Evolve Power Limited Overview
Evolve Power Limited, known until 2023 as Montem Resources Limited, began as an ASX-listed junior that aimed to become a Canadian steelmaking coal producer. Its asset base was a portfolio of brownfield and greenfield metallurgical coal properties in the Crowsnest Pass of south-west Alberta. The company abandoned coal when Alberta reinstated its 1976 Coal Policy and imposed a moratorium on Eastern Slopes development. It then repurposed the idled Tent Mountain mine as a 320 MW pumped-hydro energy storage project, sold 50% of that project to TransAlta in April 2023, and delisted from the ASX the same month. After later exiting both Tent Mountain and a nascent battery-storage venture, it became a single-purpose litigation vehicle. In September 2025 it settled its de facto expropriation claim against the Government of Alberta for C$95 million. Today it is best characterised as a cash-rich, operationally dormant shell whose stated priority is returning settlement proceeds to shareholders, not growth.
Company's own description
In its 30 June 2023 interim report, the company said it transitioned in April 2023 from steelmaking coal to renewable-energy development in Alberta and British Columbia. Its stated strategy was to redevelop the idled Tent Mountain Mine as a pumped hydro energy storage project (TM-PHES). The same report said the company was exiting coal and had ceased all coal development activities. Residual freehold land and coal leases would remain until that exit was complete.
The company's current website gives a historical account. In 2016 it acquired Tent Mountain, Chinook, 4-Stack, Isola and Oldman. The plan was to restart Tent Mountain and then build Chinook, targeting more than 5 Mtpa of hard coking coal. The company pivoted Tent Mountain to pumped hydro in mid-2021 and sold its remaining TM-PHES interest to TransAlta in early 2025. It then pursued legal action over the Alberta moratorium.
The 17 October 2025 Company Update states that the Board has no current plans to grow the company with the settlement proceeds.
Independent characterisation
| Phase | Period | Business model | Revenue model | Value-chain position |
|---|---|---|---|---|
| 1. Coal developer | 2016 – mid-2021 | Restart and develop open-cut hard coking coal mines (Tent Mountain, then Chinook) | Prospective seaborne coking coal sales to steel mills (historic Tent Mountain coal went mainly to Japanese mills) | Upstream mine developer; pre-production |
| 2. Dual-track | mid-2021 – Apr 2023 | Parallel investigation of coal restart and the Tent Mountain Renewable Energy Complex (TM-REX) | Prospective merchant/contracted power and storage revenue; hydrogen | Pre-development energy-infrastructure developer |
| 3. Energy-storage developer | Apr 2023 – Feb 2025 | 50% (later approx. 40%) partner in TM-PHES with TransAlta; distributed battery storage ("Evolve Battery Storage") | Milestone payments from TransAlta (up to C$17M contingent); prospective storage/PPA revenues | Minority project co-owner |
| 4. Litigation / capital-return vehicle | Feb 2025 – present | Pursue, then settle, expropriation claim; distribute proceeds | Settlement proceeds (C$95M) — non-recurring | None (no operating business) |
The business has passed through four distinct models:
Customer types and end-markets. None were ever served commercially. Targeted end-markets were seaborne metallurgical coal (Asian steelmakers) and, later, the Alberta wholesale electricity and ancillary-services market. The current entity has no customers.
Product/service mix. Product 0%, service 0%, subscription 0%, licensing 0%. Historic monetisation came from asset sales (TM-REX 50% to TransAlta in 2023; TM-PHES residual and battery business in 2024–25) and a litigation settlement (2025).
Strategy
Strategic evolution (themes from company documents)
-
2016–2021: "Integrated Crowsnest coal complex." Restart Tent Mountain first, then develop Chinook toward more than 5 Mtpa using shared infrastructure (evolvepower.ca; Market Index profile).
-
2021–2023: "Two parallel strategies" at Tent Mountain, coal restart versus TM-REX (March 2022 Quarterly).
-
2023–2024: "Energy storage in Alberta." The rebrand to Evolve reflected a new business building energy storage projects for Albertans (company LinkedIn). TM-PHES was to proceed with TransAlta as developer, with a final investment decision targeted in 2025 (Canadian Press, Apr 2023).
-
2025: litigation focus. After the power assets were sold, the company was described as fully funded (TM-PHES proceeds plus Wahl Citadel) to pursue its Alberta claim, while remaining open to a fair settlement (Pass Herald, Mar 2025).
