China Everbright Greentech Ltd. Overview
China Everbright Greentech is the "clean energy" flagship of the China Everbright Environment group. It is a state-backed operator of concession-style environmental infrastructure in China. At 30 June 2026 it had 140 environmental protection projects with total investment of about RMB30.3 billion. The asset base is anchored by 57 integrated biomass utilisation projects with 1,069 MW of designed generating capacity, about 8.26 Mtpa of biomass processing capacity and 11,610 tpd of household-waste capacity. The company is pivoting from a subsidy-dependent biomass power producer into a combined heat, power and green-attribute supplier. The other three segments are a structurally loss-making hazardous and solid waste business, a small environmental remediation contractor, and about 255 MW of solar and wind. The investment case rests on three questions:
-
Can biomass profitability be sustained as national tariff subsidies expire and power moves to market pricing?
-
Can a restructured hazardous-waste business stop destroying value?
-
Can the group's subsidy receivables keep converting into cash to de-lever a balance sheet carrying about HK$18.4 billion of borrowings against roughly HK$1.6 billion of equity market value?
Company's own description
In its 2025 results press release, the company describes itself as a specialty environmental protection service provider in China. It names five focus areas: integrated biomass utilisation, hazardous and solid waste treatment, environmental remediation, solar energy, and wind power. It cites a pioneering urban-rural integration model (co-locating biomass and waste-to-energy plants at county level) and operations in 15 provinces, autonomous regions and special administrative regions of China, plus Germany.
The 2026 Interim Report recasts the identity more ambitiously. The stated aim is to become a leading domestic integrated clean-energy operator, specialising in integrated biomass utilisation and distinguished by innovative business models (FY2025 results presentation, "Clean Energy Core Business Positioning").
Business model
The group invests in, builds and operates long-life environmental and energy assets, mostly under concession arrangements with PRC local governments:
-
Build-Operate-Transfer (BOT) and Build-Own-Operate (BOO) concessions. During construction the group books construction-services revenue at a margin, with the offset recorded as service concession assets or intangible assets. During operation it earns operation-services revenue: electricity sales, steam/heat sales, waste-treatment gate fees, and an imputed finance income on service concession assets. Service concession assets carried interest rates of 4.65%–6.60% per annum (FY2024 annual results, note 11).
-
Feed-in tariffs plus the national renewable energy tariff subsidy. Biomass and waste-to-energy power is sold to grid companies. A substantial part of the tariff historically came from the central renewable energy surcharge fund, which pays with long delays. This created large unbilled subsidy receivables: HK$3.11 billion of unbilled tariff subsidy within contract assets at end-2024 (FY2024 annual results).
Market-based gate fees: for hazardous and industrial solid waste disposal, set by competitive negotiation with industrial waste generators.
Contracting/EPC-style fees: for environmental remediation projects, with stage payments on milestones.
New asset-light, B2B revenue lines: steam and heat supply to industrial users, electricity retail/power trading (about 769 million kWh contracted in 2025), green certificate sales, zero-carbon industrial park solutions, slag recycling and chelating-agent sales.
Revenue model mix (by nature of revenue)
| Revenue nature (HKD Mn) | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
| Construction services revenue (HK$ M) | 1,737 | 1,297 | 661 | 231 | 94 |
| Operation services revenue (HK$ M) | 6,351 | 6,384 | 6,413 | 6,417 | 6,316 |
| Finance income from concessions (HK$ M) | 359 | 367 | 344 | 329 | 319 |
| Total revenue (HK$ M) | 8,447 | 8,048 | 7,417 | 6,977 | 6,729 |
| Operation services share of revenue (%) | 75 | 79 | 86 | 92 | 94 |
Sources: FY2022 and FY2024 annual results announcements (business review tables); FY2025 results presentation (construction HK$94 million, operation HK$6,316 million). FY2025 finance income is derived as total minus construction minus operation.
The shift is decisive. Construction revenue, which carries recognised margin but no cash until operations begin, collapsed by about 95% between FY2021 and FY2025. The group is now almost a pure operating-asset business. In H1 2026, construction was 0.2%, operation 95.0% and finance income 4.8% of revenue (Interim Report 2026).
Value-chain position
The group sits mid-to-downstream as an asset owner and operator:
Upstream: it procures agricultural residues ("yellow culms" such as wheat, rice and corn straw, rice husks and peanut shells) and forestry residues ("grey culms" such as branches, bark and wood-processing waste) from farmers and brokers. It runs its own fuel collection and storage networks.
Midstream: it converts fuel and waste into electricity, steam, heat and bio-natural gas.
Downstream: it sells to state grid companies, industrial heat users, waste generators and local governments. It increasingly sells green certificates and retail power to corporate buyers in the Yangtze and Pearl River deltas.
Customer types and concentration
Local government authorities in the PRC are the dominant counterparties. Aggregate revenue from local government authorities was HK$5,025 million in FY2024, or 72% of revenue (FY2024 annual results, note 4). In H1 2026 it was HK$2,458 million, or 70%. Two local government authorities each exceeded 10% of revenue in H1 2026, contributing HK$920 million and HK$359 million (Interim Report 2026, note 3). In FY2024, one authority contributed HK$1,782 million, about 25.5% of revenue.
End-markets served
-
Renewable power generation (biomass, waste-to-energy, solar, wind).
-
Industrial steam and heat supply. This is the fastest-growing line: H1 2026 steam sales of 2.60 million tonnes, up 19%, with heat revenue of RMB516 million, up 16.7%, equal to 16.1% of principal operating revenue.
-
Municipal and rural household waste treatment.
-
Industrial hazardous and general solid waste disposal.
-
Contaminated land, farmland and water remediation.
-
Corporate decarbonisation services (zero-carbon parks, power trading, green certificates).
Independent characterisation
Everbright Greentech is a leveraged, state-sponsored infrastructure yield vehicle whose earnings have been hollowed out by three forces:
-
the end of the construction-margin growth model;
-
the collapse of hazardous-waste gate fees after a capacity build-out across China;
-
the phase-out and slow payment of renewable subsidies.
