Central Puerto S.A. Overview
Central Puerto is Argentina's largest private-sector power generator, operating a diversified fleet of roughly 7 GW across combined-cycle gas turbines, conventional steam units, cogeneration, the 1,440 MW Piedra del Águila hydro complex, and about 569 MW of wind and solar farms. Born from the 1992 privatization of SEGBA, it combines legacy Buenos Aires baseload assets (Puerto and Costanera complexes) with newer, dollar-contracted capacity. The company is now repositioning from a regulated, CAMMESA-dependent generator toward an integrated, market-facing energy platform. Argentina's 2025 market liberalization (Resolution SE 400/2025) restored dollar-denominated, negotiated pricing and created a thermal term market where Central Puerto already holds over 35% share. Growth vectors include a 30-year renewal of Piedra del Águila (secured for USD 245 million), 205 MW of battery storage due in 4Q26, self-procurement of natural gas, and a nascent upstream position in Vaca Muerta. Leverage remains modest at 1.2x net debt to EBITDA.
Company's own description (latest annual filing and press releases). Central Puerto describes itself as one of the largest private-sector power generation companies in Argentina measured by both installed capacity and generation, with a portfolio diversified by geography and technology: combined cycles, co-generation units, steam turbines, hydroelectric plants, wind turbines and photovoltaic farms, listed on both the New York and Buenos Aires exchanges (press release, 5 May 2026). Its FY2025 20-F organized the business into segments for conventional generation, renewable generation, natural gas transport and distribution (deconsolidated via the ECOGAS split-off effective 1 October 2025) and forest activity.
What the company does. Central Puerto generates and sells electricity and steam into the Argentine Wholesale Electricity Market (MEM), dispatched by CAMMESA (the market administrator). Revenue derives from four principal mechanisms:
Business model characterization. By the user's taxonomy, Central Puerto is essentially a product business (electricity and steam as commodities) with a growing contracted (quasi-subscription) element: long-dated, dollar-indexed PPAs and capacity contracts. In FY2025, 68% of energy sales were US-dollar-denominated versus 52% in FY2021 (4Q25 release, annual table), and management reports that 97% of gross financial debt is dollar-denominated (4Q25 webcast), giving a natural hedge.
Value-chain position. Central Puerto sits in the generation stage of the electricity chain. It does not own transmission or electricity distribution. Until October 2025 it held equity in the gas distributors Distribuidora de Gas Cuyana and Distribuidora de Gas del Centro (Ecogas group); those stakes were spun off to shareholders. Since April 2026 it has moved upstream into hydrocarbons through Patagonia Energy S.A., and management targets self-procurement of natural gas for its combined cycles.
Customer types and end-markets.
-
CAMMESA (state-majority market administrator) for spot/base remuneration and RenovAr/legacy contracts.
-
Large industrial users: over 120 large industrial customers in 2Q26 (2Q26 release).
-
Distribution companies: 16 distribution companies under contract in 2Q26.
-
Industrial steam off-takers at San Lorenzo (Santa Fe) and Luján de Cuyo (Mendoza).
-
Forestry product buyers (timber, logs) from the Mesopotamia-region plantations.
Independent characterization. Central Puerto is best understood as a hybrid: a legacy, regulated baseload generator whose economics were historically set by government resolution and paid by a chronically late CAMMESA, now undergoing a regime change toward a merchant-plus-contracted model. Its moat is scale and location: the Puerto and Costanera complexes sit inside the Buenos Aires load center, giving them system-critical status and making them natural hosts for the AlmaGBA battery projects. The 2025–2026 inflection (Res. 400/2025, the Piedra del Águila renewal, the Brigadier López closing cycle and storage) is turning a cash-generative but capital-constrained utility into a growth platform. Its emerging adjacencies (mining stakes, oil and gas, a gas-infrastructure vehicle) signal ambitions toward a diversified Argentine energy holding, a strategy that adds optionality but also execution and capital-allocation risk.
Strategy
Stated strategic themes (paraphrased from 2025 annual report, 2026 investor presentations and calls).
-
Commercial repositioning under market liberalization: maximize contracted, dollar-denominated sales under Res. 400/2025 while retaining selective spot exposure; secure over a third of the new thermal term market.
-
Fuel self-procurement and vertical integration: capture margin by sourcing liquid fuels, LNG and, increasingly, domestic natural gas directly; management would be satisfied to self-supply three combined-cycle units (about 4–5 million m³/day, roughly one-third to 40% of total consumption), with full local-gas self-procurement more feasible toward 2028 when Plan Gas.Ar expires.
