GCDI S.A. Overview
GCDI S.A. is the reconstituted form of TGLT S.A., once one of Argentina's most visible premium residential developers. TGLT built the Forum, Astor, Metra and Venice brands. In January 2018 it acquired Caputo S.A.I.C.F., an engineering and construction contractor with roots back to 1938 and more than 500 completed public and private works. After a deep 2019–2020 recapitalization and a 2022 rebrand, management turned the company into a third-party construction contractor and progressively exited own-account real estate development. The contractor platform delivered nationally visible projects: the Más Monumental stadium expansion for River Plate, the new Ezeiza departures hall, the RA-10 nuclear reactor building, and refurbishments of the Plaza and Sheraton hotels. Its finances never stabilized. Consecutive losses, a stalled legacy project (Astor San Telmo), US-dollar notes and peso volatility left equity negative by end-2025. A new controlling shareholder (MFX Holding) and CEO arrived in late 2025 and early 2026, followed by a court reorganization filing in May 2026. GCDI is now a distressed micro-cap whose equity value depends on the outcome of its creditor negotiation.
What the company does
GCDI is an Argentine engineering and construction company. It acts mainly as a general contractor ("contratista principal") for third-party private and institutional clients. It also retains a residual portfolio of legacy real estate development assets from the TGLT era. Its activities fall into three groups.
Construction for third parties (core business since 2022). GCDI bids in private price competitions and public or private tenders to build civil, commercial, hospitality, industrial, sports and infrastructure works. Recent work includes:
-
stadium expansion (Más Monumental, River Plate);
-
airport terminals (Ezeiza new departures hall);
-
hotels (Plaza Hotel, Sheraton Buenos Aires);
-
industrial plants (Toyota Zárate, Mirgor Baradero);
-
scientific infrastructure (RA-10 nuclear reactor building);
-
corporate and residential buildings (Bliss Buenos Aires, OM Recoleta, L'Avenue, Sucre, Aura Núñez, Manzana Concepción);
-
tourism and leisure (Rueda de Buenos Aires observation wheel in Puerto Madero, Buquebus terminal);
-
urban public space (Parque Mujeres Argentinas).
Real estate development (legacy, being wound down). TGLT developed premium and middle-upper-income residential projects in Buenos Aires, Rosario, Tigre and Montevideo. It also acquired land banks such as La Maltería in Hudson. Since 2022 the stated strategy has been to withdraw from projects considered non-core. The main remaining exposure is Astor San Telmo. That project is stalled by litigation, yet it was the largest single asset on the March 2026 balance sheet at ARS 51,661 million.
Engineering services. When TGLT bought Caputo in 2018, Caputo operated in three segments: construction, real estate development and engineering services (Ámbito, 2018). Engineering and project-management services survive as part of the contracting offer.
Business and revenue model
| Revenue stream | Model | Recognition | Current relevance |
|---|---|---|---|
| Construction contracts (third parties) | Fixed-price lump-sum ("ajuste alzado") with price redetermination and fixed term; cost-plus and unit-price contracts also typical in Argentina | Over time (IFRS 15, percentage of completion) | Dominant (~all FY2025 revenue, by inference) |
| Real estate unit sales | Pre-sales in USD or indexed pesos during construction, with delivery at completion | At delivery (point in time) | Residual |
| Engineering services | Fee-based | Over time | Minor; not separately disclosed in sources reviewed |
| Land / project disposals | Asset sales | On transfer | Episodic: ARS 16,324M of divestiture proceeds in FY2022 and ARS 6,438M in FY2024 (S&P cash-flow data) |
The product/service/subscription/licensing mix is essentially 100% project-based service revenue. GCDI has no subscription or licensing income. Unearned revenue (customer advances) is a large balance-sheet item: ARS 57,431M long-term and ARS 7,944M current at 30 September 2025 (S&P). This reflects pre-sale and advance-payment structures inherited from development projects and contract advances.
Value-chain position, customers and end-markets
GCDI sits in the middle of the construction value chain. It buys steel, cement and energy from suppliers; its largest trade creditors in the concurso include Acindar, Loma Negra and Cementos Avellaneda. It subcontracts specialties and delivers turnkey works to project owners. Its customer types are:
-
private developers (residential, office, hotel);
-
industrial corporates (Toyota, Mirgor, UPM in Uruguay);
-
sports institutions (Club Atlético River Plate);
-
concession-holders and state-linked entities (airport works at Ezeiza; the RA-10 reactor for Argentina's nuclear programme);
-
leisure operators (RDBA S.A. for the Rueda de Buenos Aires, a project promoted by Fénix Entertainment).
