Company ProfilePremium

CAMUS ENGINEERING & CONSTRUCTION Inc.

Company Profile Analysis

Ticker: 013700.KS주식회사 까뮤이앤씨

ESOMAR 23 Corporate BadgeISO Certifications Badge
CAMUS ENGINEERING & CONSTRUCTION Inc. - Company showcase

Year Founded & Workforce

1978

159 Employees

CAMUS ENGINEERING & CONSTRUCTION Inc. logo

CAMUS ENGINEERING & CONSTRUCTION Inc. Employee Contacts

We don't hold contact details for this company yet — you can request them.

Request Employee Contacts

CAMUS ENGINEERING & CONSTRUCTION Inc. Overview

CAMUS E&C is a mid-sized Korean general contractor built around a niche manufacturing capability: precast concrete (PC). The company brought French engineer Raymond Camus's precast system to Korea in the late 1970s. It now produces columns, beams, slabs and wall elements at plants in Icheon and Cheonan, and in September 2026 it added an acquired plant in Eumseong. It erects these elements on large logistics centres, semiconductor fabs and public works. Since 2024 the business has been pulled decisively toward SK hynix's fab programme in Cheongju and Yongin. This has turned a loss-making general builder (FY2024 net loss KRW 21.9bn) into a profitable one (FY2025 net income KRW 20.0bn; H1 2026 revenue +82% YoY). A second, smaller leg came from the 2023–24 acquisition of Korea Aluminium (한국알미늄), a maker of aluminium foil and battery pouch film, which accounts for about 18% of revenue. The company is controlled by the privately held Base Group. It trades at roughly 3–4x trailing earnings and below book value.


Company's own description (paraphrased from filings and company statements)

In its filings and press material, the company describes itself as a general construction company with three activities [S18][S19][S20]:

  1. General construction (종합건설업): building and civil works.

  2. Manufacture and sale of PC products (PC제품 제조·판매): manufacture and installation of precast components.

  3. Real-estate leasing (부동산임대업).

Its business-report summary, as reproduced by Korean Wikipedia, says it uses the PC method on large logistics centres, factories and building façades, and that it has expanded into general building, apartment construction, housing sales and civil engineering. The PC business manufactures columns, beams, slabs and walls in the factory, then transports and installs them on site. The main applications are logistics centres, semiconductor plants and underground car parks [S19].

Following the Korea Aluminium acquisition, consolidated reporting also includes a manufacturing segment for aluminium foil and related products (은박지 및 포일 제조) [S10].

Business model and revenue model

DimensionCharacterisation
Revenue modelAlmost entirely project/contract revenue recognised over time (percentage-of-completion) for construction and PC supply-and-install contracts. Product revenue comes from aluminium foil and pouch-film sales through Korea Aluminium. Minor rental income. No subscription or licensing revenue identified.
Product vs. service mixMostly "product-embedded service": PC elements are manufactured in-house and sold under supply-and-installation contracts. In August 2024 the company said PC manufacturing made up 40–60% of revenue [S21]. In 2017, PC-related revenue was 63% of the total [S17].
Payment termsLarge PC contracts are typically paid as progress billings without down-payments. The 2026 Yongin Ph-4 FAB contract has no deposit or advance and is billed on progress [S13].
Value-chain positionTier-2 specialist subcontractor to EPC/general contractors (notably SK ecoplant for SK hynix fabs). Also a prime contractor on public building/housing (LH, KEPCO) and private logistics/knowledge-industry-centre projects.
Customer typesSemiconductor makers (via their EPC arms), logistics developers and PFVs, public agencies (LH, KEPCO), hospitals and foundations, industrial and pharmaceutical/food packaging buyers (aluminium).
End-marketsSemiconductor fab construction; logistics/warehouse; public housing and buildings; civil infrastructure (airports, rail, waterways, wastewater); packaging (food/pharma); lithium-ion battery materials (pouch film).

Independent characterisation

CAMUS has three businesses of very different quality inside one listed shell:

The PC franchise: is the economic core. Precast fab shells have become the default structural method for Korean memory-fab super-structures and utility buildings, and CAMUS is one of a small number of domestic suppliers with the plant capacity, engineering references and SK-group relationships to deliver them at scale. Its references include SK hynix M16 Icheon (2018–2020), M15 WWT, M15X Cheongju, Yongin Y1 WWT/UT, Cheongju P&T7 and Yongin Ph-4 FAB [S14][S16][S24][S25].

The general-building/housing arm: caused most of the 2022 and 2024 losses. It carried private-housing receivables, unsold completed units and PF completion guarantees. Management says it has largely stopped private self-developed housing and now concentrates on public works [S14].

Korea Aluminium: is a diversification move by the controlling group. Its standalone performance is weak (most recent fiscal year: total assets KRW 38.8bn, net loss KRW 2.4bn) [S8]. Strategically it gives the group exposure to battery pouch film and foil packaging, but it has no operating synergy with construction.

The investment case is therefore essentially a leveraged bet on SK hynix's Korean capex cycle, delivered through a thinly traded, majority-controlled vehicle.

Strategy

Stated strategy themes (from company statements; paraphrased)

Management, in August 2024 Dong-A Ilbo interview and feature material [S21], sets out four themes:

  1. Raise PC technology and productivity. Management sees the construction sector as late-mature and over-crowded, and describes PC as the future of building. Fab PC is framed as critical-infrastructure work requiring a high level of know-how.

