Daewoo Engineering & Construction Co., Ltd. Overview
Daewoo E&C is one of South Korea's five largest general contractors by the government's Construction Capability Evaluation. It fell from 3rd to 5th in the July 2026 ranking after its FY2025 "big bath" reduced its management-evaluation score to zero.
The company has three businesses:
-
A housing franchise built on the PRUGIO and SUMMIT apartment brands, which generates most of its revenue.
-
A civil infrastructure business with large state projects such as the Gadeokdo New Airport site works and Iraq's Al Faw Grand Port.
-
A plant business with unusual depth across the LNG value chain, from Nigeria LNG to Papua New Guinea and Mozambique.
Since 2022 it has been controlled by the regional builder Jungheung Group. The investment case has recently shifted from a cyclical domestic housing story to a nuclear and energy-infrastructure re-rating. That re-rating is anchored on Daewoo's role as lead construction contractor for KHNP's Dukovany 5 & 6 project in the Czech Republic. Its record backlog of KRW 53.4T (June 2026) contrasts with an equity base weakened by the FY2025 loss.
What the company does
Daewoo E&C is an integrated engineering and construction company. It works as a general contractor, an EPC contractor and, increasingly, a self-developer. Recruitment and company-profile sources describe its business as civil engineering, building, housing, power plants, petrochemical plants and development projects in Korea and abroad. Disclosed item types include apartment construction, plant construction, landscaping, steel structures, dredging, gas works and facility maintenance (Saramin company profile).
It reports four segments:
Building (Housing & Architecture, 건축사업부문): Apartments, redevelopment and reconstruction, officetels, mixed-use, commercial and knowledge-industry centres, and data centres.
Civil (토목사업부문): Roads, bridges, tunnels, ports, airports, rail including GTX-B, and industrial-complex site works.
Plant (플랜트사업부문): LNG liquefaction and processing, refineries, fertilizer plants, power (combined-cycle, combined heat and power) and nuclear.
Other consolidated subsidiaries (기타연결종속부문): Mainly the Vietnamese THT development company behind Starlake City, Hanoi, plus other subsidiaries (company FY2023 results release, as reported by Dealsite and SmartToday).
Business and revenue model
Revenue is overwhelmingly contract-based construction revenue recognised over time on a percentage-of-completion (cost-to-cost) basis. Three revenue channels matter:
-
Contracted construction (도급). Daewoo builds for third parties. These are public agencies such as LH, the Gadeokdo New Airport Construction Authority and Iraq's General Company for Ports. They also include trust companies acting for redevelopment associations (for example, Daishin Asset Trust on Sangdo 15) and private owners. Payment is usually by progress billing (기성불). The Sangdo 15 disclosure of 16 October 2026 specified no down payment and progress-based billing.
-
Self-development (자체사업). Daewoo owns or controls the land and captures the developer margin, but takes pre-sale and PF (project-finance) risk. Hana Securities (April 2026) expected the revenue share from self-development projects started in 2025 to rise from 7% to 14%, improving margin mix.
-
Overseas EPC and development. Lump-sum or reimbursable EPC for oil and gas and infrastructure clients, plus the Starlake (Tay Ho Tay) urban development in Hanoi through a consolidated subsidiary.
There is no material subscription or licensing revenue. The mix is close to 100% "project/service" revenue, with a development-sale element inside Building and Other.
Value-chain position, customers and end-markets
| Dimension | Characterisation |
|---|---|
| Value-chain position | Tier-1 general contractor and EPC prime contractor; selective developer; in nuclear, a construction sub-contractor under KHNP (the EPC prime) |
| Customer types | Korean redevelopment and reconstruction associations (via trust companies); public agencies (LH, MOLIT-linked authorities, KHNP); NOCs and IOCs (TotalEnergies, ExxonMobil, NLNG); foreign governments (Iraq, Libya, Turkmenistan); private developers and data-centre owners |
| End-markets | Korean residential (urban renewal and new supply); public infrastructure (airports, semiconductor-cluster site works, metropolitan rail); global LNG; fertilizer and chemicals; nuclear power; urban development in Vietnam |
Company's own description. The company describes itself as a construction company carrying out civil, building, housing, power-plant, petrochemical-plant and development businesses domestically and overseas (company profile data). Its 2025 Sustainability Report states a vision of a company that realises the dreams of customers and employees. The full text of the latest annual report's business section is NPD-SR.
Independent characterisation. Daewoo is best understood as a Korean housing contractor with an exceptionally deep overseas energy-EPC heritage. In FY2025, Building was 68% of revenue (KRW 5,508.4bn of 8,054.6bn). That makes reported earnings highly sensitive to Korean housing cost ratios and regional unsold inventory.
The market currently values the company mainly on optionality in three areas:
Nuclear: Dukovany, a possible Temelín follow-on, Vietnam's Ninh Thuan 2 and US projects.
LNG: Papua LNG and Rovuma LNG.
State mega-infrastructure: Gadeokdo.
None of these yet contributes meaningful revenue. Dukovany construction is expected to start around 2029.