-
Asset base renewal and expansion: secure long-life concessions (Piedra del Águila to 2055/2056), close open cycles (Brigadier López), add storage (205 MW BESS) and selectively add renewables (Cafayate, San Carlos).
-
Diversification into an "integrated energy platform": entry into Vaca Muerta upstream (Patagonia Energy), gas infrastructure (Gasinver), mining equity (3C Lithium; formerly AbraSilver), and opportunities in transmission and data centers flagged on the 2Q26 call.
-
Financial discipline: keep leverage low (1.2x), fund growth with multilateral and local-market debt, and return excess capital (buybacks; September 2026 special dividend).
Initiatives announced in the last 24 months.
ESG/sustainability commitments. IFC financing implies adherence to IFC Performance Standards; renewables reached about 7.75% of national renewable generation share in 2025. Formal emissions targets were not identified.
Cost programs. No formal company-wide cost-reduction program with targets was identified in the sources reviewed.
Management medium-term targets/guidance.
Implied 2026 adjusted EBITDA, computed from management's increment, is about USD 487–497 M; LTM to June 2026 was USD 403.8 M.
Products & Services
For a power generator, "products" are generating assets and the energy/capacity/steam they sell. Each asset is listed individually.
Conventional thermal generation
| Asset | Location | Technology / capacity | Commercial model | Notes | Source |
|---|---|---|---|---|---|
| Puerto complex (Puerto Nuevo and Nuevo Puerto) | City of Buenos Aires | 1,747 MW thermal: combined cycle and steam turbines | Spot/base energy, Res. 400 term contracts | Host site for 150 MW Nuevo Puerto BESS | 6-K 2Q25 note 1 |
| Central Costanera | City of Buenos Aires | 661 MW from four steam turbo units plus 1,128 MW from two combined cycles (Mitsubishi and Siemens) | Spot and contracts | Acquired 2023; both CCs under maintenance in 4Q25, returned 1Q26; host for 55 MW Costanera BESS | 6-K 2Q25; 1Q26 call |
| Luján de Cuyo | Mendoza | 576 MW plus 125 t/h steam (cogeneration) | Spot, contracts, steam sales | One gas turbine out of service since a generator failure in 1Q25 (still out in 2Q26) | 6-K 2Q25; 2Q26 call |
| Terminal 6 – San Lorenzo cogeneration | San Lorenzo, Santa Fe | Cogeneration with 340 t/h steam capacity; MW not extracted | Energía Plus/contracts and steam to industrial host | Located at an agro-export terminal | 2025 Annual Report (6-K) |
| Brigadier López | Sauce Viejo, Santa Fe | 280.5 MW open cycle converted to combined cycle by a 140 MW closing unit; COD January 2026 | New PPA sales from 2026 | FIX estimated about USD 60 M incremental EBITDA from 2026 | 6-K 2Q25; FIX Aug 2025; 1Q26 call |
Hydroelectric generation
| Asset | Location | Capacity | Status | Source |
|---|---|---|---|---|
| Piedra del Águila | Limay River, Neuquén | 1,440 MW (largest of the four Comahue concessions) | New 30-year concession won for USD 245 M (beating three rival bids between USD 170 M and USD 205 M); concession to 2055/2056; committed works plan of USD 160 M; regulated-sale share phased out progressively by 2046 | Company press release; iProfesional; 4Q25 release |
Renewable generation (568.8 MW commercially authorized at end-2025)
| Asset | Type | Capacity (MW) | Location | Notes |
|---|---|---|---|---|
| La Castellana | Wind | 100.8 | Buenos Aires province | RenovAr |
| La Castellana II | Wind | 15.2 | Buenos Aires province | MATER |
| La Genoveva | Wind | 88.2 | Buenos Aires province | Vientos La Genoveva |
| La Genoveva II | Wind | 41.8 | Buenos Aires province | MATER |
| Achiras | Wind | 48.0 | Córdoba | RenovAr |
| Los Olivos | Wind | 22.8 | Córdoba | CP Los Olivos S.A.U. |
| Manque | Wind | 57.0 | Córdoba | CP Manque S.A.U. |
| Guañizuil II A | Solar PV | 100.0 | San Juan | Cordillera Solar |
| Cafayate | Solar PV | 80.0 | Salta | Acquired Sep 2025 for USD 48.5 M |
| San Carlos | Solar PV | 15.0 | Salta | COD 2025; PPA term to 2035 |
Sources: 6-K 2Q25 note 1 (473.8 MW list); 2025 Annual Report summary (568.8 MW); 3Q25 6-K. Note: the 2Q25 list labels La Genoveva sizes from the financial statements; minor rounding differences exist across documents.
