Cemindia Projects Limited Overview
Cemindia Projects Limited is a Mumbai-headquartered heavy-civil engineering, procurement and construction contractor whose operating history in India dates to 1931. It is today one of a small group of Indian contractors pre-qualified across the full spectrum of technically demanding infrastructure: rubble-mound breakwaters and deep-water berths, tunnel-boring-machine underground metro, integrated airport terminals, pumped-storage hydro and railway tunnelling, heavy industrial civil works, and — since FY25 — turnkey data centre EPC. The FY26 financial year was the most consequential in its modern history: the ninety-year-old Thai-controlled contractor became an Adani Group portfolio company, changed its name, crossed ₹10,000 crore of revenue for the first time, and secured record order inflows of ₹14,821 crore. As at 30 June 2026 its consolidated order book stood at an all-time high of ₹31,307 crore, roughly three times FY26 revenue. The strategic logic of the change of control is straightforward and already visible in the numbers: Cemindia has become the preferred civil-execution arm for a promoter group deploying capital across ports, airports, data centres, thermal and renewable power, roads and water — while retaining an open-market franchise in metro, marine and government work that accounted for the majority of its backlog.
The company's own characterisation
The FY26 Annual Report describes the business as follows: "Cemindia Projects Limited builds on an enduring engineering legacy that has supported India's infrastructure expansion for decades. FY 2025-26 marked a new chapter in our journey as we got integrated within the Adani Group ecosystem." The Company states it operates across maritime structures, metro rail, airports, highways, bridges and flyovers, industrial structures and buildings, hydro dams, tunnels and irrigation, water and wastewater, foundation and specialist engineering, and data centre, supported by "deep engineering expertise and disciplined project management." Its stated vision is "a satisfied client, a strong and proactive workforce and quality product finished on time maintaining highest safety standards and to budget," and its mission is "to make Cemindia Projects Limited, the country's leading construction Company in customer choice, quality and safety."
The Company's own investment case rests on six declared pillars: robust execution track record; technology and digital innovation; a diversified order book; consistent financial performance; alignment with infrastructure megatrends; and strategic Adani Group synergies.
Independent characterisation
Cemindia is best understood as a pure-play, asset-light, fixed-price civil EPC contractor operating at the technically complex end of the Indian construction market. It is not a developer: it takes no concession risk, holds no BOT/HAM annuity portfolio of consequence, and does not carry the balance-sheet burden of road SPVs that weighs on several listed peers. Revenue is recognised on percentage-of-completion under Ind AS 115 against milestone-based and progress-based billing. There is no product revenue, no subscription revenue and no licensing revenue — the revenue model is 100% project services, delivered through item-rate, lump-sum and design-build contracts.
Three characteristics differentiate the franchise:
First, capability moat over price moat. The segments where Cemindia earns its best economics — breakwaters, deep-water berths, TBM-driven underground metro, pumped-storage hydro, railway tunnelling in Himalayan geology — have short qualified-bidder lists. Pre-qualification typically requires demonstrated completion of comparable scope, owned specialist plant, and marine/geotechnical engineering depth that cannot be rented. The Company's owned fleet as at December 2025 comprised 7 tunnel boring machines, 3 micro-TBMs, 5 trench cutters, 49 hydraulic piling rigs, 3 jack-up barges, 120 cranes, 42 batching plants and 9 twin-boom jumbo drills. That fleet is the moat.
Second, a negative-working-capital operating model. Cemindia has run a structurally negative cash conversion cycle for a decade, funded by extended supplier credit and mobilisation advances. This is the reason a contractor with ₹10,061 crore of FY26 revenue operates on gross debt of only ₹1,001 crore. It is also the model's principal fragility: the negative cycle is a liability-funded position, not a cash position, and it inverts quickly if payment cycles from government counterparties elongate.
Third, a bifurcated client base that has just shifted. In December 2025 the order book was 44% government, 8% PSU and 48% private. By March 2026 it had moved to 36% government, 6% PSU and 58% private — a direct consequence of Adani-ecosystem awards. Management indicated on the Q3 FY26 call that group-entity work was approximately 27% of the order book, with a stated FY26 target of roughly 20% and earlier guidance of 25–26%. This is now the single most important structural variable in the equity story: it simultaneously reduces receivable risk and government-payment-cycle risk, while introducing related-party concentration and pricing-transparency risk.
Value chain position and end markets
Cemindia sits in the execution tier of the infrastructure value chain — downstream of the concessionaire/asset owner and the design consultant, upstream of specialist subcontractors and material suppliers. It performs its own design on design-build packages, procures and installs, and self-performs the technically critical scope (tunnelling, marine piling, diaphragm walling) while subcontracting commoditised civil and finishing work. Subcontracting expense of ₹2,900 crore in 9M FY26 against construction materials consumed of ₹2,334 crore indicates a labour-and-subcontract-heavy cost structure, which is the normal shape for an Indian heavy-civil contractor and provides operational flexibility but limits gross-margin ceiling.
End markets served: ports and maritime logistics; urban mass transit; civil aviation; national and state highways; steel, power, mining and petrochemical industrial capex; hydro and pumped storage; irrigation and water conveyance; municipal water and wastewater; and, newest, hyperscale/colocation data centres.
Customer types: central and state government departments and ministries (CPWD, Military Engineer Services, state irrigation departments); metro rail corporations (Chennai, Mumbai, Kolkata, Bengaluru, Maharashtra Metro, Rail Infrastructure Development Company Karnataka); central PSUs (Petronet LNG, IRCON, SAIL, IOCL); private industrial and infrastructure groups (Adani Ports & SEZ, Adani Infra, Adani Enterprises, Adani Green, Adani Road Transport, ArcelorMittal Nippon Steel, JSW, Ingka Centres/IKEA, Korba Power, Bengal Bonded Warehouse, Mindstone Mall Developers); municipal bodies (Ahmedabad Municipal Corporation, MCGM); and overseas clients (Colombo West International Terminal, Power Grid Company of Bangladesh, NMDC Group in Abu Dhabi).
Strategy
Stated strategy — verbatim themes
The FY26 Annual Report's cover theme is "Accelerating Infrastructure, Leveraging Intelligence." The framing statement is direct: "Infrastructure in India is entering a decisive decade, one that calls not only for scale but for intelligent execution... acceleration can only be sustained when guided by intelligence."
The Managing Director sets out four explicit strategic priorities:
-
"Maintaining a conservative and resilient balance sheet"
-
"Accelerating digital transformation to enhance execution visibility and efficiency"
-
"Diversifying our order book across geographies and high-growth sectors"
-
"Strengthening organisational capability, operational agility and execution excellence"
The stated ambition: "to be recognised among India's premier construction companies, distinguished by engineering excellence, technological expertise and sustainable value creation," aligned to "India's long-term development vision of Viksit Bharat@2047."
The Chairman identifies the forward focus areas as "maritime structures, urban transit systems, multimodal logistics, airports, urban infrastructure, Tier II and Tier III city development and digital infrastructure," pursued "selectively and responsibly... while maintaining disciplined bidding practices, capital prudence and operational resilience."