Strategy
Stated strategic themes
-
Energy-infrastructure leadership. The company aims to grow its global presence through competitiveness in nuclear and LNG. It also seeks to diversify into high-value areas: data centres, overseas urban development and urban renewal (H1 2026 release, paraphrased).
-
Selective, quality order intake with rigorous risk management. The company explained the order-target increase by greater visibility on major projects, and pledged to exceed the target while keeping tight risk control (H1 2026 statement).
-
The "next 100 years" diversification. The Chairman described diversifying the construction portfolio at home and abroad to sustain the company long term (Korea Times, June 2025).
-
New CEO's agenda (October 2026).
-
"SUMMIT": focus on fundamentals and internal strength.
-
"TOGETHER": a collaborative culture.
-
"CHALLENGE": new markets and businesses, including AI infrastructure, data centres and robotics.
-
Initiatives in the last 24 months
| Initiative | Date | Detail |
|---|---|---|
| FY2025 risk clean-up ("big bath") | Q4 2025 | About KRW 1.1T Q4 operating loss to clear unsold-housing and overseas-site risks |
| Record 2026 order target | Feb 2026, raised Aug 2026 | KRW 18T, the highest in company history, raised to KRW 27T |
| Nuclear export push | 2025–2026 | Dukovany construction lead; Temelín priority negotiation; Vietnam Ninh Thuan 2; US pursuit (Mirae) |
| LNG value-chain strategy | 2,026 | Papua LNG CPF (preferred bidder), Rovuma LNG (LOI), Toyo Engineering MOU |
| Gadeokdo New Airport | 2,026 | Lead (55%) of 19-company consortium; basic design submitted 7 September 2026; priority works targeted November 2026 |
| Data centres | 2025–2026 | Gangnam DC; Jangseong Pine DC (KRW 252.5bn) |
| Vietnam urban development | 2025–2026 | Starlake Phase 2; Kien Giang; Korea–Vietnam New City framework |
| Smart construction | 2,025 | Smart Construction Technology Research Team established |
| Talent for nuclear and mega-projects | Apr 2026 | 70+ new hires across architecture, civil, plant/nuclear and safety, framed around global nuclear and domestic mega-projects |
| Safety programme | Sep 2025 onwards | 105-site suspension and inspection after fatalities; Chairman's safety-first directive (October 2026) |
Guidance and medium-term targets
| Item | 2025 guidance | 2025 actual | 2026 guidance |
|---|---|---|---|
| Revenue (KRW T) | 8.4 | 8.05 | 8.0 |
| New orders (KRW T) | 14.2 | 14.24 (100.3% achieved) | 18.0 at start of year, raised to 27.0 in August |
At the Q4 2025 call, management also guided to housing and building gross margins above 13% (Hana Securities).
No formal medium-term (3–5 year) financial targets, ROE target or capital-return policy were identified (NPD-SR). ESG commitments are covered in §20.
Products & Services
Construction "products" are capabilities, brands and flagship project types. Pricing is project-specific and not disclosed beyond contract values.
Building / Housing
| Offering | Description | Target customer | Latest / flagship examples |
|---|---|---|---|
| PRUGIO (푸르지오) | Mass-premium apartment brand; Korea Service Grand Prix apartment-category grand prize for 7 consecutive years (company history page, 2026) | Redevelopment associations, public housing, self-development buyers | Baegunhosu Prugio, Yeongtong Prugio Pineville (H1 2025 revenue drivers) |
| SUMMIT (써밋) | High-end apartment brand; the new CEO's "SUMMIT" management theme deliberately echoes it (Asia Economy, October 2026) | Prime Seoul and Busan urban-renewal sites | Busan Seomyeon "Summit The New" (KRW 1,516.2bn order, 2025); "Summit The Hill", Heukseok 11 (record-high pricing, May 2026); Yongsan Prugio Summit |
| ARCLOUD | Mid-to-large commercial-facility brand launched in 2020 (company history page) | Mixed-use and commercial developers | NPD-SR |
| Urban renewal (정비사업) | Redevelopment, reconstruction, remodelling | Associations via trust companies | 2026: 8 urban-renewal sites selected as of August, totalling KRW 4,353bn (Money Today). Contracts include Seongnam Sinheung 3 (KRW 1,268.7bn), Sangdo 15 (KRW 1,436.7bn) and the Suwon remodelling (KRW 782.8bn). |
| Public and rental housing | LH and public rental | LH | LH rental housing contract of KRW 418.1bn (Lead Economy, April 2026) |
| Data centres | Hyperscale and enterprise DC construction | DC owners and operators | Gangnam Data Center (H1 2025 driver); Jangseong Pine Data Center (KRW 252.5bn, May 2026) |
| Knowledge-industry centres and officetels | Mixed office/industrial; residential officetels | Developers | Incheon Cheongna B1 officetel (KRW 479.5bn, Q1 2025). This product line was the source of 2025 bad-debt losses. |
Civil
| Offering | Description | Flagship examples |