The biomass core remains solidly cash-generative. Segment EBITDA was HK$1.94 billion and segment net profit HK$1.17 billion in FY2025. But it carries a hazardous-waste segment that lost HK$757 million in FY2025 after losing HK$1.28 billion in FY2024. The strategic narrative (zero-carbon parks, storage, glycation, sustainable aviation fuel) is real but immaterial in revenue terms today. The near-term equity story is about cash conversion, de-leveraging and dividend restoration, not growth.
Strategy
Stated strategy (themes from FY2025 annual results presentation and 2026 Interim Report)
Core development strategy, "Two Modernisations, One Model": Technologisation, Internationalisation and Ecological Model.
"Second-stage Entrepreneurship": launched 2025 and pursued "with full force" in 2026, the first year of the 15th Five-Year Plan.
Operating principle: progress in stability, and stability through solidity, around the dual objectives of safety and low carbon.
Positioning: the "clean energy" flagship of CEEGL.
Three principal pathways (2026 Interim Report):
-
Deepen integrated biomass utilisation. Accelerate the CHP model and high-value biomass uses (heat supply, glycation, gasification).
-
Build new energy as a "second growth pole". Integrate wind, solar, storage and virtual power plants around zero-carbon industrial parks, and expand overseas in a measured way, especially along the Belt and Road.
-
Expand B2B asset-light business (heat and gas supply, power trading, green power and certificates, remediation). Target: B2B businesses to contribute at least 30% of profit by 2030.
Ecological Model: an industrial ecosystem of clean energy, environmental treatment and the circular economy, coordinating "green power, green steam, green hydrogen and green fertiliser".
Initiatives in the last 24 months (Oct 2024 – Oct 2026)
| Initiative | Date | Detail / target |
|---|---|---|
| Organisational regionalisation | 2,026 | From 2 business centres to 6 regional management centres; "regional coordination, local in-depth operation" |
| Intelligent stockyard programme | 2026–2029 | Zhongxiang pilot; acceptance end-2026; roll-out to all 15 biomass projects 2027–2029 |
| "One enterprise, one policy" HSW rescue | 2024–2026 | 12 priority projects; 5 turned profitable in H1 2026; losses narrowed sharply at Yancheng HW and Lianyungang SW |
| Asset optimisation | 2025–2026 | Deregistration, sale and scrapping of low-efficiency HSW assets; one subsidiary sold in H1 2026 |
| Zero-carbon industrial parks | 2024–2026 | Changzhou Zhonglou (PAS2060); Feng County and Dangshan approved; 4 park projects signed in 2024 |
| Independent energy storage | 2,026 | Nanjing Pukou 250 MW / 500 MWh approved |
| Biomass natural gas | 2,025 | First project under construction, 10 million m³/yr |
| Biomass glycation | 2025–2026 | Feasibility study complete; 1,000-tonne pilot in preparation |
| Power trading and green certificates | 2024–2026 | About 769 million kWh contracted in 2025; green certificate volume up 11.3 times in 2025 |
| Heat supply expansion | Ongoing | +727,400 tpa capacity in 2025; H1 2026 heat revenue RMB516 million (+16.7%) |
| Subsidy receivable monetisation | 2025–2026 | ABS Phase 1 (RMB653 million) and Phase 2 (RMB700 million) |
| Funding cost reduction | 2023–2026 | Effective rate down 105 bp to 2.67% (2025); 2026 notes at 1.61%–1.75% |
| Overseas expansion | 2,026 | Advance listing and construction of overseas projects; bid for international projects using Hong Kong experience |
| ESG integration | 2,025 | ESG embedded in top-level strategy; 13 honours in 2025 |
Medium-term targets and guidance
-
At least 30% B2B profit contribution by 2030 (Interim Report 2026).
-
Management states it is "confident" of fully achieving its 2026 targets. The targets themselves are not quantified.
-
No quantitative revenue, EBITDA or EPS guidance has been issued.
-
Dividend: no formal payout policy disclosed. FY2025 payout was 102% and the H1 2026 interim payout 30.67%.
Products & Services
Integrated biomass utilisation
| Offering | Description / capabilities | Target customer | Status / scale | Pricing model |
|---|---|---|---|---|
| Biomass direct-combustion power | Water-cooled vibrating grate and circulating fluidised bed boilers firing agricultural and forestry residues | State grid companies | Core of the 1,069 MW biomass/WtE designed capacity; 54 projects operating or completed at H1 2026 | Benchmark on-grid tariff plus national renewable tariff subsidy (all biomass power projects on the subsidy list per FY2025 presentation); shifting to market-based pricing under the 2025 NDRC/NEA tariff reform |
| Biomass heat supply / CHP | Steam and heat to industrial parks via pipeline networks; gasified boiler retrofits | Industrial users | Steam supplied 2.157 Mt in H1 2026 (+22%); 3.18 Mt in FY2024 (+32%); +727,400 tpa capacity added in 2025 | Negotiated steam/heat tariffs (B2B) |
| Waste-to-energy (household waste) | Incineration of rural and county municipal waste | County governments | 11,610 tpd designed; 4.16 Mt processed in FY2024 | Gate fee plus power tariff |
| Urban-rural integration model | Co-located biomass and WtE plants treating agricultural/forestry residues and rural household waste together | County governments | Company describes it as a first in China | Concession (BOT/BOO) |
| Bio-natural gas | Straw dry high-temperature anaerobic fermentation to biomethane | Gas networks, industry | First project under construction (10 million m³/yr) | Gas sales |
| Bundled straw gasification heat supply | Straw-bale gasification coupled with boiler heat supply | Industrial heat users | First project in trial operation in 2025 | Heat sales |
| Biomass glycation (biomass-to-sugar) | High-value conversion of lignocellulose to sugars | Chemical/bio-manufacturing | Feasibility study done; 1,000-tonne pilot scheme in preparation (H1 2026) | Not yet commercial |
| Sustainable aviation fuel (SAF) | Industrialisation research named in FY2025 strategy | Aviation | R&D stage | — |
| Biomass ash organic fertiliser | Eco-agriculture use of biomass ash | Agriculture | Early stage (FY2024 annual results) | Product sales |
| Green certificates | Green Electricity Certificates (1 cert = 1,000 kWh) | Corporate buyers | About 30,000 traded in 2024; volume up 11.3 times in 2025 | Market price |
| Power trading / electricity retail | "Source-grid-load-storage" model; retail power to corporates in the Yangtze and Pearl River deltas | Commercial and industrial users | About 700 million kWh contracted (2024); about 769 million kWh and 32 new users (2025) | Bilateral/market contracts |
| Intelligent stockyard system | Unmanned posts, patrol, smart security, smart temperature monitoring, CCER module | Internal (15 biomass projects) | Zhongxiang pilot live; acceptance end-2026; roll-out 2027–2029 | Internal cost saving |
| Biomass KPI | FY2021 | FY2022 | FY2023 | FY2024 |
|---|---|---|---|---|
| On-grid electricity (GWh) | 6,027 | 6,009 | 6,155 | 6,351 |
| Biomass raw material processed (kt) | 7,964 | 8,186 | 7,845 | 7,686 |
| Household waste processed (kt) | 2,919 | 3,457 | 3,836 | 4,156 |
| Steam supplied (kt) | 2,155 | 2,411 | 2,406 | 3,181 |
Biomass operating KPIs:
Sources: FY2022 and FY2024 annual results. The FY2025 press release reports heat and gas supply volume up about 17% and related revenue up 13%. H1 2026 on-grid electricity was 3,123 GWh (-4%), biomass processed 3.897 Mt (+4%), household waste 2.114 Mt (+2%) and steam 2.157 Mt (+22%).
