Enel Generacion Costanera S.A.

Company Profile Analysis

Ticker: CECO2.BA

ESOMAR 23 Corporate BadgeISO Certifications Badge
Enel Generacion Costanera S.A. - Company showcase

Year Founded & Workforce

1992

244 Employees

Enel Generacion Costanera S.A. logo

Enel Generacion Costanera S.A. Employee Contacts

We don't hold contact details for this company yet — you can request them.

Request Employee Contacts

Enel Generacion Costanera S.A. Overview

Central Costanera S.A. owns and operates one of the largest thermal power stations in Argentina: a 1,789 MW gas- and liquid-capable complex on the Buenos Aires waterfront. It is electrically embedded in the Greater Buenos Aires (AMBA) load centre and in the Edesur distribution area. The company was privatized in 1992 and run by Endesa and then Enel for three decades. In February 2023 it was sold to Central Puerto for USD 48M for 75.68%, an implied equity value of roughly USD 63M for 100%. It is a single-segment, single-site merchant generator. Until late 2025 essentially all its revenue came from regulated spot remuneration paid by CAMMESA. Its investment case now rests on four things: Argentina's 2024–2026 market normalization (Resolution SE 400/25 and the return of bilateral MAT contracts), the reliability premium its AMBA location earns (Resolution 294/2024), a 55 MW/275 MWh battery project due online in Q4-2026, and synergies with Central Puerto's adjacent Puerto Nuevo complex. Its weaknesses are an aging steam fleet, concentrated combined-cycle maintenance risk, and a residual USD-denominated vendor loan from Mitsubishi.


Company's own description (FY2024 audited financial statements, Note 1, paraphrased). Costanera's corporate purpose is the generation and wholesale commercialization of electric power. To that end it operates four conventional steam-turbine units with 661 MW of installed capacity and two combined cycles: one supplied by Mitsubishi with 851 MW, and the other made up of a Siemens gas turbine and a BTH steam turbine with 277 MW. For management purposes the company is organised as a single business unit, so it has no separate operating segments under IFRS 8. Its articles also allow transmission, distribution and trading of power, and the provision of engineering, consultancy and plant-management services. No such activity is reported as material.

Revenue model. Revenue is almost entirely the sale of electricity and capacity into Argentina's Wholesale Electricity Market (MEM).

FY2024: 100% of revenue (ARS 110,414M) was "venta mercado spot." The FS state that under the regulation then in force the company did not operate in the term market. Revenue is recognised over time, based on (i) the effective capacity made available and (ii) energy dispatched.

Billing and collection: CAMMESA bills monthly and usually pays within 90 days, so no significant financing component is recognised (FY2024 FS, Note 2.4.4).

Product vs. service mix: In effect this is a regulated capacity-plus-energy "service" model. There is no subscription or licensing revenue. Fuel was supplied by CAMMESA, so fuel cost did not pass through revenue. In FY2024, combustible consumption in cost of sales was zero.

Remuneration mechanics (evolution).

  1. Base "Energía Base" spot remuneration (Res. SE 95/13 and successors: 826/22, 750/23, 869/23, 9/24, 99/24, 193/24, 233/24, 285/24, SCEyM 20/24, 387/24, 603/24). Peso-denominated capacity and energy prices, updated by administrative resolution. In 2024 alone the increments were +74% (Feb), +25% (Jun), +3% (Aug), +5% (Sep), +2.7% (Oct), +6% (Nov), +5% (Dec) and +4% (Jan-2025). (FY2024 press release)

  2. Res. SE 59/2023 "Acuerdo de Disponibilidad de Potencia y Mejora de Eficiencia" for combined cycles. Partly USD-linked prices in exchange for at least 85% average monthly availability.

    • Mitsubishi CC: accepted by CAMMESA 25-Apr-2023, effective from March 2023 transactions.

    • Siemens CC: accepted 28-Jul-2023, conditional on conversion to gas-only operation and down-rating of installed capacity; effective from October 2023 after corrective maintenance. (FY2023 press release)

  3. Res. SE 294/2024 contingency plan (published 1-Oct-2024). Additional USD-denominated remuneration for thermal units at critical nodes during critical hours: USD 2,000/MW-month for availability, scaled by a node criticality factor of 0.75–1.25. Costanera's steam units were eligible; adhesion was pending at March 2025. Central Puerto's FY2025 release states the GT/ST units of Central Puerto and Central Costanera that adhered continue to earn an incremental USD 2,500/MW, in force until March 2027.

  4. Res. SE 381/25 and Res. SE 400/25 (MEM reform). From 1 November 2025, uncontracted thermal units moved to a framework with a marginal-price spot energy component and a term market (MAT) in which capacity and energy can be contracted with large users and distributors. It also includes a USD 1,000/MW-month reliability reserve component for legacy spot thermal assets. (CEPU 4Q25 release)

  5. Contracting (2026). CEPU reports higher MAT contracted energy and capacity sales from the Central Puerto, Central Costanera, Piedra del Águila and Luján de Cuyo assets in 2Q26. Costanera therefore moved from 100% spot toward a partially contracted revenue base. (CEPU 2Q26 release)

Value chain position. Costanera sits in the upstream generation segment. It is fuelled principally by natural gas: allocated by CAMMESA under the "Gas Acuerdo" programme and, since 2026, increasingly self-procured at group level. Liquid fuels serve as back-up on dual-fuel steam units; the Siemens CC is gas-only since 2023. Output flows to the high-voltage grid at a critical AMBA node. Downstream customers are CAMMESA (spot) and, since Nov-2025, MAT counterparties.

Customer types and end-markets. In FY2024 the single counterparty was CAMMESA, the market administrator acting on behalf of distributors and large users. CAMMESA trade receivables were ARS 23,559M of ARS 29,122M current receivables at 31-Dec-2024 (FY2024 FS, Note 12.1). The end-market is Argentine electricity demand, with a strong AMBA weighting. The national system set a record 30,257 MW peak on 10-Feb-2025 (CEPU 4Q25 release).

Independent characterization. Costanera is a peaking-and-mid-merit reliability asset in a constrained metropolitan node more than a baseload generator.

Utilisation: 2025 output of 3,947 GWh on 1,789 MW implies a fleet capacity factor of only about 25%. The Mitsubishi CC carries most of the energy; the steam units earn mainly for availability.

