Carnegie Clean Energy Overview
Carnegie Clean Energy is a pre-commercial Australian wave energy technology developer whose principal asset is the proprietary CETO submerged point-absorber wave energy converter, carried on its balance sheet at A$18.9 million. After a troubled 2016–2019 diversification into solar and battery microgrids that ended in large write-downs and the exit of its Energy Made Clean subsidiary, the company has been rebuilt as a lean, grant-leveraged technology house with its operational centre of gravity in Europe. Its near-term value hinges on a single event: the staged ocean deployment of a grid-connected CETO unit at Spain's Biscay Marine Energy Platform (BiMEP) under the ACHIEVE Programme, scheduled to begin in October 2026. A spin-off product, MoorPower, targets diesel displacement on aquaculture feed barges. Revenue (A$0.45M in FY2026) comes almost entirely from a legacy solar-battery microgrid supplying the Department of Defence at Garden Island, WA. The company is loss-making, lightly capitalised and carries a going-concern material uncertainty.
Company's own description
In its FY2026 Financial Report the company states that the principal activity of the Group during the year was the development of the CETO Wave Energy Technology. Its standard corporate boilerplate describes Carnegie as a technology developer focused on delivering ocean energy technologies, the owner and developer of the CETO and MoorPower technologies, which capture energy from ocean waves and convert it into electricity, operating from Australia with wholly owned international subsidiaries (notably CETO Wave Energy Ireland and Carnegie Technologies Spain). The FY2026 Directors' Report also describes an "Other Products" activity: using the wave energy IP portfolio and know-how to investigate remote-power applications for Defence, aquaculture and data centres.
Independent characterisation
Carnegie is best understood as a single-technology, pre-revenue IP developer with a small legacy utility cash stream. It sits at the very upstream end of the ocean-energy value chain: concept, design, numerical modelling, controls software, component specification and system integration. Fabrication and assembly are outsourced (power take-off assembly by SKF in Germany; the electrical module with Basque supplier SEI), and offshore installation is subcontracted to marine contractors. It does not own manufacturing capacity, vessels or large-scale project pipelines in operation.
The company's funding model is distinctive and central to the investment case. Rather than fund development wholly from equity, Carnegie stacks non-dilutive sources: (i) competitive pre-commercial procurement (EuropeWave PCP, €3.75M for the ACHIEVE Project); (ii) national and regional grants (Spain's RENMARINAS DEMOS programme, €1.2M; Basque Energy Agency EVE, €2.1M); (iii) EU Horizon Europe collaborative research (COIN, €4M consortium budget); (iv) the Australian R&D Tax Incentive and the sale of Spanish R&D tax deductions; and (v) Blue Economy CRC co-funding for MoorPower. Under its accounting policy, grants relating to capitalised development are offset against the intangible asset rather than recognised as income, which is why reported "revenue" is tiny even in years when several million dollars of grant cash is received.
Revenue model and mix (FY2026)
| Revenue / income stream (FY2026, AUD) | Amount | Share of total revenue and other income | Model type |
|---|---|---|---|
| Garden Island Microgrid electricity sales (recognised over time) | 453,774 | 74.6% | Utility / power purchase (Electricity Supply Agreement with Department of Defence) |
| Interest income | 42,864 | 7.0% | Treasury |
| Net gain on disposal of fixed assets | 59,656 | 9.8% | Non-recurring |
| Rental income (sub-lease to Secure Energy) | 15,851 | 2.6% | Property |
| Other income | 36,490 | 6.0% | Miscellaneous |
| Total revenue and other income | 608,635 | 100% | — |
Source: FY2026 Financial Report, Note 2. Product sales, subscription or licensing revenue: nil. The intended long-run model (per the company's impairment methodology) is IP licensing and royalties on CETO units sold into third-party projects, plus potential project development equity and MoorPower product sales.
Customer types and end-markets
| End-market | Status | Customer / counterparty type |
|---|---|---|
| Utility-scale grid-connected wave energy (CETO) | Pre-commercial; first European demonstrator deploying from October 2026; 6 MW array at concept/MOU stage | Utilities, project developers, governments (EuropeWave buyers group of Wave Energy Scotland and Basque Energy Agency acting as procurers) |
| Aquaculture feed-barge power (MoorPower) | Preliminary commercial-scale design complete; seeking aquaculture host for commercial pilot | Salmon and finfish aquaculture operators (initial work with Tasmanian operators via Blue Economy CRC) |
| Defence remote/offshore power | Exploratory; ASCA Pitch Day award (Nov 2025) | Australian Department of Defence; potentially allied navies |
| Offshore finfish arrays (US) | Technical study under US TEAMER (Kelson Marine) | US aquaculture sector, US DOE-supported programmes |
| Data centres | Exploratory (named in FY2026 strategy) | — |
| Legacy microgrid power sales | Operating; output constrained by equipment issues | Australian Department of Defence (HMAS Stirling, Garden Island) |
Strategy
Stated strategy (themes from FY2026 Directors' Report)
The company's strategy, in its own framing, rests on five themes:
-
Focus on core products. As a technology developer, Carnegie concentrates on commercialising CETO and MoorPower.
