Company ProfilePremium

Elia Group SA/NV

Company Profile Analysis

Ticker: ELI.BR

ESOMAR 23 Corporate BadgeISO Certifications Badge
Elia Group SA/NV - Company showcase

Year Founded & Workforce

2001

4,500 Employees

Elia Group SA/NV logo

Elia Group SA/NV Employee Contacts

We don't hold contact details for this company yet — you can request them.

Request Employee Contacts

Elia Group SA/NV Overview

MetricFY2023FY2024FY2025
Employees, Revelio Labs estimate (aggregator)2,7673,3404,268
Employees, company rounded disclosure—4,0004,500

Elia's primary disclosures give only rounded headcounts ("over 4,000", then "more than 4,500"). The third-party estimates below differ in methodology and are shown for direction only.

Elia Group is a pure-play, regulated electricity transmission holding company and one of Europe's five largest transmission system operator (TSO) groups. It owns the sole Belgian TSO, Elia Transmission Belgium (ETB). Through Eurogrid GmbH, it also owns 80% of 50Hertz, the TSO for northern and eastern Germany; German state bank KfW holds the remaining 20%. The group operates more than 19,500 km of high-voltage lines serving about 30 million end-users. Its regulated asset base (RAB) reached €22.6bn at end-2025, up 22.5% year-on-year, and is guided to grow above 20% a year through 2028 on the back of a €31.6bn 2024–2028 capex programme. That programme is focused on offshore wind connections in the North Sea and Baltic, HVDC corridors and interconnectors. Earnings are almost entirely regulated and asset-driven. The investment case therefore rests on execution, regulatory returns (Belgian OLO-linked; German base rate and the post-2029 framework) and access to capital at a BBB rating. A small unregulated arm — WindGrid, Elia Grid International (EGI) and Nemo Link — provides optionality.


Company self-description (FY2025 release, "About Elia Group")

Elia describes itself as an international energy group that designs, builds and operates high-voltage transmission systems in Belgium and in the north and east of Germany. Through Elia Transmission Belgium and 50Hertz, it says it keeps electricity flowing securely across borders, operating a highly interconnected grid that serves 30 million end users at 99.9% reliability. The company frames its role as broader than grid operation: it presents itself as an enabler of electrification, decarbonisation and economic competitiveness.

Beyond system operation, the group offers international consulting through Elia Grid International (EGI) and develops offshore transmission solutions through WindGrid. It positions the combination as "regulated stability with entrepreneurial agility."

Independent characterisation

Economically, Elia Group is a holding company for two regulated natural monopolies, plus a small portfolio of merchant-light and development assets.

What the TSOs do. Each TSO is legally mandated to:

  • own, maintain and expand the high-voltage grid (Belgium roughly 30–380 kV; Germany 220/380 kV plus HVDC and offshore grid connection systems);

  • operate the power system in real time, including balancing, frequency and voltage control, congestion management and redispatch;

  • facilitate the electricity market through cross-border capacity allocation, balancing markets and, in Belgium, administration of the Capacity Remuneration Mechanism.

How it earns money. The model is cost-plus with incentives. Regulators set allowed revenues that recover efficient operating costs and depreciation, plus a return on the RAB:

Belgium (CREG): the equity remuneration is linked to the 10-year Belgian government bond (OLO). The assumed OLO was about 3.4% for 2026, against 3.19% in 2025 and 2.91% in 2024. Incentives add returns for operational performance and project delivery.

Germany (BNetzA): incentive regulation under the ARegV with a regulated return on equity. 50Hertz's equity remuneration on investment was 5.72% in 2025 and 6.07% in H1 2026, and a growing share of the asset base earns a floating rate applied since 2024. Offshore and certain onshore investments are remunerated on an annual (capex-pass-through-like) basis.

Revenue model. Effectively 100% service and tariff-based. There is no product, subscription or licensing revenue of note. Tariffs are charged to:

  • grid users directly connected to the transmission grid (large industrials, generators, storage);

  • distribution system operators (DSOs), which pass costs on to households and SMEs;

  • the market, through congestion income and auction revenues, which are partly regulated and partly retained, as at Nemo Link.

Value-chain position. Midstream: between generators (including offshore wind farms) and distribution grids or large consumers. Elia does not generate, trade or supply electricity.

Customer types:

  • Belgian and German DSOs (Fluvius, Ores, Sibelga and RESA in Belgium; regional DSOs in eastern Germany)

  • Directly connected industrial users (chemicals in the Port of Antwerp-Bruges, steel, data centres)

  • Generators and storage operators

  • Balancing service providers

  • Neighbouring TSOs

  • Federal and regional governments (offshore planning)

  • EGI consulting clients internationally

End-markets:

  • Belgian electricity transmission (national monopoly)

  • German transmission in the 50Hertz control area (Berlin, Brandenburg, Hamburg, Mecklenburg-Western Pomerania, Saxony, Saxony-Anhalt, Thuringia, plus Baltic and North Sea offshore connections)

  • Cross-border interconnection (Nemo Link Belgium–UK; Tarchon Germany–UK under development)

  • US transmission development via WindGrid / energyRe Giga, partially impaired in 2025

  • Global grid consulting via EGI

Earnings mix (FY2025, adjusted net profit, from FY2025 release)

SegmentAdjusted net profit FY2025 (EUR Mn)Share of adjusted group result
Elia Transmission (Belgium)272.138%
50Hertz Transmission (Germany, 100%)439.061%
Non-regulated & Nemo Link5.31%
Group adjusted net profit (before minorities and hybrids)716.5100%

Note: percentages are derived; 50Hertz is shown at 100% before KfW's 20% minority.

