Boab Metals Limited Overview
Boab Metals is a Perth-based base and precious metals developer on the cusp of becoming a producer. Its single core asset, Sorby Hills near Kununurra in Western Australia's East Kimberley, is described by the company as Australia's largest undeveloped near-surface silver-lead deposit. Following a final investment decision in December 2025, Boab consolidated 100% ownership, secured more than A$350 million of debt and equity, bought Sandfire Resources' idle DeGrussa processing plant for relocation, and awarded a A$109 million EPC contract to GR Engineering Services. The September 2026 Project Delivery Plan extended mine life to 10.5 years and lifted base-case pre-tax NPV8 to A$1.06 billion. The investment proposition is a low-cost, shallow open-pit operation in which lead revenue is expected to cover operating costs, leaving silver as high-margin upside. Boab is thus primarily a leveraged silver-price instrument with execution risk concentrated in an 11-month construction window to first concentrate.
Company's own description
In its 2026 investor materials, Boab describes itself as an Australian resources company focused on exploring, developing and producing base and precious metals. It states that it is positioning to become a significant new silver and lead producer, capitalising on market fundamentals for both metals. It also notes a portfolio of exploration assets that could support resource growth and mine-life extension [Boab corporate presentation, September 2026]. Quarterly reports describe the company as advancing the fully funded, 100%-owned Sorby Hills Silver-Lead Project in the East Kimberley [Quarterly Activities Report, December 2025 quarter].
What the company does
Boab is currently a developer: it explores, defines resources, permits, finances and is now building a mine. Once operational (target September quarter 2027), Sorby Hills will:
-
Mine ore by conventional shallow open-pit methods (excavator/haul truck) under a contractor model (RE:GROUP Australia binding Heads of Agreement, mining to start no later than 1 March 2027) [Kalkine/Grafa, Sept 2026].
-
Process ore through the relocated and refurbished DeGrussa crushing/grinding/flotation plant to produce a single silver-bearing lead concentrate [DeGrussa completion release, 18 May 2026].
-
Haul concentrate in sealed half-height containers by road train roughly 150–159 km to Wyndham Port, where Cambridge Gulf provides port access and stevedoring under a 10-year agreement, for shipment on Handy-class vessels to international smelters [Boab presentation Sept 2026; Project Delivery Plan, 29 Sep 2026].
Business and revenue model
| Dimension | Characterisation |
|---|---|
| Revenue model (future) | 100% product sales — a lead-silver concentrate sold to traders/smelters under offtake (Trafigura) and tender/spot arrangements |
| Product vs service vs subscription vs licensing mix | Product: 100% (prospective). No service, subscription or licensing revenue |
| Current revenue | Interest income, management fees from the former Sorby Hills joint venture, and other income. A$0.17 million in FY2025 [S&P via StockAnalysis] |
| Pricing mechanism | Concentrate priced on LME lead and LBMA/COMEX silver, less smelter treatment charges (TCs) and payability deductions. Spot lead-concentrate TCs are currently negative (smelters paying for silver-rich feed): Boab cites spot TCs of minus US$145/t versus +US$125/t assumed in the FEED Study [Boab presentation Sept 2026] |
| Revenue mix (projected) | FEED basis (silver US$27.4/oz): lead ~A$1.8bn and silver ~A$0.7bn of life-of-mine revenue. At US$60/oz silver, silver exceeds 50% of revenue [Boab presentation Sept 2026]. Shaw and Partners estimated a ~60/40 silver/lead split at spot prices in February 2026 [Shaw and Partners equity report via OTC Markets, 25 Feb 2026] |
| Cost model | Contractor mining, owner-operated processing, diesel-fired thermal power station (grid connection planned Q1 2028), six-year diesel supply contract with CGL Fuel (Cambridge Gulf) [Project Delivery Plan; June 2026 quarterly] |
Value chain position
Boab sits at the upstream mining and concentrating stage. It does not smelt or refine. Downstream, concentrate passes to traders (Trafigura) and smelters (predominantly Asian lead smelters, with India cited by Boab as a demand growth centre) who produce refined lead (mainly for lead-acid batteries) and recover silver (industrial uses, photovoltaics, electronics, investment).
Customer types and end-markets
| Customer type | Detail |
|---|---|
| Commodity traders | Trafigura Asia Trading Pte. Ltd. — binding offtake for 50% of concentrate (reduced from the original 75% base case because Boab used alternative financing rather than the Trafigura prepayment) [Dec 2024 quarterly; Project Delivery Plan, 29 Sep 2026] |
| Smelters / traders (remaining 50%) | Expressions of Interest issued for the remaining 50% for the first two years of production; negotiations expected to start Q4 2026 [Project Delivery Plan] |
| End-markets (indirect) | Lead: lead-acid batteries (automotive replacement and industrial). Silver: industrial (solar PV, electronics, EV electronics), jewellery/silverware and investment demand [Boab presentation, citing Silver Institute and ILZSG] |
Independent characterisation
Boab is best characterised as a pre-production, single-asset, silver-leveraged lead developer that has crossed the two hardest hurdles for a junior — permitting and full financing — and is now an execution story. Its economics are unusual: lead credits are projected to cover essentially all site costs (net C1 cost of US$2.80/oz of payable silver after lead credits in the base case), so the silver price drives free cash flow sensitivity [Project Delivery Plan, 29 Sep 2026]. Corporate strategy has been to minimise capital intensity by buying second-hand infrastructure (DeGrussa plant), using existing regional infrastructure (sealed roads, Wyndham Port) and contracting out mining. Its key vulnerabilities are single-asset concentration, construction and ramp-up risk in a remote location subject to a wet season, and leverage once the A$236 million debt facility is drawn.