  2. Prioritise semiconductors and public housing. This includes a dedicated Yongin-cluster task force and an expected uplift from the restart of Samsung Pyeongtaek fab work.

  3. Diversify toward a "100-year company", via aluminium (Korea Aluminium) and participation in defence projects.

  4. Lobby for policy support: PC-adoption incentives, deregulation, and an expanded foreign-worker quota.

Initiatives in the last 24 months

InitiativeTimingDetailStatusSource
Korea Aluminium integration2024–202692.92% stake agreed December 2023; now 100%; about 18% of Q2 2026 revenueConsolidated; subsidiary loss-making[S5][S8][S10]
PC capacity expansion2024 plan → 2026 executionTarget 200,000–300,000 m³/yr; Eumseong plant acquired for KRW 18.2bnAcquisition decided September 2026[S21][S14]
SK hynix Yongin programme2024 → 2028Y1 WWT, Y1 UT, Ph-4 FABExecuting[S13][S14]
De-risking housing2025–2026Exit from private self-developed housing; PF completion guarantee (KRW 175bn loan balance) fully released by June 2026Achieved[S14]
OSC public-housing R&DOngoingMOLIT programme; joint R&D with large contractorsOngoing[S21]
Defence-sector entryAnnounced 2024No contract identifiedUnrealised[S21]
Shareholder returns2,026Moved to a quarterly-style dividend (KRW 15 for 31 Aug 2026 record date), after KRW 25 for year-end 2025Executing[S23][S44]

Medium-term financial targets / guidance: none published.

Products & Services

PC (precast concrete) business, within the Building segment

Product / serviceDescription and capabilitiesTarget customerFlagship referencesSource
PC columnsFactory-cast reinforced columns. Hybrid PC column (HPC) is cited as an in-house developmentFab EPCs, logistics developersSK hynix M16, M15X, Yongin Y1[S21][S37]
PC beams and girdersLong-span precast beams for heavy-load industrial floorsSameSame[S19][S21]
PC slabsPrecast slabs. OPS slab cited as a development item. Hollow-core slab (HCS) planned for the new smart plantLogistics, fabs, knowledge-industry centresIncheon Geomdan logistics centre[S21][S37]
PC walls and façade/curtain-wall panelsArchitectural precast exterior panels for buildings and high-risesCommercial and public buildingsIncheon Airport T2 frame and exterior[S17]
Semiconductor fab PC packagesSupply-and-install of fab, utility (UT) and waste-water-treatment (WWT) building structures. A large PC core method at SK hynix Icheon is described as a domestic first (secondary source)SK hynix via SK ecoplant / SK E&CM16 Ph-1 (KRW 48.7bn); M15 WWT (KRW 49.5bn); M15X (KRW 93.5bn); Y1 WWT (KRW 80.0bn); Y1 UT (KRW 266.0bn); P&T7 (KRW 66.4bn); Yongin Ph-4 FAB (KRW 195.7bn)[S14][S27][S32][S24][S13][S37]
Logistics-centre PC packagesColumns, beams and slabs for multi-storey distribution centresLogistics PFVs, contractorsHwaseong JW (KRW 17.2bn); Icheon Pyogyo-ri (KRW 8.6bn); Anseong Seongeun (KRW 120bn, full build)[S28][S31][S30]
Infrastructure PCBridges, utility tunnels/power conduits (전력구), rail sleepersPublic agencies, contractorsIncheon Metro Line 2[S17][S20]
Underground car-park PCMain structural elementsDevelopers—[S19]
OSC public housing (R&D)Off-site-construction systems for public apartments under a MOLIT R&D programme with LH/SHLH, SHProgramme participation[S21]

Capacity: more than 120,000 m³/yr at Icheon and Cheonan (2024). A smart third plant was targeted for 2025 to lift capacity to 200,000–300,000 m³/yr [S21]. Instead, the company decided in September 2026 to acquire Nara PC's Eumseong site (75,434 m² of land plus buildings and machinery) for KRW 18.2bn [S14]. Pricing is negotiated per contract and not disclosed.

General construction, within the Building and Civil segments

OfferingDescriptionRepresentative projectsSource
Knowledge-industry centresTurnkey buildingBiltek Camus KIC, Siheung (KRW 41.3bn)[S26]
Healthcare / institutionalBuilding and extension worksCatholic Univ. Incheon St. Mary's Hospital research and parking building (KRW 25.9bn)[S38]
Rental / youth housingResidential buildingWangsimni station youth housing (KRW 39.5bn)[S29]
Public apartmentsLH public housingReported as likely winner of LH Gunpo Daeyami A-1BL, Section 2 (date and award not confirmed)[S1]
Civil worksWaterways, rail, environmentalGyeongin Ara Waterway, Incheon Metro Line 2, Geomdan industrial-complex wastewater facility[S17]
Utility-sector worksKEPCO contract (KRW 46.4bn per corrected filing of 9 Sep 2026)—[S39]

Aluminium (Korea Aluminium), Manufacturing segment

ProductDescriptionTarget customerSource
Secondary-battery pouch filmMultilayer aluminium-laminate exterior material (aluminium film with nylon and CPP layers) for Li-ion pouch cells used in EVs, ESS and IT devicesDomestic and overseas battery-cell makers[S40]
Aluminium foilRolled foil for food, pharmaceutical and cap applicationsFood, pharma, packaging converters[S40]
Flexible packagingPrinted and laminated foil packaging for food, pharma, household and industrial goodsFMCG, pharma[S40]

Korea Aluminium is run by Kim Chang-ho, who is also a CAMUS related-party shareholder [S8][S40]. Its launch years, volumes and pricing are not disclosed.