Strategy

Stated strategic themes (FY2025 and H1 2026 management statements)

"Driving execution to power tomorrow": (FY2025) and "building Europe's grid backbone: disciplined execution at unprecedented scale" (H1 2026): delivery of the largest investment programme in the group's history while maintaining cost discipline and consumer affordability.

Prioritisation: advocacy that Europe should prioritise mature, system-relevant projects, operate storage where it best supports the grid, and integrate flexibility.

Regulation as precondition: Belgium secured; Germany "reaching a critical stage." Elia wants full recovery of financing costs, better return visibility and compensation for execution risk.

Funding toolkit: equity (done 2025), hybrids (2026), green and sustainability-linked debt, and KfW green loans, all to protect BBB ratings.

Three pillars of growth: (CMD Dec 2023): core regulated growth in Belgium and Germany, offshore development, and international expansion via WindGrid and EGI.

AI and data-centre demand: management flags new large loads, especially from AI data centres, as creating severe pressure on grid capacity.

Strategic initiatives, last 24 months

InitiativeDateDescriptionTargets / status
€2.2bn equity packageMar–Apr 2025€850m PIPE (ATLAS/Future Fund €234.6m, BlackRock €117.3m, CPP €117.3m, NextGrid €380.7m) plus about €1.35bn rights issueCompleted; covers straight equity needs to 2028
2024–2028 capex planMar 2025 update€31.6bn total, €26.8bn after 2024; 60% of 2025–2028 capex already committedRAB growth >20% a year to 2028
Princess Elisabeth Island resetFeb–Jun 2025HVDC contract not signed; "new concept" requested by government; possible second UK interconnectorIsland construction continues: 19 of 23 caissons by Jun 2026; HVDC farm delayed at least three years per Gas Outlook
Green financing2025–2026€3.6bn green debt in 2025; ETB €500m EU Green Bond (3.50%, 10-year); Eurogrid €3.1bn; €5.25bn Eurogrid green RCF and €2.0bn ETB sustainability-linked RCF (2026)Liquidity €11.9bn at end-2025
€900m hybridMay 2026Non-dilutive, 50% S&P equity credit; 5.25-year non-call, 4.625% coupon (financial-position page)Funded early repayment of a €300m term loan
Eurogrid equity injections2025 and Q4 2026€600m in 2025 (Elia €480m, KfW €120m); a further €600m planned in Q4 2026Pro-rata
US strategic reviewQ3 2025–Q1 2026Reassessment of energyRe Giga€99.1m impairment; "remain confident" in long-term US potential
Tarchon acquisitionJul 202625% via WindGrid alongside CPP Investments (about C$1bn commitment for majority)Subject to UK and German regulatory approvals
Climate targets2025–2026New Scope 3 intensity target (two-thirds reduction relative to added transformer capacity; SBTi validation pending); 2035 targets; SF₆ leakage target tightened to 0.2% from 2026See Section 20
Digitalisation and flexibilityOngoingStorage for System Strength study; Flexibility Needs Assessment 2026; Innovation Strategy 2024–27—
Cost and affordability2,026German state co-finances transmission tariffs with €6.5bn for 2026Mitigates tariff backlash

Management guidance and medium-term targets

ItemGuidanceSource
2026 net profit, Elia Group share€690–740m (incl. hybrid coupon), reiterated Jul 2026H1 2026 release
2026 Belgium adjusted net profitTowards upper end of €290–320m (OLO about 3.4%)H1 2026
2026 Germany adjusted net profit (100%)€585–625m (base rate 3.0%)H1 2026
2026 International & holdingAbout break-even (previously a €10–30m loss); Nemo Link about €30mH1 2026
2026 capexAbout €6.5bn (Belgium €1.7bn, Germany €4.8bn), down from €6.8bn in March (Germany €5.1bn)H1 2026 vs FY2025 releases
RAB growthAbove 20% a year through 2028FY2024 results
Dividend policyDPS to grow in line with Belgian CPI (stated FY2024); FY2025 held flat at €2.05FY2024/FY2025
Financial policyMinimum BBB for Elia Group and Eurogrid; BBB+ for ETBCMD Dec 2023

Source discrepancy: one secondary source (Idéal Investisseur, Aug 2026) reported group 2026 investment guidance as "€4.8bn". The primary release shows €4.8bn is the German figure and the group total is about €6.5bn.