Economics: Value is driven by regulation (capacity prices, reliability adders) rather than commodity spreads. Absent a step change in contracting, its earnings power is a function of Argentine energy policy and plant availability.

Ownership logic: Under Central Puerto it is run as a satellite of the adjacent Puerto Nuevo complex. Value comes from shared operations, fuel management and SACME coordination, plus optionality on the site (grid connection, land, cooling water) for new capacity such as batteries.

Strategy

Stated strategic themes. The company's 2024–2025 disclosures and Central Puerto's statements on the acquisition rationale cluster into five themes:

  1. Operational synergies and integrated management. At acquisition, CEPU cited its staff's know-how in steam and combined-cycle plants, unified administration of facilities and resources, centralised fuel management, and integrated coordination with the regional operator SACME as sources of value beyond the purchase price (CEPU 6-K, Feb-2023).

  2. Availability and reliability first. Maintenance programmes on both CCs (2023, 2025), adhesion to availability-linked regimes (Res. 59/23; Res. 294/24), and the Mitsubishi CC life extension to 2043 (FY2024 FS) show a strategy of monetising reliability at a critical AMBA node.

  3. Portfolio rationalisation. Retirement of the two least economic steam units (TV04/TV06; 470 MW), with parts of their facilities to be reused for new projects (Res. SE 57/2024).

  4. Re-use of the site for new capacity.

    • Thermal: the TerConf bid of 515 MW was awarded, then annulled.

    • Storage: the AlmaGBA award of 55 MW/275 MWh is now under construction.

  5. Commercial transition to contracts. Under Res. 400/25 the group is moving Costanera's output from regulated spot toward USD-denominated MAT contracts.

Initiatives in the last 24 months (Oct-2024 to Oct-2026).

Medium-term targets and guidance. Central Costanera issues no standalone financial guidance. Group-level guidance relevant to Costanera:

  • The two AlmaGBA BESS projects (Nuevo Puerto 150 MW plus Costanera 55 MW) are expected to contribute USD 25–27M of combined adjusted EBITDA in 2027 (CEPU 2Q26 call, via MarketBeat).

  • Combined BESS capex is about USD 130M for both projects (press reports of the CEPU plan), with 81% executed (USD 106M) by Aug-2026 (CEPU 2Q26).

  • CEPU projected USD-denominated energy revenue growth above 60% for 2026 (iProfesional, Jan-2026).

Products & Services

Central Costanera sells a narrow set of "products" defined by Argentine market rules rather than by brand. Each is catalogued below.

Discontinued or cancelled offerings.

Product Portfolio

#OfferingDescriptionKey specificationsCustomerLaunch / latest versionPricing model (as disclosed)
1

Spot energy — Mitsubishi CC

Energy dispatched by CAMMESA from the 851 MW combined cycle

Most efficient unit; useful life extended to Feb-2043; major maintenance 2021 and 2Q/4Q-2025

CAMMESA (spot)

Late 1990s COD; upgraded 2025

Res. 400/25 marginal-price formula (CVP + RMA, about USD 7/MWh net of fuel in 4Q25 per CEPU)

2

Capacity availability — Mitsubishi CC

Payment for declared available MW

≥85% availability commitment under Res. 59/23 (to Oct-2025)

CAMMESA

Res. 59/23 adhesion effective Mar-2023

Partly USD-denominated under Res. 59/23; Res. 400/25 capacity payment plus USD 1,000/MW-month reliability reserve from Nov-2025

3

Spot energy and capacity — Buenos Aires CC

Energy and capacity from the 277 MW Siemens/BTH CC

Gas-only since 2023; net operable 270 MW; impaired ARS 5,152M in FY2024

CAMMESA (spot)

Res. 59/23 effective Oct-2023

As above

4

Steam-unit availability (TV01/02/03/07)

Capacity and energy from 661 MW legacy steam units, mainly for critical-hour reliability

Dual-fuel capability; avg ST/GT availability in group 58% (FY2025)

CAMMESA

Res. 294/2024 adhesion (date not disclosed; confirmed by FY2025)

Res. 294/24 incremental USD 2,500/MW (to Mar-2027) plus Res. 400/25 spot

5

MAT (term market) contracted capacity and energy

Bilateral sales of capacity (MAT-P) and energy (MAT-E) to large users and distributors under Res. 400/25

Volumes for Costanera alone not disclosed

Industrial large users (GUMA/GUME), distributors

From Nov-2025; expanded 1H-2026

Bilateral, USD-denominated (CEPU: 100% of group energy sales USD-denominated in 2Q26)

6

Battery storage capacity (AlmaGBA)

55 MW / 275 MWh BESS on the Costanera site in the Edesur network

5-hour duration; 54% complete Aug-2026; COD targeted Q4-2026

Distributor (Edesur area) with CAMMESA guarantee

Award Aug–Sep-2025

Fixed USD/MW-month capacity price. Reported as USD 10,161 or USD 11,147 per MW-month: sources conflict on which bid was Costanera's

7

Engineering, consultancy, O&M services

Permitted under corporate purpose

No disclosed third-party revenue

———
8

Fuel-cost pass-through (self-procured fuel)

When the generator procures fuel, CVP fuel cost is recognised in revenue

Group-level 2Q26: USD 176.4M self-procured fuel CVP. Costanera share not disclosed

CAMMESA

2,026

Cost reimbursement via CVP

“—” = not publicly disclosed.

OfferingStatusDetailSource

TerConf new thermal capacity (202 MW + 313 MW)

Cancelled

Awarded 24-Nov-2023; annulled by Res. SE 151/2024 on 10-Jul-2024; CAMMESA ordered to return guarantees

FY2024 press release

COSTTV04 / COSTTV06 output

Retired from MEM

Disconnected from 1-May-2024; CAMMESA noted part of their facilities would be used for new projects

Res. SE 57/2024

Enel-group shared services

Terminated

Contracts cancelled at the Feb-2023 change of control; Enel systems unused from 1-Jul-2023

FY2023 press release; FY2024 FS

Financial Narrative

Data availability. Audited full-year figures were retrieved for FY2022–FY2024 (two restatement bases) plus interim 2025. FY2025 full-year audited statements were not located in primary sources. FY2021 standalone figures were not located. All ARS figures are in millions unless stated.

