China Everbright Environment Group Limited Overview
China Everbright Environment is China's largest environmental-services group by revenue. It ranked first in the China Environment Chamber of Commerce "Top 50 Chinese Environmental Enterprises by Revenue" for the seventh consecutive year in 2025. Broker research also describes it as the world's largest investor-operator of waste-to-energy (WTE) assets, with about 163,000 tonnes/day of WTE capacity across 196 operating WTE projects at end-2025. The group is a state-backed, concession-based infrastructure operator. It runs three core platforms:
Environmental Energy: WTE and synergistic solid-waste streams.
Environmental Water: via 72.87%-owned China Everbright Water.
Greentech: biomass, hazardous waste and renewables, via 69.70%-owned China Everbright Greentech.
These are supported by equipment manufacturing and an R&D arm. After a decade of capex-led BOT expansion, the company is moving from "investment-and-construction driven" to "operations driven" growth. Construction revenue fell to 6% of sales in 1H2026. Management is redirecting capital toward dividends, debt reduction, overseas WTE (Central Asia, Southeast Asia), and asset-light equipment and technology exports.
What the company does
Everbright Environment invests in, designs, builds, operates and transfers environmental infrastructure, mostly under long-dated concessions. The main contract forms are BOT (build-operate-transfer), BOO (build-own-operate), TOT (transfer-operate-transfer) and PPP structures with Chinese local governments, typically for 25–30 years. As at 30 June 2026 (2026 interim results):
-
Business footprint covered 24 Chinese provinces, autonomous regions and municipalities plus one SAR, spanning 228 cities and counties.
-
Overseas markets covered 20 countries, including Germany, Poland, Vietnam and Uzbekistan.
-
The group had invested in and implemented 603 environmental projects, with total committed investment of about RMB164.506 billion.
-
It also provides asset-light services: environmental remediation, waste sorting, design consulting, equipment supply and technical services.
Company's own description (paraphrased from FY2025 results materials)
The company describes its primary responsibility as serving China's "ecological civilisation" agenda and creating a sound living environment. Its core businesses are solid waste, water-related business and clean energy. Its stated goal is "Building a World-Class Environmental Enterprise with Chinese Characteristics", with milestones of notable progress by 2030 and world-class standing by 2035. It pursues three development strategies:
-
Technology as a driving force (科技化).
-
Internationalisation (国际化).
-
An industrial ecosystem (生态型).
Together these are branded "两化一型" ("two-isations and one type"). They sit under a broader "Second-Stage Entrepreneurship" (二次创业) programme.
Revenue model
| Revenue category (HKD Mn) | FY2024 | FY2025 | 1H2025 | 1H2026 |
|---|---|---|---|---|
| Operation service revenue | 19,440 | 19,830 | 9,943 | 10,755 |
| Construction service revenue | 5,790 | 2,720 | 1,844 | 853 |
| Finance income (concession receivables) | 5,028 | 4,971 | 2,516 | 2,573 |
| Total revenue | 30,258 | 27,521 | 14,304 | 14,181 |
Under HK(IFRIC)-Int 12 service-concession accounting, revenue is recognised in three categories.
Notes:
-
FY2025 categories are from the FY2025 results (72%/10%/18% mix). FY2024 operation and construction figures are derived from the disclosed YoY changes (+2% and −53%), and FY2024 finance income is the residual.
-
1H2025 categories are from a Zheshang-style broker review of the 2025 interim. 1H2026 operation and construction figures are from the interim announcement as reported by Zhitong/Guosen, and finance income is the residual (18%).
-
One broker (Gelonghui-carried 1H26 review) reports 1H2026 operation revenue of HK$10,529M and construction of HK$848M, a minor discrepancy versus HK$10,755M and HK$853M.
The three categories map onto distinct economics:
Operation service revenue: is recurring. It comprises waste tipping/treatment fees paid by municipalities, on-grid electricity tariffs (including national renewable subsidies for older WTE and biomass projects), heat and steam sales to industrial users, wastewater treatment tariffs, water supply charges, hazardous-waste disposal fees, slag/by-product sales, and green certificate and electricity-trading income.
Construction service revenue: is recognised as BOT assets are built. It carries a construction margin but no cash until operation.
Finance income: is the unwinding of interest on financial-asset concession receivables.
Mix characterisation (analyst view). By value, the group is roughly 90% service/utility-like (operations plus finance income) and about 6–10% construction. Product sales (equipment manufacturing) and technology licensing are small, but management is pushing them, especially overseas. There is no subscription or licensing model of significance.
Value-chain position
Everbright is vertically integrated across the WTE value chain:
-
Technology R&D: grate furnaces, flue-gas purification, leachate treatment, fly-ash treatment.
-
Equipment manufacturing: Changzhou, Jiangsu base, plus a state-level environmental equipment innovation centre under development.
-
EPC/construction.
-
Long-term operation.
-
Downstream monetisation: power, steam, biomethane, slag, green certificates.
This integration is a key differentiator against pure operators and pure equipment makers.
Customers and end-markets
| Customer type | Description | Revenue mechanism |
|---|---|---|
| Municipal and county governments (PRC) | Grantors of WTE, wastewater and water-supply concessions | Tipping fees, wastewater tariffs, availability payments |
| State Grid / provincial grid companies | Offtakers of electricity from WTE, biomass, solar and wind | On-grid tariff plus renewable subsidy (where eligible) |
| Industrial parks and enterprises | Steam and heat offtake, industrial wastewater, hazardous waste | Steam price, disposal fees. Example: biomethane supply to Jiangsu Jingjiang Special Steel. |
| Overseas governments and municipalities | Vietnam (Can Tho, Hue), Uzbekistan (Namangan, Fergana), Indonesia (Bekasi, preferred partner) | BOT/BOO tipping fees and power |
| Overseas EPC / equipment buyers | Thailand, Malaysia, Egypt, Italy, Turkey, Philippines, Singapore, Seychelles | Equipment supply, EPC, O&M contracts |
End-markets: municipal solid waste treatment; food/kitchen waste and sludge; municipal and industrial wastewater; water supply; biomass power and heat; hazardous and solid industrial waste; soil and environmental remediation; distributed solar and wind; power-battery recycling (emerging); biomethane and waste-to-hydrogen (pilot).