Strategy
Stated strategy (themes from the 2026 presentations and quarterlies)
Boab's stated strategic pillars, paraphrased from its September 2026 presentation and 2026 Strategic Outlook (15 January 2026):
-
Capital-efficient development — use existing regional infrastructure and repurpose major assets (DeGrussa) to cut capital cost, schedule and new-infrastructure needs.
-
Systematic de-risking along the "Lassonde curve" — resource definition → studies and permits → full funding → construction → operations, with mine-life extension drilling.
-
Silver leverage with lead-backed cost coverage — giving shareholders exposure to silver price upside while lead revenue covers site costs.
-
Resource-to-reserve growth — the FEED-era mine plan used only ~37% of the defined resource, with pit shells optimised at US$21.1/oz silver; higher prices support pit re-optimisation.
-
Commercial optimisation — run a competitive tender for the uncontracted 50% of concentrate to capture record-low treatment charges, keeping optionality between term contracts and spot sales.
Strategic initiatives in the last 24 months
| Initiative | Date | Detail / target | Status | Source |
|---|---|---|---|---|
| Consolidation to 100% ownership | Sep 2024 option → Jan 2026 completion | A$12.5m completion + A$5.5m and A$5.0m deferred (12 and 18 months after production start) | Complete | Mining Weekly (19 Dec 2025) |
| DeGrussa plant acquisition | Apr 2025 SPA → May 2026 completion | A$10.0m; Boab cites ~A$20m capex saving and ~6-month schedule reduction | Complete; dismantling done by end-Sep 2026 | ASX 18 May 2026; Boab presentation |
| Full funding package | Oct 2025 – Apr 2026 | ~A$117m equity + A$236m debt (>A$350m) | Complete | Boab presentation |
| FID | 17 Dec 2025 | Board approval to proceed | Complete | Mining Weekly |
| EPC contract (GR Engineering) | May 2026 | A$109m: disassemble, refurbish, relocate, rebuild, commission | Underway (~14%) | Grafa; Project Delivery Plan |
| Mining services (RE:GROUP) | Late Sep 2026 | Site establishment 15 Jan 2027; mining no later than 1 Mar 2027 | Binding HOA; contract finalisation expected within ~2 weeks | Kalkine; Grafa |
| Energy and logistics | Q1–Q2 2026 | Six-year diesel supply (CGL Fuel); thermal power station procured; 10-year port agreement | Complete / underway | June 2026 quarterly; Project Delivery Plan |
| Metallurgical optimisation (Norton) | Testwork completed Aug 2026 | Pb recovery 83% → 88.4%; Ag 78% → 83.3%; ~A$5m circuit upgrade deferred to 2029 | Complete (testwork) | Project Delivery Plan |
| Phase IX drilling + Manbarrum | From ~22 May 2026 | Up to 5,000 m / ~45 holes; reserve conversion, Beta, Keep target | ~60% complete by early Sep 2026 | FNN; Boab presentation |
| Project Delivery Plan | 29 Sep 2026 | Updated reserve, life (10.5 yrs), economics, capex to complete | Released | Discovery Alert |
| US market access | ~late 2025 | OTCQB quotation (BMLQF) | Complete | TipRanks (Hebrew); Digrin |
ESG commitments
Boab states it will prioritise local and regional employment during construction [ASX release 10 Feb 2026] and is progressing work health and safety, environmental management and stakeholder engagement programs [ASX release 30 Mar 2026]. No quantified emissions targets were identified.
Cost programmes
No formal corporate cost-reduction programme; the cost strategy is embedded in project design (second-hand plant, contractor mining, fixed-price EPC packages). Management reports the majority of the remaining A$205m capex is covered by fixed-price EPC contracts [Project Delivery Plan].
Medium-term guidance and targets
| Target | Value | Source |
|---|---|---|
| First concentrate | September quarter 2027 (presentations say "H2 2027") | Project Delivery Plan |
| Total project capex | ~A$262m; A$56m spent to end-Aug 2026; A$205m remaining incl. A$17m contingency | Grafa; Project Delivery Plan |
| Mine life | 10.5 years | Project Delivery Plan |
| Average annual payable output | ~2.1 Moz Ag, ~60 kt Pb | Project Delivery Plan |
| Average annual EBITDA (base case) | A$184m | Project Delivery Plan |
| Net C1 cost (base case) | US$2.80/oz payable Ag after lead credits | Project Delivery Plan |
| Pre-tax NPV8 / IRR — base (forward curve Ag, CRU Pb) | A$1.06bn / 97% | Project Delivery Plan |
| Pre-tax NPV8 / IRR — spot (10 Sep 2026) | A$821m / 86% | Project Delivery Plan |
| LOM free cash flow (forward curve case) | ~A$1.7bn | Project Delivery Plan |
Products & Services
Boab has no commercial products today. Its "portfolio" consists of a prospective concentrate product and a set of mineral projects, catalogued below asset by asset.
Prospective product: Sorby Hills silver-lead concentrate
| Attribute | Detail | Source |
|---|---|---|
| Product | Single lead-silver flotation concentrate | Boab presentation Sept 2026 |
| Planned volume | ~873 kt over the FEED life at ~103 ktpa; FEED-era average grade 664 g/t Ag and 65.8% Pb | Boab presentation Sept 2026 |
| Contained metal (FEED basis) | ~18.6 Moz silver and ~575 kt lead across ~897 kt of concentrate | Mining Technology via Yahoo Finance (Sept 2025) |
| Annual payable output (FEED) | ~68 kt lead and ~2.2 Moz silver | Boab presentation Sept 2026 |
| Annual payable output (Project Delivery Plan, Sep 2026) | ~60 kt lead and ~2.1 Moz silver over 10.5 years | Project Delivery Plan |
| Target customer | Traders and smelters; 50% contracted to Trafigura | Project Delivery Plan |
| Pricing model | LME/LBMA-linked, net of TCs/payability; spot TCs currently negative | Boab presentation |
| Launch | First concentrate targeted September quarter 2027 | Project Delivery Plan |
Boab positions Sorby Hills' ~2.19 Moz average annualised silver output as larger than several established Australian silver sources (e.g., MMG Dugald River 1.85 Moz, Glencore McArthur River 1.76 Moz, BHP South Australia 0.91 Moz) and below South32 Cannington (10.29 Moz), Glencore Mt Isa/George Fisher (3.91 Moz) and MMG Rosebery (2.41 Moz) — using FY24/FY25 annual reports of those companies as compiled by Boab [Boab presentation Sept 2026].
