Enel Generacion Costanera S.A. Overview
Central Costanera S.A. owns and operates one of the largest thermal power stations in Argentina: a 1,789 MW gas- and liquid-capable complex on the Buenos Aires waterfront. It is electrically embedded in the Greater Buenos Aires (AMBA) load centre and in the Edesur distribution area. The company was privatized in 1992 and run by Endesa and then Enel for three decades. In February 2023 it was sold to Central Puerto for USD 48M for 75.68%, an implied equity value of roughly USD 63M for 100%. It is a single-segment, single-site merchant generator. Until late 2025 essentially all its revenue came from regulated spot remuneration paid by CAMMESA. Its investment case now rests on four things: Argentina's 2024–2026 market normalization (Resolution SE 400/25 and the return of bilateral MAT contracts), the reliability premium its AMBA location earns (Resolution 294/2024), a 55 MW/275 MWh battery project due online in Q4-2026, and synergies with Central Puerto's adjacent Puerto Nuevo complex. Its weaknesses are an aging steam fleet, concentrated combined-cycle maintenance risk, and a residual USD-denominated vendor loan from Mitsubishi.
Company's own description (FY2024 audited financial statements, Note 1, paraphrased). Costanera's corporate purpose is the generation and wholesale commercialization of electric power. To that end it operates four conventional steam-turbine units with 661 MW of installed capacity and two combined cycles: one supplied by Mitsubishi with 851 MW, and the other made up of a Siemens gas turbine and a BTH steam turbine with 277 MW. For management purposes the company is organised as a single business unit, so it has no separate operating segments under IFRS 8. Its articles also allow transmission, distribution and trading of power, and the provision of engineering, consultancy and plant-management services. No such activity is reported as material.
Revenue model. Revenue is almost entirely the sale of electricity and capacity into Argentina's Wholesale Electricity Market (MEM).
FY2024: 100% of revenue (ARS 110,414M) was "venta mercado spot." The FS state that under the regulation then in force the company did not operate in the term market. Revenue is recognised over time, based on (i) the effective capacity made available and (ii) energy dispatched.
Billing and collection: CAMMESA bills monthly and usually pays within 90 days, so no significant financing component is recognised (FY2024 FS, Note 2.4.4).
Product vs. service mix: In effect this is a regulated capacity-plus-energy "service" model. There is no subscription or licensing revenue. Fuel was supplied by CAMMESA, so fuel cost did not pass through revenue. In FY2024, combustible consumption in cost of sales was zero.
Remuneration mechanics (evolution).
-
Base "Energía Base" spot remuneration (Res. SE 95/13 and successors: 826/22, 750/23, 869/23, 9/24, 99/24, 193/24, 233/24, 285/24, SCEyM 20/24, 387/24, 603/24). Peso-denominated capacity and energy prices, updated by administrative resolution. In 2024 alone the increments were +74% (Feb), +25% (Jun), +3% (Aug), +5% (Sep), +2.7% (Oct), +6% (Nov), +5% (Dec) and +4% (Jan-2025). (FY2024 press release)
-
Res. SE 59/2023 "Acuerdo de Disponibilidad de Potencia y Mejora de Eficiencia" for combined cycles. Partly USD-linked prices in exchange for at least 85% average monthly availability.
-
Mitsubishi CC: accepted by CAMMESA 25-Apr-2023, effective from March 2023 transactions.
-
Siemens CC: accepted 28-Jul-2023, conditional on conversion to gas-only operation and down-rating of installed capacity; effective from October 2023 after corrective maintenance. (FY2023 press release)
-
-
Res. SE 294/2024 contingency plan (published 1-Oct-2024). Additional USD-denominated remuneration for thermal units at critical nodes during critical hours: USD 2,000/MW-month for availability, scaled by a node criticality factor of 0.75–1.25. Costanera's steam units were eligible; adhesion was pending at March 2025. Central Puerto's FY2025 release states the GT/ST units of Central Puerto and Central Costanera that adhered continue to earn an incremental USD 2,500/MW, in force until March 2027.
-
Res. SE 381/25 and Res. SE 400/25 (MEM reform). From 1 November 2025, uncontracted thermal units moved to a framework with a marginal-price spot energy component and a term market (MAT) in which capacity and energy can be contracted with large users and distributors. It also includes a USD 1,000/MW-month reliability reserve component for legacy spot thermal assets. (CEPU 4Q25 release)
-
Contracting (2026). CEPU reports higher MAT contracted energy and capacity sales from the Central Puerto, Central Costanera, Piedra del Águila and Luján de Cuyo assets in 2Q26. Costanera therefore moved from 100% spot toward a partially contracted revenue base. (CEPU 2Q26 release)
Value chain position. Costanera sits in the upstream generation segment. It is fuelled principally by natural gas: allocated by CAMMESA under the "Gas Acuerdo" programme and, since 2026, increasingly self-procured at group level. Liquid fuels serve as back-up on dual-fuel steam units; the Siemens CC is gas-only since 2023. Output flows to the high-voltage grid at a critical AMBA node. Downstream customers are CAMMESA (spot) and, since Nov-2025, MAT counterparties.