|---|---|---|
| Airports and reclamation | Large marine and site-preparation works | Gadeokdo New Airport site preparation: project cost KRW 10.7T, 106-month build, Daewoo 55% lead (Seoul Economic Daily) |
| Ports and marine | Breakwaters, berths, dredging, immersed tunnels | Al Faw Grand Port, Iraq: five berths completed, 62km road, submerged tunnel, ship canal, container yard (IraqiNews, July 2026) |
| Industrial-complex site works | Earthworks, utilities, retaining walls, bridges | Yongin Advanced System Semiconductor Cluster National Industrial Complex, Section 1: KRW 413.0bn Daewoo share (48%), October 2026 to July 2032 (DART) |
| Rail PPP | Metropolitan express rail | GTX-B PPP, which won a 2026 Korea Mobility Innovation Award (company history page) |
| Roads and bridges | Highways, cable-stayed and long-span bridges | Kazungula Bridge, Botswana (2014–2020); 3rd in 2026 road-works performance at KRW 345.9bn (Dailian) |
| Water and river | River development | Oued El Harrach River development, Algeria, completed 2026 (company history page) |
Plant
| Offering | Description | Flagship examples |
|---|---|---|
| LNG liquefaction (midstream) | EPC for LNG trains | Nigeria LNG Train 7 (prime contractor, 40% share of KRW 5.2T project); Bonny Island Units 1–3, 5–6; Rovuma LNG Phase 1, Mozambique (LOI August 2026, SMDC JV, about 18.6 mtpa) |
| Upstream CPF and gas processing | Central processing facilities, well pads | Papua LNG CPF & Wellpads EPSCC (TotalEnergies preferred bidder August 2026, about 6 mtpa project; subject to FID). Prior CPFs in Nigeria and Algeria. |
| LNG storage and terminals | Receiving terminals, tanks | 25 LNG storage tanks built domestically (Asia Economy); Ulsan North Port Terminal |
| Fertilizer and chemicals | Ammonia/urea and mineral fertilizers | Nigeria Indorama Fertilizer III (completed 2026); Turkmenistan mineral fertilizer plant (KRW 940.1bn, 2025); Nigeria "Indorama" chemical plant pipeline (IBK) |
| Refining | Refinery revamps | Nigeria Kaduna Refinery (KRW 670bn order, 2023) |
| Power | Combined-cycle, combined heat and power, fast-track power | Libya fast-track power project (KRW 1T order, 2023); Songsan CHP main-equipment purchase contract (2026) |
| Nuclear | Construction of large reactors and radwaste facilities | Lead constructor for Shin-Wolsong 1 & 2 (CEO Score Daily); Wolsong radioactive waste disposal facility Phase 2 (completed 2026); Dukovany 5 & 6 (Czech, APR1000 ×2, construction lead with 55% vs Doosan Enerbility 45%, contract pending) |
Development (Other)
| Offering | Description | Flagship examples |
|---|---|---|
| Overseas new-town development | Master-planned urban districts | Starlake City (Tay Ho Tay), Hanoi: 186.3 ha, Phase 1 completed 2024, Phase 2 targeted 2028 |
| Vietnam pipeline | New urban areas | Kien Giang urban city (investor approval August 2024); "Korea–Vietnam New City" public-private framework signed 21 April 2026 |
Financial Narrative
Basis. Revenue, operating profit and net income are company-reported where available. Gross profit, cash flow and balance-sheet lines come from S&P Global standardised data via StockAnalysis. Ratios are computed by the analyst from these inputs.
Income statement
Notes:
-
FY2021 net income is derived from the S&P standardised profit margin of 5.58%.
-
FY2022–FY2025 net income is company-reported: KRW 508.0bn (Dealsite), 521.5bn, 242.8bn and -916.1bn.
-
Reported basic EPS per S&P/Simply Wall St is KRW 570 (FY2024) and KRW -2,220 (FY2025). The derived figures above differ because of non-controlling interests.
-
No cash dividend is recorded in the standardised data for FY2021–FY2025. Confirm against DART.
Company-reported operating profit (KRW bn):
There is a discrepancy between sources. The company reported FY2025 operating loss as KRW 815.4bn, while S&P standardised data shows KRW 880.6bn. FY2024 shows the same pattern: 403.1bn versus 359.8bn. This reflects S&P reclassification of certain other operating items. Company figures are used in the narrative.
Margins and growth (computed)
Revenue CAGR from FY2021 to FY2025 is -1.9% per year (computed). Excluding the FY2025 collapse, FY2021–FY2023 revenue grew at a 15.8% CAGR.
EBITDA. Depreciation and amortisation is NPD-SR, so EBITDA and EBITDA margin could not be computed. Construction is asset-light, with capex of roughly KRW 50–100bn a year (§6.4), so EBITDA would sit modestly above operating profit.
Balance sheet (fiscal year-end)
Source: StockAnalysis (S&P Global). A negative net-debt figure means net cash.
Latest reported quarter (June 2026): total assets KRW 14,078.1bn; cash KRW 2,022.5bn; total debt KRW 4,509.1bn; net debt KRW 2,105.2bn; equity KRW 3,727.7bn.