-
Astute capital management through non-dilutive support. For CETO, the company assembled EuropeWave (€3.75M), Spanish Government (€1.2M) and Basque Government (€2.1M) support to deliver its first European deployment through ACHIEVE, describing Europe as the most attractive current jurisdiction for wave energy.
-
Demonstrate to attract partners. Carnegie's EuropeWave bid ranked first of three finalists, giving it first choice of deployment site (BiMEP). Management intends to use the ACHIEVE deployment to attract a partner to drive future projects, starting with a 6 MW array at BiMEP, and highlights independent third-party validation from EuropeWave as an input to partner investment decisions.
-
MoorPower customer confidence. Demonstrate the technology on a working aquaculture feed barge with a strategic aquaculture partner, working through the Blue Economy CRC.
-
Adjacent remote-power markets. Apply the wave IP portfolio to Defence, aquaculture and data-centre power needs.
Strategic initiatives register (last 24 months, to October 2026)
| Initiative | Date | Description | Status |
|---|---|---|---|
| ACHIEVE Programme | Ongoing since EuropeWave Phase 3 award | Build, deploy and operate a grid-connected CETO at BiMEP for two years | Assembly complete or near complete; foundations completed; first-stage ocean deployment targeted October 2026 |
| BiMEP installation contract | Apr 2025 | c. €600,000 contract covering berth, subsea cable, connector, fibre optics, onshore substation and office space | Signed |
| SKF manufacturing partnership | May 2025 | PTO manufacture and assembly | Active; first PTO module delivered to SKF Germany for final assembly (mid-2026) |
| 6 MW CETO array | MOU Aug 2025 | Six 1 MW commercial-scale CETO units at BiMEP using existing offshore cable and grid connection | Development commenced; partner and financing NPD |
| COIN (Horizon Europe) | Sep 2025 | €4M consortium validating controls innovations targeting 30% cost-of-energy reduction | Active |
| MoorPower Commercial Pilot | FY2025–FY2026 | Preliminary design (A$335k, BE CRC) completed; host selection | Partner discussions ongoing |
| Defence: Energy Autonomy at Sea | Nov 2025 | ASCA Pitch Day; Power and Energy Innovation Award | Exploratory |
| US TEAMER | May 2026 | Finfish array with distributed WEC power, with Kelson Marine | Technical support stage |
| US market entry | Oct 2024 onward | Carnegie Clean Energy LLC; placement funds earmarked for US business development | Early-stage |
| Data centre remote power | FY2026 | Named as target application | Exploratory; no details |
Sustainability/ESG commitments: The company's mission is decarbonisation through ocean energy; no formal corporate emissions targets were identified.
Cost programmes: None with quantified targets. The impairment model assumes net R&D spending of about A$2M per year, after grants and R&D refunds, through 2026.
Medium-term guidance
Carnegie provides no revenue, earnings or cash-flow guidance. Its forward-looking statements are milestone-based: first-stage CETO ocean deployment in October 2026, followed by progressive deployment, commissioning, testing and optimisation; a two-year operating period at BiMEP; and a follow-on 6 MW array. Management states it cannot say with certainty when the group will become profitable and expects net operating cash outflows until it reaches positive cash flow.