Income statement

Interim 2025 (ARS M, constant currency of each interim report).

Column mapping for the 1H25 FS is inferred from the column order in the published FS (6M-2025, Q2-2025, 6M-2024, Q2-2024). The Q2-2025 collapse matches the Mitsubishi CC outage (409 GWh in Q2-2025 vs 1,486 GWh in Q1-2026).

Margins and growth

A revenue CAGR cannot be computed meaningfully: the available series is too short and mixes restatement bases. Real growth was −8% (FY2023) and +9% (FY2024).*

Ratios (computed by analyst from FY2024 FS; Dec-2024 constant pesos)

FY2023 profitability ratios are not meaningful: large write-offs produced a net loss of ARS 117.7bn on equity of ARS 127.6bn. Cost of sales includes depreciation (ARS 32.8bn in FY2024), which understates cash-cost-based payable and inventory days.

Commentary on trends, inflections and drivers

FY2022 → FY2023: the transition shock. Real revenue fell 8% and generation fell 25% to 4,260 GWh. Two causes: maintenance on both combined cycles (Siemens corrective works through October 2023) and lower thermal dispatch as hydro rose about 30% and nuclear about 20% with Atucha II's return (FY2023 press release).

Three charges, all linked to the change of control, turned the year to a loss:

Write-offs of Enel-group software and licences: no longer used from 1-Jul-2023: ARS 16.4bn intangibles write-off in Dec-2024 pesos.

  • Write-offs of PP&E and impairment of spare parts and materials: ARS 25.4bn materials impairment in Dec-2024 pesos.

PP&E impairment: ARS 11.8bn.

Below EBIT, the December-2023 devaluation inflated the USD-denominated MHI liability, giving an FX loss on liabilities of ARS 80.5bn in Dec-2024 pesos. Partly offsetting: Enel's forgiveness of balances and contract cancellation of ARS 25.8bn, booked directly in equity (FY2024 FS, Note 1), plus a shareholder contribution line of ARS 15.1bn.

FY2023 → FY2024: operating recovery. Revenue grew 9% in real terms and generation rose 9% to 4,638 GWh, with 4Q24 output up 55% year on year. Drivers were better availability of both the CCs and the steam units, the full-year effect of Res. 59/23 (which only started in March 2023), and successive spot price increases. EBITDA rose to ARS 53.3bn (48% margin). EBIT of ARS 20.2bn included:

  • partial reversal of prior impairment (net +ARS 5.8bn: TV02/03/07 reversal of 9.4bn less a Siemens CC impairment of 5.2bn);

  • insurance recoveries (ARS 4.1bn);

  • offset by a one-off ARS 5.9bn loss from the CAMMESA settlement under Res. 58/66-2024 (payment partly in AE38 sovereign bonds).

Net income was only ARS 6.4bn because deferred tax swung to a charge of ARS 27.8bn as tax-loss carryforwards were consumed and inflation adjustments reversed. Net debt halved to ARS 18.6bn as MHI principal was amortized and the peso's real appreciation shrank the USD liability in real terms.

2025: maintenance year. Generation fell 15% to 3,947 GWh because of the scheduled major overhaul and upgrade of the Mitsubishi CC in 2Q25 and works on both CCs in 4Q25 (CEPU 4Q25 release and Q1-2026 call).

  • Q1-2025 was strong: net income ARS 10.6bn on gross profit of ARS 19.1bn.

  • Q2-2025 swung to an ARS 8.8bn loss with revenue of only ARS 17.2bn.

  • Aggregator data indicate FY2025 revenue of about ARS 161.5bn and net income of about ARS 9.8bn.

  • Group-level non-recurring maintenance capex attributable to Costanera and Luján de Cuyo was USD 27M (CEPU 4Q25).

2026: inflection. Q1-2026 generation recovered to 1,486 GWh, the highest quarterly level in the data reviewed, after maintenance. Q2-2026 fell back to 841 GWh, −43.4% q/q (CEPU 2Q26 release does not attribute the decline to a specific Costanera event), though still +105.7% y/y. Meanwhile Res. 400/25 brought USD-denominated MAT contracts, a marginal-price spot energy component and a reliability reserve payment. Group commentary indicates the conventional generation segment's adjusted EBITDA rose from USD 57.4M in 1H25 to USD 199.3M in 1H26 (CEPU 2Q26 segment table), and Costanera is a material part of that segment.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Group Entities

EntityRelationship to Central CostaneraStakeSource

Central Puerto S.A. (NYSE/BYMA: CEPU)

Ultimate parent

Indirect via Proener

CEPU 20-F FY2023

Proener S.A.U.

Direct controlling shareholder

72.26%

FY2024 FS, Note 1

Other holders (free float and others)

Minority shareholders

27.74% (balance)

Derived

Termoeléctrica José de San Martín S.A. (TJSM)

Minority investment (FONINVEMEM plant)

1.68%

FY2024 FS, Note 14

Termoeléctrica Manuel Belgrano S.A. (TMB)

Minority investment (FONINVEMEM plant)

1.89%

FY2024 FS, Note 14

Central Vuelta de Obligado S.A. (VOSA)

Minority investment; Costanera also holds VOSA receivables

1.30%

FY2024 FS, Note 14

Revenue by Segment and Revenue by Segment (%)

MetricFY2022FY2023FY2024FY2025

Conventional generation revenue (ARS Mn, Dec-2024 constant; FY2024 FS)

—101,582110,414—

Conventional generation revenue (ARS Mn, Dec-2023 constant; FY2023 press release)

50,97446,648——

Conventional generation revenue (ARS Bn; Dec-2025 basis; Simply Wall St aggregator)

———161.5

Share of total revenue (%)

100100100100

Operating income (ARS Mn, Dec-2024 constant)

—-68,17720,156—

Operating income (ARS Mn, Dec-2023 constant)

2,453-31,308——

Operating margin (%, same-basis)

4.8-67.118.3—

Real revenue growth YoY (%, same-basis)

—-89—

Block Details

BlockUnits (CAMMESA code)Gross MWTechnology / fuelRegulatory framework (2026)Source

Costanera (Mitsubishi) combined cycle — "CC II"

COSTTG08 (264), COSTTG09 (264), COSTTV10 (322)

850 (851 per FS)

