Chinney Alliance Group Limited Overview

Chinney Alliance is a mid-sized Hong Kong construction and engineering holding company controlled by the Wong family's Chinney Group. Roughly 93% of its revenue is construction services recognised over time, delivered through four contracting platforms: a 74.5%-owned, separately listed foundation piling and ground-investigation specialist (Chinney Kin Wing, 1556.HK); an electrical and mechanical (E&M) building-services subcontractor (Shun Cheong); a general building contractor in Hong Kong and Macau (Chinney Construction and Chinney Timwill); and a niche aviation-systems integrator serving airports, the Hong Kong Observatory and the emerging low-altitude economy (Chinney Alliance Engineering). A small plastics and chemicals trading arm (Jacobson van den Berg) and a residential development site in Fanling complete the portfolio. The group is almost wholly dependent on Hong Kong (96% of FY2025 revenue), is heavily geared to government-funded infrastructure and public housing, and earns thin margins. Its listed foundation subsidiary is the dominant profit engine. On 8 October 2026 the market valued the whole group below the look-through value of that stake.


Company's own description

In its FY2025 results announcement (26 Mar 2026), the Company describes itself as "principally engaged in the trading of plastic and chemical products, provision of building related contracting services, provision of foundation piling works and sub-structure works, building construction works for both public and private sectors, distribution and installation of aviation system and other hi-tech products and others, which include property holding and development." Operating segments are reported consistently with internal management reporting.

Independent characterisation

Chinney Alliance is a holding company for five semi-autonomous Hong Kong engineering and trading businesses that share a controlling family, a head office and a balance sheet. It does not run an integrated design-build model. Each unit bids independently, and the units sit at different points of the construction value chain:

  1. Sub-structure (foundation piling and ground investigation). Chinney Kin Wing works at the earliest stage of a project. It owns a large bored-pile machinery fleet and a depot of over 200,000 sq ft, and its DrilTech subsidiary holds HOKLAS laboratory accreditation. This is the most capital-intensive unit and the one with the strongest margins. FY2025 segment capex was HK$93.2m out of a group total of HK$95.2m.

  2. Main contracting (building construction). Chinney Construction, Chinney Builders and Chinney Timwill (Macau) act as main contractors on public, institutional, hospitality and private projects. They compete in the most crowded licence category, and management describes margins there as "razor thin."

  3. Specialist subcontracting (E&M building services). Shun Cheong installs electrical, HVAC, fire services, and pump and drainage systems, mainly as a nominated or domestic subcontractor to main contractors on public housing and private projects. It is exposed to delays in upstream handover and to the credit risk of main contractors.

  4. Systems integration (aviation). Chinney Alliance Engineering (CAE) distributes and installs aviation systems, weather radar and monitoring, vessel-traffic and anti-drone technologies for airport and government clients in Hong Kong and Macau.

  5. Distribution (plastics, chemicals, hygiene). Jacobson van den Berg trades engineering and commodity plastics and chemicals to export manufacturers. It also owns the proprietary JcoNAT hypochlorous-acid disinfectant brand, which is patented, including for the treatment of onychomycosis.

Revenue model mix

Revenue type (HKD K)FY2021FY2022FY2023FY2024FY2025
Construction services (recognised over time)6,030,3525,325,8775,460,3457,045,6196,031,439
Sales of goods (recognised at a point in time)769,469572,482521,295646,879466,305
Total revenue6,799,8215,898,3595,981,6407,692,4986,497,744
Revenue type share (%)FY2021FY2022FY2023FY2024FY2025
Construction services88.790.391.391.692.8
Sales of goods11.39.78.78.47.2

Source: Note 3 of each year's results announcement. "Sales of goods" covers Jacobson's trading revenue plus equipment sales within Shun Cheong (HK$95.3m in FY2025). The Group has no subscription or licensing revenue.

In 1H2026, construction services were HK$2,166.6m and sales of goods HK$328.2m. Goods rose to 13.2% of revenue because Jacobson's sales surged on oil-driven pricing.

Customers and end-markets

Customers ≥10% of revenue (HKD K)FY2021FY2022FY2023FY2024FY2025
Largest disclosed customer001,033,314929,043769,860
Second disclosed customer0000663,242

The customer base consists of Hong Kong government works departments and public bodies (the Housing Authority, the Airport Authority, the Hong Kong Observatory, and infrastructure departments behind Northern Metropolis and Route 11 site investigation), main contractors (for Shun Cheong), private developers (including connected Hon Kwok Land), Macau hospitality operators (historically Chinney Timwill's main Macau clients), and export-oriented manufacturers in Hong Kong and southern China (Jacobson).

Customer concentration has risen. No single customer exceeded 10% of revenue in FY2021 or FY2022. One customer did in FY2023 (HK$1,033.3m) and in FY2024 (HK$929.0m). Two did in FY2025 (Customer A HK$769.9m; Customer B HK$663.2m), together 22.1% of revenue. The customers are not named.

(0 = no customer above the 10% threshold.)

Strategy

Stated strategic themes

The FY2025 chairman's statement (26 Mar 2026) and the 1H2026 statement (26 Aug 2026) set out five recurring themes:

  1. Capital discipline and selective bidding. "Revenue for revenue's sake is a fool's game"; "We do not confuse backlog with value"; "We do not take uncompensated risk." The policy is to prioritise risk-adjusted returns over volume, especially in private-sector tenders.

  2. Technology-led repositioning ("Hong Kong 4.0"). The FY2024 outlook argued that Hong Kong's next growth phase will service China's technology boom (EVs, robotics, low-altitude economy, new energy, data centres). The Group claims a "head start" through aviation systems, robotics, drones, new energy, data centres and consumer hygiene.

  3. Operational excellence at CKW ("CKW 2.0"). This covers modern equipment, an enlarged depot, AI-enabled monitoring, AI training through the CKW Academy, the Method Statement, and a "No Supervision No Work" safety culture.