Independent characterisation
Economically, Everbright Environment is a regulated-like infrastructure annuity wrapped in a state-owned enterprise. Its earnings power comes from the large installed base built in 2015–2021 (WTE capacity grew at about a 31% CAGR in 2017–2021 per Industrial Securities), now ageing into a cash-harvest phase. The post-2021 decline in reported revenue (from HK$49.9bn in FY2021 to HK$27.5bn in FY2025) is overwhelmingly a construction-revenue run-off, not an erosion of operating earnings. The equity story has shifted from growth to yield and deleveraging. Three swing factors dominate:
-
Collection of government receivables and national renewable subsidies.
-
Refinancing at lower RMB rates.
-
Whether overseas WTE and asset-light exports can offset domestic saturation.
Strategy
Stated strategic framework (FY2025 annual results / 2026 interim)
Vision. "Building a World-Class Environmental Enterprise with Chinese Characteristics", with milestones in 2030 and 2035.
Three Major Development Strategies (两化一型):
-
Technology (科技化). The 1H2026 interim lists four breakthroughs: core technology, commercialisation, standards and AI.
-
Internationalisation (国际化). The interim lists three leaps: heavy-asset, asset-light and customer pipeline.
-
Ecosystem (生态型). The interim lists three results: industry-chain partnerships, multi-party trust and brand.
Strategic missions:
-
Serve national regional strategies.
-
Serve livelihood needs (solid waste, water, clean energy).
-
Serve the green Belt and Road.
Operating programmes:
-
"Second-Stage Entrepreneurship" (二次创业).
-
"Twenty Refined Management Measures".
-
"Fifteen Special Measures to Increase Operating Revenue".
-
"Four Adherences": problem orientation, people-centredness, focus on core business, uniting efforts.
Division-level 2026 business plan (FY2025 presentation)
| Pillar | Goal | Focus |
|---|---|---|
| Environmental Energy | Leading integrated solid-waste service provider at home and abroad | Intelligent operations, internationalisation, M&A, cost efficiency |
| Environmental Water | First-class comprehensive water operator in China | Growth, intelligent operations, higher sector ranking |
| Greentech | First-class clean-energy operator anchored in integrated biomass | Risk control; dispose of or revitalise non-core hazardous-waste assets; high-value biomass |
| Equipment Manufacturing | One-stop environmental equipment provider | Overseas equipment sales and services; profit contribution |
| Envirotech | Domestic technology innovation leader | Cutting-edge tracking; new business models |
| International Business | "Vital pillar" of Second-Stage Entrepreneurship | Rising overseas revenue share and financial contribution |
Strategic initiatives, last 24 months
| Initiative | Date | Detail / target |
|---|---|---|
| A-share (Shenzhen) listing | Announced 14 Nov 2025 | ≤800M RMB shares (+≤15% over-allotment). Aims: broaden financing, strengthen technology capability, attract insurance and mutual-fund capital |
| 15th Five-Year Plan strategic planning system | 2,025 | Formal plan for 2026–2030 |
| First AI construction plan | 1H2026 | "AI + environmental protection" across all scenarios; five showcases: smart power plants, smart water plants, smart biomass fuel yards (zero accidents), fly-ash reduction, energy efficiency |
| State-level environmental equipment innovation centre | 2025–2026 | 6 academicians preliminarily confirmed |
| "3+1" key R&D areas | 2025– | Waste-to-hydrogen, fly-ash resource utilisation, high-value biomass, micro-scale grate furnace |
| Overseas regional model | 2,025 | Representative offices in Vietnam, Indonesia and Central Asia; shift from project-driven to region-focused |
| Central Asia WTE | 2025– | Uzbekistan 2 × 1,500 t/d (~RMB3bn), equity IRR estimated at ~11% by Industrial Securities; operation expected 2027 |
| Southeast Asia re-entry | Jul–Aug 2026 | Bekasi, Indonesia (1,400 t/d, >RMB1bn); Thanh Hoa, Vietnam (1,000 t/d, ~RMB0.8bn); first return to Vietnam in 8 years |
| Biomethane / bio-natural gas | 2,025 | First project (10M Nm³/yr) for Jingjiang Special Steel |
| Receivables asset-preservation department | 2,025 | Collection rate >98% |
| Non-core disposal programme | 2,025 | 10 projects disposed |
| Procurement reform | 2,025 | Public procurement rate ~95% (+3.5ppt) |
| Cost programme | 2025–2026 | Routine management expenses −10%+ (2025); administrative expenses −21.3% (1H2026) |
| Financing diversification | 2025–2026 | RMB10.14bn raised in 2025 (MTNs, ABS, science-and-technology innovation bonds); RMB15bn PRC debt registration (Jan 2026); 2.15% and 1.67% MTNs (2026) |
| ESG governance | 2,025 | Sustainability Committee; ESG White Paper; ESG forum in Hong Kong |
Medium-term financial targets and guidance
The company does not publish numerical revenue or profit guidance. Qualitative commitments:
-
Achieve a "high-quality start" to the 15th Five-Year Plan.
-
Raise the operations share of revenue.
-
Raise the overseas revenue share and financial contribution.
