Company ProfilePremium

Fluxys Belgium SA

Company Profile Analysis

Ticker: FLUX.BR

ESOMAR 23 Corporate BadgeISO Certifications Badge
Fluxys Belgium SA - Company showcase

Year Founded & Workforce

1929

994 Employees

Fluxys Belgium SA logo

Fluxys Belgium SA Employee Contacts

We don't hold contact details for this company yet — you can request them.

Request Employee Contacts

Fluxys Belgium SA Overview

Fluxys Belgium is the legally unbundled, CREG-regulated owner and operator of Belgium's high-pressure natural gas infrastructure: roughly 4,000 km of transmission pipeline, the Zeebrugge LNG terminal (annual regasification capacity of 197 TWh, operated through subsidiary Fluxys LNG), and the Loenhout underground storage facility. Because Belgium sits at the crossroads of North-West European gas flows, its network functions as a transit hub feeding Germany, the Netherlands, France and Luxembourg, a role that intensified dramatically after Russian pipeline flows collapsed in 2022 and replacement LNG arrived from the west. Earnings are set by a cost-plus regulated return on the regulated asset base rather than by volumes or commodity prices, producing stable profits of EUR 75–84 M per year and a EUR 1.40 dividend. The company is now the designated operator for Belgium's nascent hydrogen network (Fluxys hydrogen) and, through Fluxys c-grid, for CO₂ transport networks in Wallonia and Flanders — the core of its long-term growth narrative.


What the company does

Fluxys Belgium operates three regulated natural-gas businesses and is building two new regulated molecule businesses:

  1. Gas transmission (regulated, CREG): Entry/exit capacity services on the Belgian high-pressure grid for shippers supplying Belgian distribution system operators, power plants and industrial end-users, plus border-to-border transit to neighbouring markets. In H1 2026, border-to-border volumes reached 167.2 TWh versus 80.8 TWh of Belgian domestic consumption (H1 2026 PR) — i.e., transit volumes are roughly double domestic volumes.

  2. LNG terminalling (regulated, via Fluxys LNG): Unloading, storage, regasification, reloading, truck loading, small-scale/bunkering and bio-LNG liquefaction services at Zeebrugge, with long-term "ship-or-pay" capacity contracts.

  3. Storage (regulated): Underground storage at Loenhout (aquifer), sold as Standard Bundled Units (injection, storage volume and withdrawal capacity), plus booster and priority capacity products.

  4. Hydrogen transmission (Fluxys hydrogen, subsidiary): Appointed by the federal energy minister on 26 April 2024 as the operator responsible for developing and operating Belgium's hydrogen transmission network. A 14-km network in the port of Antwerp has been technically completed and made available to the market; the 34-km Zelzate–Kallo section is due spring 2027 (H1 2026 PR).

  5. CO₂ transport (Fluxys c-grid, 77.5% subsidiary; Fluxys c-grid Antwerp, JV): Appointed CO₂ network operator in Wallonia (July 2025) and Flanders (October 2025); Fluxys c-grid Antwerp appointed local CO₂ network operator for the Antwerp port area in late March 2026 (FY2025 and H1 2026 PRs).

Business and revenue model

Revenue model: Almost entirely regulated service revenue (capacity-based tariffs). There is no meaningful product sale, licensing or subscription income. Gas purchases and sales related to balancing and operational needs flow through revenue but are profit-neutral under the regulatory framework (H1 2023 commentary reported by Trend).

Earnings driver: Under the 2024–2027 tariff methodology, regulated net profit is driven by four parameters — equity invested in the regulated asset base, financial structure, the OLO (Belgian government bond) rate and performance incentives (FY2025 PR outlook). Reasonable operating costs are passed through to revenue, so revenue moves with cost components rather than with profit.

Volume insensitivity: Results are not dependent on volumes handled (company outlook, also noted by Test-Aankoop, Apr 2026). Excess regulated revenue is booked to regulatory accounts (liabilities) that reduce future tariffs.

Contract structure: LNG terminal capacity is held under long-term ship-or-pay contracts; the company stated in March 2026 that contracts with Qatar-supplied customers remain fully in force despite the Hormuz disruption.

Value-chain position

Midstream, regulated, asset-heavy: Fluxys Belgium neither produces, buys nor sells gas for its own account (it is explicitly "not an importer" — FY2025 PR). It sits between upstream suppliers/LNG exporters and downstream DSOs, power generators, industrials and neighbouring TSOs.

Customer types and end-markets

Customer typeServiceComment
Shippers / gas suppliers and tradersTransmission entry/exit capacity, balancingIncludes international utilities supplying Germany, Netherlands, France
Distribution system operators (public distribution)Domestic exit capacity43.9 TWh consumption in H1 2026 (H1 2026 PR)
Industrial end-usersDirect connections21.3 TWh in H1 2026
Gas-fired power plantsDirect connections15.6 TWh in H1 2026, up 11.3%
LNG terminal users (long-term capacity holders, incl. Qatar-linked and Yamal LNG contracts)Regas, storage, reloading, transshipmentYamal LNG 20-year transshipment contract (2015) — reloading for non-EU export banned since 27 Mar 2025
Road and maritime transport (via LNG/bio-LNG)Truck loading, bunkering, bio-LNG liquefaction8,440 truck loadings in 2025; bio-LNG > 2.5 TWh in 2025
Storage usersLoenhout SBUs20% of capacity unsold for winter 2026/27 as of Sep 2026
Industrial emitters / hydrogen producers & usersCO₂ and H₂ transportEarly-stage; first H₂ section available; first CO₂ section (Zandvliet–Lillo) technical completion scheduled end-Sep 2026

Company's own description

The company describes itself (H1 2026 PR boilerplate) as a Euronext-listed subsidiary of the Fluxys infrastructure group, a "purpose-led company" operating 4,000 km of pipeline, an LNG terminal with 197 TWh of annual regasification capacity and an underground storage facility, committed to transporting hydrogen, biomethane and other carbon-neutral carriers as well as CO₂.