Its end-markets are Argentine private non-residential construction, residential construction, industrial capex and selected infrastructure. Uruguay is a secondary market.
Company's own description vs. independent characterization
Company framing (paraphrased from public statements and CNV filings). GCDI describes itself as an Argentine construction group with more than 80 years of history and over 500 completed works. It presents the concurso as a tool to reorder liabilities, keep the business running as a going concern, protect jobs and safeguard assets. It states that works in progress, notably the Rueda de Puerto Madero and the Plaza Hotel, continue.
Independent characterization. GCDI is a mid-sized general contractor with a strong engineering track record and a weak balance sheet. It is burdened by the residue of a failed premium-development strategy, USD-linked debt and contingent labour and project litigation. Revenue fell 54% nominally in FY2025 and about 67% on a TTM basis to June 2026, so the backlog appears to be shrinking just as insolvency proceedings constrain bonding and supplier credit. The new controlling shareholder brings related-party demand (Fénix Entertainment's Rueda project) and capital-market relationships. Contract-flow revival is therefore plausible, but the concurso proposal will determine value allocation between creditors and existing shareholders.
Strategy
Stated strategy (paraphrased themes from company communications)
-
Pure-play construction contractor. Since the 2022 rebrand, focus on third-party construction (private, civil, industrial and infrastructure works) and leave own-account real estate development in the background.
-
Non-core asset disposal. Progressive withdrawal from development projects classified as non-core, with proceeds used to deleverage. Major disposal inflows occurred in FY2022 (ARS 16.3bn) and FY2024 (ARS 6.4bn).
-
Brand positioning. Continued positioning of the GCDI brand on quality and sustainability (CEO statement, Ámbito, Dec 2023).
-
Liability reorganization. Use the concurso preventivo to restructure liabilities equitably among creditors while protecting going-concern value, jobs and assets, and keep executing current contracts.
-
Sponsor-led revival. Under MFX Holding, regain prominence in private works and infrastructure (Forbes Argentina, Jan 2026).
Initiatives in the last 24 months
| Date | Initiative | Detail | Status |
|---|---|---|---|
| Oct–Nov 2024 | ON consent solicitation (Classes XVI and XVII) | Extend payments beyond 11 Feb 2027 (up to US$50M nominal); waive the debt-limitation covenant to allow up to US$35M of new debt, subordinated to the ONs in insolvency | Failed (insufficient consents by 12 Nov 2024) |
| Late 2024 | Related-party contract with ACP | Board approved a contract with ACP, a related party under Art. 72 of the Capital Markets Law, exceeding 1% of equity (details undisclosed) | Approved |
| Nov 2025 | Change of control | MFX Holding acquires 42.5% | Completed |
| Jan 2026 | Management reset | New CEO Ramiro Juez | Completed |
| Mar 2026 | Rueda de Buenos Aires contract | Civil works and assembly for RDBA S.A. (Fénix Entertainment project): ARS 10,163M, 450 days | In execution |
| 2,026 | Authorized capital increase | Shareholders asked to approve issuance of up to 3bn new ordinary shares (Boletín Oficial) | — |
| 2,026 | River Plate stadium next stage | GCDI among bidders for further expansion and roofing | Outcome not disclosed |
| May–Jun 2026 | Concurso preventivo | Filed 11 May; opened 17 June 2026 | In progress (claims verification stage) |
Medium-term targets and guidance
Management has published no financial targets or guidance: no revenue, margin or backlog targets appear in any source reviewed. Under the concurso timeline, a creditor proposal ("propuesta de acuerdo preventivo") and a vote within the exclusivity period are the de facto medium-term "targets".
Products & Services
GCDI does not sell catalogued products. Its "portfolio" consists of capability lines (construction types) and legacy development brands. Each is listed below with its named flagship work. Pricing is project-specific and generally not disclosed.