-
Sustain shareholder returns. Payout rose from 30.5% (FY2023) to 41.8% (FY2024) to 42.3% (FY2025); the 1H2026 interim payout was 40.4%.
BofA expects the A-share process to bring a clearer dividend policy.
Products & Services
Pricing model note: tariffs are set per concession agreement and are not disclosed project by project. For WTE electricity, the PRC policy reference historically included a benchmark of RMB0.65/kWh for the first 280 kWh per tonne, with national subsidies capped by "reasonable utilisation hours". This is a policy framework, not a company disclosure.
Environmental Energy
| Offering | Description / capabilities | Target customer | Pricing model | Flagships / notes |
|---|---|---|---|---|
| Household-waste-to-energy (WTE) | Grate-furnace incineration with ultra-low-emission flue-gas purification; ~58Mt waste and 28.5bn kWh in FY2025 | Municipal governments, grid | Tipping fee plus power tariff (plus subsidy where eligible) | Hainan Sanya WTE Phase V (750 t/d, secured 2025); Suzhou, Hangzhou and Sanya plants (cities named among UN's first 20 "zero-waste cities") |
| Food & kitchen waste treatment | Anaerobic digestion co-located with WTE; ~8Mt with sludge in FY2025 (+87%) | Municipalities | Treatment fee | Synergy with WTE sites |
| Leachate treatment | Membrane and anammox processes | Internal plus third party | Fee / internal | Zhejiang Ninghai WTE: first anammox application in China's WTE sector |
| Sludge treatment & disposal | Co-incineration / drying | Municipal WWTPs | Fee | — |
| Methane-to-energy / biogas | Landfill and digester biogas capture | Grid / gas users | Tariff | — |
| Biomethane (bio-natural gas) | Biogas upgrading to pipeline-quality gas | Industrial gas users | Gas sales price | First biomethane project (10 million Nm³/yr) supplying Jiangsu Jingjiang Special Steel; Wuxi Xidong WTE sells biomethane externally |
| Heat & steam supply | Extraction steam from WTE turbines | Industrial parks | Steam price | ~3.5Mt (FY2025) |
| Fly-ash landfill & resource utilisation | Stabilisation; proprietary fly-ash recirculation treatment | Internal / municipalities | Fee | Fly-ash resource utilisation is a "3+1" R&D priority |
| Medical waste treatment | High-temperature treatment | Hospitals / municipalities | Fee | — |
| Fecal treatment | Night-soil treatment | Municipalities | Fee | — |
| Slag utilisation | Bottom ash processing to building materials | Construction-material users | Sales | ~12Mt slag (+55%) |
| Zero-carbon energy projects | Integrated low-carbon energy | Beijing Daxing District | TBD | Investment cooperation agreement (2025) |
| Waste charcoal production | 100 t/d waste-to-charcoal process | Industrial | Sales | Developed in 2025 |
Environmental Water (China Everbright Water)
| Offering | Description | Customer | Pricing | Notes |
|---|---|---|---|---|
| Municipal WWT | 1.811bn m³ treated (FY2025) | Municipalities | Per-m³ tariff | Tariff increases cited in 1H2026 |
| Industrial WWT | Niche industrial effluents | Industrial parks | Fee | Huadu, Guangzhou cosmetics-industry WWT via minority stake (2025) |
| Water supply | Raw / potable supply (~103M m³) | Municipalities | Tariff | — |
| Reusable water | Reclaimed water (>40M m³) | Industry / municipal | Tariff | — |
| Sludge treatment | — | WWTPs | Fee | 125 t/d sludge capacity commissioned in 2025 |
| Sponge city & river-basin restoration | Ecological water management | Local governments | EPC / PPP | — |
| Wastewater-source heat pumps | Thermal recovery from effluent | Buildings | Energy price | — |
| Plant-level solar | 20MW across 12 plants | Self-use | Saves cost | — |
| Digital operations | "Dark factory", AI-driven visual inspection | Internal | — | Deployed in 2025 |
| Synergy-based external services | >30 contracts (WWT, reusable water, technical services) | Third parties | Contract | 2,025 |
Greentech (China Everbright Greentech)
| Offering | Description | Customer | Pricing | Notes |
|---|---|---|---|---|
| Integrated biomass utilisation | Agricultural and forestry residue-fired CHP | Grid, industrial heat users | Power tariff, subsidy, steam price | Anhui Dangshan biomass: first loss-to-profit turnaround without national subsidy |
| Hazardous & solid waste treatment | Incineration, landfill, physicochemical, resource recycling | Industrial generators | Disposal fee per tonne | Under "revitalise or dispose" review; unit prices recovering in 2026 |
| Environmental remediation | Soil / groundwater remediation (73 projects, RMB1.88bn cumulative) | Governments, developers | EPC contract | Asset-light |
| Solar PV | Distributed and utility solar | Grid / C&I | Tariff | — |
| Wind power | Onshore wind | Grid | Tariff | — |
| Virtual Power Plant & electricity sales | Aggregation and market trading platform | C&I customers | Spread | Customer base expanded in 2025 |
| Green certificates | Trading of green energy certificates | Corporates | Market price | Volume ~11.3 times higher in FY2025 |
| Biomass-to-hydrogen / methanol (pilot) | Pilot projects | Future industrial | — | Exploratory |
| SCR high-dust denitrification | For water-cooled vibrating-grate biomass boilers | Internal / external | — | 2025 breakthrough cutting SCR cost |
Equipment Manufacturing
| Offering | Description | Customer | Notes |
|---|---|---|---|
| Grate furnaces (large) | WTE incineration grates | Internal plus third-party WTE | Exported to Thailand, Malaysia, Egypt, Italy, Turkey |
| Micro-scale grate furnace | 10 t/d (and below) units for remote areas and islands; described as internationally leading, filling a domestic gap | Remote counties, islands, overseas | 14 units sold cumulatively (Qinghai, Malaysia, etc.) as at Aug 2026 |
| Flue-gas purification systems | Ultra-low-emission technology | WTE operators | MEE 2025 exemplary case |
| Leachate treatment equipment | Packaged systems | WTE / landfill | Technology selected as a national typical case (2026) |
| Power-battery recycling equipment | High-efficiency pyrolysis and valuable-component recovery | Battery recyclers | In MIIT 2025 encouraged catalogue and the national major environmental equipment list; first full-chain demo in Jiangsu |
| "Equipment Cloud Service" platform | Remote monitoring and after-sales digital service | Equipment customers | Launched 2025 |
| Overseas EPC | Turnkey plants | Overseas governments | Philippines: 5 EPC contracts (~RMB400M) in 1H2026 |
Envirotech, digital and asset-light services
| Offering | Description | Notes |
|---|---|---|
| Design & consulting | Environmental project design institute | Asset-light revenue |
| Technical services / O&M | Third-party operation | Overseas O&M (Singapore, Seychelles, etc.) |
| ACC (automatic combustion control) | AI-based combustion control for incinerators, scaled in 2026 ("AI brain" for incineration) | Flagship AI deployment |
| Operations AI assistant | Internal AI operations model; selected as a Digital China Summit typical case | 2,026 |
| Intelligent power plants | Unmanned slag crane operation; integrated DCS | Rolled out in 2025 |
| Waste sorting & sanitation services | Collection / sorting contracts | Asset-light |
Financial Narrative
Sources: FY2021–FY2025 annual results announcements (audited; HKFRS). Ratios are derived where noted.