Independent characterisation

Fluxys Belgium is best understood as a bond-like regulated utility with an embedded energy-transition option. Its core economics are those of a cost-of-capital regulated network: low volatility, low growth in the legacy gas asset base, and returns increasingly linked to interest rates (the OLO-linked fair margin). Its strategic value has been elevated by the post-2022 rerouting of European gas supply, which turned Zeebrugge and the Belgian grid into a primary western entry corridor for Germany (roughly a quarter of German consumption flowed via its Zeebrugge-area infrastructure in 2025, per FY2025 PR). The investment case is now pivoting on whether the hydrogen and CO₂ networks — which depressed 2025 earnings because their costs are not yet covered by a regulatory framework — will be converted into a remunerated regulated asset base. Governance is dominated by Belgian public-sector shareholders, with a 10% free float that limits liquidity and index relevance.

Strategy

Stated strategic themes (company documents)

Dual mission: ensure security of supply for Belgium and North-West Europe while accelerating the energy transition ("shaping a bright energy future", purpose-led company).

Multi-molecule infrastructure: building pipelines that are "fully future-proof" — able to carry natural gas now and hydrogen or CO₂ when markets are ready (Desteldonk–Opwijk, Knokke–Evergem, hydrogen pipelines laid with multi-purpose technology).

Belgium as a CO₂ hub for North-West Europe: (FY2025 headline theme).

Market-paced expansion of hydrogen/CO₂: infrastructure will expand in line with demand and only insofar as start-up investment risk is reduced to acceptable levels via support mechanisms.

Operational excellence within the regulated model: strict operating cost control and efficiency to capture regulatory incentives.

Climate neutrality by 2050;: halving own GHG emissions by 2025 (2021–2025 target).

Strategic initiatives in the last 24 months (Oct 2024 – Oct 2026)

InitiativeDateDescriptionStatus
First biomethane direct injectionOct 2024Green Logix, LommelOperational; biomethane +39% H1 2026
New LNG truck loading baysJan 2025Four bays, ZeebruggeOperational
Hydrogen network phase 1 constructionEarly 2025Antwerp port and Kallo–ZelzateAntwerp 14 km available; Zelzate–Kallo spring 2027
Antwerp CO₂ networkEarly 2025Fluxys c-grid Antwerp JV with Pipelink and Air LiquidePhase 1 completion end-Sep 2026
Knokke–Evergem pipeline2025–2026+5 GWh/h Zeebrugge entryUnder construction (EUR 68.5 M spent 2025)
Fluxys–OGE–Equinor cross-border CO₂ MoUJun 2025Germany–Belgium–North Sea CO₂ chainDevelopment
Loenhout solar parkMid-20255.5 MWpOperational
CO₂ operator designationsJul/Oct 2025, Mar 2026Wallonia, Flanders, Antwerp LCNOAppointed
Ruhbens corridorMar 2026Up to 20 Mt/year potential, with OGEDevelopment
Hydrogen interconnection with NetherlandsApr 2026Agreement with Hynetwork (Gasunie) via ZandvlietPlanning
HyOffwind hydrogen injection connectionEnd-2026First renewable hydrogen into gas gridIn preparation
MethER methane programmeOngoing~75% methane reduction since 2017Ongoing
Potential Zeebrugge regas expansionUndatedUp to 6 Mtpa additional firm capacity under considerationContemplated

Medium-term financial targets / guidance

The company does not publish numeric earnings guidance. Its stated outlook is that regulated profit will evolve with equity invested, financial structure, OLO rates and incentives; that the hydrogen/CO₂ "latent asset" will become a regulated asset (positive earnings impact) once frameworks are adopted; and that the 2028–2031 methodology (approved June 2026) will stabilise the fair margin against interest-rate volatility. Dividend policy: a stable EUR 1.40 gross dividend has been maintained since FY2022 (no formal target disclosed). Earlier group-level ambition (2022 annual report summary): capacity for 30 TWh of hydrogen and 30 Mt of CO₂ transport annually by 2030 — a Fluxys group target, not reiterated in recent Fluxys Belgium PRs.

Products & Services

Transmission (Natural gas & biomethane)

OfferingDescriptionTarget customerPricing modelNotes
Entry/exit capacity (cross-border points)Firm/interruptible capacity at interconnection points to UK, Netherlands, Germany, France, LuxembourgShippers, tradersCREG-approved tariffs (EUR/kWh/h/year); multi-year and short-term productsTariff documents published annually; 2026 tariffs effective 1 Jan 2026
Domestic exit capacityDelivery to DSOs, industrials, power plantsDSOs, industrials, generatorsRegulated tariffs; price simulator published2026 domestic tariff sheet
Zeebrugge entry capacity expansionNew multi-molecule pipelines (Desteldonk–Opwijk: +15 GWh/h; Knokke–Evergem: +5 GWh/h)Shippers serving Germany/BelgiumIncremental capacity regimeTotal +20 GWh/h at Zeebrugge entry
Biomethane injectionDirect grid injection of biomethaneBiogas producersConnection tariffsBelgian biomethane production 268 GWh in H1 2026, +39%
L-gas transmission to FranceTransport of low-calorific gas to France until French conversion completesFrench shippersRegulatedBelgium itself no longer uses L-gas (FY2024 PR)
Scheduling/balancing servicesMarket balancing (BeLux)ShippersRegulatedGroup also owned GMSL scheduling (group-level)
Hydrogen injection connectionConnection of HyOffwind (Belgium's first large-scale renewable hydrogen plant, Zeebrugge) to inject surplus H₂ into gas gridHydrogen producers—Connection scheduled end-2026