Products & Services
CETO (core wave energy converter)
| Attribute | Detail |
|---|---|
| Description | Fully submerged point-absorber wave energy converter. A buoyant actuator sits a few metres below the surface and moves with the orbital motion of passing waves; tethers transmit this motion to a power take-off (PTO) that generates electricity. |
| Generations | CETO 3 (early test unit, approx.); CETO 5 (Perth Wave Energy Project, c. 2015, hydraulic PTO); CETO 6 (1 MW design concept, c. 2015–2018); current CETO (electric PTO, three PTO modules plus an Electrical Module, AI-enabled controls) |
| Key capabilities | Submerged operation for storm survivability and minimal visual impact; multi-tether electric PTO; advanced control algorithms (developed with partners including Hewlett Packard Enterprise); negligible onboard fluids or chemicals (cited by the company as an ESG advantage) |
| ACHIEVE unit | Scaled, grid-connected CETO unit; three PTO modules (generators, tensioners, shafts, couplings, bearings, seals, sensors) assembled with SKF in Germany; Electrical Module completed with Basque supplier SEI; to be installed on foundations at BiMEP and connected to the site's existing export cable; planned two-year operating period. Rated capacity of the ACHIEVE unit: NPD in sources reviewed. |
| Commercial unit | 1 MW commercial-scale CETO unit (basis for proposed 6 MW BiMEP array of six units) |
| Target customers | Utilities, offshore renewable project developers, islands and remote grids, governments pursuing ocean energy targets |
| Pricing model | Not disclosed; impairment model assumes licensing at a 3%–5% royalty (midpoint 4%) on CETO units sold into a minority share of forecast installed wave capacity |
| Flagship programmes | ACHIEVE (BiMEP, Spain); 6 MW CETO array (BiMEP, MOU); COIN (Horizon Europe) |
MoorPower
| Attribute | Detail |
|---|---|
| Description | CETO-derived wave energy product designed to supply power to marine industries operating at fixed moored locations, reducing diesel use |
| Initial market | Aquaculture feed barges |
| Development status | Scaled Demonstrator completed (prior period); MoorPower Commercial Pilot Preliminary Design project (A$335,000, Blue Economy CRC funded) completed in FY2026; energy models refined with GPS data from active Tasmanian feed barges and ROV footage of mooring lines |
| Next step | Commercial pilot integrating MoorPower units on an operating barge; discussions with potential aquaculture hosts ongoing |
| Pricing model | NPD |
"Energy Autonomy at Sea" (Defence concept)
Wave-powered renewable energy for deployable and fixed offshore defence sites, pitched to senior Defence officials at the Advanced Strategic Capabilities Accelerator (ASCA) Pitch Day in Sydney (November 2025), where Carnegie was one of 30 invited companies and received the Power and Energy Innovation Award. Product specification, customer contract and pricing: NPD.
Distributed WEC power for offshore finfish arrays (US)
Project titled "Development of a Finfish Array with Distributed WEC Power Integration", selected for the final stage of technical support under the US TEAMER (Testing Expertise and Access to Marine Energy Research) programme, with numerical modelling by Kelson Marine. Announced 7 May 2026. A study-stage activity rather than a product.
Garden Island Microgrid (legacy operating asset)
| Attribute | Detail |
|---|---|
| Description | Solar photovoltaic and battery storage microgrid at Garden Island, WA, selling all output to the Department of Defence under an Electricity Supply / Power Supply Agreement |
| FY2026 revenue | A$453,774 (FY2025: A$317,363) |
| Carrying value | Microgrid/battery asset A$1,545,144 at 30 June 2026, depreciated over 15 years (A$225,953 p.a.) |
| O&M | Provided by Secure Energy Pty Ltd (jointly owned by director Grant Mooney and CEO Jonathan Fievez); FY2026 payments A$166,247 incl. GST |
| Status | Operational and equipment issues constrain output; the Directors note the asset may be sold if liquidity requires |
| Detailed capacity rating | NPD in FY2026 filings |
Research and collaborative projects (service-like activities)
| Project | Role | Funding | Status |
|---|---|---|---|
| COIN (Control Oriented Innovations for future wave energy farms) | Carnegie's CETO is the reference WEC; aim to validate innovations cutting cost of energy by 30% for commercial arrays | €4M consortium, 100% EU Horizon Europe; Carnegie Technologies Spain received €287,344 upfront (75% of its expected share) in Dec 2025 | Commenced Sep 2025 |
| WECHULL+ | Participant | NPD | Ongoing |
| MEGA WAVE PTO | Participant | NPD | Ongoing |
| Modular electrical systems project (CETO Wave Energy Ireland as industry partner) | Industry partner | Secured funding (H1 FY2025 report) | Ongoing (details NPD) |
Financial Narrative
Income statement
Notes and sources: Sales revenue and net loss FY2022–FY2026 from the five-year table in the FY2026 Remuneration Report. FY2024 total revenue and other income derived from the FY2025 Appendix 4E (FY2025 total of A$405,371 represented a 9.4% decline). FY2024 EPS from Simply Wall St (consolidated basis). Derivations: operating loss = loss before tax + finance costs − interest income; EBITDA = operating loss + depreciation (FY2026: −2,760 + 931 − 43 + 248; FY2025: −2,316 + 601 − 70 + 282). Note that FY2025 "employee share-based payments" of A$48,523 exclude the A$573,162 option value attributed to the loan, which flows through finance costs via amortised deferred borrowing costs.
Margins and growth
Revenue CAGR FY2022–FY2026 (4 years): 9.0% (derived: 454/322 to the power of 0.25). The FY2026 gross margin spike reflects cost of sales falling from A$167k to A$11k, which the filings do not explain; it likely reflects reclassification of O&M costs or non-recurring FY2025 repairs and should not be treated as a structural improvement.