Hazardous and solid waste treatment
| Offering | Description | Target customer | Scale | Pricing |
|---|---|---|---|---|
| Hazardous waste incineration | Thermal destruction | Industrial generators | Part of 2.21 Mtpa total designed HSW capacity (45 projects, H1 2026) | Negotiated gate fees (declining) |
| Hazardous waste landfill | Secure landfill | Industrial generators | Landfill unit treatment cost cut 41% in 2025 | Gate fees |
| Physicochemical treatment | Neutralisation and stabilisation | Industrial | Not disclosed separately | Gate fees |
| Resource recycling | Recovery of saleable products | Industrial | 23,900 t treated in H1 2026; 6,900 t of recycled products sold | Product sales |
| General industrial solid waste CHP | Co-generation using industrial solid waste | Industrial parks | H1 2026: 18.0 GWh on-grid (+38%); 439 kt steam (+9%) | Power/steam sales plus gate fees |
| Infectious animal carcass treatment | Safe disposal | Agricultural authorities | — | Fees |
| Slag (furnace bottom ash) recycling | Resource use of incinerator slag | Construction materials | Being scaled across the group | Product sales |
| Environmental chelating agent (new material) | Heavy-metal stabilisation agent | Waste-to-energy operators | 16 customers; RMB11.378 million cumulative contracts (H1 2026) | Product sales |
| HSW KPI | FY2021 | FY2022 | FY2023 | FY2024 |
|---|---|---|---|---|
| Detoxification treatment volume (kt) | 246 | 399 | 361 | 454 |
| Integrated resource utilisation volume (kt) | 23 | 32 | 88 | 45 |
| Recycled products sold (kt) | 9.5 | 12.1 | 21.4 | 11.7 |
| On-grid electricity (GWh) | 0 | 6.4 | 22.1 | 30.6 |
| Steam supplied (kt) | 0 | 8 | 677 | 828 |
Capability: safe disposal of 44 of the 46 hazardous waste categories in China's National Catalogue of Hazardous Wastes.
Sources: FY2022 and FY2024 annual results.
Environmental remediation
| Offering | Description | Target customer | Status |
|---|---|---|---|
| Industrial contaminated site remediation | Soil and groundwater clean-up | Local governments, developers | Core line; Jiangsu provincial Class III Science and Technology Progress Award (2025) for mine-polluted land and groundwater remediation |
| Contaminated farmland remediation | Agricultural soil treatment | Agricultural authorities | Ongoing |
| Mine and landfill ecological restoration | Including dig-up and screening of decayed garbage (first contract 2022) | Municipalities | Ongoing; Yancheng Jianhu project completed May 2026 |
| River/lake sediment and industrial sludge treatment | Dredging and treatment | Water authorities | Ongoing |
| Landfill anti-seepage engineering | Liners and containment | Landfill operators | Ongoing |
| Oil sludge integrated treatment; industrial gas emission treatment | Specialist treatment | Industry | Ongoing |
| Wetland park construction and operation; environmental stewardship ("environmental butler") | Ecological services | Local governments | Ongoing |
| New materials for eco-agricultural restoration | Soil amendment materials | Agriculture | Added to segment definition in 2026 |
Backlog and scale: 95 asset-light projects undertaken cumulatively, total contract value about RMB2.38 billion (H1 2026). Twelve projects were under implementation at 30 June 2026 (contract value about RMB589 million), mainly in Jiangsu, Guangdong, Zhejiang and Anhui. New contracts were RMB47.81 million in H1 2026 and RMB226 million in FY2025, the latter up 42% by value according to the FY2025 presentation.
Qualifications: First-grade Professional Contracting for Environmental Protection Projects; Second-grade General Contractor for Municipal Public Works and for Construction Works; Environmental Engineering Design Class B (pollution remediation, water pollution prevention); Power Facility Installation/Repair/Testing Class III. Also an AAA corporate credit certificate and ISO 9001, ISO 45001, ISO 14001 and ISO 29490 certifications (Interim Report 2026).
Solar energy and wind power
| Offering | Description | Scale (30 Jun 2026) |
|---|---|---|
| Centralised and distributed solar (PRC) | Ground-mounted and rooftop solar in Jiangsu and Anhui; centralised digital operations and maintenance | 35 operating/completed solar projects in total |
| County-wide solar programme, Feng County (Jiangsu) | 9 sub-projects, RMB124 million investment | 27.88 MW, fully operational |
| Hong Kong rooftop solar | 13 projects including South Seas Centre, Tsim Sha Tsui | 3.60 MW |
| Germany solar | Small operating portfolio | Revenue about HK$5.7 million in FY2024 |
| Wind power | 2 projects, primarily in Shanxi | 96 MW |
| Distributed energy storage | Storage paired with solar | 12.2 MW / 24.4 MWh added in 2024 |
| Independent energy storage (Nanjing Pukou Economic Development Zone) | Grid-scale battery storage | 250 MW / 500 MWh; project approval completed (H1 2026) |
| Zero-carbon industrial parks | "Green energy supply + digital empowerment" solution combining solar, wind, storage and VPP | Feng County and Dangshan parks approved; Changzhou Zhonglou park (PAS2060) operating; 68.66 MW of park capacity completed by 2024 |
| Energy and carbon management platform; VPP trading platform | Proprietary software | Used for the Jiangsu King's Luck Brewery "Zero-carbon Factory" certification (2025) |
Segment totals: 254.72 MW designed capacity and RMB1.937 billion total investment (H1 2026). On-grid electricity was 163.2 GWh in H1 2026 (+12%), 294.6 GWh in FY2024 and 296.8 GWh in FY2023.