LNG terminalling (Zeebrugge — Fluxys LNG)

OfferingDescriptionCapabilityNotes
Unloading, storage and regasification (send-out)Long-term berthing slots, tank storage and send-out197 TWh/year regasification capacity (H1 2026 PR); record send-out 720 GWh on 17 Feb 2026Long-term ship-or-pay contracts
Additional regasification slotsSubscription windows (e.g., 6,000 additional slots in 2025 per Similarweb news feed)—Company is contemplating up to 6 Mtpa (~10.5 GWh/h) of additional firm regas capacity (Fluxys news)
Transshipment (ship-storage-ship, ship-to-ship)Reloading LNG from ice-class to conventional carriersDedicated 180,000 m³ tank built for Yamal LNGReloading Russian LNG for non-EU export banned since 27 Mar 2025
Truck and container loadingLNG/bio-LNG for road fuel stations8,440 loading operations in 2025 (+>10%); four new bays since 1 Jan 2025Bio-LNG ~70% of truck loads in 2025
Small-scale ship loading / bunkeringLNG as marine fuel39 bunkering loadings H1 2026 vs 53 in FY2025Growing
Bio-LNG liquefactionVirtual liquefaction of grid biomethane into bio-LNG>2.5 TWh in 2025 (+73%); >1.0 TWh H1 2026Launched 2020

Storage (Loenhout)

Offering2026 regulated tariffNotes
Golden SBU (Standard Bundled Unit)EUR 104.01 per SBU per yearBundled injection/volume/withdrawal
Firm injection capacityEUR 2,523.87 per MWh/h per yearBooster (daily) at same rate; priority booster EUR 2,091.10
Firm withdrawal capacityEUR 1,531.26 per MWh/h per yearBooster same; priority booster EUR 1,225.01
Firm storage volumeEUR 1.35 per MWh per year—
Energy in cash1% of injected quantities; 0.5% of withdrawn quantities—
Capacity transfer (OTC)EUR 308.35 per transfer per party3% fee if realised by Fluxys Belgium
Hydrogen aquifer storage pilotTesting underground hydrogen storage in an aquifer at LoenhoutPilot

(Fluxys Belgium storage tariff sheet 2026.)

Hydrogen (Fluxys hydrogen)

Asset/offeringStatus (Oct 2026)
Antwerp port hydrogen network (14 km)Technically complete, available to the market (H1 2026 PR)
Zelzate–Kallo pipeline (34 km), linking Ghent and Antwerp portsUnder construction; completion expected spring 2027
Cross-border link to Netherlands via ZandvlietCooperation agreement with Gasunie subsidiary Hynetwork signed early April 2026
Belgium–Germany hydrogen connectionUnder study with OGE (FY2023 PR)

CO₂ (Fluxys c-grid, Fluxys c-grid Antwerp)

Asset/offeringStatus (Oct 2026)
Antwerp port CO₂ network phase 1 (Zandvliet–Lillo)Construction well advanced; technical completion scheduled end-September 2026
Wallonia CO₂ networkOperator appointment July 2025; development phase
Flanders CO₂ networkOperator appointment October 2025
Ruhbens corridor (Ruhr → Belgium → Zeebrugge → North Sea storage), up to 20 Mt CO₂/year potentialLaunched March 2026 with OGE; subject to market demand and support mechanisms
Equinor offshore CO₂ pipeline from Zeebrugge to Norwegian storageJoint development (MoU June 2025)
CarbonConnect (subsea link Zeebrugge → UK southern North Sea storage)Enabled by Belgium–UK agreement of 16 June 2026

Launch years and pricing for hydrogen and CO₂ services are not publicly disclosed (regulatory frameworks still being finalised).

Financial Narrative

Income statement (IFRS consolidated)

Sources: FY2021–FY2025 annual results PRs. EPS computed by dividing reported consolidated net profit by shares outstanding; reported group net profit may include minority interests in Fluxys c-grid/c-grid Antwerp (not separately verified). Test-Aankoop reports FY2025 EPS of EUR 1.07, consistent with the computation. Diluted EPS equals basic (no dilutive instruments identified).

Earlier glossary disclosures on fluxys.com show EBITDA in the EUR 278–297 M range for prior years, but the years could not be mapped reliably and are not tabulated.

Revenue CAGR FY2021–FY2025 (computed): 3.2% per year (573.2 → 650.5). This figure is distorted by FY2022, when revenue was inflated by the EUR 300 M solidarity-contribution mechanism and exceptional storage/capacity income; the FY2023 decline of EUR 319.8 M was attributed by the company to the non-recurrence of the EUR 300 M contribution.

Half-year comparison (H1 PRs):

Discrepancy note: Idéal Investisseur reported H1 2026 net income of EUR 46.784 M, whereas the company PR table shows EUR 45.303 M; the difference likely reflects group share versus total (incl. minorities). The PR figure is used.

Commentary on income trends

Revenue: tracks pass-through cost components under the cost-plus methodology rather than demand; FY2025 growth of EUR 41.7 M (+6.8%) was explained by changes in tariff-covered cost components.

Net profit: has been range-bound at EUR 75–84 M for five years, reflecting the regulated-return model. The FY2023 dip (−EUR 6.3 M) was caused by a lower fair margin for the LNG terminal under the new methodology; the FY2025 dip (−EUR 7.2 M) by unremunerated hydrogen/CO₂ expenditure.