Strategic initiatives — last 24 months
| Initiative | Date | Detail |
|---|---|---|
| Change of control and integration into the Adani Group | May 2025 | Renew Exim DMCC acquires 46.64% from Italian-Thai Development; open offer lifts holding to 67.46%. Stated synergies: shared procurement, global vendor networks, financial strength, capital access, early visibility of group project pipeline |
| Corporate rebranding | August 2025 | Name changed to Cemindia Projects Limited; new logo adopted; MoA and AoA amended; NSE symbol changed to CEMPRO in September 2025 |
| Data centre vertical launch | FY25–FY26 | Dedicated vertical established on the back of strengthened in-house MEP capability. Backlog scaled from nil to ₹1,738 crore (March 2026) and to 13.3% of a much larger book by June 2026 |
| Middle East expansion | 2024–2025 | Abu Dhabi branch established and made operational; first contract (Ruwais LNG jetty, USD 67.4 million) secured June 2025; IMS sub-certificate issued FY26 |
| Geographic rationalisation | 2,025 | Liberia and Myanmar branches de-registered |
| Water infrastructure entry via JV vehicle | FY26 | 26% stake in Morsagar Bisalpur Water Limited (Adani Enterprises 74%) for the Mor Sagar Artificial Reservoir and Bisalpur feeder, awarded by Rajasthan Water Grid Corporation |
| Digital transformation programme | Ongoing | Building Information Modelling (BIM) for digitally integrated design; Internet of Things (IoT) for asset intelligence; Unmanned Aerial Vehicles (UAVs) for site monitoring; integrated Project Management Information System (PMIS) for near-real-time cost, schedule and quality visibility |
| Auditor transition | November 2025 – June 2026 | T R Chadha & Co LLP resigns citing Adani Group alignment; Price Waterhouse Chartered Accountants LLP appointed, ratified at the 48th AGM for a five-year term |
| Governance framework tightening | FY26 | Independent director tenure capped at three years per term (max two terms); mandatory management share ownership; independent third-party RPT certification; four annual ID education sessions; three additional business-specific board committees |
| ₹5,000 crore capital raise authorisation | July–August 2026 | Board approval 23 July 2026; shareholder special resolution passed at the EGM on 17 August 2026. Permissible routes: QIP, FPO, rights issue, preferential allotment, private placement, public issue, FCCB; green-shoe option contemplated; one or more tranches. Stated uses: organic and inorganic growth, loan repayment/prepayment, capital expenditure, general corporate purposes |
| ESG programme | FY26 | Rooftop solar (TOPCon panels) at project sites and Kolkata Depot; Organic Waste Composters at 18 locations; low-carbon materials (fly ash, GGBS) in concrete mixes; steel and TMT rebar reuse; minimum 10% green area around project offices |
Management guidance and medium-term targets
| Guidance item | FY26 guidance | FY27 guidance |
|---|---|---|
| Revenue growth | 15% (Q3 FY26 restatement); 20–22% (earlier in year) | 25% (reaffirmed at Q1 FY27) |
| Order inflow | ~₹15,000 crore (₹15,000–16,000 crore at the start of the year) | ~₹25,000 crore |
| EBITDA margin | ~10% | 10.5–11% sustainable range |
| Group-entity share of order inflow | ~20% (guided); ~27% of order book actual at Dec 2025; ~35% of expected FY26 orders per earlier commentary | Not separately quantified |
| Bid pipeline | ₹25,000 crore (Q3 FY26); ₹70,000 crore (Q4 FY26) | ₹90,000 crore (Q1 FY27), with a stated ~15% hit-rate expectation |
| Capital expenditure | ₹300 crore (₹200 crore deployed in 9M FY26) | Not separately quantified |
Actual against guidance, FY26: revenue grew 8.8% against 15% guidance — a clear miss, attributed to execution delays including at Vadhvan Port. Order inflow reached ₹14,821 crore against ~₹15,000 crore guidance — effectively met. EBITDA margin reached 11.9% against ~10% guidance — a clear beat, though roughly 100 basis points of it was non-recurring claim realisation.
Assessment of the FY27 guidance. A 25% revenue target implies FY27 revenue of approximately ₹12,575 crore. Q1 FY27 delivered ₹2,721 crore — an annualised run-rate of ₹10,884 crore, or 8% growth. To hit 25%, the remaining nine months must deliver approximately ₹9,854 crore against ₹7,340 crore in 9M FY26 — 34% growth. Management explicitly expects H2 weighting as recently awarded packages complete mobilisation. This is achievable but requires near-flawless ramp-up and is the single most important monitorable of the next twelve months. Cemindia missed its FY26 revenue guidance for precisely this reason.
Products & Services
Cemindia sells engineering execution, not products. The catalogue below is therefore organised by the eight service verticals the Company itself defines, with the specific capabilities, live projects, named clients and disclosed contract values for each. Pricing is contract-specific and negotiated per tender; no standard price list exists or is disclosed. Contract values shown are remaining order-book value as at 31 March 2026 unless stated.
Maritime Structures — ₹8,180 crore (33.3% of backlog)
The founding franchise and the Company's strongest competitive position. India's external trade moves through thirteen major and roughly sixty minor ports; the Company states it has worked at all of them.
Capabilities: construction of jetties, dolphins, berths and wharfs; ship lifts, dry docks and wet basins; breakwaters and piled approach trestles; steel piles and bored cast-in-situ concrete pile foundations; cargo and material handling equipment installation; dredging and land reclamation; coastal erosion protection, rock bunds and stabilisation; port-related onshore infrastructure and port connectivity works.
Major projects under execution: marine infrastructure project, Bangladesh; West Container Terminal, Port of Colombo, Sri Lanka (1,400 m berth × 52.7 m, rock revetment, bored cast-in-situ piles, approach trestles, fire-water pipelines — at advanced completion, 8 million safe working hours recorded); balance outer harbour works, Andhra Pradesh; near-shore reclamation and shore protection for greenfield Vadhvan Port, Maharashtra; third berth (jetty) at Dahej LNG terminal, Gujarat (approach trestle, unloading platform, berthing and mooring dolphins, port craft jetty, catwalks — 1.9 million safe man-hours); LNG jetty works, Abu Dhabi (Ruwais, USD 67.4 million); bulk and breakwater works for greenfield captive jetty, Odisha (JSW, Paradip, ~₹893 crore); container terminals at Mundra Port, Gujarat; breakwater at Vizhinjam Port, Kerala (rubble-mound, 2,426 m including 143 m spur — completed during FY26); container terminal berth 1,200 m × 54 m with rock bund at Vizhinjam Phases II & III.
Named clients: Vadhvan Port Project Limited; Power Grid Company of Bangladesh Limited; JSW Group; NMDC Group, Abu Dhabi; Adani Infra (India) Limited; Adani Ports and Special Economic Zone Ltd; Colombo West International Terminal (Private) Limited; Indian Navy; Petronet LNG Limited.
Track record: 100+ projects completed or under execution.
Urban Infrastructure, MRTS and Airports — ₹5,701 crore (23.2%)
Capabilities: underground metro (TBM and cut-and-cover); elevated metro viaducts; metro station buildings and track works; integrated passenger terminal buildings for airports.
Major projects under execution: underground tunnelling and metro stations in Chennai, Bengaluru, Pune, Mumbai and Kolkata; elevated metro stations and associated civil works in Bengaluru; infrastructure works at Jaipur International Airport, Rajasthan (₹593 crore); infrastructure works at Trivandrum International Airport, Kerala; design, procurement and construction of RCC box metro tunnel, West Bengal; design and construction of underground stations and tunnel, Pune Metro (₹1,393 crore).