Pricing for all of the above is not disclosed product by product. Revenue comes from grid tariffs, steam contracts, gate fees, EPC milestone billing and market sales of power and certificates.
Financial Narrative
Income statement
Notes:
-
FY2025 finance costs of about HK$551 million are derived from the company's statement that finance costs fell by HK$219 million versus FY2024 (FY2025 presentation).
-
FY2025 profit for the year of 55 is the upper bound in the positive profit alert of 4 March 2026 ("no more than HK$55 million").
-
Sources: annual results announcements FY2021–FY2024; FY2025 results press release and presentation.
Margins
Revenue CAGR FY2021–FY2025: about -5.5% per year (derived). From the FY2020 peak (HK$9,835 million), the five-year CAGR to FY2025 is about -7.3%.
Commentary. The P&L shows a three-stage arc.
-
FY2021–FY2022: end of the build-out. Construction revenue fell from HK$1.74 billion to HK$1.30 billion and margin compressed. Rising biomass fuel prices during COVID disruptions and the first hazardous-waste price declines cut EBITDA by 23% in FY2022.
-
FY2023–FY2024: impairment cycle. HSW market pricing collapsed and the group wrote down HK$656 million (FY2023) and HK$1,175 million (FY2024) of HSW intangibles, PP&E, right-of-use assets and goodwill, producing two consecutive losses. Unbilled subsidy receivables also ballooned.
-
FY2025: inflection. EBITDA recovered 62% to HK$1.61 billion because impairments fell sharply, biomass fuel quality improved, HSW unit cost fell 15–16%, and finance costs fell HK$219 million as subsidies were collected and debt repaid. The FY2025 attributable profit of HK$113 million is thin, and the "profit for the year" figure (no more than HK$55 million) is lower still because of perpetual-note distributions and minority losses.
The H1 2026 run-rate (EBITDA HK$1.04 billion, attributable profit HK$195 million) suggests FY2026 could exceed FY2025 if H2 impairments are contained. H2 2025 was loss-making at the attributable level: FY HK$113 million minus H1 HK$191 million equals about -HK$78 million.
Balance sheet
Sources: annual results announcements FY2022 and FY2024 (statements of financial position); FY2025 comparatives in the Interim Report 2026. Goodwill at 31 December 2025 is shown as nil in the Interim Report 2026 balance sheet. FY2025 contract assets equal HK$6,062.7 million non-current plus HK$931.7 million current.
Balance sheet at 30 June 2026 (Interim Report 2026): total assets HK$35,572 million; total liabilities HK$21,792 million; equity attributable HK$10,495 million (NAV HK$5.08/share, lifted by a HK$692 million FX translation gain); perpetual MTNs HK$3,237 million. Borrowings were HK$18,418 million: HK$7,864 million current and HK$10,554 million non-current, 99.93% RMB, 49% fixed and 51% floating. Cash was HK$2,270 million. Net debt was about HK$16,148 million. Banking facilities totalled HK$18,236 million, of which HK$7,044 million was unused. Pledged assets had a carrying value of HK$15,865 million.
Commentary. Leverage peaked in FY2023, when net debt was about HK$20.8 billion and short-term borrowings HK$10.2 billion, a refinancing risk at the time. Since then:
-
Gross debt has fallen by HK$4.7 billion. FY2025 alone saw HK$2.6 billion repaid, funded by RMB2.951 billion of subsidy collections.
-
Perpetual MTNs, which are equity-classified, rose from zero to HK$3.2 billion. Part of the de-leveraging is therefore an accounting re-classification of funding into hybrid capital. The coupons (2.39%–2.43%) rank ahead of ordinary dividends.
-
Shareholders' equity fell 31% from FY2021 to FY2025 through losses and RMB translation, then rebounded in H1 2026 on RMB appreciation.
Cash flow
Capex proxy is from segment notes. FY2025 dividends declared are derived: HK5.6 cents × 2,066 million shares. No buybacks were made in any period reviewed (repeated in each results announcement).
Commentary. Capex has wound down sharply, from HK$2.9 billion in FY2021 to about HK$0.1 billion in H1 2026. The group is now generating meaningful free cash flow. The company stated that FY2025 delivered record free cash flow and a receivables collection rate of 113.4%, up 24.4 percentage points (FY2025 presentation). The constraint on dividends is earnings quality and the hybrid capital stack, not capex.
Ratios
Notes:
-
FY2025 ROA uses the profit-alert upper bound of HK$55 million.
-
ROIC uses PBT plus finance costs, taxed at the effective rate (FY2021 17%, FY2022 32%) or 25% statutory in loss years. It is indicative only.
-
A cash conversion cycle is not meaningful for a concession operator. Debtor days are shown instead and capture the subsidy-receivable problem: debtors aged over 13 months were HK$4.32 billion at end-2024, versus HK$0.32 billion at end-2021.
