Empresa Distribuidora y Comercializadora Norte Sociedad Anonima Overview
| Metric | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
| Employees (headcount at 31 Dec) | 4,635 | 4,642 | 4,576 |
Edenor is Argentina's largest electricity distributor by customer count and by energy sold. It holds an exclusive 95-year federal concession, running to 31 August 2087, to distribute and sell power to about 3.4 million customers. Those customers live in the dense, mostly higher-income northern half of the Buenos Aires metropolitan area. The business is a regulated natural monopoly: revenue equals pass-through energy cost plus a regulated distribution margin (VAD) set by ENRE. After years of tariff freezes, cumulative losses and arrears with the wholesale market operator CAMMESA, Edenor's economics were reset by three events: a 319.2% transitional tariff increase in February 2024, the 2025–2030 Five-Year Tariff Review (RQT) approved in April 2025, and the CAMMESA debt regularization of May 2025. Under Chairman and CEO Daniel Marx (since August 2024), management is using the restored cash flow and renewed bond-market access to diversify. Moves so far include critical-minerals stakes held through Edenor Tech and the pending USD 780 M acquisition of YPF's 70% stake in gas distributor Metrogas. Together they would turn Edenor into a multi-utility platform.
What the company does
Edenor's corporate purpose is the distribution and sale of electricity within its concession area under the 1992 Concession Agreement (FY2025 Financial Statements, Note 1).
Exclusivity and obligation to serve. Edenor has the exclusive right to supply all customers in its area who are not authorized to buy directly from the Wholesale Electricity Market (MEM). In return it must meet all demand at regulated quality levels. It must also give MEM agents (large users buying directly) free access to its network for a wheeling ("peaje") fee.
Concession terms. No specific concession fee is payable (Note 2.a). The concession can be extended once for up to 10 years.
Management periods and the Class A shares. The concession term is divided into management periods. At the end of each period, the Class A controlling block (51%) must be put up for public bidding. The incumbent keeps the block if it bids highest or matches the highest bid. In February 2022, ENRE Resolution 65 deemed the first management period to conclude at the end of the term set for the next integral tariff revision (RTI). Per the FY2025 20-F, no such RTI process had been initiated.
Expanded corporate purpose. In April 2024 shareholders broadened the purpose (bylaws last amended 24 July 2024). The company may now:
-
provide telecommunication services;
-
hold interests in electricity generation (renewable or conventional), critical minerals, digitalization and artificial intelligence;
-
sell advisory, O&M, consulting and research services;
-
license specialized know-how.
Business and revenue model
| Revenue component | Nature | Who bears economic risk | Comment (FY2025) |
|---|---|---|---|
| Energy & capacity resold to captive customers (pass-through) | Commodity pass-through at Secretariat of Energy seasonal reference prices (PEST/POTREF) | Largely passed through, but Edenor carries collection risk and losses above the regulatory allowance (about 10%) | Energy purchases ARS 1,737,628 M = 58.1% of revenue |
| Value Added of Distribution (VAD / CPD) | Regulated margin: return on and of the asset base, plus opex | Edenor (regulatory risk) | Distribution margin ARS 1,253,263 M = 41.9% of revenue |
| Wheeling / toll ("peaje") for large users buying in the MEM | Regulated network-access fee | Edenor | Included in revenue; not separately quantified in the sources reviewed |
| Connection, reconnection, surcharges, other services | Regulated / service fees | Edenor | Customer surcharge income ARS 31,730 M (FY2025, other operating income) |
| Non-regulated (Edenor Tech; minerals stakes) | Equity investments | Edenor | Immaterial to revenue in FY2025. The minority stakes appear as financial assets at fair value through profit or loss (non-current FVTPL of ARS 53,686 M, newly recognized in FY2025) |
Mix. The revenue model is effectively 100% regulated service (utility tariff). There is no product, subscription or licensing revenue of any significance.
Tariff mechanics under the 2025–2030 RQT
The review was approved by ENRE Resolution 304/2025 on 29 April 2025 and effective 1 May 2025. Its main elements:
Initial step: a 3% CPD increase, plus a real increase of 0.42% per month from June 2025 through November 2027.
Indexation: monthly CPD adjustment by a formula of 33% CPI and 67% WPI (2Q26 release).
Efficiency: an Efficiency Incentive Factor (the "E Factor").
Investment true-up: an annual adjustment for deviations from the investment plan.
Allowed return: set by ENRE Resolution 237/2025 at 6.50% real after tax, equivalent to 9.99% real pre-tax, on the regulatory asset base.
In 2025 monthly VAD steps ranged from 0.75% to 3.60%. Through June 2026, cumulative VAD rose 20% against 17% CPI. The company reports that its 12M25 tariffs rose 37% against 32% CPI and 41% FX depreciation (2Q26 release).
Value chain position
Edenor sits in the distribution and retail link of Argentina's electricity chain. The chain runs: generation (Central Puerto, Pampa, Enel, AES, YPF Luz, etc.) → wholesale market administered by CAMMESA → high-voltage transmission (Transener, regional transmission companies) → distribution (Edenor, Edesur, provincial distributors) → end users.
Edenor buys almost all its energy from CAMMESA at regulated seasonal prices. Its network takes supply at 500/220/132 kV interfaces and steps down to 33/13.2 kV medium voltage and 380/220 V low voltage.