Real-estate leasing

Listed as a business line [S18][S30]. The assets and rental income are not separately disclosed in retrieved sources.

Financial Narrative

Income statement (consolidated, K-IFRS, FY = calendar year)

Sources: revenue, operating income and net income from Butler, ChickenStock and ETF쇼핑 compilations of DART business reports [S9][S10][S12]. FY2020 for reference: revenue KRW 161.7bn, operating income KRW 2.8bn, net income KRW 9.2bn [S9]. Growth rates and margins are derived. DPS = interim + year-end per record date [S23].

Flags. FY2021 and FY2022 net income are reported as identical to operating income (–3.0 and –15.9) in all three aggregators. This may be a data artefact, and the DART originals should be checked. Revenue CAGR FY2021–FY2025: 16.1% (derived).

Gross profit and EBITDA. Only FY2025 could be reconstructed. ValueLine trailing figures give FY2025 cost of sales of KRW 240.4bn, so gross profit was KRW 57.1bn and gross margin 19.2% (derived) [S6]. For the 12 months to Q3 2025, Simply Wall St shows revenue KRW 248.2bn, cost of revenue KRW 225.9bn and gross profit KRW 22.3bn (9.0% margin) [S41]. That points to a sharp gross-margin expansion in Q4 2025. TTM EBITDA was KRW 35.7bn as of June 2026 (MarketInOut) [S2].

Quarterly income statement (consolidated)

Source: ETF쇼핑 compilation of DART periodic reports [S12]. Margins are derived. For comparison, FY2024 quarters were Q1 –1.5, Q2 –0.2, Q3 –0.4 and Q4 –16.1 (operating income, KRW bn) [S12].

TTM to Q2 2026 (derived): revenue KRW 394.0bn, operating income KRW 35.0bn (8.9% margin), net income KRW 28.7bn, EPS about KRW 480 on 59.75M shares.

Balance sheet and liquidity (latest available)

MarketInOut reports debt/equity of 0.76x, with its definition unstated [S2].

Cash flow and shareholder returns

Source: ETF쇼핑 [S23]. Payout is shown as 0 in loss years, where it is not meaningful. The sharp H1 2026 fall in receivables (–KRW 31.9bn) and rise in cash (+KRW 21.4bn) despite debt repayment imply strong operating cash generation in H1 2026 [S14]. Known capex commitment: Nara PC Eumseong asset purchase of KRW 18.2bn (H2 2026) [S14].

Commentary: trends, inflections and drivers

FY2021–FY2022: volume without margin. Revenue grew 19% in FY2022 on logistics-centre and housing work, but operating losses widened to KRW 15.9bn (–8.1% margin). The cause was the same pressures that hit Korean mid-tier builders in 2022: steel, cement and labour inflation on fixed-price contracts, followed by the post-Legoland PF credit freeze from late 2022. The private-housing exposure, unsold completed units and PF completion guarantees that later appear in the FY2025 balance sheet date from this period [S14].

FY2023: brief recovery. Revenue rose 43% to KRW 278.8bn with a thin 2.4% operating margin. This was the high-water mark before the semiconductor cycle, and the Korea Aluminium acquisition was agreed in December 2023 [S5].

FY2024: the reckoning. Revenue slipped 6.6% and a Q4 2024 operating loss of KRW 16.1bn [S12] drove a full-year net loss of KRW 21.9bn. The size and timing point to year-end provisioning on legacy housing and receivables, consistent with the elevated bad-debt and unsold-inventory items still visible in 2026 [S14]. The Q4 charges were not itemised in retrieved sources.

FY2025 to H1 2026: semiconductor-led inflection. Quarterly revenue jumped from about KRW 64bn (Q3 2025) to above KRW 100bn from Q4 2025 onward as SK hynix Yongin Y1 UT and Cheongju M15X reached peak execution. The contract value of SK hynix-related jobs rose from KRW 390.8bn at end-2025 to KRW 505.9bn at June 2026 [S14], before the KRW 195.7bn Ph-4 FAB award [S13]. Operating margin settled around 10–11% in H1 2026, against 2–8% historically. That reflects higher-value PC packages, better fixed-cost absorption at the plants (revenue per employee up 64% from FY2021 to FY2025 [S8]) and the absence of housing write-downs. The Q4 2025 margin dip to 5.4% on record revenue suggests a lower-margin general-building mix or year-end true-ups; net income exceeded operating income that quarter, implying non-operating gains [S12].

Balance-sheet repair. Between December 2025 and June 2026, receivables halved, cash rose almost fivefold, borrowings fell 8%, and the KRW 175bn PF completion guarantee was fully extinguished [S14]. The equity injection of 14.6M shares to Base in 2024 [S22] also helped. Bad-debt expense of KRW 2.2bn in H1 2026 (versus KRW 0.3bn a year earlier) shows the legacy housing book is still being cleaned up [S14].

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Group Entities

EntityRelationshipStakeLatest total assetsLatest net income

(주)베이스 (Base Co., Ltd.)