Income statement
Notes:
-
FY2021 EPS is derived as profit attributable divided by 6,143M shares.
-
Diluted EPS equals basic because no dilutive instruments exist.
-
FY2021–FY2023 payout ratios are derived; FY2024–FY2025 are company-reported.
-
Dividend splits: FY2021 interim 19.0 + final 15.0; FY2022 final 9.0; FY2023 final 8.0; FY2024 final 9.0; FY2025 interim 15.0 + final 12.0.
Margins
All margins are derived.
Growth rates:
-
Revenue CAGR FY2021–FY2025 (derived): −13.8% a year.
-
Profit attributable CAGR (derived): −12.8% a year.
-
EBITDA CAGR (derived): −9.1% a year.
Commentary. The revenue decline is a mix effect. Construction revenue fell from a peak during the 2019–2021 BOT build-out to HK$2.7bn in FY2025 and HK$0.85bn in 1H2026. Operation revenue kept growing (+2% in FY2025, +8% in 1H2026). Because construction carries lower margins than operations, gross margin structurally rose from 33% to around 40% over the period.
The FY2024 trough had several causes:
-
Lower construction margin.
-
Greentech impairments (hazardous waste, biomass), producing a HK$415M Greentech loss.
-
FX translation and receivable provisions.
-
High finance costs (about HK$3.0bn).
The FY2025 recovery (+16% profit on −9% revenue) came from:
-
Finance costs down 20.4% to HK$2.39bn.
-
Lower impairments.
-
The Greentech turnaround.
1H2026 extended this: profit +10% on revenue −1%, with net margin up 1.7ppt to 17.1%, administrative expenses −21.3% and finance costs −12.5%.
Interim trend
1H2025 EBITDA is derived from CICC's +4.3% YoY figure for 1H2026. The 1H2023 and 1H2024 interim DPS of 14.0 cents are derived from full-year totals less the final dividend (FY2023: 22.0 − 8.0; FY2024: 23.0 − 9.0).
Balance sheet
Notes:
-
FY2024–FY2025 figures are from the FY2025 Annual Results Presentation.
-
FY2024 borrowings are derived (FY2025 HK$88.55bn plus the HK$3.1bn reduction).
-
Net debt is derived as borrowings less cash and bank balances.
-
Cash and cash equivalents (narrower definition) were HK$10.33bn at end-2025.
-
Banking facilities totalled HK$94.38bn, of which HK$34.28bn was unused, at end-2025.
-
At 30 Jun 2026: total assets HK$198.11bn, net assets HK$78.18bn, gearing 61%, cash about HK$9.92bn, borrowings HK$90.5bn (−HK$3.0bn YoY).
-
Equity attributable for FY2023 and FY2022 is from the FY2023 presentation.
Cash flow
Notes:
-
FY2025 FCF of HK$8.5bn is per Industrial Securities (July 2026). The broker describes FCF as nearly turning positive in 2023, followed by improvement through 2024–2026 as national subsidies flowed back.
-
Dividends declared are derived as DPS times 6,143M shares.
-
There were no buybacks in FY2025 (no purchase, sale or redemption of listed securities). None were reported in monthly returns through May 2026.
Cash collection data points:
-
FY2025 receivable collection rate was above 98%, up more than 12ppt YoY and the highest on record.
-
16 projects obtained national-subsidy confirmation in FY2025.
-
In 1H2026, receivable collections were about RMB12.8bn (+RMB1.3bn YoY), including national subsidies of RMB1.38bn (+RMB0.71bn).
Ratios
Notes:
-
FY2024–FY2025 ROE are company-reported. FY2023 ROE is derived using average equity.
-
FY2024 finance costs of about HK$3.0bn are derived from the FY2025 figure of HK$2.39bn (−20.4%).
-
ROIC, current ratio and cash conversion cycle were not publicly disclosed in the retrieved documents.
-
Effective financing cost at Greentech fell from 3.72% (2023) to 3.38% (2024) to 2.67% (2025), saving HK$219M of finance costs in FY2025 (Greentech FY2025 presentation). This is indicative of group-wide refinancing.