Construction & engineering (core)
| Line | Description / capability | Target customer | Named flagship works | Year(s) | Contract model (where disclosed) |
|---|---|---|---|---|---|
| Sports infrastructure | Stadium expansion, remodeling and capacity increase | Sports clubs | Más Monumental (River Plate) expansion and remodeling; GCDI also bid in River's tender for a further stage (capacity increase and roofing) | 2022–2024; tender 2026 | — |
| Airport & transport terminals | Main contractor for terminal buildings: masonry and finishes, furnishings, metalwork, plumbing, structures | Airport concessionaires and state | Ezeiza Airport new Terminal B departures hall (45,000 m²; 150 check-in positions; "Zeppelin" control level; two operational basements; capacity cited at 30M passengers/year); Buquebus terminal; ongoing Ezeiza expansion work (Jan 2026) | Completed 2023; ongoing 2026 | — |
| Hospitality | Refurbishment of heritage and luxury hotels | Hotel owners and operators | Plaza Hotel (historic Buenos Aires hotel remodeling); Hotel Sheraton Buenos Aires (Retiro) | Awarded 2023; in execution 2026 | — |
| Leisure & tourism | Civil works and assembly of attractions | Entertainment operators | Rueda de Buenos Aires (Dique 1, Puerto Madero): 79 m diameter, 82 m height, up to 288 passengers, eight steel support columns, LED lighting, ~20-minute ride; client RDBA S.A.; promoted by Fénix Entertainment | Started Mar 2026; 450-day term; opening targeted around mid-2027 | Lump-sum with price redetermination, fixed term; budget ARS 10,163M (~US$7.1M at the time; Forbes cites >US$8M) |
| Industrial | Industrial plants and warehouses | Manufacturers | Toyota Zárate plant and parts-building expansion; Mirgor industrial plant (Baradero) | 2022–2023 | — |
| Scientific & nuclear | High-specification structures | State science and nuclear agencies | RA-10 nuclear research reactor building | Completed 2023 | — |
| Corporate & administrative | Office and administrative buildings | Corporates | UPM administrative building (Paso de los Toros, Uruguay); historical Caputo works include Torre Consultatio | 2023 (UPM) | — |
| Residential (third-party) | High-end residential towers for other developers | Developers | Bliss Buenos Aires; OM Recoleta; L'Avenue; Sucre; Aura Núñez; Manzana Concepción | 2022–2024 | — |
| Cultural & public space | Cultural centres and parks | City government | Usina del Arte (Caputo era); Parque Mujeres Argentinas | Various | — |
| Retail & energy (Caputo legacy) | Shopping centres and power plants | Retail REITs, utilities | Abasto Shopping; Tortugas Open Mall; Central Térmica Mendoza | Historical | — |
Legacy real estate brands (TGLT era)
| Brand | Positioning | Named projects | Status (latest available) |
|---|---|---|---|
| Forum | Large-scale premium waterfront and urban developments | Forum Alcorta (Buenos Aires); Forum Puerto Norte (Rosario); Forum Puerto del Buceo (Montevideo) | Delivered / residual |
| Astor | Middle-upper-income urban buildings of 10,000–30,000 m² | Astor Palermo (built by Caputo); Astor Núñez; Astor San Telmo | San Telmo stalled by the height dispute; valued at ARS 51,661M (31 Mar 2026) |
| Metra | Middle-income urban projects | Metra Puerto Norte (Rosario); Metra Devoto | Delivered / under construction per 2023 press |
| Venice | Mixed-use marina community (Tigre) | Venice | Developed through a 49.99%/49.99% vehicle with Marcelo Gómez Prieto; GCDI's stake reported as taken over by the partner (iProfesional, Nov 2024; details unconfirmed) |
| La Maltería | Land bank (former brewery site, Hudson) | La Maltería S.A.U. | Held as a 100% subsidiary (EMIS); development plans not disclosed |
Financial Narrative
Source for all tables in this section: S&P Global Market Intelligence via StockAnalysis.com (income statement and cash flow last updated 28 September 2026; balance sheet through 30 September 2025). FY2025 balance-sheet items come from press reports of the FY2025 statements (Forbes Argentina, Canal 12 Misiones, May–June 2026). Units are ARS millions unless stated. Figures are nominal and subject to IAS 29.
Income statement
Note on income tax: S&P reports income tax as an expense line. Net income equals pre-tax income minus that line, so a negative "expense" is a tax benefit (for example FY2025: -24,410 − (-4,309) = -20,101).
TTM to 30 June 2026 (S&P):
-
Revenue ARS 26,774M, down 66.82% YoY.
-
Gross profit ARS -3,018M.
-
Other operating expenses ARS 62,851M, which implies large impairments or provisions in H1 2026, most plausibly on Astor San Telmo and receivables; this attribution is an inference.