Customer types and end-markets. In FY2024 the single counterparty was CAMMESA, the market administrator acting on behalf of distributors and large users. CAMMESA trade receivables were ARS 23,559M of ARS 29,122M current receivables at 31-Dec-2024 (FY2024 FS, Note 12.1). The end-market is Argentine electricity demand, with a strong AMBA weighting. The national system set a record 30,257 MW peak on 10-Feb-2025 (CEPU 4Q25 release).
Independent characterization. Costanera is a peaking-and-mid-merit reliability asset in a constrained metropolitan node more than a baseload generator.
Utilisation: 2025 output of 3,947 GWh on 1,789 MW implies a fleet capacity factor of only about 25%. The Mitsubishi CC carries most of the energy; the steam units earn mainly for availability.
Economics: Value is driven by regulation (capacity prices, reliability adders) rather than commodity spreads. Absent a step change in contracting, its earnings power is a function of Argentine energy policy and plant availability.
Ownership logic: Under Central Puerto it is run as a satellite of the adjacent Puerto Nuevo complex. Value comes from shared operations, fuel management and SACME coordination, plus optionality on the site (grid connection, land, cooling water) for new capacity such as batteries.
Strategy
Stated strategic themes. The company's 2024–2025 disclosures and Central Puerto's statements on the acquisition rationale cluster into five themes:
-
Operational synergies and integrated management. At acquisition, CEPU cited its staff's know-how in steam and combined-cycle plants, unified administration of facilities and resources, centralised fuel management, and integrated coordination with the regional operator SACME as sources of value beyond the purchase price (CEPU 6-K, Feb-2023).
-
Availability and reliability first. Maintenance programmes on both CCs (2023, 2025), adhesion to availability-linked regimes (Res. 59/23; Res. 294/24), and the Mitsubishi CC life extension to 2043 (FY2024 FS) show a strategy of monetising reliability at a critical AMBA node.
-
Portfolio rationalisation. Retirement of the two least economic steam units (TV04/TV06; 470 MW), with parts of their facilities to be reused for new projects (Res. SE 57/2024).
-
Re-use of the site for new capacity.
-
Thermal: the TerConf bid of 515 MW was awarded, then annulled.
-
Storage: the AlmaGBA award of 55 MW/275 MWh is now under construction.
-
-
Commercial transition to contracts. Under Res. 400/25 the group is moving Costanera's output from regulated spot toward USD-denominated MAT contracts.
Initiatives in the last 24 months (Oct-2024 to Oct-2026).
Medium-term targets and guidance. Central Costanera issues no standalone financial guidance. Group-level guidance relevant to Costanera:
-
The two AlmaGBA BESS projects (Nuevo Puerto 150 MW plus Costanera 55 MW) are expected to contribute USD 25–27M of combined adjusted EBITDA in 2027 (CEPU 2Q26 call, via MarketBeat).
-
Combined BESS capex is about USD 130M for both projects (press reports of the CEPU plan), with 81% executed (USD 106M) by Aug-2026 (CEPU 2Q26).
-
CEPU projected USD-denominated energy revenue growth above 60% for 2026 (iProfesional, Jan-2026).
Products & Services
Central Costanera sells a narrow set of "products" defined by Argentine market rules rather than by brand. Each is catalogued below.
Discontinued or cancelled offerings.
Product Portfolio
| # | Offering | Description | Key specifications | Customer | Launch / latest version | Pricing model (as disclosed) |
|---|---|---|---|---|---|---|
| 1 | Spot energy — Mitsubishi CC | Energy dispatched by CAMMESA from the 851 MW combined cycle | Most efficient unit; useful life extended to Feb-2043; major maintenance 2021 and 2Q/4Q-2025 | CAMMESA (spot) | Late 1990s COD; upgraded 2025 | Res. 400/25 marginal-price formula (CVP + RMA, about USD 7/MWh net of fuel in 4Q25 per CEPU) |
| 2 | Capacity availability — Mitsubishi CC | Payment for declared available MW | ≥85% availability commitment under Res. 59/23 (to Oct-2025) | CAMMESA | Res. 59/23 adhesion effective Mar-2023 | Partly USD-denominated under Res. 59/23; Res. 400/25 capacity payment plus USD 1,000/MW-month reliability reserve from Nov-2025 |
| 3 | Spot energy and capacity — Buenos Aires CC | Energy and capacity from the 277 MW Siemens/BTH CC | Gas-only since 2023; net operable 270 MW; impaired ARS 5,152M in FY2024 | CAMMESA (spot) | Res. 59/23 effective Oct-2023 | As above |
| 4 | Steam-unit availability (TV01/02/03/07) | Capacity and energy from 661 MW legacy steam units, mainly for critical-hour reliability | Dual-fuel capability; avg ST/GT availability in group 58% (FY2025) | CAMMESA | Res. 294/2024 adhesion (date not disclosed; confirmed by FY2025) | Res. 294/24 incremental USD 2,500/MW (to Mar-2027) plus Res. 400/25 spot |
| 5 | MAT (term market) contracted capacity and energy | Bilateral sales of capacity (MAT-P) and energy (MAT-E) to large users and distributors under Res. 400/25 | Volumes for Costanera alone not disclosed | Industrial large users (GUMA/GUME), distributors | From Nov-2025; expanded 1H-2026 | Bilateral, USD-denominated (CEPU: 100% of group energy sales USD-denominated in 2Q26) |
| 6 | Battery storage capacity (AlmaGBA) | 55 MW / 275 MWh BESS on the Costanera site in the Edesur network | 5-hour duration; 54% complete Aug-2026; COD targeted Q4-2026 | Distributor (Edesur area) with CAMMESA guarantee | Award Aug–Sep-2025 | Fixed USD/MW-month capacity price. Reported as USD 10,161 or USD 11,147 per MW-month: sources conflict on which bid was Costanera's |
| 7 | Engineering, consultancy, O&M services | Permitted under corporate purpose | No disclosed third-party revenue | — | — | — |
| 8 | Fuel-cost pass-through (self-procured fuel) | When the generator procures fuel, CVP fuel cost is recognised in revenue | Group-level 2Q26: USD 176.4M self-procured fuel CVP. Costanera share not disclosed | CAMMESA | 2,026 | Cost reimbursement via CVP |
“—” = not publicly disclosed.