Largest shareholder / group parent

44.74% of CAMUS

——

(주)후니드 (Hunid) – contract catering

Group affiliate, CAMUS shareholder

5.92% of CAMUS

——

(주)금양인터내셔날 (Geumyang International) – imported liquor/wine wholesale

Group affiliate, CAMUS shareholder

2.26% of CAMUS

——

(주)한국알미늄 (Korea Aluminium)

100% subsidiary of CAMUS

100%

KRW 38.8bn

–KRW 2.4bn

Construction Guarantee Cooperative, Specialty Construction Guarantee Cooperative, HUG, Electrical Contractors' Financial Cooperative, Asiad Country Club

Minority investments

0.01–0.36%

——

Segment (As Reported) Overview

Segment (as reported)ContentsShare of Q2 2026 revenue

Building (건축)

PC supply-and-install for fabs and logistics; general building; public housing

81%

Manufacturing (제조업 – foil and aluminium products)

Korea Aluminium: aluminium foil, flexible packaging, battery pouch film

18%

Civil (토목)

Civil infrastructure works

1%

Other (likely real-estate leasing)

Rental

~0% (not separately quantified)

Revenue by Segment and Revenue by Segment (%)

MetricH1 2025H1 2026

Building segment revenue (KRW Bn)

84.95174.25

Total consolidated revenue (KRW Bn)

117.64214.17

Building share of revenue (%)

72.281.4

Non-building revenue, derived (KRW Bn)

32.6939.92

Income Statement and Margin Analysis (%)

MetricFY2021FY2022FY2023FY2024FY2025

Revenue (KRW Bn)

163.7195.1278.8260.4297.5

Operating income (KRW Bn)

-3.0-15.96.7-18.123.8

Net income (KRW Bn)

-3.0-15.92.6-21.920.0

Revenue growth YoY (%)

1.219.242.9-6.614.2

Operating margin (%)

-1.8-8.12.4-7.08.0

Net margin (%)

-1.8-8.10.9-8.46.7

Dividends per share (KRW, by record-date year)

2020202030

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Income Statement and Margin Analysis (%) (Quarterly)

MetricQ1 2025Q2 2025Q3 2025Q4 2025Q1 2026Q2 2026

Revenue (KRW Bn)

56.061.764.2115.6104.9109.3

Operating income (KRW Bn)

3.78.55.56.311.012.2

Net income (KRW Bn)

2.55.53.58.58.08.7

Revenue YoY (%)

-7.7-8.9-2.274.287.577.1

Operating margin (%)

6.613.88.65.410.511.2

Balance Sheet

Item31 Dec 202530 Jun 2026Source

Cash and cash equivalents (KRW Bn)

5.626.96

[S14]

Total borrowings (KRW Bn)

87.1980.23

[S14]

Net debt (KRW Bn, derived)

81.653.3

derived

Construction receivables (공사미수금) (KRW Bn)

64.8832.94

[S14]

Completed (unsold) housing inventory (KRW Bn)

17.617.3

[S14]

PF responsible-completion commitments – loan balance covered (KRW Bn)

175.0 (1 project)

0

[S14]

Book equity (KRW Bn, approximate)

n/r

~112–128

derived from BPS KRW 1,881 [S7] and P/B 0.70 at KRW 1,504 [S10]

Dividends & Capital Returns and Returns & Leverage Ratios (%)

MetricFY2021FY2022FY2023FY2024FY2025

Cash dividends declared for the fiscal year (KRW Bn)

0.90.90.91.11.8

Share buybacks (KRW Bn)

00000

Dividend payout ratio (%)

003509

Financial Analysis

RatioValueBasisSource

ROE

20.7% / 22.6% / 23.9%

TTM, differing dates and methods

[S7][S10][S2]

ROA

8.94%

TTM, June 2026

[S2]

ROIC

13.31%

TTM, June 2026

[S2]

Interest coverage

5.88x

TTM, June 2026

[S2]

Debt/equity

0.76x

June 2026

[S2]

Net debt/EBITDA

~1.5x

derived: KRW 53.3bn / KRW 35.7bn

derived

Altman Z-score

2.16

June 2026

[S2]

Piotroski F-score

8/9

June 2026

[S2]

Revenue by Region (%)

RegionFY2023FY2024FY2025

Korea – share of revenue (%, estimated as ≈100 given no disclosed overseas contracts; exports not disclosed)

100100100

Period / Reference Point Details

Period / reference pointPrice / return

Current (circa 12 Oct 2026)

KRW 1,504

52-week range

KRW 997 – 2,005

1-year return (to 19 Jun 2026)

+6.3%

6-month return (to 19 Jun 2026)

+7.06%

3-year return

not computed (no verified price for Oct 2023)

Reference: 17 Dec 2021

~KRW 2,335 intraday

Reference: 6 Jan 2022 intraday high

KRW 4,735

Valuation Multiples

MultipleCAMUSSector medianSource

P/E (TTM)

3.1x (Butler, Oct) / 4.07x (ChickenStock, 23 Sep) / 2.77x (MarketInOut, Jun)

6.7x

[S10][S7][S2]

EV/EBITDA

4.31x (Jun 2026); ~4.0x derived (EV ≈ KRW 143bn / EBITDA KRW 35.7bn)

n/r

[S2], derived

EV/Sales

0.45x (Jun 2026); ~0.36x on TTM Q2 2026 revenue (derived)

n/r

[S2], derived

P/B

0.70x – 0.84x

0.58x

[S10][S7]

P/S

0.28x0.28x

[S7]

Per-Share Data

MetricFY2021FY2022FY2023FY2024FY2025

DPS – interim, June record (KRW)

55555

DPS – year-end, December record (KRW)

1515151525

DPS – total (KRW)

2020202030

Analyst Conclusions

Management guidance and consensus

Guidance: none published.

