Carnegie Clean Energy

Company Profile Analysis

Ticker: CCE.AX

ESOMAR 23 Corporate BadgeISO Certifications Badge
Carnegie Clean Energy - Energy & Power showcase

Year Founded & Workforce

1987

200 Employees

Industry

Energy & Power

Services

Wave Energy-CETO
Carnegie Clean Energy logo

Carnegie Clean Energy Employee Contacts

We don't hold contact details for this company yet — you can request them.

Request Employee Contacts

Carnegie Clean Energy Overview

Carnegie Clean Energy is a pre-commercial Australian wave energy technology developer whose principal asset is the proprietary CETO submerged point-absorber wave energy converter, carried on its balance sheet at A$18.9 million. After a troubled 2016–2019 diversification into solar and battery microgrids that ended in large write-downs and the exit of its Energy Made Clean subsidiary, the company has been rebuilt as a lean, grant-leveraged technology house with its operational centre of gravity in Europe. Its near-term value hinges on a single event: the staged ocean deployment of a grid-connected CETO unit at Spain's Biscay Marine Energy Platform (BiMEP) under the ACHIEVE Programme, scheduled to begin in October 2026. A spin-off product, MoorPower, targets diesel displacement on aquaculture feed barges. Revenue (A$0.45M in FY2026) comes almost entirely from a legacy solar-battery microgrid supplying the Department of Defence at Garden Island, WA. The company is loss-making, lightly capitalised and carries a going-concern material uncertainty.


Company's own description

In its FY2026 Financial Report the company states that the principal activity of the Group during the year was the development of the CETO Wave Energy Technology. Its standard corporate boilerplate describes Carnegie as a technology developer focused on delivering ocean energy technologies, the owner and developer of the CETO and MoorPower technologies, which capture energy from ocean waves and convert it into electricity, operating from Australia with wholly owned international subsidiaries (notably CETO Wave Energy Ireland and Carnegie Technologies Spain). The FY2026 Directors' Report also describes an "Other Products" activity: using the wave energy IP portfolio and know-how to investigate remote-power applications for Defence, aquaculture and data centres.

Independent characterisation

Carnegie is best understood as a single-technology, pre-revenue IP developer with a small legacy utility cash stream. It sits at the very upstream end of the ocean-energy value chain: concept, design, numerical modelling, controls software, component specification and system integration. Fabrication and assembly are outsourced (power take-off assembly by SKF in Germany; the electrical module with Basque supplier SEI), and offshore installation is subcontracted to marine contractors. It does not own manufacturing capacity, vessels or large-scale project pipelines in operation.

The company's funding model is distinctive and central to the investment case. Rather than fund development wholly from equity, Carnegie stacks non-dilutive sources: (i) competitive pre-commercial procurement (EuropeWave PCP, €3.75M for the ACHIEVE Project); (ii) national and regional grants (Spain's RENMARINAS DEMOS programme, €1.2M; Basque Energy Agency EVE, €2.1M); (iii) EU Horizon Europe collaborative research (COIN, €4M consortium budget); (iv) the Australian R&D Tax Incentive and the sale of Spanish R&D tax deductions; and (v) Blue Economy CRC co-funding for MoorPower. Under its accounting policy, grants relating to capitalised development are offset against the intangible asset rather than recognised as income, which is why reported "revenue" is tiny even in years when several million dollars of grant cash is received.

Revenue model and mix (FY2026)

Revenue / income stream (FY2026, AUD)AmountShare of total revenue and other incomeModel type
Garden Island Microgrid electricity sales (recognised over time)453,77474.6%Utility / power purchase (Electricity Supply Agreement with Department of Defence)
Interest income42,8647.0%Treasury
Net gain on disposal of fixed assets59,6569.8%Non-recurring
Rental income (sub-lease to Secure Energy)15,8512.6%Property
Other income36,4906.0%Miscellaneous
Total revenue and other income608,635100%—

Source: FY2026 Financial Report, Note 2. Product sales, subscription or licensing revenue: nil. The intended long-run model (per the company's impairment methodology) is IP licensing and royalties on CETO units sold into third-party projects, plus potential project development equity and MoorPower product sales.

Customer types and end-markets

End-marketStatusCustomer / counterparty type
Utility-scale grid-connected wave energy (CETO)Pre-commercial; first European demonstrator deploying from October 2026; 6 MW array at concept/MOU stageUtilities, project developers, governments (EuropeWave buyers group of Wave Energy Scotland and Basque Energy Agency acting as procurers)
Aquaculture feed-barge power (MoorPower)Preliminary commercial-scale design complete; seeking aquaculture host for commercial pilotSalmon and finfish aquaculture operators (initial work with Tasmanian operators via Blue Economy CRC)
Defence remote/offshore powerExploratory; ASCA Pitch Day award (Nov 2025)Australian Department of Defence; potentially allied navies
Offshore finfish arrays (US)Technical study under US TEAMER (Kelson Marine)US aquaculture sector, US DOE-supported programmes
Data centresExploratory (named in FY2026 strategy)—
Legacy microgrid power salesOperating; output constrained by equipment issuesAustralian Department of Defence (HMAS Stirling, Garden Island)

Strategy

Stated strategy (themes from FY2026 Directors' Report)

The company's strategy, in its own framing, rests on five themes:

  1. Focus on core products. As a technology developer, Carnegie concentrates on commercialising CETO and MoorPower.

  2. Astute capital management through non-dilutive support. For CETO, the company assembled EuropeWave (€3.75M), Spanish Government (€1.2M) and Basque Government (€2.1M) support to deliver its first European deployment through ACHIEVE, describing Europe as the most attractive current jurisdiction for wave energy.