2×GT + 1×ST combined cycle

Spot, Res. 400/25

CEPU 2Q26 Annex III; FY2024 FS

Buenos Aires (Siemens/BTH) combined cycle — "CC I"

BSASTG01 (190), BSASTV01 (87)

277 (270 net operable)

1×Siemens GT + 1×BTH ST; gas-only since 2023

Spot, Res. 400/25

CEPU 2Q26 Annex III; Sustainability Report 2024

Conventional steam turbines

COSTTV01 (123), COSTTV02 (116), COSTTV03 (112), COSTTV07 (310)

661

Boiler/steam turbine; gas with liquid back-up

Spot, Res. 400/25 + Res. 294/24

CEPU 2Q26 Annex III; FY2024 FS

Retired from MEM

COSTTV04, COSTTV06

120 + 350 = 470 (114 + 333 = 447 in earlier filings)

Steam

Disconnected from 1-May-2024 (Res. SE 57/2024)

Boletín Oficial; CEPU 20-F FY2024

Under construction

Costanera BESS

55 MW / 275 MWh

Lithium-ion battery storage

AlmaGBA contract with distributor, CAMMESA-backed

CEPU 2Q26 release

Income Statement and Per-Share Data

MetricFY2022FY2023FY2024FY2025

Revenue (ARS Mn, Dec-2024 constant; FY2024 FS)

—101,582110,414—

Revenue (ARS Mn, Dec-2023 constant; FY2023 PR)

50,97446,648——

Revenue (ARS Mn; Dec-2025 basis; Simply Wall St)

———161,500

Revenue (USD Mn, convenience translation at ARS 1032.5)

——107—

Cost of sales (ARS Mn, Dec-2024 constant)

—127,67098,374—

Gross profit (ARS Mn, Dec-2024 constant)

—-26,08812,040—

Gross profit (ARS Mn, Dec-2023 constant)

2,729-11,980——

Gross profit (ARS Mn; Dec-2025 basis; Simply Wall St)

———27,300

Admin and selling expenses (ARS Mn, Dec-2024 constant)

—9,0946,579—

Other operating income (ARS Mn, Dec-2024 constant)

—29,10516,205—

Other operating expenses (ARS Mn, Dec-2024 constant)

—50,2957,320—

PP&E impairment (−) / reversal (+), net (ARS Mn, Dec-2024 constant)

—-11,8055,810—

Operating income (ARS Mn, Dec-2024 constant)

—-68,17720,156—

Operating income (ARS Mn, Dec-2023 constant)

2,453-31,308——

EBITDA as reported (ARS Mn, Dec-2024 constant; op. result before D&A)

—-11,07453,276—

EBITDA as reported (ARS Mn, Dec-2023 constant; before D&A and asset write-offs/impairment)

25,32016,458——

EBITDA (USD Mn, convenience translation at ARS 1032.5)

——51.6—

Finance income (ARS Mn, Dec-2024 constant)

—30,7039,580—

Finance costs (ARS Mn, Dec-2024 constant)

—85,87815,512—

RECPAM monetary result (ARS Mn, Dec-2024 constant)

—-2,13520,002—

Pre-tax income (ARS Mn, Dec-2024 constant)

—-125,47234,229—

Pre-tax income (ARS Mn, Dec-2023 constant)

4,835-57,618——

Income tax (ARS Mn, Dec-2024 constant)

—7,771-27,801—

Net income (ARS Mn, Dec-2024 constant)

—-117,7016,428—

Net income (ARS Mn, Dec-2023 constant)

11,891-54,050——

Net income (ARS Mn; Dec-2025 basis; Simply Wall St)

———9,800

EPS basic and diluted (ARS, Dec-2024 constant; FY2024 FS)

—-175.9410.18—

EPS basic (ARS, Dec-2023 constant; computed NI/701.988M shares)

16.94-77.00——

EPS (ARS; Simply Wall St FY2025)

———13.97

Dividend per share (ARS, Dec-2024 constant; computed 9028/701.988)

—12.860—

Financial Analysis

MetricQ1-2024Q1-20251H-20241H-2025Q2-2025

Revenue (Jun-2025 constant; 1H25 FS)

——66,13357,87817,232

Gross profit (Mar-2025 constant; Q1-25 FS)

2,94019,088———

Operating income (Mar-2025 constant)

5,96418,343———

Pre-tax income (Mar-2025 constant)

14,73316,823———

Net income (Mar-2025 constant for Q1; Jun-2025 constant for 1H/Q2)

57110,621-2,2502,425-8,835

Margin Analysis (%)

MetricFY2022FY2023FY2024FY2025

Gross margin (%, same-report basis)

5.4-25.710.916.9

Operating margin (%)

4.8-67.118.3—

EBITDA margin (%, as reported; FY2023 on Dec-2023 PR definition)

49.735.348.3—

EBITDA margin (%, FY2023 on FY2024-report definition)

—-10.948.3—

Net margin (%)

23.3-115.95.86.1

Real revenue growth YoY (%)

—-89—

Balance Sheet and Key Financials

MetricFY2022FY2023FY2024FY2025

Total assets (ARS Mn, Dec-2024 constant)

—257,631218,062—

PP&E, net (ARS Mn, Dec-2024 constant)

—153,066148,016—

Intangible assets (ARS Mn, Dec-2024 constant)

—6641—

Goodwill (ARS Mn)

—00—

Cash and equivalents (ARS Mn, Dec-2024 constant)

—1,984135—

Other current financial assets — sovereign bonds and funds (ARS Mn, Dec-2024 constant)

—24,77815,976—

Short-term debt (ARS Mn, Dec-2024 constant)

—8,3593,089—

Long-term debt (ARS Mn, Dec-2024 constant)

—55,88632,059—

Total financial debt (ARS Mn, Dec-2024 constant)

—64,24535,148—

Net debt as reported (ARS Mn, Dec-2024 constant)

—37,08318,634—

Net debt as reported (ARS Mn, Dec-2023 constant)

8,22417,029——

Total equity (ARS Mn, Dec-2024 constant)

—127,574134,723—

Total equity (ARS Mn, Jun-2025 constant; 1H25 FS)

———157,488

Current assets (ARS Mn, Dec-2024 constant)

—73,90762,743—

Current liabilities (ARS Mn, Dec-2024 constant)

