Carnavale Resources Limited Overview
Carnavale Resources is a Perth-based, ASX-listed gold company at a late stage of development. Its value is concentrated almost entirely in its 80% interest in the Kookynie Gold Project (KGP), located 60 km south of Leonora in Western Australia's Eastern Goldfields.
The company discovered the Swiftsure lode beneath barren transported cover by following aircore anomalies first defined in January 2022. It then grew the deposit into a JORC 2012 Mineral Resource of 855kt at 4.4 g/t for 120koz (May 2026). That resource includes a bonanza-grade core of about 60kt at more than 28 g/t.
Carnavale's model is deliberately low-capital:
-
contract mining of compact open pits at Swiftsure and Tiptoe;
-
an underground mine beneath the Swiftsure pit;
-
toll treatment or ore sale to one of several third-party mills within trucking distance.
The October 2025 Scoping Study outlined the following (pre-tax, A$5,500/oz):
-
NPV8: A$188M
-
IRR: 165%
-
Payback: 14 months
-
Peak funding: about A$21M
The mining lease was granted in February 2026. The Bankable Feasibility Study (BFS) was guided for Q3 2026 and had not been confirmed as released at the research date.
Company's own description (FY2026 Annual Report)
The FY2026 Annual Report describes Carnavale in these terms:
-
an Australian mineral exploration company with a strategy of acquiring and exploring high-quality, advanced exploration and development projects;
-
currently focused on finalising the BFS for the high-grade, truckable resources at the KGP;
-
those resources can be processed at an existing third-party plant nearby.
The Directors' Report states the Group's principal activity as exploring mineral interests prospective for precious metals and energy. Its stated long-run objective is to maximise shareholder value through discovering and delineating gold, cobalt, nickel, tin, copper, silver and other deposits. That boilerplate dates from the company's earlier multi-commodity era.
Independent characterisation
| Advantages | Costs |
|---|---|
| Very low pre-production capital: open-pit pre-production capital was A$3.0M in the 2025 Scoping Study | Margin is ceded to the mill owner through treatment charges or OPA discounts |
| Short time to first gold | Processing timing and capacity depend on third parties |
| High leverage to the gold price, because of exceptionally high head grades | Mine life is short: about 5 years in the Scoping Study |
In substance, Carnavale is a single-asset, pre-production gold developer with:
-
no operating revenue;
-
no debt;
-
a balance sheet of mainly capitalised exploration (A$13.3M of A$16.6M total assets at 30 June 2026).
Its business model is a "mine-and-truck" junior development strategy. The company intends to:
-
avoid building a processing plant;
-
use contract miners for open-pit and underground development;
-
monetise ore through a toll-treatment agreement or ore purchase agreement (OPA) with a nearby mill owner.
This approach brings three advantages and three costs.
Revenue model
| Revenue type | Status | Evidence |
|---|---|---|
| Product (gold or ore sales) | Prospective only; no sales to date | FY2026 AR: "the Group has no operating revenue or earnings" |
| Interest income | Current; A$156,291 in FY2026 | FY2026 AR Note 3 |
| Option and asset-sale fees (non-core project optionees) | Current; A$90,000 in FY2026 | FY2026 AR Note 3 |
| R&D tax offsets | Episodic; nil in FY2026, A$57,536 received in FY2025 | FY2025 and FY2026 ARs |
| Services / subscription / licensing | — | — |
Value-chain position, customers and end-markets
Value-chain position. Upstream: exploration, resource definition and planned mining. Carnavale would sit at the ore-production end of the chain. Under a toll arrangement it would sell doré or bullion through a refiner such as the Perth Mint. Under an OPA it would sell ore at the mill gate. The FY2026 AR confirms Strategic Metallurgical Consultants (SM) has been engaged to negotiate one of these arrangements.
Prospective counterparties:
-
Eastern Goldfields mill owners with spare capacity; the plants within trucking distance are shown in the FY2026 AR, Figure 12, but not named.
-
Ultimately, the global gold market through a refiner.
End-markets. Gold bullion, which is used for investment, central bank reserves, jewellery and technology.
Strategy
Stated strategy themes (FY2026 AR and announcements, paraphrased)
-
Finalise the BFS for a derisked, "shovel-ready" KGP. The target was Q3 2026; the FY2026 AR describes final reports as imminent.
-
Low-capital development. No processing plant. Contract mining. Toll treatment or OPA with a third-party Eastern Goldfields CIL mill.
-
Open pit to underground. Swiftsure pit first. The underground starts from the pit and is funded by open-pit cash flow. Tiptoe pit follows.
-
Organic growth. Exploration east and NE of Swiftsure (more than 5,000 m of aircore). Depth extensions of the bonanza shoots. McTavish North, Champion South and Valiant.
-
Crystallise value from non-core assets (Barracuda, Grey Dam, E40/394).