Commentary. The income statement is not the right lens for valuing Carnegie, but three observations matter. First, sales revenue is small, volatile and tied to a single ageing asset whose output is constrained; FY2026's 43% increase reflects improved availability or tariff effects rather than growth in the core business. Second, the cash cost base is stable at roughly A$3.4M of gross expenses before the capitalisation credit, and the reported loss has crept up mainly because of finance costs (A$931k in FY2026 versus A$601k), driven by the 15% Ballamena loan and amortisation of option-based borrowing costs. Third, the unusually low FY2023 loss (A$0.63M) stands out against a A$1.9M–A$2.8M run-rate; the cause (likely higher capitalisation, grant or R&D refund timing) is not explained in the sources reviewed.
Balance sheet
Sources: FY2026 Financial Report (statements of financial position and changes in equity, Notes 8, 11, 13, 17, 18). FY2023 equity of c. A$21.2M from InvestSMART (secondary). FY2024 PP&E is the sum of opening FY2025 microgrid (A$1,997k) and plant (A$60k) balances. Short-term debt FY2026 = Ballamena loan A$2,500,000 + other short-term borrowings A$71,193. Net debt = debt − cash.
Commentary. The balance sheet is dominated by a single Level-3 intangible (82% of total assets) that has never been amortised because it is "not yet ready for use". Its recoverable amount is tested using a relief-from-royalty model with a 19% discount rate, 15-year forecast plus terminal value and 3%–5% royalty, which the auditor flags as a Key Audit Matter. Shareholders should recognise that tangible book is effectively nil (NTA per share −0.01 cents at 30 June 2026). Liquidity deteriorated sharply in FY2026: cash fell 66% to under A$1M, working capital deficit doubled to A$2.46M, and the group moved from net cash to net debt. The A$2.5M July 2026 placement and the A$1M loan upsizing in August 2026 partially repair this, but the A$3.5M facility falls due on 30 June 2027. The A$784k RENMARINAS liability represents grant cash received in advance and already partially spent, so it is not a cash buffer.
Cash flow statement
Free cash flow defined as operating cash flow plus net investing cash flow, because development grants are received through investing activities. Net borrowings FY2026 = proceeds 120 − repayments/borrowing costs 49 − transaction costs 616; FY2025 = proceeds 2,500 − borrowing costs 316.
Commentary. The company burns roughly A$3M–A$3.5M a year of free cash flow even after A$4.4M–A$4.6M of annual grant receipts. Gross development spending rose 28% in FY2026 to A$4.9M as ACHIEVE moved into fabrication. The large FY2026 "transaction costs related to loans and borrowings" (A$616k) is notable and is not itemised in the filings. Funding has come in roughly equal parts from equity (SPP plus options, A$2.33M in FY2026), debt (A$2.5M in FY2025) and tax/grant monetisation (Spanish R&D deduction sale €773k; ATO refund A$569k).
Ratios
Derived from FY2026 Financial Report. ROA FY2025 not computed because FY2024 total assets were not available. Runway = 30 June 2026 cash ÷ (FY2026 operating cash outflow ÷ 12).
Overall financial trend assessment. Carnegie's financial trajectory over five years is one of stable, modest losses (A$0.6M–A$2.8M) funded by repeated small capital raises, with the development asset growing by about A$1M–A$2M a year net of grants. The inflection point is not financial but technical: until CETO demonstrates performance at BiMEP, the company remains a cash-consuming option on wave energy commercialisation, with financing risk as its dominant near-term variable.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Business Lines
| Business line | Legal vehicle(s) | Contents | FY2026 P&L revenue |
|---|---|---|---|
CETO wave energy | CETO IP (Australia) Pty Ltd; CETO Wave Energy Ireland Ltd; Carnegie Technologies Spain S.L.; CETO Wave Energy UK Ltd | ACHIEVE Programme, 6 MW array development, COIN, WECHULL+, MEGA WAVE PTO | Nil (grant receipts capitalised) |
MoorPower | Parent / Australian entities | Commercial pilot design, aquaculture engagement | Nil |
Other products (Defence, aquaculture, data centres) | Parent; Carnegie Clean Energy LLC (US) | ASCA, US TEAMER | Nil |