—68,44432,746—

Working capital (ARS Mn, Dec-2024 constant)

—5,46229,997—

MHI loan principal, nominal (USD Mn)

—57.3554.35—

MHI loan carrying amount (USD Mn)

—36.4934.02—

Cash Flow

MetricFY2022FY2023FY2024

Operating cash flow (ARS Mn, Dec-2024 constant)

—-5,12718,240

Capex — PP&E acquisitions (ARS Mn, Dec-2024 constant)

—4,77916,120

Investments as reported in press release (ARS Mn, Dec-2024 constant)

—5,77621,137

Investments as reported in press release (ARS Mn, Dec-2023 constant)

12,2948,073—

Free cash flow, OCF minus PP&E capex (ARS Mn, Dec-2024 constant)

—-9,9062,120

Dividends paid (ARS Mn, Dec-2024 constant)

—9,0280

Share buybacks (ARS Mn)

—00

Loans repaid (ARS Mn, Dec-2024 constant)

—4,2216,721

Interest paid (ARS Mn, Dec-2024 constant)

—6221,843

Returns & Leverage Ratios (%) and Financial Ratios (x)

RatioFY2023FY2024

ROE (%, net income / average equity)

—4.9

ROA (%, net income / average assets)

—2.7

ROIC (%, EBIT×(1−35%) / (equity + debt − cash), year-end)

—7.7

Current ratio (x)

1.081.92

Debt / equity (x)

0.500.26

Net debt / EBITDA (x, reported basis)

—0.35

Interest coverage, EBIT / interest on debt (x)

—3.9

Interest coverage, EBITDA / interest on debt (x)

—10.3

Asset turnover (x, revenue / average assets)

—0.46

Receivable days, CAMMESA (days)

—78

Payable days (days, trade payables / cost of sales)

—54

Inventory days (days)

—34

Cash conversion cycle (days, approximate)

—58

Revenue by Region and Revenue by Region (%)

RegionFY2022FY2023FY2024FY2025

Argentina revenue (ARS Mn, Dec-2024 constant)

—101,582110,414—

Argentina revenue (ARS Mn, Dec-2023 constant)

50,97446,648——

Argentina share of revenue (%)

100100100100

Rest of world revenue (ARS Mn)

0000

Revenue by Region (%) and Region Margins & Growth (%)

ChannelFY2022FY2023FY2024FY2025

Spot market share of revenue (%)

100100100—

Generation volume (GWh; FY2022–FY2024 company PRs, FY2025 CEPU)

5,7084,2604,6383,947

Generation YoY change (%)

—-259-15

4Q-2024 by Period

Period4Q-20242Q-20253Q-20254Q-20251Q-20262Q-2026

Central Costanera generation (GWh)

1,3254098861,0411,486841

Valuation Snapshot

MetricValueDateSource

Share price (ARS)

374.50

15-Oct-2025

Fintel

Share price (ARS)

538.00

2-Aug-2026

Investing.com

52-week range (ARS)

250.00 – 548.00

to 2-Aug-2026

Investing.com

1-year price return (%)

36.0

to 2-Aug-2026

Investing.com

Market capitalization (ARS Mn)

377,670

2-Aug-2026

Investing.com

Average daily volume, 3-month (shares)

≈73,860

2026

Investing.com

Beta, 5-year monthly

−0.16 to −0.28 (varies by snapshot)

2025–2026

Yahoo Finance

Metric

FY2021

FY2022

FY2023

Valuation Snapshot by Multiple

MultipleValueBasisComment

P/E (TTM)

≈15.7x

ARS 538 / Investing.com TTM EPS 34.36 (2026)

—

P/E on FY2025 EPS

≈38.5x

ARS 538 / Simply Wall St FY2025 EPS 13.97

Aggregator data; inflation distorts

P/B

≈2.4x

ARS 377.7bn / equity ARS 157.5bn (30-Jun-2025, Jun-25 constant)

Equity date lags price; true P/B likely lower after 2025–26 inflation restatement

EV/EBITDA

Not reliably computable

Latest audited EBITDA is FY2024 (Dec-24 constant)

—

EV/Sales

Not reliably computable

——

Implied value vs 2023 acquisition

Market cap several times the USD 63.4M implied 100% equity value paid by CEPU in Feb-2023

Holds under any plausible 2026 ARS/USD rate

Indicates market re-rating with Argentine utilities

Analyst consensus

None (no sell-side coverage identified)

—

Yahoo shows no target

Capital Instruments

InstrumentCurrencyPrincipal, nominalCarrying amountRateMaturity / amortizationSecuritySource

Mitsubishi Corporation loan

USD

USD 54.35M (31-Dec-2024)

USD 34.02M (ARS 35,108M)

0.25% contractual; 10.805% effective

Final by 15-Dec-2032; minimum USD 3.0M/yr quarterly plus FCF-linked prepayments

First-degree pledge on financed CC assets; dividend restrictions

FY2024 FS

Banco Santander (Uruguay) import loan

USD

USD 36,318

ARS 38M

7%

5-May-2025

—

FY2024 FS

ON programme

USD or equivalent

Up to USD 100M authorised; none issued

——

Programme expires 30-Oct-2029

—

FY2024 FS

Metric

FY2021

FY2022

FY2023

FY2024

FY2025

——

MHI loan nominal principal (USD Mn)

——57.3554.35———

MHI loan carrying value (USD Mn)

——36.4934.02———

Analyst Conclusions

Management guidance. There is no standalone guidance. Group-level indications:

  • Costanera BESS energization in October–November 2026 and COD in Q4-2026.

  • USD 25–27M of combined 2027 adjusted EBITDA from the two BESS projects.

  • Continued MAT contracting under Res. 400/25.

  • Res. 294/24 adders in force to March 2027.

Consensus. No sell-side coverage of CECO2 identified.

Bull case

  1. Market normalization re-rates earnings. Res. 400/25 converts peso-administered spot pay into USD capacity, reliability (USD 1,000/MW-month) and marginal energy prices, plus MAT contracts. The parent's conventional segment adjusted EBITDA more than tripled from USD 57.4M (1H25) to USD 199.3M (1H26), and Costanera is a large component.