  3. Demonstrate to attract partners. Carnegie's EuropeWave bid ranked first of three finalists, giving it first choice of deployment site (BiMEP). Management intends to use the ACHIEVE deployment to attract a partner to drive future projects, starting with a 6 MW array at BiMEP, and highlights independent third-party validation from EuropeWave as an input to partner investment decisions.

  4. MoorPower customer confidence. Demonstrate the technology on a working aquaculture feed barge with a strategic aquaculture partner, working through the Blue Economy CRC.

  5. Adjacent remote-power markets. Apply the wave IP portfolio to Defence, aquaculture and data-centre power needs.

Strategic initiatives register (last 24 months, to October 2026)

InitiativeDateDescriptionStatus
ACHIEVE ProgrammeOngoing since EuropeWave Phase 3 awardBuild, deploy and operate a grid-connected CETO at BiMEP for two yearsAssembly complete or near complete; foundations completed; first-stage ocean deployment targeted October 2026
BiMEP installation contractApr 2025c. €600,000 contract covering berth, subsea cable, connector, fibre optics, onshore substation and office spaceSigned
SKF manufacturing partnershipMay 2025PTO manufacture and assemblyActive; first PTO module delivered to SKF Germany for final assembly (mid-2026)
6 MW CETO arrayMOU Aug 2025Six 1 MW commercial-scale CETO units at BiMEP using existing offshore cable and grid connectionDevelopment commenced; partner and financing NPD
COIN (Horizon Europe)Sep 2025€4M consortium validating controls innovations targeting 30% cost-of-energy reductionActive
MoorPower Commercial PilotFY2025–FY2026Preliminary design (A$335k, BE CRC) completed; host selectionPartner discussions ongoing
Defence: Energy Autonomy at SeaNov 2025ASCA Pitch Day; Power and Energy Innovation AwardExploratory
US TEAMERMay 2026Finfish array with distributed WEC power, with Kelson MarineTechnical support stage
US market entryOct 2024 onwardCarnegie Clean Energy LLC; placement funds earmarked for US business developmentEarly-stage
Data centre remote powerFY2026Named as target applicationExploratory; no details

Sustainability/ESG commitments: The company's mission is decarbonisation through ocean energy; no formal corporate emissions targets were identified.

Cost programmes: None with quantified targets. The impairment model assumes net R&D spending of about A$2M per year, after grants and R&D refunds, through 2026.

Medium-term guidance

Carnegie provides no revenue, earnings or cash-flow guidance. Its forward-looking statements are milestone-based: first-stage CETO ocean deployment in October 2026, followed by progressive deployment, commissioning, testing and optimisation; a two-year operating period at BiMEP; and a follow-on 6 MW array. Management states it cannot say with certainty when the group will become profitable and expects net operating cash outflows until it reaches positive cash flow.

Products & Services

CETO (core wave energy converter)

AttributeDetail
DescriptionFully submerged point-absorber wave energy converter. A buoyant actuator sits a few metres below the surface and moves with the orbital motion of passing waves; tethers transmit this motion to a power take-off (PTO) that generates electricity.
GenerationsCETO 3 (early test unit, approx.); CETO 5 (Perth Wave Energy Project, c. 2015, hydraulic PTO); CETO 6 (1 MW design concept, c. 2015–2018); current CETO (electric PTO, three PTO modules plus an Electrical Module, AI-enabled controls)
Key capabilitiesSubmerged operation for storm survivability and minimal visual impact; multi-tether electric PTO; advanced control algorithms (developed with partners including Hewlett Packard Enterprise); negligible onboard fluids or chemicals (cited by the company as an ESG advantage)
ACHIEVE unitScaled, grid-connected CETO unit; three PTO modules (generators, tensioners, shafts, couplings, bearings, seals, sensors) assembled with SKF in Germany; Electrical Module completed with Basque supplier SEI; to be installed on foundations at BiMEP and connected to the site's existing export cable; planned two-year operating period. Rated capacity of the ACHIEVE unit: NPD in sources reviewed.
Commercial unit1 MW commercial-scale CETO unit (basis for proposed 6 MW BiMEP array of six units)
Target customersUtilities, offshore renewable project developers, islands and remote grids, governments pursuing ocean energy targets
Pricing modelNot disclosed; impairment model assumes licensing at a 3%–5% royalty (midpoint 4%) on CETO units sold into a minority share of forecast installed wave capacity
Flagship programmesACHIEVE (BiMEP, Spain); 6 MW CETO array (BiMEP, MOU); COIN (Horizon Europe)

MoorPower

AttributeDetail
DescriptionCETO-derived wave energy product designed to supply power to marine industries operating at fixed moored locations, reducing diesel use
Initial marketAquaculture feed barges
Development statusScaled Demonstrator completed (prior period); MoorPower Commercial Pilot Preliminary Design project (A$335,000, Blue Economy CRC funded) completed in FY2026; energy models refined with GPS data from active Tasmanian feed barges and ROV footage of mooring lines
Next stepCommercial pilot integrating MoorPower units on an operating barge; discussions with potential aquaculture hosts ongoing
Pricing modelNPD

"Energy Autonomy at Sea" (Defence concept)

Wave-powered renewable energy for deployable and fixed offshore defence sites, pitched to senior Defence officials at the Advanced Strategic Capabilities Accelerator (ASCA) Pitch Day in Sydney (November 2025), where Carnegie was one of 30 invited companies and received the Power and Energy Innovation Award. Product specification, customer contract and pricing: NPD.

Distributed WEC power for offshore finfish arrays (US)

Project titled "Development of a Finfish Array with Distributed WEC Power Integration", selected for the final stage of technical support under the US TEAMER (Testing Expertise and Access to Marine Energy Research) programme, with numerical modelling by Kelson Marine. Announced 7 May 2026. A study-stage activity rather than a product.