Customer types and end-markets
| Customer group | Description | Notes |
|---|---|---|
| Residential (T1-R) | Households, including social-tariff and subsidy-registry users | 876,768 social-tariff customers (2Q26). Subsidy scheme changed to a single "Targeted Energy Subsidy" (ReSEF) category under Executive Order 943/2025, effective 16 Jan 2026 |
| Small commercial / general (T1-G) | Shops and small businesses | Collection rate 96.27% across the base (2Q26) |
| Medium commercial / industrial (T2) | Mid-size demand | Demand growth driver in 2Q26 |
| Large users (T3) | Industrial and large commercial | Some buy energy directly in the MEM/MAT and pay wheeling |
| Wheeling system | Large users supplied by third-party generators | Deregulation under Executive Order 450/2025 targets 75% of demand contracted in the term market (MAT) |
| Vulnerable neighborhoods | Informal settlements supplied under framework agreements with the Federal Government and the Province of Buenos Aires | Credits under review; ARS 27 bn recognized in June 2026 for 2024–2025 consumption |
Company description vs. independent characterization
Company's own description. Edenor describes itself as the largest electricity distribution company in Argentina by number of customers and by electricity sold in GWh. It distributes exclusively in the northwest of Greater Buenos Aires and the northern area of the City of Buenos Aires (2Q26 earnings release; FY2025 20-F).
Independent characterization. Edenor is a regulated network utility emerging from a two-decade regulatory and financial distress cycle. The key turning point was the move from discretionary, politically frozen tariffs (2002–2015 and 2019–2023) to a formula-indexed, real-return regime (2024–2030). The equity story is no longer pure tariff recovery. It now has three strands:
-
normalization of regulated returns, with real VAD growth of 0.42% per month through November 2027;
-
resolution of legacy claims (the "Regulatory Asset" claim and CAMMESA arrears);
-
a controlling shareholder–driven diversification strategy (gas distribution, minerals, generation and storage, e-mobility).
This diversification adds execution, leverage and related-party governance risk. Leverage rises structurally: senior notes reached USD 1,415 M pro forma in August 2026, against USD 814 M of borrowings at end-2025.
Strategy
Stated strategic themes (paraphrased from the 2Q26 release, FY2025 20-F and management commentary)
-
Tariff normalization and regulatory normalization. Management describes the first full year under the RQT as completed, with tariffs outpacing inflation. It intends to keep pursuing the "Regulatory Asset" claim for income deficits from the frozen-tariff years.
-
Service quality via investment.
-
SAIDI improved from 13.7 hours (2021) to 5.6 hours (June 2026), −48%.
-
SAIFI improved from 6.0 to 2.7 interruptions per customer, −34%.
-
Both are the best since 2021 and below regulatory requirements.
-
-
Operational efficiency. An OPEX optimization plan launched in 2025, including a Workforce Development and Retirement Plan. Results include materials consumption −39% and ENRE penalties −24% in 1H26, and total opex −8% in 1H26.
-
Loss reduction through technology. AI-driven inspection routing, MIDE metering and regularization of informal connections. LTM losses were 15.8% at June 2026.
-
Financial strategy. A diversified funding base, an active liability-management track record, and extension of maturities to 2033.
-
New businesses (expansion + diversification + value creation). Vertical and horizontal integration into:
-
natural gas distribution and marketing;
-
generation and storage;
-
e-mobility;
-
complementary assets, including the ongoing privatization program. Management cites the positive regulatory environment and technological modernization as enablers.
-
Strategic initiatives announced in the last 24 months
| Date | Initiative | Detail | Status |
|---|---|---|---|
| Jul 2024 | Edenor Tech S.A.U. | New-business subsidiary (AI, digital, generation, minerals) | Operating as a holding vehicle |
| Aug 2024 → 2025 | Leadership pivot | Daniel Marx appointed with a mandate beyond pure distribution | Done |
| 2,025 | OPEX optimization & voluntary retirement program | Cost cuts; headcount 4,642 → 4,576 | Ongoing; −8% opex in 1H26 |
| Jul 2025 | Critical minerals | 40% (11.76% of votes) of Polimetales del Noroeste (copper); 15% of Integra (lithium) | Held at fair value |
| Oct 2025 | Monthly meter reading | ENRE Res. 730/2025 authorizes the switch from bimonthly to monthly reading for T1 | Implementing |
| Sep 2025 | Demand Management Program | Distributors may charge a technical management fee for large-user load-reduction services | Framework in place |
| 2025–2026 | Network expansion program | Moreno substation, Zappalorto, Rodríguez and Paso del Rey works | 2026 schedule |
| Apr–Aug 2026 | Liability management | Class 10 (USD 750 M total), Class 11 (USD 213 M), Class 7 tender, Class 3/5 exchange, Class 9 cancellation | Completed |
| Jul–Aug 2026 | Metrogas acquisition | USD 780 M for 70% of Metrogas + 5% of MetroENERGÍA (with Andina Energies PLC) | Accepted; closing targeted before end-2026 per government sources |
| Mar 2026 (press) | Transener privatization | Press reports list energy groups with mining interests among Transener bidders and mention Edenor's mining moves; Edenor's own bid status unconfirmed | Unconfirmed |
ESG / sustainability commitments
Edenor publishes a sustainability report (GRI-style).
Medium-term targets and guidance
Edenor does not publish formal financial guidance (revenue, EBITDA or EPS targets). The regulatory visibility it does point to is:
-
VAD real growth of 0.42% per month to November 2027 plus monthly CPI/WPI indexation;
-
the allowed real pre-tax return of 9.99%;
Products & Services
Edenor's "products" are regulated services and the infrastructure and digital channels that deliver them. They are catalogued service by service below.
