

—

Chief Geologist and Mining Manager, Ernest Henry Mining; Executive Director, Macquarie Bank Metals, Energy & Capital (principal investments, project finance origination); Investment Director, EMR Capital

BSc (Geology), Grad Dip (Applied Finance); MAusIMM; Fellow CISI

Partner (Managing Partner per Breakaway), Lionhead Resources (critical minerals fund); Chair, Brightstar Resources (ASX: BTR)

John de Vries

Managing Director and CEO

CEO since 2017

WMC Resources (1984 onward: Underground Manager, Manager Mining); Principal Mining Engineer, AMC Consultants (1998); Global Business Manager, Orica Mining Services (2003); Manager Strategic Mine Planning, BHP Billiton (2007); GM Technical Services, St Barbara (2011–2015)

B Eng (Mining), M Sc (Mineral Economics), Grad Dip (Economic Geology), Grad Dip (Financial Markets); WA First Class Mine Manager's Certificate; MAusIMM; FFINSIA; Member SME

Advisory Committee Member–Mining, MRIWA (per Breakaway)

Ian Murray

Independent Non-Executive Director

—

Executive Chair and MD, Gold Road Resources (delivered the Gruyere gold mine); CFO then CEO, DRDGOLD (1997–2005); director of Rand Refinery and GoldMoney.com; KPMG, Price Waterhouse, Bioclones

B Com (University of Cape Town); Oxford Saïd Advanced Management; FCA (CA ANZ); SAICA; FAICD

Non-Executive Chair, Jupiter Mines (ASX: JMS); NED, Arafura Rare Earths (ASX: ARU)

Ursula Phillips

Independent Non-Executive Director

—

CTO, Tattarang (owner of Wyloo Metals, Squadron Energy); CIO, PepsiCo ANZ; CIO and CRO, Real Pet Food Company

BA Hons (Politics), University of Newcastle upon Tyne; GAICD

Co-Founder and Executive Director, Batea Consulting (digital, risk, cyber)

Dongjoo (DJ) Kim

Non-Executive Director (POSCO nominee; not independent of a substantial shareholder)

—

POSCO International since 2010; more than 15 years in raw-materials investment, purchasing and sales

BA

Senior Manager, POSCO International (Sydney office)

Executive Leadership Team

NameTitleJoinedBackground

John de Vries

MD and CEO

2017

See above

Paul Sims

Chief Financial Officer

2022

More than 40 years in resources finance; ERA, BHP, WMC Resources; Commercial Manager and Acting CFO, Minara Resources (Murrin Murrin turnaround); B Acc & Fin (Curtin)

Daniel Pantany

GM Engineering & Technical

—

More than 28 years in project development across Australia and Africa (EPCM, EP, lump-sum EPC); CPC Engineering, including secondment as Project Engineering Manager for Syrah Resources' Balama graphite project (Mozambique); B Eng (Civil), UWA

Rae Wyatt

Chief People & Sustainability Officer

—

About 20 years in HR and stakeholder engagement: Iluka Resources, Clean TeQ, Gold Road Resources, Evolution Mining, Norton Goldfields, BHP Nickel West; B Com (HR & IR), Curtin; GAICD

Harry Miller

Company Secretary

15 Dec 2025

Experienced ASX company secretary (replaced James Doyle)

“—” = not publicly disclosed.

Share-Based Incentives

PlanInstrumentGranted in H1 FY26Vesting assessmentKPIs

STI

Nil-priced performance rights

10,981,394

30 Jun 2026

Deliver early works; retain social licence; retain support of banking syndicate and POSCO; fully fund the project and implement the Project Execution Plan; personal KPIs

LTI

Nil-priced performance rights

31,541,684

30 Jun 2028

Growth project selected; absolute 3-year TSR

Total outstanding performance rights (31 Dec 2025)

—62,112,555

Weighted average remaining life 2.6 years

—

Governance Overview

AttributeStatus

Board size

5

Independent NEDs

3 (Crookes, Murray, Phillips).