Balance sheet commentary. Leverage is high in absolute terms, with net debt/EBITDA around 7.6x. This is typical of Chinese concession operators and is mitigated by three factors:
-
RMB funding at low and falling rates. Recent MTNs were issued at 2.15% and 1.67%.
-
State sponsorship.
-
Long-dated, contracted cash flows.
The direction of travel is clearly toward deleveraging. Borrowings fell by HK$3.1bn in FY2025 and by HK$3.0bn YoY to mid-2026. Gearing declined from 64% to 61%. Perpetual MTNs are being redeemed with cheaper senior paper. The structural risk is that a large share of concession receivables depends on local-government payment capacity.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Segment Overview
| Segment | What it contains | Key products / services |
|---|---|---|
Environmental Energy Project Construction & Operation | WTE plants and synergistic "incineration+" streams | Household-waste incineration power; food/kitchen waste; leachate; sludge; methane-to-energy; fecal treatment; fly-ash landfill; medical waste; slag; heat/steam; biomethane |
Environmental Water Project Construction & Operation | China Everbright Water | Municipal and industrial WWT; water supply; reusable water; sludge; sponge city; river-basin restoration; wastewater-source heat pumps; leachate; distributed solar at plants |
Greentech Project Construction & Operation | China Everbright Greentech | Integrated biomass utilisation (power + heat); hazardous and solid waste treatment; environmental remediation; solar; wind; virtual power plant / electricity sales; green certificates |
Others (incl. Equipment Manufacturing and Envirotech) | Equipment manufacturing, design, R&D, HQ | Grate furnaces, flue-gas systems, leachate systems, micro-scale grate furnaces, battery-recycling equipment, design consulting, technical services |
Environmental Energy | Core (284 projects) | Vietnam (2 WTE operating), Uzbekistan (2 × 1,500 t/d, ~RMB3bn, operation expected 2027), Poland (waste management; impaired 2022), Indonesia Bekasi (preferred partner), Vietnam Thanh Hoa (pre-winning) |
Environmental Water | 172 projects, PRC-centric | Limited |
Greentech | PRC-centric | None material |
Equipment / asset-light | Domestic plus internal | Thailand, Malaysia, Egypt, Italy, Turkey, Philippines, Singapore, Seychelles, India (equipment) |
Segment external revenue (HKD Mn)
| Segment external revenue (HKD Mn) | 1H2025 | 1H2026 |
|---|---|---|
Environmental Energy | 7,476 | 8,067 |
Environmental Water | 3,272 | 2,392 |
Greentech | 3,399 | 3,491 |
Segment adjusted EBITDA (HKD Mn)
| Segment adjusted EBITDA (HKD Mn) | FY2024 | FY2025 | 1H2026 |
|---|---|---|---|
Environmental Energy | 6,890 | 7,110 | 4,373 |
Environmental Water | 2,202 | 1,920 | — |
Greentech | 1,009 | 1,640 | — |
Group EBITDA | 10,075 | 10,273 | 6,307 |
Segment profit attributable to group (HKD Mn)
| Segment profit attributable to group (HKD Mn) | FY2024 | FY2025 | 1H2025 | 1H2026 |
|---|---|---|---|---|
Environmental Energy | 3,855 | 4,510 | 2,554 | 2,477 |
Environmental Water | 812 | 601 | 411 | 382 |
Greentech | -285 | 87 | 139 | 122 |
Group profit attributable | 3,377 | 3,925 | 2,207 | 2,431 |
Segment share of group segment net profit (%)
| Segment share of group segment net profit (%) | FY2024 | FY2025 | 1H2026 |
|---|---|---|---|
Environmental Energy | 88.0 | 87.4 | 83.1 |
Environmental Water | 18.5 | 11.6 | 12.8 |
Greentech | -6.5 | 1.7 | 4.1 |
Income Statement and Margin Analysis (%)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Revenue (HKD Mn) | 49,895 | 37,321 | 32,090 | 30,258 | 27,521 |
Revenue growth YoY (%) | 16.2 | -25.2 | -14.0 | -5.7 | -9.0 |
Gross profit (HKD Mn) | 16,463 | 14,365 | 13,811 | 11,536 | 11,085 |
Profit from operating activities (HKD Mn) | 13,227 | 10,600 | 10,516 | 7,887 | 8,022 |
EBITDA (HKD Mn) | 15,027 | 12,842 | 12,828 | 10,075 | 10,273 |
Profit before tax (HKD Mn) | 10,321 | 7,263 | 7,124 | 4,867 | 5,651 |
Profit for the year incl. NCI & perpetuals (HKD Mn) | 8,120 | 5,515 | 5,297 | 3,974 | 4,705 |
Profit attributable to equity holders (HKD Mn) | 6,804 | 4,602 | 4,429 | 3,377 | 3,925 |
Basic EPS (HK cents) | 110.76 | 74.91 | 72.10 | 54.98 | 63.90 |
Diluted EPS (HK cents) | 110.76 | 74.91 | 72.10 | 54.98 | 63.90 |
Dividend per share (HK cents) | 34.0 | 24.0 | 22.0 | 23.0 | 27.0 |
Payout ratio (%) | 30.7 | 32.0 | 30.5 | 41.8 | 42.3 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansMargin (%)
| Margin (%) | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Gross margin | 33.0 | 38.5 | 43.0 | 38.1 | 40.3 |