Electricity distribution segment
| Offering | Description & key specifications | Target customer | Launch / latest version | Pricing model |
|---|---|---|---|---|
| Residential supply (Tariff 1-R) | Low-voltage supply. Monthly meter reading approved by ENRE Res. 730/2025, replacing bimonthly reading | Households (about 9 M population served) | Concession since 1992; RQT 2025–2030 schedules; monthly reading approved Oct 2025 | ENRE tariff schedule = seasonal energy price (SE) + VAD (ENRE), monthly indexed |
| Social / subsidized supply | Supply to registered vulnerable users. Since 16 Jan 2026 a single "Targeted Energy Subsidy" category (ReSEF) replaced the three-tier income segmentation | Low-income households (876,768 customers on social tariff, 2Q26) | Executive Order 943/2025; ENRE Res. 22/2026 | Subsidized energy component, financed federally |
| General / small commercial supply (Tariff 1-G) | Low-voltage commercial supply | Shops, small businesses | RQT schedules | Regulated tariff |
| Medium demand supply (Tariff 2) | Supply with contracted capacity | Medium commercial/industrial | RQT schedules | Capacity + energy charges |
| Large demand supply (Tariff 3) | MV/HV supply | Large industrial/commercial | RQT schedules | Capacity + energy charges by voltage level |
| Wheeling ("peaje") | Network access for large users buying directly from generators in the MEM/MAT | MEM large users | Since 1992. Expanding under Executive Order 450/2025 (75% of demand to be contracted in the MAT) | Regulated toll (VAD component only) |
| Technical management fee, Demand Management Program | Distributors may charge a fee for administering voluntary paid load reduction offered by large users (SE Res. 379/2025) | Large users of distributors | Created 25 Sep 2025 | Regulated fee (amount not disclosed) |
| New connections & capacity upgrades | New supplies, power increases, meter installations; 4,863 meters installed in 2Q26, mostly regularizing informal connections | All categories | Ongoing | Regulated connection charges; non-reimbursable customer contributions (ARS 4,428 M recognized as income in FY2025) |
| Energy recovery / market discipline (DIME) | Inspections, fraud detection and normalization of irregular connections using AI-optimized routes; 63,759 T1 inspections in 2Q26 at 46.6% efficacy | Internal / loss reduction | Ongoing; AI analytics introduced 2024–2026 | Recovered energy billed; regulatory loss allowance about 10% |
| Integrated / anti-fraud metering (MIDE meters) | Meter systems used to normalize inactive accounts and informal connections | Vulnerable and high-loss areas | Ongoing | Part of regulated capex |
| Gated-community supply integration | System for integrating country clubs and closed neighborhoods (growing segment in Pilar/Tigre/Escobar corridors) | Developers, residents | In implementation (2Q26) | Regulated |
| Edenor Digital (web + app) | Online bill viewing and payment, balance checks, service requests, alerts | All customers | Launched 2017 | Free channel |
| Contact center (Avaya OneCloud CCaaS) | Cloud contact-center platform for customer service | All customers | Date not disclosed | Internal |
| Energy-efficiency programs ("Cuidamos la Energía") | Awareness and efficiency initiatives | Residential/commercial | — | Non-commercial |
Network asset base (the "platform")
| Asset | Specification | Source / date |
|---|---|---|
| HV transformation substations & interconnections | 85 substations; 20,295 MVA installed | StockAnalysis profile drawn from the 20-F |
| HV network | 1,594 km | Same |
| MV/LV and MV/MV transformers | 19,845 units; 10,137 MVA | Same |
| MV network | 12,732 km | Same |
| LV network | 28,590 km | Same |
| Projects commissioned 2026 | Bancalari substation expanded to 2×80 MVA (132/13.2 kV); third 300 MVA transformer at Zappalorto (220/132 kV) | 2Q26 release |
| Projects scheduled 2026 | New Moreno substation, 132/13.2 kV, 2×80 MVA (Sep 2026); decommissioning of Newbery 27.5 kV substation and interconnection with Colegiales (Aug 2026); new 132 kV busbar at Paso del Rey (Oct 2026); 220 kV busbar expansion at Rodríguez (Dec 2026) | 2Q26 release |
Non-regulated / new business lines
| Offering | Description | Status |
|---|---|---|
| Edenor Tech S.A.U. | Wholly owned vehicle for new businesses (AI, digitalization, generation, critical minerals) | Constituted July 2024 |
| Polimetales del Noroeste S.A. | Copper exploration; about 60,704 ha in the Maricunga belt, west Catamarca, near NGEX's Valle Ancho. Edenor holds 40% of shares and 11.76% of votes | Acquired July 2025; price undisclosed |
| Integra Recursos Naturales Minerales S.A. | Lithium exploration; about 220,000 ha (Antofalla, Cortaderas, Ancasti). Edenor holds 15% | Acquired July 2025; price undisclosed |
| Natural gas distribution (pending) | Metrogas S.A.: CABA and 11 southern/southwestern GBA municipalities, 2.4 M+ customers. MetroENERGÍA S.A.: gas marketing | USD 780 M offer accepted 10 Aug 2026; closing pending |
| Generation & storage; e-mobility | Stated target areas, including links with oil & gas downstream | Strategic intent only (2Q26 release) |
Financial Narrative
Sources. FY2023–FY2025: FY2025 audited consolidated financial statements (constant Dec-2025 ARS). FY2021–FY2022: analyst roll-forward of originally reported constant-currency figures [analyst-derived] (see methodology note). EBITDA is analyst-computed as operating result plus depreciation of PP&E and right-of-use assets. It excludes the one-off "Agreement on the Regularization of Obligations" gains unless labelled.