Goodwill and intangibles are NPD-SR and immaterial in standardised data.
Cash flow
The trailing twelve months to June 2026 show operating cash flow of KRW 124.0bn (StockAnalysis).
Ratios (computed)
Cross-checks.
-
The computed Korean debt ratio of 225.1% (FY2021) and 199.1% (FY2022) matches Bondsupermart's figures from company data.
-
192.1% (FY2024) and 284.5% (FY2025) match the Alphabiz and Topdaily reporting of the company disclosures.
-
Mirae Asset reported an FY2024 interest-coverage figure on a different (accrual) basis, which differs from the cash-interest basis above.
Not computed (NPD-SR):
-
ROIC. TipRanks shows -7.83% on a trailing basis.
-
Net debt/EBITDA, because EBITDA is unavailable.
Quarterly trajectory (company provisional results)
Sources: Financial News, StockHub (DART summary) and Dealsite. Q4 2025 net loss is shown as KRW 878.1bn in the company newsroom and KRW 878.2bn in the DART summary; this is a rounding difference.
H1 2026 totals: revenue KRW 3,994.9bn (-8.2% YoY), operating profit KRW 487.9bn (+109.0%), net income KRW 363.0bn, operating margin 12.2% versus 5.4%.
Commentary on trends, inflections and drivers
Revenue. Revenue peaked at KRW 11.65T in FY2023. That peak was driven by pre-sold housing projects and by Al Faw and Nigeria LNG Train 7 (company FY2023 statement). Revenue then fell for two consecutive years as the number of active sites shrank. FY2026 guidance is about KRW 8T, broadly flat on FY2025. Daishin forecasts KRW 8,059bn for FY2026, up 0.1%.
Margins. Margins compressed steadily. The cost ratio rose from 87.9% in FY2022 to 91.2% in FY2024 because housing projects contracted before the 2021–2022 construction-cost spike were delivered at fixed prices.
FY2025 big bath. FY2025 included a deliberate "big bath" of KRW 1.1T in Q4. It covered discounting of unsold regional housing, about KRW 595bn of bad-debt expense on unsold apartments and knowledge-industry centres, and cost overruns on some overseas sites.
2026 rebound. Building gross margin rebounded to 20.8% in Q1 2026, partly on one-offs, and an underlying 13–15% is now expected by several brokers. Operating profit for H1 2026 more than doubled despite lower revenue. Shinhan Securities projects FY2026 operating profit of KRW 858.2bn and net profit of KRW 607.3bn (15 October 2026).
Balance sheet. The balance sheet weakened materially over FY2022–FY2024 even while the company was profitable. Operating cash flow was cumulatively negative by about KRW 2.5T over those three years. That reflects working-capital build in self-development projects, receivables and inventory, financed by debt: total debt doubled from KRW 1.95T to KRW 3.99T. FY2025 operating cash flow turned positive at KRW 462.9bn even as the P&L showed a large loss. That timing gap between profit and cash supports management's description of the FY2025 loss as largely non-cash provisioning.
The equity loss pushed the Korean debt ratio to 284.5%. It partially recovered to about 278% by June 2026 (computed: liabilities KRW 10,350.4bn against equity KRW 3,727.7bn). Interest burden is now material, at about KRW 210bn a year in cash interest.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Segment (As Reported) Overview
| Segment (as reported) | Contents | Representative products/projects |
|---|---|---|
Building / Housing & Architecture (건축사업부문) | Apartments (contracted and self-developed), urban redevelopment and reconstruction, remodelling, mixed-use, officetels, knowledge-industry centres, data centres | PRUGIO and SUMMIT complexes; Busan Seomyeon "Summit The New"; Seongnam Sinheung 3; Sangdo 15; Jangseong Pine Data Center; Gangnam Data Center |
Civil (토목사업부문) | Transport infrastructure, ports, airports, industrial site works, rail PPP | Gadeokdo New Airport site works; Yongin semiconductor cluster site works; GTX-B PPP; Al Faw Grand Port |
Plant (플랜트사업부문) | Oil and gas (LNG, CPF), refining, fertilizer, power, nuclear | Nigeria LNG Train 7; Indorama Fertilizer III; Turkmenistan mineral fertilizer; Shin-Wolsong; Dukovany (pending) |
Other consolidated subsidiaries (기타연결종속부문) | Mainly THT Development (Hanoi Starlake) and other subsidiaries | Starlake City Phase 2 |