-
Growth beyond Kookynie in the medium term. Hale told Proactive in May 2026 that Carnavale plans to keep growing beyond Kookynie.
Initiatives announced in the last 24 months
| Initiative | Date | Detail | Status |
|---|---|---|---|
| Updated MRE (117koz) | Jul 2025 | 38% ounce increase; Indicated up 46% | Superseded |
| Updated Scoping Study | Oct 2025 | NPV8 A$188M; IRR 165% | Basis for the BFS |
| A$7.09M recapitalisation | Oct–Nov 2025 | Placement plus underwritten entitlement offer | Completed |
| 15:1 share consolidation | 27 Nov 2025 | Capital-structure clean-up | Completed |
| BFS programme | Dec 2025 onward | Infill RC (138 holes, about 8,384 m), 7 HQ3 metallurgical holes (474 m), 6–8 geotechnical holes, LIDAR, hydrogeology, environmental, heritage | Technical work complete; financial model in progress |
| Mining and Heritage Agreement (WTAC) | FY2026 | Heritage protocol, compensation, milestone payments, production-linked royalty, employment and contracting opportunities | Signed |
| Mining lease M40/362 | Feb 2026 | Hosts all resources | Granted |
| Measured resource MRE | May 2026 | 30koz Measured | Completed |
| DFS-level metallurgy | Aug 2026 | 98–99% recovery | Completed |
| Toll / OPA process (SM engaged) | 2,026 | Assessing plants by performance and distance | In progress |
| Project financing | 2,026 | "Discussions with potential financiers" | In progress |
| ESG / sustainability targets | — | No emissions or ESG targets disclosed | — |
| Cost programs | — | None disclosed | — |
Guidance and medium-term targets
| Item | Guidance | Source |
|---|---|---|
| BFS completion | Q3 2026; earlier guidance was "mid-2026", then "end of July". The FY2026 AR (17 Sep 2026) still expected Q3 2026 publication | ASX quarterlies; FY2026 AR; Proactive |
| First production | "Before the end of the year" (2026), per Hale in May 2026. Analyst view: highly ambitious, given that financing, OPA and environmental approvals were outstanding | Proactive, May 2026 |
| Exploration aircore | Completion Q4 2026 | FY2026 AR |
| Financial targets | None issued | — |
Products & Services
Carnavale sells no products or services. Its "portfolio" is its set of mineral projects, catalogued asset by asset below.
Kookynie Gold Project (KGP), the flagship (80% Carnavale)
| Attribute | Detail | Source |
|---|---|---|
| Location | 60 km south of Leonora, 180 km north of Kalgoorlie, 2 km west of the Kookynie township, WA Eastern Goldfields | ASX 4 Feb 2026; FY2026 AR |
| Tenure | Granted M40/362 (hosts all resources) and E40/355 (surrounding exploration). Applied: L40/53 (miscellaneous licence, haul road to the Kookynie–Malcolm Road) and P40/1616. Also P40/1480 (100% Carnavale) | FY2026 AR |
| Deposits | Swiftsure (lodes 1, 2, 22) and Tiptoe (lodes 3, 4), 160 m apart along strike | FY2026 AR |
| Mineralisation | Quartz-carbonate-sulphide veins with scheelite and sericite alteration. Best grades sit at the quartz diorite / dolerite contact. Mineralisation dips steeply to the SE in plunging high-grade shoots | FY2025 and FY2026 ARs |
| Resource (May 2026) | 855kt @ 4.4 g/t for 120koz (Measured 30koz, Indicated 50koz, Inferred 40koz) | ASX 20 May 2026 |
| Bonanza core | About 60kt at more than 28 g/t for about 55–56koz. Proactive cites about 60kt @ 29.1 g/t for 56koz (May 2026); the FY2025 AR cites 60kt @ 28.3 g/t for 55koz | FY2025 AR; Proactive |
| Development concept | Contract-mined open pits (Swiftsure, then Tiptoe); underground decline from the Swiftsure pit; toll treatment or OPA | FY2026 AR |
| Scoping Study (Oct 2025) | 93koz produced over 61 months. Pre-tax NPV8 A$188M, IRR 165%, payback 14 months, at A$5,500/oz | FY2026 AR |
| Metallurgy | 98–99% recoveries at a P80 of 106 µm across oxide, transitional and fresh ore; gravity recovery 71–82% | ASX 3 Aug 2026 |
| Stage | BFS (technical work complete; financial model in progress at 17 Sep 2026) | FY2026 AR |
| Encumbrances | WTAC compensation, milestone payments and a production royalty. A 1% gross royalty applied to E40/394, the tenement subject to the KoBold agreement | FY2026 AR; FY2025 AR Note 20 |
| Target | Status | Source |
|---|---|---|
| McTavish North | High-grade fresh-rock discovery in 2022 (11m @ 14.30 g/t); not in the MRE | FY2023 AR |
| Champion South | Prospect along the about 2 km McTavish East trend; not in the MRE | FY2023 and FY2025 ARs |
| Valiant | Named exploration target | FY2025 AR; Mining Weekly |
| East / NE Puzzle granite contact | More than 5,000 m of aircore across 19 lines planned, completion expected Q4 2026 | FY2026 AR |