Storage (under construction)
| Project | Capacity | Duration | Status (2Q26) | Expected contribution |
|---|---|---|---|---|
| Nuevo Puerto BESS (AlmaGBA) | 150 MW | 5 hours | 69% construction complete; COD expected 4Q26 | Together with Costanera BESS: USD 25–27 M adjusted EBITDA in 2027 |
| Costanera BESS (AlmaGBA) | 55 MW | 5 hours | 54% complete; COD expected 4Q26 | As above |
Source: 2Q26 earnings call (MarketBeat summary); IFC/Mercom. Note: an investor review summarizing 1Q26 referenced mid-2027 COD; the 2Q26 call reaffirmed 4Q26, the more recent statement.
Equity-accounted thermal associates (FONINVEMEM-related)
| Associate | Capacity | Role |
|---|---|---|
| Termoeléctrica José de San Martín (TJSM) | 865 MW | Combined cycle built with generators' receivables (FONINVEMEM) |
| Termoeléctrica Manuel Belgrano (TMB) | 873 MW | Same |
| Central Vuelta de Obligado (CVOSA) | 816 MW | Combined cycle; Central Puerto earns management fees |
Source: 6-K 2Q25 note 1. Outstanding FONINVEMEM receivable credit: USD 118 M at end-2025 and USD 105.8 M at 1Q26 (4Q25 and 1Q26 calls).
Non-power businesses
| Business | Description | Status |
|---|---|---|
| Forestry | About 72,000 ha acquired from Masisa (2022) plus Empresas Verdes Argentina/Las Misiones (2023); timber and log sales; 27 employees at end-2025 | Revenue USD 3.6 M in 3Q25 |
| Oil and gas (Patagonia Energy S.A.) | Aguada del Chivato and Aguada Bocarey blocks, about 110 km² (over 27,000 oil-focused acres) in northern Vaca Muerta; conventional exploitation licence valid to May 2031 with potential for unconventional concession (CENCH); existing oil treatment plant of 1,900 bbl/d | Closed 16 April 2026; USD 50 M deployed in 1H26; technical due diligence ongoing |
| Mining equity stakes | 3C Lithium (Tres Cruces, Catamarca), now 35%; AbraSilver 9.9% sold September 2026 | Financial investments via Proener |
| Gas infrastructure vehicle (Gasinver) | 50/50 company with Ecogas group entities (DGCU 20%, DGCE 18%, Ecogas Inversiones 12%) to invest in gas business and privatization tenders | Formed July 2026 |
Pricing models. Spot remuneration is set by Secretariat of Energy resolutions (historically Res. 59/2023 for contracted combined cycles, with base energy indexation; from November 2025 Res. 400/2025 with USD-denominated pricing). RenovAr pricing is fixed in USD for 20 years; MATER and Res. 400 term contracts are bilaterally negotiated (individual prices not disclosed). Management cited about USD 7/MWh net of fuel costs as an illustrative margin for self-procured fuel dispatch in its 4Q25 materials.
Financial Narrative
All figures below are management convenience USD figures from the 4Q25 earnings release (6-K, March 2026) unless stated otherwise. Statutory figures are in ARS under IAS 29.
Income statement
Note: the FY2025 revenue figure appears as USD 782.6 M in the release and webcast and USD 782.8 M in the transcript; the difference is rounding/translation. Pre-tax income is computed below.
(The 4Q25 release reconciliation shows pre-tax figures of 143.5 for FY2022 and 70.9 for FY2021, matching the computation.)
Margins
FY2021 adjusted EBITDA margin computed (393.7/510.2). Operating income in FY2022–FY2023 was inflated by non-recurring items (including FONINVEMEM-related effects and, in 2023, effects of the Costanera business combination), so adjusted EBITDA is the cleaner operating measure.
Revenue CAGR (computed): FY2021–FY2025, 11.3% per year (510.2 to 782.6). FY2022–FY2025, 11.4% per year.
Quarterly trajectory: notes and sources
Sources: 2Q25, 3Q25, 4Q25, 1Q26, 2Q26 releases and calls. 1Q26 net income computed from 2Q26 disclosure (82.5 = 41.9% below 1Q26). Discrepancy flag: The 2Q26 release states revenues rose 165.8% YoY and net income rose 22.2% YoY, implying re-presented 2Q25 revenue of about USD 170.5 M and net income of about USD 67.5 M, versus USD 179.6 M and USD 71.2 M originally reported. The difference reflects the functional-currency change and re-translation; both are noted. A rise in 2Q26 revenue to USD 453.3 M also reflects grossed-up fuel revenues when the company self-procures fuel (when CAMMESA supplies fuel under the gas program, fuel cost is not recognized as revenue), which compresses the reported EBITDA margin (about 32% in 2Q26, computed) without implying weaker unit economics.