Revenue by Segment
| Segment (KRW Bn) | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Building revenue (KRW Bn) | 7,205.1 | 6,841.8 | 5,508.4 |
Civil revenue (KRW Bn) | 2,415.1 | 2,170.4 | 1,404.1 |
Plant revenue (KRW Bn) | 1,620.2 | 1,138.6 | 841.1 |
Other consolidated subsidiaries revenue (KRW Bn) | 407.4 | 352.8 | 301.0 |
Total revenue (KRW Bn) | 11,647.8 | 10,503.6 | 8,054.6 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansRevenue by Segment (%) and Segment Margins & Growth (%)
| Segment metric | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Building share of revenue (%) | 61.9 | 65.1 | 68.4 |
Civil share of revenue (%) | 20.7 | 20.7 | 17.4 |
Plant share of revenue (%) | 13.9 | 10.8 | 10.4 |
Other share of revenue (%) | 3.5 | 3.4 | 3.7 |
Building YoY growth (%) | 0.0 | -5.0 | -19.5 |
Civil YoY growth (%) | 0.0 | -10.1 | -35.3 |
Plant YoY growth (%) | 0.0 | -29.7 | -26.1 |
Segment Revenue
| Indicator | Period | Value | Source |
|---|---|---|---|
Building cost ratio | Q1 2025 | 89.2% (down 4.2pp YoY) | Dealsite, 29 Apr 2025 |
Civil cost ratio | Q1 2025 | 91.3% (up 2.2pp YoY) | Dealsite |
Plant cost ratio | Q1 2025 | 77.4% (down 4.9pp YoY) | Dealsite |
Group cost ratio | FY2022 / FY2023 / FY2024 | 87.94% / 89.62% / 91.20% | Dealsite, 6 Feb 2025 |
Building gross margin | Q1 2026 | 20.8% (about 13% excluding a KRW 58bn cost-ratio reversal and KRW 43bn of settlement/variation gains) | Hana Securities via Asia Economy |
Building gross margin, estimated | Q2 2026 | About 14% | KB Securities estimate |
Q2 2026 notes | Q2 2026 | Plant cost ratio weak on a re-construction issue at a Nigerian site; building helped by about KRW 80bn of one-offs | KB Securities via Asia Economy |
Income Statement and Margin Analysis (%)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Revenue (KRW Bn) | 8,685.2 | 10,419.2 | 11,647.8 | 10,503.6 | 8,054.6 |
Revenue YoY growth (%) | 6.7 | 20.0 | 11.8 | -9.8 | -23.3 |
Gross profit, S&P standardised (KRW Bn) | 1,238.7 | 1,253.7 | 1,211.7 | 927.5 | 238.4 |
SG&A, S&P standardised (KRW Bn) | 421.1 | 439.6 | 392.9 | 378.3 | 399.2 |
Operating income, S&P standardised (KRW Bn) | 769.9 | 758.5 | 651.0 | 359.8 | -880.6 |
Net income, consolidated (KRW Bn) | 484.6 | 508.0 | 521.5 | 242.8 | -916.1 |
EPS, derived from consolidated NI / 410.89m shares (KRW) | 1,179 | 1,236 | 1,269 | 591 | -2,230 |
Dividends per share (KRW) | 0 | 0 | 0 | 0 | 0 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansKey Financials
| Metric | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|
Operating profit, company-reported (KRW Bn) | 760.0 | 662.5 | 403.1 | -815.4 |
Margin Analysis (%)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Gross margin (%) | 14.3 | 12.0 | 10.4 | 8.8 | 3.0 |
Operating margin, S&P OP (%) | 8.9 | 7.3 | 5.6 | 3.4 | -10.9 |
Operating margin, company OP (%) | 8.5 | 7.3 | 5.7 | 3.8 | -10.1 |
Net margin (%) | 5.6 | 4.9 | 4.5 | 2.3 | -11.4 |
Cost-of-sales ratio (%) | 85.7 | 88.0 | 89.6 | 91.2 | 97.0 |
Balance Sheet
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Total assets (KRW Bn) | 10,458.0 | 11,140.4 | 11,243.1 | 12,658.5 | 13,358.5 |
Cash & equivalents (KRW Bn) | 1,061.0 | 1,423.1 | 981.6 | 1,161.8 | 1,828.9 |
Short-term debt incl. current LTD (KRW Bn) | 598.3 | 1,082.2 | 1,385.7 | 1,201.4 | 951.7 |
Long-term debt (KRW Bn) | 906.4 | 1,023.5 | 954.5 | 2,470.1 | 2,778.6 |
Total debt incl. leases, S&P (KRW Bn) | 1,949.1 | 2,508.6 | 2,704.8 | 3,991.5 | 4,084.2 |
Net debt (KRW Bn) | -308.5 | 262.9 | 1,038.4 | 2,057.7 | 1,820.2 |
Total liabilities (KRW Bn) | 7,241.6 | 7,415.7 | 7,181.2 | 8,324.4 | 9,883.9 |
Total equity (KRW Bn) | 3,216.4 | 3,724.6 | 4,061.9 | 4,334.1 | 3,474.6 |
Working capital (KRW Bn) | 2,071.4 | 2,564.4 | 2,987.2 | 5,041.8 | 4,767.8 |
Cash Flow
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Operating cash flow (KRW Bn) | 1,746.8 | -423.1 | -832.8 | -1,283.5 | 462.9 |
Capex, derived as OCF minus FCF (KRW Bn) | 53.2 | 91.6 | 99.0 | 74.6 | 100.4 |
Free cash flow, derived from S&P FCF margin (KRW Bn) | 1,693.6 | -514.7 | -931.8 | -1,358.1 | 362.5 |
Net debt issued / repaid (KRW Bn) | -581.5 | 513.0 | 139.6 | 1,137.3 | -35.5 |