Asset 1 — Sorby Hills Silver-Lead-Zinc Project (100%)
| Attribute | Detail | Source |
|---|---|---|
| Location | ~50 km NE of Kununurra, East Kimberley, WA; ~150–159 km by sealed road to Wyndham Port | Boab presentation; Project Delivery Plan |
| Deposit type | Mississippi Valley-type (carbonate-hosted) Pb-Ag-Zn | Stockhead (2018) |
| Deposits | Bimota (formerly A/B), Omega, Norton, Aprilia, Alpha (Pb and Zn), Beta; Keep seismic target ~2 km south | Discovery Alert MRE summary; FNN (May 2026) |
| Mineral Resource (Sep 2026) | 50.6 Mt @ 3.0% Pb, 34 g/t Ag, 0.4% Zn (+7% tonnes; +1.6 Moz contained Ag vs Dec 2021 MRE); M&I across Bimota, Omega and Norton +10% | Boab MRE release, 29 Sep 2026 (via Discovery Alert) |
| Ore Reserve (Sep 2026) | 18.3 Mt @ 37.3 g/t Ag, 3.2% Pb; ~22.0 Moz Ag, ~581 kt Pb contained (+20% tonnes vs FEED reserve) | Project Delivery Plan |
| Production target (Sep 2026) | 22 Mt containing 26 Moz Ag and 690 kt Pb | Project Delivery Plan |
| Mining method | Shallow open pit; low strip ratio (FEED average 7.5:1) | Boab presentation |
| Process | Conventional crush–SAG/ball mill–flotation using relocated DeGrussa plant; Norton circuit upgrade (pyrite rougher + regrind, ~A$5m ±30%, deferred to 2029) | DeGrussa release; Project Delivery Plan |
| Mine life | 10.5 years (from 8.5 years at FEED) | Project Delivery Plan |
| Royalties | 1% NSR to Quintana MH Holding Company LLC (disclosed as contingent liability) plus WA state royalty | FY2022 AFR, Note 24 |
| Status | Under construction; FID December 2025 | Mining Weekly |
| Deposit / Class | Tonnes (Mt) | Pb (%) | Ag (g/t) |
|---|---|---|---|
| Bimota – Measured | 1.4 | 3.8 | 19 |
| Bimota – Indicated | 1.6 | 3.1 | 19 |
| Bimota – Inferred | 0.2 | 2.3 | 12 |
| Omega – Measured | 8.6 | 3.3 | 37 |
| Omega – Indicated | 6.7 | 3.3 | 31 |
| Omega – Inferred | 3.1 | 2.6 | 26 |
| Norton – Measured | 3.1 | 3.7 | 67 |
| Norton – Indicated | 2.7 | 2.8 | 32 |
| Norton – Inferred | 17.1 | 2.3 | 27 |
| Grand total (incl. Aprilia, Alpha, Beta) | 50.6 | 3.0 | 34 |
Mineral Resource by key deposit (29 Sep 2026, Pb domains + NSR domains, rounded):
Source: Boab ASX release 29 Sep 2026, Table 1 (via Discovery Alert). Aprilia, Alpha and Beta were not re-estimated. ERM International Group prepared the update.
Asset 2 — Manbarrum Zinc-Silver-Lead Project (100%)
| Attribute | Detail | Source |
|---|---|---|
| Location | ~25 km east of Sorby Hills; geology genetically related | FY2022 AFR |
| Acquired | 31 Aug 2021 from Todd River Metals for A$0.5m in shares (1,186,521 shares) | FY2022 AFR, Note 18 |
| Royalty | 1.25% NSR to vendor; buy-back right at market value after a PFS | FY2022 AFR, Note 24 |
| Status | Greenfield exploration commenced 2026 alongside Phase IX drilling | FNN (May 2026); Boab release 23 Jul 2026 |
Legacy and minor interests
| Asset | Interest | Status | Source |
|---|---|---|---|
| Borroloola West (NT) | 51% JV | Written off FY2022 (A$1.02m) | FY2022 AFR |
| Mt Jukes | 14.8% joint operation | Carried at nil (FY2022) | FY2022 AFR |
| E80/5317 (south of Sorby Hills) | Acquired 2020 | Regional exploration tenure | Pacifico Annual Report 2020 |
| Colombian assets | Former 100% | Disposed FY2021 | FY2022 AFR |
Financial Narrative
Income statement
Notes: FY2023 EPS from Simply Wall St (A$0.036 loss). FY2024–FY2025 EPS derived (net loss ÷ weighted shares from TipRanks). EBITDA discrepancy: TipRanks shows FY2021 EBITDA of -5.40 and FY2024 of -3.31 versus StockAnalysis -5.06 and -3.28; StockAnalysis figures are used. FY2022 pre-tax loss includes a A$1.02m Borroloola write-down.
Margins and growth
Revenue CAGR FY2021–FY2025: approximately -24% per year (derived). All margin metrics are not meaningful for a pre-revenue developer: "revenue" consists of interest and JV fees, and gross margin of 100% is an artefact. The informative metric is the annual cash cost of the corporate and exploration platform, which fell from ~A$6.5m (FY2022) to ~A$3.8m (FY2025) as the company moved from drilling-intensive resource definition to engineering and approvals work funded partly on the project side.