Non-independent

2 (de Vries as executive; Kim as POSCO nominee)

Chair / CEO separation

Yes; Non-Executive Chair (Crookes) is separate from MD and CEO (de Vries)

Gender diversity

1 of 5 directors female (20%)

Governance framework

ASX Corporate Governance Principles reporting (Appendix 4G) expected

AGM

24 Nov 2025; all resolutions carried on a poll

Board & Management Changes

DateChangeContext

15 Dec 2025

Harry Miller appointed Company Secretary; James Doyle resigned

Routine secretarial change

2022

Paul Sims joined as CFO

Build-out of financing capability ahead of debt process

Major Shareholders

HolderStake (%)DateSource

Copulos Group

16.8

Jul 2026

Breakaway (company data)

POSCO Group (POSCO Holdings / POSCO International)

8.6

Jul 2026

Breakaway

Turner Group

6.9

Jul 2026

Breakaway

Board and management

1.2

Jul 2026

Breakaway

Top 20 holders combined

36.6

Jul 2026

Breakaway

Competitive Landscape

Key Competitors

CompetitorAsset / locationStageRelevance to Black Rock

EcoGraf Limited (ASX: EGR)

Epanko Graphite Project, Ulanga District, Tanzania (84% EcoGraf / 16% GoT)

Developer

Contiguous neighbour; competes for the same Tanzanian financing, infrastructure and community; uses a higher US$1,746/t basket price

Armadale Capital (LSE: ACP)

Mahenge Liandu Graphite Project, Ulanga, Tanzania

Developer (open pit)

Same district; shared ESG and community scrutiny

Syrah Resources (ASX: SYR)

Balama, Mozambique; Vidalia anode facility (USA)

Producer / integrated

Largest ex-China natural flake producer; price-setter for African flake

Walkabout Resources (ASX: WKT)

Lindi Jumbo, Tanzania

Small producer / early-stage

—

Magnis Energy Technologies

Nachu, Tanzania

Development stalled (corporate distress reported in 2024; verify)

Illustrates sector funding risk

Triton Minerals

Ancuabe, Mozambique

Developer

East African flake competitor

NextSource Materials (TSX: NEXT)

Molo, Madagascar

Producer / developer

Large-flake competitor

Tirupati Graphite

Madagascar / Mozambique

Small producer

Specialty flake competitor

Talga Group (ASX: TLG)

Sweden (Vittangi / Talnode)

Developer (integrated anode)

Ex-China anode-feed competitor (Europe)

Renascor Resources (ASX: RNU)

Siviour, South Australia

Developer (integrated PSG)

Ex-China battery-grade competitor

Nouveau Monde Graphite (TSX/NYSE: NOU)

Matawinie, Québec

Developer (integrated)

North American ex-China competitor

Chinese producers (Heilongjiang, Inner Mongolia, Shandong)

China

Dominant producers (about 80% of natural flake, per Breakaway)

Price-setters; policy risk

Synthetic graphite producers (China-dominated)

Global

About 70% of anode graphite supply (Breakaway)

Substitute for fines; not a substitute for large flake

Peer Comparison FY2025

MetricBlack Rock (BKT)EcoGraf (EGR)Syrah (SYR)Armadale (ACP)

Revenue

Nil

Nil (developer)

—

Nil (developer)

Project stage

Permitted, debt documented, early works near complete

Permitted developer

Producing (Balama)

Developer

Debt package

US$204m signed (undrawn)