Operating margin | 26.5 | 28.4 | 32.8 | 26.1 | 29.1 |
EBITDA margin | 30.1 | 34.4 | 40.0 | 33.3 | 37.3 |
Net margin (attributable) | 13.6 | 12.3 | 13.8 | 11.2 | 14.3 |
Income Statement and Per-Share Data
| Metric | 1H2023 | 1H2024 | 1H2025 | 1H2026 |
|---|---|---|---|---|
Revenue (HKD Mn) | 16,297 | 15,612 | 14,304 | 14,181 |
EBITDA (HKD Mn) | 7,376 | 6,550 | 6,047 | 6,307 |
Profit attributable (HKD Mn) | 2,785 | 2,454 | 2,207 | 2,431 |
Interim DPS (HK cents) | 14.0 | 14.0 | 15.0 | 16.0 |
Balance Sheet and Margin Analysis (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|
Total assets (HKD Mn) | — | — | 186,027 | 189,143 |
Total liabilities (HKD Mn) | — | — | 119,610 | 116,929 |
Total equity incl. NCI & perpetuals (HKD Mn) | — | — | 66,417 | 72,214 |
Equity attributable to equity holders (HKD Mn) | 47,374 | 48,141 | 48,211 | 52,220 |
Cash and bank balances (HKD Mn) | — | — | 8,042 | 10,524 |
Total interest-bearing borrowings (HKD Mn) | — | — | 91,650 | 88,550 |
Net debt (HKD Mn) | — | — | 83,608 | 78,026 |
Intangible assets (HKD Mn) | 30,795 | 30,976 | 29,839 | 30,806 |
Gearing: liabilities / assets (%) | — | — | 64 | 62 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansCash Flow
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Free cash flow (HKD Mn) | — | — | — | — | 8,500 |
Dividends declared (HKD Mn) | 2,089 | 1,474 | 1,351 | 1,413 | 1,659 |
Share buybacks (HKD Mn) | — | — | — | — | 0 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
ROE on attributable equity (%) | 9.3 | 7.01 | 7.82 |
ROA, profit for year / year-end assets (%) | — | 2.14 | 2.49 |
Debt / total equity (x) | — | 1.38 | 1.23 |
Net debt / EBITDA (x) | — | 8.3 | 7.6 |
EBITDA / finance costs (x) | — | 3.4 | 4.3 |
Operating profit / finance costs (x) | — | 2.6 | 3.4 |
Asset turnover (x) | — | 0.16 | 0.15 |
Geographic revenue (approx. % of total)
| Geographic revenue (approx. % of total) | FY2025 |
|---|---|
Mainland China and Hong Kong | 96 |
Overseas | 4 |
Share Price & Returns
| Date | Close (HKD) |
|---|---|
22 Aug 2025 | 4.28 |
20 Mar 2026 | ~5.21 (intraday, post-results) |
24 Mar 2026 | ~5.44 (intraday) |
30 Mar 2026 | ~5.36 (intraday) |
18 Jun 2026 | 4.67 |
30 Jun 2026 | 4.56 |
29 Jul 2026 | 5.20 |
31 Aug 2026 | 5.035 |
~15 Sep 2026 | 4.88 |
Performance Details
| Performance | Value |
|---|---|
Calendar 2025 return (HK listing) | ~+25% (company disclosure) |
1-year return (to Sep 2026) | ~+14% (derived: 4.88 vs 4.28 on 22 Aug 2025; price only) |
Annualised return since listing (vendor) | ~6.8% |
Beta (vendor) | ~0.10 |
Valuation Multiples
| Multiple | Everbright | Notes |
|---|---|---|
P/E (TTM) | 7.2x | Vendor (lixinger) |
P/E (FY2026E) | ~7.5–7.7x | CICC, Guosen |
P/B | 0.53x | Vendor |
Dividend yield (TTM) | ~5.7% | Vendor |
EV / EBITDA (TTM) | ~12.4x | Derived. EV ≈ market cap 30.0 + net debt ~80.6 + NCI and perpetuals ~20.0 = ~HK$130.6bn; TTM EBITDA ~HK$10.53bn |
EV / Sales (TTM) | ~4.8x | Derived |
Sector P/E (Hang Seng non-traditional / renewable energy) | ~12.4x | Vendor; Everbright trades at a discount |
Analyst Ratings & Targets
| Broker | Date | Rating | Target price (HKD) | Earnings view |
|---|---|---|---|---|
BofA Securities | 17 Nov 2025 | Buy | 5.3 | Positive on A-share plan |
BofA Securities | 8 Jan 2026 | Buy | 6.2 | — |
BofA Securities | 23 Mar 2026 | Buy | 6.8 | — |
Industrial Securities | 14 Jul 2026 | Overweight (增持) | — | FY26–28E profit HK$4.22/4.47/4.67bn; payout 44%/45%/47%; yield 6.4%/7.1%/7.7% at 10 Jul 2026 price |
CICC | late Aug/Sep 2026 | Outperform | 6.16 | FY26/27E profit HK$4.28/4.66bn; TP implies 8.8x/8.1x P/E |
Guosen | 31 Aug 2026 | Outperform (优于大市) | — | FY26–28E profit HK$4.13/4.39/4.48bn |
Market range (TradingView aggregate) | 2026 | — | 5.80–6.80 | — |
Per-Share Data and Returns & Leverage Ratios (%)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
DPS total (HK cents) | 34.0 | 24.0 | 22.0 | 23.0 | 27.0 |
Payout ratio (%) | 30.7 | 32.0 | 30.5 | 41.8 | 42.3 |
Credit Ratings
| Agency | Rating / outlook |
|---|---|
Domestic (Shanghai Brilliance) for Everbright Water bonds | AAA (historical filings) |
Domestic issuer ratings supporting the company's PRC MTNs | AAA-equivalent implied by pricing; not specifically verified |
Analyst Conclusions
Management guidance (qualitative)
For 2026, management prioritises a "high-quality start" to the 15th FYP. The stated agenda covers:
-
Technology: fly-ash utilisation, high-value biomass, AI and intelligent operations.
-
International expansion: technology and equipment exports plus heavy assets in Central and Southeast Asia.