| Swiftsure and Tiptoe depth extensions | Open at depth. Deepest intercept: 4.1m @ 2.75 g/t at 443 m downhole (MEPC018) | FY2025 AR |
Ora Banda South Gold Project (80% Carnavale)
| Attribute | Detail |
|---|---|
| Concept | Intrusion-related gold in sediments along the Carnage Shear, viewed as an analogue of St Ives |
| Best results | Aircore 4m @ 30.20 g/t (OBAC413); reverse circulation (RC) 1m @ 9.49 g/t at 137 m (OBRC007) |
| Status | Material spend ceased; A$2,588,666 impaired in FY2025; "under review" in FY2026 |
| Source | FY2023, FY2025 and FY2026 ARs |
Non-core and divested assets
| Asset | Commodity | Status | Economic terms | Source |
|---|---|---|---|---|
| Grey Dam (E28/1477, M28/378) | Ni-Co laterite / Ni sulphide | Option to sell 80% to Trans Pacific Energy Group (Dec 2023); optionee meets tenement costs | Option-fee terms not detailed in the excerpts reviewed. A 2% gross royalty to third parties attaches to M28/378 | FY2025 AR Note 20 |
| Barracuda (E58/551) | PGE-Ni-Cu | Option to Midas Resources (MM1) | A$20k per year in option fees; A$300k on exercise; A$500k on a JORC resource; 0.5% NSR to Carnavale | FY2023 AR |
| E40/394 (Leonora, Kookynie area) | Gold / other | Asset sale agreement with KoBold (A$405k); KoBold advised in FY2026 it would not proceed | A$405k (not completed) | FY2025 and FY2026 ARs |
Financial Narrative
All figures are consolidated, audited, in A$ thousands unless noted. Sources: FY2023 AR (FY2022–FY2023), FY2025 AR (FY2024–FY2025) and FY2026 AR (FY2026).
Income statement
Notes on the income statement:
EBITDA definition: EBITDA = pre-tax result plus depreciation. There is no interest expense; interest income is included in revenue.
Restated EPS: FY2025 and FY2026 restated EPS are as reported. FY2022–FY2024 restated EPS are derived by dividing reported weighted-average shares by 15.
Margins: Gross, operating, EBITDA and net margins are not meaningful, because the company has no operating revenue. Third-party InvestSMART computes net margins of -659% (FY2024), -3,784% (FY2025) and -1,371% (FY2026) on "other income". These are statistically valid but economically uninformative.
Revenue CAGR: FY2022–FY2026 "revenue" CAGR is about 193% per year (derived). This is not meaningful because the base is tiny interest income.
Commentary. The income statement is a function of three drivers: corporate overhead, non-cash impairments and share-based payments.
Administrative costs: These were flat at A$576–596k from FY2022 to FY2025. They then rose 35% to A$798k in FY2026, reflecting higher director fees after the November 2025 fee-pool increase and higher corporate activity around the BFS and capital raising.
FY2025 inflection: The A$3.03M loss was overwhelmingly the A$2.59M impairment of Ora Banda South. This was a non-cash write-down that formally concentrated the company on Kookynie.
FY2026: The A$1.23M loss includes A$620k of non-cash share-based payments: 10.8M director, consultant and secretary options, 2M underwriter options and 1.67M MD performance rights, all granted at the consolidated price of A$0.09. Excluding impairment and share-based payments, the underlying cash-type loss was about A$552k (derived).
Balance sheet
Commentary.
The balance sheet is clean: there is no debt, no leases of note and only trade payables as liabilities. It is, however, structurally dependent on equity.
Dilution: Issued capital has risen A$11.3M in four years. The share count, on a post-consolidation basis, has risen about 2.25x since FY2022.
Exploration asset: Capitalised exploration more than doubled from A$6.0M to A$13.3M. The FY2026 step-up of A$3.92M reflects the BFS drilling: 138 infill RC holes for about 8,384 m, plus metallurgical and geotechnical diamond holes.
Accumulated losses: These of A$39.1M are large relative to equity of A$16.1M. They reflect roughly two decades of exploration across earlier, unsuccessful commodity strategies.
Going concern.
Cash flow
Commentary.
Cash burn ran at roughly A$2.3–2.6M per year from FY2023 to FY2025, then stepped up to A$4.3M in FY2026 as BFS drilling peaked. Quarterly data show how front-loaded the FY2026 spend was:
This burn profile matters for Section 22. Cash of about A$3.0M at 30 June 2026 covers ongoing BFS completion, exploration aircore and overheads only for a limited period. The approximately A$21M peak funding requirement in the Scoping Study implies a material financing event ahead of any development decision.