Cash interest paid (KRW Bn) | 60.4 | 76.5 | 151.7 | 210.0 | 207.5 |
Dividends paid (KRW Bn) | 0 | 0 | 0 | 0 | 0 |
Share buybacks (KRW Bn) | 0 | 0 | 0 | 0 | 0 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
ROE on year-end equity (%) | 15.1 | 13.6 | 12.8 | 5.6 | -26.4 |
ROA on year-end assets (%) | 4.6 | 4.6 | 4.6 | 1.9 | -6.9 |
Current ratio (x) | 1.41 | 1.47 | 1.59 | 2.11 | 1.93 |
Liabilities/equity, Korean debt ratio (%) | 225.1 | 199.1 | 176.8 | 192.1 | 284.5 |
Total debt/equity (x) | 0.61 | 0.67 | 0.67 | 0.92 | 1.18 |
Interest coverage, S&P OP / cash interest (x) | 12.7 | 9.9 | 4.3 | 1.7 | -4.2 |
Asset turnover (x) | 0.83 | 0.94 | 1.04 | 0.83 | 0.60 |
Income Statement and Margin Analysis (%) (Quarterly)
| Metric | Q1 2025 | Q2 2025 | Q3 2025 | Q4 2025 | Q1 2026 | Q2 2026 |
|---|---|---|---|---|---|---|
Revenue (KRW Bn) | 2,076.7 | 2,273.3 | 1,990.6 | 1,714.0 | 1,951.4 | 2,043.5 |
Operating profit (KRW Bn) | 151.3 | 82.2 | 56.6 | -1,105.5 | 255.6 | 232.3 |
Net income (KRW Bn) | 58.0 | -42.9 | -53.0 | -878.2 | 195.8 | 167.2 |
Operating margin (%) | 7.3 | 3.6 | 2.8 | -64.5 | 13.1 | 11.4 |
Region / Country Details
| Region / country | Main exposure | Direction |
|---|---|---|
Korea | Most of Building, most of Civil, domestic plant (nuclear, radwaste, CHP, LNG tanks) | Housing contracted in FY2024–25; recovering through urban-renewal orders. Civil set for a step-up from Gadeokdo, Yongin and GTX-B. |
Iraq | Al Faw Grand Port (berths, tunnel, roads); naval and air-force base pipeline | Phase 1 port works completed (2026); new pier tenders forthcoming; the naval base is in the 2026 order pipeline |
Nigeria | NLNG Train 7, Indorama Fertilizer III (completed), Kaduna refinery, HI OPF contract (2026) | Mature; Q2 2026 re-construction issue at a Nigerian site |
Vietnam | Starlake City (THT), Kien Giang, Korea–Vietnam New City | Phase 2 to 2028; Hanoi authorities pledged in September 2026 to resolve project difficulties |
Libya | Fast-track power (KRW 1T, 2023); reconstruction | Pipeline |
Turkmenistan | Mineral fertilizer plant (KRW 940.1bn, 2025) | New market; CEO Lee met President Serdar Berdimuhamedov (September 2026) |
Czech Republic | Dukovany 5 & 6 construction (pending); Temelín option | Revenue expected only from about 2029 |
Papua New Guinea | Papua LNG CPF (preferred bidder) | Subject to FID |
Mozambique | Rovuma LNG Phase 1 (LOI) | FID targeted end-2026 |
Algeria | Oued El Harrach river (completed 2026); earlier CPF | Winding down |
Capital Markets
| Measure | Value | Source |
|---|---|---|
Close, last trading day of 2025 | KRW 3,820 | Seoul Economic Daily |
Current, 20 Oct 2026 intraday | KRW 14,420–14,500 | Jaekyung Ilbo; Ad-hoc News |
YTD 2026 change (computed) | About +280% | Computed |
52-week range | KRW 3,320–40,350 | Ad-hoc News |
Peak market capitalisation | Above KRW 11T (23 April 2026, KRW 33,200) | Lead Economy |
Drawdown from peak to July 2026 | About -60% | KB Securities via Asia Economy |
Valuation Snapshot
| Multiple | Value | Basis |
|---|---|---|
Market capitalisation | KRW 5.96T | 410.89m shares |
Enterprise value | About KRW 8.2T | Market cap + net debt KRW 2.11T + non-controlling interests about KRW 0.13T (June 2026, S&P) |
P/E, trailing | Not meaningful (negative) | TTM net loss about KRW 568bn (Q3'25–Q2'26) |
P/E, FY2026E | About 9.8x | Shinhan FY2026E net profit KRW 607.3bn |
P/B | About 1.66x | Equity attributable to owners KRW 3,593bn (June 2026) |
EV/Sales, trailing | About 1.06x | TTM revenue KRW 7,699.5bn |
EV/EBITDA | Not computed (EBITDA NPD-SR) | — |
Analyst Ratings & Targets
| Broker | Date | Rating | Target price (KRW) |
|---|---|---|---|
Yuanta Securities Korea | 16 Oct 2026 | Maintained | 24,000 |
Shinhan Securities | 15 Oct 2026 | Buy (upgraded) | 20,000 |
IBK Investment & Securities | 5 Aug 2026 | Buy | 31,000 |
KB Securities | 4 Aug 2026 | Buy | 21,000 |
Mirae Asset Securities | 13 Jul 2026 | Buy (upgraded from Neutral) | 24,000 |
Daishin Securities | Jun 2026 (initiation) | Buy | 28,000 |
Hana Securities | 29 Apr 2026 | Buy | 49,000 |
Analyst Conclusions
Guidance and consensus
| Item | Value | Source |
|---|---|---|