  4. Front-loading problems. "Face the brutal facts early... take our medicine upfront," as illustrated by the Shun Cheong margin markdowns in 1H2026.

  5. Greater Bay Area / Macau optionality. Recovery is expected from 2027 on the back of Macau airport expansion and urban renewal.

Initiatives announced in the last 24 months

InitiativeUnitStatus / detailSource
CKW 2.0 programmeCKWUnder way; led by CKW Academy1H2026
Bored-pile fleet expansion and depot over 200,000 sq ftCKWCompleted 2025; development waiver May 2026FY2025, 1H2026
AI-enabled site monitoring and IT infrastructure upgradeCKWOngoingFY2025
Marine ground investigation via purpose-built vesselDrilTechLaunching 2026FY2025
NEC4 Framework Contract placementDrilTechSecuredFY2025
Data centre infrastructure (power, cooling, life safety)Shun CheongStrategic pivotFY2025, 1H2026
EV charging gridsShun CheongExpandingFY2024–1H2026
Solar PV, incl. floating solar in reservoirsShun CheongProject won 2024FY2024
Robotics for drilling and weldingShun CheongDeployedFY2024, FY2025
Low-altitude economy, anti-drone, weather radar, vessel trafficCAEPositioning; Macau airport expansionFY2024–1H2026
JcoNAT onychomycosis therapeutic applicationJacobsonCommercial traction claimedFY2025, 1H2026
Eco-friendly plastics, wellness products, Mainland e-commerceJacobsonOngoingFY2025
New construction technologies and partnerships to lower costsBuilding constructionExploratory (partners not named)FY2024, FY2025
ESG committee (monthly), carbon emission reportingCKWOngoingFY2023, 1H2026

Financial targets and guidance

The Company publishes no quantitative medium-term targets or guidance. Qualitative guidance from the 1H2026 statement is that 2026 "will not be easy," that bored-pile activity will soften in 2026, and that Drilling and Everest will remain stable. The Board keeps a "reserved" outlook (FY2024) and a "cautiously optimistic" medium-term view for Shun Cheong. Management also cites public housing supply of about 196,000 units over five years and private completions of about 17,000 units a year (2026–27 Budget) as supports for tender flow.

Products & Services

Foundation piling and ground investigation (Chinney Kin Wing Group)

OfferingDescription / capabilitiesTarget customerNotes
Bored pilingLarge-diameter bored piles; one of Hong Kong's largest bored-pile fleets after a substantial equipment acquisition in 2025Government works departments, Housing Authority, private developersActivity expected to soften in 2026 (1H2026 interim)
Percussive and socketed H-piling; rock-socketed steel H-pile in pre-bored holeDriven and socketed steel piles; CKW holds Development Bureau registration for Rock-socketed Steel H-pile in Pre-bored Hole (Group II)Public and private projectsPer CKW Interim Report 2021
Mini-piling, sheet piling, pipe and soldier pilingSpecialist piling for constrained sitesPublic and privateCKW business description (investing.com/stoxray profile)
ELS (excavation and lateral support), site formation, pile caps, basementsSub-structure works ancillary to pilingMain contractors and developersCKW profile
Everest Engineering — site formation, civil works, roads and drainageDiversification into civil works via additional licencesGovernmentFY2023 announcement; expected "relatively stable" in 2026
DrilTech — drilling and site investigationGround investigation contracts such as the Route 11 (Yuen Long–North Lantau) section and the Yau Tong service reservoirs relocation to cavernsGovernment (CEDD and others)FY2023 announcement
DrilTech — laboratory and field testingHOKLAS-accredited, including the Koden Test; licences cover site investigation, instrumentation, directional coring and field testingGovernment, consultantsFY2022–FY2025 announcements
DrilTech — marine ground investigationLaunched in 2026 using a purpose-built exploration vesselGovernment marine/reclamation projectsFY2025 announcement
NEC4 Framework Contract placementDrilTech placed on a significant NEC4 frameworkGovernmentFY2025 announcement; client and value not disclosed
Equipment and machinery leasingFleet leasing; depot over 200,000 sq ft; short-term development waiver granted May 2026Industry1H2026 interim
CKW 2.0 / CKW AcademyInternal operational excellence, AI training and AI-enabled monitoring programmeInternalFY2025 and 1H2026 announcements

Pricing is by tendered lump-sum or re-measurement contracts. Unit pricing is not publicly disclosed.

Building related contracting services (Shun Cheong Engineering Group)

OfferingDescriptionTarget customerNotes
Electrical installationLow-voltage and building electrical systemsMain contractors on public housing and private projectsApproved specialist contractor for public works (FY2024 announcement)
HVACAir-conditioning and ventilation design, supply and installationMain contractors, developersGroup historically an authorised Daikin distributor via Westco Chinney (AR 2005)
Fire servicesFire detection and suppression systemsPublic and privateListed in each year's business review
Pump and drainage (plumbing)Water, pump and drainage installationsPublic housing—
Security systems and video electronicsApproved specialisationsGovernmentFY2024 announcement
Robotics for drilling and weldingRobotic deployment on repetitive site tasksInternal productivityFY2024 and FY2025 announcements
EV charging infrastructureCharging installationsDevelopers, car park operatorsGrowth initiative (FY2024–1H2026)
Data centre infrastructurePower, thermal cooling and life-safety systems for data centres, including hyperscaleData centre owners/developers1H2026 strategic pivot
Solar PV installationIncludes floating solar panels on water reservoirs (project won 2024)Government (water reservoirs), commercialFY2024 announcement
Equipment salesHK$95.3m of goods sales within the segment (FY2025)Customers of E&M worksNote 3, FY2025

Building construction (Chinney Construction, Chinney Builders, Chinney Timwill)