Ratios
Notes and ratios that are not applicable:
ROIC: not meaningful, given no operating profit.
Net debt / EBITDA: not meaningful (net cash, negative EBITDA).
Interest coverage: not applicable (no interest expense).
Asset turnover: not meaningful.
Cash conversion cycle: not applicable (no inventory or trade receivables).
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Group Entities
| Entity | Jurisdiction | Ownership | Role | Source |
|---|---|---|---|---|
Carnavale Resources Limited | Australia | Parent (listed) | Holding company; holds the Kookynie interest | FY2025 AR Note 23 |
Carnavale Petroleum Pty Ltd | Australia | 100% | Legacy subsidiary; current activity not disclosed | FY2025 AR Note 23 |
Tojo Minerals Pty Ltd | Australia | 100% | Holds non-core tenements (Barracuda E58/551; E40/394, the subject of the KoBold sale agreement) | FY2023 and FY2025 ARs |
Kookynie Gold Project JV (unincorporated) | Western Australia | Carnavale 80% / Western Resources 20% | Swiftsure and Tiptoe resources on M40/362; E40/355. Western Resources is free-carried to BFS completion | FY2025 and FY2026 ARs |
Ora Banda South JV (unincorporated) | Western Australia | Carnavale 80% / Western Resources 20% | Exploration; impaired in FY2025 | FY2023 and FY2025 ARs |
Revenue by Segment and Revenue by Segment (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Investing segment revenue (AUD K) | 3.3 | 35.2 | 102.6 | 71.8 | 156.3 |
Mineral Exploration segment revenue (AUD K) | 0 | 20.0 | 120.0 | 80.0 | 90.0 |
Total revenue (AUD K) | 3.3 | 55.2 | 222.6 | 151.8 | 246.3 |
Investing share of revenue (%) | 100 | 64 | 46 | 47 | 63 |
Exploration share of revenue (%) | 0 | 36 | 54 | 53 | 37 |
Results by Segment and Segment Assets & Liabilities
| Metric | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|
Investing segment pre-tax result (AUD K) | -764.8 | -496.1 | -863.7 | -499.7 |
Mineral Exploration segment pre-tax result (AUD K) | -724.7 | -55.7 | 15.0 | -2,527.2 |
Investing segment assets (AUD K) | 3,474.1 | 1,090.0 | 1,287.3 | 931.2 |
Mineral Exploration segment assets (AUD K) | 6,018.0 | 7,889.9 | 10,204.1 | 9,472.5 |
Exploration capex in segment (AUD K) | 3,255.9 | 1,901.8 | 2,250.7 | 2,002.4 |
Income Statement and Per-Share Data
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue: interest and other income (AUD K) | 3.3 | 55.2 | 222.6 | 151.8 | 246.3 |
of which interest income (AUD K) | 3.3 | 35.2 | 102.6 | 71.8 | 156.3 |
of which option fees (AUD K) | 0 | 20.0 | 120.0 | 80.0 | 90.0 |
Gross profit (AUD K) | 3.3 | 55.2 | 222.6 | 151.8 | 246.3 |
Administrative expenses (AUD K) | -596.2 | -575.9 | -585.7 | -590.1 | -798.3 |
Exploration impairment (AUD K) | -707.2 | -30.5 | -83.2 | -2,588.7 | -61.5 |
Share-based payments (AUD K) | -189.2 | 0 | -401.8 | 0 | -619.9 |
Depreciation (AUD K) | -0.5 | -0.6 | -0.5 | 0 | 0 |
EBITDA, derived (AUD K) | -1,488.3 | -550.5 | -848.2 | -3,027.0 | -1,233.5 |
Operating income / EBIT (AUD K) | -1,488.7 | -551.1 | -848.7 | -3,027.0 | -1,233.5 |
Pre-tax income (AUD K) | -1,488.7 | -551.1 | -848.7 | -3,027.0 | -1,233.5 |
Income tax benefit, R&D offset (AUD K) | 76.1 | 98.5 | 57.5 | 0 | 0 |
Net income (AUD K) | -1,412.6 | -452.6 | -791.1 | -3,027.0 | -1,233.5 |
Basic EPS as reported (A$ cents) | -0.06 | -0.017 | -0.023 | -0.077 | -0.34 |
Basic EPS, restated for 15:1 consolidation (A$ cents) | -0.84 | -0.25 | -0.35 | -1.15 | -0.34 |
Diluted EPS (A$ cents, restated) | -0.84 | -0.25 | -0.35 | -1.15 | -0.34 |
Dividends per share (A$ cents) | 0 | 0 | 0 | 0 | 0 |
Weighted avg shares, restated post-consolidation (M) | 168.5 | 182.0 | 224.7 | 262.9 | 362.8 |