Flagship deliveries: Chennai Metro Phase II Line 4 — approximately 16 km of underground corridor, eight stations, two crossovers, twin tunnels, with multiple TBM breakthroughs achieved during FY26 in difficult geology; Bengaluru underground metro — approximately 6 km of twin tunnels, four underground stations, cut-and-cover sections, with tunnelling, cross passages, track beds and permanent walkways completed in FY26; Mumbai underground metro (Siddhivinayak, Dadar, Shitaladevi stations) completed FY26; Kolkata underground Central Station to Subhash Sarabar (Contract UG-2) completed FY26; Pune International Airport terminal; Trichy International Airport; Ahmedabad International Airport Terminal 2 modification and refurbishment.
Named clients: Chennai Metro Rail Limited; Maharashtra Metro Rail Corporation Limited; Bangalore Metro Rail Corporation Limited; Mumbai Metro Rail Corporation Limited; Kolkata Metro Rail Corporation Limited; Rail Infrastructure Development Company (Karnataka) Limited; Jaipur International Airport Limited; TRV (Kerala) International Airport Limited.
Track record: 30+ projects; 40+ km of underground metro tunnelling and 40+ km of elevated viaducts completed. Ten elevated metro projects, eight underground metro projects, two station-building-and-track projects and seven airport projects were recorded as completed or under execution as at December 2025.
Industrial Structures and Buildings — ₹3,852 crore (15.7%)
Capabilities: civil works for refineries, petrochemical facilities, power plants, steel plants; commercial buildings; residential colonies; malls; academic and institutional buildings; factories and warehouses.
Major projects under execution: redevelopment of General Pool Residential Colony at Kasturba Nagar, New Delhi (Phases I and II) for CPWD; multistorey commercial building, Uttar Pradesh; multistorey commercial building, West Bengal (project "KEVENTER ONE"); Thal Sena Bhawan, New Delhi; aerospace museum at Air Force Station, Palam, New Delhi; civil works and erection of prefabricated steel structures for Korba Power Limited, Chhattisgarh; civil and piling works for the coke oven project at Hazira Steel Plant, Gujarat (high-rise structures exceeding 45 m including quenching tower, coal storage silo and coal bunker); civil and related works at Taldih and Barsuan iron ore mines of SAIL, Odisha; INGKA NMP Package 1B, Sector 51, Noida (IKEA).
Flagship delivery: Circuit Bench of the Calcutta High Court at Jalpaiguri, West Bengal — completed FY26.
Named clients: Ingka Centres India Private Limited; Central Public Works Department; ArcelorMittal Nippon Steel India Limited; Bengal Bonded Warehouse Limited; Military Engineer Services; Korba Power Limited; Adani Enterprises Limited; Mindstone Mall Developers Private Limited.
Highways, Bridges and Flyovers — ₹3,207 crore (13.1%)
Capabilities: national highways; river bridges; flyovers; underpasses; pre-stressed box girders; advanced traffic management systems.
Major projects under execution: six-laning of the Ganga Expressway, Uttar Pradesh — approximately 157 km between Unnao and Prayagraj, including major and minor bridges, vehicular underpasses, flyovers and ATMS, with all major components including the main carriageway completed during FY26; four-laning road project, Bihar (secured FY26); steel bridge over River Ganga, Uttar Pradesh.
Named client: Adani Road Transport Limited.
Track record: 600+ km of highways, bridges and flyovers completed or under execution.
Data Centre — ₹1,738 crore (7.1% at March 2026; 13.3% at June 2026)
The newest vertical, established in FY25–FY26 and explicitly framed by the Company as a portfolio-diversification and margin-accretion play enabled by strengthened in-house electromechanical (MEP) capability.
Capabilities: integrated EPC across data centre infrastructure — civil, shell and core, mechanical, electrical, plumbing and fire protection (MEPF), testing and commissioning.
Major projects under execution: construction of a data centre on EPC basis, Maharashtra; 80 MW Data Centre (NMI-03) at Ghansoli, Maharashtra; 30 MW Data Centre (NMI-01) at Ghansoli, Maharashtra; civil and structure site adaptation works for a data centre, Maharashtra; civil and structural works for an 80 MW data centre in Maharashtra (~₹485 crore).
Named clients: Adani Infra (India) Limited; Support Properties Private Limited.
Strategic context: Adani Enterprises has publicly targeted 1 GW of data centre capacity by 2030, with an announced investment tie-up with Google at Visakhapatnam. Cemindia is positioned as the group's civil-and-MEP execution partner for that pipeline.
Hydro, Dams, Tunnels and Irrigation — ₹978 crore (4.0%)
Capabilities: dams and powerhouses; tunnels including railway tunnels (NATM and drill-and-blast); intake structures; steel-lined pressure shafts; irrigation projects; geomembrane-faced rockfill dams.
Major projects under execution: railway tunnels in hilly terrain across West Bengal and Sikkim; civil and hydro-mechanical works for the 500 MW Chitravathi Pumped Storage Project, Andhra Pradesh (geomembrane-faced rockfill upper dam, intake structures, steel-lined pressure shafts, underground powerhouse complex, tailrace tunnels); lined gravity canal and tunnel-based water conveyance system, Telangana.
Flagship delivery: Sivok–Rangpo new single-line broad-gauge railway tunnels connecting West Bengal and Sikkim — over 15 km of tunnelling and adits at approximately 7.12 m diameter through challenging high-altitude terrain, completed during FY26.
Named clients: Adani Renewable Energy Forty-Two Limited; IRCON International Limited; Government of Telangana, Irrigation and CAD Department; Government of Andhra Pradesh, Irrigation and CAD Department.
Track record: 10–15+ dams, barrages, pressure shafts, NATM and DBM tunnels.
Foundation and Specialist Engineering — ₹499 crore (2.0%)
The Company's founding capability set, now a smaller share of backlog but still the technical substrate on which the marine and metro franchises rest.
Capabilities: piling (bored cast-in-situ, driven, marine); diaphragm walls; ground improvement (sand wicks, band drains, vibroflotation stone columns); drilling and grouting; rock and soil anchors; slope stabilisation; structural rehabilitation and underpinning; colcrete; gunite/shotcrete; grouted mattress; box pushing; tube heading; geotechnical investigations.
Major projects under execution: civil works for Yard-BB5, Odisha (mechanised import system through BB-5 with stockyard and IMWL silo at Dhamra); piling works at Khavda, Gujarat (~₹151 crore); piling work at JSW Utkal, Odisha.
Flagship delivery: Brahmaputra riverfront development, Assam — approximately 1.2 km from the New DC Bungalow to Kachari Ghat at Uzanbazar under the Guwahati Smart City initiative, including walkways, recreational spaces, landscaping, drainage, riverbank protection and stabilisation. Completed during FY26.
Named clients: The Dhamra Port Company Limited; Adani Green Energy Six Limited.
Track record: 250+ to 1,000+ projects completed or under execution across the specialist disciplines (the Annual Report cites 1,000+ for the vertical as a whole; the Q3 FY26 presentation cites 250+ for the specialist-engineering subset).
Distinctive capability: the Company describes itself as a pioneer of the box-pushing technique under live railway tracks in India.
Water and Wastewater — ₹390 crore (1.6%)
Capabilities: civil works for water treatment and sewerage plants; micro-tunnelling and pipe jacking with advanced guidance systems; pipelines for drainage projects; pumping stations; operation of water and wastewater treatment plants.
Major projects under execution: micro-tunnelling project, Ahmedabad, Gujarat; MCGM micro-tunnelling project, Maharashtra; civil works for the Raw Water Intake System at Ganga River and Upper Khejuri Dam at Mirzapur, Uttar Pradesh.