Garden Island Microgrid | Parent / Australian subsidiaries | Solar-battery system selling power to Defence | A$453,774 |
Revenue by Segment and Segment Margins & Growth (%)
| Metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Segment sales revenue (AUD K) | 347 | 317 | 454 |
Segment loss after tax (AUD K) | -2,320 | -2,328 | -2,766 |
Sales revenue YoY growth (%) | — | -8.5 | 43.0 |
Net margin on sales revenue (%) | -669 | -733 | -609 |
Contribution to group revenue (%) | 100 | 100 | 100 |
Income Statement and Per-Share Data
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Sales revenue (AUD K) | 322 | 384 | 347 | 317 | 454 |
Total revenue and other income (AUD K) | — | — | 447 | 405 | 609 |
Cost of sales (AUD K) | — | — | — | 167 | 11 |
Gross profit (AUD K) | — | — | — | 150 | 443 |
Operating loss before net finance costs (AUD K, derived) | — | — | — | -1,785 | -1,872 |
EBITDA (AUD K, derived) | — | — | — | -1,503 | -1,624 |
Finance costs (AUD K) | — | — | — | 601 | 931 |
Loss before tax (AUD K) | — | — | — | -2,316 | -2,760 |
Net loss after tax (AUD K) | -1,925 | -630 | -2,320 | -2,328 | -2,766 |
Basic and diluted EPS (AUD cents) | — | — | -0.7 | -0.64 | -0.69 |
Dividends per share (AUD cents) | 0 | 0 | 0 | 0 | 0 |
Weighted average shares (millions) | — | — | — | 313.6 | 399.6 |
Margin Analysis (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Sales revenue YoY growth (%) | — | 19.2 | -9.6 | -8.5 | 43.0 |
Gross margin (%) | — | — | — | 47.3 | 97.6 |
Operating margin (%) | — | — | — | -562 | -413 |
EBITDA margin (%) | — | — | — | -474 | -358 |
Net margin (%) | -598 | -164 | -669 | -733 | -609 |
Balance Sheet and Per-Share Data
| Metric | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|
Total assets (AUD K) | — | — | 24,620 | 23,102 |
Cash and equivalents (AUD K) | — | 3,729 | 2,899 | 996 |
Short-term debt (AUD K) | — | — | 2,125 | 2,571 |
Long-term debt (AUD K) | — | — | 0 | 0 |
Net debt (AUD K, derived) | — | — | -774 | 1,575 |
Total equity (AUD K) | 21,200 | 21,098 | 19,237 | 18,849 |
Intangibles: CETO development asset (AUD K) | — | 15,465 | 17,751 | 18,877 |
Goodwill (AUD K) | — | 0 | 0 | 0 |
Property, plant and equipment (AUD K) | — | 2,057 | 1,812 | 1,556 |
Working capital (AUD K, derived) | — | — | -1,237 | -2,461 |
Unearned grant liability: RENMARINAS (AUD K) | — | — | 1,870 | 784 |
Net tangible assets per share (AUD cents) | — | — | 0.41 | -0.01 |
Accumulated losses (AUD K) | — | -191,040 | -192,425 | -195,154 |
Cash Flow
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Operating cash flow (AUD K) | — | — | — | -3,474 | -3,087 |
Payments for development of assets, capex (AUD K) | — | — | — | -3,844 | -4,902 |
Receipts for development of assets, grants (AUD K) | — | — | — | 4,418 | 4,578 |
Net investing cash flow (AUD K) | — | — | — | 574 | -324 |
Free cash flow (AUD K, derived) | — | — | — | -2,900 | -3,411 |
Equity issued net of costs (AUD K) | — | — | — | 0 | 2,314 |
Net borrowings and borrowing costs (AUD K) | — | — | — | 2,184 | -545 |
Dividends paid (AUD K) | 0 | 0 | 0 | 0 | 0 |
Share buybacks (AUD K) | 0 | 0 | 0 | 0 | 0 |
Net change in cash (AUD K) | — | — | — | -821 | -1,747 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2025 | FY2026 |
|---|---|---|
Return on average equity (%) | -11.5 | -14.5 |
Return on average assets (%) | — | -11.6 |
Current ratio (x) | 0.77 | 0.42 |
Debt to equity (x) | 0.11 | 0.14 |
Interest coverage, EBIT to finance costs (x) | -3.0 | -2.0 |
Asset turnover, sales to average assets (x) | — | 0.019 |
Cash runway at FY2026 operating burn, pre-placement (months) | — | 3.9 |
Revenue by Region and Region Margins & Growth (%)
| Region (sales revenue) | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Australia (AUD K) | 347 | 317 | 454 |
Europe (AUD K) | 0 | 0 | 0 |
Americas (AUD K) | 0 | 0 | 0 |
Australia YoY growth (%) | — | -8.5 | 43.0 |
Funding Inflow by Geography Details
| Funding inflow by geography (FY2026, as disclosed) | Amount | Source |
|---|---|---|
Spain: sale of CY2025 R&D tax deductions (Carnegie Technologies Spain) | €773,163 (A$1.37M) | FY2026 Directors' Report |
EU / Spain: COIN upfront grant | €287,344 | FY2026 Directors' Report |