Balance Sheet and Share Count (M)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Cash and equivalents (AUD K) | 3,246.7 | 919.2 | 1,244.8 | 777.6 | 2,991.1 |
Receivables (AUD K) | 190.3 | 135.2 | 153.4 | 117.4 | 196.7 |
Total current assets (AUD K) | 3,458.7 | 1,075.8 | 1,420.3 | 918.7 | 3,214.3 |
Capitalised exploration and evaluation (AUD K) | 6,012.4 | 7,883.7 | 10,051.2 | 9,465.0 | 13,323.9 |
Total assets (AUD K) | 9,492.1 | 8,979.9 | 11,491.5 | 10,403.7 | 16,558.1 |
Trade and other payables (AUD K) | 527.0 | 379.1 | 338.2 | 224.6 | 448.7 |
Total liabilities (AUD K) | 527.0 | 379.1 | 338.2 | 224.6 | 448.7 |
Short-term debt (AUD K) | 0 | 0 | 0 | 0 | 0 |
Long-term debt (AUD K) | 0 | 0 | 0 | 0 | 0 |
Net debt, negative = net cash (AUD K) | -3,246.7 | -919.2 | -1,244.8 | -777.6 | -2,991.1 |
Total equity (AUD K) | 8,965.1 | 8,600.8 | 11,153.3 | 10,179.0 | 16,109.4 |
Issued capital (AUD K) | 39,572.0 | 39,660.3 | 42,327.3 | 44,380.0 | 50,877.6 |
Accumulated losses (AUD K) | -33,626.6 | -34,079.2 | -34,870.3 | -37,897.3 | -39,130.8 |
Goodwill and intangibles (AUD K) | 0 | 0 | 0 | 0 | 0 |
Working capital (AUD K) | 2,931.6 | 696.7 | 1,082.1 | 694.1 | 2,765.6 |
Shares on issue, post-consolidation basis (M) | 181.2 | 182.2 | 228.2 | 272.7 | 408.1 |
Auditor / Directors' Position by Year
| Year | Auditor / directors' position |
|---|---|
FY2025 | Material-uncertainty language: "additional funding will be required" |
FY2026 | No material uncertainty. Directors rely on a 12-month cash flow forecast, with net current assets of A$2.77M |
Cash Flow
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Operating cash flow (AUD K) | -502.0 | -416.3 | -351.1 | -388.3 | -560.3 |
Exploration payments, capex (AUD K) | -2,467.9 | -1,760.2 | -2,265.0 | -2,131.7 | -3,770.1 |
Tenement acquisition payments (AUD K) | -278.9 | -150.0 | 0 | 0 | 0 |
Total investing cash flow (AUD K) | -2,748.4 | -1,910.2 | -2,265.0 | -2,131.7 | -3,770.1 |
Free cash flow, OCF + investing, derived (AUD K) | -3,250.3 | -2,326.5 | -2,616.1 | -2,520.0 | -4,330.4 |
Equity raised, gross (AUD K) | 3,123.6 | 0 | 3,105.7 | 2,200.0 | 7,090.5 |
Issue costs (AUD K) | -157.0 | -1.7 | -163.9 | -147.3 | -546.6 |
Net financing cash flow (AUD K) | 2,966.6 | -1.7 | 2,941.7 | 2,052.7 | 6,543.9 |
Dividends paid (AUD K) | 0 | 0 | 0 | 0 | 0 |
Buybacks (AUD K) | 0 | 0 | 0 | 0 | 0 |
Net change in cash (AUD K) | -283.8 | -2,328.2 | 325.7 | -467.2 | 2,213.5 |
Cash Flow History
| Quarter | Operating cash flow | Investing cash flow | Closing cash | Source |
|---|---|---|---|---|
December 2025 | -A$226k | -A$538k | A$6.273M | December 2025 quarterly |
March and June 2026 combined | — | — | Fell by about A$3.28M | Derived |
June 2026 | -A$224k | — | A$2.991M | June 2026 quarterly |
Margin Analysis (%) and Financial Ratios (x)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
ROE, net loss / avg equity, derived (%) | -17.9 | -5.2 | -8.0 | -28.4 | -9.4 |
ROA, net loss / avg assets, derived (%) | -14.9 | -4.9 | -7.7 | -27.6 | -9.1 |
Current ratio (x) | 6.56 | 2.84 | 4.20 | 4.09 | 7.16 |
Debt / equity (x) | 0 | 0 | 0 | 0 | 0 |
Cash / total assets (%) | 34.2 | 10.2 | 10.8 | 7.5 | 18.1 |
Exploration asset / total assets (%) | 63.3 | 87.8 | 87.5 | 91.0 | 80.5 |
Book value per share, post-consolidation (A$ cents) | 4.9 | 4.7 | 4.9 | 3.7 | 3.9 |
Revenue by Region and Region Margins & Growth (%)
| Region | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Australia revenue (AUD K) | 3.3 | 55.2 | 222.6 | 151.8 | 246.3 |
Rest of world revenue (AUD K) | 0 | 0 | 0 | 0 | 0 |
Australia revenue growth (%) | — | 1,549 | 303 | -32 | 62 |
Per-Share Data
| Metric | FY2021 | FY2022 | FY2023 | FY2024 |
|---|---|---|---|---|
30-June closing price, consolidation-adjusted (A$ cents) | 9.0 | 10.5 | 4.5 | 6.0 |