Income statement
Blank cells = not computed or not available on a comparable basis for FY2021–FY2022. FY2021–FY2022 rows are [analyst-derived]. FY2023–FY2025 EPS figures are as reported.
Margins
Revenue CAGR FY2021–FY2025 (real, constant pesos): about 11.0% p.a. [analyst-derived base]. Nominal growth was far higher. In USD terms at year-end official FX, FY2025 revenue was about USD 2.06 bn (ARS 2,990,891 M / 1,455). At the 2025 average rate of 1,245.42 it was about USD 2.40 bn.
Balance sheet
FY2023 equity (constant Dec-2025) was ARS 1,621,475 M.
CAMMESA payment-plan payables at 31 Dec 2025 (within other payables):
-
Dec-2022 plan: ARS 87,035 M
-
Jul-2023 plan, converted to pesos: ARS 120,041 M
-
May-2025 plan: ARS 180,777 M
1H2026 update (constant Jun-2026 ARS M; 2Q26 release):
Management reports financial debt of about USD 1,159 M and net debt of about USD 303 M at 30 Jun 2026.
Cash flow
1H2026: OCF ARS 156,960 M (1H25: 144,131 M); investing −212,174 M; financing +349,776 M; capex accrued ARS 162,904 M (constant Jun-2026).
Ratios (analyst-computed from the figures above)
The cash conversion cycle is not meaningful for a distributor: inventory is maintenance material (ARS 233,305 M at FY2025), not goods for resale.
Commentary on trends, inflections and drivers
FY2021–FY2023: the trough. Under the 2019–2023 tariff freeze, the distribution margin collapsed in real terms. Gross margin fell to roughly 4% in FY2022–FY2023, and the operating result was deeply negative (−ARS 343 bn in FY2023 in today's money). Edenor financed the gap by not paying CAMMESA in full. That created large trade payables and penalty interest: financial costs were ARS 915 bn in FY2023, most of it accrued interest on CAMMESA arrears. Reported FY2023 net income of ARS 252 bn is an accounting artefact of two items: the ARS 566 bn gain on the July 2023 CAMMESA plan, and an ARS 1.30 tn monetary gain (RECPAM) from carrying large peso liabilities through 211% inflation.
FY2024: the inflection. The February 2024 transitional increase of 319.2%, followed by monthly adjustments averaging about 3%, lifted the distribution margin 66% in real terms. Gross profit rose to ARS 519 bn and the operating result turned positive (ARS 55 bn). Net income (ARS 358 bn) still relied on RECPAM (ARS 803 bn) and a tax credit (ARS 104 bn).
FY2025: earnings quality improves.
-
Distribution margin grew 8.7% in real terms. Transmission and distribution expenses fell 9.7% and selling expenses fell 6.9%; administrative expenses rose 31%.
-
Operating result rose to ARS 143 bn.
-
The ARS 218 bn May-2025 CAMMESA agreement gain helped, but RECPAM fell to ARS 307 bn as inflation decelerated to 31.5%. Net income therefore declined to ARS 239 bn.
-
EBITDA excluding agreements was about ARS 354 bn (11.8% margin), roughly USD 243 M at year-end FX.
Cash and leverage. Free cash flow was negative in every year shown, because capex has run at 12–18% of revenue and 1.7–2.2× depreciation to repair service quality. FY2025 OCF fell versus FY2024 because the company paid down CAMMESA trade payables (−ARS 551 bn working-capital outflow). Gross borrowings nearly doubled in real terms in FY2025 (ARS 1.18 tn, about USD 814 M). Peso devaluation sensitivity is material: the company discloses a net FX liability of ARS 284,590 M, so a 10% devaluation would reduce profit by about ARS 28.5 bn (FY2025 FS, financial risk note).
1H2026. Underlying improvement continued:
-
Revenue +5% real; distribution margin +7%; gross profit +28.5%.
-
Opex −8% (cost plan and voluntary retirement program).
-
Operating result ARS 190.7 bn vs 45.6 bn.
-
EBITDA ARS 313.7 bn, +94% YoY excluding the 2Q25 ARS 224.7 bn CAMMESA gain.