OfferingDescriptionRepresentative projects
Main contracting — Hong KongSuperstructure construction for public, institutional and private clientsNew Airport District Police Operational Base (completing 2026); Kwai Chung data centre for Gold Famous (HK$757.8m, 2018 framework); 119–121 Connaught Road Central revamp (≤HK$96.3m builder's works)
Main contracting — MacauHotel, hospitality and infrastructure works via Chinney TimwillHistorical MGM Grand Macau piling/basement works (Chinney Investments 2006 report); variation orders on major Macau projects (FY2023)
Curtain wall and windowsApex Curtain Wall and Windows (subsidiary)Activity not disclosed

Aviation (Chinney Alliance Engineering Limited)

OfferingDescriptionCustomerNotes
Airport systemsDistribution, installation and maintenance of aviation systems at HKIA and MacauAirport Authority Hong Kong, Macau airportThree-runway system revenue boost in FY2024
Weather systems and radarWeather monitoring and radar contractsHong Kong ObservatorySeveral contracts won in FY2024
Anti-drone technologiesCounter-UAS systemsAirport and governmentFY2025 chairman's statement
Vessel traffic managementExploring new opportunitiesMarine Department / portsFY2024 announcement
Low-altitude economy servicesDrone infrastructure, autonomous aviation and airspace systemsMainland and Hong KongStrategic focus from FY2025

Plastic and chemical products (Jacobson van den Berg)

OfferingDescriptionCustomerNotes
Plastic resins and chemicals tradingImport, marketing and distribution of commodity and engineering plastics and chemicalsExport-oriented manufacturers in Hong Kong and the PRCFY2025 revenue HK$371m
Eco-friendly / green plasticsSustainable plastics rangeManufacturersFY2022–FY2025 announcements
JcoNAT disinfectant and hygiene productsProprietary hypochlorous-acid products; patent for use in treating onychomycosisConsumers, institutions; Mainland via e-commerceSales almost doubled in FY2022; management cites an onychomycosis market of about US$4.1bn in 2026 rising to US$5.7bn by 2033 (company estimate)
Wellness productsNew product range developmentConsumers—

Others

AssetDescription
Fanling residential developmentProperty held for sale under development near Fanling railway station; moved from planning to construction stage by FY2025. Carrying value HK$85.7m at 30 Jun 2026 after cumulative write-downs of HK$136.3m (FY2022 36.0 + FY2023 16.0 + FY2024 20.0 + FY2025 64.3)
Investment propertiesHK$95.4m (30 Jun 2026), including Mainland properties
Owner-occupied offices and warehousesCarried within PP&E at revalued amounts

Financial Narrative

All figures are taken from the consolidated statements in the annual results announcements, HK$ million.

Definitions used for derived figures:

EBIT (derived): profit before tax + finance costs − interest income.

EBITDA (derived): EBIT + depreciation (PP&E and right-of-use assets).

Total debt: trust receipt loans + interest-bearing bank borrowings + lease liabilities.

Income statement

Revenue CAGR FY2021–FY2025 (derived): −1.1% per year. FY2021 was the peak before the pandemic slowdown. Revenue troughed at HK$5.9bn in FY2022, peaked again at HK$7.7bn in FY2024 and fell 15.5% in FY2025. The 1H2026 run-rate (HK$2.5bn, down 24% year on year) implies a further decline in FY2026.

Commentary. The P&L shows a business whose gross margins (9.5–11.5%) are respectable for Hong Kong contracting but whose overhead base keeps consuming them.

Overhead growth: Administrative expenses rose 29% from FY2021 to FY2025 (HK$496m to HK$641m), while revenue fell 4%. The driver is staff costs: employee benefits rose 44% to HK$1,236.9m over the period even though headcount was broadly stable (c.1,670 to c.1,840). Management repeatedly attributes this to "recruiting and retaining competitive personnel" and to performance bonuses for CKW directors.

Interest costs: Finance costs nearly tripled from FY2021 to FY2024 as HIBOR rose and trust-receipt borrowings grew. Interest income partly offset this from FY2023, including HK$15m a year from the related-party loan to Chinney Investments.

Tax rate: The effective tax rate is structurally high because profitable CKW pays Hong Kong tax at 16.5% while losses elsewhere (property write-downs, loss-making units) are not fully tax-relieved.

Value leakage to minorities: Non-controlling interests, essentially CKW's 25.5% public minority, took HK$33.9m in FY2025, more than the entire profit for the year. Shareholders of the parent recorded a loss.

Inflection points:

FY2022: COVID project prolongation crushed Shun Cheong's margin (82.0m to 11.5m) and produced the first Fanling write-down (HK$36m). Only ESS subsidies (HK$38.2m) kept the Group profitable.

FY2024: Volume recovered across Shun Cheong (+54%) and CAE (+60%) without a margin recovery.

FY2025: Profit was preserved in CKW but lost elsewhere, and the HK$64.3m Fanling write-down drove the attributable loss.

1H2026: Revenue collapsed and the HK$61.8m Shun Cheong loss pushed the Group to a pre-tax loss of HK$11.8m.

Balance sheet (31 December)

At 30 Jun 2026, total debt was HK$1,016.6m, cash HK$1,089.5m, net cash HK$72.9m, owners' equity HK$2,016.0m, gearing 50.4%, the current ratio 1.3, undrawn facilities HK$2,212m and performance bonds HK$837.5m (1H2026 interim announcement).

Commentary. The balance sheet is conservative in headline terms. The Group has been net cash at every year end, with equity of c.HK$2.0bn against a market capitalisation of c.HK$0.14bn. The quality of that cash and equity needs qualification, however:

Cash is concentrated in CKW: CKW has been "debt free" with "relatively high cash reserves" (FY2024 announcement). Debt sits largely in the trading, E&M and construction units through trust-receipt and bank loans, so parent-level liquidity is weaker than the consolidated net cash suggests.

Contract assets are large: Contract assets of HK$1.9–2.1bn equal roughly one-third of total assets and about 95% of owners' equity. Their recoverability depends on contract finalisation, which management concedes is "prolonged" at Shun Cheong.