Named clients: Ahmedabad Municipal Corporation; Mirzapur Thermal Energy (UP) Pvt. Ltd.
Adjacent development: the 26% associate stake in Morsagar Bisalpur Water Limited marks the Company's first move from pure contracting into a project-vehicle structure in water infrastructure.
Specialist plant fleet (as at December 2025)
| Equipment | Units |
|---|---|
| Tunnel Boring Machines | 7 |
| Micro Tunnel Boring Machines | 3 |
| Trench Cutters | 5 |
| Hydraulic Piling Rigs | 49 |
| Cranes | 120 |
| Batching Plants | 42 |
| Twin Boom Jumbo Drills | 9 |
| Jack-up Barges | 3 |
Financial Narrative
All figures consolidated, in ₹ crore, for fiscal years ended 31 March, unless stated. Primary sources: FY26 Annual Report (Directors' Report and Key Performance Indicators); quarterly results filings; investor presentations. Certain FY25 line items were reclassified in the FY26 accounts to align with the March 2026 classification; the reclassification did not affect reported profit. Where a pre-reclassification figure differs materially it is noted.
Income statement: notes and sources
Dividend note: FY25 (₹2.00) and FY26 (₹3.00) are as declared and confirmed in company announcements. FY22–FY24 values are derived from disclosed dividend-payout ratios of 11%, 10% and 11% respectively applied to reported EPS and should be treated as approximations pending confirmation from those years' annual reports. There are no options or convertibles outstanding, so basic and diluted EPS are identical.
Margins and growth
Revenue CAGR FY2022–FY2026: 27.5%. Five-year compounded sales growth as computed by market data providers is 30%; three-year 25%; ten-year 13%. Five-year compounded profit growth is 112% (flattered by the depressed FY21 base of ₹16 crore).
Balance sheet: notes and sources
Notes: Net worth for FY24–FY26 is per the Annual Report's Key Performance Indicators (₹1,498, ₹1,833 and ₹2,400 crore respectively); FY22–FY23 are computed as equity capital plus reserves. Net debt for FY22–FY25 is per the Company's Q3 FY26 investor presentation trend chart; FY26 net debt of ₹527 crore is per the FY26 Annual Report highlights. Certain secondary sources cite FY26 net debt of ₹430 crore; the Annual Report figure of ₹527 crore is preferred as the primary disclosure, and it reconciles with the Chairman's stated net-debt-to-equity of 0.22x (527 ÷ 2,400). Cash and equivalents are implied as gross debt less net debt and are therefore approximations. The FY24 gross-debt figure of ₹889 crore is from structured financial data; the Annual Report cites ₹862 crore for FY24 on a "gross debt including lease liabilities" basis — a definitional difference. Goodwill and intangible assets are not separately disclosed in the summary financial presentations available; the Company has made no acquisitions that would generate material goodwill.
Cash flow: notes and sources
Capital expenditure is derived as CFO less FCF. Dividends paid and buybacks are not separately broken out in the summary cash flow presentation; the FY26 dividend outflow, if approved, was disclosed as ₹51.54 crore. The Company has never announced a share buyback.
Ratios: notes and sources
Note on inventory days: ICRA's July 2025 rating rationale cites inventory days of 116 as at 31 March 2025 and 119 as at 31 March 2024 — materially different from the 73 and 86 shown above. The divergence reflects different denominators (ICRA computes against operating income on a standalone basis; the series above uses a cost-of-sales denominator on a consolidated basis). Both are internally consistent; the direction of travel differs. This is a genuine data conflict and should be resolved against the audited financial statements before any credit conclusion is drawn. ICRA also disclosed total outside liabilities to tangible net worth of 2.5x as at 31 March 2025 (2.9x as at 31 March 2024) and DSCR of 2.0x in FY25. Current ratio is not separately disclosed in the accessible summary statements.
Commentary on trends, inflections and drivers
The FY24 revenue inflection. Revenue grew 51.6% in FY24 — the sharpest expansion in the Company's listed history. This was not a new-order phenomenon; the order book actually declined slightly in FY24 to ₹19,918 crore from ₹20,044 crore. It was an execution phenomenon: the large marine and metro packages won in FY22–FY23 (including the ~₹3,290 crore marine contract and the USD 205 million order) hit peak billing simultaneously. Depreciation rose 83% in FY24 as the specialist fleet was commissioned. The lesson for FY27 modelling is precise and important: Cemindia's revenue lags its order book by roughly six to eight quarters, because large complex packages require six to seven months post-award for design and mobilisation before meaningful billing begins. Management said exactly this on the Q1 FY27 call to explain why 6% revenue growth coexisted with 66% order-book growth.
The FY25 working capital shock. FY25 is the year to interrogate. Revenue grew 19.8% and PAT 36.1%, but operating cash flow collapsed from ₹704 crore to ₹184 crore — cash conversion fell from 105% to 34%. Free cash flow was effectively nil at ₹12 crore. Net debt rose from ₹253 crore to ₹575 crore. The proximate cause was a ₹508 crore swing in "other liabilities" (from ₹3,534 crore to ₹3,026 crore), i.e. the unwinding of the supplier-credit and advance float that funds the negative cash cycle. This is the model's central fragility made visible. It was also the year the promoter transition was being negotiated and executed, and receivables from the Bangladesh contract were elevated.
The FY26 margin inflection. EBITDA margin expanded 170 basis points to 11.9% — the largest single-year improvement on record — and PAT margin reached 5.9%. Three drivers, in descending order of quality:
-
Genuine mix and operating leverage. Higher-margin marine, underground metro and data centre work displaced lower-margin scope; overheads were spread across a larger base. This is durable.
-
Claim realisations and provision reversals. Management explicitly stated on the Q4 FY26 call that Q4 margins of 15.1% were elevated by approximately ₹100 crore of claim realisations and provision reversals on completed metro projects. This is not recurring. Strip it out and FY26 EBITDA margin is approximately 10.9% — still an improvement on FY25's 10.2%, but a far less dramatic one. Q1 FY27's 10.5% margin is the better run-rate reference, and management's own guided sustainable range is 10.5–11%.
-
Falling depreciation and finance cost. Depreciation fell 14.5% to ₹166 crore and finance cost fell 9.0% to ₹215 crore despite higher revenue — the former reflecting an ageing fleet cohort, the latter reflecting improved credit terms following the ratings upgrade and change of control. Together these added roughly ₹49 crore to PBT.
Other income more than doubled to ₹177 crore in FY26 from ₹77 crore, contributing approximately ₹100 crore of the ₹310 crore PBT increase — nearly a third. This is a material quality-of-earnings observation that management commentary does not foreground.
Leverage and coverage. Gross debt has been almost flat at ₹993–1,001 crore across FY25 and FY26 while EBITDA grew 28%, driving interest coverage from 4.0x to 5.6x and net debt/EBITDA from 0.61x to 0.44x. This is the arithmetic that earned the A+ upgrade. Q1 FY27 net debt rose to ₹700 crore against net worth of ₹2,492 crore (0.28x) as mobilisation on new awards consumed cash — expected, and not yet concerning.