-
Net income ARS 157.1 bn (vs 175.0 bn), lower only because of that one-off.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Segment Overview
| Segment | Contents | Products/services |
|---|---|---|
Electricity distribution (only reportable segment) | Concession network: HV/MV/LV lines, substations, meters; commercial operations | Regulated supply to residential, commercial, industrial and government customers; wheeling for MEM large users; connections and related services |
Non-segment holdings (immaterial) | Edenor Tech S.A.U.; interests in joint ventures (ARS 202 M); FVTPL equity stakes in Polimetales del Noroeste and Integra Recursos Naturales Minerales | Investment vehicles; no material revenue |
Revenue by Segment and Segment Margins & Growth (%)
| Metric | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Segment revenue (ARS Mn constant Dec-2025) | 2,008,401 | 2,687,708 | 2,990,891 |
Energy purchases (ARS Mn constant Dec-2025) | 1,314,715 | 1,534,378 | 1,737,628 |
Distribution margin (ARS Mn constant Dec-2025) | 693,686 | 1,153,330 | 1,253,263 |
Transmission and distribution expenses (ARS Mn constant Dec-2025) | 614,262 | 634,244 | 572,685 |
Gross profit (ARS Mn constant Dec-2025) | 79,424 | 519,086 | 680,578 |
Operating result (ARS Mn constant Dec-2025) | -343,145 | 55,346 | 143,139 |
Pre-tax income (ARS Mn constant Dec-2025) | 521,881 | 254,257 | 291,332 |
Distribution margin as % of revenue | 34.5 | 42.9 | 41.9 |
Operating margin % | -17.1 | 2.1 | 4.8 |
Revenue YoY growth % (real) | 9.4 | 33.8 | 11.3 |
Contribution to total revenue % | 100 | 100 | 100 |
Components
| Component (% of revenue) | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Energy purchases pass-through share % | 65.5 | 57.1 | 58.1 |
Distribution margin share % | 34.5 | 42.9 | 41.9 |
Income Statement and Per-Share Data
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Revenue (ARS Bn constant Dec-2025) | 1,971.9 | 1,835.9 | 2,008.4 | 2,687.7 | 2,990.9 |
Gross profit (ARS Bn constant Dec-2025) | 253.5 | 68.6 | 79.4 | 519.1 | 680.6 |
Operating result (ARS Bn constant Dec-2025) | -94.7 | -299.9 | -343.1 | 55.3 | 143.1 |
EBITDA excl. CAMMESA agreements (ARS Bn constant Dec-2025) | — | — | -98.0 | 272.6 | 353.9 |
CAMMESA regularization gain (ARS Bn constant Dec-2025) | 0 | 0 | 566.4 | 0 | 218.1 |
Net financial costs (ARS Bn constant Dec-2025) | — | — | -1,003.6 | -604.1 | -377.2 |
Monetary gain RECPAM (ARS Bn constant Dec-2025) | — | — | 1,302.2 | 803.0 | 307.3 |
Pre-tax income (ARS Bn constant Dec-2025) | -99.2 | -23.5 | 521.9 | 254.3 | 291.3 |
Income tax (ARS Bn constant Dec-2025) | — | — | -270.1 | 103.7 | -52.1 |
Net income (ARS Bn constant Dec-2025) | -370.8 | -155.8 | 251.8 | 358.0 | 239.2 |
EPS basic = diluted (ARS per share constant Dec-2025) | -423.6 | -178.0 | 287.73 | 409.12 | 273.41 |
EPS per ADS (ARS constant Dec-2025) | -8,472 | -3,560 | 5,755 | 8,182 | 5,468 |
Dividends per share (ARS) | 0 | 0 | 0 | 0 | 0 |
Margin Analysis (%)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Gross margin % | 12.9 | 3.7 | 4.0 | 19.3 | 22.8 |
Operating margin % | -4.8 | -16.3 | -17.1 | 2.1 | 4.8 |
EBITDA margin excl. agreements % | — | — | -4.9 | 10.1 | 11.8 |
Net margin % | -18.8 | -8.5 | 12.5 | 13.3 | 8.0 |
Business Lines
| Line (ARS Mn constant Dec-2025) | FY2024 | FY2025 |
|---|---|---|
Transmission & distribution expenses | 634,244 | 572,685 |
Selling expenses | 267,951 | 249,422 |
Administrative expenses | 227,210 | 298,466 |
Other operating income | 77,810 | 65,620 |
Other operating expense | 46,372 | 55,214 |
Depreciation of PP&E | 203,322 | 203,273 |
Depreciation of right-of-use assets | 13,971 | 7,449 |
Allowance for impairment of receivables | 12,462 | 23,196 |
Provision for contingencies | 31,230 | 26,708 |
Balance Sheet
| Metric (ARS Mn constant Dec-2025) | FY2024 | FY2025 |
|---|---|---|
Total assets | 5,235,080 | 5,759,383 |
Property plant and equipment | 3,949,901 | 4,133,929 |
Cash and cash equivalents | 31,465 | 207,180 |
Current financial assets at FVTPL | 477,984 | 565,669 |
Financial assets at amortized cost | 13,417 | 23,530 |
Short-term borrowings | 148,033 | 479,740 |
Long-term borrowings | 466,925 | 704,553 |
Total borrowings | 614,958 | 1,184,293 |
Net debt (borrowings less cash and current financial assets) | 92,092 | 387,914 |
Total equity | 1,982,526 | 2,222,906 |
Goodwill and intangibles | 0 | 0 |
Current assets | 1,271,109 | 1,560,430 |
Current liabilities | 1,433,592 | 1,457,872 |
Working capital | -162,483 | 102,558 |
Trade payables current (mainly CAMMESA) | 998,153 | 527,048 |
Other payables (current + non-current, incl. CAMMESA plans) | 395,062 | 464,403 |
Deferred tax liability | 904,778 | 840,587 |
Financial Analysis
| Item | 31 Dec 2025 (restated) | 30 Jun 2026 |
|---|---|---|
Total assets | 6,729,603 | 7,081,961 |
Cash | 242,081 | 548,118 |
Current FVTPL assets | 660,961 | 667,695 |
Borrowings: non-current / current | 823,241 / 560,556 | 1,337,778 / 360,425 |