  2. Storage adds contracted USD cash flow. 55 MW at about USD 10–11k/MW-month implies roughly USD 6.7–7.4M of annual capacity revenue (analyst computation, 55 × 10,161–11,147 × 12). Payment is from a distributor backed by CAMMESA, starting around 2027.

  3. Clean balance sheet and recovering asset base. Net debt is 0.35x EBITDA (FY2024), the main loan is concessional and amortizing to 2032, the Mitsubishi CC's life runs to 2043, and post-overhaul availability supports Q1-2026 record output (1,486 GWh).

Bear case

  1. Policy risk is proven. TerConf awards were cancelled and receivables settled at a discount within six months in 2024. Res. 294/24 payments expire in March 2027 and could be withdrawn.

  2. Output volatility and aging fleet. Generation swung from 409 GWh (Q2-2025) to 1,486 GWh (Q1-2026) to 841 GWh (Q2-2026). Steam units have low availability, and the Siemens CC has already been impaired.

  3. Minority-holder disadvantage. Capital allocation, contracting and financing are run from Central Puerto. There are no dividends since 2023, a covenant-restricted payout, thin liquidity (about 74k shares/day), and no coverage. A possible future squeeze-out may not be priced at fundamental value.

Catalysts and monitorables (next 12 months).

Analyst verdict. Central Costanera is no longer the Enel subsidiary the input list describes. It is a 1,789 MW AMBA thermal platform controlled at 72.26% by Central Puerto and acquired in 2023 at a distressed USD 63M implied equity value. The three years since show both the asset's resilience and its fragility.

Resilience: after the write-off-driven FY2023 loss, the company returned to a 48% EBITDA margin and halved net debt in FY2024. Its location earned it reliability payments and a storage award, and Q1-2026 output hit the highest quarterly level in the data reviewed.

Fragility: a single CC outage turned Q2-2025 into a loss. Regulators cancelled a 515 MW award and imposed a receivables haircut. Two steam units have already been retired.

The investment debate therefore hinges on Argentina's power-market normalization, not on company-specific execution alone. If Res. 400/25 holds, USD-denominated capacity, reliability and contracted MAT revenues plus the 2026 BESS should give Costanera structurally higher and steadier USD earnings than at any time in the last decade. That would be well supported by a balance sheet whose only significant debt is a concessional Mitsubishi loan amortizing to 2032.

For minority shareholders, two structural discounts apply: control by a parent that allocates capital group-wide, and the absence of dividends since 2023. The share price has already risen about 36% in the year to August 2026 and implies a value several times the 2023 transaction. Further upside likely requires visible distributions, a fair-value corporate simplification, or audited FY2026 results showing the reform's full benefit.

Overall stance: Constructive on the operating asset; neutral on the minority equity pending FY2026 audited results and clarity on Res. 294/24's continuation beyond March 2027. Key risks to this view are regulatory reversal and another major forced outage on the Mitsubishi combined cycle.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Executive Leadership Team

NameRoleTenurePrior roles / notesSource

Osvaldo Arturo Reca

President (Chairman) of the Board

Since Feb-2023

Appointed on the closing of the Central Puerto acquisition; member of the Reca family, among CEPU's principal shareholder groups

CEPU press release 17-Feb-2023; FY2024 FS signature

Fernando Carlos Luis Boggini

Administration and Finance Officer

——

Yahoo Finance key executives

Rodrigo Quesada

Legal Affairs Officer

——

Yahoo Finance key executives

Leonel Sánchez

Human Resources Officer

——

Yahoo Finance key executives

General Manager (Gerente General)

Signs Sustainability Reports 2023 and 2024

—

Name not captured in sources reviewed

Sustainability Reports

César Halladjian

Member, Comisión Fiscalizadora (statutory audit committee)

FY2024

—

FY2024 FS signature

“—” = not publicly disclosed.

Directors' Remuneration

MetricFY2023FY2024

Directors' and syndics' fees (ARS Mn, Dec-2024 constant; FY2024 FS Note 6)

13.3114.0

Total salaries and social charges, cost of sales plus admin (ARS Mn, Dec-2024 constant)

39,54733,312

Board & Management Changes

DateChangeContextSource

17-Feb-2023

Enel-appointed board replaced; Osvaldo Reca named President

Change of control to Central Puerto

CEPU press release

2023

Enel shared-service contracts terminated; systems migrated by 1-Jul-2023

Integration into CEPU systems

FY2023 PR

Major Shareholders

HolderStake (%)Source

Proener S.A.U. (Central Puerto group)

72.26

FY2024 FS

Other shareholders (including any other CEPU-group holdings and free float)

27.74

Derived

Competitive Landscape

Market Share by Competitor

#CompetitorRelevance to CostaneraComparative revenue / shareSource / note
1

Pampa Energía

Largest diversified Argentine generator; multiple thermal plants in AMBA and the interior; MAT competitor

——
2

AES Argentina Generación

Thermal and hydro portfolio including Buenos Aires-area units

——
3

YPF Luz

Thermal and renewable generator; co-owner of Central Dock Sud

—

Econojournal (YPF Luz 40% of Dock Sud)

4

Central Dock Sud

Immediate neighbour on the Buenos Aires waterfront; won a 90 MW AlmaGBA BESS award at USD 12,815/MW-month

—

Econojournal

5

MSU Energy / MSU Green Energy

Thermal generator; largest AlmaGBA bidder (330 MW)

—

Econojournal

6

Genneia

Renewables leader; AlmaGBA bidder (170 MW) and potential awardee

—

Econojournal

7

Grupo Albanesi (Generación Mediterránea)

Thermal IPP with contracted CCs

—

Industry knowledge

8

Sullair Argentina

AlmaGBA bidder (144 MW); distributed and peaking capacity

—

Econojournal

9

Aluar Aluminio Argentino

Self-generator; AlmaGBA awardee (30 MW)

—

Econojournal

10

Enel Generación El Chocón / other legacy hydro

Low-cost hydro whose output displaces thermal dispatch

——
11

Nucleoeléctrica Argentina (Atucha I/II, Embalse)

Baseload nuclear; Atucha II's return in 2023 cut thermal dispatch

—

FY2023 PR

12

Sister plants (Central Puerto complex, Luján de Cuyo, San Lorenzo, Brigadier López)

Intra-group competition for capital and contracted volumes

CEPU group revenue USD 782.6M (FY2025)

CEPU 4Q25

Peer Comparison FY2025

MetricCentral CostaneraCentral Puerto (consolidated)

Installed capacity (MW)

1,7896,933

Latest annual revenue

ARS 110,414M FY2024 (≈USD 107M)

USD 782.6M FY2025

Revenue growth

+9% real FY2024

+17% USD FY2025

EBITDA margin

48.3% FY2024 (reported)

43% adjusted FY2025

R&D intensity

Not disclosed (≈0)

—

Generation (GWh)

3,947 FY2025

18,598 FY2025

“—” = not publicly disclosed.