Balance sheet
Sources: FY2021–FY2022 primary (FY2022 AFR); FY2023–FY2025 S&P via StockAnalysis. Note: StockAnalysis shows FY2022 working capital of 5.87 versus 5.81 derived from the audited balance sheet; the audited figure is used. Debt consists solely of office lease liabilities; Boab carried no borrowings at any FY year-end.
Cash flow
Sources: FY2021–FY2022 primary; FY2023 Stockopedia (annual report-based); FCF FY2021–FY2025 StockAnalysis; FY2025 OCF KoalaGains. FY2021 equity issued = A$10.24m placements + A$4.85m option conversions [FY2022 AFR].
Ratios
All ratios derived from the tables above (average equity/assets basis). ROIC, net debt/EBITDA, interest coverage and cash conversion cycle are not meaningful (negative EBITDA, no interest-bearing debt, no inventory or trade receivables cycle).
FY2026 interim and quarterly financial position (post-FID transformation)
Units: A$ millions.
Sources: Dec 2024 quarterly (~A$3.5m); June and December 2025 balance sheets via S&P/StockAnalysis; quarterly activity reports (Mar 2026 A$97.8m, Jun 2026 A$60.2m); Sept 2026 presentation (A$49m at 31 Aug 2026; 578m shares at 4 Sep 2026).
Liabilities at 31 December 2025 (A$22.0m) include ~A$12.5m of current "other" liabilities and ~A$9.4m of non-current "other" liabilities [S&P via StockAnalysis]. These are consistent with (but not confirmed as) the Yuguang completion payment (A$12.5m) and deferred consideration (A$5.5m + A$5.0m, discounted), plus DeGrussa deferred amounts. Trailing-twelve-month net loss to December 2025 was A$3.88m [StockAnalysis].
Commentary on trends, inflections and drivers
Phase 1 (FY2021–FY2023): exploration and study burn. Annual losses of A$5–7m were driven almost entirely by expensed exploration and evaluation (A$3.8m in FY2021, A$4.4m in FY2022), reflecting resource drilling that took the MRE to 47.3 Mt in December 2021 and the DFS in January 2023. Boab expenses exploration as incurred, capitalising only acquisition costs, which is why the balance sheet stayed small (total assets A$11–19m) despite cumulative project spend. Cash fell from A$12.9m (FY2021) to A$4.6m (FY2023) with only modest equity top-ups — a classic junior funding squeeze.
Phase 2 (FY2024–FY2025): lean de-risking. Losses fell to A$3.3–3.8m as the work shifted to FEED (June 2024), offtake (Trafigura, December 2024), the DeGrussa plant deal (April 2025), the Yuguang option, and permitting. The equity base was rebuilt through small raises (A$1.7m placement plus A$3.3m entitlement in mid-2024 at A$0.10; A$6m placement in June 2025) and an Acuity Capital standby facility (up to A$5m to 31 January 2027). Share count grew ~83% from FY2022 to FY2025 (153m to 279m) — a dilution cost of survival at low share prices.
Phase 3 (FY2026): transformational recapitalisation. The inflection came in the December 2025 quarter. A 200%+ share price rally from late August 2025 (on silver strength and EPBC approval) allowed Boab to raise A$50m at A$0.40 in October and A$60m (plus an oversubscribed SPP of up to A$7m) in December — about A$117m of equity in total — and to secure A$236m of committed debt [Boab presentation; ASX releases]. Total assets rose from A$16.5m to A$121.6m in six months; equity from A$15.8m to A$99.6m. Cash then peaked at A$97.8m (March 2026) and fell to A$49m (August 2026) as construction spending (A$56m incurred by end-August 2026) ramped up ahead of the first debt drawdown [Project Delivery Plan].
Forward drivers. From Q4 CY2026 the balance sheet will lever up as the A$236m facility is drawn. Interest, establishment fees (3.2% of facility limit) and a 2.5% p.a. facility fee [ASX release 27 Nov 2025] will hit the P&L or be capitalised. Revenue recognition will start only with first concentrate sales (late 2027, i.e., FY2028). FY2027 is expected to be the peak-debt, zero-revenue year.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Group Entities
| Entity | Jurisdiction | Ownership | Role |
|---|---|---|---|
Boab Metals Limited | Australia | Parent | Listed holding company |
Sorby Hills Pty Ltd | Australia | 100% | Project owner; borrower under the A$236m facility; seller under Trafigura offtake |
Sorby Management Pty Ltd | Australia | 100% | Project management |
Manbarrum Pty Ltd | Australia | 100% | Manbarrum Project |
West Rock Resources Pty Ltd | Australia | 100% | Legacy (West Rock acquisition) |
West Rock Resources Panama Corp. | Panama | 100% | Legacy |
Pacifico Minerals Sucursal Colombia (Branch) | Colombia | 100% | Legacy (dormant) |
Pacifico Holdings SAS | Colombia | 100% | Legacy (dormant) |
Revenue by Segment and Segment Margins & Growth (%)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Exploration & Development – Australia revenue (AUD Mn) | 0.52 | 0.25 | 0.30 | 0.24 | 0.17 |
Group pre-tax loss (AUD Mn) | -5.04 | -6.80 | -5.92 | -3.32 | -3.84 |
Revenue YoY growth (%) | 76.6 | -51.2 | 18.8 | -20.4 | -26.7 |
Share of group revenue (%) | 100 | 100 | 100 | 100 | 100 |