Total equity | 2,597,380 | 2,754,512 |
Cash Flow
| Metric (ARS Mn constant Dec-2025) | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Operating cash flow | 204,744 | 323,500 | 192,036 |
Capex (payments for PP&E) | 343,129 | 473,527 | 368,467 |
Free cash flow (OCF less capex) | -138,385 | -150,027 | -176,431 |
Investing cash flow | -226,483 | -746,204 | -461,549 |
Proceeds from borrowings | 49,914 | 459,516 | 694,344 |
Repayment of borrowings | 2,956 | 29,551 | 136,655 |
Interest paid on borrowings | 5,320 | 40,389 | 92,092 |
Financing cash flow | 21,020 | 348,837 | 435,079 |
Dividends paid | 0 | 0 | 0 |
Share buybacks | 0 | 0 | 0 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2024 | FY2025 |
|---|---|---|
ROE % (net income / average equity) | 19.9 | 11.4 |
ROA % (net income / average assets) | — | 4.4 |
ROIC % (operating result × (1−35%) / (equity + net debt)) | 1.7 | 3.6 |
Current ratio (x) | 0.89 | 1.07 |
Debt / equity (x) | 0.31 | 0.53 |
Net debt / EBITDA excl. agreements (x) | 0.34 | 1.10 |
EBITDA / financial costs (x) | 0.61 | 1.13 |
Asset turnover (x, revenue / average assets) | — | 0.54 |
Days sales outstanding (trade receivables / revenue × 365) | 69 | 61 |
Days payables outstanding (trade payables / energy purchases × 365) | 237 | 111 |
Revenue by Region and Region Margins & Growth (%)
| Region | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Argentina revenue (ARS Mn constant Dec-2025) | 2,008,401 | 2,687,708 | 2,990,891 |
Rest of world revenue (ARS Mn constant Dec-2025) | 0 | 0 | 0 |
Argentina revenue YoY growth % (real) | 9.4 | 33.8 | 11.3 |
Operating Metrics (GWh)
| Metric | FY2024 | FY2025 |
|---|---|---|
Edenor electricity demand (GWh) | 27,700 | 27,256 |
Energy losses (GWh) | 4,100 | 4,305 |
Share Price History
| Date | Price | Venue |
|---|---|---|
28 Jan 2026 | USD 31.55 (intraday high USD 33.17) | NYSE ADR |
30 Jan 2026 | USD 30.64 / ARS 2,352 | NYSE / BYMA |
27 Feb 2026 | USD 25.69 / ARS 1,840 | NYSE / BYMA |
31 Mar 2026 | ARS 2,210 | BYMA |
5 Jun 2026 | USD 25.76 | NYSE |
7 Aug 2026 | USD 24.3 / ARS 1,923 | NYSE / BYMA (2Q26 release) |
21 Sep 2026 | ARS 1,884 | BYMA |
30 Sep 2026 | USD 20.87 | NYSE |
52-week range (to 30 Sep 2026) | USD 14.38 – 36.70 | Investing.com via AD HOC NEWS |
Valuation Snapshot
| Multiple | Value | Basis |
|---|---|---|
P/E (FY2025) | about 5.6x | Net income ARS 239,236 M / 1,455 = USD 164 M |
P/E (TTM, StockAnalysis, June 2026) | 5.36x | Third-party |
EV/EBITDA (FY2025) | about 5.0x | EV about USD 1.22 bn (market cap + June-2026 net debt USD 303 M); EBITDA ex-one-offs USD 243 M |
EV/Sales (FY2025) | about 0.59x | Revenue USD 2.06 bn at year-end FX |
P/B | about 0.60x | Equity ARS 2,222,906 M / 1,455 = USD 1.53 bn. About 0.61x on ARS terms at August 2026 (market cap ARS 1,684 bn vs June-2026 equity ARS 2,755 bn) |
Source Details
| Source | Rating | Price target |
|---|---|---|
StockAnalysis (June 2026) | Buy | USD 38.50 |
INDmoney (July 2026) | — | USD 37 |
Simply Wall St | Coverage by 7 analysts | — |
Capital Markets
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Dividends per share (ARS) | 0 | 0 | 0 | 0 | 0 |
Dividends paid (ARS Mn constant Dec-2025) | 0 | 0 | 0 | 0 | 0 |
Share Count (millions)
| Metric | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Treasury shares held (millions) | 30.8 | 30.8 | 30.8 |
Share repurchases in year (ARS Mn) | 0 | 0 | 0 |
Credit Ratings
| Agency | Scale | Rating | Outlook / date |
|---|---|---|---|
S&P Global Ratings | Global (Class 10 notes) | B- | — |
S&P Global Ratings | National | raAA- (from raA+) | Stable (from Positive), 2026 |
Moody's | Global (Class 10 notes) | B3 | — |
Moody's | National | AA-.ar (from A.ar) | Upgraded 7 Aug 2026 |
FIX SCR (Fitch affiliate) | National long-term | AA-(arg) (from A+) | Positive, 7 Aug 2026 |
FIX SCR | National short-term | A1+(arg) | — |
Fitch (Class 11, at issue) | National | A+(arg) | July 2026 |
Capital Instruments
| Instrument | Amount (USD Mn) | Currency / law | Coupon | Maturity |
|---|---|---|---|---|
Class 3 | 82 | USD / Argentine | 9.75% | Nov 2026 |
Class 5 | 70 | USD / Argentine | 9.50% | Aug 2028 |
Class 7 | 300 | USD / NY | 9.75% | Amortizing Oct 2028, Oct 2029, Oct 2030 |
Class 11 | 213 | USD / Argentine | 7.50% | Jul 2029 |
Class 10 (Series I + II + reopening) | 750 | USD / NY | 9.50% | Amortizing Apr 2031, Apr 2032, Apr 2033 |
Total senior notes | 1415 | — | — | — |
Capital Markets Data
| Maturity year | 2026 | 2028 | 2029 | 2030 | 2031 | 2032 | 2033 |
|---|---|---|---|---|---|---|---|
Senior notes maturing (USD Mn, pro forma Aug 2026) | 82 | 170 | 313 | 100 | 250 | 250 | 250 |
Capital Markets (2)
| Metric | 1Q26 | 2Q26 |
|---|---|---|
Revenue (ARS Bn, constant currency of each release) | 846.7 | 918.5 |
EBITDA (ARS Bn) | 190.6 | 110.3 |
Capex (ARS Bn) | 60.7 | 92.1 |
LTM energy losses % | 15.32 | 15.8 |
Financial debt (USD Mn) | 832 | 1,159 |
Net debt (USD Mn) | 461 | 303 |
Analyst Conclusions
Management guidance and consensus
Formal guidance: none issued.