Recent Developments

Undated incident: * Econojournal reported a failure in the steam turbine of the Buenos Aires combined cycle. It tripped the protection systems of the adjacent Dock Sud plant, caused about 550 MW of lost supply in the Edesur network and led to outages in southern Buenos Aires. CEPU had to repair or replace the damaged switch. The exact date was not captured in the sources reviewed.

Company Snapshot

244

Employees

1992

Founded

Ciudad Autónoma de Buenos Aires, Argentina

Headquarters

SWOT Analysis

Strengths

  • Strategic location. 1,789 MW sits at a critical AMBA node in the Edesur area; it qualified for Res. 294/24 critical-node payments and an AlmaGBA BESS award at the site (FY2024 PR; Econojournal).
  • Efficient core asset with extended life. The Mitsubishi CC (851 MW) life was extended to Feb-2043 after engineering review and is backed by OEM maintenance contracts (FY2024 FS, Note 2.4.6).
  • Low leverage. Net debt fell 50% in FY2024 to ARS 18.6bn (0.35x EBITDA). The main debt is a concessional MHI loan carried at USD 34.0M against USD 54.3M nominal, with a 0.25% contractual coupon (FY2024 FS).
  • Strong parent. Central Puerto has FY2025 adjusted EBITDA of USD 337.2M, net leverage of 0.32x at end-2025 (1.2x at Jun-2026 after acquisitions), IFC financing and #1 MAT-P share (CEPU 4Q25, 2Q26).
  • High EBITDA margin in normal years. 49.7% in FY2022 and 48.3% in FY2024 (company PRs).
  • Rising USD revenue share. 100% of group energy sales were USD-denominated in 2Q26, up from 64% in 2Q25 (CEPU 2Q26). Costanera participates through MAT contracts and Res. 294/400.

Weaknesses

  • Single-site concentration. Maintenance on one CC cut Q2-2025 output to 409 GWh and drove an ARS 8.8bn quarterly loss (1H25 FS; CEPU).
  • Aging steam fleet. 661 MW of steam units with low availability (group ST/GT average 58% in FY2025). Two units (470 MW) already retired in 2024.
  • Volatile reported earnings. Net results swung from +ARS 11.9bn (FY2022) to −54.1bn (FY2023) to +6.4bn (FY2024, different restatement bases).
  • Thin free cash flow. FY2024 FCF was only ARS 2.1bn after ARS 16.1bn of capex; FY2023 FCF was −ARS 9.9bn (FY2024 FS).
  • Customer concentration. CAMMESA was 100% of FY2024 revenue and the counterparty in the 2024 receivables haircut (ARS 5.9bn loss).
  • Weak standalone disclosure. No standalone guidance, no individual board or compensation data in readily available sources, and minimal investor relations. The legacy website still points to Enel.

Opportunities

  • BESS. 55 MW / 275 MWh with a USD capacity contract, COD in Q4-2026. Group guidance: USD 25–27M of 2027 adjusted EBITDA from both BESS projects (CEPU 2Q26 call).
  • Re-use of retired-unit facilities. CAMMESA explicitly noted new projects would use parts of the TV04/TV06 facilities (Res. SE 57/2024), giving optionality for future thermal or storage tenders.
  • Contract-market expansion. Res. 400/25 MAT contracts; the group held 43% of MAT/MATER in 2Q26 (CEPU 2Q26).
  • Fuel self-procurement margins. The group earned USD 8M from self-procured gas in 1Q26 and secured 30-year firm transport from TGS (CEPU).
  • Rising marginal costs. CMO of USD 188–203/MWh in May–June 2026 lifts the spot energy value of efficient CC output.
  • Corporate simplification. With 72%+ control, a merger into CEPU or a squeeze-out could crystallise value for minorities. This is unconfirmed and speculative.

Threats

  • Regulatory reversal. TerConf awards of 515 MW were annulled (Res. 151/2024); CAMMESA arrears were settled at a discount (Res. 58/66-2024).
  • Displacement by renewables and storage. Renewables +16.5% in 2025; ALMA SADI awarded 700 MW of BESS in 2026.
  • Hydrology and nuclear swings. Hydro +30% and nuclear +20% in 2023 cut Costanera's dispatch by 25%.
  • FX and inflation. The Dec-2023 devaluation caused an ARS 80.5bn FX loss on liabilities (FY2023, Dec-2024 constant).
  • Mechanical failure risk. The Buenos Aires CC steam-turbine trip cascaded into about 550 MW of lost supply in Edesur's network (Econojournal).
  • Gas supply tightness. "Gas Acuerdo" volumes fell 48.2% y/y in June-2026, raising fuel procurement and liquid-fuel use risk (CEPU 2Q26).