-
Effective borrowing cost: 3.72% (2023), 3.38% (2024), 2.67% (2025), a cumulative 105 bp decline (FY2025 presentation). New 2026 issuance priced at 1.61%–1.75%.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Segment revenue (HKD Mn)
| Segment revenue (HKD Mn) | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Integrated biomass utilisation (HKD Mn) | 6,265 | 6,037 | 5,784 | 5,482 | 5,310 |
Hazardous and solid waste treatment (HKD Mn) | 1,658 | 1,674 | 1,180 | 1,140 | 1,049 |
Environmental remediation (HKD Mn) | 318 | 148 | 243 | 151 | 161 |
Solar energy and wind power (HKD Mn) | 205 | 189 | 210 | 203 | 209 |
Total (HKD Mn) | 8,447 | 8,048 | 7,417 | 6,977 | 6,729 |
Segment share of revenue (%)
| Segment share of revenue (%) | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Integrated biomass utilisation (%) | 74.2 | 75.0 | 78.0 | 78.6 | 78.9 |
Hazardous and solid waste treatment (%) | 19.6 | 20.8 | 15.9 | 16.3 | 15.6 |
Environmental remediation (%) | 3.8 | 1.8 | 3.3 | 2.2 | 2.4 |
Solar energy and wind power (%) | 2.4 | 2.4 | 2.8 | 2.9 | 3.1 |
Segment revenue growth (%)
| Segment revenue growth (%) | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|
Integrated biomass utilisation (%) | -3.6 | -4.2 | -5.2 | -3.1 |
Hazardous and solid waste treatment (%) | 0.9 | -29.5 | -3.4 | -8.0 |
Environmental remediation (%) | -53.4 | 64.2 | -37.9 | 6.7 |
Solar energy and wind power (%) | -7.8 | 10.8 | -3.2 | 2.9 |
Segment adjusted EBITDA (HKD Mn)
| Segment adjusted EBITDA (HKD Mn) | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Integrated biomass utilisation (HKD Mn) | 2,061 | 1,650 | 1,858 | 1,918 | 1,942 |
Hazardous and solid waste treatment (HKD Mn) | 687 | 489 | -428 | -1,119 | -374 |
Environmental remediation (HKD Mn) | 42 | 11 | 30 | 25 | -78 |
Solar energy and wind power (HKD Mn) | 189 | 171 | 188 | 179 | 192 |
Total segment adjusted EBITDA (HKD Mn) | 2,979 | 2,321 | 1,648 | 1,002 | 1,681 |
Segment net profit (HKD Mn)
| Segment net profit (HKD Mn) | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Integrated biomass utilisation (HKD Mn) | 1,060 | 777 | 998 | 1,140 | 1,167 |
Hazardous and solid waste treatment (HKD Mn) | 364 | -24 | -753 | -1,282 | -757 |
Environmental remediation (HKD Mn) | 16 | -8 | 9 | 7 | -88 |
Solar energy and wind power (HKD Mn) | 73 | 62 | 80 | 73 | 83 |
Segment EBITDA margin (%)
| Segment EBITDA margin (%) | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Integrated biomass utilisation (%) | 32.9 | 27.3 | 32.1 | 35.0 | 36.6 |
Hazardous and solid waste treatment (%) | 41.4 | 29.2 | -36.3 | -98.1 | -35.7 |
Environmental remediation (%) | 13.3 | 7.3 | 12.3 | 16.6 | -48.5 |
Solar energy and wind power (%) | 92.1 | 90.5 | 89.7 | 88.0 | 91.6 |
Revenue by Segment
| Segment (HKD Mn) | Revenue H1 2025 | Revenue H1 2026 | EBITDA H1 2025 | EBITDA H1 2026 |
|---|---|---|---|---|
Integrated biomass utilisation | 2,711 | 2,792 | 1,022 | 974 |
Hazardous and solid waste treatment | 515 | 531 | 27 | 3 |
Environmental remediation | 73 | 62 | -59 | 6 |
Solar energy and wind power | 101 | 107 | 87 | 89 |
Total | 3,400 | 3,492 | 1,076 | 1,072 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansIncome Statement and Margin Analysis (%)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Revenue (HKD Mn) | 8,447 | 8,048 | 7,417 | 6,977 | 6,729 |
Revenue growth YoY (%) | -14.1 | -4.7 | -7.8 | -5.9 | -3.5 |
Gross profit (HKD Mn) | 2,346 | 1,683 | 1,595 | 1,460 | — |
EBIT proxy: PBT plus finance costs (HKD Mn, derived) | 2,090 | 1,251 | 486 | 91 | — |
EBITDA (HKD Mn, company definition) | 2,838 | 2,176 | 1,454 | 994 | 1,614 |
Non-financial asset impairments (HKD Mn) | 0 | 30 | 656 | 1,175 | — |
Finance costs (HKD Mn) | 742 | 741 | 825 | 770 | 551 |
Profit/(loss) before tax (HKD Mn) | 1,349 | 510 | -339 | -679 | — |
Income tax charge/(credit) (HKD Mn) | 229 | 165 | -37 | -174 | — |
Profit/(loss) for the year (HKD Mn) | 1,120 | 345 | -302 | -505 | 55 |
Profit/(loss) attributable to shareholders (HKD Mn) | 1,110 | 340 | -302 | -415 | 113 |
Basic and diluted EPS (HK cents) | 53.74 | 16.47 | -14.60 | -20.10 | 5.47 |
Dividend per share (HK cents) | 11.0 | 3.6 | 2.5 | 1.4 | 5.6 |
Dividend payout (%) | 20.5 | 21.9 | — | — | 102 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansMargin
| Margin | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Gross margin (%) | 27.8 | 20.9 | 21.5 | 20.9 | — |
EBIT proxy margin (%, derived) | 24.7 | 15.5 | 6.6 | 1.3 | — |
EBITDA margin (%) | 33.6 | 27.0 | 19.6 | 14.2 | 24.0 |
Net margin, attributable (%) | 13.1 | 4.2 | -4.1 | -6.0 | 1.7 |
Balance Sheet and Per-Share Data
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Total assets (HKD Mn) | 40,540 | 39,156 | 39,757 | 36,332 | 34,604 |
Total liabilities (HKD Mn) | 26,394 | 25,622 | 27,401 | 24,669 | 21,804 |
Equity attributable to shareholders (HKD Mn) | 13,761 | 12,385 | 11,271 | 9,610 | 9,506 |
Perpetual MTNs (HKD Mn) | 0 | 807 | 807 | 1,901 | 3,249 |
Non-controlling interests (HKD Mn) | 384 | 343 | 278 | 152 | 46 |