Balance sheet and leverage
Sources: 4Q25 release; 1Q26 and 2Q26 calls; 2Q25 6-K. Debt composition: 97% USD-denominated at end-2025 (4Q25 webcast).
Cash flow and capital allocation
Sources: 4Q25 webcast; 2Q26 call. FIX SCR reported positive free cash flow in each of the four years to 2024, averaging about USD 115 M, and projected about USD 100 M for 2025 (FIX, August 2025). Buybacks: USD 10 M programs in 2022 and 2023 (252,034 and 2,299,993 shares repurchased respectively) and a USD 20 M program from September 2025 (20-F FY2025 Item 16E).
Ratios
Interest-coverage computations use the "financial expenses" line, which in Argentina includes FX differences and inflation-related items; they understate true cash interest coverage. As a rough indicator only, FY2025 net income of USD 254 M against aggregator-implied equity of about USD 2.0 billion implies an ROE in the low teens.
Commentary on trends and inflections
FY2021–FY2023: regulated erosion. Adjusted EBITDA fell from USD 393.7 M (FY2021) to USD 277.8 M (FY2023), and the margin compressed from about 77% to 52%, as peso-denominated base-energy remuneration lagged inflation and legacy dollar contracts rolled off. Headline net income was distorted by enormous financial items (FY2023 financial expenses of USD 537 M versus financial income of USD 354 M), typical of a hyperinflationary, devaluing environment.
FY2024: the regulatory floor. Revenue recovered to USD 671.3 M as spot prices were realigned under the new administration, but net income collapsed to USD 52 M on FX and impairment effects; CAMMESA payment arrears early in 2024 strained the sector.
FY2025: normalization despite volume headwinds. Revenue grew 17% to USD 782.6 M and adjusted EBITDA 17% to USD 337.2 M even though generation dropped 14% to 18,598 GWh, reflecting historically low hydrology at Piedra del Águila and major maintenance at Costanera and Puerto combined cycles. Higher margins from self-procured liquid fuels added roughly USD 8–12 M (the transcript cites about USD 8 M; the webcast slide cites USD 12 M — a discrepancy between documents). Net income rose 389% to USD 254.1 M on improved financial results.
1H2026: structural inflection. Adjusted EBITDA reached USD 120.0 M in 1Q26 and USD 145.0 M in 2Q26 (+136% YoY). Drivers: Res. 400/2025 pricing, Brigadier López PPA sales, return of Costanera combined cycles, full-period contributions from Cafayate and San Carlos, the new Piedra del Águila concession, and self-procured fuel margins. Leverage rose from 0.32x to 1.2x as the company paid USD 245 M for Piedra del Águila and funded storage and oil and gas, but remains low for a utility.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Segment Overview
| Segment | Contents | Status |
|---|---|---|
Electric power generation from conventional sources | Puerto complex (Puerto Nuevo, Nuevo Puerto), Central Costanera, Luján de Cuyo cogeneration, Terminal 6–San Lorenzo cogeneration, Brigadier López, Piedra del Águila hydro; steam sales; CVO management fees | Core segment |
Electric power generation from renewable sources | Wind farms (La Castellana I/II, La Genoveva I/II, Achiras, Los Olivos, Manque) and solar farms (Guañizuil II A, Cafayate, San Carlos) | Core segment |
Natural gas transport and distribution | Stakes in Distribuidora de Gas Cuyana, Distribuidora de Gas del Centro, Inversora de Gas del Centro, Energía Sudamericana (Ecogas group) | Spun off effective 1 Oct 2025 (ECOGAS split-off-merger) |
Forest activity (Forest and others) | Plantation forestry companies acquired 2022–2023 (Forestal Argentina, Empresas Verdes Argentina, Las Misiones, etc.) | Small; non-core |
Oil and gas (prospective) | Patagonia Energy S.A. (Aguada del Chivato, Aguada Bocarey) | Acquired April 2026; segment presentation for FY2026 not yet published |
Segment revenue (ARS Bn, constant Dec-2025 measuring unit)