Returns. ROCE of 33.5% and ROE of 28.2% in FY26 are exceptional for Indian heavy civil and sit at the top of the peer set. They are, however, partly a function of the asset-light structure and the negative working-capital float: capital employed is artificially compressed. A ₹5,000 crore equity raise would mechanically halve ROE in the year of issuance and take several years to earn back — a point the market appears to be under-weighting.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Income Statement and Per-Share Data
| Metric (INR Cr) | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue from operations | 3,809 | 5,091 | 7,718 | 9,246 | 10,061 |
Other income | 45 | 63 | 64 | 77 | 177 |
Total income | 3,854 | 5,154 | 7,782 | 9,323 | 10,238 |
Operating expenses excl. depreciation and finance cost | 3,516 | 4,691 | 6,973 | 8,384 | 9,039 |
EBITDA (company definition, incl. other income) | 338 | 463 | 809 | 939 | 1,199 |
Depreciation and amortisation | 103 | 114 | 208 | 194 | 166 |
EBIT | 235 | 349 | 601 | 745 | 1,033 |
Finance cost (interest and bank charges) | 142 | 165 | 218 | 236 | 215 |
Profit before tax | 94 | 184 | 383 | 508 | 818 |
Total tax expense | 25 | 59 | 109 | 135 | 220 |
Profit after tax | 69 | 125 | 274 | 373 | 598 |
Basic EPS (INR per share of FV 1) | 4.01 | 7.23 | 15.93 | 21.70 | 34.79 |
Diluted EPS (INR per share of FV 1) | 4.01 | 7.23 | 15.93 | 21.70 | 34.79 |
Dividend per share (INR) | 0.44 | 0.72 | 1.75 | 2.00 | 3.00 |
Margin Analysis (%)
| Metric (%) | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
EBITDA margin on revenue | 8.9 | 9.1 | 10.5 | 10.2 | 11.9 |
EBIT margin on revenue | 6.2 | 6.9 | 7.8 | 8.1 | 10.3 |
Profit before tax margin | 2.5 | 3.6 | 5.0 | 5.5 | 8.1 |
Net profit margin | 1.8 | 2.5 | 3.6 | 4.0 | 5.9 |
Effective tax rate | 26 | 32 | 28 | 27 | 27 |
Revenue growth year on year | 39.6 | 33.7 | 51.6 | 19.8 | 8.8 |
EBITDA growth year on year | 15.4 | 37.0 | 74.7 | 16.1 | 27.7 |
PAT growth year on year | 331.3 | 81.2 | 119.2 | 36.1 | 60.3 |
Balance Sheet and Per-Share Data
| Metric (INR Cr) | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Equity share capital | 17 | 17 | 17 | 17 | 17 |
Reserves and surplus | 1,114 | 1,220 | 1,477 | 1,816 | 2,382 |
Total net worth | 1,131 | 1,237 | 1,494 | 1,833 | 2,399 |
Gross borrowings incl. lease liabilities | 560 | 766 | 889 | 993 | 1,001 |
Net debt | 130 | 278 | 253 | 575 | 527 |
Cash and equivalents (implied) | 430 | 488 | 636 | 418 | 474 |
Other liabilities | 1,925 | 3,013 | 3,534 | 3,026 | 3,686 |
Total liabilities and equity | 3,616 | 5,017 | 5,917 | 5,852 | 7,086 |
Net fixed assets | 655 | 847 | 1,081 | 1,077 | 1,168 |
Capital work in progress | 2 | 117 | 10 | 21 | 22 |
Investments | 113 | 45 | 5 | 0 | 0 |
Other assets incl. current assets | 2,847 | 4,007 | 4,821 | 4,753 | 5,897 |
Total assets | 3,616 | 5,017 | 5,917 | 5,852 | 7,086 |
Book value per share (INR) | 65.9 | 72.0 | 87.2 | 106.7 | 139.7 |
Cash Flow
| Metric (INR Cr) | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Cash from operating activities | 339 | 471 | 704 | 184 | 500 |
Capital expenditure (derived) | 95 | 402 | 335 | 172 | 226 |
Free cash flow | 244 | 69 | 369 | 12 | 274 |
Cash from investing activities | -25 | -438 | -419 | -233 | -147 |
Cash from financing activities | -56 | 28 | -123 | -218 | -243 |
Net change in cash | 258 | 61 | 162 | -267 | 110 |
Operating cash flow as % of EBITDA | 100 | 102 | 87 | 20 | 42 |
Cash conversion (CFO / operating profit) | 136 | 143 | 105 | 34 | 66 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Return on equity (%) | 6.3 | 10.6 | 20.0 | 22.4 | 28.2 |
Return on capital employed (%) | 13.8 | 19.4 | 27.8 | 28.5 | 33.5 |
Return on assets (%) | 1.9 | 2.5 | 4.6 | 6.4 | 8.4 |
Gross debt to equity (x) | 0.50 | 0.62 | 0.60 | 0.54 | 0.42 |
Net debt to equity (x) | 0.11 | 0.22 | 0.17 | 0.31 | 0.22 |
Net debt to EBITDA (x) | 0.38 | 0.60 | 0.31 | 0.61 | 0.44 |
Interest coverage, EBITDA basis (x) | 2.4 | 2.8 | 3.7 | 4.0 | 5.6 |
Interest coverage, EBIT basis (x) | 1.7 | 2.1 | 2.8 | 3.2 | 4.8 |
Asset turnover (x) | 1.05 | 1.01 | 1.30 | 1.58 | 1.42 |
Debtor days | 60 | 77 | 57 | 39 | 47 |
Inventory days | 118 | 119 | 86 | 73 | 82 |
Payable days | 276 | 275 | 179 | 232 | 238 |
Cash conversion cycle (days) | -99 | -78 | -36 | -120 | -110 |
Working capital days | -19 | -35 | -26 | -8 | 6 |
Geographic Revenue
| Geography | Dec 2025 | Mar 2026 |
|---|---|---|
India | 95 | 97 |
Overseas | 5 | 3 |
Geographic Revenue — Indian states of operation
| Metric | Dec 2025 | Mar 2026 |
|---|---|---|
Indian states of operation | 15 | 16 |
Overseas countries of operation | 3 | 3 |
Total project locations (standalone, BRSR basis) | 0 | 79 |
National project locations | 0 | 73 |
International project locations | 0 | 6 |
Valuation Snapshot
| Metric | Value |
|---|---|
Price (18 August 2026) | ₹1,335 |
Market capitalisation (18 August 2026) | ~₹22,933 crore |
Shares outstanding | 17,17,87,584 |
52-week high | ₹1,649.20–₹1,650 (July 2026) |
52-week low | ₹481.40–₹503.30 (March–May 2026, source-dependent) |
All-time high prior to FY27 | ₹943.20 (1 July 2025) |
All-time low | ₹2.61 (31 May 1989) |
Market capitalisation at 31 March 2026 | ₹8,773 crore |
Free float | ~32.5% (8,16,74,384 shares) |
Beta (1 year) | 0.47 to 1.15 (source-dependent) |
Return period
| Return period | Total return (%) |
|---|---|
1 year | 69 |
3 years | 87 |
5 years | 75 |
10 years | 25 |
Valuation Multiples
| Multiple | Cemindia (18 August 2026) | Reference points |
|---|---|---|
Trailing P/E | 38.2x (on TTM EPS of ₹35.03) | Afcons ~35.9x; NCC ~13.1–17x; J. Kumar ~9.1x; L&T ~31x |
Price to book | 9.5x (book value ₹140 per share) | J. Kumar ~1.06–1.21x; NCC materially below |
EV / EBITDA (FY26) | ~19.7x (EV ~₹23,633 crore on Q1 FY27 net debt of ₹700 crore) | J. Kumar ~4.26x |
EV / Sales (FY26) | ~2.35x | — |
Dividend yield | 0.22% | — |
Dividend payout ratio (FY26) | ~8.6% | — |
Source and Date Details
| Source and date | Consensus target |
|---|---|
Late 2025 (13 analysts, aggregated) | ₹862 (revised down from ₹865) |
Mid-2026 (3 analysts, aggregated) | ₹820 |
TradingView (2 analysts) | ₹828 (max ₹875, min ₹781) |
Later 2026 DCF-based fair value revision | ₹1,328 (raised from ₹875) |
Non-broker model-based estimate (June 2026) | ₹1,400 (bull ₹1,700, bear ₹945) |
Dividend History
| Fiscal year | Dividend per share (INR) | Payout ratio (%) | Notes |
|---|---|---|---|
FY2022 | 0.44 | 11 | Derived from payout ratio |
FY2023 | 0.72 | 10 | Derived from payout ratio |
FY2024 | 1.75 | 11 | Derived from payout ratio |
FY2025 | 2.00 | 9 | Confirmed; 200% of face value; approved at the AGM of 7 August 2025; paid 18 August 2025 |