-
Operating income ARS -74,248M.
-
Net income ARS -75,256M; EPS ARS -82.17.
Margins and growth
Revenue CAGR FY2021–FY2025 (nominal ARS): about 42.5% per year, computed as (58,075 / 14,099)^(1/4) − 1. Argentine consumer prices rose by several hundred percent cumulatively over the same period, so real revenue almost certainly declined. A real CAGR cannot be computed reliably from aggregator data mixing restated and unrestated years.
Commentary.
-
Gross margins held in a 15–18% band from FY2021 to FY2024, consistent with a functioning contractor.
-
They collapsed to 3.3% in FY2025 and turned negative on a TTM basis to June 2026. This points to cost overruns on fixed-price contracts in a disinflating but high-cost environment, under-absorption of overhead as volumes fell, and likely loss provisions on legacy contracts.
-
FY2024 was the only year with positive EBIT (ARS 749M) and positive EBITDA (ARS 1,110M). Even then, legal settlements (ARS 5,551M), asset writedowns (ARS 9,492M) and FX losses (ARS 8,822M) pushed net income to ARS -16,542M.
-
The bottom line has been driven far more by below-the-line items than by operations. The FY2023 FX loss of ARS 34,444M coincided with the December 2023 devaluation and the company's USD-denominated ONs.
-
Legal settlement charges escalated from ARS 86M in FY2021 to ARS 9,150M in FY2025, consistent with the Argerich, Weil and Astor San Telmo-related claims.
Balance sheet
How the FY2025 column was built:
Total liabilities: of ARS 159,700M as reported by Forbes Argentina from the FY2025 statements.
Equity: reported by Canal 12 Misiones as "ARS 7.6 million" negative. Given the scale of the balance sheet, this is read as about ARS -7,600 million (a likely units error in the press report).
Total assets: derived as liabilities plus equity.
Working capital: reported as more negative than "31.3" (read as ARS 31,300M).
- Blank cells: not available in the sources reviewed.
30 September 2025 (S&P, last quarterly detail available):
-
Total assets ARS 148,773M; total liabilities ARS 147,930M; equity ARS 843M.
-
Cash ARS 825M; total debt ARS 33,172M; net debt ARS 32,347M.
-
Working capital ARS -28,730M; goodwill ARS 33,206M.
31 March 2026 (court filing, per Ámbito, 7 July 2026):
-
Total assets ARS 107,679M, of which Astor San Telmo is ARS 51,661M.
-
Total liabilities ARS 125,477M, implying equity of about ARS -17,798M (derived).
-
Liability breakdown: suppliers of goods and services ARS 17,080.8M; financial liabilities (mainly ONs) ARS 25,376.6M; Astor San Telmo-related liabilities ARS 27,599M; plus tax, social security and labour obligations.
Conflicting source. Seeking Alpha (TGLTY page) states Q4 2025 total assets of US$107.83M and liabilities of US$107.22M, implying marginally positive equity. This conflicts with the company's own negative-equity statements in its CNV filings and is likely a currency-translation artefact. The company's CNV disclosures take precedence.
Commentary.
-
The balance sheet has deteriorated monotonically since FY2023. Equity fell from ARS 15,365M (FY2023) to ARS 8,673M (FY2024), to ARS 843M (Sep 2025), to negative at FY2025, and further negative by March 2026.
-
Goodwill (ARS 27–33bn), essentially from the Caputo acquisition, is large relative to equity. Tangible book value has been negative since FY2022, so reported equity was propped up by acquisition goodwill for four years.
-
Cash has never exceeded ARS 1.9bn against debt of ARS 28–47bn. Liquidity has been structurally insufficient.
Cash flow
TTM June 2026 free cash flow was ARS -7,890M (S&P).
Commentary. The business is asset-light (capex below ARS 100M per year), so cash generation depends entirely on working-capital dynamics.
-
FY2025 operating cash outflow of ARS 11,984M combined a ARS 12,548M reduction in unearned revenue (customer advances consumed without replenishment, a classic sign of a shrinking backlog) with a ARS 10,572M release of receivables.
-
Asset sales funded the gap in FY2022 (ARS 16.3bn) and FY2024 (ARS 6.4bn). Nothing material was sold in FY2025, which left the company unable to service debt.
-
Dividends and buybacks: none in the period. Dividends are effectively prohibited given accumulated losses and negative equity.