Income Statement and Per-Share Data
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Revenue (AUD Mn) | 0.52 | 0.25 | 0.30 | 0.24 | 0.17 |
Gross profit (AUD Mn) | 0.52 | 0.25 | 0.30 | 0.24 | 0.17 |
Exploration & evaluation expensed (AUD Mn) | 3.82 | 4.44 | — | — | — |
Total operating expenses (AUD Mn) | 5.59 | 6.03 | 6.22 | 3.56 | 4.01 |
Operating income / EBIT (AUD Mn) | -5.07 | -5.78 | -5.92 | -3.32 | -3.84 |
EBITDA (AUD Mn) | -5.06 | -5.76 | -5.89 | -3.28 | -3.81 |
Pre-tax income (AUD Mn) | -5.04 | -6.80 | -5.92 | -3.32 | -3.84 |
Net income (AUD Mn) | -5.04 | -6.80 | -5.92 | -3.32 | -3.84 |
EPS basic (A$ cents) | -3.55 | -4.44 | -3.60 | -1.80 | -1.63 |
EPS diluted (A$ cents) | -3.55 | -4.44 | -3.60 | -1.80 | -1.63 |
Dividends per share (A$ cents) | 0 | 0 | 0 | 0 | 0 |
Weighted avg shares (millions) | 141.76 | 153.23 | 165.50 | 184.58 | 235.49 |
Margin Analysis (%)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Gross margin (%) | 100 | 100 | 100 | 100 | 100 |
Operating margin (%) | -983.7 | -2,298.2 | -1,980.0 | -1,397.1 | -2,203.3 |
EBITDA margin (%) | -973 | -2,290 | -1,970 | -1,380 | -2,186 |
Net margin (%) | -977.3 | -2,705.7 | -1,980.0 | -1,397.1 | -2,203.3 |
Balance Sheet and Share Count (millions)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Total assets (AUD Mn) | 18.66 | 11.67 | 11.63 | 12.76 | 16.54 |
Cash & equivalents (AUD Mn) | 12.90 | 6.32 | 4.58 | 5.66 | 7.53 |
Total current assets (AUD Mn) | 13.27 | 6.70 | 5.14 | 6.22 | 8.60 |
PP&E incl. capitalised E&E (AUD Mn) | 5.25 | 4.83 | 6.35 | 6.39 | 6.30 |
Total current liabilities (AUD Mn) | 1.51 | 0.89 | 1.00 | 0.39 | 0.50 |
Short-term debt – leases (AUD Mn) | 0.05 | 0.07 | 0.03 | 0.08 | 0.04 |
Long-term debt – leases (AUD Mn) | 0.00 | 0.03 | 0.00 | 0.04 | 0.00 |
Total debt (AUD Mn) | 0.05 | 0.10 | 0.03 | 0.11 | 0.04 |
Net cash (AUD Mn) | 12.85 | 6.22 | 4.55 | 5.55 | 7.49 |
Total equity (AUD Mn) | 16.98 | 10.58 | 10.39 | 12.09 | 15.79 |
Goodwill & intangibles (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Working capital (AUD Mn) | 11.76 | 5.81 | 4.14 | 5.83 | 8.09 |
Contributed equity (AUD Mn) | 47.70 | 48.20 | 53.68 | 58.51 | 65.80 |
Accumulated losses (AUD Mn) | -32.01 | -38.81 | -44.73 | -48.05 | -51.89 |
Shares outstanding, period end (millions) | 152.31 | 153.49 | 174.46 | 233.40 | 279.23 |
Cash Flow
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Operating cash flow (AUD Mn) | -4.55 | -6.49 | -5.38 | — | -3.83 |
Capex – PP&E (AUD Mn) | -0.04 | -0.04 | -1.64 | — | — |
Free cash flow (AUD Mn) | -4.60 | -6.53 | -7.02 | -3.67 | -3.84 |
Financing cash flow (AUD Mn) | 14.39 | -0.07 | 5.27 | — | — |
Equity issued (gross, AUD Mn) | 15.09 | 0.00 | — | — | — |
Dividends paid (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Share buybacks (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
ROE (%) | -41.0 | -49.3 | -56.5 | -29.5 | -27.5 |
ROA (%) | -37.1 | -44.8 | -50.8 | -27.2 | -26.2 |
Current ratio (x) | 8.8 | 7.5 | 5.1 | 15.9 | 17.2 |
Debt / equity (x) | 0.003 | 0.009 | 0.003 | 0.009 | 0.003 |
Asset turnover (x) | 0.04 | 0.02 | 0.03 | 0.02 | 0.01 |
Balance Sheet and Share Count (millions) (31-Dec-2024–31-Aug-2026)
| Metric | 31-Dec-2024 | 30-Jun-2025 | 31-Dec-2025 | 31-Mar-2026 | 30-Jun-2026 | 31-Aug-2026 |
|---|---|---|---|---|---|---|
Cash (AUD Mn) | 3.5 | 7.53 | 89.87 | 97.8 | 60.2 | 49.0 |
Total assets (AUD Mn) | — | 16.54 | 121.56 | — | — | — |
PP&E (AUD Mn) | — | 6.30 | 28.03 | — | — | — |
Total liabilities (AUD Mn) | — | 0.75 | 22.01 | — | — | — |
Shareholders' equity (AUD Mn) | — | 15.79 | 99.55 | — | — | — |
Shares outstanding (millions) | — | 279.23 | 505.29 | — | — | 578 |
Revenue by Region and Revenue by Region (%)
| Region | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Australia revenue (AUD Mn) | 0.52 | 0.25 | 0.30 | 0.24 | 0.17 |
Colombia revenue (AUD Mn) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Australia share of total (%) | 100 | 100 | 100 | 100 | 100 |
Period / Date Details
| Period / date | ASX price (AUD) | Note | Source |
|---|---|---|---|
8 May 2024 | 0.11 | Pre-offtake low range | FNArena |
Late Oct 2024 | 0.14 | — | InvestSMART |
~9 Oct 2025 | ~0.409 (5-day VWAP) | Pre-placement | ASX 14 Oct 2025 |
Oct 2025 | ~0.495 (peak before raise) | ~200% rally since late Aug 2025 | AFR via Techleap |
2026 YTD high | 0.725 | Silver above US$110/oz (Jan–Feb 2026) | InvestSMART |
2026 YTD low | 0.315 | — | InvestSMART |
31 Jul 2026 | 0.41 | — | StockAnalysis |
21 Aug 2026 | 0.51 | — | StockAnalysis |
4 Sep 2026 | 0.45 | Market cap ~A$260m | Boab presentation |
Return metric | Value | Source | — |
1-year total return (to ~Sep 2026) | +242% | Motley Fool data page | — |
5-year return (to ~Sep 2026) | +7% | Motley Fool data page | — |
Since IPO (2004) | -86% | Motley Fool data page | — |
Share Count (millions)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Shares on issue at 30 June (millions) | 152.31 | 153.49 | 174.46 | 233.40 | 279.23 |