Products & Services

Elia is a regulated infrastructure operator, so its "products" are regulated services, infrastructure assets and a handful of unregulated offerings. Detailed tariff schedules are published by CREG and BNetzA; tariff levels are not reproduced here.

Elia Transmission (Belgium)

OfferingDescription / capabilitiesTarget customerPricing model
Grid access and connectionConnection of generation, storage, large loads and DSOs to the 30–380 kV gridIndustrials, generators, storage, data centres, DSOsRegulated tariffs (CREG); connection fees
Transmission system operationReal-time balancing, frequency containment and restoration (FCR/aFRR/mFRR procurement), voltage control, congestion managementSystem-wideRecovered via regulated tariffs
Market facilitationCross-border capacity allocation (Core flow-based region), balancing market design, imbalance settlementMarket parties, balance responsible partiesRegulated
Capacity Remuneration Mechanism (CRM) administrationElia runs Belgian adequacy studies and CRM auctions. Publications include the adequacy and flexibility study 2026–2036 and the first Flexibility Needs Assessment (8 Oct 2026).Generators, storage, demand responsePass-through mechanism
Offshore grid (Modular Offshore Grid; Princess Elisabeth Island)Princess Elisabeth Island will bundle AC and DC infrastructure for the Princess Elisabeth wind zone. 19 of 23 caissons installed by June 2026; the HVDC part for the third 1.4 GW farm is postponed.Offshore wind farm concession holdersRegulated RAB
Onshore backbone projectsVentilus (West Flanders, environmental permit granted H1 2026); Boucle du Hainaut (preferred route Oct 2026, commissioning 2032–2033); BRABO III (Port of Antwerp, full line due spring 2026); Massenhoven–Van EyckSystem-wideRegulated RAB
InterconnectorsALEGrO (Belgium–Germany); Nemo Link (Belgium–UK, held in the holding segment); a second UK link is studied as a possible solution for the energy islandMarketRegulated / cap-and-floor (Nemo)

50Hertz (Germany)

OfferingDescription / capabilitiesTarget customerPricing model
Onshore transmission and HVDC corridorsSuedOstLink HVDC towards Bavaria; Suedharz line; Uckermark line; two lines of more than 100 km each commissioned in 2025Germany-wideBNetzA revenue cap (ARegV)
Baltic offshore grid connectionsOstwind 3 (connection due 2026 after cable tests); Ostwind 4; GennakerOffshore wind developersOffshore grid levy / regulated
North Sea offshore grid connections (LanWin programme)Offshore cable installation commenced on LanWin3; key contracts awarded for LanWin6 in H1 2026Offshore wind developersRegulated
Bornholm Energy Island (with Energinet)HVDC converters awarded in 2025; strengthened cooperation framework in 2026Denmark–Germany systemRegulated / cross-border cost allocation
System operation and EEG administrationBalancing and redispatch; administers EEG renewable-surcharge mechanism cash flows (EEG cash €347.8m at June 2026)System-widePass-through
Power-to-Heat (Berlin)120 MW project launched in H1 2026 to integrate renewable power into district heatingHeating sector / system flexibility—
EEX shareholding5.36% stake in European Energy ExchangeFinancial investmentDividends and revaluation

International & holding activities

OfferingDescriptionCustomerStatus
Nemo Link1 GW Belgium–UK HVDC interconnector; 98.7% availability in 2025 and 100% in H1 2026Market (congestion, capacity market, ancillary services)Cap-and-floor regime, assessment period 2024–2028; above-cap revenue and interest repayable
Elia Grid International (EGI)Grid consulting, engineering and owner's engineering. Revenue up €2.6m in H1 2026 despite Middle East turmoil.TSOs, governments, developers worldwideFee-based
WindGridDevelopment and investment platform for offshore and onshore transmission outside the core marketsRegulated-asset investors, governmentsEquity investments
WindGrid US / energyRe GigaUS transmission projects: Clean Path New York (CPNY), SOO Green, and a 12.5% interest in Leading Light Wind (LLW)US utilities / RfPsImpaired €99.1m in FY2025; LLW lease termination settlement with potential reimbursement up to $645m (financial effect under assessment)
Tarchon1.4 GW HVDC UK–Germany interconnector project (bidirectional transfer up to 1.8 GW cited by partners)Regulated interconnectorRegulatory approvals ongoing in the UK and Germany
re.altoEnergy data platform—Discontinued

Financial Detail

Income Statement and Per-Share Data

MetricFY2021FY2022FY2023FY2024FY2025

Revenue, other income & settlement (EUR Mn)

2,860.04,113.03,954.04,102.94,273.1

IFRS revenue line (EUR Mn)

——3,842.63,767.04,442.2

Gross profit, aggregator definition (EUR Mn)

998.91,117.01,244.01,537.01,900.0

Results from operating activities (EUR Mn)

490.7559.8644.2879.11,040.0

EBIT incl. equity-accounted investees (EUR Mn)