Total equity (HKD Mn) | 14,145 | 13,534 | 12,356 | 11,662 | 12,801 |
Cash and bank balances (HKD Mn) | 2,644 | 2,003 | 2,379 | 1,674 | 2,344 |
Short-term borrowings (HKD Mn) | 4,493 | 5,809 | 10,214 | 7,718 | 6,937 |
Long-term borrowings (HKD Mn) | 16,058 | 14,927 | 12,918 | 13,282 | 11,448 |
Total borrowings (HKD Mn) | 20,551 | 20,737 | 23,132 | 21,000 | 18,385 |
Net debt (HKD Mn, derived) | 17,907 | 18,734 | 20,753 | 19,326 | 16,041 |
Goodwill (HKD Mn) | 163 | 134 | 131 | 66 | 0 |
Intangible assets (HKD Mn) | 14,365 | 13,356 | 12,820 | 11,636 | 11,294 |
Contract assets, current plus non-current (HKD Mn) | 9,511 | 9,791 | 9,628 | 9,993 | 6,994 |
Net current assets / working capital (HKD Mn) | 3,247 | 3,381 | 1,540 | 2,619 | 2,778 |
NAV per share attributable (HKD) | 6.66 | 5.99 | 5.46 | 4.65 | 4.60 |
Dividends & Capital Returns
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Additions to PP&E, ROU, intangibles, goodwill and prepayments (HKD Mn, capex proxy) | 2,939 | 1,372 | 996 | 622 | — |
Additions to non-current contract assets (HKD Mn) | 948 | 826 | 398 | 390 | — |
Dividends declared for the year (HKD Mn) | 227 | 74 | 52 | 29 | 116 |
Share buybacks (HKD Mn) | 0 | 0 | 0 | 0 | 0 |
Cash Flow
| Metric | H1 2025 | H1 2026 |
|---|---|---|
Net operating cash flow (HKD Mn) | 806 | 1,015 |
Purchases of PP&E (HKD Mn) | 212 | 102 |
Additions to intangible assets (HKD Mn) | 48 | 8 |
Free cash flow: OCF minus PP&E and intangible additions (HKD Mn, derived) | 546 | 905 |
Dividends paid to shareholders (HKD Mn) | 0 | 58 |
Interest paid (HKD Mn) | 286 | 282 |
Distributions to perpetual MTN holders (HKD Mn) | 25 | 26 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
ROE, attributable profit / average attributable equity (%, derived) | 8.1 | 2.6 | -2.6 | -4.0 | 1.2 |
ROA, profit for year / year-end total assets (%, derived) | 2.8 | 0.9 | -0.8 | -1.4 | 0.2 |
ROIC, after-tax EBIT proxy / (debt + total equity) (%, derived estimate) | 5.0 | 2.5 | 1.0 | 0.2 | — |
Current ratio (%) | 137.5 | 137.3 | 111.9 | 125.4 | 129.6 |
Gearing, total liabilities / total assets (%) | 65.1 | 65.4 | 68.9 | 67.9 | 63.0 |
Debt / total equity (x, derived) | 1.45 | 1.53 | 1.87 | 1.80 | 1.44 |
Net debt / EBITDA (x, derived) | 6.3 | 8.6 | 14.3 | 19.4 | 9.9 |
EBITDA interest coverage (x, derived) | 3.8 | 2.9 | 1.8 | 1.3 | 2.9 |
Asset turnover, revenue / total assets (x, derived) | 0.21 | 0.21 | 0.19 | 0.19 | 0.19 |
Debtor days, debtors / revenue × 365 (days, derived) | 239 | 281 | 387 | 338 | — |
Region revenue (HKD Mn)
| Region revenue (HKD Mn) | FY2021 | FY2022 | FY2023 | FY2024 |
|---|---|---|---|---|
Mainland China (HKD Mn) | 8,439.1 | 8,036.6 | 7,402.2 | 6,960.1 |
Hong Kong (HKD Mn) | 2.3 | 5.7 | 9.4 | 11.1 |
Germany (HKD Mn) | 5.6 | 5.8 | 5.4 | 5.7 |
Geographic growth (%)
| Geographic growth (%) | FY2022 | FY2023 | FY2024 |
|---|---|---|---|
Mainland China (%) | -4.8 | -7.9 | -6.0 |
Hong Kong (%) | 148.9 | 64.7 | 18.5 |
Germany (%) | 3.7 | -7.9 | 5.7 |
Segment Overview
| Segment | Provinces (company disclosure) |
|---|---|
Biomass (57 projects, 10 provinces) | Mainly Anhui, Jiangsu, Sichuan, Hubei, Henan (Shandong listed in FY2024); project at Guixi (Jiangxi) referenced in FY2025 |
HSW (45 projects, 6 provinces/ARs) | Mainly Jiangsu, Shandong, Anhui, Hubei, Zhejiang |
Remediation (12 active) | Jiangsu, Guangdong, Zhejiang, Anhui (Beijing and Tianjin in 2022; Yunnan in 2024) |
Solar/wind | Jiangsu, Anhui, Shanxi, Hong Kong, Germany (Guangdong in 2024) |
Capital Markets
| Item | Value | Source |
|---|---|---|
IPO price (May 2017) | HK$5.40 | CEI announcement, 28 Apr 2017 |
Reference price (Oct 2026) | HK$0.79 (another aggregator observation: HK$0.75) | Motley Fool; Moomoo |
52-week range | HK$0.73 – HK$1.14 | Motley Fool |
Change since IPO | About -85% (price only, excluding dividends; derived) | Derived |
Shares outstanding | 2,066.078 million | Interim Report 2026 |
Market capitalisation | About HK$1.63 billion at HK$0.79 | Derived |
Valuation Snapshot
| Multiple | Value | Basis |
|---|---|---|
P/E | 14.4x | FY2025 basic EPS HK5.47 cents |
P/B | 0.16x | NAV HK$5.08/share (30 Jun 2026) |
EV | About HK$21.1 billion | Market cap + borrowings HK$18.42 billion − cash HK$2.27 billion + perpetual MTNs HK$3.24 billion + NCI HK$0.05 billion |
EV/EBITDA (LTM) | About 12.5x | LTM EBITDA about HK$1.68 billion (FY2025 − H1 2025 + H1 2026) |
EV/Sales (LTM) | About 3.1x | LTM revenue about HK$6.82 billion |
Dividend yield (trailing) | About 7.2% | HK2.8 cents final FY2025 + HK2.9 cents interim FY2026 |
Dividend (HK cents per share)
| Dividend (HK cents per share) | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Interim dividend (HK cents) | 7.0 | 3.6 | 2.5 | 1.4 | 2.8 |
Final dividend (HK cents) | 4.0 | 0 | 0 | 0 | 2.8 |
Total dividend (HK cents) | 11.0 | 3.6 | 2.5 | 1.4 | 5.6 |
Debt Maturity Profile
| Maturity bucket (HKD Mn) | 31 Dec 2025 | 30 Jun 2026 |
|---|---|---|
Within 1 year (HKD Mn) | 6,937 | 7,864 |
2nd year (HKD Mn) | 5,028 | 3,112 |
3rd to 5th year (HKD Mn) | 4,319 | 5,457 |