Valuation Snapshot
| Multiple | Value | Basis |
|---|---|---|
P/B | ~2.6x | A$260m market cap ÷ A$99.6m equity at 31 Dec 2025 (mixed dates; derived) |
EV / base-case pre-tax NPV8 | ~0.20x | A$211m ÷ A$1,060m (derived) |
EV / spot-case pre-tax NPV8 | ~0.26x | A$211m ÷ A$821m (derived) |
EV / forward EBITDA (plan average) | ~1.1x | A$211m ÷ A$184m (derived; pre-debt drawdown) |
Analyst Ratings & Targets
| Broker / source | Rating | Target (AUD) | Date | Source |
|---|---|---|---|---|
Shaw and Partners | Positive (implied Buy) | 1.70 (raised from 1.08 on higher silver assumptions) | Feb 2026; reiterated May 2026 | OTC Markets research; Motley Fool AU |
Euroz Hartleys | Covers (site visit, positive commentary) | — | 2024–2025 | Euroz Hartleys; Investing News |
TipRanks aggregate | Moderate Buy (2 Buy, 1 Hold) | Average 0.78 (high 1.08, low 0.50) | Date uncertain (likely late 2025/early 2026) | TipRanks |
Simply Wall St | 1 analyst | Breakeven/profit forecast for 2027 (A$116m profit in a stale forecast) | Pre-FID | Simply Wall St |
Analyst Conclusions
Management guidance
| Item | Guidance | Source |
|---|---|---|
| Near-term catalysts (Q3–Q4 2026) | Mining contract award; DeGrussa reconstruction start at Sorby Hills; Project Delivery Plan (released); resource/reserve growth; competitive tender for remaining 50% of concentrate | Boab presentation Sept 2026 |
| First debt drawdown | Q4 2026 | Project Delivery Plan |
| Mining start | Site establishment 15 Jan 2027; mining by 1 Mar 2027 | Grafa/Kalkine |
| Water reticulation; mining mobilisation | Q1 2027 | Project Delivery Plan |
| First concentrate | September quarter 2027 | Project Delivery Plan |
| Main power connection | Q1 2028 | Project Delivery Plan |
| Norton circuit upgrade | 2029 (~A$5m) | Project Delivery Plan |
Consensus growth expectations
Directionally, revenue moves from ~A$0.2m (FY2025) to zero-to-modest in FY2027 and toward a run-rate implied by plan EBITDA of ~A$184m p.a. from FY2028–FY2029 (base case), subject to ramp-up.
Bull case (grounded in data)
-
Valuation gap: EV of ~A$211m (undrawn) against base-case pre-tax NPV8 of A$1.06bn and spot-case A$821m implies a large re-rating as construction risk falls, typically stepwise at plant completion, first concentrate and nameplate.
-
Free silver: lead credits of US$55.6/oz versus C1 before credits of US$58.4/oz mean silver revenue is near-pure margin; every US$10/oz of silver adds ~A$30m p.a. of revenue at ~2.1 Moz payable (derived, at A$:US$ ~0.70).
-
Growing reserve base: reserve +20% to 18.3 Mt, mine life to 10.5 years, MRE +7%, and Phase IX intercepts (e.g., 12.62 m @ 204 g/t Ag) not yet included — supporting a longer life beyond 10.5 years.
Bear case (grounded in data)
-
Execution compression: with the process plant package ~14% complete and A$205m still to spend, any slippage moves first concentrate into 2028 and burns liquidity; cash had already fallen to A$49m before first drawdown.
-
Lead underpin weakening: lead at ~US$1,870/t versus US$2,252/t at FEED erodes the "lead pays the costs" thesis; if silver also retraces from ~US$65–71/oz toward historical levels (FEED US$27.4/oz), economics revert toward the FEED NPV of ~A$411m.
-
Leverage and dilution history: a high-fee private-credit facility (3.2% establishment, 2.5% p.a. facility fee, make-whole) on a single asset, combined with ~3.8x share dilution since FY2022, means cost overruns could again be funded by equity at unfavourable prices.
Key catalysts and monitorables (next 12 months)
-
Final mining services contract with RE:GROUP (expected October 2026).
-
First debt drawdown (Q4 2026) and any disclosed covenant or condition details.
-
Offtake tender outcome for the remaining 50% (TCs achieved vs FEED +US$125/t).
-
FY2026 annual report (late September 2026) and December 2026 / March 2027 quarterlies: capex to date versus A$262m budget; contingency usage.
-
DeGrussa reconstruction milestones (SAG/ball mill installation; flotation circuit).
-
Wet-season (Dec 2026–Mar 2027) productivity on site.
-
Mining start by 1 March 2027.
-
Phase IX assays and any reserve update incorporating them.
-
Silver and lead prices; A$:US$.
-
Governance: CFO appointment, board renewal (independence), committee formation.
Concluding analyst verdict
Boab Metals has completed one of the cleaner junior-to-developer transitions on the ASX in the 2025–2026 cycle. Within roughly nine months it moved from a sub-A$50 million explorer with a 75% joint-venture stake to a 100% owner of a permitted, fully financed project under construction, while improving project economics through pragmatic choices: a second-hand processing plant bought for A$10 million, contractor mining, fixed-price EPC packages, and existing road and port infrastructure. The September 2026 Project Delivery Plan materially strengthened the asset, with a 20% larger reserve, a 10.5-year life, better Norton recoveries and a base-case pre-tax NPV8 of A$1.06 billion.