The related-party loan ties up cash: The HK$250m loan to Chinney Investments is unsecured and has been rolled to Oct 2027, with an option to Oct 2028. It is effectively a long-term, non-operating use of CKW cash in favour of the controlling shareholder group.

Debt is short-term and floating: Over 98% of interest-bearing debt is current and mostly floating-rate HKD, leaving the Group dependent on rolling bank facilities.

Cash flow

Operating cash flow, free cash flow, and dividends paid to non-controlling interests are reported in the full annual report cash flow statements. They are not available in the results announcements reviewed and are therefore not stated here. No share repurchases occurred in any year (each announcement states that neither the Company nor its subsidiaries purchased, sold or redeemed listed shares).

Ratios (derived)

Commentary. Returns are persistently below any reasonable cost of equity. ROE peaked at 3.6% in FY2021 and has been near zero since. Interest coverage halved from FY2021 and fell to 1.8x in FY2025, and was negative at the pre-tax level in 1H2026.

The conventional cash conversion cycle looks benign, because suppliers fund receivables. The relevant working-capital metric for a contractor, however, is contract assets, which have risen from about 89 to 109 days of revenue. That rise signals slower certification and billing, consistent with management's references to delayed handovers and prolonged final accounts.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Income statement (HKD Mn)

Income statement (HKD Mn)FY2021FY2022FY2023FY2024FY2025

Revenue

6,799.85,898.45,981.67,692.56,497.7

Cost of sales

6,153.35,328.85,321.46,935.55,751.4

Gross profit

646.6569.5660.3757.0746.4

Administrative expenses

496.0517.7533.3585.8641.2

Selling and distribution costs

22.423.916.318.616.3

Finance costs

15.918.738.354.445.6

Interest income

0.13.021.131.432.0

Depreciation (PP&E + ROU)

116.2122.4122.4124.5105.2

EBIT (derived)

145.152.493.2136.181.7

EBITDA (derived)

261.3174.9215.6260.7187.0

Profit before tax

129.336.876.1113.168.1

Income tax

34.922.519.630.637.1

Profit for the year

94.414.356.482.531.0

Attributable to owners

77.4-10.225.750.7-3.0

Attributable to non-controlling interests

17.024.530.731.833.9

Employee benefits expense

860.0879.2990.91,061.21,236.9

Per-share data (HK cents)

Per-share data (HK cents)FY2021FY2022FY2023FY2024FY2025

EPS basic

13.0-1.74.38.5-0.5

EPS diluted

13.0-1.74.38.5-0.5

Dividend per share (final; no interim)

2.752.502.502.501.00

Book value per share attributable (derived)

356.5350.5354.0350.4345.0

Margins (%, derived)

Margins (%, derived)FY2021FY2022FY2023FY2024FY2025

Gross margin

9.59.711.09.811.5

EBIT margin

2.10.91.61.81.3

EBITDA margin

3.83.03.63.42.9

Pre-tax margin

1.90.61.31.51.0

Net margin (profit for year)

1.40.20.91.10.5

Effective tax rate

27.061.125.827.154.5

Balance Sheet and Margin Analysis (%)

Balance sheet (HKD Mn)FY2021FY2022FY2023FY2024FY2025

Total assets

4,935.54,835.95,573.36,081.05,789.7

Property, plant and equipment

1,261.41,106.11,111.9949.0906.3

Investment properties

23.1117.4104.796.492.5

Goodwill (no other intangibles reported)

14.414.414.412.512.5

Contract assets

1,653.81,502.71,918.42,089.91,943.1

Trade receivables

835.0814.9777.1799.0703.7

Property held for sale under development

106.773.5102.4104.952.4

Loan to a related company (Chinney Investments)

0.00.00.0250.0250.0

Cash and cash equivalents

648.8760.71,071.01,043.0973.9

Trust receipt loans

120.0132.9324.3488.1297.6

Interest-bearing bank borrowings

368.8349.8390.0514.2625.5

Lease liabilities current

4.94.47.65.85.7

Lease liabilities non-current

58.152.451.71.618.6

Total debt (derived)

551.7539.5773.61,009.7947.4

Short-term debt (derived)

493.7487.1721.91,008.1928.8

Long-term debt (lease liabilities only)

58.152.451.71.618.6

Net debt / (net cash) (derived)

-97.1-221.2-297.4-33.3-26.6

Total current assets

3,602.43,551.74,295.54,953.34,701.8

Total current liabilities

2,474.32,443.83,146.53,710.43,434.6

Working capital (net current assets)

1,128.01,107.81,149.01,242.91,267.2

Equity attributable to owners

2,120.72,085.22,105.82,084.62,052.3

Non-controlling interests

146.9167.4187.0205.0224.9

Total equity

2,267.62,252.62,292.92,289.52,277.2

Gearing ratio as reported (debt ÷ owners' equity, %)

26.025.936.748.446.2

Undrawn banking facilities

—2,6202,7012,3702,464

Performance/surety bonds guaranteed

—909.0669.4660.0651.8

“—” = not publicly disclosed.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Cash flow (HKD Mn)

Cash flow (HKD Mn)FY2021FY2022FY2023FY2024FY2025

Capital expenditure (PP&E and investment property additions excl. ROU)

113.171.5113.192.295.2

Dividends declared to CAG shareholders (derived from DPS × shares)

16.414.914.914.95.9

Change in cash and cash equivalents (derived)

—111.8310.3-28.0-69.1

Share buybacks

00000

“—” = not publicly disclosed.