———

Strategic offtaker

POSCO (Korea) plus 2 Chinese buyers

—

Various

—

R&D intensity

No R&D line

———

Company Snapshot

$16.6M

Market Cap

2000

Founded

West Perth, Australia

Headquarters

SWOT Analysis

Strengths

  • Scale: Ore Reserve of 70.5 Mt at 8.5% TGC (6.0 Mt contained), described as the world's 2nd largest; Resource of 213.1 Mt at 7.8% TGC (website; Breakaway Table 3).
  • Product quality: About 59% +80 mesh flake; 95–99% TGC concentrates; +99% TGC achieved at pilot scale (SGS, May 2018).
  • Permitting complete: SML 676/2022 (26 years) granted 5 Sep 2022; Framework Agreement signed 14 Dec 2021; RAP completed (mine area 2022, access road December 2025).
  • Debt fully documented: US$204m from DBSA, IDC and CRDB, comprising a US$138m term loan, US$20m RCF, US$20m cost-overrun facility and US$26m bank guarantee facility. The term loan runs 8.5 years at SOFR+8% (Breakaway).
  • Tier-1 strategic partner: POSCO holds 8.6% equity, offtakes 100% of Module 1 and 2 fines, provides a US$10m prepayment and a US$40m conditional equity commitment, and has a board seat.
  • Low-cost power: About US$0.08/kWh grid hydro, versus about US$0.35–0.40/kWh for diesel. The Julius Nyerere 2,115 MW station has nearly doubled national grid capacity (Breakaway).
  • First-quartile cost claim: -100# normalised C1 of US$271/t; adjusted ASIC of about US$313/t on the Benchmark Q4 CY25 normalised curve (website).

Weaknesses

  • Micro-cap valuation: Market cap about A$25.8m (24 Jul 2026), against an equity need of about US$100–111m. The company is roughly 6x too small to raise this at corporate level without massive dilution.
  • Cash runway: A$4.9m at 30 Jun 2026, against a quarterly operating burn of A$1.77m plus investing outflows.
  • Going-concern dependency: All funding agreements are conditional on raising about US$111m of project equity (H1 FY26 Report, Note 1).
  • Single asset, single jurisdiction: 100% of carrying value (A$57.0m E&E) is Mahenge.
  • Heavy dilution history: Shares rose 72% from 1,251m to 2,148m between July 2024 and December 2025. Placement prices fell from A$0.065 to A$0.021.
  • Headline NPV downgrade: US$1,376m (2022) to US$730m (May 2026), driven by lower prices and +US$46/t logistics.
  • Aged study base: Capex is grounded in the October 2022 eDFS and FEED; cost escalation since then is only partly reflected.

Opportunities

  • Project-level sell-down: Breakaway estimates a ~50% sale could yield US$61m (2 modules) to US$130m (4 modules) at a US$1,500/t basket.
  • Price recovery: The four-module NPV rises to about US$1,019m at a US$1,700/t basket (Breakaway Table 1).
  • Ex-China premium: The FOB Africa benchmark and Chinese export controls are lifting ex-China enquiries (October 2025 quarterly).
  • POSCO expansion: POSCO Future M's SPG plant in Pohang (US$277m, 37 ktpa) and its 370 ktpa anode capacity target by 2030 (Breakaway).
  • Resource growth: 96.7 Mt of Inferred Resource, plus ML applications ML777 and ML778/2025.
  • Expandable graphite growth: 7–10% p.a. growth in large-flake demand, which synthetics cannot substitute.

Threats

  • Debt-deadline risk: Facilities lapse if financial close is not achieved by 30 Nov 2026 (1 Jul 2026 release).
  • Chinese oversupply: China controls about 80% of natural flake supply, with ongoing synthetic expansion.
  • Community / human rights scrutiny: The CHRD report of 5 Nov 2025 alleges displacement and rights violations across Ulanga graphite projects. Black Rock responded on 16 Mar 2026.
  • Sovereign / fiscal risk: Tanzania's 2017 mining law reforms are a precedent, although they have since been amended.
  • Opportunistic takeover at a low valuation: EV of about 2% of attributable NPV (Breakaway).
  • Cost inflation: The 2022 capex was already 59% above the 2019 estimate (Breakaway).