-
Since October 2025: capital return. The board has no current plans to grow the company with the proceeds. It proposed an initial return of up to A$40M and promised further updates on additional distributions once remaining obligations are met (Company Update, 17 Oct 2025).
Initiatives in the last 24 months (Oct 2024 – Oct 2026)
| Initiative | Date | Detail | Status |
|---|---|---|---|
| Exit of Evolve Battery Storage | Nov 2024 | Sold for C$250k | Complete |
| Exit of TM-PHES | 28 Feb 2025 | Net C$3.05M received | Complete |
| PMRU liability restructuring | Feb 2025 | C$2.5M reduced to C$1.1M, fully satisfying 2016-agreement obligations | Complete |
| Litigation funding | 2023–2025 | Wahl Citadel funded the claim; ~A$36.5M payable from proceeds | Payable/paid (n/d) |
| Alberta settlement | 26 Sep 2025 | C$95M; surrender of all Alberta coal rights except Tent Mountain | Definitive |
| Chinook exploration reclamation | Through end-2025 | C$1.5M held back pending completion | Scheduled end-2025; completion n/d |
| Initial return of capital | EGM 20 Nov 2025 | Up to A$40M (~A$0.1113/share) | Vote held |
| Further distributions | 2026+ | Contingent on settling tax, fees and reclamation | Pending |
ESG commitments and cost programmes: none formally disclosed. Medium-term financial targets: none. Management guidance is limited to capital-return intentions.
Products & Services
The company never commercialised a product. The "portfolio" was a set of development projects, catalogued below project by project.
Coal projects (Crowsnest Pass, Alberta/BC)
| Project | Description | Key specifications | Target customer | Status (latest) | Source |
|---|---|---|---|---|---|
| Tent Mountain Mine (coal restart) | Idled open-pit hard coking coal mine ~16 km west of Coleman, straddling the Alberta–BC border; last mined 1983 | ~1,700 ha. DFS restart at ~1 Mtpa (tier-two coal). Expansion plan of 4,925 t/day over 14 years. A$168M capex. DFS indicated ~A$65M p.a. earnings and a 5-year payback at US$150/t. Described as a ~60 Mt mine at IPO. Designated an "advanced coal project" in 2022. | Seaborne steel mills (historically Japan) | Coal plan abandoned; EIA withdrawn Apr 2023; E&E fully impaired FY2022 | MiningNews; Mining Technology; Pearler; Interim Report 2023 |
| Chinook Project | Larger brownfield project; Vicary area drilled | Scoping study for a 5 Mtpa open-cut hard coking coal mine. Tent Mountain plus Chinook: 232 Mt in-place resources (JORC 2012). | Seaborne steel mills | Leases surrendered and freehold mineral and surface rights transferred to Alberta under the Sep 2025 settlement | evolvepower.ca; Coal Age; Company Update Oct 2025 |
| 4-Stack Project | Greenfield coal exploration property | — | — | Surrendered under settlement | evolvepower.ca; Company Update |
| Isola Project | Greenfield coal exploration property | — | — | Surrendered under settlement | Same |
| Oldman Project | Greenfield coal exploration property | — | — | Surrendered under settlement | Same |
Renewable energy and storage
| Offering | Description | Key specifications | Target market | Launch / status | Source |
|---|---|---|---|---|---|
| Tent Mountain Pumped Hydro Energy Storage (TM-PHES) | Pumped storage using legacy mine water reservoirs at Tent Mountain | 320 MW. ~15 hours storage (TransAlta); 4,955 MWh (company LinkedIn). >80-year asset life. Construction targeted as early as 2026; COD 2028–2030. Up to ~400,000 homes; up to 590,000 t CO2 abatement p.a.; up to 400 jobs (company claims). | Alberta wholesale power / grid reliability; PPA offtake sought | Interest-sharing with TransAlta from Apr 2023; residual interest sold Feb 2025 | TransAlta release; Lethbridge News Now; Interim Report 2023 |
| TM-REX green hydrogen electrolyser | Offsite electrolyser concept | 100 MW | Industrial hydrogen | IP transferred within TM-REX deal; no further disclosure | Power Technology; Lethbridge News Now |
| TM-REX offsite wind farm | Wind generation to supply pumping energy, explored with Piikani Nation | 100 MW | Alberta power market | IP within TM-REX deal | March 2022 Quarterly; Power Technology |
| Evolve Battery Storage (EBS) | Distributed battery storage solutions | — | Alberta grid | Sold Nov 2024 for C$250,000 | Pass Herald |
Pricing models. None were disclosed. TM-PHES was to depend on a PPA, and the C$3.5M TransAlta milestone was tied to PPA execution.