Inflection in H1 2026: net profit rose 40% year on year to EUR 45.3 M on lower hydrogen/CO₂ expenses, growth of the regulated asset base and a higher OLO rate — the first clear sign of rate-base growth flowing to earnings.

EBIT stagnation: in FY2025 despite higher EBITDA indicates rising depreciation and impairments as the asset base expands.

Balance sheet

Sources: FY2025 and H1 2026 PRs (H1 2026 PR annex discloses the NFD bridge: cash at 75% of EUR 589.2 M at end-2025 and EUR 554.1 M at mid-2026). Definition caveat: company NFD deducts regulatory liabilities and certain loans, and counts only 75% of cash; it is therefore not comparable to a conventional net debt figure. Conventional net debt (gross interest-bearing debt minus 100% cash and cash investments) would be approx. EUR 185 M at end-2025 (computed: 1043.5 − 785.7 − 72.3 cash investments at 100%), but this excludes leases/regulatory items treatment and should be read as indicative.

Goodwill and intangibles: not material/not disclosed in sources reviewed. Working capital: not disclosed in sources reviewed. Equity fell to EUR 541.1 M at H1 2026 because the EUR 98.4 M dividend (paid May 2026) exceeds half-year earnings — the dividend has exceeded consolidated net profit in every year shown.

Statutory (Belgian GAAP, parent only) data:

(FY2020–FY2023 statutory figures from Companyweb and results PRs; FY2024–FY2025 from PRs.) The dividend is paid out of statutory distributable reserves; FY2025 allocation drew EUR 22.7 M from reserves.

Cash flow

FY2025 CFO from financialfilings.com, citing the Integrated Annual Report 2025 (aggregator; not cross-checked to the cash-flow statement). Buybacks: none (no buyback programme identified).

Ratios

Not disclosed or not computable from verified inputs: ROIC, current ratio, interest coverage (Fluxys Belgium-level), cash conversion cycle (not meaningful for a regulated network). For context, the parent Fluxys group reported interest coverage of 7.7x in 2024 (13.4x in 2023) and net financial debt/extended RAB of 34% (group financial information page) — these are group, not Fluxys Belgium, ratios.

Overall financial assessment

Fluxys Belgium combines a stable regulated earnings stream with an investment programme that has more than doubled (EUR 92 M in 2024 to EUR 262 M in 2025, with H1 2026 at EUR 88 M) and a dividend that structurally exceeds both consolidated earnings and free cash flow. Leverage remains low on the company's own measure (NFD/EBITDA ~1.0x) because of a large cash pile (~EUR 740–790 M), much of it effectively owed back to tariff payers via regulatory liabilities.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Segment Overview

SegmentContentProducts/services

Transmission

All operations subject to the Gas Act related to transmission of gas and hydrogen in Belgium

Entry/exit capacity, border-to-border transit, domestic exit, balancing, connections; hydrogen transmission is reported within this regulated perimeter description

Storage

All Gas Act operations related to storage at Loenhout

Standard Bundled Units, injection/withdrawal capacity, booster and priority booster capacity, capacity transfers

LNG terminalling

All Gas Act operations related to the Zeebrugge LNG terminal

Unloading, storage, regasification, reloading, transshipment, truck/container loading, bunkering, bio-LNG liquefaction

Other

Non-regulated and other activities (incl. CO₂ development, subsidiaries)

Not detailed in sources reviewed

Revenue by Segment

MetricFY2023FY2024FY2025

Group operating revenue (EUR Mn)

592.8608.8650.5

Group EBIT (EUR Mn)

—133.9133.9

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Capex by activity (EUR Mn)

Capex by activity (EUR Mn)FY2024FY2025

Transmission-related

83.9246.2

Storage-related

3.611.5

LNG infrastructure

4.64.1

Total PP&E investment

92.1261.8

Capex by activity (EUR Mn) (Half-Yearly)

Capex by activity (EUR Mn)H1 2025H1 2026

Gas transmission

48.438.9

Hydrogen transmission

25.738.3

CO2 transmission

8.16.1

Storage

4.53.3

Total

88.787.8

Group Entities

EntityOwnership by Fluxys BelgiumRoleSource

Fluxys Belgium SA

Parent (listed)

Transmission, storage

Filings

Fluxys LNG SA

—

Zeebrugge LNG terminal operator

FPS Economy; registry

Fluxys hydrogen

Subsidiary

Designated Belgian hydrogen network operator

FY2024 PR

Fluxys c-grid

77.5% (partners Pipelink, Socofe, SFPIM)

CO₂ network operator, Wallonia and Flanders

FY2025 PR

Fluxys c-grid Antwerp

70% (partners Pipelink, Air Liquide)

Local CO₂ network operator, Antwerp port

H1 2025 PR

Balansys (BeLux balancing JV with Creos), Flux Re (captive reinsurer)

—

Balancing / insurance

—

Income Statement and Margin Analysis (%)

MetricFY2021FY2022FY2023FY2024FY2025

Operating revenue (EUR Mn)

573.2912.6592.8608.8650.5

Net profit (EUR Mn)

75.583.777.482.174.9

Net margin (%) (computed)

13.29.213.113.511.5

Basic EPS (EUR) (computed on 70263501 shares)

1.071.191.101.171.07

Gross dividend per share for fiscal year (EUR)

1.381.401.401.401.40

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Income Statement and Margin Analysis (%) (FY2024–FY2025)

MetricFY2024FY2025

EBITDA (EUR Mn)

302.3320.1

EBIT (EUR Mn)

133.9133.9

EBITDA margin (%) (computed)

49.749.2

EBIT margin (%) (computed)

22.020.6

Income Statement

MetricH1 2024H1 2025H1 2026

Operating revenue (EUR Mn)