Consensus: none (no coverage).

The implicit outlook rests on contracted work. Y1 UT was 40.8% complete at June 2026 [S14]. P&T7 was 2.6% complete [S14]. Ph-4 FAB runs from August 2026 to May 2028 [S13]. Revenue therefore appears underpinned at or above the H1 2026 run-rate (about KRW 105–110bn per quarter) into 2027, subject to execution, safety-related stoppages and the absence of new impairments.

Bull case

  1. Contracted visibility. About KRW 701.6bn of SK hynix-related contract value (derived), together with the KRW 195.7bn Ph-4 award covering two years, supports sustained revenue of KRW 400bn or more versus FY2025's KRW 297.5bn.

  2. Margin and balance-sheet quality. A clean balance sheet (PF released, receivables halved) plus about 10–11% operating margins could lift ROE above 20% for a stock trading at 3–4x earnings and below book value. The P/E discount to the sector is more than 40% [S7][S14].

  3. Controlling-shareholder signal. The group has bought from 53.54% to 56.55% within 2026 [S8], with no apparent intent to sell. That limits supply and could precede higher payouts or other corporate actions.

Bear case

  1. Concentration risk. The investment case reduces to SK hynix capex timing. Any memory down-cycle or deferral of later Yongin phases would hit a business that lost money in three of the last five years [S9].

  2. Safety and governance. The 2026 fatality and the KRX designation expose operational-control weaknesses. A SAPA prosecution or further disclosure penalties could cause stoppages, fines and client friction [S33][S34].

  3. Minority-shareholder disadvantage. Majority control, related-party equity issuance [S22], a loss-making subsidiary acquired from a group-adjacent context [S8], a thin float and no investor relations argue for a permanent valuation discount.

Key catalysts and monitorables (next 12 months)

Catalyst / monitorableExpected timing
Q3 2026 results; margin sustainability above 10%~14 Nov 2026
Outcome of the Ministry of Employment and Labor / SAPA investigation (Cheonan)H2 2026 – 2027
Closing and ramp-up of the Eumseong PC plantQ4 2026 – 2027
Further Yongin cluster package awards (Phase 2 onward) and Samsung Pyeongtaek workRolling
FY2026 dividend (year-end record date 31 Dec 2026) and any formal shareholder-return policyMar 2027
Korea Aluminium path to break-even; any restructuringFY2026 business report (Mar 2027)
Controlling-group stake changes (5%-holding filings)Rolling
Legacy housing receivable write-downs (bad-debt line)Quarterly

Analyst verdict

CAMUS E&C has changed more in the last 18 months than in the preceding decade. It was a marginal general contractor carrying private-housing credit and PF guarantees, with losses in three of five years. It is now a profitable precast specialist riding Korea's largest semiconductor build-out. The numbers are not ambiguous. H1 2026 revenue rose 82% to KRW 214.2bn. Operating margin roughly doubled to about 11%. Cash nearly quintupled, receivables halved and the KRW 175bn PF completion commitment disappeared [S12][S14]. The KRW 195.7bn Yongin Ph-4 FAB award, equal to about two-thirds of FY2025 revenue, extends contracted work to mid-2028 [S13].

Against this, the stock trades at roughly 3–4x trailing earnings and 0.7–0.8x book [S7][S10]. That is a striking discount, but it is not irrational. Earnings concentrate on one customer ecosystem whose capex is notoriously cyclical. The Cheonan fatality and the resulting disclosure lapse show that operational controls have not scaled as fast as revenue [S33][S34]. Minority holders sit beneath a 56.55% controlling group that has issued itself new shares [S8][S22], bought a loss-making aluminium business [S8], and offers no guidance, IR or coverage.

On balance, the fundamental trajectory is clearly positive for FY2026–FY2027 and the valuation already discounts a severe cycle turn. The key swing factors are execution safety and capital allocation, not demand. If management sustains double-digit margins through 2027, keeps housing write-downs contained, and either fixes or isolates Korea Aluminium, a re-rating toward sector multiples (about 6–7x) is plausible. If the SK hynix cycle softens before the Eumseong capacity is absorbed, the company's history suggests earnings could revert quickly toward break-even. Assessment: fundamentally improving, deep-value but governance-discounted. The appropriate posture is evidence-led monitoring of Q3/Q4 2026 margins, safety outcomes and capital-allocation signals before assuming the discount will close.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Executive Leadership Team

NameRoleTenure / notes

Son Byung-jae (손병재)

Co-CEO / Representative Director (registered)

CEO since at least 2021; publicly fronts strategy ("100-year company"); holds 0.17%

Kwon Soon-young (권순영)

Co-CEO / Representative Director

Named co-CEO in FY2025 business report data

Lee Eun-kyu (이은규)

Former co-CEO

Listed as co-CEO alongside Son by Korean Wikipedia and in earlier press

Oh Su-jeong (오수정)

Shown as representative by TheVC

Conflicts with DART-based sources

Choi Hwan-jin (최환진)

Inside Director (registered)

Holds 0.03%

Kim Young-ae (김영애)

CEO of controlling shareholder Base Co.