FY2026 | 3.00 | 9 | Confirmed; 300% of face value; recommended 14 May 2026; record date 12 June 2026; paid 3 July 2026; total outflow ₹51.54 crore |
Credit Ratings
| Agency | March 2019 | March 2025 | February–March 2026 |
|---|---|---|---|
CARE Ratings | A (Stable) | A (Rating Watch with Positive implications) | A+ (Stable) |
ICRA | A (Stable) | A (Stable) | A+ (Stable) |
Balance Sheet and Financial Ratios (x)
| Metric | FY2024 | FY2025 | FY2026 | Q1 FY2027 |
|---|---|---|---|---|
Gross debt including lease liabilities (INR Cr) | 862 | 993 | 1,001 | 0 |
Net debt (INR Cr) | 253 | 575 | 527 | 700 |
Net debt to equity (x) | 0.17 | 0.31 | 0.22 | 0.28 |
Gross debt to equity (x) | 0.6 | 0.5 | 0.4 | 0 |
Analyst Conclusions
Management guidance for FY27
| Guidance item | FY27 target |
|---|---|
| Revenue growth | 25% (implying ~₹12,575 crore) |
| Order inflow | ~₹25,000 crore |
| Sustainable EBITDA margin | 10.5–11% |
| Bid pipeline | ₹90,000 crore at ~15% expected hit rate |
| Focus segments | Underground metro, marine, road tunnels, PSP hydro, data centres |
| Capital raise | Up to ₹5,000 crore authorised; instrument, size and timing undetermined |
Progress at Q1 FY27: revenue ₹2,721 crore (+5.6%), order inflow ₹8,519 crore (34% of the full-year target achieved in one quarter), plus ₹1,247 crore of July orders and L1 positions of approximately ₹990 crore. Order book ₹31,307 crore.
Consensus expectations
Sell-side consensus as at mid-2026 forecast revenue CAGR of 18.0–18.2%, earnings CAGR of 23.0–25.6%, EPS growth of 23.7–25.6% per annum, and a three-year forward ROE of approximately 24.9%. FY27 consensus EPS sat around ₹32.40 — below the FY26 actual of ₹34.79, reflecting analysts' assumption that FY26's claim-driven margin will not repeat. Net income was forecast to grow 29% in the following year against 26% for the Indian construction industry. Coverage is thin and targets are stale.
Bull case
-
The order book is not yet in the numbers. ₹31,307 crore against a ₹10,884 crore annualised run-rate is 2.9x coverage. If the six-to-seven-month mobilisation lag resolves as management describes, H2 FY27 and FY28 revenue acceleration is arithmetically supported, not speculative. Every large package awarded in Q1 FY27 begins billing before FY28.
-
The Adani pipeline is a step-change in addressable demand, not a marginal add. Data centre backlog went from nil to 13.3% of a much larger book in roughly eighteen months. Adani Enterprises targets 1 GW of data centre capacity by 2030; Adani Power has a substantial thermal pipeline (management cites ₹2,000–2,500 crore of annual potential); Adani Ports, Adani Road Transport and Adani Green all award directly. This is a captive multi-year annuity of tender opportunity that no listed peer possesses.
-
The credit and capital position is transformed. A+ (Stable) from both agencies, net debt/EBITDA of 0.44x, interest coverage of 5.6x, and now ₹5,000 crore of authorised equity headroom. Cemindia can bid single packages it previously could not underwrite — and the DMRC award of ₹212.54 crore plus a live ₹130 crore claim demonstrate that legacy claims are converting to cash.
Bear case
-
FY26's earnings growth is substantially non-recurring. Approximately ₹100 crore of Q4 claim realisations and provision reversals, plus a ₹100 crore increase in other income, account for roughly two-thirds of the ₹310 crore PBT increase. Adjusted FY26 EBITDA margin is closer to 10.9% than 11.9%, and Q1 FY27's 10.5% confirms the normalised level. The 60% PAT growth headline that drove a 116% three-month share price move is not a fair representation of underlying operating improvement.
-
The Company has already missed a revenue guidance number on exactly the risk it now asks investors to underwrite. FY26 delivered 8.8% against 15% guidance (itself cut from 20–22%) on Vadhvan Port delays. Q1 FY27 delivered 5.6%. To hit 25%, the remaining nine months must grow ~34%. The same execution-timing problem is affecting NCC (guidance withdrawn), Afcons (Q4 net loss) and J. Kumar (GMLR and Vadhavan delays) — it is a sector condition, not a company-specific solvable.
-
Valuation prices perfection while dilution is authorised. At 38.2x trailing earnings and 9.5x book against a 5.9% net margin, versus J. Kumar at 9.1x and 1.1x, the multiple embeds flawless conversion. A ₹5,000 crore raise implies up to ~18% dilution and would compress FY27 ROE from 28.2% toward the mid-to-high teens. Published sell-side targets of ₹820–865 sit 35–40% below the market price. Meanwhile the AP corruption matter has reopened, FII holding has fallen to 7.26%, working capital days have turned positive (+6 in FY26 from -8 in FY25), and net debt rose 33% in Q1 FY27.
Catalysts and monitorables — next twelve months
| Monitorable | Why it matters | Timing |
|---|---|---|
| Q2 and Q3 FY27 revenue conversion | The single decisive variable. H2 must deliver ~34% growth for the 25% target. Watch whether the Bihar highway, Pune metro, Ghansoli data centres and Mundra terminal move into billing | October 2026; February 2027 |
| EBITDA margin ex-claims | Whether the 10.5–11% guided band holds without claim support | Quarterly |
| QIP execution — size, price, timing, investor mix | Determines dilution quantum and whether institutional demand exists at current multiples. An enabling resolution, not a commitment | Any time from 17 August 2026 |
| FY27 order inflow run-rate | ₹8,519 crore in Q1 plus ₹1,247 crore in July puts ~₹9,766 crore against a ₹25,000 crore target. A slowdown would puncture the visibility narrative | Quarterly |
| Adani-group share of order book | Rising related-party concentration is both the bull thesis and the governance risk. Watch the disclosed percentage | Quarterly |
| AP High Court disposal of the Criminal Revision Cases | Reputational and commercial exposure in a state where the Company holds marine and irrigation work | Unpredictable |
| Working capital and operating cash flow | Working capital days turned positive in FY26; net debt rose to ₹700 crore in Q1 FY27. FY25 demonstrated how fast this model inverts | Quarterly |
| Realisation of the ₹212.54 crore DMRC award and the ₹130 crore arbitration claim | Direct cash impact; the DMRC award alone is ~36% of FY26 PAT | Ongoing |
| TBM procurement decision and capex | Management flagged new TBMs as required; a step-up in capex would pressure free cash flow | FY27 |
| Restoration of institutional coverage and holding | FII at 7.26%; sell-side targets stale by 35–40%. Coverage refresh could be a re-rating or de-rating catalyst | Ongoing |
Analyst verdict
Cemindia Projects is the clearest example in Indian listed construction of a business whose strategic position has improved faster than its operating results, and whose share price has outrun both.