Returns & Leverage Ratios (%) and Financial Ratios (x)

RatioFY2021FY2022FY2023FY2024FY2025

ROE on owners' equity (%)

3.6-0.51.22.4-0.1

ROA (profit for year ÷ average total assets, %)

1.90.31.11.40.5

ROIC (EBIT × (1−16.5%) ÷ (total equity + net debt), %)

5.62.23.95.03.0

Current ratio (x)

1.461.451.371.331.37

Debt / total equity (x)

0.240.240.340.440.42

Net debt / EBITDA (x; negative = net cash)

-0.37-1.26-1.38-0.13-0.14

Interest coverage, EBIT ÷ finance costs (x)

9.12.82.42.51.8

Asset turnover (revenue ÷ average total assets, x)

1.381.211.151.321.09

Days sales outstanding, trade receivables only (days)

4550473840

Days inventory (days)

66343

Days payable, trade/bills/retention payables (days)

6453655952

Cash conversion cycle excl. contract assets (days)

-133-15-17-9

Days of contract assets (contract assets ÷ revenue × 365)

899311799109

Geographic revenue (HKD Mn)

Geographic revenue (HKD Mn)FY2021FY2022FY2023FY2024FY2025

Hong Kong

5,895.75,070.95,672.57,321.46,242.6

Mainland China and Macau

904.2827.5309.1371.1255.1

Total

6,799.85,898.45,981.67,692.56,497.7

Geographic YoY growth (%)

Geographic YoY growth (%)FY2022FY2023FY2024FY2025

Hong Kong

-14.011.929.1-14.7

Mainland China and Macau

-8.5-62.620.1-31.3

Geographic share (%)

Geographic share (%)FY2021FY2022FY2023FY2024FY2025

Hong Kong

86.786.094.895.296.1

Mainland China and Macau

13.314.05.24.83.9

Segment × Geography FY2025 Details

Segment × geography FY2025 (HKD Mn)Hong KongMainland China and MacauTotal

Foundation piling and ground investigation

2,271.50.02,271.5

Building related contracting services

2,343.2131.22,474.4

Building construction

1,061.445.91,107.3

Aviation

272.70.8273.5

Plastic and chemical products

293.777.3371.0

Total

6,242.6255.16,497.7

Mainland China and Macau revenue by segment (HKD Mn)

Mainland China and Macau revenue by segment (HKD Mn)FY2021FY2022FY2023

Building related contracting services

210.1553.4111.2

Building construction

618.4215.1152.3

Plastic and chemical products

72.656.845.4

Aviation

3.02.20.3

Non-current assets (HKD Mn)

Non-current assets (HKD Mn)FY2022FY2023FY2024FY2025

Hong Kong

983.91,000.4919.4891.5

Mainland China and Macau

254.1230.7147.2133.1

Valuation Snapshot

MetricValueBasis

Share price

HK$0.240

etnet, 8 Oct 2026

Market capitalisation

c.HK$142.8m

594.9m shares

Enterprise value (derived)

c.HK$298.9m

Market cap + debt HK$1,016.6m + NCI HK$229.0m − cash HK$1,089.5m (30 Jun 2026)

TTM revenue (derived)

HK$5,696.3m

FY2025 − 1H2025 + 1H2026

TTM attributable profit (derived)

−HK$60.1m

FY2025 (−3.0) − 1H2025 (20.6) + 1H2026 (−36.5)

P/E (TTM)

n/m (loss)

—

P/E (FY2024)

c.2.8x

HK$0.24 ÷ HK8.5 cents

P/B

c.0.07x

Owners' equity HK$2,016.0m

EV/Sales (TTM)

c.0.05x

—

EV/EBITDA (FY2025 EBITDA HK$187.0m)

c.1.6x

Derived

Dividend yield (FY2025 DPS HK1.0 cent)

c.4.2%

—

Look-through value of 74.5% CKW stake

c.HK$397m

—

Price Reference Details

Price referenceValue (HKD)Source

Nov 2024

0.380

moomoo

Jan 2025

0.41

Simply Wall St

9 May 2025

0.400

etnet

30 Sep 2026

0.240

etnet

8 Oct 2026

0.240

etnet

52-week range (2024 snapshot)

0.270–0.610

—

Total share price change (approx., %)

1-year

3-year

0385.HK

-39—

Dividend per share (HK cents)

Dividend per share (HK cents)FY2021FY2022FY2023FY2024FY2025

Interim

0.000.000.000.000.00

Final

2.752.502.502.501.00

Total

2.752.502.502.501.00

Dividend cash declared (HKD Mn)

Dividend cash declared (HKD Mn)FY2021FY2022FY2023FY2024FY2025

Total to CAG shareholders

16.414.914.914.95.9

Capital Markets

ItemDetail

Buyback authorisation

Standard general mandates may exist; no repurchases made FY2021–1H2026

Credit ratings (Moody's/S&P/Fitch)

None; the Company is unrated

Debt maturity profile

Over 98% of interest-bearing debt is current (30 Jun 2026); non-current debt is limited to lease liabilities of HK$18.5m. Borrowings are mainly HKD floating-rate bank loans and trust-receipt loans

Analyst consensus

No sell-side coverage (Simply Wall St reports 0 analysts). TipRanks shows a single "Hold" rating with an HK$0.50 target, of unclear provenance

Analyst Conclusions

Management guidance

There are no numerical targets. Management expects 2026 to be difficult:

  • Bored-pile volume will soften.

  • Building construction is near breakeven, with an outstanding contract sum of only HK$682m at 30 Jun 2026.

  • Shun Cheong has reset its project margins and holds an outstanding contract sum of HK$3,024m, plus HK$214m awarded after the period end.

  • CAE and Jacobson are positioned for structural opportunities but remain small.

There is no consensus forecast.

Bull case

  1. Deep asset discount. At about 0.07x book and an EV of about HK$300m, the market price implies the stake in CKW alone (c.HK$397m at the Aug 2025 CKW market capitalisation) is worth more than CAG's entire market value. Any value-realisation event, such as privatisation, consolidation or a special dividend from CKW, could re-rate the shares sharply.

  2. Backlog rebuild into a public works upswing. Public infrastructure output rose 17.8% in 1H2026. The Northern Metropolis and about 196,000 public housing units should rebuild order books for CKW and Shun Cheong, whose backlog had already recovered from HK$2,644m to HK$3,024m by June 2026.