———912.21,052.9

Adjusted EBIT (EUR Mn)

———912.21,151.9

EBITDA (EUR Mn)

958.21,074.01,202.01,531.71,794.5

Net finance costs (EUR Mn)

———-172.4-184.7

Profit before tax (EUR Mn)

433.5555.7555.0739.8868.1

Income tax (EUR Mn)

———-227.3-185.0

Net profit, total (EUR Mn)

328.3408.2399.5512.5683.1

Adjusted net profit (EUR Mn)

———512.5716.5

Non-controlling interests (EUR Mn)

———62.097.2

Hybrid coupons attributable (EUR Mn)

19.319.331.029.329.3

Net profit, Elia Group share (EUR Mn)

276.0341.7324.5421.3556.6

Basic EPS, Elia share (EUR)

——4.485.735.56

Bonus-adjusted EPS (EUR)

———5.455.51

Dividend per share (EUR)

1.751.911.992.052.05

Margin Analysis (%)

MetricFY2021FY2022FY2023FY2024FY2025

Gross margin, aggregator (%)

34.927.231.537.544.5

Operating margin (%)

17.213.616.321.424.3

EBITDA margin (%)

33.526.130.437.342.0

Net margin, total net profit (%)

11.59.910.112.516.0

Revenue growth YoY (%)

15.643.8-3.93.84.1

Net profit Elia share growth YoY (%)

10.423.8-5.029.832.1

CAGR (FY2021–FY2025, derived)

Value

————

Revenue (company definition)

10.6%————

EBITDA

17.0%————

Net profit, Elia Group share

19.2%————

DPS

4.0%————

Balance Sheet and Per-Share Data

MetricFY2024FY2025

Total assets (EUR Mn)

24,927.632,148.6

Equity attributable to owners, incl. hybrids (EUR Mn)

5,556.28,150.2

Equity per share (EUR)

68.669.9

Net financial debt incl. EEG (EUR Mn)

12,798.213,629.6

Net financial debt excl. EEG (EUR Mn)

13,158.714,083.0

Closing RAB, group, 100% (EUR Mn)

18,50022,600

Available liquidity, group (EUR Mn)

—11,900

Average cost of debt (%)

2.82.9

Cash Flow and Per-Share Data

MetricFY2021FY2022FY2023FY2024FY2025

Operating cash flow (EUR Mn)

————2,090.4

Capex / RAB investments (EUR Mn)

1,2281,535—4,8005,186.2

Free cash flow, OCF minus capex (EUR Mn) (derived)

————-3,095.8

Free cash flow per share, aggregator (EUR)

40.64-5.54-13.09-44.97-25.71

Equity raised, net of costs (EUR Mn)

—590.1——2,186.6

Dividends paid to Elia shareholders (EUR Mn)

————150.7

Share buybacks (EUR Mn)

00000

Returns & Leverage Ratios (%) and Financial Ratios (x)

RatioFY2022FY2024FY2025

Adjusted ROE, Elia share, company (%)

7.528.377.29

ROA, total net profit / total assets (%)

—2.12.1

Net debt excl. EEG / EBITDA (x)

—8.67.8

Net debt excl. EEG / equity attributable (x)

—2.371.73

Interest coverage, EBIT / finance costs (x)

—3.32.9

Asset turnover, revenue / total assets (x)

—0.160.13

Revenue by Region

RegionFY2024FY2025

Belgium: revenue, other income & settlement (EUR Mn)

1,608.91,603.9

Germany: revenue, other income & settlement (EUR Mn)

2,520.12,720.9

International & holding: revenue and other income (EUR Mn)

107.383.4

Revenue by Region (%)

Region (%)FY2024 growth %FY2025 growth %

Belgium

16.0-0.3

Germany

-2.08.0

International & holding

—-22.3

Region by earnings (adjusted net profit)

Region by earnings (adjusted net profit)FY2024FY2025

Belgium (EUR Mn)

213.8272.1

Germany, 100% (EUR Mn)

307.9439.0

International & holding (EUR Mn)

-9.25.3

Data Point Details

Data pointValueSource / date

Last close, Euronext Brussels

€121.30

15 Oct 2026 (AD HOC NEWS)

52-week range

€96.70–141.50 (alternative series: €99.05–143.10)

AD HOC NEWS, Oct 2026

Calendar 2025 performance

+48.5%

justETF

2026 YTD to 28 Jul 2026

About +21%

La Libre, 29 Jul 2026

Reaction to H1 2026 results

-5.8% to €128.10 (another source cites -7.5%)

La Libre / allinvestview

Reaction to equity package (7 Mar 2025)

Intraday high of +19%

Belga

Market capitalisation

About €13.0–13.2bn

Simply Wall St / AD HOC NEWS, Sep–Oct 2026

Valuation Multiples

MultipleElia GroupBasis

P/E (TTM)

20.8x

TTM net profit to common €635.6m / 109.16m shares = €5.82 EPS (StockAnalysis TTM). Lightyear shows 20.4x (3 Oct 2026).