30-June closing price, as traded (A$ cents) | 0.6 | 0.7 | 0.3 | 0.4 |
Capital Markets
| Indicator | Value | Source |
|---|---|---|
Recent price | A$0.078–0.091 (Aug–Sep 2026) | InvestSMART; StockLight; Kalkine |
52-week range | A$0.0504–A$0.165 | StockLight |
1-year performance | About +13% (derived from about A$0.075 equivalent in early Oct 2025 to about A$0.085). Market Index shows +15.83% vs ASX 200 and -7.28% vs sector over 1 year | Derived; Market Index |
3-year performance (from June 2023 equivalent A$0.045) | About +89% (derived) | Derived |
5-year performance (from June 2021 equivalent A$0.09) | About -6% (derived) | Derived |
Post-raise drawdown | From A$0.145 (29 Jan 2026) to about A$0.08 (Jul 2026), about -45% (derived), despite positive technical news | InvestSMART |
Valuation Snapshot
| Multiple | Value | Comment |
|---|---|---|
P/B | About 2.2x (range 2.0–2.3x) | Book value A$16.1M |
Enterprise value | About A$32M | Market cap less cash; no debt |
EV per resource ounce, 100% basis | About A$267/oz | 120koz |
EV per attributable ounce (80%) | About A$333/oz | 96koz attributable |
Market cap / attributable Scoping NPV8 | About 0.23x | 80% of A$188M = A$150M; pre-tax, scoping-level, before financing and dilution |
Capital Markets — Analyst consensus
| Item | Detail | Source |
|---|---|---|
Analyst consensus | Not covered by a major broker | Market Index |
Dividend history and policy | No dividends ever paid; directors do not recommend a dividend | Market Index; FY2026 AR |
Credit ratings (Moody's, S&P, Fitch) | Not rated | — |
Debt maturity profile | No debt | FY2026 AR |
Key Events
| Event | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Gross equity raised (AUD K) | 3,123.6 | 0 | 3,105.7 | 2,200.0 | 7,090.5 |
Issue price, consolidation-adjusted (A$ cents) | 16.5 | — | 6.75 | 4.95 | 5.25 |
Analyst Conclusions
Guidance and expectations
Management guidance:
-
BFS publication in Q3 2026. This was not confirmed as released at the research date, and Market Index displayed an unconfirmed halt flag.
-
Exploration aircore to be completed in Q4 2026.
-
Production "before the end of the year" (May 2026 interview).
-
No financial guidance.
Consensus. None; there is no broker coverage.
Bull case
-
Grade-driven economics with price leverage. At A$5,500/oz the Scoping Study already shows NPV8 A$188M and IRR 165%. Gold is reportedly well above that, and each +A$500/oz adds about A$37M of NPV8. An attributable NPV about 4x the current market cap leaves room for a significant re-rating on BFS delivery.
-
De-risked across tenure, metallurgy and confidence. The granted mining lease, native-title agreement, 98–99% recoveries and 30koz Measured resource remove the most common pre-production failure points for toll-treat juniors.
-
Low capital and fast payback. A$3.0M open-pit pre-production capital and a 14-month payback suggest the project can be financed with a modest, possibly non-equity, package.
Bear case
-
Funding gap and dilution. Cash of about A$3M against about A$21M peak negative cash flow, plus serial dilution history (408M shares versus about 181M equivalent in FY2022), implies a large equity component. That would erode per-share NPV capture.
-
Commercial dependence. No toll or OPA agreement is signed. Mill owners hold bargaining power and could impose treatment charges, discounts or scheduling that compress margins well below scoping assumptions.
-
Execution and reconciliation risk on a small, nuggety ore body. About half the ounces sit in a narrow bonanza core. Grade under-call or dilution, combined with a 61-month life, gives little margin for error. Schedule slippage (BFS moved from mid-2026 to Q3 2026) is already evident.