Financial Narrative
Income statement
Derived note (FY2022): accumulated losses rose from A$30.98M (1 Jan 2022) to A$45.90M (31 Dec 2022), an increase of A$14.92M (H1 2023 Interim Report, statement of changes in equity). The FY2022 net loss is therefore at least ~A$14.9M, of which A$11.89M was the Tent Mountain impairment. The exact figure depends on any option-expiry reserve transfers, so it is not entered as a verified number.
FY2025 qualitative: FY2025 will include recognition of the C$95M settlement (C$93.5M payable by 3 Nov 2025, C$1.5M retained), net of ~A$36.5M payable to litigation funder Wahl Citadel, legal fees and tax. The FY2025 profit figure is in the 9 Apr 2026 annual report, which could not be retrieved, so it is n/d.
Interim income statements (A$)
Source: H1 2023 Interim Report (reviewed by William Buck): ### Balance sheet
Sources: H1 2023 Interim Report — statement of financial position (31 Dec 2022), statement of changes in equity (1 Jan 2022 equity), cash flow statement (opening FY2022 cash), Note 7 (E&E reconciliation).
Interim balance sheets (A$)
Sources: 30 Jun 2023 from the H1 2023 Interim Report. 30 Jun 2022 equity and cash from the H1 2023 Interim Report comparatives. 30 Jun 2022 total assets, liabilities and borrowings from Simply Wall St (A$17.63M, A$1.25M, A$44.98k), which reconcile to the filed equity of A$16.37M.
Cash flow (A$)
Annual free cash flow for FY2021–FY2025 is n/d. Capex was effectively zero beyond capitalised exploration. The FY2022 E&E expenditure was A$1.03M (Note 7).
Ratios
FY2022 current ratio = current assets A$463,142 / current liabilities A$1,009,243. Debt/equity = borrowings A$344,401 / equity A$2,732,710. H1 2023 current ratio = A$2,643,058 / A$649,913 = 4.07x.
Commentary
FY2021 → FY2022: collapse in book value. Equity fell from A$17.85M to A$2.73M. The main driver was the A$11.89M write-off of Tent Mountain coal E&E once the board accepted that the pumped-hydro pivot would permanently sterilise the coal. Cash fell from A$3.80M to A$0.36M, and the company closed 2022 with a working-capital deficit of A$0.55M. It relied on a related-party bridge loan from Chairman-linked Rigi Investments, which shows how close it came to insolvency.
H1 2023: the inflection. The TransAlta deal produced an A$13.76M accounting gain. This arose because the 50% retained JV interest was booked at fair value (A$8.52M), and A$8.52M of cash (C$7.7M) was received while only A$3.28M of book assets were derecognised. Equity rebuilt to A$13.38M. This was a one-off, non-cash-heavy gain, not operating profitability. Operating cash burn actually rose to A$3.79M in the half.
FY2023–FY2024: funding strain. The auditor raised going-concern doubts for FY2022, FY2023 and FY2024 (MarketScreener event log; William Buck review report H1 2023). Evolve could not fund its share of TM-PHES holding costs, which led to the 2024 dilution from 50% to ~40% (TransAlta 40-F).