EuropeWave Phase 3 milestone payments (CETO Wave Energy Ireland) | Several milestones; amounts NPD except a €64k milestone in the June 2026 quarter | ASX quarterly summary |
Australia: ATO R&D Tax Incentive refund (FY2025 claim) | A$568,630 | FY2026 Directors' Report |
Australia: Blue Economy CRC (MoorPower) | Project value A$335,000 | FY2026 Directors' Report |
Share Price and Share Count (millions)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Year-end share price, consolidated basis (AUD) | 0.10 | 0.05 | 0.10 | 0.05 | 0.20 |
Year-end shares on issue (millions) | — | — | 366.2 | 366.2 | 411.5 |
Year-end market capitalisation (AUD Mn, derived) | — | — | 36.6 | 18.3 | 82.3 |
Performance Window Details
| Performance window (to 30 Jun 2026, price basis) | Return |
|---|---|
1-year (Jun 2025 to Jun 2026) | +300% |
3-year (Jun 2023 to Jun 2026) | +300% |
4-year (Jun 2022 to Jun 2026) | +100% |
5-year | Not computed (FY2021 consolidated-basis price NPD) |
Intra-2026 path | c. A$0.06–0.07 (Jan–Apr 2026) to c. A$0.19 (19 May) to A$0.20–0.24 (Jun–Jul) to A$0.175 (29 Jul) |
Valuation Snapshot
| Multiple | Value | Basis |
|---|---|---|
Market capitalisation | c. A$74.4M | 425.4M shares |
Enterprise value | c. A$73.6M | Market cap + debt A$2.57M − cash (A$0.996M + c. A$2.35M net placement proceeds) |
EV/Sales (FY2026) | c. 162x | A$73.6M / A$0.454M |
P/B (30 Jun 2026 book) | c. 3.9x | A$74.4M / A$18.85M |
P/B (pro forma post-placement book c. A$21.2M) | c. 3.5x | Derived |
EV / CETO asset carrying value | c. 3.9x | A$73.6M / A$18.9M |
Capital Markets
| Item | Detail |
|---|---|
Facility | Ballamena Pty Ltd ATF Ellann Finance Unit Trust |
Limit | A$3.5M (increased from A$2.5M on 26 Aug 2026) |
Drawn at 30 Jun 2026 | A$2.5M |
Interest | 15% per annum, fixed |
Maturity | 30 June 2027 (extended 14 Jul 2026) |
Security | Featherweight General Security Agreement over company assets |
Fees | Original: 50M options at A$0.06 (valued A$573,162) plus A$50,000 cash; variations: 10M options at A$0.27 (expiring 14 Jul 2029) |
Other borrowings | A$71,193 short-term (likely insurance premium funding) |
Share Price & Returns
| Date | Type | Amount (AUD) | Price (AUD) | Shares |
|---|---|---|---|---|
Sep 2025 | Share Purchase Plan | 2,116,903 | c. 0.057 (derived) | 37,138,648 |
FY2026 | Option exercises (cash and cashless) | 214,520 cash | 0.06 / 0.065 | 8,132,895 |
Jul 2026 | Placement (overseas investors) | 2,500,000 | 0.18 | 13,888,888 |
Analyst Conclusions
Management guidance
No financial guidance is issued. Operational guidance: first-stage ocean deployment of the ACHIEVE CETO unit at BiMEP from October 2026, beginning with the buoyant actuator, with PTO modules integrated in a later phase, followed by commissioning, testing and optimisation; a two-year operating period; development of a 6 MW CETO array at BiMEP; a MoorPower commercial pilot on a working barge; and continued exploration of Defence, aquaculture and data-centre applications. Management expects continued net operating cash outflows until positive cash flow is achieved and cannot predict when profitability will occur.
Consensus expectations
None (no analyst coverage).
Bull case
-
Demonstration catalyst: A successful staged deployment and commissioning at BiMEP would make Carnegie one of very few developers with a grid-connected device operating in European waters, directly supporting the 6 MW array and partner discussions that management has made central to its strategy.
-
Capital efficiency: The company has reached deployment on roughly €7M of non-dilutive programme funding plus tax monetisation, while keeping annual KMP costs near A$0.6M; partner-funded arrays would extend this leverage.
-
Optionality across markets: Defence (ASCA award), US aquaculture (TEAMER) and MoorPower add multiple adjacent pathways, and A$55.9M of carried-forward tax losses would shelter future profits.
Bear case
-
Liquidity and refinancing: With A$996k of cash at year-end, a going-concern uncertainty, and a A$3.5M, 15% facility due 30 June 2027, the company will likely need further dilutive raises during the critical testing period, potentially on poor terms if deployment slips.