Ratios
All ratios are derived from the S&P figures above. "n.m." means not meaningful.
Notes on the ratios:
ROE: is n.m. in FY2025 because equity is negative.
Current ratio: at 30 September 2025 was 0.50x.
Debt/equity: is n.m. in FY2025 because equity is negative.
Net debt/EBITDA: is n.m. wherever EBITDA is negative; it appears only for FY2024.
FY2025 ROA and asset turnover: use derived total assets of about ARS 152,100M.
ROIC: was negative in every year except marginally in FY2024: EBIT of ARS 749M after a ARS 1,147M tax charge on invested capital of roughly ARS 36,500M (equity plus total debt) is negative after tax. It is not shown as a precise series.
Cash conversion cycle: is not computable for a percentage-of-completion contractor without contract-asset and liability detail, which is not available in the sources reviewed.
Commentary. No ratio indicates a self-financing business. Interest coverage was below 1x in every year. Leverage tripled in FY2023 when the peso devaluation inflated USD-linked debt. The FY2024 net debt/EBITDA of 23.6x was already incompatible with refinancing, which explains the failed November 2024 consent solicitation.
Trends, inflections and drivers (summary)
-
FY2022–FY2023 scale-up. Nominal revenue rose about 8x, driven by the Más Monumental, Ezeiza and RA-10 works and by inflation. Margins stayed positive at the gross level.
-
FY2023 FX shock. The December 2023 devaluation produced a ARS 34.4bn FX loss on USD liabilities.
-
FY2024 peak and fragility. The only positive-EBIT year, but heavy legal and impairment charges pushed net income deeply negative.
-
FY2025 collapse. Revenue fell 54% nominally (far more in real terms) as large works concluded and new awards lagged. Public-works austerity also weighed on the sector (Letra P reported that construction SMEs were owed ARS 800,000M by the state in 2024). Gross margin fell to 3%, and equity turned negative.
-
H1 2026 impairments. TTM other operating expenses of ARS 62.9bn signal major write-downs ahead of or alongside the concurso.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Segment (As Described Publicly) Overview
| Segment (as described publicly) | Contents | Products / services | Status |
|---|---|---|---|
Construction (third-party works) | Former Caputo S.A.I.C.F. operations, merged into the listed entity in 2022 | General contracting for commercial, hospitality, sports, industrial, airport, scientific and residential buildings; engineering services | Core; source of nearly all recent revenue |
Real estate development – Argentina | Legacy TGLT projects and land bank (Astor San Telmo; La Maltería S.A.U.; residual units) | Residential units, land | In run-off; Astor San Telmo stalled |
Real estate development – Uruguay | TGLT Uruguay S.A. (100%) | Legacy Forum Puerto del Buceo (Montevideo) | Residual |
Holding / other | GCDI LLC (100%, US) | Holding/financing vehicle | — |
“—” = not publicly disclosed.
Revenue by Segment and Segment Margins & Growth (%)
| Metric | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Consolidated revenue (ARS Mn, S&P Global) | 117,633 | 125,912 | 58,075 |
Consolidated gross profit (ARS Mn, S&P Global) | 19,306 | 23,094 | 1,891 |
Consolidated gross margin (%) | 16.41 | 18.34 | 3.26 |
Revenue YoY growth, nominal (%) | 186.27 | 7.04 | -53.88 |
Income Statement and Per-Share Data
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Revenue (ARS Mn) | 14,099 | 41,091 | 117,633 | 125,912 | 58,075 |