-
Ecosystem building.
-
Risk control: receivables, safety, disposal of non-core assets.
No numerical guidance is issued.
Consensus expectations
| Metric | FY2025A | FY2026E | FY2027E | FY2028E |
|---|---|---|---|---|
| Profit attributable, Industrial Securities (HK$ M) | 3,925 | 4,220 | 4,470 | 4,670 |
| Profit attributable, CICC (HK$ M) | 3,925 | 4,280 | 4,660 | — |
| Profit attributable, Guosen (HK$ M) | 3,925 | 4,127 | 4,386 | 4,475 |
The implied FY2026E growth range is about 5–9%. Growth comes from finance-cost savings, cost control and operating volume growth, partially offset by continued construction run-off.
Bull case
-
Cash-harvest re-rating. Construction is down to 6% of revenue, FCF is about HK$8.5bn and the collection rate is above 98%. Dividends could rise faster than earnings: Industrial Securities models 44% to 47% payout and yields of 6.4–7.7%. That is compelling against a P/B of about 0.5x.
-
A-share listing arbitrage. A Shenzhen listing would give domestic insurers and funds direct access. A-share WTE peers trade at materially higher multiples than the HK sector, which already trades at about 12x versus Everbright's 7x.
-
Overseas second curve. The Uzbekistan projects (operating in 2027 at about 11% equity IRR) plus Bekasi and Thanh Hoa add more than RMB4.8bn of higher-return heavy assets. Equipment exports leverage proprietary technology.
Bear case
-
Leverage and policy dependence. Net debt/EBITDA of about 7.6x and exposure to local-government payment capacity. Any renewed fiscal squeeze or subsidy clawback hits cash flow, and impairments drove the FY2022–FY2024 earnings decline.
-
Low-quality earnings growth. FY2025–1H2026 profit growth came mostly from lower finance costs, FX and lower impairments. All three segments' profit contributions fell YoY in 1H2026, and power per tonne declined 1.3%. Once refinancing gains are exhausted, organic growth may be only low single digits.
-
Governance and dilution. The CEO seat has been vacant since July 2026 and the Chair/CEO roles are combined. The A-share issue could dilute holders by up to about 15% (including the shoe) if priced near HK book discounts. SOE priorities may not maximise minority returns.
Catalysts and monitorables (next 12 months)
| Catalyst / monitorable | Timing | What to watch |
|---|---|---|
| Permanent CEO appointment | 4Q2026 – 1H2027 | Profile (operator vs financier) and re-separation of Chair/CEO |
| A-share listing milestones | Rolling | EGM approval, CSRC/SZSE acceptance, pricing vs H-share |
| FY2026 results | ~Mar 2027 | Payout ratio (≥42%?), FCF, borrowings below HK$88bn |
| Overseas awards | Rolling | Final award / financial close for Bekasi and Thanh Hoa; Uzbekistan COD in 2027 |
| Receivables and subsidies | Semi-annual | Collections, national subsidy confirmation progress |
| Tipping-fee revisions | Rolling | More approvals to offset subsidy roll-off |
| Funding costs | Rolling | New MTN coupons; redemption of perpetuals |
| Greentech hazardous waste | Semi-annual | Disposal of non-core assets; impairments |
| China rate cycle | Macro | Reversal risk to the refinancing tailwind |
Concluding analyst verdict
China Everbright Environment is at an inflection that the market only partly prices. The FY2021–FY2024 period, in which revenue nearly halved and profit fell 50%, was the painful unwinding of a construction-led growth model. That model has now largely run its course. What remains is the largest WTE operating portfolio in the world, about 163,000 tonnes per day, generating EBITDA margins of 37–45% and roughly HK$8.5bn of free cash flow. Management has visibly pivoted to harvesting it: cutting overhead, disposing of non-core projects, collecting receivables at record rates and refinancing at sub-2.2% RMB coupons. The result is a business growing reported profit at 10–16% while revenue shrinks. That is unusual and analytically important.
At about 7x earnings, about 0.5x book and a 5.7% yield, the shares discount a structurally low-return, policy-exposed SOE utility. That discount is partly justified. ROE of 7.8% is below any reasonable cost of equity. Leverage is heavy. A meaningful portion of recent earnings growth is financial rather than operational, and the leadership vacancy and combined Chair/CEO role weaken the governance narrative.
Three levers have high visibility and are largely within management's control: a rising payout ratio, further deleveraging, and A-share access for domestic income capital. Overseas WTE adds optionality rather than core value at this stage. The principal downside risks are a deterioration in local-government payments and an end to the rate tailwind.
Verdict: a high-yield, deleveraging infrastructure annuity with re-rating catalysts. Constructive (accumulate) for dividend-focused mandates, conditional on three monitorables: (i) a credible permanent CEO appointment; (ii) maintaining a payout of at least 42% with borrowings continuing to fall; and (iii) A-share pricing that does not materially dilute HK shareholders. Investors seeking growth should look elsewhere until overseas assets reach commercial operation in 2027.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Executive Leadership Team
| Name | Title | Tenure / notes | Prior roles / background | Compensation (latest disclosed) |
|---|---|---|---|---|
Wang Silian (王思联) | Executive Director; Chairman of the Board; Acting CEO (since 17 Jul 2026) | — | — | Annual salary HK$1,699,800 plus discretionary performance bonus; no extra pay as Acting CEO (HKEX, 17 Jul 2026) |
Luan Zusheng (栾祖盛) | Former ED and CEO (Jun 2021 – 17 Jul 2026); resigned for age-related reasons | ~5 years as CEO; also former Chairman of Everbright Water | Previously director of Sun Life Everbright Life Insurance and other Everbright entities; certified intermediate accountant (PRC); aged 55 in 2021 | — |
Liang Yanyu | Company Secretary (from 15 Sep 2025) | Replaced the retiring Poon Yuen Ling | — | — |
“—” = not publicly disclosed.