296.7329.3343.0

EBITDA (EUR Mn)

147.9155.7174.2

EBIT (EUR Mn)

70.561.984.6

Net profit (EUR Mn)

40.632.345.3

Key Financials

MetricFY2021FY2022FY2023FY2024FY2025

Total consolidated balance sheet (EUR Mn)

—3,406.63,358.63,310.13,173.7

Net financial debt, company definition (EUR Mn)

846.0493.8219.4159.8326.9

Balance Sheet and Margin Analysis (%)

MetricFY2024FY2025H1 2026

Total property, plant and equipment (EUR Mn)

1,804.31,862.21,880.9

Equity (EUR Mn)

603.8592.8541.1

Non-current interest-bearing liabilities (EUR Mn)

—986.3964.6

Current interest-bearing liabilities (EUR Mn)

—57.1105.6

Gross interest-bearing debt (EUR Mn) (computed)

—1,043.51,070.2

Cash and cash equivalents, 100% (EUR Mn) (computed from 75% figure)

—785.7738.8

Net financial debt (EUR Mn)

159.8326.9378.7

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Income Statement (Annual)

MetricFY2020FY2021FY2022FY2023FY2024FY2025

Statutory net profit (EUR Mn)

70.771.784.079.584.185.5

Profit carried forward after allocation (EUR Mn)

——93.1101.7111.8121.7

Cash Flow

MetricFY2021FY2022FY2023FY2024FY2025

Investments in PP&E (EUR Mn)

50.6105.5167.792.1261.8

Dividends paid to all shareholders (EUR Mn) (computed, DPS paid in year × shares)

96.397.098.498.498.4

Metric

FY2025

————

Cash from operations (EUR Mn)

147.5————

Free cash flow, CFO minus PP&E investment (EUR Mn) (computed)

-114.3————

Returns & Leverage Ratios (%) and Financial Ratios (x)

RatioFY2024FY2025Basis

ROE (%)

13.612.5

Computed: net profit / year-end equity (FY2024) and average equity (FY2025)

ROA (%)

2.52.3

Computed: net profit / average total assets

Asset turnover (x)

0.180.20

Computed: revenue / average total assets

Net financial debt / EBITDA (x)

0.531.02

Computed on company NFD

Net financial debt / equity (x)

0.260.55

Computed

Dividend payout vs consolidated net profit (%)

120131

Computed: EUR 98.4 M / net profit

Operating Metrics (TWh)

Flow (TWh)H1 2024H1 2025H1 2026

Border-to-border transit, total

133.3160.0167.2

Flows to Germany

84.098.0122.6

Flows to Netherlands

36.048.039.7

Belgian domestic consumption

79.582.080.8

Operating Metrics (TWh) (H1 2025–H1 2026)

Belgian consumption by segment (TWh)H1 2025H1 2026

Public distribution

46.843.9

Industry

21.021.3

Gas-fired power plants

14.015.6

Valuation Snapshot

MetricValueBasis

Share price

~EUR 21.9

Simply Wall St/Webull, mid-Oct 2026; EUR 22.10 close on 28 Sep 2026; EUR 21.00 at Test-Aankoop analysis (Apr 2026)

Market capitalisation

~EUR 1,539 M

Computed

Trailing P/E on FY2025 EPS (1.07)

~20.5x

Computed

Trailing P/E on TTM to H1 2026 (net profit ~EUR 87.9 M; EPS ~1.25)

~17.5x

Computed (74.9 − 32.3 + 45.3)

EV (market cap + company NFD at H1 2026)

~EUR 1,918 M

Computed; NFD definition flatters EV

EV / TTM EBITDA (~EUR 338.6 M)

~5.7x

Computed

EV / TTM revenue (~EUR 664.2 M)

~2.9x

Computed

P/B (equity EUR 541.1 M at H1 2026)

~2.8x

Computed (Test-Aankoop cited ~2.5x in Apr 2026)

Dividend yield

~6.4%

Computed: 1.40 / 21.9

Per-Share Data

MetricFY2019FY2020FY2021FY2022FY2023FY2024FY2025

Gross DPS for fiscal year (EUR)

1.301.371.381.401.401.401.40

Capital Markets

ItemStatus

Buyback authorisations

None identified

Gross interest-bearing debt

EUR 1,070.2 M at 30 Jun 2026 (EUR 964.6 M non-current; EUR 105.6 M current)

Debt maturity profile

Not disclosed in sources reviewed (available in annual report financing note)

Analyst Conclusions

Management guidance

No numeric guidance. Management expects regulated profit to follow equity invested, financial structure, OLO rates and incentives; the hydrogen/CO₂ contingent asset to convert into a regulated asset once frameworks are set, with a positive profit impact; and the 2028–2031 methodology to stabilise the fair margin. Management is assessing the legality and consequences of the federal government's EUR 300 M regulatory-account plan and monitoring Russian sanctions and Middle East disruption daily.

Consensus expectations

No sell-side consensus is available. On the computed TTM basis, earnings run-rate has recovered to ~EUR 88 M, above the FY2025 level, driven by the H1 2026 rebound.

Bull case

  1. Rate-base growth plus higher OLO is now visible in earnings: H1 2026 net profit +40% to EUR 45.3 M, with management explicitly citing RAB growth and a higher OLO rate; a full-year profit above EUR 85 M would restore payout below ~115%.

  2. Transition option value: designated monopoly operator for hydrogen and CO₂ in all relevant Belgian jurisdictions, with the first H₂ section live, Antwerp CO₂ phase 1 near completion, Ruhbens (up to 20 Mt/yr) and bilateral treaties with Norway, UK, Denmark and the Netherlands; regulatory recognition of the latent asset would provide a one-off and recurring earnings uplift.