  3. Margin reset. Shun Cheong's upfront markdowns in 1H2026, building construction's return to breakeven, and CKW's margin improvement (segment margin 7.2% in FY2025) could combine with lower interest rates to lift group EBIT margins back towards the 2% achieved in FY2021.

Bear case

  1. Structural low returns. ROE has stayed between −0.5% and 3.6% for five years, overheads are growing faster than revenue, and profits accrue disproportionately to the CKW minority. The discount to book may be permanent.

  2. Governance and capital allocation. CKW cash has been lent to the controlling shareholder (HK$250m, rolled to 2027–2028), a HK$50m director bonus was paid in a loss-making half-year, the board meets only twice a year, and family control stands at about 74%. These factors limit any prospect of value accruing to minority holders.

  3. Revenue cliff and working-capital stress. Revenue fell 24% in 1H2026, contract assets stand at about 109 days of revenue, and more than 98% of debt is short-term floating-rate. A further downturn or a major final-account dispute could push the Group into a sustained loss and a net-debt position.

Catalysts and monitorables (next 12 months)

MonitorableWhy it mattersTiming
FY2026 results and dividendTests whether the 1H2026 loss widens; dividend continuityLate Mar 2027
Shun Cheong final-account settlements and further markdownsDetermines whether 1H2026 cleared the losses2H2026
CKW contract awards (foundation and drilling)Rebuild of the HK$2,321m foundation contract sumOngoing
DrilTech marine ground investigation start-upNew revenue stream2,026
Fanling project progress and valuationRisk of further write-downsFY2026 year end
Related-party loan statusRepayment, or further extension beyond Oct 2027Oct 2027
Board changes under Raymond Chow's influencePossible governance or strategic shift across the Chinney GroupOngoing
Macau airport and hotel tendersChinney Timwill recovery2,027
HIBOR trajectoryFinance cost reliefOngoing
Post-fire regulatory changesCompliance cost2026–2027

Analyst verdict

Chinney Alliance is a classic Hong Kong small-cap holding company. The market prices it for its governance and its returns, not its assets. On the numbers, the Group is solvent and asset-rich. It has been net cash at every reporting date for five years, holds owners' equity of HK$2.0bn and has HK$2.2bn of undrawn facilities. It also controls a genuinely good business in Chinney Kin Wing, whose segment profit doubled from FY2021 to FY2025 while the rest of the industry struggled.

Everything else is mediocre or worse. Shun Cheong, the largest unit by revenue, has earned essentially zero across four years and lost HK$61.8m in 1H2026. Building construction oscillates around breakeven. The plastics business tracks oil prices. A residential site in Fanling has absorbed HK$136m of write-downs. Group overheads keep outpacing revenue, and CKW's minority shareholders capture a growing share of the only reliable profit stream.

The decisive issue is capital allocation. CKW's surplus cash has been lent to the controlling shareholder group rather than distributed, and a HK$50m one-off director bonus was paid in a half-year in which shareholders of the parent lost HK$36.5m. Together with board practices at the regulatory minimum, these signal that the 0.07x price-to-book reflects a rational expectation that value will not flow to minority holders.

The upside scenario requires an event: privatisation by the Wong family, a restructuring that collapses the CKW minority, or a sustained public-works upcycle combined with a lower-rate environment that lifts ROE meaningfully above 5%. None is signalled.

Until FY2026 results confirm that the 1H2026 markdowns cleared the decks, and until governance or capital return policies visibly change, the stock is best regarded as a deep-value, illiquid, special-situation holding. The analyst stance is neutral, with a high-risk designation.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Board of Directors

NameRoleAppointedAge (approx.)Background

Mr. James Sing-Wai Wong

Chairman, Executive Director

ED Aug 2010; Chairman 2 Jun 2023

c.62 (59 in Jun 2023)

Son of founder Dr. James Sai-Wing Wong. Chairman of Chinney Investments (0216) and Hon Kwok Land (0160); ED of Chinney Kin Wing (1556). Chairman of CAE and Jacobson; director of Chinney Construction and Kin Wing Engineering. Director of Lion Mark Holdings/Lion Foods (UK) 1995–2007, which entered administration in 2002 (disclosed in appointment announcement)

Mr. Yuen-Keung (Zuric) Chan

Vice Chairman and Managing Director, Executive Director

ED by 2006 (listed on AR 2006 board)

—

Also Vice Chairman of Chinney Investments; signs results announcements as Vice Chairman & MD; effectively the chief executive

Mr. Philip Bing-Lun Lam

Executive Director

——

Common director with Hon Kwok Land

Dr. Emily Yen Wong

Non-executive Director

—

c.60 (57 in Dec 2023)

Doctor of Medicine and Executive Masters in health; daughter of the founder; NED of Chinney Investments; director of Chinney Capital

Mr. Chi-Chiu Wu

Non-executive Director

Long-standing director; listed as INED in 2022, as NED from 2024

——

Mr. Raymond Ming-Joe Chow

Non-executive Director

11 Aug 2026

c.60 (57 in Dec 2023)

Former ED of Hongkong Land; MD of Chinney Investments since 29 Aug 2025; former INED of Hon Kwok (2023–2025); director of Ocean Park; education at Simon Fraser University and Harvard Business School (per zonebourse)

Mr. Ronald James Blake

INED

10 Jun 2013

c.91

Over 13 years' tenure

Mr. Anthony King-Yan Tong

INED

29 Jul 2021

c.68

—

Ms. Dee-Dee Chan

INED

28 Dec 2021

c.43

Chief Investment Officer, Park Lane Capital Holdings; director of Seal of Love Charitable Foundation

“—” = not publicly disclosed.