Garden Island Microgrid (legacy operating asset)

AttributeDetail
DescriptionSolar photovoltaic and battery storage microgrid at Garden Island, WA, selling all output to the Department of Defence under an Electricity Supply / Power Supply Agreement
FY2026 revenueA$453,774 (FY2025: A$317,363)
Carrying valueMicrogrid/battery asset A$1,545,144 at 30 June 2026, depreciated over 15 years (A$225,953 p.a.)
O&MProvided by Secure Energy Pty Ltd (jointly owned by director Grant Mooney and CEO Jonathan Fievez); FY2026 payments A$166,247 incl. GST
StatusOperational and equipment issues constrain output; the Directors note the asset may be sold if liquidity requires
Detailed capacity ratingNPD in FY2026 filings

Research and collaborative projects (service-like activities)

ProjectRoleFundingStatus
COIN (Control Oriented Innovations for future wave energy farms)Carnegie's CETO is the reference WEC; aim to validate innovations cutting cost of energy by 30% for commercial arrays€4M consortium, 100% EU Horizon Europe; Carnegie Technologies Spain received €287,344 upfront (75% of its expected share) in Dec 2025Commenced Sep 2025
WECHULL+ParticipantNPDOngoing
MEGA WAVE PTOParticipantNPDOngoing
Modular electrical systems project (CETO Wave Energy Ireland as industry partner)Industry partnerSecured funding (H1 FY2025 report)Ongoing (details NPD)

Financial Narrative

Income statement

Notes and sources: Sales revenue and net loss FY2022–FY2026 from the five-year table in the FY2026 Remuneration Report. FY2024 total revenue and other income derived from the FY2025 Appendix 4E (FY2025 total of A$405,371 represented a 9.4% decline). FY2024 EPS from Simply Wall St (consolidated basis). Derivations: operating loss = loss before tax + finance costs − interest income; EBITDA = operating loss + depreciation (FY2026: −2,760 + 931 − 43 + 248; FY2025: −2,316 + 601 − 70 + 282). Note that FY2025 "employee share-based payments" of A$48,523 exclude the A$573,162 option value attributed to the loan, which flows through finance costs via amortised deferred borrowing costs.

Margins and growth

Revenue CAGR FY2022–FY2026 (4 years): 9.0% (derived: 454/322 to the power of 0.25). The FY2026 gross margin spike reflects cost of sales falling from A$167k to A$11k, which the filings do not explain; it likely reflects reclassification of O&M costs or non-recurring FY2025 repairs and should not be treated as a structural improvement.

Commentary. The income statement is not the right lens for valuing Carnegie, but three observations matter. First, sales revenue is small, volatile and tied to a single ageing asset whose output is constrained; FY2026's 43% increase reflects improved availability or tariff effects rather than growth in the core business. Second, the cash cost base is stable at roughly A$3.4M of gross expenses before the capitalisation credit, and the reported loss has crept up mainly because of finance costs (A$931k in FY2026 versus A$601k), driven by the 15% Ballamena loan and amortisation of option-based borrowing costs. Third, the unusually low FY2023 loss (A$0.63M) stands out against a A$1.9M–A$2.8M run-rate; the cause (likely higher capitalisation, grant or R&D refund timing) is not explained in the sources reviewed.

Balance sheet

Sources: FY2026 Financial Report (statements of financial position and changes in equity, Notes 8, 11, 13, 17, 18). FY2023 equity of c. A$21.2M from InvestSMART (secondary). FY2024 PP&E is the sum of opening FY2025 microgrid (A$1,997k) and plant (A$60k) balances. Short-term debt FY2026 = Ballamena loan A$2,500,000 + other short-term borrowings A$71,193. Net debt = debt − cash.

Commentary. The balance sheet is dominated by a single Level-3 intangible (82% of total assets) that has never been amortised because it is "not yet ready for use". Its recoverable amount is tested using a relief-from-royalty model with a 19% discount rate, 15-year forecast plus terminal value and 3%–5% royalty, which the auditor flags as a Key Audit Matter. Shareholders should recognise that tangible book is effectively nil (NTA per share −0.01 cents at 30 June 2026). Liquidity deteriorated sharply in FY2026: cash fell 66% to under A$1M, working capital deficit doubled to A$2.46M, and the group moved from net cash to net debt. The A$2.5M July 2026 placement and the A$1M loan upsizing in August 2026 partially repair this, but the A$3.5M facility falls due on 30 June 2027. The A$784k RENMARINAS liability represents grant cash received in advance and already partially spent, so it is not a cash buffer.

Cash flow statement

Free cash flow defined as operating cash flow plus net investing cash flow, because development grants are received through investing activities. Net borrowings FY2026 = proceeds 120 − repayments/borrowing costs 49 − transaction costs 616; FY2025 = proceeds 2,500 − borrowing costs 316.

Commentary. The company burns roughly A$3M–A$3.5M a year of free cash flow even after A$4.4M–A$4.6M of annual grant receipts. Gross development spending rose 28% in FY2026 to A$4.9M as ACHIEVE moved into fabrication. The large FY2026 "transaction costs related to loans and borrowings" (A$616k) is notable and is not itemised in the filings. Funding has come in roughly equal parts from equity (SPP plus options, A$2.33M in FY2026), debt (A$2.5M in FY2025) and tax/grant monetisation (Spanish R&D deduction sale €773k; ATO refund A$569k).

Ratios

Derived from FY2026 Financial Report. ROA FY2025 not computed because FY2024 total assets were not available. Runway = 30 June 2026 cash ÷ (FY2026 operating cash outflow ÷ 12).