FY2025: transformational liquidity event. The C$95M settlement dwarfs every prior balance-sheet figure, roughly 7x peak historical equity. Deductions announced by the company include ~A$36.5M to Wahl Citadel, legal and professional fees, Canadian and Australian tax, and reclamation. An initial capital return of up to A$40M (~A$0.1113/share) was proposed for the November 2025 EGM.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Segment Revenue
| Segment (AUD Mn) | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Coal exploration & evaluation revenue (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Energy storage development revenue (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Total operating revenue (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Group Entities
| Entity | Role | Ownership | Source |
|---|---|---|---|
Evolve Power Limited (Australia) | Parent / former ASX issuer | — | Interim Report 2023 |
Montem Resources Alberta Operations Ltd. (Canada) | Holder of Alberta coal assets; litigation plaintiff; settlement recipient | 100% (subsidiary) | Company Update, Oct 2025 |
Tent Mountain Pumped Hydro GP Ltd (Canada) | JV general partner | 50% (2023), later diluted to ~40% (2024), exited Feb 2025 | Interim Report 2023 Note 5; TransAlta 40-F; Pass Herald |
Tent Mountain Pumped Hydro Limited Partnership (Canada) | TM-PHES project vehicle | Same as above | Same |
Evolve Battery Storage (EBS) | Distributed battery-storage development | Sold Nov 2024 | Pass Herald |
Key Financials
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Revenue (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Gross profit (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Impairment of exploration assets (AUD Mn) | — | 11.89 | — | — | — |
Dividends per share (AUD) | 0 | 0 | 0 | 0 | 0 |
Income Statement (AUD) and Per-Share Data
| Metric | H1 2022 | H1 2023 |
|---|---|---|
Other income (AUD) | 0 | 13,764,569 |
Of which gain on sale of TM-REX (AUD) | 0 | 13,760,587 |
TM-REX pre-feasibility and sale expenses (AUD) | 1,564,412 | 2,242,744 |
Exploration tenement management expenses (AUD) | 0 | 620,637 |
Employee benefits expense (AUD) | 387,204 | 361,008 |
Professional fees (AUD) | 200,695 | 315,054 |
Corporate expenses (AUD) | 297,304 | 138,389 |
Financing costs (AUD) | 3,222 | 64,777 |
Profit/(loss) after tax (AUD) | -2,554,899 | 9,984,328 |
Basic & diluted EPS (A$ cents) | -0.8773 | 3.0430 |
Weighted average shares (M) | 291.24 | 328.11 |
Balance Sheet
| Metric | FY2021 | FY2022 |
|---|---|---|
Total assets (AUD Mn) | — | 3.76 |
Cash & equivalents (AUD Mn) | 3.80 | 0.36 |
Total borrowings (AUD Mn) | — | 0.34 |
Total liabilities (AUD Mn) | — | 1.03 |
Total equity (AUD Mn) | 17.85 | 2.73 |
Exploration & evaluation assets (AUD Mn) | 13.68 | 2.84 |
Goodwill & intangibles (AUD Mn) | 0 | 0 |
Net working capital (AUD Mn) | — | -0.55 |
Balance Sheet (AUD)
| Metric | 30 Jun 2022 | 30 Jun 2023 |
|---|---|---|
Cash & equivalents (AUD) | 1,315,075 | 2,420,278 |
Total assets (AUD) | 17,630,000 | 15,895,614 |
Investment in TM-PHES joint venture (AUD) | 0 | 8,518,013 |
Exploration & evaluation (AUD) | — | 2,937,048 |
Borrowings (AUD) | 44,980 | 44,909 |
PMRU deferred consideration (AUD) | 0 | 1,860,680 |
Total liabilities (AUD) | 1,250,000 | 2,513,237 |
Total equity (AUD) | 16,373,159 | 13,382,377 |
Net working capital (AUD) | — | 1,993,145 |
Returns & Leverage Ratios (AUD)
| Metric | H1 2022 | H1 2023 |
|---|---|---|
Net operating cash flow (AUD) | -2,050,298 | -3,791,574 |
Payments for exploration & evaluation, investing (AUD) | -559,155 | 0 |
Payments to PMRU for land (AUD) | 0 | -2,806,782 |
Proceeds from TM-REX sale (AUD) | 0 | 8,518,013 |
Net investing cash flow (AUD) | -559,155 | 5,645,552 |
Proceeds from share issues (AUD) | 150,000 | 20,000 |
Net financing cash flow (AUD) | 100,347 | 199,798 |
Dividends paid (AUD) | 0 | 0 |
Buybacks (AUD) | 0 | 0 |
Financial Ratios (x)
| Ratio | FY2021 | FY2022 |
|---|---|---|
Current ratio (x) | — | 0.46 |
Debt/equity (x) | — | 0.13 |
Gross / operating / EBITDA / net margin | n/a (no revenue) | — |
Geographic Revenue
| Region (AUD Mn) | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Canada revenue (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Australia revenue (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Total revenue (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Valuation Snapshot
| Metric | Value | Source / date |
|---|---|---|
IPO price | A$0.25 (Sep 2020) | SmallCaps; MiningNews |
Last ASX price | A$0.04 (Apr 2023) | InvestSMART; GuruFocus |
Change, IPO to delisting | ~-84% | Derived |
52-week range before delisting | A$0.02 – A$0.04 | GuruFocus |
Market cap at delisting | A$11.7M – A$12.6M | GuruFocus; Simply Wall St |
EV at delisting | A$10.44M | GuruFocus |
1/3/5-year share price performance (to Oct 2026) | Not applicable (unlisted) | — |
Analyst coverage | 0 analysts | Simply Wall St; Market Index |
Dividends | None paid through H1 2023; no dividend policy | Interim Report 2023 |
Proposed return of capital | Up to A$40M (~A$0.1113/share) | Company Update, Oct 2025 |
Credit ratings | None (Moody's/S&P/Fitch: not rated) | — |
Debt maturity profile | PMRU obligations satisfied (Feb 2025); no rated or long-term debt disclosed | Pass Herald |
Share Count (M)
| Metric | FY2022 |
|---|---|
Ordinary shares on issue, year-end (M) | 322.33 |
Analyst Conclusions
Management guidance
-
An initial return of capital of up to A$40M was put to shareholders in November 2025.