-
Single-point technical risk: One unit, one site; supplier, vessel and weather risks are acknowledged by management, and the deployment has already slipped from 2025 to 2026.
-
Valuation already discounts success: At about A$74M, the market values the company at nearly four times the carrying value of the CETO asset and about 160 times sales after a more than 200% rally in 2026 without new fundamental disclosure, as the May 2026 price query response indicates.
Catalysts and monitorables (next 12 months)
| Timing | Catalyst / monitorable |
|---|---|
| Oct 2026 | Confirmation of first-stage ocean deployment at BiMEP |
| c. 16 Oct 2026 | 2026 Annual Report: top-20 holders, governance statement, any updated risk disclosure |
| Oct 2026 | September quarter Appendix 4C (cash post-placement, burn rate) |
| Nov 2026 | AGM: director re-elections, any option or placement-capacity resolutions |
| Q4 CY2026 – H1 CY2027 | PTO integration, commissioning, first export of power to grid; EuropeWave milestone payments |
| H1 CY2027 | FY2026 Australian R&D refund; potential Spanish R&D deduction sale for CY2026 |
| By 30 Jun 2027 | Repayment, extension or refinancing of A$3.5M Ballamena facility |
| Ongoing | 6 MW array partner announcement; MoorPower aquaculture host; Defence or US contracts; Garden Island asset sale (if pursued) |
| Ongoing | Any impairment indicator on the CETO asset |
Concluding analyst verdict
Carnegie Clean Energy is a high-risk, binary, event-driven exposure to the commercialisation of wave energy, and in October 2026 it stands at the most consequential moment in nearly a decade. After the reputational and financial damage of the 2016–2019 microgrid diversification, which ended in A$47M of write-downs and a CEO change, management has rebuilt a credible, disciplined technology programme. Its signature achievement is assembling roughly €7M of competitive European support, top-ranked independent validation through EuropeWave, a permitted grid-connected berth at BiMEP, and an industrial supply chain led by SKF, all on a shoestring corporate cost base.
The difficulty is that the balance sheet has not kept pace with the technical ambition. The company ended FY2026 with under A$1M of cash, net current liabilities of A$2.5M, an auditor's going-concern flag and expensive secured debt maturing in mid-2027, precisely when the CETO unit will be in its commissioning and early operating phase. The July 2026 placement at A$0.18 shows that capital is available at a much higher price than a year earlier, but the 2026 share-price surge preceded rather than followed demonstrable results.
Our view is that the investment case depends almost entirely on execution at BiMEP over the next two to three quarters. Clean deployment, safe commissioning and early power generation would validate the strategy, strengthen the hand of management in partner negotiations for the 6 MW array, and likely enable refinancing on better terms. Delay or technical failure would expose the company to severe dilution and potential impairment of its principal asset. Governance, with a three-person board and several related-party arrangements, is a secondary but real concern.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Appointed | Background | Education | Age |
|---|---|---|---|---|---|
Anthony Shields | Non-Executive Chairman (Chair since 5 Feb 2025) | 25 Nov 2019 | Managing Director of Asymmetric Investment Management Fund Pty Ltd (Perth; private debt, venture capital, risk management); boards of Source Certain International, NWQ Capital, Old Perth Port; investment committee of Canci Group; formerly family-office portfolio manager, Deutsche Bank equities and derivatives, Macquarie Bank equity analyst | B.Bus | NPD |
Michael Fitzpatrick AO | Non-Executive Director | 28 Nov 2012 | Founder of Hastings Funds Management (over A$3.8B managed); early investor in Pacific Hydro and Ord Hydro-Electric Scheme; Alternate Director of Foresight Australia (manager of Australian Renewables Infrastructure Fund); former Rio Tinto Ltd director; former AFL Chairman; Chairman of LATAM Autos | B.Eng (Hons), B.A. (Hons), M.A. (Oxon) | NPD |
Grant Mooney | Non-Executive Director and Company Secretary | 19 Feb 2008 | Principal of Mooney & Partners (corporate advisory and compliance); directorships at Gibb River Diamonds, Accelerate Resources, Talga Group, CGN Resources; former director Aurora Labs (to Nov 2025) and Riedel Resources (to Apr 2025); member of CA ANZ | B.Bus, CA | NPD |
Executive Leadership Team
| Name | Title | Tenure | Prior roles | Education |