Overall financial trend assessment. Carnegie's financial trajectory over five years is one of stable, modest losses (A$0.6M–A$2.8M) funded by repeated small capital raises, with the development asset growing by about A$1M–A$2M a year net of grants. The inflection point is not financial but technical: until CETO demonstrates performance at BiMEP, the company remains a cash-consuming option on wave energy commercialisation, with financing risk as its dominant near-term variable.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Business Lines

Business lineLegal vehicle(s)ContentsFY2026 P&L revenue

CETO wave energy

CETO IP (Australia) Pty Ltd; CETO Wave Energy Ireland Ltd; Carnegie Technologies Spain S.L.; CETO Wave Energy UK Ltd

ACHIEVE Programme, 6 MW array development, COIN, WECHULL+, MEGA WAVE PTO

Nil (grant receipts capitalised)

MoorPower

Parent / Australian entities

Commercial pilot design, aquaculture engagement

Nil

Other products (Defence, aquaculture, data centres)

Parent; Carnegie Clean Energy LLC (US)

ASCA, US TEAMER

Nil

Garden Island Microgrid

Parent / Australian subsidiaries

Solar-battery system selling power to Defence

A$453,774

Revenue by Segment and Segment Margins & Growth (%)

MetricFY2024FY2025FY2026

Segment sales revenue (AUD K)

347317454

Segment loss after tax (AUD K)

-2,320-2,328-2,766

Sales revenue YoY growth (%)

—-8.543.0

Net margin on sales revenue (%)

-669-733-609

Contribution to group revenue (%)

100100100

Income Statement and Per-Share Data

MetricFY2022FY2023FY2024FY2025FY2026

Sales revenue (AUD K)

322384347317454

Total revenue and other income (AUD K)

——447405609

Cost of sales (AUD K)

———16711

Gross profit (AUD K)

———150443

Operating loss before net finance costs (AUD K, derived)

———-1,785-1,872

EBITDA (AUD K, derived)

———-1,503-1,624

Finance costs (AUD K)

———601931

Loss before tax (AUD K)

———-2,316-2,760

Net loss after tax (AUD K)

-1,925-630-2,320-2,328-2,766

Basic and diluted EPS (AUD cents)

——-0.7-0.64-0.69

Dividends per share (AUD cents)

00000

Weighted average shares (millions)

———313.6399.6

Margin Analysis (%)

MetricFY2022FY2023FY2024FY2025FY2026

Sales revenue YoY growth (%)

—19.2-9.6-8.543.0

Gross margin (%)

———47.397.6

Operating margin (%)

———-562-413

EBITDA margin (%)

———-474-358

Net margin (%)

-598-164-669-733-609

Balance Sheet and Per-Share Data

MetricFY2023FY2024FY2025FY2026

Total assets (AUD K)

——24,62023,102

Cash and equivalents (AUD K)

—3,7292,899996

Short-term debt (AUD K)

——2,1252,571

Long-term debt (AUD K)

——00

Net debt (AUD K, derived)

——-7741,575

Total equity (AUD K)

21,20021,09819,23718,849

Intangibles: CETO development asset (AUD K)

—15,46517,75118,877

Goodwill (AUD K)

—000

Property, plant and equipment (AUD K)

—2,0571,8121,556

Working capital (AUD K, derived)

——-1,237-2,461

Unearned grant liability: RENMARINAS (AUD K)

——1,870784

Net tangible assets per share (AUD cents)

——0.41-0.01

Accumulated losses (AUD K)

—-191,040-192,425-195,154

Cash Flow

MetricFY2022FY2023FY2024FY2025FY2026

Operating cash flow (AUD K)

———-3,474-3,087

Payments for development of assets, capex (AUD K)

———-3,844-4,902

Receipts for development of assets, grants (AUD K)

———4,4184,578

Net investing cash flow (AUD K)

———574-324

Free cash flow (AUD K, derived)

———-2,900-3,411

Equity issued net of costs (AUD K)

———02,314

Net borrowings and borrowing costs (AUD K)

———2,184-545

Dividends paid (AUD K)

00000

Share buybacks (AUD K)

00000

Net change in cash (AUD K)

———-821-1,747

Returns & Leverage Ratios (%) and Financial Ratios (x)

RatioFY2025FY2026

Return on average equity (%)

-11.5-14.5

Return on average assets (%)

—-11.6

Current ratio (x)

0.770.42

Debt to equity (x)

0.110.14

Interest coverage, EBIT to finance costs (x)

-3.0-2.0

Asset turnover, sales to average assets (x)

—0.019

Cash runway at FY2026 operating burn, pre-placement (months)

—3.9

Revenue by Region and Region Margins & Growth (%)

Region (sales revenue)FY2024FY2025FY2026

Australia (AUD K)

347317454

Europe (AUD K)

000

Americas (AUD K)

000

Australia YoY growth (%)

—-8.543.0

Funding Inflow by Geography Details

Funding inflow by geography (FY2026, as disclosed)AmountSource

Spain: sale of CY2025 R&D tax deductions (Carnegie Technologies Spain)

€773,163 (A$1.37M)

FY2026 Directors' Report

EU / Spain: COIN upfront grant

€287,344

FY2026 Directors' Report

EuropeWave Phase 3 milestone payments (CETO Wave Energy Ireland)

Several milestones; amounts NPD except a €64k milestone in the June 2026 quarter

ASX quarterly summary

Australia: ATO R&D Tax Incentive refund (FY2025 claim)

A$568,630

FY2026 Directors' Report

Australia: Blue Economy CRC (MoorPower)

Project value A$335,000

FY2026 Directors' Report

Share Price and Share Count (millions)

MetricFY2022FY2023FY2024FY2025FY2026

Year-end share price, consolidated basis (AUD)