The strategic re-rating is real and defensible. A ninety-five-year-old contractor with genuinely scarce marine and tunnelling pre-qualification has been acquired by the most aggressive infrastructure capital allocator in India. The order book has gone from ₹18,300 crore at the March 2025 trough to ₹31,307 crore fifteen months later — a 71% increase that is not a market-share story but a captive-demand story. Both rating agencies upgraded to A+. The balance sheet carries net debt/EBITDA of 0.44x and interest coverage of 5.6x. ROCE of 33.5% leads the peer set. Safety performance, at an LTIFR of 0.09 across 128 million man-hours, is genuinely best-in-class and commercially material in a sector where incidents stop work. None of this is promotional; it is in the filings.
The operating record is more equivocal, and the market is not pricing it. FY26 revenue grew 8.8% against guidance of 15% — itself already cut from 20–22%. Roughly two-thirds of the FY26 PBT increase came from ₹100 crore of Q4 claim realisations and provision reversals plus a doubling of other income to ₹177 crore. Q1 FY27's 5.6% revenue growth and 10.5% EBITDA margin are the honest run-rate. Working capital days turned positive for the first time in five years, and net debt rose 33% sequentially to ₹700 crore. The Company is now asking investors to underwrite 34% growth over the next nine months — on exactly the execution-conversion risk it failed to manage last year, in a sector where NCC has withdrawn guidance entirely and Afcons posted a Q4 loss.
Against that, the stock trades at 38.2x trailing earnings and 9.5x book — roughly four and eight times J. Kumar respectively, on a lower EBITDA margin — while published sell-side targets sit 35–40% below the market price and an authorised ₹5,000 crore raise implies up to 18% dilution that would compress ROE by roughly a third in the issuance year. FII holding has fallen from 21% to 7.3%. The Andhra Pradesh corruption matter, discharged in April, was reopened by the State ACB in August.
The synthesis is not that the business is weak — it is that the equity currently offers very little margin of safety against an execution assumption that management itself missed twelve months ago. For a trade-partner, supplier, lender or acquirer, Cemindia is a strengthening counterparty with improving credit and a demonstrably captive demand pipeline. For an equity investor at ₹1,335, the entire strategic re-rating is already in the price, and the operating proof is not yet in the numbers. The next two quarterly prints, and the terms of the QIP, will settle which of those two readings the market ends up holding.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | DIN | Appointed | Age | Background |
|---|---|---|---|---|---|
Dr Malay Ramesh Mahadevia | Non-Executive Chairman (Non-Independent) | 00,064,110 | 28 May 2025 | 62 | Joined Adani in 1992; developed Mundra port from conceptualisation to commissioning. Master's in Dental Surgery, Nair Hospital Dental College; PhD in coastal ecology around the Mundra area, Kutch, Gujarat University (2008). Formerly Assistant Professor, Government Dental College, Ahmedabad. Awarded 'Outstanding Manager of the Year' by Ahmedabad Management Association (2002). Member of CEPT, FICCI, ASSOCHAM, CII, GCCI, and Board of Advisors for Maritime Studies at Gujarat University |
Mr Jayanta Basu | Managing Director | 08,291,114 | MD from 23 April 2019; Whole-Time Director from 31 October 2018; with the Company since 1986 | — | B.E. Civil Engineering, Indian Institute of Engineering Science and Technology (formerly Bengal Engineering College), Calcutta University. 40+ years' experience. Joined as Graduate Engineer Trainee in 1986; COO in 2017. Domain expert in maritime structures. Former National Council Member, Construction Federation of India; Member, Board of Governors, NICMAR Mumbai |
Mr KS Rao (Srinivasa Rao Kattunga) | Non-Executive, Non-Independent Director | 00,022,533 | 28 May 2025 | — | B.E. Mechanical Engineering; 30+ years managing business growth across digital and physical infrastructure. Currently Whole-time Director at Adani Infra (India) Limited |
Mr Manoj Kumar Kohli | Independent Director | 00,162,071 | 20 June 2025 (term to 19 June 2028) | 67 | 47 years across manufacturing, telecom, renewable energy and digital in 30+ countries. Chairman and Managing Partner, MK Knowledge LLP. Formerly Country Head, SoftBank India (to January 2023), supporting ~USD 15 billion of investment across 25+ Indian companies; Executive Chairman, SB Energy (7+ GW renewables); MD and CEO, Bharti Airtel across 20 countries, scaling from 2 million to 400+ million customers. GSMA Board member 2008 and 2012; Chairman, CII Task Force on Ease of Doing Business; member, National Start-up Advisory Council. Degrees in Commerce and Law and an MBA from Delhi University; executive programmes at Michigan and Wharton. 'Telecom Man of the Year' (2000) |
Mrs Sangeeta Bhatia | Independent Director | 06,889,475 | 20 June 2025 (term to 19 June 2028) | 66 | 36 years in Finance and Accounts at NTPC Ltd, spanning its growth from 200 MW to an integrated power major. Raised over USD 3 billion via multilateral/bilateral/commercial loans, export credits and Eurobonds. Supported ERP implementation across 100+ locations. B.Sc.; Diploma in International Trade; ICFAI |
Mr Abizer Shabbir Diwanji | Additional Director, Non-Executive Independent | 02,540,442 | 29 April 2026 (first term to 28 April 2029) | — | Rank-holder Chartered Accountant. Founder, NeoStrat Advisors LLP. Previously head of financial services across KPMG and EY (the Annual Report cites both "20 years" and "30 years" in different passages — an internal inconsistency). Handled Lehman Brothers and MF Global liquidations (2008); started EY India's Restructuring business (2015); restructuring assignments included SP Group and HCC. Former COO of SBUT. Member of RBI/SEBI/MCA-appointed policy committees. Teaches Investment Banking at SP Jain; Course Director, PGIP, Indian Institute of Corporate Affairs, Manesar; visiting faculty at IIM Ahmedabad, NLU Delhi and SIMSREE |
“—” = not publicly disclosed.