| Offering | Status | Detail | Source |
|---|---|---|---|
TerConf new thermal capacity (202 MW + 313 MW) | Cancelled | Awarded 24-Nov-2023; annulled by Res. SE 151/2024 on 10-Jul-2024; CAMMESA ordered to return guarantees | FY2024 press release |
COSTTV04 / COSTTV06 output | Retired from MEM | Disconnected from 1-May-2024; CAMMESA noted part of their facilities would be used for new projects | Res. SE 57/2024 |
Enel-group shared services | Terminated | Contracts cancelled at the Feb-2023 change of control; Enel systems unused from 1-Jul-2023 | FY2023 press release; FY2024 FS |
Financial Narrative
Data availability. Audited full-year figures were retrieved for FY2022–FY2024 (two restatement bases) plus interim 2025. FY2025 full-year audited statements were not located in primary sources. FY2021 standalone figures were not located. All ARS figures are in millions unless stated.
Income statement
Interim 2025 (ARS M, constant currency of each interim report).
Column mapping for the 1H25 FS is inferred from the column order in the published FS (6M-2025, Q2-2025, 6M-2024, Q2-2024). The Q2-2025 collapse matches the Mitsubishi CC outage (409 GWh in Q2-2025 vs 1,486 GWh in Q1-2026).
Margins and growth
A revenue CAGR cannot be computed meaningfully: the available series is too short and mixes restatement bases. Real growth was −8% (FY2023) and +9% (FY2024).*
Ratios (computed by analyst from FY2024 FS; Dec-2024 constant pesos)
FY2023 profitability ratios are not meaningful: large write-offs produced a net loss of ARS 117.7bn on equity of ARS 127.6bn. Cost of sales includes depreciation (ARS 32.8bn in FY2024), which understates cash-cost-based payable and inventory days.
Commentary on trends, inflections and drivers
FY2022 → FY2023: the transition shock. Real revenue fell 8% and generation fell 25% to 4,260 GWh. Two causes: maintenance on both combined cycles (Siemens corrective works through October 2023) and lower thermal dispatch as hydro rose about 30% and nuclear about 20% with Atucha II's return (FY2023 press release).
Three charges, all linked to the change of control, turned the year to a loss:
Write-offs of Enel-group software and licences: no longer used from 1-Jul-2023: ARS 16.4bn intangibles write-off in Dec-2024 pesos.
- Write-offs of PP&E and impairment of spare parts and materials: ARS 25.4bn materials impairment in Dec-2024 pesos.
PP&E impairment: ARS 11.8bn.
Below EBIT, the December-2023 devaluation inflated the USD-denominated MHI liability, giving an FX loss on liabilities of ARS 80.5bn in Dec-2024 pesos. Partly offsetting: Enel's forgiveness of balances and contract cancellation of ARS 25.8bn, booked directly in equity (FY2024 FS, Note 1), plus a shareholder contribution line of ARS 15.1bn.
FY2023 → FY2024: operating recovery. Revenue grew 9% in real terms and generation rose 9% to 4,638 GWh, with 4Q24 output up 55% year on year. Drivers were better availability of both the CCs and the steam units, the full-year effect of Res. 59/23 (which only started in March 2023), and successive spot price increases. EBITDA rose to ARS 53.3bn (48% margin). EBIT of ARS 20.2bn included:
-
partial reversal of prior impairment (net +ARS 5.8bn: TV02/03/07 reversal of 9.4bn less a Siemens CC impairment of 5.2bn);
-
insurance recoveries (ARS 4.1bn);
-
offset by a one-off ARS 5.9bn loss from the CAMMESA settlement under Res. 58/66-2024 (payment partly in AE38 sovereign bonds).
Net income was only ARS 6.4bn because deferred tax swung to a charge of ARS 27.8bn as tax-loss carryforwards were consumed and inflation adjustments reversed. Net debt halved to ARS 18.6bn as MHI principal was amortized and the peso's real appreciation shrank the USD liability in real terms.