0.100.050.100.050.20

Year-end shares on issue (millions)

——366.2366.2411.5

Year-end market capitalisation (AUD Mn, derived)

——36.618.382.3

Performance Window Details

Performance window (to 30 Jun 2026, price basis)Return

1-year (Jun 2025 to Jun 2026)

+300%

3-year (Jun 2023 to Jun 2026)

+300%

4-year (Jun 2022 to Jun 2026)

+100%

5-year

Not computed (FY2021 consolidated-basis price NPD)

Intra-2026 path

c. A$0.06–0.07 (Jan–Apr 2026) to c. A$0.19 (19 May) to A$0.20–0.24 (Jun–Jul) to A$0.175 (29 Jul)

Valuation Snapshot

MultipleValueBasis

Market capitalisation

c. A$74.4M

425.4M shares

Enterprise value

c. A$73.6M

Market cap + debt A$2.57M − cash (A$0.996M + c. A$2.35M net placement proceeds)

EV/Sales (FY2026)

c. 162x

A$73.6M / A$0.454M

P/B (30 Jun 2026 book)

c. 3.9x

A$74.4M / A$18.85M

P/B (pro forma post-placement book c. A$21.2M)

c. 3.5x

Derived

EV / CETO asset carrying value

c. 3.9x

A$73.6M / A$18.9M

Capital Markets

ItemDetail

Facility

Ballamena Pty Ltd ATF Ellann Finance Unit Trust

Limit

A$3.5M (increased from A$2.5M on 26 Aug 2026)

Drawn at 30 Jun 2026

A$2.5M

Interest

15% per annum, fixed

Maturity

30 June 2027 (extended 14 Jul 2026)

Security

Featherweight General Security Agreement over company assets

Fees

Original: 50M options at A$0.06 (valued A$573,162) plus A$50,000 cash; variations: 10M options at A$0.27 (expiring 14 Jul 2029)

Other borrowings

A$71,193 short-term (likely insurance premium funding)

Share Price & Returns

DateTypeAmount (AUD)Price (AUD)Shares

Sep 2025

Share Purchase Plan

2,116,903

c. 0.057 (derived)

37,138,648

FY2026

Option exercises (cash and cashless)

214,520 cash

0.06 / 0.065

8,132,895

Jul 2026

Placement (overseas investors)

2,500,0000.1813,888,888

Analyst Conclusions

Management guidance

No financial guidance is issued. Operational guidance: first-stage ocean deployment of the ACHIEVE CETO unit at BiMEP from October 2026, beginning with the buoyant actuator, with PTO modules integrated in a later phase, followed by commissioning, testing and optimisation; a two-year operating period; development of a 6 MW CETO array at BiMEP; a MoorPower commercial pilot on a working barge; and continued exploration of Defence, aquaculture and data-centre applications. Management expects continued net operating cash outflows until positive cash flow is achieved and cannot predict when profitability will occur.

Consensus expectations

None (no analyst coverage).

Bull case

  1. Demonstration catalyst: A successful staged deployment and commissioning at BiMEP would make Carnegie one of very few developers with a grid-connected device operating in European waters, directly supporting the 6 MW array and partner discussions that management has made central to its strategy.

  2. Capital efficiency: The company has reached deployment on roughly €7M of non-dilutive programme funding plus tax monetisation, while keeping annual KMP costs near A$0.6M; partner-funded arrays would extend this leverage.

  3. Optionality across markets: Defence (ASCA award), US aquaculture (TEAMER) and MoorPower add multiple adjacent pathways, and A$55.9M of carried-forward tax losses would shelter future profits.

Bear case

  1. Liquidity and refinancing: With A$996k of cash at year-end, a going-concern uncertainty, and a A$3.5M, 15% facility due 30 June 2027, the company will likely need further dilutive raises during the critical testing period, potentially on poor terms if deployment slips.

  2. Single-point technical risk: One unit, one site; supplier, vessel and weather risks are acknowledged by management, and the deployment has already slipped from 2025 to 2026.

  3. Valuation already discounts success: At about A$74M, the market values the company at nearly four times the carrying value of the CETO asset and about 160 times sales after a more than 200% rally in 2026 without new fundamental disclosure, as the May 2026 price query response indicates.

Catalysts and monitorables (next 12 months)

TimingCatalyst / monitorable
Oct 2026Confirmation of first-stage ocean deployment at BiMEP
c. 16 Oct 20262026 Annual Report: top-20 holders, governance statement, any updated risk disclosure
Oct 2026September quarter Appendix 4C (cash post-placement, burn rate)
Nov 2026AGM: director re-elections, any option or placement-capacity resolutions
Q4 CY2026 – H1 CY2027PTO integration, commissioning, first export of power to grid; EuropeWave milestone payments
H1 CY2027FY2026 Australian R&D refund; potential Spanish R&D deduction sale for CY2026
By 30 Jun 2027Repayment, extension or refinancing of A$3.5M Ballamena facility
Ongoing6 MW array partner announcement; MoorPower aquaculture host; Defence or US contracts; Garden Island asset sale (if pursued)
OngoingAny impairment indicator on the CETO asset

Concluding analyst verdict

Carnegie Clean Energy is a high-risk, binary, event-driven exposure to the commercialisation of wave energy, and in October 2026 it stands at the most consequential moment in nearly a decade. After the reputational and financial damage of the 2016–2019 microgrid diversification, which ended in A$47M of write-downs and a CEO change, management has rebuilt a credible, disciplined technology programme. Its signature achievement is assembling roughly €7M of competitive European support, top-ranked independent validation through EuropeWave, a permitted grid-connected berth at BiMEP, and an industrial supply chain led by SKF, all on a shoestring corporate cost base.