P/E (2026 guidance midpoint)

18.5x

€715m / 109.16m = €6.55 EPS (derived)

P/B

1.69x

Equity per share €71.9 (H1 2026), which includes hybrid equity; P/B on common-only equity would be higher

EV/EBITDA (TTM)

~15.4x

EV ≈ €30.0bn (market cap €13.2bn + net debt excl. EEG €14.6bn + hybrids €1.4bn + KfW minority ≈€0.8bn) / TTM EBITDA €1,947m

EV/Sales (TTM)

~6.7x

TTM revenue (company definition) €4,498m

Dividend yield

~1.7%

€2.05 / €121.30

Capital Markets

ItemValueSource

Consensus rating

Buy (15 analysts)

MarketScreener via AD HOC NEWS, 7 Oct 2026

Average price target

€149.17 (about +23% vs €121.30)

Same

KBC

Target raised to €145 from €131 (1 Oct 2026)

TickerLandia via AD HOC NEWS

Bernstein

Outperform

Parqet news summary, Aug 2026

Jefferies

Coverage initiated Nov 2025

Owler / Investing.com

Coverage breadth

21–22 analysts

Simply Wall St

Per-Share Data and Returns & Leverage Ratios (%)

MetricFY2021FY2022FY2023FY2024FY2025

Gross DPS (EUR)

1.751.911.992.052.05

Payout, DPS / EPS (%) (derived)

——44.435.836.9

Group Entities

EntityS&PMoody'sMorningstar DBRS

Elia Group SA/NV

BBB / A-2, stable (updated 28 Jan 2026; reaffirmed in H1 2026 release)

Not rated / not disclosed

BBB (high), stable (Dec 2024)

Elia Transmission Belgium

BBB+, stable

—

A (low), stable (Dec 2024)

Eurogrid GmbH

BBB, stable

Baa2, stable (Eurogrid site)

—

€900m hybrid (2026)

50% equity credit

——

“—” = not publicly disclosed.

Capital Instruments

InstrumentIssuerAmountCoupon / termsMaturity / status

Hybrid bond

Elia Group

€900m

4.625%

First call ≈5.25 years from May 2026 (≈2031)

Hybrid securities (earlier)

Elia Group

€500m

—

Perpetual

Senior unsecured bond

Elia Group

€600m

3.875% (per TradingView listing "11-Jun-2031")

2031

EU Green Bond

ETB

€500m

3.50%, 10-year

≈2035

Bond repaid

ETB

€500m

—

Repaid early 2026 (pre-financed 2025)

Green bonds and loans

Eurogrid

€3.1bn raised in 2025

Various

Various

KfW Green Loan

Eurogrid

€850m

—

Drawn H1 2026

Promissory note (Schuldschein)

Eurogrid

€325m

5- and 7-year tranches

2031 / 2033

Sustainability-linked RCF

ETB

€2.0bn

Undrawn

—

Green RCF

Eurogrid

€5.25bn (replaced €3.75bn)

Undrawn

—

Commercial paper

ETB / Eurogrid / Elia Group

€700m / €750m / €100m

Undrawn at Jun 2026 (ETB, Eurogrid)

—

Average cost of debt

Group

3.04% (H1 2026); ETB 2.78%; Eurogrid 2.92%

All ETB debt fixed-rate

—

Analyst Conclusions

Management guidance (2026)

  • Net profit, Elia Group share: €690–740m (midpoint +28% vs FY2025 €556.6m).

  • Belgium: towards the upper end of €290–320m.

  • Germany (100%): €585–625m.

  • International & holding: about break-even.

  • Capex: about €6.5bn (Belgium €1.7bn, Germany €4.8bn).

  • RAB: growth above 20% a year to 2028.

Consensus expectations

  • 15 analysts, consensus Buy, average target €149.17.

  • Aggregator data (TradingView) previously showed half-year EPS estimates around €2.5–2.7.

  • Consensus revenue estimates appear distorted by pass-through items. H1 2026 revenue "missed" by about 20% against aggregator estimates (allinvestview), while profit met guidance, which underlines that revenue consensus is not a useful KPI here.

Bull case

  1. Compounding regulated earnings. RAB growth above 20% a year to 2028, with equity already funded. The 2026 guidance midpoint implies EPS of about €6.55, or 18.5x P/E. That is undemanding for 20%+ profit growth once dilution washes through.

  2. Rate-linked returns and Belgian clarity. Belgian returns are visible to 2031 with incentives worth up to +2pp RoE. German equity remuneration is rising (6.07% in H1 2026 versus 5.72%).

  3. Balance-sheet de-risking. €11.9bn of liquidity, €7.25bn of new RCFs, the €900m hybrid and stable S&P ratings reduce the probability of another dilutive raise before 2028.

Bear case

  1. German framework risk. BNetzA's post-2029 TSO framework (WACC-based return, annual cost-based tariffs) may under-remunerate financing costs on a €14.8bn RAB growing about 25–30% a year. Clarity may not arrive until late 2027.