Related party, 0.23%

Kim Chang-ho (김창호)

CEO of subsidiary Korea Aluminium

Related party, 0.31%

Pyo Hak-gil (표학길)

Outside Director (as of 2022)

Former head of a support group for Ahn Cheol-soo, which triggered "theme stock" trading

Major Shareholders

HolderRelationshipStakeDate

(주)베이스 (Base)

Largest shareholder

44.74%

31 Dec 2025

(주)후니드 (Hunid)

Affiliate

5.92%

31 Dec 2025

(주)금양인터내셔날

Affiliate

2.26%

31 Dec 2025

Kim Chang-ho

Affiliate executive

0.31%

31 Dec 2025

Kim Young-ae

Affiliate executive

0.23%

31 Dec 2025

Son Byung-jae

CAMUS executive

0.17%

31 Dec 2025

Choi Hwan-jin

CAMUS executive

0.03%

31 Dec 2025

Controlling group total

—

53.66%

31 Dec 2025

Controlling group total (latest)

—

56.55%

1 Sep 2026

National Pension Service

Institutional

0.05%

end-2023

Minority shareholders (11,875 holders)

Retail

43.9%

31 Dec 2025

Foreign ownership

—1.05%

Nov 2021

Governance Overview

MetricDec 2021Dec 2022Dec 2023Dec 2024Dec 2025Sep 2026

Controlling group stake (%)

35.9537.8138.3753.5453.6656.55

Competitive Landscape

Competitors by Segment

SegmentCompetitorRelationship / positioningSource

PC (fab and industrial)

GPC (지피씨)

Named by IB Tomato as a direct rival also expanding PC plants for fab demand

[S14]

PC (general)

In-house precast divisions of large contractors; regional PC fabricators

Price competitors on logistics/parking work

analyst view

General building (small/mid-cap listed)

Bumyang Construction (범양건영)

Listed peer; modular construction

[S46][S47]

General building

KCC E&C (KCC건설)

Listed mid-cap builder

[S43]

General building / civil

Namkwang Engineering & Construction (남광토건)

Listed mid-cap

[S48]

General building

SGC E&C

Listed mid-cap

[S43]

General building

Gyeryong Construction (계룡건설)

Listed mid-cap; dividend payer

[S23]

General building

Dongbu Corporation (동부건설)

Listed mid-cap

[S23]

Aluminium foil / packaging

Sama Aluminium (삼아알미늄)

Korea's leading foil and packaging maker; raised KRW 115.3bn in 2022

[S49]

Battery pouch film

Global incumbents in pouch film (Japanese laminate suppliers) and domestic entrants

Korea Aluminium is a sub-scale challenger

industry context

Peer Comparison FY2025

MetricCAMUSConstruction-sector median (Korea)Source

P/E (TTM)

4.07x (at 23 Sep 2026); 3.1x at KRW 1,504

6.7x (42 profitable companies)

[S7][S10]

P/B

0.84x (23 Sep) / 0.70x (Oct)

0.58x (61 companies)

[S7][S10]

P/S (TTM)

0.28x0.28x

[S7]

Revenue growth (H1 2026 YoY)

+82.1%—

[S14]

Operating margin (H1 2026)

10.8% (derived)

—

derived

Company Snapshot

$209.4M

Revenue

159

Employees

1978

Founded

Icheon, South Korea

Headquarters

SWOT Analysis

Strengths

  • Fab-PC reference franchise. Seven SK hynix-related PC packages since 2018, culminating in a KRW 195.7bn Ph-4 FAB award [S13][S27].
  • Profitability inflection. Operating margin rose from –7.0% (FY2024) to 8.0% (FY2025) and about 10.8% in H1 2026 [S9][S12].
  • Balance-sheet repair. Cash went from KRW 5.6bn to KRW 27.0bn and receivables from KRW 64.9bn to KRW 32.9bn in six months [S14].
  • PF risk extinguished. The KRW 175bn PF completion-guarantee exposure fell to zero by June 2026 [S14].
  • Committed controlling shareholder. Group stake rose from 35.95% in 2021 to 56.55% in 2026 [S8].
  • Operating leverage. Revenue per employee rose from KRW 0.9bn to KRW 1.48bn between FY2021 and FY2025 [S8].

Weaknesses

  • Earnings volatility. Operating losses in three of the last five years (FY2021, FY2022, FY2024) [S9].
  • Concentration. Building was 81.4% of H1 2026 revenue, largely SK-related [S14].
  • Loss-making subsidiary. Korea Aluminium reported a net loss of KRW 2.4bn [S8].
  • Disclosure and control lapses. Unfaithful-disclosure designation in September 2026 [S34].
  • No investor-relations infrastructure. No sell-side coverage: 0 analyst reports [S11].
  • Low payout. FY2025 payout ratio of 9% [S23].

Opportunities

  • Yongin cluster. Multi-phase build-out to 2028 and beyond; Ph-4 runs to May 2028 [S13].
  • Capacity. Eumseong adds a third plant, toward the 200,000–300,000 m³ ambition [S14][S21].
  • OSC public housing. The MOLIT/LH R&D programme could open a large addressable market [S21].
  • Samsung Pyeongtaek restart [S21].
  • Pouch-film demand from Li-ion batteries via Korea Aluminium [S40].
  • Re-rating potential. P/E of about 3–4x versus a 6.7x sector median [S7].

Threats

  • SK hynix capex cycle. A slowdown would hit an order book that is many times revenue (derived).
  • Safety enforcement. Serious Accidents Punishment Act exposure from the Cheonan fatality [S33].
  • Competitive capacity additions by GPC and others [S14].
  • Residual private-housing credit. H1 2026 bad-debt expense of KRW 2.2bn; KRW 17.3bn of unsold completed housing [S14].
  • Pricing pressure. Fixed-price exposure to cement, steel and labour inflation (FY2022 precedent, –8.1% margin) [S9].
  • Governance and minority-shareholder risk. 56.55% control, related-party share issuance [S8][S22].