The difficulty is that the balance sheet has not kept pace with the technical ambition. The company ended FY2026 with under A$1M of cash, net current liabilities of A$2.5M, an auditor's going-concern flag and expensive secured debt maturing in mid-2027, precisely when the CETO unit will be in its commissioning and early operating phase. The July 2026 placement at A$0.18 shows that capital is available at a much higher price than a year earlier, but the 2026 share-price surge preceded rather than followed demonstrable results.

Our view is that the investment case depends almost entirely on execution at BiMEP over the next two to three quarters. Clean deployment, safe commissioning and early power generation would validate the strategy, strengthen the hand of management in partner negotiations for the 6 MW array, and likely enable refinancing on better terms. Delay or technical failure would expose the company to severe dilution and potential impairment of its principal asset. Governance, with a three-person board and several related-party arrangements, is a secondary but real concern.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Board of Directors

NameRoleAppointedBackgroundEducationAge

Anthony Shields

Non-Executive Chairman (Chair since 5 Feb 2025)

25 Nov 2019

Managing Director of Asymmetric Investment Management Fund Pty Ltd (Perth; private debt, venture capital, risk management); boards of Source Certain International, NWQ Capital, Old Perth Port; investment committee of Canci Group; formerly family-office portfolio manager, Deutsche Bank equities and derivatives, Macquarie Bank equity analyst

B.Bus

NPD

Michael Fitzpatrick AO

Non-Executive Director

28 Nov 2012

Founder of Hastings Funds Management (over A$3.8B managed); early investor in Pacific Hydro and Ord Hydro-Electric Scheme; Alternate Director of Foresight Australia (manager of Australian Renewables Infrastructure Fund); former Rio Tinto Ltd director; former AFL Chairman; Chairman of LATAM Autos

B.Eng (Hons), B.A. (Hons), M.A. (Oxon)

NPD

Grant Mooney

Non-Executive Director and Company Secretary

19 Feb 2008

Principal of Mooney & Partners (corporate advisory and compliance); directorships at Gibb River Diamonds, Accelerate Resources, Talga Group, CGN Resources; former director Aurora Labs (to Nov 2025) and Riedel Resources (to Apr 2025); member of CA ANZ

B.Bus, CA

NPD

Executive Leadership Team

NameTitleTenurePrior rolesEducation

Jonathan Fievez

Chief Executive Officer (not a board member)

CEO since 28 Sep 2018; previously Chief Technology Officer

CTO of Carnegie; experience in research, product development, mechanical and electronic design, IP management and customer liaison

BEng (Mechatronics)

Directors' Remuneration

KMPCash salary and feesSuperannuationShare-based paymentsTotal FY2026Total FY2025

Anthony Shields

85,39210,247095,639636,974

Michael Fitzpatrick

50,0006,000056,00055,750

Grant Mooney (incl. A$60,000 company secretarial fees)

110,0006,0000116,000115,750

Jonathan Fievez

306,71636,8060343,522358,829

Terry Stinson (retired Feb 2025)

000050,131

Total

552,108

59,053

0

611,161

1,217,434

Directors' Remuneration — Board size

ItemDetail

Board size

Three, all non-executive; CEO not on board

Chair/CEO separation

Yes

Independence

The company describes Shields and Fitzpatrick as independent (they form the committee negotiating Secure Energy contracts). Analyst view: Mooney is not independent (paid company secretary; co-owner with the CEO of the microgrid O&M contractor Secure Energy). Shields' entity holds 44.5M options linked to the loan financing arrangements, which a governance-focused investor may regard as a material relationship.

Committees

Separate audit, remuneration or nomination committees not disclosed in sources reviewed; with three directors, these functions are likely handled by the full board (to be confirmed in the 2026 Corporate Governance Statement)

Meetings FY2026

Five board meetings (Mooney 5/5, Shields 5/5, Fitzpatrick 4/5) plus eight circular resolutions

Gender diversity

0% female directors (three male directors)

Board average tenure

About 12.9 years (Simply Wall St)

Remuneration consultants

None used in FY2026

Major Shareholders

HolderSharesOptionsApprox. % of c. 425.4M sharesSource

Michael Fitzpatrick (via Log Creek Pty Ltd)

20,430,70904.8

FY2026 Directors' Report

Anthony Shields (via Asymmetric Credit Partners)

14,616,415 to 15,539,710

44,485,466

3.4 to 3.7

Directors' Report vs Remuneration Report (discrepancy noted)

Grant Mooney (direct and via Ocean Flyers Pty Ltd)

7,000,00001.6

FY2026 Directors' Report

Jonathan Fievez

1,414,63400.3

FY2026 Remuneration Report

Total KMP

c. 43.5M to 44.4M

44.5M

c. 10.2 to 10.4

Derived

Competitive Landscape

Key Competitors

CompetitorCountryTechnologyListingRelative positioning vs Carnegie

CorPower Ocean

Sweden

Submerged-phase-control point absorber (C4/C5)

Private

Generally regarded as a technology front-runner; deployed C4 in Portugal (Aguçadoura); larger private funding base

Mocean Energy

UK

Hinged raft (Blue Horizon / Blue X)

Private

EuropeWave Phase 3 peer; subsea and oil-and-gas niche applications

IDOM (MARMOK-A-5)

Spain

Oscillating water column buoy

Private engineering group

EuropeWave Phase 3 peer; MARMOK-A-5 already deployed at BiMEP

Ocean Power Technologies

US

PowerBuoy surface point absorber plus maritime robotics

NYSE American: OPTT

—

Eco Wave Power

Sweden / Israel

Onshore/breakwater floater systems

Nasdaq: WAVE

Pilot projects (Gibraltar, Jaffa Port, Los Angeles); low-cost onshore model

AW-Energy (WaveRoller)