  3. Defensive yield with low leverage: ~6.4% yield, NFD/EBITDA ~1.0x, ~EUR 740 M of cash, and a newly approved 2028–2031 methodology that reduces interest-rate volatility in returns.

Bear case

  1. Political appropriation: a second EUR 300 M extraction (after the 2023 levy) would consume roughly 40% of the cash pile and could constrain financing of transition capex and the dividend.

  2. Dividend not covered: payout has exceeded consolidated profit every year since FY2021, free cash flow was deeply negative in FY2025 (~−EUR 114 M) and equity is shrinking; capex at ~EUR 175 M per half-year pace implies rising debt.

  3. Valuation and liquidity: ~20x trailing earnings and ~2.8x book for a 10% free-float regulated utility with single-analyst coverage, exposed to Qatari LNG disruption, Russian-sanctions counterparty risk and slow hydrogen/CO₂ demand formation.

Key catalysts and monitorables (next 12 months)

Catalyst / monitorableExpected timing
Legislative fate of the EUR 300 M regulatory-account withdrawalRolling; federal budget cycle 2026–27
Adoption of hydrogen and CO₂ regulatory/tariff frameworks (conversion of latent asset)2026–2027
FY2026 results and FY2026 dividend proposal (watch for any change from EUR 1.40)~End-March 2027
HyOffwind hydrogen grid connectionEnd-2026
Commissioning of Antwerp CO₂ phase 1 and first commercial CO₂ flowsQ4 2026 – 2027
Zelzate–Kallo hydrogen pipeline completionSpring 2027
Restoration of Qatari LNG flows / Hormuz reopening; Zeebrugge shipping recoveryUncertain
Russian LNG import phase-out timetable impact on Fluxys LNG contracts2026–2027
Winter 2026/27 Loenhout fill level and sale of remaining 20% capacityNov–Dec 2026
Knokke–Evergem pipeline commissioning2026–2027
2028–2031 tariff proposals based on approved methodology2,027
AGM May 2027: board renewals and confirmation of Managing Director mandateMay 2027

Concluding analyst verdict

Fluxys Belgium is a high-quality, strategically vital piece of European energy infrastructure whose listed equity is, in practice, a regulated cash-flow stream controlled by Belgian public shareholders. The core gas business has proved resilient: five years of EUR 75–84 M profits through the most turbulent gas market in decades, record LNG send-outs, and a network that became a primary western supply route into Germany. H1 2026 delivered the long-awaited inflection, with net profit up 40% as regulated asset growth and higher OLO rates fed through and transition costs moderated, and the June 2026 approval of the 2028–2031 methodology improves earnings visibility beyond the current period.

Against that, the equity story carries three unresolved tensions. First, capital allocation: a fixed EUR 98.4 M dividend sits above consolidated earnings and far above free cash flow while capex has nearly tripled, so the payout is being sustained by reserves and balance-sheet cash. Second, political risk is real and recurring — the federal government extracted EUR 300 M in 2023 and has announced intent to take another EUR 300 M from regulatory balances, a claim the company is still contesting. Third, the transition upside depends on regulatory frameworks and support mechanisms for hydrogen and CO₂ that are not yet finalised; until they are, those investments depress rather than lift returns.

At ~EUR 21.9, the shares trade on roughly 17.5–20.5x earnings, ~2.8x book and a ~6.4% yield. That is a full valuation for a 10%-float, minimally covered regulated subsidiary, but the yield is underpinned by a monopoly asset base and low leverage. Our synthesis: a hold-quality income instrument with asymmetric event risk — the key swing factors are the EUR 300 M regulatory-account outcome and the timing of hydrogen/CO₂ asset recognition. Investors should demand clarity on both before underwriting the dividend at current levels.


Data integrity note: All figures are drawn from Fluxys Belgium regulated releases unless otherwise attributed. Figures marked "computed" are analyst calculations from verified inputs.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Executive Leadership Team

NameTitleTenurePrior roles / educationCompensation

Pascal De Buck (born 1966)

CEO and Chairman of the Executive Board (since 1 Jan 2015); Managing Director (since May 2020); also CEO and MD of Fluxys group (since 1 Jan 2016)

10+ years as CEO

Joined Fluxys 1995 as legal counsel; head of Legal and Commercial; Commercial Director; Deputy CEO of Fluxys SA (2015); law degree (economic law), VLEKHO, EHSAL Management School, IESE Global CEO Program. Board roles at ENTSOG, GIIGNL, Synergrid; VBO-FEB strategic committee

Total FY2024 EUR 592k (salary EUR 276k); FY2023 EUR 885k; FY2022 EUR 670k (Simply Wall St, from remuneration report). CEO pension contribution EUR 123,532 (Beursgenoten). Figures likely reflect only the portion charged to Fluxys Belgium

Christian Leclercq

CFO and Member of the Executive Board (since 1 Jan 2020)

~6.8 years

30 years in finance; CFO of Hamon Group 2013–2019

—

Other Executive Board members

Beursgenoten lists Nicolas Daubies, Ben De Waele, Erik Vennekens, Damien Adriaens, Raphaël De Winter, Jan Van de Vyver, Rafaël Van Elst, Anne Vander Schueren, Leen Vanhamme and Joeri Pavlovic among management

———

“—” = not publicly disclosed.