| Management 2026 guidance | Revenue about KRW 8.0T; new orders KRW 27T (raised from KRW 18T) | Company |
| Order progress | H1 2026 orders KRW 7.13T plus major Q3–Q4 awards (Sangdo 15 KRW 1.44T; Yongin KRW 0.41T) | Company / DART |
| Shinhan forecast, FY2026 | Operating profit KRW 858.2bn; net profit KRW 607.3bn; orders KRW 16.54T (+16.2%) | Shinhan, 15 Oct 2026 |
| Daishin forecast, FY2026 | Revenue KRW 8,059bn; operating profit KRW 682.5bn | Daishin, Jun 2026 |
| Medium-term revenue growth | About 5.5–5.9% per year forecast | S&P consensus via Simply Wall St |
Bull case
-
Earnings have re-based upward. Legacy high-cost housing sites are nearly exhausted: 2021 starts are complete and only 7–8% of 2022 starts remain. H1 2026 operating profit of KRW 487.9bn already exceeds every full year since FY2023. A normalised 13–15% Building gross margin on about KRW 5.5T of Building revenue supports operating profit of KRW 0.7–0.9T.
-
Backlog quality is rising. Backlog reached KRW 53.4T with large Seoul urban-renewal wins. A higher self-development share (to about 14%) lifts mix. Gadeokdo (55% of KRW 10.7T) and Yongin add long-duration public civil work.
-
Nuclear and LNG optionality is underpriced on a sum-of-the-parts basis. Shinhan values a KRW 12T nuclear order pipeline separately. Signing Dukovany construction, then Papua and Rovuma FIDs, could convert the KRW 27T target into reality.
Bear case
-
The balance sheet constrains everything. The debt ratio is about 278–285%, ratings carry a Negative outlook, and cash interest runs at about KRW 0.2T a year. Mega-projects require bonding and working capital, and Korean self-development ties up cash. Equity is thin relative to an ambition of KRW 27T in orders.
-
Headline orders are not signed contracts. Dukovany pricing is contested (KHNP sought a cut of 10% or more). Papua and Rovuma depend on FIDs. Gadeokdo depends on design approval. Shinhan explicitly flags possible slippage to 2027.
-
Theme-driven valuation. At about 1.7x book versus a historical 0.5x, the stock prices in nuclear success. The 60% drawdown from April shows how sharply sentiment can reverse. Revenue is still shrinking and safety enforcement remains severe.
Catalysts and monitorables (next 12 months)
-
Q3 2026 results (early to mid November 2026): Building gross margin sustainability, cost ratio in Plant (Nigeria), and operating cash flow.
-
Czech construction contract re-disclosure deadline of 1 December 2026, with signing and final price.
-
Papua LNG and Rovuma LNG FIDs and EPC contract signings (H2 2026 / end-2026).
-
Gadeokdo Central Construction Technology Deliberation approval and start of priority works (targeted November 2026).
-
FY2026 results and 2027 guidance (around February 2027); restoration of credit outlook.
-
Construction Capability Evaluation 2027 (July 2027): recovery toward the top three.
-
Any capital action (hybrid issuance, asset sales, equity) to repair leverage.
-
Safety record under the new CEO; outcomes of SAPA investigations.
-
Nuclear pipeline: Vietnam Ninh Thuan 2 contractor selection; Temelín decision; US projects.
Concluding analyst verdict
Daewoo E&C is in the middle of a genuine but incomplete turnaround. The FY2025 big bath was large: a KRW 1.1T Q4 operating loss, a KRW 916bn full-year net loss and a debt ratio of 284.5%. It appears to have been largely a front-loading of known problems rather than the start of a new deterioration. Positive FY2025 operating cash flow, two consecutive quarters of operating profit above KRW 230bn and Building gross margins in the mid-teens all point the same way. On operations, the company is in better shape than at any point since FY2022.
The equity story, however, has moved well ahead of contracted reality. The stock rose about 280% year-to-date on nuclear and LNG optionality, and none of those projects will produce meaningful revenue before 2028–2029. The single most important near-term fact is that Daewoo's Dukovany construction contract remains unsigned, with KHNP pressing for price cuts. A signing on acceptable terms by the December re-disclosure date would validate the "global nuclear builder" thesis. A deep price concession or further delay would undercut it.