Board of Directors
| Director | Role | Committees | Notes |
|---|---|---|---|
Wang Silian | Chairman, ED, Acting CEO | Chair of Sustainability Committee (from Jul 2026) | Combined Chair/CEO role: deviation from CG Code C.2.1, acknowledged by the board |
Two NEDs | Non-executive (China Everbright Group nominees) | — | — |
Fok Kai Man (霍啟文) | INED (from 21 Mar 2026; term to 2028 AGM) | Audit, Nomination, Remuneration, Sustainability | Aged 38; VP of Henry Fok Estates; Director of Fok Ying Tung Foundation; BA (Hons) Accounting & Finance, Durham; fee HK$480,000 a year |
Two further INEDs | Independent | Audit / Nomination / Remuneration | — |
Prof. Zhang Xiang, JP | Former INED (resigned 21 Mar 2026) | Nomination, Remuneration, Sustainability | Left to focus on other commitments |
Board & Management Changes
| Date | Change | Context |
|---|---|---|
Jun 2021 | Luan Zusheng becomes CEO; Wang Tianyi remains Chairman only | Separation of roles |
By 2024/25 | Wang Silian becomes Chairman | — |
15 Sep 2025 | Company Secretary change (Poon Yuen Ling to Liang Yanyu) | Retirement |
21 Mar 2026 | INED Zhang Xiang out; Fok Kai Man in | Board refresh |
17 Jul 2026 | CEO Luan Zusheng resigns; Chairman becomes Acting CEO; Luan also exits the Everbright Water chair (Xiong Jianping becomes acting Chairman there, with Ge Dan as CFO) | Age-related; SOE leadership succession pending |
Major Shareholders
| Holder | Shares (M) | Stake (%) | As of |
|---|---|---|---|
China Everbright Holdings Co., Ltd. | 2,646.2 | 43.08 | 31 Dec 2024 (unchanged per later filings) |
Pacific Asset Management Co., Ltd. (China Pacific Insurance) | 364.6 | 5.94 | 31 Dec 2024 |
Value Partners Ltd. | 87.3 | 1.42 | 31 Jan 2026 |
The Vanguard Group | 60.3 | 0.98 | 30 Apr 2026 (cut by 59.0M) |
Hang Seng Investment Management | 50.8 | 0.83 | 31 Mar 2026 |
BlackRock | ~63.0 | ~1.03 | Vendor data (2025) |
CTBC Securities Investment Trust | ~50.3 | ~0.82 | Vendor data |
Dimensional Fund Advisors | ~37.3 | ~0.61 | Vendor data |
Shanghai Orient Securities AM | ~63.1 | ~1.03 | Vendor data (earlier 2.47%) |
Charles Schwab IM | ~23.4 | ~0.38 | Vendor data |
Competitive Landscape
Key Competitors
| Competitor | Listing | Segment overlap | Positioning vs Everbright |
|---|---|---|---|
Grandblue Environment (瀚蓝环境) | 600323.SH | WTE, water, gas | Acquired Canvest (粤丰) in 2025, becoming a scaled #2-tier WTE operator; FY2025 revenue above RMB10bn (one of 6 environmental listcos above RMB10bn) |
Shanghai Environment Group | 601200.SH | WTE, water | Regional (Shanghai-centric) SOE WTE operator |
Chongqing Sanfeng Environment (三峰环境) | 601827.SH | WTE, grate equipment | Integrated equipment-plus-operator rival; 54 operating WTE projects (end-2024); strong overseas equipment exports |
Zhejiang Weiming Environment (伟明环保) | 603568.SH | WTE, equipment, new materials | Most profitable A-share WTE pure play in 2024 (net profit about 5 times Dynagreen's) |
Dynagreen Environmental (绿色动力) | 601330.SH / 1330.HK | WTE | FY2024 revenue RMB3.399bn (−14.1%), net profit RMB585M (−7.0%) |
Wangneng Environment (旺能环境) | 002034.SZ | WTE | FY2025 net profit +28.6%; AI combustion optimisation with Alibaba Cloud |
Zhongke Environment (中科环保) | 301175.SZ | WTE, heat supply | Double-digit growth in 2025 and 1Q26; AICC combustion system |
Yongxing (永兴股份) | 601033.SH | WTE (Guangzhou) | Regional SOE |
Beijing Enterprises Water | 0371.HK | Water | Largest HK-listed water peer to Everbright Water |
China Water Affairs | 0855.HK | Water | Water supply peer |
Beijing Capital Eco-Environment (首创环保) | 600008.SH | Water, solid waste | Diversified SOE peer |
Dongjiang Environmental | 0895.HK / 002672.SZ | Hazardous waste | Peer to Greentech's hazardous-waste business |
China Conch Venture / Conch environmental | 0586.HK | Industrial solid waste, co-processing | Peer in hazardous / industrial waste |
Veolia; Suez | Euronext / private | Global WTE and water | Global benchmarks; potential collaborators (visited 2026) |
Peer Comparison FY2025
| Metric | Everbright Environment (FY2025) | Dynagreen (FY2024) | Grandblue (FY2025) | Sanfeng (FY2024) |
|---|---|---|---|---|
Revenue | HK$27.5bn | RMB3.40bn |
| — |
Revenue growth | −9.0% | −14.1% | double-digit | slight decline (construction) |
Net margin (attributable) | 14.3% | ~17.2% | — | — |
EBITDA margin | 37.3% | — | — | — |
R&D intensity | — | ~0.14% (9M2025) | — | — |
“—” = not publicly disclosed.
Recent Developments
--