Catalysts and monitorables (next 12 months)
| Catalyst / monitorable | Expected timing | What to watch |
|---|---|---|
| BFS release and maiden Ore Reserve | Q3–Q4 2026 | Reserve ounces and grade, capex, AISC, NPV/IRR at updated gold price; vesting of the 666,666 MD rights |
| September 2026 quarterly | ~28 Oct 2026 | Cash balance; capital-raising disclosure |
| Clarification of trading status | Imminent | Whether a halt relates to the BFS, financing or both |
| Toll treatment / OPA signing | H2 2026–H1 2027 | Counterparty, charges, capacity and timing |
| Project financing package | H2 2026–2027 | Debt / equity / offtake mix; dilution |
| Environmental approval and L40/53 grant | 2026–2027 | Triggers WTAC milestone payments |
| Western Resources' election post-BFS | After BFS | Contribution versus dilution |
| Aircore results (east / NE) | Q4 2026–Q1 2027 | New discoveries extending mine life |
| First ore delivery | 2027 (analyst estimate; management guided end-2026) | Vesting of the final 666,667 MD rights |
Analyst verdict
Carnavale Resources has done what most ASX micro-cap explorers never do. It turned an under-cover aircore anomaly into a granted mining lease, a native-title agreement, a Measured and Indicated-dominated high-grade resource and DFS-quality metallurgy in about four and a half years. On those technical dimensions, the KGP is substantially de-risked.
The Scoping Study's economics are striking for the capital involved:
-
pre-tax NPV8 A$188M;
-
IRR 165%;
-
14-month payback;
-
A$3M open-pit pre-production capital.
The market capitalisation of about A$33–37M implies only about 0.2x attributable scoping NPV. In other words, investors are applying a heavy discount for what remains unresolved.
That discount is rational because the outstanding risks are commercial and financial, not geological:
No mill agreement: A toll-treat model is only as good as its mill agreement, and none has been signed.
Funding: Cash of about A$3M at 30 June 2026 cannot fund a project with about A$21M peak negative cash flow. The company's own history points to equity-led solutions, with share-count growth of roughly 2.25x since FY2022.
Ownership and scale: The 80% interest and a mine life of roughly five years cap the size of the prize and limit financier interest.
Credibility of timelines: Repeated BFS slippage and an end-2026 production target that looks unrealistic weigh on management credibility.
Verdict. Carnavale is a high-quality, small-scale, binary development story. The BFS, together with an executed toll or OPA agreement, are the two events that would justify a structural re-rating toward NPV. Of the two, the mill agreement is arguably the more important.
Investors should focus on three items:
-
the terms of the next capital raise relative to BFS NPV;
-
the identity and economics of the processing counterparty;
-
reconciliation of the bonanza core in the first months of mining.
Absent those, the shares are likely to stay range-bound despite favourable gold prices. With them, the gap between price and value could narrow quickly.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Appointed | Background | Education |
|---|---|---|---|---|
Andrew Beckwith | Independent Non-Executive Chairman (Chair since 27 Nov 2025) | 29 Jul 2014 | Geologist with about 40 years' experience. Former MD of Westgold, where resources grew to about 5Moz. Former technical director of De Grey Mining (26 Oct 2017–5 May 2025; De Grey was acquired by Northern Star in a deal valuing it at about A$6bn). Early-stage Tropicana discovery team (AngloGold Ashanti) | BSc Geology; AusIMM |
Humphrey Hale | Managing Director (CEO from 1 Jun 2021; MD from 1 May 2026) | Joined Jul 2020 | Exploration Manager at Sunrise Dam (AngloGold Ashanti); MD of Wolf Minerals; Technical Director of Infinity Lithium. Competent Person for exploration results | BSc; MAIG |
Rhett Brans | Independent Non-Executive Director | 17 Sep 2013 | Civil engineer with more than 50 years' experience in treatment-plant design and mine development (gold in Ghana; Cu/Li in the DRC; graphite in Mozambique; Australia). Director of AVZ Minerals; former director of Australian Potash (to 2 Feb 2024) | MIEAust, CPEng |
Paul Jurman | Company Secretary | 22 Nov 2006 | CPA. Also company secretary of Tempest Minerals, Diablo Resources, Lord Resources, Desert Metals and Platina Resources | BCom, CPA |
Ron Gajewski (former) | NED, previously Chairman | 18 Oct 2006 to 30 Jun 2026 | Accountant and corporate adviser; director since before the IPO | BBus (CPA) |