Board of Directors

NameRoleNotes (per Fluxys board page / Beursgenoten)

Andries Gryffroy

Chairman of the Board

Industrial electromechanical engineer, master's in marketing; technology and energy consultant

Jean-Claude Marcourt

Vice-Chairman

Listed as vice-chairman (Beursgenoten); board page lists a vice-chair role

Pascal De Buck

Managing Director and CEO

Executive director

Daniël Termont

Director, Chairman of the Audit and Risk Committee

Also on Publigas board

Ludo Kelchtermans

Director

CEO of Nuhma (Limburg climate company); mandate expiring May 2026 per board page

Cécile Flandre

Director

Mathematics and actuarial science, ULB

Anne Leclercq, Roberte Kesteman, Sabine Colson, Sandra Gobert, Koen Van den Heuvel, Abdellah Achaoui, Leen Dierick, Gianni Infanti, Nathalie Gilson, Martin Jadin, Joris Laenen

Directors

—

Independent directors under the Gas Act

Include a Chair of the Corporate Governance Committee and a Chair of the Appointment and Remuneration Committee

Board page describes an independent director (appointed 2013, former CFO of Belfius Insurance and Ethias, former Elia director, chair of Synatom) and another (Executive Director of GUBERNA since 2019)

May 2026 appointments

New directors appointed on proposal of Publigaz (term to 2032) and Ethias (term to 2028)

Names not captured in sources reviewed

Major Shareholders

HolderSharesStakeSource

Fluxys SA

63,237,24090.00%

FSMA notification (11 Dec 2017; overview 16 May 2025)

Public float (incl. retail, institutions)

7,026,26110.00%

Computed

BlackRock, Inc.

12,3420.018%

Simply Wall St

State Street Global Advisors

279

<0.001%

Simply Wall St

Segall Bryant & Hamill

275

<0.001%

Simply Wall St

Competitive Landscape

Key Competitors

CompetitorCountrySegment of competitionRelative positioning

Gasunie / Gasunie Transport Services

Netherlands

Transit routes to Germany; hydrogen backbone; Gate and Eemshaven LNG (via stakes)

Larger network; competing western entry to Germany

Gate terminal (Gasunie/Vopak)

Netherlands (Rotterdam)

LNG regasification

Direct LNG competitor for NW Europe

Eemshaven LNG (EemsEnergyTerminal)

Netherlands

FSRU regasification

Post-2022 capacity competitor

Deutsche Energy Terminal FSRUs / German LNG terminals

Germany

LNG supply directly into Germany

Structural threat to Belgian transit to Germany

GRTgaz / Elengy (Montoir, Fos)

France

LNG terminals; Montoir also handled Yamal transshipment

Competing terminals

Dunkerque LNG

France

LNG regasification

Fluxys group-owned (internal competitor, not Fluxys Belgium)

National Grid Grain LNG

UK

LNG regasification and reload

Competing LNG hub

OGE

Germany

Gas transmission; also partner on CO₂/H₂

Partner more than rival

Snam

Italy

European gas TSO/storage, peer benchmark

Larger, diversified peer

Enagás

Spain

LNG and TSO peer; competing LNG reload/transshipment

Peer benchmark

Northern Lights / Aramis / Porthos (CO₂)

Norway / Netherlands

CO₂ export/storage hubs

Competing CO₂ routes to North Sea

Competitor Detail

MetricFluxys Belgium FY2025

Revenue (EUR Mn)

650.5

Revenue growth (%)

6.8

EBITDA margin (%)

49.2

Net margin (%)

11.5

Company Snapshot

$733.4M

Revenue

994

Employees

1929

Founded

Brussels, Belgium

Headquarters

SWOT Analysis

Strengths

  • Regulated, volume-insensitive earnings: net profit held in a EUR 74.9–83.7 M band across FY2021–FY2025 despite revenue swinging between EUR 573 M and EUR 913 M.
  • Strategic hub position: ~40% more gas to Germany and the Netherlands in 2025; roughly a quarter of German consumption routed via its Zeebrugge-area infrastructure (FY2025 PR).
  • Record-scale LNG operations: record send-outs of 716 GWh (6 Jun 2025) and 720 GWh (17 Feb 2026).
  • Designated operator status for hydrogen (Apr 2024) and CO₂ (Wallonia Jul 2025, Flanders Oct 2025, Antwerp Mar 2026).
  • Low leverage and high cash: NFD of EUR 326.9 M vs EBITDA of EUR 320.1 M (FY2025); ~EUR 786 M of cash and equivalents at end-2025 (computed).
  • Environmental execution: ~75% methane reduction since 2017; 215 kt CO₂ avoided in 2025 via seawater regasifiers.

Weaknesses

  • Dividend exceeds earnings: EUR 98.4 M payout vs EUR 74.9 M FY2025 net profit (131% payout); EUR 22.7 M drawn from reserves.
  • Negative free cash flow: FY2025 CFO ~EUR 147.5 M vs EUR 261.8 M capex (aggregator CFO figure).
  • Earnings drag from pre-regulated transition spend: FY2025 profit −EUR 7.2 M attributed to hydrogen/CO₂ costs.
  • Illiquidity and control: only 10% free float; 90% held by Fluxys SA.
  • Limited disclosure: no quarterly reporting, no guidance, no earnings calls, single analyst coverage (Simply Wall St).
  • Equity erosion: equity fell from EUR 603.8 M (end-2024) to EUR 541.1 M (mid-2026).

Opportunities

  • Conversion of latent hydrogen/CO₂ asset into regulated RAB would lift profits (company outlook, FY2025 and H1 2026 PRs).
  • 2028–2031 methodology (approved Jun 2026) stabilises fair margin against rate volatility.
  • Ruhbens corridor potential of up to 20 Mt CO₂/year.
  • Bilateral CO₂ treaties with Norway (Mar 2026), UK (16 Jun 2026), Denmark and Netherlands open multiple storage routes.
  • Bio-LNG growth: +73% in 2025 to >2.5 TWh; marine bunkering loadings 39 in H1 2026 vs 53 in all of 2025.
  • Potential regas expansion of up to 6 Mtpa at Zeebrugge; gas-for-power demand growth (+11.3% H1 2026).