The market still prices Boab at a deep discount to that NPV, which is rational. The company has never built or operated a mine. The board is long-tenured and thinly resourced on the finance side. The process plant was only about 14% complete in September 2026, with first concentrate expected within roughly a year. The financing is expensive private credit rather than bank or government debt. And the "free silver" construct depends on lead holding up — lead currently sits about 17% below the FEED price.
On balance, Boab represents a high-beta, execution-dependent silver call option with a lead-funded cost floor. For investors who are constructive on silver and accept construction risk, the risk-reward appears favourable: the funding gap is closed, approvals are in hand, and the main value inflection points (plant mechanical completion, first concentrate, nameplate throughput, reserve growth) fall within the next 12–18 months. The thesis would weaken materially with (i) a capex overrun beyond the A$17 million contingency, (ii) a schedule slip into 2028, or (iii) a simultaneous fall in silver below ~US$40/oz and lead below ~US$1,800/t. Monitoring should focus on construction progress reporting, first-drawdown terms, offtake TCs and governance upgrades. Pending verification of the FY2026 annual accounts, the overall stance is constructive, with elevated execution risk.
APPENDIX A — PROJECT STUDY EVOLUTION
| Metric | PFS update (2019) | 2021-era study (company website) | DFS (Jan 2023) | FEED (Jun 2024) | Project Delivery Plan (Sep 2026) |
|---|---|---|---|---|---|
| Throughput (Mtpa) | 1.0 | — | — | 2.25 | — |
| Pre-production capex (A$M) | 95.4 | — | — | 264 | 262 (total) |
| Pre-tax NPV8 (A$M) | — | 303 | 370 | 411 | 1,060 |
| IRR (%) | — | 46 | 35 | 37 | 97 |
| Avg annual EBITDA (A$M) | — | 75 | 119 | 126 | 184 |
| Mine life (years) | 8 | — | — | 8.5 | 10.5 |
| Silver price assumption (US$/oz) | — | — | — | 27.4 | forward curve (~71 for FY2027) |
Sources: Mining Weekly (2019); boabmetals.com Sorby Hills page (the A$303m/46% case, with LOM net operating cash flow of A$747m, ~A$75m p.a. — study date inferred as the 2021-era study, not confirmed); Discovery Alert (DFS 2023); Boab presentation (FEED); Project Delivery Plan. Blank = not disclosed in sources reviewed. A Mining Weekly article (Apr 2021) refers to a "2020 DFS" with A$183m capex at 1.5 Mtpa — this appears to describe the 2020 optimised PFS; flagged as a source discrepancy.
APPENDIX B — ORE RESERVE COMPARISON
| Item | FEED Reserve (Jun 2024) | PDP Reserve (Sep 2026) |
|---|---|---|
| Ore (Mt) | 15.2 | 18.3 |
| Pb grade (%) | 3.5 | 3.2 |
| Ag grade (g/t) | 39 | 37.3 |
| Contained Pb (kt) | 531 | 581 |
| Contained Ag (Moz) | 19.1 | 22.0 |
Sources: Boab presentation (FEED reserve: Proved 10.4 Mt, Probable 4.9 Mt); Project Delivery Plan.
APPENDIX C — PRINCIPAL SOURCES
-
Boab Metals, Annual Financial Report for the year ended 30 June 2022 (ASX, 2 Sep 2022)
-
Boab Metals, Corporate Presentation "Building Australia's Next Silver-Lead Producer" (September 2026)
-
Boab Metals ASX releases: 10 Dec 2024 (Trafigura); 23 Dec 2024 (EPA amendments); 30 Apr 2025 (DeGrussa SPA); 3 Sep 2025 (EPBC); 14 Oct 2025 (A$50m placement); 27 Nov 2025 (debt binding terms); 15 Dec 2025 (A$60m raise); 10 Feb 2026 (Works Approval); 30 Mar 2026 (Mining Proposal); 27 Apr 2026 (SFA); 18 May 2026 (DeGrussa completion); 29 Sep 2026 (MRE; Project Delivery Plan)
-
Boab quarterly activity reports: Dec 2024, Dec 2025, Mar 2026, Jun 2026 (via Boab website, InvestorPA, Investing News)
-
Boab Half-Year Report FY2025 (ASX, 13 Mar 2025)
-
S&P Global Market Intelligence data via StockAnalysis.com (income statement, balance sheet)
-
TipRanks; Simply Wall St; MarketIndex; MarketScreener; Motley Fool (US and AU); InvestSMART; Stockopedia; KoalaGains; IBISWorld; FNArena; Digrin
-
Mining Weekly / Creamer Media (2019, 2021, Oct–Dec 2025); Mining Technology via Yahoo Finance; Discovery Alert (29 Sep 2026); Grafa; Kalkine; Finance News Network; Stockhead; SmallCaps; Business News; Investing News; NS Energy; Shaw and Partners equity report via OTC Markets (25 Feb 2026); Euroz Hartleys
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Appointed / tenure | Background & education | Age | Source |
|---|---|---|---|---|---|
Gary Comb | Chairman (described as Executive Chairman in some sources; the FY2022 AFR describes him as "Executive Director and Chairman") | 9 Mar 2020 (~6.6 yrs) | Mechanical engineer; BE(Mech), BSc, Dip Ed; 30+ years in Australian mining with a record of commissioning and operating base metal mines; former MD of Jabiru Metals and CEO of BGC Contracting; prior directorships include Ironbark Zinc and Cyprium Metals | Born 1952 (~74) | FY2022 AFR; Motley Fool AU; Kalkine |
Simon Noon | Managing Director & CEO | 19 Oct 2013 (~13 yrs) | MAICD, AFAIM; formerly at Groote Resources; co-founder and MD of West Rock Resources (acquired by Pacifico 2013); led the 2018 Sorby Hills acquisition | — | FY2022 AFR; MarketScreener |
Richard Monti | Non-Executive Director | 12 Oct 2009 (~17 yrs); Chairman until 6 Mar 2020 | Geologist; BSc (Hons), Grad Dip App Fin, MAusIMM; 30+ years in international minerals; former principal of Ventnor Capital; principal of Terracognita; also on boards of Caravel Minerals, Alto Metals and others | — | FY2022 AFR; MarketIndex |
Andrew Parker | Non-Executive Director | 12 Oct 2009 (~17 yrs) | Lawyer (LLB, UWA); co-founder and former MD of Trident Capital; former Director of Stadia Capital; Non-Executive Chairman of WIN Metals | — | FY2022 AFR; MarketIndex |
“—” = not publicly disclosed.