| Segment revenue (ARS Bn, constant Dec-2025 measuring unit) | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Conventional generation | 705.0 | 751.2 | 877.9 |
Renewable generation | 158.2 | 162.9 | 169.3 |
Forestry | 16.7 | 28.7 | 19.1 |
Total of three continuing segments (computed) | 879.9 | 942.9 | 1,066.3 |
Segment growth and mix (computed from 20-F FY2025) | FY2024 | FY2025 | — |
Conventional YoY growth (%) | 6.6 | 16.9 | — |
Renewable YoY growth (%) | 3.0 | 3.9 | — |
Forestry YoY growth (%) | 72.5 | -33.6 | — |
Conventional share of segment revenue (%) | 79.7 | 82.3 | — |
Renewable share of segment revenue (%) | 17.3 | 15.9 | — |
Forestry share of segment revenue (%) | 3.0 | 1.8 | — |
Revenue Lines
| Revenue line (ARS Bn) | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Spot sales | 445.5 | 469.4 | 548.8 |
Sales under contracts | 375.3 | 392.8 | 450.3 |
Steam sales | 42.4 | 52.0 | 51.8 |
Forestry | 16.7 | 28.7 | 19.1 |
Revenue by Segment and Segment Margins & Growth (%)
| Metric (USD Mn) | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Thermal and hydro revenues | 396.2 | 450.2 | 422.5 | 519.5 | 632.1 |
Thermal and hydro operating expenses | -262.9 | -299.7 | -335.8 | -400.7 | -489.9 |
Thermal and hydro operating margin (computed) | 133.3 | 150.5 | 86.7 | 118.8 | 142.2 |
Renewable operating expenses | -38.1 | -40.6 | -49.3 | -49.3 | -53.0 |
Renewable operating margin | 63.1 | 61.5 | 43.9 | 62.8 | 63.0 |
Renewable revenues (computed: margin minus expenses) | 101.2 | 102.1 | 93.2 | 112.1 | 116.0 |
Income Statement and Per-Share Data
| Metric (USD Mn) | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Revenue | 510.2 | 566.1 | 536.9 | 671.3 | 782.6 |
Energy sales | 482.1 | 524.9 | 489.9 | 595.4 | 712.3 |
Cost of sales | — | -298.4 | -359.4 | -407.2 | — |
Gross income | — | 267.7 | 177.5 | 264.2 | — |
Operating income | — | 345.0 | 529.5 | 170.3 | 265.1 |
Adjusted EBITDA | 393.7 | 344.0 | 277.8 | 288.0 | 337.2 |
Financial income | 18.0 | 144.7 | 354.4 | 107.8 | 89.8 |
Financial expenses | 153.5 | 244.2 | 537.0 | 154.6 | 172.4 |
Income tax | -74.6 | -37.5 | -36.7 | -72.6 | -71.5 |
Net income | -3.7 | 106.0 | 193.3 | 52.0 | 254.1 |
Net income attributable to equity holders | -4.5 | 105.8 | 194.0 | 41.6 | 249.3 |
EPS basic and diluted (USD per share) | 0.00 | 0.07 | 0.13 | 0.03 | 0.17 |
EPS per ADS (USD, computed x10) | 0.0 | 0.7 | 1.3 | 0.3 | 1.7 |
FONINVEMEM collections (USD Mn) | 72.9 | 69.4 | 66.3 | 74.4 | 54.2 |
Income Statement
| Metric (USD Mn, computed) | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Pre-tax income (net income minus income tax line) | 70.9 | 143.5 | 230.0 | 124.6 | 325.6 |
Margin (%)
| Margin (%) | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Gross margin | — | 47.3 | 33.1 | 39.4 | — |
Operating margin (computed) | — | 60.9 | 98.6 | 25.4 | 33.9 |
Adjusted EBITDA margin (reported) | 77.2 | 61 | 52 | 43 | 43 |
Net margin (computed) | -0.7 | 18.7 | 36.0 | 7.7 | 32.5 |
US$-denominated share of energy sales | 52 | 62 | 59 | 59 | 68 |
Financial Analysis
| Metric (USD Mn) | 1Q25 | 2Q25 | 3Q25 | 4Q25 | 1Q26 | 2Q26 |
|---|---|---|---|---|---|---|
Revenue (as originally reported 2025) | 196.2 | 179.6 | 233.9 | 172.8 | 248.6 | 453.3 |
Adjusted EBITDA | 89.9 | 61.4 | 101.1 | 84.7 | 120.0 | 145.0 |
Net income (as originally reported) | 80.1 | 71.2 | — | 0.4 | 142.0 | 82.5 |
Generation (GWh) | — | 4,372 | — | 3,957 | 5,420 | 5,250 |
Income Statement and Financial Ratios (x)
| Metric (USD Mn) | Jun-2025 | Dec-2025 | Mar-2026 | Jun-2026 |
|---|---|---|---|---|
Gross financial debt | — | 337.8 | — | — |
Cash and cash equivalents | — | 25.8 | — | — |
Current financial assets | — | 205.7 | — | — |
Cash plus current financial assets | 235.2 | 231.5 | — | — |
Net financial debt | — | 106.3 | 390.8 | 493.4 |
LTM adjusted EBITDA | 309.9 | 337.2 | 367.2 | 403.8 |
Net debt / LTM adjusted EBITDA (x) | — | 0.32 | 1.06 | 1.2 |
FONINVEMEM receivable outstanding | — | 118.0 | 105.8 | — |
Cash Flow and Margin Analysis (%)