After 5th year (HKD Mn) | 2,101 | 1985 |
Total (HKD Mn) | 18,385 | 18,418 |
Capital Instruments
| Instrument | Amount | Tenor | Coupon |
|---|---|---|---|
2022 Green MTN (Bond Connect) | RMB1.2 billion | 3+2 years | 3.27% (first 3 years) |
2024 First Tranche Green MTN | RMB1 billion | 3+2 years | 2.34% |
2024 Second Tranche MTN | RMB1 billion | 5 years | 2.24% |
2024 Third Tranche (perpetual) | RMB1 billion | 3+N years | 2.43% |
2025 First Tranche Green (perpetual) | RMB1 billion | 3+N years | 2.39% |
2026 First Tranche Green MTN | RMB1 billion | 3 years | 1.75% |
2026 Second Tranche Green (carbon-neutral) | RMB1 billion | 2 years | 1.61% |
ABS Phase 1 senior | RMB630 million | Amortising | 1.79% |
ABS Phase 2 senior | RMB665 million | Amortising | 1.70% |
Analyst Conclusions
Management guidance
Management gives no numerical guidance. Qualitative 2026 priorities (Interim Report 2026):
-
Expand heat supply and its share of revenue.
-
Deliver the Feng County and Dangshan zero-carbon parks and the Nanjing Pukou storage project.
-
Deepen the regionalisation reform.
-
Complete intelligent stockyard acceptance and roll-out.
-
Advance overseas (Belt and Road) clean-energy projects.
Management states confidence in fully achieving 2026 targets. The medium-term target is at least 30% B2B profit contribution by 2030.
Consensus
Not available. No published consensus was identified.
Bull case
-
Earnings recovery has room to run. H1 2026 attributable profit of HK$195 million versus FY2025's HK$113 million implies a step-up if H2 impairments normalise. Finance costs fell 15% year on year in H1 2026 (HK$250 million versus HK$294 million) and will keep falling as 1.6%–1.8% paper replaces 3%-plus debt.
-
Cash yield and de-leveraging. Capex is about HK$110 million a semester against about HK$1 billion of operating cash flow. Subsidy collections (RMB2.95 billion in 2025) and ABS monetisation could take net debt below HK$15 billion, supporting a 7%-plus dividend yield on a 0.16x P/B stock.
-
The HSW drag is shrinking. Capacity is being pruned (61 projects to 45). Five of twelve rescue projects are profitable. Segment net loss narrowed from HK$1.28 billion (FY2024) to HK$757 million (FY2025) and HK$164 million (H1 2026).
Bear case
-
Biomass margin squeeze. Market-based tariffs plus fuel inflation directly threaten the segment that generates all group profit. H1 2026 biomass segment EBITDA was already down 5% and net profit down 14%.
-
Hybrid-heavy capital structure. HK$3.24 billion of perpetual MTNs (distributions of about HK$66 million in H1 2026, rising) sit ahead of ordinary shareholders. Headline de-leveraging is partly re-labelling, and leverage on an all-in basis (net debt plus perpetuals divided by EBITDA) remains about 11x.
-
Earnings fragility and governance churn. H2 2025 was loss-making after impairments. Recurring HSW impairments (HK$150 million in H1 2026) and repeated leadership turnover undermine visibility. The 102% FY2025 payout may not be sustainable.
Catalysts and monitorables (next 12 months)
-
About 13 October 2026: interim dividend payment.
-
FY2026 results (around March 2027): H2 impairment level; full-year payout decision.
-
Further subsidy collections and any ABS Phase 3.
-
Biomass tariff settlements under the market reform; any provincial pricing outcomes.
-
Commissioning progress at Nanjing Pukou storage and the Feng County and Dangshan parks.
-
Biomethane project commissioning; glycation pilot start.
-
HSW segment break-even trajectory; further disposals.
-
Usage of the remaining RMB3 billion NAFMII quota and refinancing of HK$7.86 billion of short-term debt.
-
Any parent-level corporate action (privatisation or asset injection), given the deep discount to book. Not rumoured; monitor only.
-
Board refresh after the July 2026 resignation.
Concluding analyst verdict
China Everbright Greentech is past the worst of its post-subsidy, post-construction reckoning. It is not yet a clean equity story.
The improvement is real and traceable. EBITDA rebounded 62% to HK$1.61 billion in FY2025. The hazardous-waste loss more than halved in H1 2026. Borrowings are HK$4.7 billion below their 2023 peak, and funding now costs well under 2%. The biomass franchise, with 1,069 MW, 57 projects and a mature fuel network, earned a 36.6% segment EBITDA margin in FY2025 and is being re-engineered toward industrial heat and green attributes. That is the right hedge against tariff marketisation. Capex discipline has turned the group into a free-cash-flow generator, and the board has started sharing it through a HK5.6-cent FY2025 dividend and a HK2.9-cent interim.
Against this sit structural question marks. Group profit depends almost entirely on one segment whose revenue model is being re-priced by policy. Return on equity is about 1–2%, far below any reasonable cost of capital. The equity is subordinated to more than HK$3.2 billion of perpetual hybrids. Seventy percent of revenue comes from local governments. Leadership has rotated repeatedly, and management guidance is entirely qualitative.