Executive Leadership Team
| Name | Role | Since | Notes | Source |
|---|---|---|---|---|
Simon Noon | MD & CEO | 2013 | See above | — |
Russell Taylor | Project Director | — | 30+ years in large-scale mining; senior roles at BHP, Peabody, Mineral Resources and Downer Mining | Boab presentation Sept 2026 |
Jerry (Calogero) Monzu | Company Secretary | Oct 2018 | FGIA, CPA; 25+ years in governance, finance and accounting; has acted as CFO and company secretary for ASX, JSE and AIM companies | FY2022 AFR; Motley Fool AU |
Dr Simon Dorling | Exploration Manager | — | PhD geologist | Kalkine |
Paul Hewitt | Director of Operations | — | — | Kalkine |
David English | Former COO | Resigned 6 Jan 2022 | Salary A$350k p.a. | FY2022 AFR |
“—” = not publicly disclosed.
Directors' Remuneration
| KMP | Salary & fees | Non-monetary | Super | Share-based (reversal) | Total |
|---|---|---|---|---|---|
G. Comb | 100,000 | 0 | 11,187 | -11,778 | 99,409 |
S. Noon | 320,000 | 24,963 | 27,500 | -55,340 | 317,123 |
R. Monti | 48,000 | 0 | 4,800 | -11,529 | 41,271 |
A. Parker | 48,000 | 0 | 4,800 | -9,223 | 43,577 |
D. English (to Jan 2022) | 199,480 | -9,581 | 19,304 | -9,340 | 199,863 |
Total | 715,480 | 15,382 | 67,591 | -97,210 | 701,243 |
Major Shareholders
| Rank | Holder | % |
|---|---|---|
| 1 | Citicorp Nominees Pty Limited | 14.60 |
| 2 | JP Morgan Nominees Australia Pty Ltd | 7.45 |
| 3 | BNP Paribas Nominees Pty Ltd | 6.37 |
| 4 | HSBC Custody Nominees | 2.94 |
| 5 | Villiers Queensland Pty Ltd | 2.21 |
Directors' Shareholdings
| Insider | Shares | Approx. % | Date | Source |
|---|---|---|---|---|
Simon Noon | 6,190,933 | 1.07 | 10 Feb 2026 | MarketScreener |
Richard Monti | 2,055,872 (indirect) | 0.36 | 23 Mar 2026 | MarketIndex |
Andrew Parker | 94,286 direct + 834,900 indirect | ~0.16 | 2 Feb 2026 | MarketIndex |
Competitive Landscape
Key Competitors
| # | Company | Asset(s) | Relevance | Annual silver output (koz) | Source |
|---|---|---|---|---|---|
| 1 | South32 | Cannington (Qld) | Australia's largest silver-lead-zinc producer | 10,292 | Boab presentation (FY24/25 annual reports) |
| 2 | Glencore | Mt Isa / George Fisher (Qld) | Zinc-lead-silver | 3,909 | Boab presentation |
| 3 | MMG | Rosebery (Tas) | Polymetallic | 2,414 | Boab presentation |
| 4 | MMG | Dugald River (Qld) | Zinc-lead | 1,853 | Boab presentation |
| 5 | Glencore | McArthur River (NT) | Zinc-lead | 1,760 | Boab presentation |
| 6 | BHP | South Australia (Olympic Dam etc.) | By-product silver | 913 | Boab presentation |
| 7 | 29Metals | Golden Grove (WA) | Base metals | 882 | Boab presentation |
| 8 | Evolution Mining | All assets | By-product silver | 827 | Boab presentation |
| 9 | Silver Mines Ltd (ASX: SVL) | Bowdens Silver (NSW) | ASX silver developer — peer for capital | Pre-production | — |
| 10 | Investigator Resources (ASX: IVR) | Paris Silver (SA) | ASX silver developer | Pre-production | — |
| 11 | Galena Mining (ASX: G1A) | Abra (WA) | Most recent WA lead-silver developer; ramp-up and financial difficulties reported in 2024 — a cautionary analogue | — | — |
| 12 | Develop Global (ASX: DVP) | Woodlawn (NSW) | Base-metal restart competing for contractors and capital | — | Industry context |
Peer Comparison FY2028
| Metric | Boab (Sorby Hills, plan) | South32 Cannington | Glencore Mt Isa/George Fisher | MMG Rosebery |
|---|---|---|---|---|
Silver output (koz/yr) | ~2,100–2,191 | 10,292 | 3,909 | 2,414 |
Mining method | Shallow open pit | Underground | Underground | Underground |
Revenue (AUD Mn) | 0 (pre-production) | — | — | — |
Growth | New supply from FY2028 | — | — | — |
Margin indicator | Base-case EBITDA A$184m/yr (plan) | — | — | — |
Recent Developments
The only schedule-related softening is the slip in expected first debt drawdown (Q3 → Q4 2026).