-
Further distributions of "additional or remaining funds" will follow once tax, funder, legal and reclamation obligations are determined.
-
There are no plans to grow the company with the proceeds (Company Update, 17 Oct 2025).
-
There is no consensus forecast (no analyst coverage).
Bull case
-
Residual cash is material. Gross proceeds of C$95M less ~A$36.5M to the funder and the A$40M initial return could leave meaningful residual cash for a second distribution, after tax, fees and reclamation.
-
Holdback release. The C$1.5M retained by Alberta should be released once Chinook reclamation (scheduled for end-2025) is certified.
-
Low ongoing cost base. With 1–10 employees and no projects, wind-down overheads should be modest, preserving cash for shareholders.
Bear case
-
Tax leakage. Double-jurisdiction tax on the settlement could materially reduce any second distribution.
-
Weak governance safeguards. Unlisted status limits disclosure and enforceability. Holders have no market exit and depend on board decisions on timing.
-
Long-term investors still lost money. Even with distributions, IPO-era investors have likely lost capital in nominal terms (A$0.25 IPO price versus ~A$0.11 initial return), and the remaining entity has no growth option.
Catalysts and monitorables (next 12 months)
| Catalyst | Expected timing | What to watch |
|---|---|---|
| Confirmation that the A$40M capital return was paid | Likely already occurred (late 2025 / early 2026) | EGM results; ATO class ruling, if any |
| Release of the C$1.5M reclamation holdback | 2,026 | Reclamation certification |
| Final tax assessments | 2026–2027 | Canadian and Australian tax payable on the settlement |
| Second (final) distribution / members' voluntary liquidation | 2026–2027 | Board announcement |
| FY2026 Annual Report | ~Q1–Q2 2027 | Residual net assets per share |
Analyst verdict
Montem Resources is a case study in how jurisdictional policy risk can overwhelm asset quality. The company assembled credible brownfield metallurgical coal assets in the Crowsnest Pass, completed a feasibility study at Tent Mountain and listed in 2020 on a plan to produce coking coal within two years. Within 18 months, Alberta's reversal of its 1976 Coal Policy and the subsequent moratorium had made that plan impossible. Management's response was resourceful: it repurposed a sterilised mine into a rare pumped-storage site, brought in TransAlta, and built a funded legal case against the province. But the company was chronically undercapitalised. It was diluted inside the TransAlta JV and carried going-concern qualifications for three consecutive years.
The outcome in 2025 is a liquidation-style result rather than an operating success. A C$95 million settlement turned a business worth around A$12 million at delisting into a cash shell whose board has explicitly ruled out reinvestment. After the litigation funder's ~A$36.5 million share, the proposed initial return of about A$0.11 per share is roughly 2.8 times the last ASX price. It is still well short of the A$0.25 IPO price.
For current holders, the investment question has narrowed to three variables: residual tax, wind-down costs, and how quickly the board makes further distributions. The FY2025 annual report and the H1 2026 half-year report are the documents that settle those questions. Their line-item contents should be obtained directly from the company or its registry, Automic, to finalise any valuation.