2025: maintenance year. Generation fell 15% to 3,947 GWh because of the scheduled major overhaul and upgrade of the Mitsubishi CC in 2Q25 and works on both CCs in 4Q25 (CEPU 4Q25 release and Q1-2026 call).
-
Q1-2025 was strong: net income ARS 10.6bn on gross profit of ARS 19.1bn.
-
Q2-2025 swung to an ARS 8.8bn loss with revenue of only ARS 17.2bn.
-
Aggregator data indicate FY2025 revenue of about ARS 161.5bn and net income of about ARS 9.8bn.
-
Group-level non-recurring maintenance capex attributable to Costanera and Luján de Cuyo was USD 27M (CEPU 4Q25).
2026: inflection. Q1-2026 generation recovered to 1,486 GWh, the highest quarterly level in the data reviewed, after maintenance. Q2-2026 fell back to 841 GWh, −43.4% q/q (CEPU 2Q26 release does not attribute the decline to a specific Costanera event), though still +105.7% y/y. Meanwhile Res. 400/25 brought USD-denominated MAT contracts, a marginal-price spot energy component and a reliability reserve payment. Group commentary indicates the conventional generation segment's adjusted EBITDA rose from USD 57.4M in 1H25 to USD 199.3M in 1H26 (CEPU 2Q26 segment table), and Costanera is a material part of that segment.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Group Entities
| Entity | Relationship to Central Costanera | Stake | Source |
|---|---|---|---|
Central Puerto S.A. (NYSE/BYMA: CEPU) | Ultimate parent | Indirect via Proener | CEPU 20-F FY2023 |
Proener S.A.U. | Direct controlling shareholder | 72.26% | FY2024 FS, Note 1 |
Other holders (free float and others) | Minority shareholders | 27.74% (balance) | Derived |
Termoeléctrica José de San Martín S.A. (TJSM) | Minority investment (FONINVEMEM plant) | 1.68% | FY2024 FS, Note 14 |
Termoeléctrica Manuel Belgrano S.A. (TMB) | Minority investment (FONINVEMEM plant) | 1.89% | FY2024 FS, Note 14 |
Central Vuelta de Obligado S.A. (VOSA) | Minority investment; Costanera also holds VOSA receivables | 1.30% | FY2024 FS, Note 14 |
Revenue by Segment and Revenue by Segment (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|
Conventional generation revenue (ARS Mn, Dec-2024 constant; FY2024 FS) | — | 101,582 | 110,414 | — |
Conventional generation revenue (ARS Mn, Dec-2023 constant; FY2023 press release) | 50,974 | 46,648 | — | — |
Conventional generation revenue (ARS Bn; Dec-2025 basis; Simply Wall St aggregator) | — | — | — | 161.5 |
Share of total revenue (%) | 100 | 100 | 100 | 100 |
Operating income (ARS Mn, Dec-2024 constant) | — | -68,177 | 20,156 | — |
Operating income (ARS Mn, Dec-2023 constant) | 2,453 | -31,308 | — | — |
Operating margin (%, same-basis) | 4.8 | -67.1 | 18.3 | — |
Real revenue growth YoY (%, same-basis) | — | -8 | 9 | — |
Block Details
| Block | Units (CAMMESA code) | Gross MW | Technology / fuel | Regulatory framework (2026) | Source |
|---|---|---|---|---|---|
Costanera (Mitsubishi) combined cycle — "CC II" | COSTTG08 (264), COSTTG09 (264), COSTTV10 (322) | 850 (851 per FS) | 2×GT + 1×ST combined cycle | Spot, Res. 400/25 | CEPU 2Q26 Annex III; FY2024 FS |
Buenos Aires (Siemens/BTH) combined cycle — "CC I" | BSASTG01 (190), BSASTV01 (87) | 277 (270 net operable) | 1×Siemens GT + 1×BTH ST; gas-only since 2023 | Spot, Res. 400/25 | CEPU 2Q26 Annex III; Sustainability Report 2024 |
Conventional steam turbines | COSTTV01 (123), COSTTV02 (116), COSTTV03 (112), COSTTV07 (310) | 661 | Boiler/steam turbine; gas with liquid back-up | Spot, Res. 400/25 + Res. 294/24 | CEPU 2Q26 Annex III; FY2024 FS |
Retired from MEM | COSTTV04, COSTTV06 | 120 + 350 = 470 (114 + 333 = 447 in earlier filings) | Steam | Disconnected from 1-May-2024 (Res. SE 57/2024) | Boletín Oficial; CEPU 20-F FY2024 |
Under construction | Costanera BESS | 55 MW / 275 MWh | Lithium-ion battery storage | AlmaGBA contract with distributor, CAMMESA-backed | CEPU 2Q26 release |
Income Statement and Per-Share Data
| Metric | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|
Revenue (ARS Mn, Dec-2024 constant; FY2024 FS) | — | 101,582 | 110,414 | — |
Revenue (ARS Mn, Dec-2023 constant; FY2023 PR) | 50,974 | 46,648 | — | — |
Revenue (ARS Mn; Dec-2025 basis; Simply Wall St) | — | — | — | 161,500 |
Revenue (USD Mn, convenience translation at ARS 1032.5) | — | — | 107 | — |