At about 0.16x book, 12–13x EV/EBITDA and a roughly 7% trailing yield, the market prices Greentech as a melting asset. Evidence from FY2025–H1 2026 suggests that view is too pessimistic, provided subsidy collections continue and hazardous-waste impairments fade. The stock is best viewed as a state-backed deep-value yield and de-leveraging play. Upside depends on proof that biomass economics hold up under market pricing, which FY2026 results should begin to show, and on any parent-level action to close the discount to book. Investors should size positions for policy risk and treat the 2030 B2B target as directional rather than bankable.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Appointed / tenure | Background (as disclosed) | Remuneration |
|---|---|---|---|---|
Dr. ZHU Fugang | Chairman, Executive Director | Joined Group Sep 2019 as Vice President; ED Dec 2022; CEO Feb 2024 – Jul 2025; Chairman from 25 Jul 2025 | — | Annual salary RMB895,282 as Chairman (Jul 2025 announcement); FY2024 total about HK$1.07 million (Simply Wall St) |
Mr. LIANG Haidong | Chief Executive Officer, Executive Director | From 25 Jul 2025 | Described as having extensive experience in China's environmental protection market; aged about 56 (aggregator) | Annual salary RMB752,400 (Jul 2025 announcement) |
Ms. MAO Jing | Non-executive Director | From 2024 | — | — |
Mr. CHOW Siu Lui | Independent NED; Chairman of Audit and Risk Management Committee | Since 2017 IPO (about 9 years) | — | About HK$330,000 (FY2024, aggregator) |
Prof. YAN Houmin | Independent NED; Chairman of Remuneration Committee (from Feb 2024) | Since 2017 IPO (about 9 years) | — | About HK$330,000 (FY2024, aggregator) |
Mr. LI Huaqiang | Independent NED | From 9 Feb 2024 | — | About HK$295,000 (FY2024, aggregator) |
“—” = not publicly disclosed.
Executive Leadership Team
| Name | Role | Notes |
|---|---|---|
Mr. QU Ning | Chief Financial Officer | Appointed 2024; Alternate Authorised Representative from 17 Jul 2026 |
Ms. KWONG Wai Ni, Anita | Company Secretary | Interim Report 2026 |
Board & Management Changes
| Date | Change | Context |
|---|---|---|
18 Jun 2022 | Huang Haiqing replaced Wang Tianyi as Nomination Committee chair | FY2022 results |
15 Dec 2022 | Zhu Fugang appointed ED | HKEX |
9 Feb 2024 | CEO Qian Xiaodong and INED Philip Tsao resigned; Zhu became CEO; Li Huaqiang joined as INED | Followed FY2023 loss trajectory |
29 Feb 2024 | NED Guo Ying retired | Retirement age |
Mar–Apr 2024 | ED and CFO Lo Kam Fan resigned; Wang Dianer and Huang Chaoxiong appointed EDs; Mao Jing appointed NED; Qu Ning appointed CFO | HKEX 28 Mar 2024 |
2024–2025 | Chairman Huang Haiqing succeeded by Wang Silian (Wang Silian was Chairman by Mar 2025) | FY2024 results board list |
25 Jul 2025 | Wang Silian, Wang Dianer and Song Jian resigned; Zhu became Chairman; Liang Haidong became CEO | Start of "Second-stage Entrepreneurship" |
17 Jul 2026 | ED Huang Chaoxiong resigned ("other business arrangements" with the parent group) | HKEX |
Major Shareholders
| Holder | Shares | % | Notes |
|---|---|---|---|
China Everbright Green Holdings Ltd | 1,440,000,000 | 69.70 | Direct holder; 100% owned by CEEGL |
Guildford Limited | 21,706,369 | 1.05 | 100% owned by China Everbright Holdings (CE Hong Kong) |
Everbright Investment & Management Ltd | 1,206,617 | 0.06 | 100% owned by CE Hong Kong |
China Everbright Group (aggregate deemed) | 1,462,912,986 | 70.81 | Via the three entities above |
Central Huijin (additional deemed interest via associates/subsidiary) | 100,550,000 | 4.87 | Huijin owns 63.16% of China Everbright Group |
Ningbo Energy Group (aggregate) | 201,997,000 | 9.78 | Via Ningbo Ningdian (122,127,000; 5.91%), Lvneng Investment (59,851,000; 2.90%) and Ningbo BSLS Trade (20,019,000; 0.97%); Ningbo Development & Investment owns 45.89% of Ningbo Energy |
Competitive Landscape
Competitors by Segment
| Segment | Competitor | Listing | Positioning vs Greentech |
|---|---|---|---|
Biomass power and heat | National Bio Energy Group (Guoneng Bio) | Unlisted / private | Large dedicated biomass operator. |
Biomass power | Kaidi Ecological (legacy) | Restructured | Former leading biomass developer; distressed. Shows subsidy-dependence risk. |
WtE, heat and biomass | China Everbright Environment Group (parent) | 0257.HK | Largest WtE operator; Greentech is its biomass/HSW arm; benchmarked below |
WtE and steam | Dynagreen Environmental Protection Group | 1330.HK / 601330.SH | WtE peer with fast-growing steam supply; higher margins |
WtE | China Tianying | 000035.SZ | — |
WtE | Canvest Environmental Protection | — | — |
Hazardous waste | Dongjiang Environmental | 0895.HK / 002672.SZ | Large HW peer, also deeply loss-making; benchmarked below |
Hazardous waste and remediation | Gaoneng Environment | 603588.SH | — |
Remediation | BCEG Environmental Remediation | — | — |
Solar/wind | Concord New Energy | 0182.HK | — |
Biomass/WtE | Grandblue / Hanlan Environment | 600323.SH | — |
Peer Comparison FY2025
| Company | Revenue | Revenue growth | Net profit attributable | Net margin | EBITDA margin |
|---|---|---|---|---|---|
China Everbright Greentech (1257) | HK$6.73 billion | -3.5% | HK$113 million | 1.7% | 24.0% |
China Everbright Environment (257) | HK$27.52 billion | -9.1% | HK$3.93 billion | 14.3% | 37.3% |
Dynagreen Environmental (1330) | RMB3.53 billion | +4.0% | RMB618 million | 17.5% | n/a (gross margin 46.7%) |
Dongjiang Environmental (895) | about RMB3.5 billion | about flat | about -RMB1.23 billion | about -35% | — |
Recent Developments
Headcount drifted from about 3,400 (end-2024) to more than 3,200 (mid-2026).