Threats

  • EUR 300 M regulatory-account withdrawal announced by federal government (Nov 2025), echoing the EUR 300 M solidarity levy paid Jan 2023.
  • Middle East disruption: Hormuz blocked for LNG vessels, Ras Laffan damage; Zeebrugge shipments sharply lower since May 2026.
  • Russian sanctions escalation: Fluxys LNG has the largest exposure to Russian-controlled counterparties via long-term contracts (FY2025 PR); EU import phase-out under Regulation 2026/261.
  • Storage under-utilisation: 20% of Loenhout capacity unsold for winter 2026/27; fill level 60% on 21 Sep 2026.
  • German LNG import build-out could reduce long-term transit bookings.
  • Regulatory delay for hydrogen/CO₂ frameworks could further depress 2026 profit (Test-Aankoop, Apr 2026).

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
27 Mar 2025EU ban on reloading Russian LNG for non-EU export enters force; Zeebrugge amends operating rulesEnds Yamal transshipment use-case; company states no negative financial impact (H1 2025 PR)
Spring 2025Construction starts on first hydrogen pipelines (Antwerp, Antwerp–Ghent) and first Antwerp CO₂ pipelineFirst physical transition assets
13 May 2025AGM and EGM; EUR 1.40 dividend for FY2024Dividend held flat
27 May 2025Fluxys c-grid Antwerp JV registered (PitchBook date)Antwerp CO₂ vehicle
6 Jun 2025Record send-out from Zeebrugge terminal: 716 GWh in a dayHub importance
Late Jun 2025MoU with OGE and Equinor on cross-border CO₂ chain, backed by Flanders and NRW Minister-PresidentsFoundation for Ruhbens
Mid-2025Loenhout 5.5 MWp solar park operationalScope 2 reduction
Jul 2025Fluxys c-grid appointed CO₂ network operator in WalloniaRegulated CO₂ franchise
Early Aug 2025Loenhout storage completely fullSupply security
24 Sep 2025H1 2025 results: net profit EUR 32.3 M (−20%) on hydrogen/CO₂ costsEarnings dip
Oct 2025Fluxys c-grid appointed CO₂ network operator in FlandersFranchise extension
Nov 2025Federal budget agreement announces intent to withdraw EUR 300 M from Fluxys Belgium regulatory-account balancesMajor regulatory/political risk
Dec 2025 – early 2026EU Regulation 2026/261 on phase-out of Russian gas imports adoptedFluxys LNG not an importer but counterparties affected
2025 full yearZeebrugge received ~4.6 Mt of Yamal LNG (Urgewald/Kpler via High North News), more than double 2024 bcm volumesReputational/political exposure
17 Feb 2026New send-out record: 720 GWh from LNG terminalStrong Q1 activity
Jan–Apr 202660 large LNG carriers unloaded vs 47 a year earlierPeak LNG usage
Mar 2026Ruhbens CO₂ corridor launched with OGE (up to 20 Mt/yr)Flagship CCS project
Mar 2026Belgian state visit to Norway; bilateral CO₂ transport treatyRegulatory enabler
Late Mar 2026Fluxys c-grid Antwerp appointed Antwerp local CO₂ network operatorFranchise secured
Mar 2026Company flags Hormuz closure for LNG vessels and damage at Ras Laffan; ship-or-pay contracts remain in forceKey 2026 risk
31 Mar 2026FY2025 results: net profit EUR 74.9 M (−8.7%); capex EUR 261.8 M; EUR 1.40 dividend proposedAnnual print
Early Apr 2026Fluxys hydrogen and Hynetwork sign cooperation agreement (Zandvliet interconnection)Cross-border H₂
Apr 2026Test-Aankoop Invest issues "sell" view citing valuation (>20x 2026e EPS, 2.5x book) and dividend sustainability concernsRare external analysis
12 May 2026AGM approves EUR 1.40 dividend; new directors appointed on proposal of Publigaz and EthiasGovernance refresh
20 May 2026FY2025 dividend paidEUR 98.4 M outflow
From May 2026LNG supplies to Zeebrugge decline significantly; very low traffic July–AugustMiddle East supply shock
Jun 2026CREG approves 2028–2031 gas tariff methodology with fair-margin stabilisationEarnings visibility
16 Jun 2026Belgium–UK CO₂ transport agreement signedSupports CarbonConnect
22–27 Jun 2026Heatwave: power plants consume 816 GWh, ~3x prior yearGas-for-power flexibility role
21 Sep 2026Loenhout only 60% full; 20% of capacity unsold for winterStorage commercial risk
End-Sep 2026Scheduled technical completion of Antwerp CO₂ phase 1 (Zandvliet–Lillo)First CO₂ asset
28 Sep 2026H1 2026 results: revenue EUR 343.0 M, net profit EUR 45.3 M (+40%)Earnings recovery
202614-km Antwerp hydrogen network technically complete and available to marketFirst H₂ capacity (delivers 2021 ambition of first capacity in 2026)
End-2026 (expected)HyOffwind renewable hydrogen connectionCatalyst

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

1 chart
Revenue by Segment: Group operating revenue rose from EUR 592.8 Mn in FY2023 to EUR 650.5 Mn in FY2025.
Fluxys Belgium SA — Revenue by Segment
Series (EUR Mn)FY2023FY2024FY2025
Group operating revenue592.8608.8650.5
Group EBIT—133.9133.9

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Unlock Company Contacts

Connect with Key Decision-Makers

Access verified employee contacts and decision-maker information from this company to support your sales, lead generation, and business development efforts.