|---|---|---|---|---|
Jonathan Fievez | Chief Executive Officer (not a board member) | CEO since 28 Sep 2018; previously Chief Technology Officer | CTO of Carnegie; experience in research, product development, mechanical and electronic design, IP management and customer liaison | BEng (Mechatronics) |
Directors' Remuneration
| KMP | Cash salary and fees | Superannuation | Share-based payments | Total FY2026 | Total FY2025 |
|---|---|---|---|---|---|
Anthony Shields | 85,392 | 10,247 | 0 | 95,639 | 636,974 |
Michael Fitzpatrick | 50,000 | 6,000 | 0 | 56,000 | 55,750 |
Grant Mooney (incl. A$60,000 company secretarial fees) | 110,000 | 6,000 | 0 | 116,000 | 115,750 |
Jonathan Fievez | 306,716 | 36,806 | 0 | 343,522 | 358,829 |
Terry Stinson (retired Feb 2025) | 0 | 0 | 0 | 0 | 50,131 |
Total | 552,108 | 59,053 | 0 | 611,161 | 1,217,434 |
Directors' Remuneration — Board size
| Item | Detail |
|---|---|
Board size | Three, all non-executive; CEO not on board |
Chair/CEO separation | Yes |
Independence | The company describes Shields and Fitzpatrick as independent (they form the committee negotiating Secure Energy contracts). Analyst view: Mooney is not independent (paid company secretary; co-owner with the CEO of the microgrid O&M contractor Secure Energy). Shields' entity holds 44.5M options linked to the loan financing arrangements, which a governance-focused investor may regard as a material relationship. |
Committees | Separate audit, remuneration or nomination committees not disclosed in sources reviewed; with three directors, these functions are likely handled by the full board (to be confirmed in the 2026 Corporate Governance Statement) |
Meetings FY2026 | Five board meetings (Mooney 5/5, Shields 5/5, Fitzpatrick 4/5) plus eight circular resolutions |
Gender diversity | 0% female directors (three male directors) |
Board average tenure | About 12.9 years (Simply Wall St) |
Remuneration consultants | None used in FY2026 |
Major Shareholders
| Holder | Shares | Options | Approx. % of c. 425.4M shares | Source |
|---|---|---|---|---|
Michael Fitzpatrick (via Log Creek Pty Ltd) | 20,430,709 | 0 | 4.8 | FY2026 Directors' Report |
Anthony Shields (via Asymmetric Credit Partners) | 14,616,415 to 15,539,710 | 44,485,466 | 3.4 to 3.7 | Directors' Report vs Remuneration Report (discrepancy noted) |
Grant Mooney (direct and via Ocean Flyers Pty Ltd) | 7,000,000 | 0 | 1.6 | FY2026 Directors' Report |
Jonathan Fievez | 1,414,634 | 0 | 0.3 | FY2026 Remuneration Report |
Total KMP | c. 43.5M to 44.4M | 44.5M | c. 10.2 to 10.4 | Derived |
Competitive Landscape
Key Competitors
| Competitor | Country | Technology | Listing | Relative positioning vs Carnegie |
|---|---|---|---|---|
CorPower Ocean | Sweden | Submerged-phase-control point absorber (C4/C5) | Private | Generally regarded as a technology front-runner; deployed C4 in Portugal (Aguçadoura); larger private funding base |
Mocean Energy | UK | Hinged raft (Blue Horizon / Blue X) | Private | EuropeWave Phase 3 peer; subsea and oil-and-gas niche applications |
IDOM (MARMOK-A-5) | Spain | Oscillating water column buoy | Private engineering group | EuropeWave Phase 3 peer; MARMOK-A-5 already deployed at BiMEP |
Ocean Power Technologies | US | PowerBuoy surface point absorber plus maritime robotics | NYSE American: OPTT | — |
Eco Wave Power | Sweden / Israel | Onshore/breakwater floater systems | Nasdaq: WAVE | Pilot projects (Gibraltar, Jaffa Port, Los Angeles); low-cost onshore model |
AW-Energy (WaveRoller) | Finland | Seabed-mounted surge converter | Private | Near-shore niche |
Wello (Penguin) | Finland | Rotating-mass floating device | Private | Tested at BiMEP and EMEC |
Seabased | Sweden | Linear-generator point absorbers | Private | Array focus |
Bombora Wave Power | Australia / UK | Membrane mWave | Private | Australian-origin peer; Pembrokeshire project |
Wave Swell Energy | Australia | Oscillating water column (UniWave) | Private | King Island demonstration |
CalWave | US | Submerged pressure-differential device | Private | US DOE-backed; directly competes in US market |
Minesto | Sweden | Tidal kite (tidal, not wave) | Nasdaq First North | Adjacent ocean-energy competitor for funding |
Peer Comparison FY2026
| Metric | Carnegie (FY2026) | CorPower Ocean |
|---|---|---|
Revenue | A$0.45M | Private, NPD |
Revenue growth | +43% | NPD |
Net margin | -609% | NPD |
R&D intensity | Gross dev. spend about 10x revenue | NPD |
Grid-connected device in water (Oct 2026) | Deploying (first stage) | Yes (C4, Portugal) |