Cost of sales (ARS Mn, Dec-2024 constant) | — | 127,670 | 98,374 | — |
Gross profit (ARS Mn, Dec-2024 constant) | — | -26,088 | 12,040 | — |
Gross profit (ARS Mn, Dec-2023 constant) | 2,729 | -11,980 | — | — |
Gross profit (ARS Mn; Dec-2025 basis; Simply Wall St) | — | — | — | 27,300 |
Admin and selling expenses (ARS Mn, Dec-2024 constant) | — | 9,094 | 6,579 | — |
Other operating income (ARS Mn, Dec-2024 constant) | — | 29,105 | 16,205 | — |
Other operating expenses (ARS Mn, Dec-2024 constant) | — | 50,295 | 7,320 | — |
PP&E impairment (−) / reversal (+), net (ARS Mn, Dec-2024 constant) | — | -11,805 | 5,810 | — |
Operating income (ARS Mn, Dec-2024 constant) | — | -68,177 | 20,156 | — |
Operating income (ARS Mn, Dec-2023 constant) | 2,453 | -31,308 | — | — |
EBITDA as reported (ARS Mn, Dec-2024 constant; op. result before D&A) | — | -11,074 | 53,276 | — |
EBITDA as reported (ARS Mn, Dec-2023 constant; before D&A and asset write-offs/impairment) | 25,320 | 16,458 | — | — |
EBITDA (USD Mn, convenience translation at ARS 1032.5) | — | — | 51.6 | — |
Finance income (ARS Mn, Dec-2024 constant) | — | 30,703 | 9,580 | — |
Finance costs (ARS Mn, Dec-2024 constant) | — | 85,878 | 15,512 | — |
RECPAM monetary result (ARS Mn, Dec-2024 constant) | — | -2,135 | 20,002 | — |
Pre-tax income (ARS Mn, Dec-2024 constant) | — | -125,472 | 34,229 | — |
Pre-tax income (ARS Mn, Dec-2023 constant) | 4,835 | -57,618 | — | — |
Income tax (ARS Mn, Dec-2024 constant) | — | 7,771 | -27,801 | — |
Net income (ARS Mn, Dec-2024 constant) | — | -117,701 | 6,428 | — |
Net income (ARS Mn, Dec-2023 constant) | 11,891 | -54,050 | — | — |
Net income (ARS Mn; Dec-2025 basis; Simply Wall St) | — | — | — | 9,800 |
EPS basic and diluted (ARS, Dec-2024 constant; FY2024 FS) | — | -175.94 | 10.18 | — |
EPS basic (ARS, Dec-2023 constant; computed NI/701.988M shares) | 16.94 | -77.00 | — | — |
EPS (ARS; Simply Wall St FY2025) | — | — | — | 13.97 |
Dividend per share (ARS, Dec-2024 constant; computed 9028/701.988) | — | 12.86 | 0 | — |
Financial Analysis
| Metric | Q1-2024 | Q1-2025 | 1H-2024 | 1H-2025 | Q2-2025 |
|---|---|---|---|---|---|
Revenue (Jun-2025 constant; 1H25 FS) | — | — | 66,133 | 57,878 | 17,232 |
Gross profit (Mar-2025 constant; Q1-25 FS) | 2,940 | 19,088 | — | — | — |
Operating income (Mar-2025 constant) | 5,964 | 18,343 | — | — | — |
Pre-tax income (Mar-2025 constant) | 14,733 | 16,823 | — | — | — |
Net income (Mar-2025 constant for Q1; Jun-2025 constant for 1H/Q2) | 571 | 10,621 | -2,250 | 2,425 | -8,835 |
Margin Analysis (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|
Gross margin (%, same-report basis) | 5.4 | -25.7 | 10.9 | 16.9 |
Operating margin (%) | 4.8 | -67.1 | 18.3 | — |
EBITDA margin (%, as reported; FY2023 on Dec-2023 PR definition) | 49.7 | 35.3 | 48.3 | — |
EBITDA margin (%, FY2023 on FY2024-report definition) | — | -10.9 | 48.3 | — |
Net margin (%) | 23.3 | -115.9 | 5.8 | 6.1 |
Real revenue growth YoY (%) | — | -8 | 9 | — |
Balance Sheet and Key Financials
| Metric | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|
Total assets (ARS Mn, Dec-2024 constant) | — | 257,631 | 218,062 | — |
PP&E, net (ARS Mn, Dec-2024 constant) | — | 153,066 | 148,016 | — |
Intangible assets (ARS Mn, Dec-2024 constant) | — | 66 | 41 | — |
Goodwill (ARS Mn) | — | 0 | 0 | — |
Cash and equivalents (ARS Mn, Dec-2024 constant) | — | 1,984 | 135 | — |
Other current financial assets — sovereign bonds and funds (ARS Mn, Dec-2024 constant) | — | 24,778 | 15,976 | — |
Short-term debt (ARS Mn, Dec-2024 constant) | — | 8,359 | 3,089 | — |
Long-term debt (ARS Mn, Dec-2024 constant) | — | 55,886 | 32,059 | — |
Total financial debt (ARS Mn, Dec-2024 constant) | — | 64,245 | 35,148 | — |
Net debt as reported (ARS Mn, Dec-2024 constant) | — | 37,083 | 18,634 | — |
Net debt as reported (ARS Mn, Dec-2023 constant) | 8,224 | 17,029 | — | — |
Total equity (ARS Mn, Dec-2024 constant) | — | 127,574 | 134,723 | — |
Total equity (ARS Mn, Jun-2025 constant; 1H25 FS) | — | — | — | 157,488 |
Current assets (ARS Mn, Dec-2024 constant) | — | 73,907 | 62,743 | — |
Current liabilities (ARS Mn, Dec-2024 constant) | — | 68,444 | 32,746 | — |
Working capital (ARS Mn, Dec-2024 constant) | — | 5,462 | 29,997 | — |