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
11 Mar 2025KRW 141bn contract win (headline) [S5]Largest award of FY2025 to date; context for the 2025 turnaround
21 Mar 2025FY2024 business report filed: net loss KRW 21.9bn [S12]Trough of the cycle
15 May 2025Q1 2025: revenue KRW 56.0bn, OP KRW 3.7bn, NI KRW 2.5bn [S12]Return to profit
14 Aug 2025Q2 2025: revenue KRW 61.7bn, OP KRW 8.5bn (13.8% margin); interim dividend KRW 5 [S12][S23]Margin recovery
13 Oct 2025Notice that the lock-up on 14,598,550 shares held by Base and 1 related party expires 17 Oct 2025 [S22]Potential overhang; in practice the controlling group kept buying
14 Nov 2025Q3 2025: revenue KRW 64.2bn, OP KRW 5.5bn [S12]Steady
11 Dec 2025KRW 82bn contract win (headline) [S5]Backlog build
22 Dec 2025KRW 44.6bn contract win (headline). Possibly the KEPCO contract later corrected to KRW 46.4bn (unconfirmed link) [S5][S39]Backlog build
11 Mar 2026Year-end dividend KRW 25/share (KRW 1.5bn) [S23]DPS up 67%
18 Mar 2026FY2025 business report: revenue KRW 297.5bn, OP KRW 23.8bn, NI KRW 20.0bn [S12]Turnaround confirmed
~26 Mar 202647th AGM approves financial statements and cash dividend [S1]Routine
2 Apr 2026Controlling-group stake 53.69% [S8]Creeping accumulation
15 May 2026Q1 2026: revenue KRW 104.9bn (+87.5%), OP KRW 11.0bn, NI KRW 8.0bn; shares +12.4% on the day [S12]Fab-driven step-change
15 May 2026Controlling-group stake 53.71% [S8]Accumulation
26 Jun & 6 Jul 2026Corrections to earlier supply-contract filings [S43][S14]SK hynix contract values rose (Y1 UT KRW 218.3bn → 266.0bn)
7 Jul 2026KRW 66.4bn SK hynix Cheongju P&T7 PC contract (SK ecoplant); 22.3% of FY2025 revenue [S15][S24]New fab programme
21 & 24 Jul 20265%-holding reports; group stake 54.67% [S43][S8]Accumulation
13 Aug 2026Dividend KRW 15/share for 31 Aug record date (KRW 0.9bn; 0.9% yield) [S44][S23]Higher interim payout
14 Aug 2026Q2 2026: revenue KRW 109.3bn (+77.1%), OP KRW 12.2bn (+44.1%), NI KRW 8.7bn; shares –4.9% [S12]Second consecutive record half
19 & 21 Aug 20265%-holding reports; group stake 56.04% [S43][S8]Accumulation
27 Aug 2026Fatal accident at Cheonan PC plant: a sub-contractor worker in his 60s was killed when a column mould tipped during bolting [S16][S33]Work-stoppage order; Serious Accidents Punishment Act probe
28 Aug 2026Serious-accident filing (plus corrected filing) [S16]Disclosure made one day after the event
31 Aug 2026KRX notice of intended "unfaithful disclosure corporation" designation [S43]Governance flag
31 Aug / 1 Sep 2026KRW 195.7bn SK hynix Yongin Cluster 1 Ph-4 IBL FAB PC contract (SK ecoplant); 65.8% of FY2025 revenue; runs 27 Aug 2026 – 31 May 2028; progress billing, no advance [S13][S25]Largest contract in company history identified
1 Sep 2026Group stake 56.55% [S8]Highest level recorded
9 Sep 2026Corrected contract filing: KEPCO, KRW 46.4bn [S39]Public utility work
16 Sep 2026Tangible-asset acquisition decision: Nara PC Eumseong plant, KRW 18.2bn [S10][S14]Capacity expansion
18 Sep 20265%-holding report [S10]Accumulation
22 Sep 2026Designated an unfaithful disclosure corporation for late disclosure of the 27 Aug accident; sanction fee KRW 8M, 0 penalty points [S34]Minor monetary penalty; reputational
2 Oct 20265%-holding report [S43]Accumulation
6–8 Oct 2026IB Tomato analysis of the H1 2026 balance-sheet repair (cash ×5, receivables halved, PF guarantee released) [S14]Market recognition of de-risking

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

3 charts
Revenue by Segment: Total consolidated revenue rose from KRW 117.6 Bn in H1 2025 to KRW 214.2 Bn in H1 2026.
CAMUS ENGINEERING & CONSTRUCTION Inc. — Revenue by Segment
Series (KRW Bn)H1 2025H1 2026
Total consolidated revenue117.6214.2
Building segment revenue85174.3
Non-building revenue32.739.9