Directors' Remuneration
| KMP | Directors' fees (AUD) | CEO fees (AUD) | Super (AUD) | Equity-based (AUD) | Total (AUD) | % performance-related |
|---|---|---|---|---|---|---|
A. Beckwith | 56,667 | 0 | 6,800 | 99,431 | 162,898 | 61.04 |
H. Hale | 46,666 | 191,667 | 28,600 | 182,445 | 449,378 | 40.60 |
R. Brans | 41,042 | 0 | 4,925 | 49,715 | 95,682 | 51.96 |
R. Gajewski | 51,567 | 0 | 0 | 99,431 | 150,998 | 65.85 |
Total | 195,942 | 191,667 | 40,325 | 431,022 | 858,956 | — |
Directors' Remuneration (Annual)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Total KMP remuneration (AUD K) | 394.1 | 386.8 | 685.6 | 390.3 | 859.0 |
of which share-based (AUD K) | 45.8 | 0 | 297.1 | 0 | 431.0 |
CEO / MD total remuneration (AUD K) | 262.1 | 254.2 | 346.7 | 256.5 | 449.4 |
Share-Based Incentives
| Tranche | Rights | Vesting condition | Status |
|---|---|---|---|
| 1 | 333,333 | Mining lease grant | Vested and exercised Feb 2026 |
| 2 | 666,666 | Board-accepted BFS | Unvested |
| 3 | 666,667 | First 50,000t of ore delivered to a mill or first 2,000oz refined | Unvested |
Board & Management Changes
| Date | Change | Context |
|---|---|---|
27 Nov 2025 | Beckwith becomes Chairman; Gajewski becomes NED | Board refresh ahead of development |
1–5 May 2026 | Hale appointed MD (from CEO) | Formalises executive leadership into development |
30 Jun 2026 | Gajewski retires | Founding director exits after about 20 years |
Major Shareholders
| Holder | Shares | % of 408.07M (derived) | Options | Rights |
|---|---|---|---|---|
A. Beckwith | 13,000,000 | 3.19 | 2,000,000 | — |
H. Hale | 852,813 | 0.21 | 2,000,000 | 1,333,333 |
R. Brans | 428,571 | 0.11 | 1,000,000 | — |
R. Gajewski (retired; at 30 Jun 2026) | 20,316,139 | 4.98 | 2,000,000 | — |
Major Shareholders (Annual)
| Holder | Shares (pre-consolidation) | % (Sep 2025) |
|---|---|---|
Troca Enterprises Pty Ltd (Coulson Super A/C) | 449,972,153 | 11.00 |
Equity Trustees Ltd (Lowell Resources Fund A/C) | 270,803,030 | 6.62 |
Mr Philip David Reese | 226,740,010 | 5.54 |
Mr Michael and Mrs Susan Lynch (Lynch Super A/C) | 194,127,613 | 4.75 |
Vienna Holdings Pty Ltd (Ronjen Super A/C; Gajewski-associated) | 171,410,227 | 4.19 |
BNP Paribas Nominees (Clearstream) | 136,535,705 | 3.34 |
Penand Pty Ltd (Beckwith Super Fund A/C) | 99,543,188 | 2.43 |
Western Resources Pty Ltd | 65,000,000 | 1.59 |
Mr Kaide Wang | 61,000,000 | 1.49 |
Wersman Nominees Pty Ltd | 60,375,000 | 1.48 |
Major Shareholders — Phillip John Coulson
| Holder | Stake | Notice date | Source |
|---|---|---|---|
Phillip John Coulson | 13.14% | 14 Sep 2025 | Market Index |
Cremorne Capital / Lowell Resources Fund | 6.62% | 14 Sep 2025 | Market Index |
Philip David Reese | 5.31% | 14 Sep 2025 | Market Index |
Lowell Resources Funds Management | 4.42% (18,053,535 post-consolidation shares) | 6 Mar 2026 | Investing.com |
Competitive Landscape
Key Competitors
| # | Company (ticker) | Relationship to Carnavale | Relative positioning (qualitative) |
|---|---|---|---|
| 1 | Genesis Minerals (GMD) | Major Leonora producer and mill owner (Gwalia / Leonora area); a potential toll / OPA counterparty, and a competitor for regional ore feed | Mid-tier producer; vastly larger |
| 2 | Vault Minerals (VAU) | Leonora-region producer (King of the Hills); a potential mill counterparty | Mid-tier producer |
| 3 | Northern Star Resources (NST) | Kalgoorlie-region mill owner; potential counterparty | Senior producer |
| 4 | Bellevue Gold (BGL) | High-grade Leonora-district producer; benchmark for grade-led valuation | Producer |
| 5 | Ora Banda Mining (OBM) | Goldfields producer with its own mill | Producer |
| 6 | Horizon Minerals (HRZ) | Goldfields junior pursuing toll / ore-sale mining models; direct competitor for mill slots and capital | Small producer / developer |
| 7 | Brightstar Resources (BTR) | Menzies / Laverton developer using third-party milling; direct model comparable | Junior developer |
| 8 | Metalicity / Nex Metals Explorations | Holders of adjacent McTavish tenure at Kookynie (per FY2023 AR); nearest geographic peers | Junior explorers |
| 9 | Saturn Metals (STN) | Eastern Goldfields gold developer competing for capital | Junior developer |
| 10 | Torque Metals (TOR) | Goldfields high-grade explorer competing for capital | Junior explorer |
Competitor Detail
| Metric | Carnavale (CAV) |
|---|---|
Revenue FY2026 | A$0.25M (interest and fees only) |
Growth | Pre-revenue |
R&D / exploration intensity | A$3.9M exploration in FY2026 |
Resource | 120koz @ 4.4 g/t (100% basis) |