As an enterprise, Montem/Evolve has effectively concluded its strategic life. Its legacy is best measured by the precedent it helped set in Alberta: governments that encourage investment and then reverse policy may ultimately have to pay compensation to the companies affected.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Title | Tenure / background | Education | Source |
|---|---|---|---|---|
Peter Doyle | Managing Director & CEO | Joined 2017; MD since Jan 2018. 25+ years in international energy/mining in Australia, USA, UK, China and Russia. Formerly VP Marketing & Business Development at Atrum Coal, COO at Cockatoo Coal, VP Coal at Wood Mackenzie. Calgary-based. | B.Sc., MBA | evolvepower.ca |
Will Souter | Independent Non-Executive Chairman | Finance executive, lawyer and investment banker; CFO of Actinogen Medical. Former CFO of Atomo Diagnostics and Verton Technologies; Executive Director, RFC Ambrian; Director, PwC London/Sydney. Director since at least 2023. | B.Com., LLB (Adel), GAICD | evolvepower.ca; Interim Report 2023 |
Rob Tindall | Non-Executive Director (website labels him independent) | Founder of Montem. Founder/MD/CEO of Silica Resources Australia; NED of Hydrogenus Energy. His company GTG assigned the Chinook Properties to Montem in 2016 (related party). | B.A., M.Tax | evolvepower.ca; Interim Report Note 13 |
Will Bridge | Independent Non-Executive Director | Appointed Executive Director & CDO 12 Apr 2023, now NED. 30-year power executive; past Chair of AESO. Former leadership roles at TransAlta and ATCO Power (CTO; EVP Generation Technology & Procurement; EVP Business Development). Chair, Calgary Housing Company. | B.Eng., ICD.D | evolvepower.ca; Interim Report 2023 |
Susie Henderson | Independent Non-Executive Director | 20+ years across government, resources, infrastructure and energy. Former GM Strategic Infrastructure & Government Relations at Macarthur Coal; Key Coal Accounts Executive at Aurizon; President and Finance Committee member, GHD board. | B.Bus., CPA, GAICD | evolvepower.ca |
Mark Lochtenberg | Former Chairman & NED | Chair through at least Sep 2023; associated with Rigi Investments (5.33% holder, Feb 2024). Exact departure date is n/d. | — | Interim Report 2023 |
Melanie Leydin | Company Secretary (2023) | — | — | Interim Report 2023 |
Major Shareholders
| Rank | Holder | Shares | % |
|---|---|---|---|
| 1 | Merrill Lynch (Australia) Nominees | 31,349,779 | 8.73 |
| 2 | HSBC Custody Nominees (Australia) | 28,727,702 | 8.00 |
| 3 | Rigi Investments Pty Ltd (Lochtenberg-associated) | 19,141,420 | 5.33 |
| 4 | Citicorp Nominees | 18,143,717 | 5.05 |
| 5 | BNP Paribas Nominees | 11,649,083 | 3.24 |
| 6 | Ilwella Pty Ltd | 11,417,490 | 3.18 |
| 7 | UBS Nominees | 11,131,605 | 3.10 |
| 8 | M&A Nominee Serv Pty Ltd | 8,642,668 | 2.41 |
| 9 | JLNEC3 Pty Ltd | 7,191,604 | 2.00 |
| 10 | Mr Michael James Timothy Everard | 6,895,558 | 1.92 |
| 19 | Mr Robert James Tindall (director) | 4,453,334 | 1.24 |
| — | Top 20 total | 211,066,316 | 58.75 |
Competitive Landscape
Key Competitors
| Peer | Segment | Relation to Evolve | Relevant facts | Source |
|---|---|---|---|---|
Atrum Coal Ltd / Elan Coal Ltd | AB metallurgical coal | Co-plaintiff | Settled with Alberta for C$143M (2025) | Global News / CP |
Cabin Ridge Holdings / Cabin Ridge Project Ltd | AB coal | Co-plaintiff | Status n/d | CBC |
Black Eagle Mining Corp / Valory Resources | AB coal | Co-plaintiff | Settled; said it saw no merit in pursuing its claim after the moratorium was lifted | CP |
Northback Holdings (Grassy Mountain; Hancock-backed, formerly Riversdale) | AB coal | Separate 2024 lawsuit | Exploratory applications granted by AER | Globe and Mail via Substack |
Teck Resources / Elk Valley coal operations | BC steelmaking coal | Regional incumbent near Montem's leases | Major seaborne exporter | SmallCaps; Stockhead |
Riversdale Resources | AB coal (historic) | Neighbour | Hancock invested at ~A$500M valuation (2018) | Mining Weekly |
Cokal Ltd | Coking coal developer (ASX) | IPO-era peer | — | Stockhead |
TransAlta Corporation | Alberta power / hydro | Former JV partner and acquirer | Alberta's largest hydro producer; now holds Tent Mountain | TransAlta |
Capital Power | Alberta power | Storage/power peer (contextual) | — | — |
Recent Developments
The register includes all identifiable items, preceded by lead-in events from late 2024 to early 2025 that define the current position.