| Metric (USD Mn) | FY2025 | 1H2026 |
|---|---|---|
Total capex (incl. acquisitions) | 202.4 | 421.9 |
of which growth capex | 150.4 | — |
Piedra del Águila concession payment | — | 245.0 |
Oil and gas blocks acquisition | — | 50.0 |
Battery storage projects | — | 106.0 |
Maintenance and other | — | 20.9 |
Financial Ratios (x)
| Ratio | FY2022 | FY2023 | FY2024 | FY2025 | LTM Jun-2026 |
|---|---|---|---|---|---|
Net debt / adjusted EBITDA (x) | — | — | — | 0.32 | 1.2 |
Adjusted EBITDA / financial expenses (x, computed) | 1.4 | 0.5 | 1.9 | 2.0 | — |
Geographic revenue (% of total)
| Geographic revenue (% of total) | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Argentina | 100 | 100 | 100 |
Rest of world | 0 | 0 | 0 |
Capital Markets Data (USD)
| Month-end close (USD per ADS) | Sep-2023 | Sep-2024 | Sep-2025 | Mar-2026 | Jul-2026 |
|---|---|---|---|---|---|
CEPU ADS | 5.82 | 9.47 | 8.01 | 16.83 | 14.53 |
Return (computed, price only, to ~USD 14.15)
| Return (computed, price only, to ~USD 14.15) | 1-year | 3-year |
|---|---|---|
CEPU ADS (%) | 77 | 143 |
Valuation Multiples
| Multiple (aggregator, Aug 2026) | Value |
|---|---|
Enterprise value (USD Bn) | 2.65 |
P/E TTM (x) | 6.27 |
EV/EBITDA TTM (x, aggregator) | 4.63 |
P/S TTM (x) | 1.81 |
P/B TTM (x) | 1.04 |
EV / LTM adjusted EBITDA (x, computed: ~USD 2.1 bn market cap + USD 0.49 bn net debt over USD 403.8 M) | 6.4 |
Declared / Paid Details
| Declared / paid | Amount | Notes | Source |
|---|---|---|---|
Nov 2019 | ARS 0.71 per share (ARS 7.1 per ADR) | Release of optional reserve | 6-K Nov 2019 |
Dec 2022 | ARS 2.881893 per share | Paid 30 Dec 2022; option for USD payment | 6-K/A Dec 2022 |
Dec 2024 | About USD 0.31 per ADS | Ex-date 29 Nov 2024; paid 13 Dec 2024 | TipRanks (aggregator) |
Sep 2026 | ARS 164.00 per share (ARS 247.3 bn total) | Extraordinary; record 18 Sep, paid 25 Sep 2026; 7% withholding; USD election for foreign holders | 6-K 16 Sep 2026; Panabee |
Capital Programmes
| Program | Authorization | Shares repurchased | Status |
|---|---|---|---|
2022 Program | Up to USD 10 M, 180 days | 252,034 | Expired; shares cancelled October 2025 |
2023 Program | Up to USD 10 M, 180 days | 2,299,993 | Expired |
2025 Program | Up to USD 20 M; max 10% of capital; daily limit 25% of average volume; caps USD 11/ADR and ARS 1,750/share | Ongoing purchases on BYMA from Sept–Oct 2025 | Approved 25 Sep 2025 |
Credit Ratings
| Agency | Rating | Outlook | Date | Note |
|---|---|---|---|---|
Moody's Local Argentina | AAA.ar (issuer, local and foreign currency) | Stable | 10 Apr 2026 (upgrade from AA+.ar) | Equity rated 1.ar; ON Class D due 2030 rated AAA.ar (24 Apr 2026) |
FIX SCR (Fitch affiliate) | AA+(arg) | Stable | 18 Dec 2025 (upgrade from AA(arg)) | Applies to issuer and ONs Class A and C (USD 136 M outstanding at the time) |
Moody's (global scale) | Not publicly disclosed / not rated in sources reviewed | — | — | — |
S&P (global scale) | Not publicly disclosed / not rated | — | — | — |
Fitch (global scale) | Not publicly disclosed / not rated | — | — | — |
Capital Instruments
| Instrument | Amount | Terms | Maturity |
|---|---|---|---|
IFC loan | USD 300 M facility (USD 50 M drawn 16 Apr 2026); 1% commitment fee on undrawn from 2 Jan 2026 | SOFR + 4.00% or 4.15% | — |
ONs Class A and C | USD 136 M outstanding (Dec 2025) | Local market | Moody's Local lists instruments due 2029 |
ON Class D | — | Local market | 2030 |
Central Costanera bank loans (Santander) | Not fully extracted | Short-term and junior shareholder loans | Various |
Total gross financial debt | USD 337.8 M (Dec 2025) | 97% USD-denominated | — |
Analyst Conclusions
Management guidance. 2026 adjusted EBITDA expected to rise USD 150–160 M versus 2025's USD 337.2 M (implied ~USD 487–497 M); BESS projects to add USD 25–27 M in 2027; Piedra del Águila works plan USD 160 M over the concession; leverage to remain moderate (FIX estimate ~1.3x Debt/EBITDA in 2026).