Regulatory visibility: monthly indexed VAD with 0.42% per month real uplift through November 2027 and a 9.99% real pre-tax allowed return.
Operational priorities: commission Moreno, Zappalorto, Paso del Rey and Rodríguez works in 2H26.
Pending items: close Metrogas before end-2026, per government sources; advance the Regulatory Asset claim.
- Published price targets of USD 37–38.50 imply meaningful upside versus USD 20.87, but predate the August–September 2026 sell-off.
Bull case
-
Compounding real tariff growth with operating leverage. 1H26 EBITDA rose 94% excluding one-offs while opex fell 8%. Continued VAD-above-CPI adjustments (20% vs 17% in 1H26) could lift the EBITDA margin well above FY2025's 11.8%.
-
Metrogas as a value-accretive second utility at a cyclical entry point. The 20-year licence extension to 2047 removes the main uncertainty. Bidder competition (Central Puerto, MSU, Pierri, Litoral Gas) suggests the price was market-tested, and shared AMBA operations offer synergies.
-
Re-rating from distressed to normalized utility. At about 5x EV/EBITDA and about 0.6x book, with national ratings upgraded to AA- and USD funding to 2033, any Regulatory Asset recognition or a first dividend (now legally permissible) could narrow the discount.
Bear case
-
Regulatory and political reversal risk. Edenor's history shows multi-year freezes. The emergency framework and ENRE-to-ENRGE transition, plus the 2027 national election cycle, could slow indexation precisely as subsidy removal raises bills.
-
Leverage and FX mismatch. Senior notes of USD 1.415 bn against peso revenues. Pro forma net debt of about USD 1.1 bn after Metrogas against FY2025 EBITDA of about USD 243 M implies roughly 4.5x before Metrogas EBITDA, while free cash flow has been negative for three straight years.
-
Earnings quality and governance. Headline profits have depended on RECPAM and one-off CAMMESA gains. Losses remain about 16%. Capital is being redeployed into minerals stakes and a large acquisition chosen by a controlling group, under a combined Chair/CEO with limited minority protections.
Key catalysts and monitorables (next 12 months)
| Catalyst | Timing | What to watch |
|---|---|---|
| Metrogas shareholders' ratification of licence extension | 29 Oct 2026 | Approval; subsequent Executive decree |
| ENRGE approval and Metrogas closing | By end-2026 (target) | Final price adjustments, financing mix, consolidation effects |
| 3Q26 results | 9 Nov 2026 | VAD vs CPI, losses, opex trajectory, net debt post-Class 10 reopening |
| Class 3 notes maturity (USD 82 M) | Nov 2026 | Repayment from cash |
| Regulatory Asset bill in Congress | 2026–2027 | Size and form of recognition (cash, tariff, offset vs CAMMESA) |
| Summer 2026–27 peak demand | Dec 2026 – Mar 2027 | SAIDI/SAIFI, penalties under Res. 808/2025 |
| FY2026 results and AGM | Mar–Apr 2027 | Any first dividend proposal |
| Seasonal price resets and subsidy scheme | Monthly | Demand and collection elasticity under ReSEF |
Analyst verdict
Edenor in late 2026 is a fundamentally different company from the one that reported operating losses of more than ARS 340 bn (in today's money) as recently as FY2023. Three structural repairs have been made:
-
an inflation-indexed, real-return tariff framework through 2030;
-
a negotiated cleanup of CAMMESA arrears;
-
re-access to international debt markets on seven-year terms.
Operationally the evidence is improving. Distribution margin, gross profit and EBITDA have risen in real terms. Opex is falling, and reliability metrics are the best in at least five years.
Yet the equity is not a simple "normalized utility" story. Reported earnings remain heavily shaped by IAS 29 monetary gains and one-off settlements. Free cash flow is negative under a capex program the concession effectively requires. Losses near 16% are a permanent drag that tariff indexation does not cure. Most importantly, management and the controlling shareholders are choosing to recycle the regulatory windfall into diversification rather than deleveraging or distributions. That choice was crystallized by the USD 780 M Metrogas purchase, funded with 9.5% dollar debt.
Metrogas may prove strategically sound: two large regulated AMBA franchises with long licences under a unified regulator. But it doubles Edenor's exposure to the same political variable, tariff policy in Buenos Aires. It also lifts leverage to levels that leave little margin for another freeze or devaluation.