  2. Execution and cost overruns. HVDC scarcity has already forced the energy-island redesign, and Boucle du Hainaut has slipped to 2032–2033. The 2026 capex cut, while framed as efficiency, could foreshadow slower RAB growth.

  3. Leverage and dilution treadmill. Net debt excl. EEG of about 7.8x EBITDA at a BBB rating, a flat dividend and negative free cash flow of about €3bn a year mean that any extension of the capex plan beyond 2028 likely requires fresh equity.

Catalysts and monitorables (next 12 months)

Date / periodCatalyst
27 Nov 2026Q3 2026 statement: capex run-rate versus the €6.5bn target; guidance
Q4 2026€600m Eurogrid capital increase (Elia €480m)
Late 2026BNetzA AgNes final decisions; progress on the TSO framework determination
2,026Ostwind 3 grid connection
2026–2027Princess Elisabeth Island "new concept" decision; possible second UK interconnector
3 Mar 2027FY2026 results; FY2026 DPS decision (test of the CPI policy); updated 2027–2031 capex plan
2,027Belgian tariff proposal for 2028–2031; German key parameters
OngoingenergyRe / LLW reimbursement valuation; Tarchon regulatory approvals; S&P rating reviews

Analyst verdict

Elia Group offers some of the purest exposure in listed European equity to the build-out of the continent's electricity transmission backbone. The quality of the underlying engine is not in doubt.

The RAB grew 22.5% to €22.6bn in 2025. Net profit attributable to shareholders rose 32% to €556.6m and is guided to €690–740m in 2026. The 2025 equity raise and 2026 hybrid have pre-funded the equity component of the plan through 2028. Belgium, roughly 38% of earnings, now has a regulatory framework locked in to 2031 that management and the market regard as stable and incentive-rich.

The debate centres almost entirely on Germany, which delivers about 60% of earnings and nearly three-quarters of capex. BNetzA's redesign of the TSO framework from 2029 will determine whether 50Hertz's extraordinary investment volumes earn returns commensurate with their execution risk and financing cost. Until parameters are set — possibly not before late 2027 — the shares are likely to trade at a discount to their growth profile. The market's negative reaction to clean H1 2026 numbers illustrates this.

At about €121, the stock trades on roughly 18.5x 2026 guided EPS, 1.7x book and about 15x TTM EV/EBITDA. Consensus targets of about €149 imply roughly 23% upside.

On balance, the risk-reward is constructive but contingent. The bull case requires three things: a bankable German framework; containment of HVDC cost inflation; and capex delivery close to plan without another dilutive equity raise before 2028.

Investors should monitor three things closely:

  1. the H2 2026 capex run-rate, given that only €1.9bn of €6.5bn was delivered in H1;

  2. the FY2026 dividend decision as a signal of capital-allocation confidence;

  3. BNetzA's final determinations.

Holders must accept elevated leverage, low cash yield and policy risk as the price of that growth.


All figures are in EUR and fiscal years end 31 December unless otherwise stated. "Not publicly disclosed" denotes data absent from the primary sources reviewed as of 19 October 2026. Aggregator-sourced figures are labelled and were not reconciled to audited statements.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Executive Leadership Team

NameTitleIn role sinceBackground / prior rolesEducation / age

Bernard Gustin

Chief Executive Officer

15 Jan 2025

Independent director and Chairman of Elia Group, ETB and Elia Asset (May 2017–Jan 2025); CEO Brussels Airlines (2012–2018, co-CEO 2008–2012); Executive Chair, then Chair, of Lineas (rail freight)

Born 1968; Commercial Engineering (ICHEC, Brussels)

Marco Nix

Chief Financial Officer

1 Apr 2025 (interim from 28 Nov 2023)

CFO and Head of Controlling & Risk Management, 50Hertz

—

Frédéric Dunon

CEO, Elia Transmission Belgium

Confirmed Dec 2023 (Deputy CEO from 1 Nov 2022)

Long-standing Elia executive

—

Stefan Kapferer

CEO, 50Hertz

Pre-2020

Former German government official and BDEW head

—

Michael von Roeder

Chief Digital Officer

Member of EMB per Dec 2024 release

Digital and IT leadership

—

Peter Michiels

Chief Alignment Officer

Retired 1 Apr 2026; role converted to Group CHRO (Q3 2025 statement)

HR leadership

—

Daniela Baratto

CEO, WindGrid

Cited Jul 2026

——

“—” = not publicly disclosed.

Major Shareholders

#ShareholderShares%Notes
1

NextGrid Holding (Publi-T 50% / Fluxys JV)

48,854,51244.76

Reference shareholder; Class B and C

2

Katoen Natie Group (Ferdinand Huts)

10,119,1509.27

Crossed 10% on 24 Jan 2025 pre-raise. Simply Wall St shows 9,455,570 (8.67%) — discrepancy noted.