Consensus. Aggregator consensus price target ~USD 14.75, roughly in line with the current price; no reliable consensus EBITDA series was verified.
Bull case.
-
Earnings re-rating already visible: LTM adjusted EBITDA rose from USD 337.2 M (Dec 2025) to USD 403.8 M (Jun 2026), and 2Q26 alone was USD 145.0 M; guidance implies further growth, while the stock trades near 6x EV/adjusted EBITDA (computed).
-
Contracted, dollarized cash flows: 68% USD revenue share in 2025 and growing term-market leadership (>35%) reduce regulatory risk versus history.
-
Optionality at low cost: Vaca Muerta acreage, storage pipeline, gas self-procurement and Gasinver offer upside, with management's record of value creation evidenced by the AbraSilver exit (6.4x cost).
Bear case.
-
Regulatory and macro reversibility: the 2024–2026 improvement rests on policy (Res. 400/2025); a political shift could reimpose peso pricing or intervention, as experienced before 2024.
-
Operational fragility: aging steam fleets, unresolved Luján de Cuyo outage, and hydrology risk produced a 14% volume decline in 2025.
-
Capital allocation drift: expansion into upstream oil and gas and infrastructure JVs requires new capabilities; leverage already quadrupled in six months (0.32x to 1.2x).
Catalysts and monitorables (next 12 months).
Concluding analyst verdict. Central Puerto has crossed a genuine inflection point. For a decade its earnings were hostage to peso-denominated regulated tariffs, inflation accounting and a slow-paying state counterparty; adjusted EBITDA drifted down from about USD 394 M in 2021 to USD 278 M in 2023. The 2025–2026 reforms have flipped the model: dollar pricing, a contestable thermal term market in which Central Puerto has claimed leadership, and the ability to earn fuel-procurement margins. Simultaneously, management executed a dense sequence of asset moves — retaining Piedra del Águila for 30 years at a defensible price, closing Brigadier López, winning the country's largest storage contract, and divesting gas distribution and a mining stake at attractive values. The result is an LTM adjusted EBITDA of about USD 404 M with net leverage of only 1.2x and top local credit ratings.