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
Apr 2025Q3 FY25 quarterly report (29 Apr 2025)Financing and offtake status update
12 May 2025Implementation Agreement and Power Supply Agreement signed with TANESCOSecures the grid-power pathway; capex recoupment over the first 4 years
May 2025Debt facility increased by US$25m to US$204mCovers capex escalation and contingencies
19 May 2025Investor presentationUpdated project narrative
30 Jul 2025Q4 FY25 quarterlyCash had fallen to A$1.88m at 30 Jun 2025 (liquidity low point)
1 Sep 2025Investor presentationPower, financing and regulatory milestones summarised
2 Sep 2025Successful bookbuild for A$10m placement at A$0.021; SPP launchedFunds early works; heavy dilution at a low price
9 Sep 2025Placement Tranche 1: 213.0m shares issued—
25–26 Sep 2025FY2025 Annual Report and second Sustainability Report releasedGoing-concern emphasis on FID funding
29 Sep 2025Early Works to commence at MahengeFirst physical site activity
10 Oct 2025Groundbreaking ceremony led by Minister of Minerals Anthony Mavunde; Korean Ambassador attendsGovernment and Korean diplomatic endorsement
17 Oct 2025General Meeting approves Placement Tranche 2 and SPP oversubscriptions—
20 Oct 2025Investor presentationEmphasises POSCO backing and offtake
24 Oct 2025SPP closes oversubscribed (about A$6m applications vs A$2m target; A$4m accepted); 263.2m Tranche 2 shares and 666.7m options issuedRetail demand evident despite share-price weakness
28 Oct 2025Q1 FY26 quarterly: contractor selection for early works; graphite market described as stable with Chinese export-control pressure and rising ex-China enquiries; cash A$3.6m—
5 Nov 2025Coalition for Human Rights in Development publishes a report alleging graphite-mining harms in Ulanga (covering Mahenge, Liandu, Epanko)Reputational / ESG scrutiny
13–14 Nov 2025Noosa Mining Investor Conference: A$14m raised; undrawn debt of about A$274m cited—
24 Nov 2025AGM; all resolutions passed on a poll; Employee Securities Incentive Plan approved—
15 Dec 2025Harry Miller appointed Company Secretary—
Dec 2025Access-road PAP compensation (US$174k) finalised: final RAP trancheRemoves the last resettlement gate to construction
13 Jan 2026Mahenge Early Works progress update—
30 Jan 2026Q2 FY26 quarterly—
4 Feb 2026US$11.0m bulk earthworks contract awarded to TaifaConstruction readiness
9–10 Mar 2026H1 FY26 Half-Year Report: loss A$4.02m; cash A$9.46m; going-concern basis maintained—
16 Mar 2026Black Rock publishes response to the BHRRC on the Ulanga report, noting no mining or construction has begun at MahengeESG risk management
10 Apr 2026Early Works Program nears completion; contract pricing update—
30 Apr 2026Q3 FY26 quarterly; cash A$7.24m at 31 Mar 2026—
5 May 2026Investor presentation with re-run economics: NPV8 US$730m (from US$1,376m), IRR 23%, basket US$1,495/tMaterial downgrade in headline NPV; more conservative pricing
1 Jul 2026US$204m facility deadline extended to 30 Nov 2026Critical window to secure equity
7 Jul 2026Issue of shares and cleansing notice; Appendix 2A quotation–
14 Jul 2026Two Change of Directors' Interest Notices—
Jul 2026Breakaway Research initiation (company-commissioned): "Spec Buy"; argues EV is about 2% of attributable NPVSell-side visibility
30 Jul 2026Q4 FY26 quarterly: early works near completion; cash A$4.9m; no drawn debt; quarterly operating outflow A$1.77mRunway limited without new capital
Late Sep 2026FY2026 Annual Report (statutory deadline 30 Sep 2026); website updated 24 Sep 2026–

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

1 chart
Results by Segment: Graphite segment total income fell from AUD 0 Mn in 2025 to AUD 0 Mn in 2026.
BLACK ROCK MINING LIMITED — Results by Segment
Series (AUD Mn)20252026
Graphite segment total income00
Corporate segment total income00
Graphite segment loss before tax-2-1.3
Corporate segment loss before tax-3.6-2.7
Consolidated loss before tax-5.5-4
Graphite E&E additions21.9

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Unlock Company Contacts

Connect with Key Decision-Makers

Access verified employee contacts and decision-maker information from this company to support your sales, lead generation, and business development efforts.