MHI loan principal, nominal (USD Mn) | — | 57.35 | 54.35 | — |
MHI loan carrying amount (USD Mn) | — | 36.49 | 34.02 | — |
Cash Flow
| Metric | FY2022 | FY2023 | FY2024 |
|---|---|---|---|
Operating cash flow (ARS Mn, Dec-2024 constant) | — | -5,127 | 18,240 |
Capex — PP&E acquisitions (ARS Mn, Dec-2024 constant) | — | 4,779 | 16,120 |
Investments as reported in press release (ARS Mn, Dec-2024 constant) | — | 5,776 | 21,137 |
Investments as reported in press release (ARS Mn, Dec-2023 constant) | 12,294 | 8,073 | — |
Free cash flow, OCF minus PP&E capex (ARS Mn, Dec-2024 constant) | — | -9,906 | 2,120 |
Dividends paid (ARS Mn, Dec-2024 constant) | — | 9,028 | 0 |
Share buybacks (ARS Mn) | — | 0 | 0 |
Loans repaid (ARS Mn, Dec-2024 constant) | — | 4,221 | 6,721 |
Interest paid (ARS Mn, Dec-2024 constant) | — | 622 | 1,843 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2023 | FY2024 |
|---|---|---|
ROE (%, net income / average equity) | — | 4.9 |
ROA (%, net income / average assets) | — | 2.7 |
ROIC (%, EBIT×(1−35%) / (equity + debt − cash), year-end) | — | 7.7 |
Current ratio (x) | 1.08 | 1.92 |
Debt / equity (x) | 0.50 | 0.26 |
Net debt / EBITDA (x, reported basis) | — | 0.35 |
Interest coverage, EBIT / interest on debt (x) | — | 3.9 |
Interest coverage, EBITDA / interest on debt (x) | — | 10.3 |
Asset turnover (x, revenue / average assets) | — | 0.46 |
Receivable days, CAMMESA (days) | — | 78 |
Payable days (days, trade payables / cost of sales) | — | 54 |
Inventory days (days) | — | 34 |
Cash conversion cycle (days, approximate) | — | 58 |
Revenue by Region and Revenue by Region (%)
| Region | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|
Argentina revenue (ARS Mn, Dec-2024 constant) | — | 101,582 | 110,414 | — |
Argentina revenue (ARS Mn, Dec-2023 constant) | 50,974 | 46,648 | — | — |
Argentina share of revenue (%) | 100 | 100 | 100 | 100 |
Rest of world revenue (ARS Mn) | 0 | 0 | 0 | 0 |
Revenue by Region (%) and Region Margins & Growth (%)
| Channel | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|
Spot market share of revenue (%) | 100 | 100 | 100 | — |
Generation volume (GWh; FY2022–FY2024 company PRs, FY2025 CEPU) | 5,708 | 4,260 | 4,638 | 3,947 |
Generation YoY change (%) | — | -25 | 9 | -15 |
4Q-2024 by Period
| Period | 4Q-2024 | 2Q-2025 | 3Q-2025 | 4Q-2025 | 1Q-2026 | 2Q-2026 |
|---|---|---|---|---|---|---|
Central Costanera generation (GWh) | 1,325 | 409 | 886 | 1,041 | 1,486 | 841 |
Valuation Snapshot
| Metric | Value | Date | Source |
|---|---|---|---|
Share price (ARS) | 374.50 | 15-Oct-2025 | Fintel |
Share price (ARS) | 538.00 | 2-Aug-2026 | Investing.com |
52-week range (ARS) | 250.00 – 548.00 | to 2-Aug-2026 | Investing.com |
1-year price return (%) | 36.0 | to 2-Aug-2026 | Investing.com |
Market capitalization (ARS Mn) | 377,670 | 2-Aug-2026 | Investing.com |
Average daily volume, 3-month (shares) | ≈73,860 | 2026 | Investing.com |
Beta, 5-year monthly | −0.16 to −0.28 (varies by snapshot) | 2025–2026 | Yahoo Finance |
Metric | FY2021 | FY2022 | FY2023 |
Valuation Snapshot by Multiple
| Multiple | Value | Basis | Comment |
|---|---|---|---|
P/E (TTM) | ≈15.7x | ARS 538 / Investing.com TTM EPS 34.36 (2026) | — |
P/E on FY2025 EPS | ≈38.5x | ARS 538 / Simply Wall St FY2025 EPS 13.97 | Aggregator data; inflation distorts |
P/B | ≈2.4x | ARS 377.7bn / equity ARS 157.5bn (30-Jun-2025, Jun-25 constant) | Equity date lags price; true P/B likely lower after 2025–26 inflation restatement |
EV/EBITDA | Not reliably computable | Latest audited EBITDA is FY2024 (Dec-24 constant) | — |
EV/Sales | Not reliably computable | — | — |
Implied value vs 2023 acquisition | Market cap several times the USD 63.4M implied 100% equity value paid by CEPU in Feb-2023 | Holds under any plausible 2026 ARS/USD rate | Indicates market re-rating with Argentine utilities |
Analyst consensus | None (no sell-side coverage identified) | — | Yahoo shows no target |
Capital Instruments
| Instrument | Currency | Principal, nominal | Carrying amount | Rate | Maturity / amortization | Security | Source |
|---|---|---|---|---|---|---|---|