The balance sheet is the binding constraint. Ratings carry Negative outlooks, interest coverage is thin and the controlling shareholder is smaller than the company it controls. Pursuing a KRW 27T order target, with heavy bonding and working-capital needs, while repairing leverage is the central tension for new CEO Lee Kang-seok.
Verdict: fundamentally improving, valuation-exposed. At about 1.7x book and about 10x FY2026E earnings, the shares price in successful conversion of most of the pipeline. Risk/reward is balanced to modestly positive only for investors who can tolerate binary catalyst risk around Dukovany, the LNG FIDs and Gadeokdo. Credit investors should wait for outlook stabilisation and evidence of sustained positive operating cash flow before adding exposure.
Data gaps to close from the FY2025 사업보고서 (filed 18 March 2026)
-
Domestic/overseas revenue split by segment (3 years).
-
Segment operating profit.
-
Auditor name.
-
Board composition and committees.
-
Executive pay above KRW 500m.
-
Top shareholders beyond Jungheung.
-
D&A and EBITDA.
-
Debt maturity ladder.
-
Contract assets and receivables (cash conversion cycle).
-
Litigation note.
-
Patents.
-
Emissions data (SR 2025).
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Executive Leadership Team
| Name | Title | Tenure | Background |
|---|---|---|---|
Jung Won-ju (정원주) | Chairman | Since 2022 | Vice Chairman of Jungheung Group. Has led overseas business development personally: Mozambique (President Daniel Chapo, June 2025), Vietnam (Hanoi, March 2025 and September 2026). |
Lee Kang-seok (이강석) | CEO & President (대표이사) | Since 2 Oct 2026 | Previously head of external affairs; promoted to EVP and nominated in August 2026; elected inside director at an EGM. Management themes: "SUMMIT, TOGETHER, CHALLENGE"; priorities include AI infrastructure, data centres and robotics. |
Kim Bo-hyun (김보현) | Former CEO | Dec 2024 – Aug 2026 | Born 1966; former Air Force brigadier general; led the 2021 acquisition team; EVP from 2023; resigned before term expiry. |
Shim Cheol-jin | CEO, Civil Business Division | Current | Met Iraq's General Company for Ports in July 2026 (Shipping Arabia) |
Board & Management Changes
| Date | Change | Context |
|---|---|---|
Dec 2024 | Kim Bo-hyun appointed CEO | Post-acquisition insider; focus on structural improvement |
6 Aug 2026 | Kim Bo-hyun resigns; Lee Kang-seok nominated | Company cited H2 challenges: large domestic and overseas contracts and future-growth initiatives (Herald Corp) |
2 Oct 2026 | Lee Kang-seok appointed CEO | Inauguration; the Chairman stressed safety as top priority |
Major Shareholders
| Holder | Stake (%) | Source |
|---|---|---|
Jungheung Togen (중흥토건) | 40.60 | Company SR 2025 |
Jungheung Construction (중흥건설) | 10.15 | Company SR 2025 |
Combined Jungheung Group | 50.75 | SR 2025; Alphabiz |
Treasury shares | About 0 after cancelling 21,918 shares (fractional shares from a 2007 capital reduction) | KRX via Vegan News |
Competitive Landscape
Competitors by Segment
| Segment | Named competitors |
|---|---|
Housing / urban renewal | Samsung C&T (Raemian), Hyundai E&C (Hillstate/THE H), GS E&C (Xi), DL E&C (e-Pyeonhansesang/ACRO), HDC Hyundai Development (IPARK), POSCO E&C (The Sharp), Lotte E&C (Lotte Castle), SK ecoplant, Hyundai Engineering |
Civil / infrastructure | Hyundai E&C, Samsung C&T, GS E&C, DL E&C, POSCO E&C; internationally Archirodon, Van Oord, Boskalis (Al Faw breakwater bidding) |
Nuclear | Hyundai E&C (Barakah; Fermi America AP1000 basic engineering), Samsung C&T, Doosan Enerbility (equipment and construction partner) |
LNG / plant EPC | Samsung E&A, GS E&C, Hyundai Engineering; globally Saipem, McDermott, Chiyoda, Technip Energies, Bechtel, JGC |
Overseas urban development | POSCO E&C, Lotte, Chinese and Japanese developers |
Peer Comparison FY2025
| Metric | Daewoo E&C | Hyundai E&C | GS E&C | DL E&C |
|---|---|---|---|---|
Revenue FY2025 (KRW Bn) | 8,054.6 | 31,062.9 | 12,450.4 | 7,442.0 |
Revenue growth FY2025 (%) | -23.3 | -4.9 | -3.2 | -10.5 |
Operating profit FY2025 (KRW Bn) | -815.4 | 653.0 | 437.8 | 387.0 |
Operating margin FY2025 (%) | -10.1 | 2.1 | 3.5 | 5.2 |
2026 capability evaluation (KRW Bn) | 9,924.9 | 18,271.4 | 11,066.8 | 0 |
Recent Developments
Next scheduled event: Q3 2026 results. Ad-hoc News cites 6 November 2026; TipRanks lists 12 November 2026. The discrepancy is flagged; use the company's fair-disclosure notice.