3

ATLAS Infrastructure Partners (with The Future Fund)

5,384,3294.93

PIPE investor

4

Interfin

3,124,4902.86—
5

Publipart

2,437,4872.23

Class A and B. Simply Wall St (Apr 2026) shows 1,836,054 — possible reduction, unconfirmed.

6

BlackRock Inc.

2,369,8892.17

PIPE shares only; aggregator shows 2.1–2.7m

7

CPP Investments

2,369,8982.17

PIPE shares; aggregator shows 1,937,000

8

Vanguard Group

~2,079,217

~1.9

Aggregator

9

Norges Bank Investment Management

~875,315

~0.8

Aggregator

10

Belfius Insurance

714,3570.65

Acting in concert with Publi-T

—

Publi-T (direct)

459,0130.42—
—

Free float

33,325,84630.53—

Competitive Landscape

Competitors by Segment

SegmentCompetitor / peerPositioning vs Elia

German TSO (peer, not rival)

TenneT Germany

Largest German TSO, North Sea offshore heavy; ownership in transition

German TSO

Amprion

Western Germany; privately held

German TSO

TransnetBW

Southwest Germany (EnBW majority)

European listed TSO

Terna (Italy)

Larger, higher-margin, A- rated (S&P upgrade 2025)

European listed TSO

Redeia (Spain)

Smaller, high-margin, low-growth

European listed TSO / utility

National Grid (UK/US)

Much larger; Nemo Link partner

European listed TSO

REN (Portugal)

Smaller listed peer

National TSOs

RTE (France), Energinet (Denmark), Statnett (Norway), TenneT NL

Interconnection partners

Interconnector developers

Copenhagen Infrastructure Partners, private developers

Compete for merchant / cap-and-floor links

Consulting (EGI)

Engineering consultancies and other TSO consulting arms

Niche competition

Peer Comparison FY2025

MetricElia GroupTernaRedeia

Revenue (EUR Mn)

4,273.14,033.01,716.0

Revenue growth (%)

4.110.04.2

EBITDA (EUR Mn)

1,794.52,751.01,258.3

EBITDA margin (%)

42.068.273.3

Net profit, group share (EUR Mn)

556.61,111.5506.0

Capex (EUR Mn)

5,186.23,514.91,551.0

Net debt (EUR Mn)

14,083.013,000.05,474.0

R&D intensity

———

Company Snapshot

4,500

Employees

2001

Founded

Brussels, Belgium

Headquarters

SWOT Analysis

Strengths

  • Rapid regulated growth: RAB up 22.5% to €22.6bn in FY2025 and guided above 20% a year to 2028 (FY2025 and FY2024 releases).
  • Earnings momentum: net profit share up 32.1% in FY2025 and 29.4% in H1 2026; 2026 guidance midpoint of €715m implies about +28% (derived).
  • Equity fully funded to 2028: €2.2bn raised in 2025 with cornerstone investors (BlackRock, CPP, ATLAS) plus the €900m hybrid in 2026.
  • Deep liquidity: €11.9bn available at end-2025; €7.25bn of new RCFs signed in H1 2026, all undrawn at 30 Jun 2026.
  • Belgian regulatory visibility: CREG methodology approved through 2031 with incentives retained.
  • ESG-aligned capex: 99.9% EU-Taxonomy-aligned capex in FY2025; SF₆ leakage of 0.11% versus a 0.25% target.

Weaknesses

  • Per-share dilution: EPS fell 2.9% in FY2025 despite 32% profit growth; shares outstanding rose about 48%.
  • Leverage: net debt excl. EEG / EBITDA of about 7.8x (FY2025, derived), rated only BBB at group and Eurogrid level versus Terna at A-.
  • Lower EBITDA margin than peers (42% vs Terna 68%, Redeia 73%), reflecting the pass-through-heavy revenue definition.
  • International misstep: €99.1m US impairment, including a €28.3m onerous-contract provision for a $150m outstanding commitment.
  • Project cost control questions: the Princess Elisabeth Zone budget roughly doubled from €3.6bn (Gas Outlook, May 2026); KPMG identified design changes worth about €1bn.
  • Dividend held flat at €2.05 for FY2025, deviating from the CPI-linked growth signalled in the FY2024 policy, with a low yield of about 1.7%.

Opportunities

  • German offshore build-out: LanWin, Ostwind 4, Gennaker and Bornholm, alongside a German TSO investment envelope of about €250bn to 2033.
  • Interconnectors: Tarchon (1.4 GW UK–Germany) and a possible second Belgium–UK link tied to the energy island.
  • AI and data-centre demand creating new connection requests and RAB.
  • EU Grids Package and accelerated permitting.
  • US optionality: the potential LLW lease-cost reimbursement of up to $645m (energyRe's 12.5% interest) and repurposing of CPNY.
  • Higher-rate environment: Belgian equity remuneration rises with the OLO (3.4% in 2026 vs 2.91% in 2024); the German base rate assumption rose to 3.0%.