Mitsubishi Corporation loan | USD | USD 54.35M (31-Dec-2024) | USD 34.02M (ARS 35,108M) | 0.25% contractual; 10.805% effective | Final by 15-Dec-2032; minimum USD 3.0M/yr quarterly plus FCF-linked prepayments | First-degree pledge on financed CC assets; dividend restrictions | FY2024 FS |
Banco Santander (Uruguay) import loan | USD | USD 36,318 | ARS 38M | 7% | 5-May-2025 | — | FY2024 FS |
ON programme | USD or equivalent | Up to USD 100M authorised; none issued | — | — | Programme expires 30-Oct-2029 | — | FY2024 FS |
Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 | — | — |
MHI loan nominal principal (USD Mn) | — | — | 57.35 | 54.35 | — | — | — |
MHI loan carrying value (USD Mn) | — | — | 36.49 | 34.02 | — | — | — |
Analyst Conclusions
Management guidance. There is no standalone guidance. Group-level indications:
-
Costanera BESS energization in October–November 2026 and COD in Q4-2026.
-
USD 25–27M of combined 2027 adjusted EBITDA from the two BESS projects.
-
Continued MAT contracting under Res. 400/25.
-
Res. 294/24 adders in force to March 2027.
Consensus. No sell-side coverage of CECO2 identified.
Bull case
-
Market normalization re-rates earnings. Res. 400/25 converts peso-administered spot pay into USD capacity, reliability (USD 1,000/MW-month) and marginal energy prices, plus MAT contracts. The parent's conventional segment adjusted EBITDA more than tripled from USD 57.4M (1H25) to USD 199.3M (1H26), and Costanera is a large component.
-
Storage adds contracted USD cash flow. 55 MW at about USD 10–11k/MW-month implies roughly USD 6.7–7.4M of annual capacity revenue (analyst computation, 55 × 10,161–11,147 × 12). Payment is from a distributor backed by CAMMESA, starting around 2027.
-
Clean balance sheet and recovering asset base. Net debt is 0.35x EBITDA (FY2024), the main loan is concessional and amortizing to 2032, the Mitsubishi CC's life runs to 2043, and post-overhaul availability supports Q1-2026 record output (1,486 GWh).
Bear case
-
Policy risk is proven. TerConf awards were cancelled and receivables settled at a discount within six months in 2024. Res. 294/24 payments expire in March 2027 and could be withdrawn.
-
Output volatility and aging fleet. Generation swung from 409 GWh (Q2-2025) to 1,486 GWh (Q1-2026) to 841 GWh (Q2-2026). Steam units have low availability, and the Siemens CC has already been impaired.
-
Minority-holder disadvantage. Capital allocation, contracting and financing are run from Central Puerto. There are no dividends since 2023, a covenant-restricted payout, thin liquidity (about 74k shares/day), and no coverage. A possible future squeeze-out may not be priced at fundamental value.
Catalysts and monitorables (next 12 months).
Analyst verdict. Central Costanera is no longer the Enel subsidiary the input list describes. It is a 1,789 MW AMBA thermal platform controlled at 72.26% by Central Puerto and acquired in 2023 at a distressed USD 63M implied equity value. The three years since show both the asset's resilience and its fragility.
Resilience: after the write-off-driven FY2023 loss, the company returned to a 48% EBITDA margin and halved net debt in FY2024. Its location earned it reliability payments and a storage award, and Q1-2026 output hit the highest quarterly level in the data reviewed.
Fragility: a single CC outage turned Q2-2025 into a loss. Regulators cancelled a 515 MW award and imposed a receivables haircut. Two steam units have already been retired.
The investment debate therefore hinges on Argentina's power-market normalization, not on company-specific execution alone. If Res. 400/25 holds, USD-denominated capacity, reliability and contracted MAT revenues plus the 2026 BESS should give Costanera structurally higher and steadier USD earnings than at any time in the last decade. That would be well supported by a balance sheet whose only significant debt is a concessional Mitsubishi loan amortizing to 2032.
For minority shareholders, two structural discounts apply: control by a parent that allocates capital group-wide, and the absence of dividends since 2023. The share price has already risen about 36% in the year to August 2026 and implies a value several times the 2023 transaction. Further upside likely requires visible distributions, a fair-value corporate simplification, or audited FY2026 results showing the reform's full benefit.