Executive Leadership Team

NameRoleSource

Mr. Johnny Wing-Sang Yu

Managing Director, Chinney Kin Wing Group

FY2024 announcement; CKW Interim Report 2021

Mr. KK Wong

Head of Chinney Alliance Engineering (Aviation)

FY2024 announcement

Mr. Yun-Sang (Sam) Lo

Company Secretary

Board meeting notices

Governance Overview

AttributeDetail

Board size

9 (3 ED, 3 NED, 3 INED)

Independence

33% INEDs, exactly meeting the HKEX one-third minimum

Gender diversity

2 of 9 directors are women (22%)

Chair/CEO separation

Separate roles (Chairman James Sing-Wai Wong; Vice Chairman & MD Yuen-Keung Chan), but both are executives tied to the controlling family's group

Family representation

Chairman and Dr. Emily Wong are children of the founder; Mr. Chow is MD of the controlling shareholder

Committees

Audit Committee meets at least twice a year; remuneration and nomination committees exist (membership not disclosed in sources reviewed)

CG Code deviations

B.2.2: Chairman and MD exempt from retirement by rotation under the Bye-laws. C.5.1: only two regular board meetings a year in FY2022–FY2025, against a four-per-year norm

Auditor

Ernst & Young

Board & Management Changes

DateChange

28 Dec 2021

Ms. Dee-Dee Chan appointed INED

2 Jun 2023

Dr. James Sai-Wing Wong retires as Chairman and becomes Founding Chairman; Mr. James Sing-Wai Wong becomes Chairman

12 Jan 2024

NED re-designation on record (Mr. Chi-Chiu Wu)

16 Feb 2025

Death of founding chairman Dr. James Sai-Wing Wong

—

Dr. Emily Yen Wong joins as NED (board grew from 7 in Mar 2025 to 8 in Mar 2026)

11 Aug 2026

Mr. Raymond Ming-Joe Chow joins as NED (board grows to 9)

Major Shareholders

HolderShares%Date

Enhancement Investments Ltd. (Wong family vehicle)

243,244,52140.89

30 Jun 2025

Chinney Investments, Limited (0216.HK)

173,093,69529.10

30 Jun 2025

Chinney Capital Limited (Wong family)

not disclosed separately

c.3.7 (derived: 73.68% aggregate per FY2022 announcement less the two above)

FY2022

Public float (derived)

—

c.26.3

—

Competitive Landscape

Competitors by Segment

SegmentNamed competitorsPositioning of CAG unit

Foundation piling and ground investigation

Bachy Soletanche (HK), Gammon Construction (foundation arm), Build King Holdings (0240), Kwan On Holdings (1559), other specialist piling contractors

One of the larger listed specialists; large owned fleet; debt-free; strong public-sector exposure

E&M building services

Analogue Holdings / ATAL (1977), FSE Lifestyle Services (0331, FSE Engineering), Hip Hing/NWS E&M units, Gammon E&M

Mid-tier subcontractor; HK$2.5bn revenue (FY2025) versus Analogue's HK$6.1bn

Building construction

Gammon Construction, Hip Hing Construction, Chun Wo (Asia Allied Infrastructure, 0711), Yau Lee Holdings (0406), Paul Y. Engineering, Build King

Small main contractor (HK$1.1bn); described by management as the "most competitive sector"

Aviation systems

International aviation and radar OEMs and their local integrators

Self-described leader in a small niche

Plastics trading

Fragmented regional distributors

Small (HK$371m revenue), commodity-exposed

Peer Comparison FY2025

Metric (FY2025)Chinney Alliance (0385)Build King (0240)Analogue Holdings (1977)

Revenue (HKD Mn)

6,497.713,842.76,087.6

Revenue growth (%)

-15.5-3.7-5.6

Gross margin (%)

11.57.516.4

Net profit for year (HKD Mn)

31.0449.9

not stated (attributable 167.0)

Net margin (%)

0.53.3

2.7 (attributable)

Attributable profit (HKD Mn)

-3.0453.0167.0

Recent Developments

--

Company Snapshot

$834.1M

Revenue

1,800

Employees

1975

Founded

Hamilton HM, Bermuda

Headquarters

SWOT Analysis

Strengths

  • A profitable foundation franchise. CKW's segment result rose every year from HK$81.7m (FY2021) to HK$163.1m (FY2025), with margins improving from 4.0% to 7.2%.
  • A net-cash balance sheet. The Group was net cash in every year FY2021–FY2025 and at 30 Jun 2026 (HK$72.9m). Undrawn facilities were HK$2,212m at 30 Jun 2026.
  • Asset backing. Owners' equity of HK$2,016m (30 Jun 2026) against a market capitalisation of about HK$143m gives a P/B of about 0.07x.
  • Technical accreditations. DrilTech has HOKLAS accreditations including the Koden Test and a NEC4 framework placement (FY2025).
  • Aviation niche incumbency. CAE's FY2025 segment margin was 7.1%, the highest in the group, with Hong Kong Observatory and HKIA contracts.
  • Approved specialist status. Shun Cheong is approved across electrical, fire services, air-conditioning, security and video electronics, positioning it for the roughly 196,000-unit public housing programme.

Weaknesses

  • Thin and volatile margins. The Group EBIT margin was 0.9–2.1% across FY2021–FY2025. Shun Cheong's margin was −0.7% to 0.5% over FY2022–FY2025 and −7.0% in 1H2026.
  • Persistently low returns. ROE has not exceeded 3.6% in five years and was negative in FY2022, FY2025 and 1H2026.
  • Cost inflation. Employee benefits rose 44% between FY2021 and FY2025 against −4% revenue. Administrative expenses rose 21% year on year in 1H2026 despite a 24% revenue fall.
  • Value leakage to minorities. NCI took HK$33.9m in FY2025 against a HK$3.0m attributable loss.
  • Property drag. Fanling write-downs totalled HK$136.3m over FY2022–FY2025, and the Others segment lost HK$77.4m in FY2025.
  • Governance gaps. Board meetings are held only twice a year (CG Code C.5.1 deviation), the chair and MD are exempt from rotation, independence sits at the regulatory minimum, and a HK$50m one-off director bonus was paid at CKW in 1H2026.