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
28-Apr-2025AGM uses reserves to absorb accumulated losses (optional reserve fully applied by 30-Jun-2025) 1H25 FS equity statementClears the path to future dividend capacity, subject to MHI covenants
8-May-2025Q1-2025 FS approved: net income ARS 10.6bn vs 0.6bn in Q1-24 (Mar-25 constant) Q1-25 FSStrong summer quarter; highest quarterly profit in the data reviewed
2Q-2025Scheduled major maintenance and upgrade of Mitsubishi CC; Costanera Q2 output 409 GWh CEPU 2Q25 call; 2Q26 releaseAbout 1,200 GWh below prior quarter (group comment)
Mid-2025AlmaGBA bid opening: Central Costanera bids 55 MW (27 offers, 1,347 MW total) EconojournalEntry into storage
5-Aug-20251H-2025 FS approved: 6M revenue ARS 57.9bn; Q2 net loss ARS 8.8bn 1H25 FSMaintenance-driven quarterly loss
11-Aug-2025CEPU Q2-25 call attributes group EBITDA decline partly to Costanera maintenance CEPU 2Q25 callVisibility of Costanera's weight in group
21-Aug-2025CEPU announces USD 520M investment plan including the Costanera BESS (55 MW, 5 h) Central Puerto press releaseGroup capital commitment
Aug–Sep-2025AlmaGBA award: Costanera project awarded (price reported as USD 10,161 or 11,147 per MW-month; sources conflict) EconojournalFirst USD-contracted revenue line for Costanera
26-Sep-2025IFC mandate letter (up to USD 300M) covering BESS and renewables Econojournal; iProfesionalLong-tenor financing route
Oct-2025Uncontracted units remunerated under Res. SE 381/25 CEPU 4Q25Transitional pricing
15-Oct-2025CECO2 closes at ARS 374.50 FintelShare-price reference
1-Nov-2025Res. SE 400/25 effective: marginal spot, MAT contracting, USD 1,000/MW-month reliability reserve CEPU 4Q25Structural change to revenue model
Nov–Dec-2025Group signs first MAT contracts (about 11% of new term volumes in the market) CEPU 4Q25Start of contracting
4Q-2025Maintenance works on both Costanera CCs CEPU 4Q25; 1Q26 callQ4 output 1,041 GWh (−21% y/y)
9-Dec-2025Sustainability Report 2024 published Central Puerto websiteESG transparency post-Enel
19-Dec-2025Parent signs USD 300M IFC A/B syndicated loan (about 5-year average life) for Piedra del Águila and BESS CEPU 4Q25Funding secured for the Costanera BESS
31-Dec-2025FY2025 Costanera generation 3,947 GWh (−15% y/y) CEPU 4Q25Weakest year in the series reviewed except 2023
1-Jan-2026Parent CEPU switches functional currency to USD (Costanera's own status not disclosed) CEPU 2Q26Reduces IAS 29 noise at group level
5-Mar-2026CEPU FY2025 results; Costanera cited as driver of lower volumes and non-recurring capex (USD 27M with Luján de Cuyo) CEPU 4Q25Context for FY2025
1Q-2026Costanera output recovers to 1,486 GWh after CC restoration CEPU 1Q26 call; 2Q26 releasePost-maintenance rebound
15-Apr-2026TGS awards CEPU 30-year firm gas transport (Perito Moreno and Neuquén–Buenos Aires pipelines) CEPU 2Q26Group fuel self-procurement capability that can serve AMBA plants
Apr-2026CEPU acquires Patagonia Energy (Vaca Muerta block) for USD 50M CEPU 2Q26Upstream gas integration at group level
13-May-2026CEPU Q1-26 call: restored Costanera volumes and spot normalization support results CEPU 1Q26 callPositive operating read-across
2-Aug-2026CECO2 at ARS 538; 52-week range 250–548; one-year return +36.0% Investing.comNear 52-week high
11-Aug-2026CEPU 2Q26: Costanera output 841 GWh (−43.4% q/q, +105.7% y/y); BESS 54% complete; MAT sales from Costanera assets increaseMixed operating quarter; contracting progress
Aug-2026ALMA SADI tender: CEPU's Campana BESS not selected (group, not Costanera) CEPU 2Q26Limits near-term additional storage growth
Oct–Nov-2026 (expected)Energization of Costanera BESS; COD in Q4-2026 CEPU 2Q26Key near-term catalyst

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

6 charts
Income Statement: Revenue & Gross Profit: Revenue rose from ARS 101.6 Bn in FY2023 to ARS 110.4 Bn in FY2024.
Enel Generacion Costanera S.A. — Income Statement: Revenue & Gross Profit
Series (ARS Bn)FY2022FY2023FY2024FY2025
Revenue—101.6110.4—
Revenue5146.6——
Revenue———161.5
Revenue (USD M, convenience translation at ARS 1032.5)——0.1—
Cost of sales—127.798.4—
Gross profit—-26.112—
Gross profit2.7-12——
Gross profit———27.3

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Sources

Sources

  1. Central Costanera S.A., Audited Financial Statements FY2024 (approved 5-Mar-2025) (centralpuerto.com)
  2. Central Costanera S.A., Press Release FY2024 (5-Mar-2025) (centralpuerto.com)
  3. Central Costanera S.A., Press Release FY2023 (centralpuerto.com)
  4. Central Costanera S.A., FY2023 Financial Statements (centralpuerto.com)
  5. Central Costanera S.A., Q1-2025 and 1H-2025 Financial Statements · centralpuerto.com
  6. Central Costanera S.A., Press Releases Q1-2023, 2Q-2023, 3Q-2023, Q1-2024, 1H-2024 (centralpuerto.com)
  7. Central Costanera S.A., Sustainability Reports 2023 and 2024 (centralpuerto.com)
  8. Evaluadora Latinoamericana, Central Costanera share-rating reports (Oct-2024, Dec-2024; centralpuerto.com)
  9. Boletín Oficial, Resolución SE 57/2024 (boletinoficial.gob.ar)
  10. Central Puerto S.A., Form 6-K (Feb-2023) and Form 20-F FY2022, FY2023, FY2024 (SEC EDGAR)
  11. Central Puerto S.A., 4Q25 Earnings Release (Mar-2026) (centralpuerto.com)
  12. Central Puerto S.A., 2Q26 Earnings Presentation (Aug-2026) (centralpuerto.com)
  13. Central Puerto press releases: acquisition of Central Costanera (17-Feb-2023); USD 520M investment plan (21-Aug-2025)
  14. Earnings call coverage: Insider Monkey (CEPU Q4-2025), roic.ai (CEPU Q2-2025, Q1-2026), MarketBeat (CEPU Q2-2026)
  15. Econojournal: AlmaGBA bids and awards (2025); IFC financing (Sep-2025); Central Puerto takeover of Costanera; Costanera outage report
  16. iProfesional (Sep-2025, Jan-2026); El Economista (Aug-2025)
  17. Market data: Investing.com (CECO2m, Aug-2026); Fintel (CECO2, Oct-2025); Yahoo Finance (CECO2.BA profile); Simply Wall St (CECO2 FY2025 aggregates)
  18. Global Energy Monitor wiki: Costanera power station
  19. Bruchou & Funes de Rioja deal note (Enel–Central Puerto transaction)