Overall stance: Constructive on the operating asset; neutral on the minority equity pending FY2026 audited results and clarity on Res. 294/24's continuation beyond March 2027. Key risks to this view are regulatory reversal and another major forced outage on the Mitsubishi combined cycle.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Executive Leadership Team
| Name | Role | Tenure | Prior roles / notes | Source |
|---|---|---|---|---|
Osvaldo Arturo Reca | President (Chairman) of the Board | Since Feb-2023 | Appointed on the closing of the Central Puerto acquisition; member of the Reca family, among CEPU's principal shareholder groups | CEPU press release 17-Feb-2023; FY2024 FS signature |
Fernando Carlos Luis Boggini | Administration and Finance Officer | — | — | Yahoo Finance key executives |
Rodrigo Quesada | Legal Affairs Officer | — | — | Yahoo Finance key executives |
Leonel Sánchez | Human Resources Officer | — | — | Yahoo Finance key executives |
General Manager (Gerente General) | Signs Sustainability Reports 2023 and 2024 | — | Name not captured in sources reviewed | Sustainability Reports |
César Halladjian | Member, Comisión Fiscalizadora (statutory audit committee) | FY2024 | — | FY2024 FS signature |
“—” = not publicly disclosed.
Directors' Remuneration
| Metric | FY2023 | FY2024 |
|---|---|---|
Directors' and syndics' fees (ARS Mn, Dec-2024 constant; FY2024 FS Note 6) | 13.3 | 114.0 |
Total salaries and social charges, cost of sales plus admin (ARS Mn, Dec-2024 constant) | 39,547 | 33,312 |
Board & Management Changes
| Date | Change | Context | Source |
|---|---|---|---|
17-Feb-2023 | Enel-appointed board replaced; Osvaldo Reca named President | Change of control to Central Puerto | CEPU press release |
| 2023 | Enel shared-service contracts terminated; systems migrated by 1-Jul-2023 | Integration into CEPU systems | FY2023 PR |
Major Shareholders
| Holder | Stake (%) | Source |
|---|---|---|
Proener S.A.U. (Central Puerto group) | 72.26 | FY2024 FS |
Other shareholders (including any other CEPU-group holdings and free float) | 27.74 | Derived |
Competitive Landscape
Market Share by Competitor
| # | Competitor | Relevance to Costanera | Comparative revenue / share | Source / note |
|---|---|---|---|---|
| 1 | Pampa Energía | Largest diversified Argentine generator; multiple thermal plants in AMBA and the interior; MAT competitor | — | — |
| 2 | AES Argentina Generación | Thermal and hydro portfolio including Buenos Aires-area units | — | — |
| 3 | YPF Luz | Thermal and renewable generator; co-owner of Central Dock Sud | — | Econojournal (YPF Luz 40% of Dock Sud) |
| 4 | Central Dock Sud | Immediate neighbour on the Buenos Aires waterfront; won a 90 MW AlmaGBA BESS award at USD 12,815/MW-month | — | Econojournal |
| 5 | MSU Energy / MSU Green Energy | Thermal generator; largest AlmaGBA bidder (330 MW) | — | Econojournal |
| 6 | Genneia | Renewables leader; AlmaGBA bidder (170 MW) and potential awardee | — | Econojournal |
| 7 | Grupo Albanesi (Generación Mediterránea) | Thermal IPP with contracted CCs | — | Industry knowledge |
| 8 | Sullair Argentina | AlmaGBA bidder (144 MW); distributed and peaking capacity | — | Econojournal |
| 9 | Aluar Aluminio Argentino | Self-generator; AlmaGBA awardee (30 MW) | — | Econojournal |
| 10 | Enel Generación El Chocón / other legacy hydro | Low-cost hydro whose output displaces thermal dispatch | — | — |
| 11 | Nucleoeléctrica Argentina (Atucha I/II, Embalse) | Baseload nuclear; Atucha II's return in 2023 cut thermal dispatch | — | FY2023 PR |
| 12 | Sister plants (Central Puerto complex, Luján de Cuyo, San Lorenzo, Brigadier López) | Intra-group competition for capital and contracted volumes | CEPU group revenue USD 782.6M (FY2025) | CEPU 4Q25 |
Peer Comparison FY2025
| Metric | Central Costanera | Central Puerto (consolidated) |
|---|---|---|
Installed capacity (MW) | 1,789 | 6,933 |
Latest annual revenue | ARS 110,414M FY2024 (≈USD 107M) | USD 782.6M FY2025 |
Revenue growth | +9% real FY2024 | +17% USD FY2025 |
EBITDA margin | 48.3% FY2024 (reported) | 43% adjusted FY2025 |
R&D intensity | Not disclosed (≈0) | — |
Generation (GWh) | 3,947 FY2025 | 18,598 FY2025 |
“—” = not publicly disclosed.
Recent Developments
Undated incident: * Econojournal reported a failure in the steam turbine of the Buenos Aires combined cycle. It tripped the protection systems of the adjacent Dock Sud plant, caused about 550 MW of lost supply in the Edesur network and led to outages in southern Buenos Aires. CEPU had to repair or replace the damaged switch. The exact date was not captured in the sources reviewed.