At about 5x EV/EBITDA and about 0.6x book, the market is pricing substantial regulatory and governance risk, and arguably more than the current framework justifies. Our assessment is constructive but conditional. The risk/reward favors holders who believe in the durability of Argentina's 2024–2026 regulatory reforms through the 2027 electoral cycle. Key confirmations would be:
-
clean Metrogas integration with disclosed synergies;
-
sustained VAD-above-CPI delivery;
-
a first tangible step on the Regulatory Asset claim or shareholder distributions.
Absent these, the discount to book is likely to persist.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Title | Tenure / since | Prior roles & education | Age |
|---|---|---|---|---|
Daniel Marx | Chairman of the Board, Executive Committee member and CEO | Appointed 6 Aug 2024; effective 31 Aug 2024 | Former Argentine Secretary of Finance and debt negotiator (including the "megacanje"); led the financial restructuring of Árbol Solo/Inversiones Unidas; earlier at Banco Tornquist; board roles at Banorte (Mexico) and Interbank (Peru) | About 62 (Simply Wall St listed 61 in 2025) |
Germán Ranftl | Chief Financial Officer (Finance & Control Director) | Executive committee since 1 Jul 2021; CFO since Apr 2022 | Public accountant (UBA), MBA (UCEMA). 11 years in banking (8 as VP Corporate Finance & IB); CFO of Supercanal (from 1998); VP at Integra Investment; CFO of Edemsa | — |
Pablo Pérez | Operations & Client Services Director | Since 1 Oct 2021 | Engineer (UTN), MBA (Universidad del Salvador). Operations manager, Pilar area (2006); distribution manager from Aug 2010 | — |
Miguel Farrel | Technical Director | — | — | — |
María José Van Morlegan | Legal & Regulatory Affairs Director | Since 1 Jul 2021 | Lawyer, MBA (IAE); 25+ years' experience with Latin America responsibilities | — |
Fabiana Colombo | Procurement, Logistics & Supply Director | Since 1 Jul 2021 | Former CFO of Grupo América | — |
Diego Poggetti | Technology / digital executive; director and financial officer of Edenor Tech S.A.U. (per FY2025 20-F excerpt) | — | Information Systems Engineer (UTN Buenos Aires). Former CIO and CDO of Grupo América | — |
Lucila Ramallo | Deputy Investor Relations Manager | Listed on 2Q26 release | — | — |
“—” = not publicly disclosed.
Board & Management Changes
| Date | Change | Context |
|---|---|---|
1 Jul 2021 | Ranftl, Van Morlegan and Colombo join the executive committee | Post-acquisition management reset by the new controller (Colombo and Poggetti came from Grupo América) |
1 Oct 2021 | Pablo Pérez becomes Operations & Client Services Director | Internal promotion |
Apr 2022 | Ranftl named CFO | Finance leadership |
6 Aug 2024 | Neil Bleasdale resigns as Chair and CEO (personal reasons); remains a director. Daniel Marx appointed | Pivot toward capital-markets and diversification strategy |
Major Shareholders
| Holder | Class | Stake % of capital | Source / note |
|---|---|---|---|
Empresa de Energía del Cono Sur S.A. (EDELCOS), controlled by Vila, Manzano and Filiberti | A | 51.00 | FY2025 FS. The shares are pledged to the Federal Government for the life of the concession |
ANSES – Fondo de Garantía de Sustentabilidad (Argentine state pension fund) | B | about 26.8 | Company IR shareholder structure as cited by Wikipedia; verify against the 20-F Item 7 |
Treasury shares | B | 3.39 | 30,772,779 shares (FY2025 FS) |
Employee Stock Ownership Program | C | 0.18 | 1,596,659 shares |
Public float (BYMA + NYSE ADS) | B | about 18.6 | Residual |
Competitive Landscape
Key Competitors
| Company | Segment / role | Relationship to Edenor | Scale indicators |
|---|---|---|---|
Edesur (Enel Group, Argentina) | Federal-jurisdiction distributor, southern AMBA | Closest regulatory twin (same ENRE/ENRGE regime) | — |
Edelap | Distributor, La Plata | Ex-SEGBA sibling (provincial jurisdiction) | — |
EDEN / EDEA / EDES (Province of Buenos Aires distributors) | Provincial distributors | Benchmark | — |
EPEC (Córdoba) | Provincial state distributor | Benchmark | — |
EPE (Santa Fe) | Provincial state distributor | Benchmark | — |
Edemsa (Mendoza), Edet (Tucumán), EDESA (Salta) | Private provincial distributors | Benchmark | — |
Pampa Energía (NYSE: PAM) | Integrated generation, transmission (Transener stake), oil & gas | Former controller; capital-markets peer | — |
Central Puerto (NYSE: CEPU) | Generation; mining interests | Competing bidder for Metrogas; capital peer | — |
MSU Energy | Generation | Competing bidder for Metrogas | — |
Grupo Pierri; Litoral Gas | Gas / energy | Competing bidders for Metrogas | — |
Transener (BYMA: TRAN) | HV transmission | Upstream supplier; privatization target | — |
Metrogas (BYMA: METR), Naturgy BAN, Camuzzi | Gas distributors | Future peers or competitors if Edenor enters gas | Metrogas: 2.4 M+ customers |
Competitor Detail
| Metric | Edenor (FY2025) |
|---|---|
Revenue | ARS 2,990,891 M (about USD 2.06 bn at year-end FX) |
Real revenue growth | +11.3% |
EBITDA margin (excl. one-offs) | 11.8% |
Net margin | 8.0% |
Customers | 3.41 M (2Q26) |
Recent Developments
--