Threats

  • German regulatory reset from 2029: key parameters (return on equity, cost of debt) may only be known by late 2027 (allinvestview recap); the shares fell 5.8–7.5% after H1 2026 on this uncertainty.
  • HVDC supply-chain scarcity and inflation: this caused the energy-island HVDC postponement.
  • Permitting delays: Boucle du Hainaut commissioning has slipped to 2032–2033.
  • Tariff-affordability backlash: Germany needed €6.5bn of state co-financing for 2026 tariffs.
  • Rating downgrade risk if capex outruns funding: S&P went to negative outlook in 2022 and downgraded in 2023.
  • Accounting change: IFRS 20 (issued May 2026, effective 2029) has an unquantified impact on reported earnings.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
Apr 2025Rights issue completes the €2.2bn equity raiseFunding certainty to 2028
1 Apr 2025Marco Nix becomes permanent Group CFOContinuity
21 May 2025Q1 2025 statement: equity raised; progress on BRABO III, Ventilus, Massenhoven–Van Eyck, SuedOstLink, Ostwind 3, Uckermark Line; Princess Elisabeth HVDC paused–
20 May 2025AGM approves €2.05 FY2024 dividend (pre-raise shares only)–
5 Jun 2025Government decision: HVDC contract for the energy island will not be signed; a new concept is requiredRemoves a large near-term capex block; delays the 1.4 GW farm
Jul 2025Catherine Vandenborre departsCompletes leadership transition
25 Jul 2025H1 2025: net profit share €269.6m (+48.4%); 2025 guidance €490–540m reiterated–
1 Oct 2025German TSOs publish provisional 2026 grid tariffs–
Q3 202550Hertz launches the Suedharz project; Bornholm HVDC converter awardGermany pipeline
28 Nov 2025Q3 2025: S&P reaffirms BBB / BBB+ ratings; US strategic review flagged; Michiels retirement announced–
Nov 2025Jefferies initiates coverageBroadening sell-side
Dec 2025EU Grids Package announcedPolicy tailwind
End-2025Belgian law change permits combining group contribution with Dividend Received DeductionTax benefit at holding
28 Jan 2026S&P rating update: Elia Group BBB / A-2–
Jan 2026USD intercompany loan to WindGrid US repaidReduces FX noise
5 Mar 2026FY2025: net profit share €556.6m (+32.1%); €99.1m US impairment; €2.05 DPS flat; 2026 guidance €690–740m; capex €6.8bn plannedBeat consensus per Bloomberg (Belga)
27 Mar 20262025 Annual Report published–
1 Apr 2026Peter Michiels retires; Group CHRO role created–
Apr 2026€9.0m tax recovery (fiscal year 2023) recognisedOne-off
H1 2026ETB signs €2.0bn sustainability-linked RCF; Eurogrid signs €5.25bn green RCF (first multi-billion green RCF by a European borrower)Liquidity
5 May 2026€900m hybrid bond priced (4.625%, 5.25-year)Equity-like funding
19 May 2026AGM; €2.05 FY2025 dividend (paid 2 Jun 2026)–
20 May 2026Q1 2026: guidance reiterated; Belgian draft tariff methodology consulted; German NEP 2037/2045 second draft–
H1 2026Ventilus environmental permit grantedDe-risks key Belgian project
End-Jun 2026CREG final tariff methodology 2028–2031 (average post-tax RoE around 8% with incentives up to +2pp, per allinvestview recap)Visibility to 2031
30 Jun 2026Princess Elisabeth Island: 19 of 23 caissons installed–
Jun 2026Eurogrid inaugural €325m promissory note (Schuldschein); €850m KfW green loan drawnFunding diversification
29 Jul 2026H1 2026: net profit share €348.7m (+29.4%); capex guidance cut to €6.5bn; holding guided break-even; shares fell 5.8% to €128.10 (La Libre)Market reaction driven by German regulatory uncertainty
29 Jul 2026Tarchon acquisition with CPP announced–
H1 202650Hertz EEX stake revalued to €232.4m (+€91.1m OCI)–
1 Oct 2026KBC raises target price to €145 from €131–
8 Oct 2026First Belgian Flexibility Needs Assessment published–
13 Oct 2026Walloon government names preferred route for Boucle du HainautCommissioning targeted 2032–2033
Upcoming: 27 Nov 2026Q3 2026 quarterly statementCatalyst

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

3 charts
Income Statement: Revenue & Gross Profit: Revenue, other income & settlement rose from EUR 2,860 Mn in FY2021 to EUR 4,273.1 Mn in FY2025.
Elia Group SA/NV — Income Statement: Revenue & Gross Profit
Series (EUR Mn)FY2021FY2022FY2023FY2024FY2025
Revenue, other income & settlement2,8604,1133,9544,102.94,273.1
IFRS revenue line——3,842.63,7674,442.2
Gross profit, aggregator definition998.91,1171,2441,5371,900

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Unlock Company Contacts

Connect with Key Decision-Makers

Access verified employee contacts and decision-maker information from this company to support your sales, lead generation, and business development efforts.