Governance Overview
| Attribute | Position |
|---|---|
Board size as at 31 March 2026 | 5 (1 Executive, 2 Non-Executive Non-Independent, 2 Non-Executive Independent) |
Board size following 29 April 2026 appointment | 6 |
Independent directors as % of board (FY26 basis) | 50% |
Women directors | 1 (Mrs Sangeeta Bhatia) |
Chair/CEO separation | Yes — Dr Malay Mahadevia is Non-Executive Chairman; Mr Jayanta Basu is Managing Director |
Chairman independence | No — the Chairman is a promoter-affiliated Non-Independent Director |
Board meetings held in FY26 | 12 |
Independent Directors' separate meetings in FY26 | 2 (30 October 2025 and 4 February 2026) |
Statutory committees chaired by Independent Directors | 80% |
Non-statutory committees chaired by Independent Directors | 67% |
Board of Directors by Director
| Director | Role | Departure | Date |
|---|---|---|---|
Mr Piyachai Karnasuta | Non-Executive Chairman | Resigned on change of control | 29 May 2025 |
Mr Santi Jongkongka | Whole-Time Director / Executive Vice Chairman | Resigned on change of control | 29 May 2025 |
Mr Sunil Shah Singh | Independent Director (since 22 February 2018) | Resigned | 20 June 2025 |
Ms Jana Chatra | Independent Director (since 9 November 2022) | Resigned | 20 June 2025 |
Mr Pankaj Inderchand Jain | Independent Director (since 31 October 2018; reappointed 31 October 2023) | Deceased | 12 March 2026 |
Executive Leadership Team
| Name | Position | Appointed |
|---|---|---|
Mr Jayanta Basu | Managing Director | 23 April 2019 |
Mr Nitesh Sharma | Chief Financial Officer (Joint Executive Vice President & CFO) | 16 June 2025 |
Mr Rahul Neogi | Company Secretary, Compliance Officer, Investor Relations contact (Senior Vice President & Company Secretary) | 1 February 2017 |
Executive Leadership Team — Mr Arbind Kumar Rai
| Name | Designation |
|---|---|
Mr Arbind Kumar Rai | Executive Vice President |
Mr Manish Kumar | Executive Vice President & Chief Technical Officer |
Mr Sunder L. Chanchlani | Executive Vice President & Chief Commercial Officer |
Mr Shivanagouda N. Patil | Executive Vice President |
Mr Kaushik Nandi | Executive Vice President |
Mr Nitesh Sharma | Joint Executive Vice President & Chief Financial Officer |
Mr Schon Sarkar | Joint Executive Vice President |
Mr VR Gopakumar | Joint Executive Vice President – Head Human Resources |
Mr Sudarshan Salunkhe | Senior Vice President |
Mr Navneet Kabra | Senior Vice President |
Mr Rahul Neogi | Senior Vice President & Company Secretary |
Mr KR Senthilnathan | Vice President – Head Business Development |
Mr Soumitra Ghosh | Vice President |
Mr Rupak Sarkar | Chief Operating Officer (per third-party governance data) |
Mr Arnab Das | Joint Executive Vice President & Proposal Head; elevated to Senior Management Personnel effective 1 November 2025 |
Mr Kamlesh Vishwakarma | Accounts and Taxation Head |
Mr Rahul Agarwal | Head, Investor Relations |
Directors' Remuneration
| Metric | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|
Managing Director total compensation (INR Mn) | 26 | 32 | 43 | 53 |
Managing Director fixed salary component (INR Mn) | 7 | 17 | 20 | 12 |
Ratio of MD compensation to median employee pay (x) | 0 | 0 | 0 | 47 |
Shareholding Trend
| Holder category (%) | Sep 2024 | Mar 2025 | Jun 2025 | Mar 2026 | Jun 2026 |
|---|---|---|---|---|---|
Promoters | 46.64 | 46.64 | 67.46 | 67.46 | 67.46 |
Foreign institutional investors | 20.99 | 13.95 | 9.21 | 7.31 | 7.26 |
Domestic institutional investors | 2.32 | 6.14 | 0.79 | 1.94 | 2.86 |
Public and others | 30.06 | 33.28 | 22.55 | 23.28 | 22.40 |
Number of shareholders | 108,988 | 102,140 | 92,686 | 90,782 | 90,808 |
Major Shareholders
| Rank | Holder | Shares | Stake (%) |
|---|---|---|---|
| 1 | Renew Exim FZCO (formerly Renew Exim DMCC) / S.B. Adani Family Trust — promoter | 115,892,883 | 67.46 |
| 2 | Hitesh Javeri | 3,057,375 | 1.78 |
| 3 | CD Equisearch Private Limited / CD Equifinance Pvt Ltd | 2,622,543 | 1.53 |
| 4 | Blue Diamond Properties Pvt Ltd | 2,535,238 | 1.48 |
| 5 | The Vanguard Group, Inc. | 2,096,017 | 1.22 |
| 6 | Aalidhra Textool Engineers Pvt Ltd | 2,000,000 | 1.16 |
| 7 | Acadian Asset Management LLC | 1,979,833 | 1.15 |
| 8 | Shruti Lodha | 1,720,000 | 1.00 |
| 9 | Norges Bank Investment Management | 1,016,324 | 0.59 |
| 10 | Goldman Sachs Asset Management, L.P. | 555,122 | 0.32 |
Competitive Landscape
Competitors by Segment
| Segment | Principal competitors |
|---|---|
Maritime structures and ports | Afcons Infrastructure; Larsen & Toubro (Heavy Civil Infrastructure); Adani Ports' in-house EPC; Van Oord and Boskalis (dredging/reclamation, international); Dredging Corporation of India |
Underground metro and tunnelling | Afcons Infrastructure; Larsen & Toubro; J. Kumar Infraprojects; Hindustan Construction Company (HCC); Patel Engineering; Navayuga Engineering; Continental Engineering Corporation and other international tunnelling specialists |
Elevated metro and viaducts | J. Kumar Infraprojects; Afcons; L&T; NCC; Rail Vikas Nigam Limited; Ircon International |
Airports | Larsen & Toubro; Shapoorji Pallonji; NCC; Tata Projects; GMR/GVK in-house EPC |
Highways, bridges and flyovers | G R Infraprojects; PNC Infratech; Dilip Buildcon; Ashoka Buildcon; H.G. Infra Engineering; KNR Constructions; Ceigall India; Montecarlo; Gawar Construction; APCO Infratech |
Hydro, dams and pumped storage | Patel Engineering; Hindustan Construction Company; Afcons; Megha Engineering & Infrastructures; L&T |
Industrial structures and buildings | Tata Projects; Shapoorji Pallonji; L&T; NCC; Kalpataru Projects International |
Water and wastewater | VA Tech Wabag; NCC (Water division); L&T; Megha Engineering |
Data centre construction | L&T; Shapoorji Pallonji; Tata Projects; Ahluwalia Contracts; international specialist DC contractors |
Peer Comparison FY2026
| Metric (INR Cr, FY26) | Cemindia | L&T (consolidated) | NCC (consolidated) | Afcons Infrastructure | J. Kumar Infraprojects | Kalpataru Projects Intl. |
|---|---|---|---|---|---|---|
Revenue / total income | 10,061 | 285,874 | 20,944 | 12,322 | 5,723 | 26,565 |
EBITDA | 1,199 | 0 | 0 | 1,439 | 823 | 0 |
EBITDA margin (%) | 11.9 | 0 | 0 | 11.7 | 14.4 | 0 |
Profit after tax | 598 | 17,238 | 675 | 251 | 387 | 0 |
Net profit margin (%) | 5.9 | 6.0 | 3.2 | 2.0 | 6.8 | 0 |
Order book at 31 March 2026 | 24,545 | 740,327 | 83,004 | 32,496 | 18,554 | 65,457 |
Order inflow FY26 | 14,821 | 435,590 | 31,884 | 4,125 | 0 | 0 |
Order book to revenue (x) | 2.4 | 2.6 | 4.0 | 2.6 | 3.2 | 2.5 |
Revenue growth FY26 (%) | 8.8 | 12.0 | -6.3 | -5.4 | 1.0 | 0 |
Recent Developments
Chronological register, February 2025 to August 2026.