Finland

Seabed-mounted surge converter

Private

Near-shore niche

Wello (Penguin)

Finland

Rotating-mass floating device

Private

Tested at BiMEP and EMEC

Seabased

Sweden

Linear-generator point absorbers

Private

Array focus

Bombora Wave Power

Australia / UK

Membrane mWave

Private

Australian-origin peer; Pembrokeshire project

Wave Swell Energy

Australia

Oscillating water column (UniWave)

Private

King Island demonstration

CalWave

US

Submerged pressure-differential device

Private

US DOE-backed; directly competes in US market

Minesto

Sweden

Tidal kite (tidal, not wave)

Nasdaq First North

Adjacent ocean-energy competitor for funding

Peer Comparison FY2026

MetricCarnegie (FY2026)CorPower Ocean

Revenue

A$0.45M

Private, NPD

Revenue growth

+43%

NPD

Net margin

-609%

NPD

R&D intensity

Gross dev. spend about 10x revenue

NPD

Grid-connected device in water (Oct 2026)

Deploying (first stage)

Yes (C4, Portugal)

Company Snapshot

$1.72M

Revenue

200

Employees

1987

Founded

Fremantle, Australia

Headquarters

SWOT Analysis

Strengths

  • Independent validation: EuropeWave bid ranked first of three Phase 3 finalists, securing first choice of deployment site (FY2026 Directors' Report).
  • Grant-leveraged funding model: About €7.05M committed for ACHIEVE (EuropeWave €3.75M, Spain €1.2M, Basque €2.1M) plus €4M COIN consortium funding.
  • Permitted, grid-connected site: BiMEP contract (c. €600k) and all Spanish regulatory approvals secured in the June 2026 quarter.
  • Industrial partners: SKF assembling PTO modules; SEI completed the Electrical Module.
  • Experienced, low-cost board: Fitzpatrick's infrastructure and renewables pedigree (Hastings, Pacific Hydro); total KMP cost only A$611k in FY2026.
  • Recurring cash from legacy asset: Garden Island microgrid revenue of A$454k in FY2026, contracted with the Department of Defence.
  • Large tax losses: A$55.9M of revenue tax losses carried forward (unrecognised deferred tax asset), with no expiry.

Weaknesses

  • Going-concern uncertainty: Auditor's material-uncertainty paragraph; net current liabilities of A$2.46M at 30 June 2026.
  • Thin liquidity: Cash of A$996k at 30 June 2026, under four months of operating burn before the July placement.
  • Expensive debt: A$3.5M facility at 15% interest, secured by a general security agreement, maturing 30 June 2027; FY2026 finance costs A$931k exceeded sales revenue.
  • Intangible-dependent balance sheet: CETO asset is 82% of total assets; NTA per share negative.
  • Governance concentration: Three-member board with related-party dealings (Secure Energy, Mooney & Partners) and loan-linked options held by the Chairman's entity.
  • History of capital destruction: Accumulated losses of A$195.2M against A$213.5M share capital; A$47M of write-downs in FY2018.
  • Customer concentration: 100% of sales revenue from one customer.

Opportunities

  • Successful BiMEP demonstration could unlock the 6 MW array and partner capital (strategy statement, FY2026).
  • EU ocean-energy targets (about 1 GW by 2030) require proven devices that do not yet exist at scale.
  • Defence remote power: ASCA award provides access to Defence innovation pathways.
  • US market: TEAMER selection and a US subsidiary position Carnegie for DOE-supported programmes.
  • MoorPower commercial pilot: Completed preliminary design with BE CRC; aquaculture operators face ESG and diesel-cost pressure.
  • Monetisable tax assets: Spanish R&D deduction sales (€773k in Dec 2025) and Australian R&D refunds provide repeatable non-dilutive cash.