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Sources

Sources

  1. S1TheVC – 까뮤 company page (thevc.kr)
  2. S2MarketInOut – Camus E&C (quote 19 Jun 2026) (marketinout.com)
  3. S3Morningstar AU – Camus E&C profile (morningstar.com.au)
  4. S4Investing.com UK – Camus E&C (uk.investing.com)
  5. S5MarketScreener – Camus E&C news/deal log (marketscreener.com)
  6. S6ValueLine Korea – 까뮤이앤씨 income statement (TTM) (valueline.co.kr)
  7. S7ChickenStock – 까뮤이앤씨 financials/valuation (chickstockfi.com)
  8. S8ETF쇼핑 – 까뮤이앤씨 company/shareholders (FY2025 business report) (etfshopping.com)
  9. S9Butler – 까뮤이앤씨 (financials, segments, filings) (butler.works)
  10. S10Butler – same page, October 2026 fetch (price KRW 1,504, market cap KRW 89.9bn, segment split, filings list) (butler.works)
  11. S11StockHub – 까뮤이앤씨 (stockhub.kr)
  12. S12ETF쇼핑 – 까뮤이앤씨 quarterly/annual results (etfshopping.com)
  13. S13CBC News – KRW 195.7bn SK hynix Yongin contract (1 Sep 2026) (cbci.co.kr)
  14. S14IB Tomato – SK hynix work lifts receivables/cash (6–8 Oct 2026) (ibtomato.com)
  15. S15ChickenStock – DART filing 7 Jul 2026 (P&T7 contract) (chickstockfi.com)
  16. S16ChickenStock – DART serious-accident filing 28 Aug 2026 (chickstockfi.com)
  17. S17Etoday – PC airport/rail revenue 63% (11 Jun 2018) (etoday.co.kr)
  18. S18Purplenty – company analysis (Nov 2021) (purplenty.com)
  19. S19Korean Wikipedia – 까뮤이앤씨 (ko.wikipedia.org)
  20. S20Namuwiki – 까뮤E&C (namu.wiki)
  21. S21Dong-A Ilbo via Daum – PC capability, strategy, CEO interview (29 Aug 2024) (v.daum.net)
  22. S22Dealsite – lock-up expiry of 14,598,550 shares (13 Oct 2025) (dealsite.co.kr)
  23. S23ETF쇼핑 – 까뮤이앤씨 dividends (etfshopping.com)
  24. S24Dealsite – P&T7 contract (7 Jul 2026) (dealsite.co.kr)
  25. S25Dealsite – Yongin Ph-4 FAB contract (1 Sep 2026) (dealsite.co.kr)
  26. S26Etoday – KRW 41.3bn KIC contract (26 Nov 2018) (etoday.co.kr)
  27. S27Etoday – SK hynix M16 PC contract (Jan 2019) (etoday.co.kr)
  28. S28Asia Economy – Hwaseong JW logistics PC (22 Apr 2021) (asiae.co.kr)
  29. S29Dealsite – Wangsimni youth housing (7 Oct 2021) (dealsite.co.kr)
  30. S30Economist (Korea) – Anseong logistics KRW 120bn (17 Dec 2021) (economist.co.kr)
  31. S31Economist (Korea) – Ahn Cheol-soo theme high (6 Jan 2022) (economist.co.kr)
  32. S32Sisa News – SK hynix M15 WWT PC KRW 49.5bn (sisa-news.com)
  33. S33Bloter – Cheonan PC plant fatality, SAPA investigation (Aug 2026) (bloter.net)
  34. S34ChickenStock – DART unfaithful-disclosure designation (22 Sep 2026) (chickstockfi.com)
  35. S35FinancialReports.eu – 5% holding report (19 Aug 2024) (financialreports.eu)
  36. S36Dealsite – Geumyang International / Base Group structure (Oct 2022) (dealsite.co.kr)
  37. S37Jasoseol – company insights (HPC, OPS slab, PC core) (jasoseol.com)
  38. S38Etoday – Catholic Univ. Incheon St. Mary's contract (etoday.co.kr)
  39. S39ChickenStock – DART corrected contract (KEPCO), 9 Sep 2026 (chickstockfi.com)
  40. S40Jobploy – Korea Aluminium company profile (jobploy.kr)
  41. S41Simply Wall St – A013700 (simplywall.st)
  42. S42Purplenty – foreign ownership 1.05% (Nov 2021) (purplenty.com)
  43. S43ChickenStock – 까뮤이앤씨 disclosures list (chickstockfi.com)
  44. S44Dealsite – KRW 15 quarterly dividend (13 Aug 2026) (dealsite.co.kr)
  45. S45Paxnet – 013700 investor forum (paxnet.co.kr)
  46. S46Stockopedia – Camus E&C peers (stockopedia.com)
  47. S47Sidae – Bumyang / modular reconstruction theme (Nov 2024) (sidae.com)
  48. S48Dealsite – Namkwang E&C co-CEO change (Aug 2026) (dealsite.co.kr)
  49. S49AL Circle – Sama Aluminium KRW 115.3bn raise (Dec 2022) (alcircle.com)
  50. S50GII Korea / Mordor – precast concrete market 2026 (giikorea.co.kr)
  51. S51GII Korea / 360iResearch – precast concrete market to 2032 (giikorea.co.kr)
  52. S52GII Korea / VMR – precast concrete market 2025–2034 (giikorea.co.kr)
  53. S53WikiDocs – WSTS 2026 semiconductor market projection (wikidocs.net)
  54. S54Korea JoongAng Daily – Russia as Korea's top aluminium supplier (1 Sep 2026) (koreajoongangdaily.com)
  55. DART primary filings referenced by receipt number: (e.g., 20260318000955 FY2025 business report; 20260814002074 H1 2026 report; 20260901800138 Ph-4 FAB contract; 20260922800662 designation) (dart.fss.or.kr)

Unlock Company Contacts

Connect with Key Decision-Makers

Access verified employee contacts and decision-maker information from this company to support your sales, lead generation, and business development efforts.