The equity, at roughly 6x EV/adjusted EBITDA on our computation, does not obviously price the full guided 2026 step-up, though valuation discounts for Argentine sovereign and policy risk are rational and persistent. The principal debates are (i) durability of the regulatory regime beyond the current administration, (ii) the reliability of an aging thermal fleet, and (iii) whether the push into hydrocarbons and gas infrastructure creates or dilutes value. On balance, the evidence supports a constructive view: management has demonstrated disciplined pricing in competitive tenders, the balance sheet provides capacity, and storage plus gas integration add visible 2027 growth. Investors should, however, treat Central Puerto as a high-beta proxy for Argentine reform continuity rather than a defensive utility, size positions accordingly, and track three metrics above all: term-market share and pricing, plant availability (notably Costanera and Luján de Cuyo), and the capital intensity of the new oil and gas venture. Data gaps flagged throughout — particularly segment USD profitability, balance-sheet ratios and global-scale ratings — should be closed from the full FY2025 20-F before final investment decisions.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Executive Leadership Team
| Name | Title | Tenure / background | Source |
|---|---|---|---|
Fernando Roberto Bonnet | Chief Executive Officer | CEO since 1 April 2021; COO from March 2020 to March 2021; earlier SEC contact person (2018 20-F) | 20-F; Simply Wall St summary of filings |
Enrique Terraneo | Chief Financial Officer | CFO; SEC contact person on recent 20-F covers | 20-F FY2023; calls 2023–2026 |
María Laura Feller | Head of Investor Relations | Leads IR from 2026 | Press release May 2026; 2Q26 call |
Alejandro Díaz López | Head of Corporate Finance | Previously Investor Relations Officer (2025) | 1Q26 call; Apr 2025 release |
Leonardo Marinaro | Legal Affairs Manager; Head of Market Relations (2019) | — | 6-K Nov 2019 |
Board of Directors
| Name | Role | First appointed | Background | Source |
|---|---|---|---|---|
Osvaldo Arturo Reca | Chairman (re-appointed 30 April 2026) | 5 April 2011 | Engineer (Universidad Católica Argentina); advanced degree, North Carolina State University (1977); former commercial, operating and planning manager at Alpargatas (1989–2002); vice chairman of HPDA (2012–2015); former director of TGN and Edesur; chairs Central Costanera and several group/affiliate boards; born 14 December 1951 | 20-F FY2019–FY2021; company website; 6-K Apr 2026 |
Miguel Dodero | Vice Chairman (appointed 30 April 2026) | 21 September 2015 | Business Administration (Universidad de Buenos Aires); Agencia Marítima Dodero; president of Dodero Inmobiliaria y Mandataria (1990–2014); president of Full Logistics since 2008; born 16 February 1955 | 20-F; company website; 6-K Apr 2026 |
José Luis Morea | Director; Audit Committee member | 30 April 2019 | Independent under CNV rules (per 2019–2020 20-F) | 20-F FY2019/2020; 6-K Apr 2026 |
Tomás White | Director; Audit Committee member | — | — | 6-K Apr 2026 |
Jorge Villegas | Director; Audit Committee member | — | — | 6-K Apr 2026 |
José Manuel Ortiz | Alternate Audit Committee member | — | — | 6-K Apr 2026 |
Mario Elizalde | Alternate Audit Committee member | — | — | 6-K Apr 2026 |
Board & Management Changes
| Date | Change | Context |
|---|---|---|
1 Apr 2021 | Fernando Bonnet becomes CEO | Succession from Jorge Rauber |
2025–2026 | IR leadership moves from Alejandro Díaz López (now Head of Corporate Finance) to María Laura Feller | Corporate finance build-out alongside larger capex program |
30 Apr 2026 | Board re-constituted after AGM: Reca chairman, Dodero vice chairman; new Audit Committee slate | Routine post-AGM appointments |
Competitive Landscape
Key Competitors
| Competitor | Segment overlap | Positioning notes |
|---|---|---|
Pampa Energía | Thermal, hydro, wind; also upstream oil and gas | 5,472 MW installed (2025); consolidated adjusted EBITDA exceeded USD 1 billion in 2025, split roughly evenly between power and oil and gas; net debt USD 801 M (Dec 2025) |
YPF Luz | Thermal, wind, cogeneration | — |
AES Argentina | Thermal, hydro (lost Alicurá in 2025 tender), wind | Hydro footprint reduced |
Enel Argentina | Thermal, hydro | Exited Costanera (2023) and lost El Chocón (2025 tender) |
MSU Energy / MSU Green Energy (BML Inversora) | Thermal; hydro from 2026 | Won El Chocón–Arroyito (USD 235.7 M) |
Edison Energía / Edison Inversiones | Hydro | Won Alicurá (USD 162 M) and Cerros Colorados |
Genneia | Wind and solar | Largest renewable generator; competes in MATER |
Albanesi / Generación Mediterránea | Thermal | Debt restructuring history |
Capex S.A. | Thermal, wind, upstream | Integrated small-cap peer |
Aluar (with Genneia in hydro bid) | Hydro (Futaleufú), wind | Bid for El Chocón (USD 223.8 M joint offer) |
Central Dock Sud | Thermal (Buenos Aires) | Competing metropolitan thermal asset |
Peer Comparison FY2025
| Metric | Central Puerto (FY2025) | Pampa Energía (FY2025) |
|---|---|---|
Installed generation capacity (MW) | 6,938 | 5,472 |
Revenue (USD Mn) | 782.6 | — |
Adjusted EBITDA (USD Mn) | 337.2 | 1,000 |
Revenue growth YoY (%) | 17 | — |
Adjusted EBITDA margin (%) | 43 | — |
Net debt (USD Mn) | 106.3 | 801 |