Threats

  • Technical failure or delay at BiMEP: Management cites supplier quality, vessel availability, weather and unscheduled maintenance as cost and schedule risks.
  • Funding competition: Management warns that mature technologies may capture a larger share of available public support.
  • Peer outperformance: CorPower and IDOM (already deployed at BiMEP) may capture partner and investor mindshare first.
  • Dilution: 54.5M options outstanding plus likely further raises; SPP in Sep 2025 raised only A$2.1M of a A$3M target.
  • Refinancing risk: Loan maturity 30 June 2027 coincides with the deployment and testing period.
  • Share price volatility: ASX price query in May 2026 after an unexplained rise of more than 200%; re-rating could reverse on any setback.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
5 Feb 2025 (context)Terry Stinson retires; Anthony Shields becomes ChairmanLeadership transition preceding review window
Apr 2025BiMEP installation and testing contract (c. €600k) signed by CETO Wave Energy Ireland and Carnegie Technologies SpainFinalises site access; BiMEP undertakes its own connector upgrade first
Apr 2025Full RENMARINAS grant received in advanceFront-loads Spanish funding
May 2025SKF partnership to manufacture PTO unitsIndustrial partner credibility
Jun 2025Grant award noted in FY2025 Appendix 4E (detail not captured in sources reviewed)Additional non-dilutive funding
Aug 2025MOU with BiMEP for 6 MW CETO arrayFirst articulated commercial-scale project
Aug 2025Share Purchase Plan launched (target A$3M)Equity funding
25 Aug 2025FY2025 results: net loss A$2.33M; revenue and other income A$405kAnnual results
Sep 2025SPP closes, raising A$2.117M (37.1M shares, c. A$0.057 each, derived)Undersubscribed vs A$3M target
Sep 2025COIN Horizon Europe project (€4M) commencesEU research validation
Oct 20252025 Annual Report releasedDisclosure
Nov 2025ASCA Pitch Day; Power and Energy Innovation AwardDefence market entry point
Nov 2025AGM at Swan Yacht Club, East Fremantle; all resolutions passedNo shareholder dissent recorded
Dec 2025Spanish R&D deductions for CY2025 sold for €773,163 (A$1.37M)Non-dilutive cash
Dec 2025COIN upfront payment €287,344 receivedNon-dilutive cash
6 Jan 2026EuropeWave milestone payments receivedACHIEVE progress validated by procurers
25 Feb 2026Half-year results to 31 Dec 2025: revenue from ordinary activities A$270,483 (+45.4%); sales revenue A$237,708; deployment rescheduled to 2026Interim results
23 Feb 2026Chairman fee revised to A$70,000 plus consultingGovernance
Mar 2026ATO R&D Tax Incentive rebate of A$568,630 receivedNon-dilutive cash
30 Apr 2026ACHIEVE Programme update and March quarter 4C: cash A$2.354MLiquidity checkpoint
7 May 2026Selected for US TEAMER technical supportUS aquaculture opportunity
19 May 2026Response to ASX price query after shares rose from c. A$0.059 to c. A$0.19; company cites possible US OTC trading, no undisclosed informationSpeculative re-rating; volatility
9–19 Jun 2026Several Appendix 2A quotation notices (option exercises)Minor dilution, small cash inflows
26 Jun 2026CETO assembly update: Electrical Module complete; PTO modules being assembled with SKF; first-stage ocean deployment targeted October 2026Key de-risking milestone
Jun quarter 2026All Spanish regulatory approvals secured for BiMEP deployment; €64k EuropeWave milestone receivedStage-gate passed
14 Jul 2026Ballamena loan maturity extended to 30 Jun 2027; 5M options at A$0.27 issued as feeRefinancing risk deferred
21–22 Jul 2026Trading halt, then A$2.5M placement at A$0.18 (13.9M shares) to overseas investors; CMC Markets UK 6% feeEquity at materially higher price than 2025 SPP
29 Jul 2026June quarter 4C: cash A$996k at quarter endLow cash pre-placement
26 Aug 2026Ballamena loan increased by A$1M to A$3.5MAdditional debt funding
27 Aug 2026FY2026 Appendix 4E: net loss A$2.77M (+18.8%); going concern material uncertaintyAnnual results
Q3 CY2026CETO foundation structures completed (industry press)Enables October first-stage deployment
Oct 2026Binary catalyst
c. 16 Oct 2026 (scheduled)2026 Annual Report releaseDisclosure (top-20 holders, governance statement)

Product Offering

  • Carnegie Clean Energy
    • Wave Energy-CETO

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

4 charts
Income Statement: Revenue & Gross Profit: Total revenue and other income rose from AUD 0.4 Mn in FY2024 to AUD 0.6 Mn in FY2026.
Carnegie Clean Energy — Income Statement: Revenue & Gross Profit
Series (AUD Mn)FY2022FY2023FY2024FY2025FY2026
Total revenue and other income——0.40.40.6
Sales revenue0.30.40.30.30.5
Cost of sales———0.20
Gross profit———0.20.4

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Sources

  1. Carnegie Clean Energy Ltd, Appendix 4E and Financial Report for the year ended 30 June 2026 (27 Aug 2026) (bulletin.webull.com)
  2. Carnegie Clean Energy Ltd, Appendix 4E, FY2025 (25 Aug 2025) (announcements.asx.com.au)
  3. Carnegie Clean Energy Ltd, Half-Year Report to 31 Dec 2025 (25 Feb 2026) (announcements.asx.com.au)
  4. Carnegie Clean Energy Ltd, Half-Year Report to 31 Dec 2024 (26 Feb 2025) (announcements.asx.com.au)
  5. Carnegie Clean Energy Ltd, 2025 Annual Report (carnegiece.com)
  6. Carnegie Clean Energy Ltd, 2024 Annual Report (carnegiece.com)
  7. Carnegie Clean Energy Ltd, Board Changes (5 Feb 2025) (carnegiece.com)
  8. Carnegie Clean Energy Ltd, BiMEP contract signed for ACHIEVE CETO deployment (carnegiece.com)
  9. Carnegie Clean Energy Ltd, Carnegie Assembling CETO Unit for October Deployment (26 Jun 2026) (bulletin.webull.com)
  10. InvestSMART ASX announcement summaries (Apr–Jul 2026) (investsmart.com.au)
  11. InvestSMART, $2.5M placement summary (22 Jul 2026) (investsmart.com.au)
  12. InvestSMART, June 2026 quarterly summary (investsmart.com.au)
  13. InvestSMART, ASX price query response (19 May 2026) (investsmart.com.au)
  14. Market Index, CCE profile and former names (marketindex.com.au)
  15. EuropeWave, CETO Phase 3 update 2026 (europewave.eu)
  16. Offshore Energy, PTO module assembly update (offshore-energy.biz)
  17. Inspenet, CETO foundations completed (inspenet.com)
  18. RenewEconomy, CEO exit and write-downs (2018) (reneweconomy.com.au)
  19. RenewEconomy, name change to Carnegie Clean Energy (2016) (reneweconomy.com.au)
  20. RenewEconomy, CETO 6 fundraising and CEFC facility (reneweconomy.com.au)
  21. IBISWorld company profile (ibisworld.com)
  22. Fintel, CCE market data (Feb 2026) (fintel.io)
  23. Simply Wall St, CCE management (simplywall.st)
  24. ROIC.ai, CWGYF summary (roic.ai)
  25. Morningstar Australia, CCE profile (morningstar.com.au)

Unlock Company Contacts

Connect with Key Decision-Makers

Access verified employee contacts and decision-maker information from this company to support your sales, lead generation, and business development efforts.