Opportunities

  • Northern Metropolis. Public infrastructure output was up 17.8% YoY in 1H2026, and the Northern Metropolis is cited repeatedly as a long-term runway for CKW.
  • Data centres and electrification. Shun Cheong's pivot to data centres, EV charging and solar draws on proven data-centre construction experience (the Kwai Chung contract worth HK$757.8m).
  • Macau recovery. Forecast growth of 4.4% a year over 2027–2029, airport expansion and hotel pipelines could restore Chinney Timwill revenue from its HK$46m FY2025 trough.
  • The low-altitude economy. Mainland policy support and Macau airport capacity expansion favour CAE.
  • Marine ground investigation. DrilTech's new vessel opens marine and reclamation work from 2026.
  • Consolidation. Industry exits (several contractors collapsed in 2024) could create bolt-on opportunities for a net-cash CKW.

Threats

  • Backlog depletion. Shun Cheong's backlog fell from HK$4,971m (FY2022) to HK$2,644m (FY2025), and the CKW foundation contract sum fell from HK$4,689m to HK$2,321m (FY2024 to FY2025).
  • Aggressive tendering. Management describes tender prices as "unsustainably low" and refers to "irrational bidding."
  • Regulatory tightening after the Wang Fuk Court fire. Higher compliance and site-management costs are expected (FY2025).
  • Customer and counterparty risk. Two customers accounted for 22% of FY2025 revenue, and main-contractor financial stress affects Shun Cheong's cash flows.
  • Commodity and geopolitical shocks. Oil and Strait of Hormuz volatility and US tariff policy hit Jacobson: revenue fell 28% in FY2025 before a 69% rebound in 1H2026.
  • Interest-rate and refinancing risk. Over 98% of debt is current and floating-rate, and interest coverage was only 1.8x in FY2025.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
Q1 2025 (reported 25 Mar 2025)Plastics demand surge from pre-tariff ordering persists into Q1 2025Temporary tailwind for Jacobson
6 Jun 2025AGM; FY2024 final dividend HK2.5 cents approvedDividend held flat for the third year
9 Jul 2025FY2024 final dividend paidHK$14.9m cash outflow
28 Aug 20251H2025 interim results: revenue HK$3,296.2m (−4.4%), PBT HK$52.8m (1H2024 HK$46.9m), attributable profit HK$20.6m; no interim dividendLast profitable half-year
28 Aug 2025CKW 1H2025 results: revenue HK$1,205.1m, PBT HK$75.5mFoundation strength
29 Aug 2025Mr. Raymond Chow becomes MD of Chinney InvestmentsProfessional management at the controlling shareholder
5 Sep 2025Chinney Investments requests, and CKW approves, a 12-month extension of the HK$250m loanProlongs the related-party exposure
25 Sep 20252025 Interim Report published, describing CKW as the "crown jewel"—
H2 2025Shun Cheong's major contracts substantially completed; new contracts at preliminary stageSets up the FY2025–1H2026 revenue gap
2025CKW acquires a substantial bored-pile equipment fleet; depot expanded beyond 200,000 sq ftCapacity and competitive moat
Nov 2025Wang Fuk Court fire, Tai PoManagement expects stricter site-safety regulation industry-wide
2025–26Dr. Emily Yen Wong joins the CAG board as NEDFamily succession on the board
2 Feb 2026Chinney Investments board reconstituted (Chow as MD)Group-level governance
19 Mar 2026Profit warning for FY2025Signals an attributable loss
23 Mar 2026Supplemental profit warning: attributable loss of not more than HK$5mNarrows guidance
26 Mar 2026FY2025 results: revenue HK$6,497.7m (−15.5%), profit HK$31.0m, attributable loss HK$3.0m, Fanling write-down HK$64.3m; DPS cut to HK1.0 centSecond attributable loss in four years
26 Mar 2026Post-year-end awards: Building construction HK$217m, Shun Cheong HK$211mModest replenishment
27 Mar 2026CKW FY2025 results: profit HK$133.1m (FY2024 HK$127.1m)Subsidiary keeps growing
Apr 20262025 Annual Report published—
4 May 2026Supplemental loan agreement extends the HK$250m loan to 7 Oct 2027 (option to 2028)Connected transaction
May 2026Short-term development waiver granted for the CKW depotOperational
3 Jun 2026AGM approves HK1.0 cent final dividend—
3 Jun 2026Circular on the supplemental loan agreement despatched—
24 Jun 2026SGMs of CAG and CKW approve the loan supplemental agreementIndependent shareholder approval
7 Jul 2026FY2025 final dividend paid (HK$5.9m)—
1H2026Strait of Hormuz disruption and a US–Iran conflict drive oil and plastics prices higherJacobson profit HK$8.2m
1H2026Shun Cheong marks down project marginsHK$61.8m segment loss
1H2026CKW pays a HK$50.0m one-off bonus to a directorGovernance and minority-leakage concern
11 Aug 2026Raymond Ming-Joe Chow appointed NED of CAGBoard strengthened
14 Aug 2026Notice of board meeting—
19 Aug 2026Profit warning for 1H2026 (expected loss)—
26 Aug 20261H2026 interim results: revenue HK$2,494.8m (−24.3%), loss HK$24.8m, attributable loss HK$36.5m, LPS HK6.1 cents; no interim dividend; ~1,800 staffWorst half-year in the dataset
8 Oct 2026Share price HK$0.24; market capitalisation c.HK$143mNear multi-year lows

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

3 charts
Income Statement: Revenue & Gross Profit: Revenue fell from HKD 6,799.8 Mn in FY2021 to HKD 6,497.7 Mn in FY2025.
Chinney Alliance Group Limited — Income Statement: Revenue & Gross Profit
Series (HKD Mn)FY2021FY2022FY2023FY2024FY2025
Revenue6,799.85,898.45,981.67,692.56,497.7
Cost of sales6,153.35,328.85,321.46,935.55,751.4
Gross profit646.6569.5660.3757746.4

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Unlock Company Contacts

Connect with Key Decision-Makers

Access verified employee contacts and decision-maker information from this company to support your sales, lead generation, and business development efforts.