Cost of revenue (ARS Mn) | 11,595 | 34,843 | 98,327 | 102,818 | 56,183 |
Gross profit (ARS Mn) | 2,504 | 6,248 | 19,306 | 23,094 | 1,891 |
SG&A (ARS Mn) | 1,984 | 6,463 | 12,410 | 12,681 | 8,560 |
Other operating expenses (ARS Mn) | 1,237 | 2,758 | 10,149 | 9,664 | 2,144 |
Operating income / EBIT (ARS Mn) | -716.9 | -2,973 | -3,253 | 748.91 | -8,812 |
EBITDA (ARS Mn) | -628.26 | -2,699 | -2,341 | 1,110 | -8,529 |
Interest expense (ARS Mn) | -2,814 | -3,733 | -4,667 | -4,397 | -3,196 |
FX gain/loss (ARS Mn) | -1,114 | -6,889 | -34,444 | -8,822 | -8,616 |
Legal settlements (ARS Mn) | -85.66 | -2,298 | -2,574 | -5,551 | -9,150 |
Asset writedowns (ARS Mn) | -1,803 | -1,044 | -1,182 | -9,492 | 959.51 |
Pre-tax income (ARS Mn) | -5,344 | -11,648 | -14,908 | -15,395 | -24,410 |
Income tax (ARS Mn) | 564.15 | 2,373 | -2,541 | 1,147 | -4,309 |
Net income (ARS Mn) | -5,908 | -14,021 | -12,367 | -16,542 | -20,101 |
EPS basic (ARS) | -6.39 | -15.16 | -13.51 | -18.07 | -21.96 |
EPS diluted (ARS) | -6.39 | -15.16 | -13.51 | -18.07 | -21.96 |
Dividends per share (ARS) | 0 | 0 | 0 | 0 | 0 |
Margin Analysis (%)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Gross margin (%) | 17.76 | 15.20 | 16.41 | 18.34 | 3.26 |
Operating margin (%) | -5.08 | -7.24 | -2.77 | 0.60 | -15.17 |
EBITDA margin (%) | -4.46 | -6.57 | -1.99 | 0.88 | -14.69 |
Net margin (%) | -41.90 | -34.12 | -10.51 | -13.14 | -34.61 |
Revenue growth YoY, nominal (%) | 104.64 | 191.45 | 186.27 | 7.04 | -53.88 |
Balance Sheet
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Total assets (ARS Mn; FY2025 derived) | 37,261 | 86,306 | 165,723 | 136,010 | 152,100 |
Cash & equivalents (ARS Mn) | 263.74 | 746.02 | 1,896 | 1,690 | — |
Receivables (ARS Mn) | 8,232 | 15,990 | 31,988 | 29,492 | — |
Inventory (ARS Mn) | 3,495 | 10,194 | 9,412 | 4,244 | — |
Total current assets (ARS Mn) | 13,590 | 31,616 | 47,481 | 38,662 | — |
Goodwill (ARS Mn) | 4,410 | 13,733 | 27,225 | 27,225 | — |
Other intangibles (ARS Mn) | 4.53 | 39.83 | 77.09 | 67.45 | — |
Short-term debt incl. current LTD (ARS Mn) | 6,177 | 6,065 | 18,758 | 10,922 | — |
Long-term debt (ARS Mn) | 5,494 | 10,202 | 28,160 | 16,968 | — |
Total debt (ARS Mn) | 11,678 | 16,294 | 46,950 | 27,894 | — |
Net debt (ARS Mn) | 11,414 | 15,548 | 45,054 | 26,203 | — |
Unearned revenue, current + LT (ARS Mn) | 10,560 | 32,337 | 64,927 | 62,257 | — |
Total liabilities (ARS Mn) | 28,501 | 73,280 | 150,358 | 127,337 | 159,700 |
Shareholders' equity (ARS Mn) | 8,760 | 13,026 | 15,365 | 8,673 | -7,600 |
Working capital (ARS Mn) | -513.88 | -8,905 | -17,352 | -12,444 | -31,300 |
Tangible book value (ARS Mn) | 4,346 | -745.96 | -11,937 | -18,619 | — |
Cash Flow and Margin Analysis (%)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Operating cash flow (ARS Mn) | -157.1 | -6,874 | 1,063 | -5,478 | -11,984 |
Capital expenditures (ARS Mn) | -6.11 | -50.67 | -63.35 | -100.09 | -34.4 |
Free cash flow (ARS Mn) | -163.21 | -6,924 | 1,000 | -5,578 | -12,019 |
Divestiture proceeds (ARS Mn) | 349.93 | 16,324 | 0 | 6,438 | 0 |
Sale of PP&E (ARS Mn) | 3.32 | 2,663 | 516.5 | 676.73 | 0 |
Dividends paid (ARS Mn) | 0 | 0 | 0 | 0 | 0 |
Share buybacks (ARS Mn) | 0 | 0 | 0 | 0 | 0 |
FCF margin (%) | -1.16 | -16.85 | 0.85 | -4.43 | -20.70 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
ROE (%) | -67.4 | -107.6 | -80.5 | -190.7 | — |
ROA (%) | -15.9 | -16.2 | -7.5 | -12.2 | -13.2 |
Current ratio (x) | 0.96 | 0.78 | 0.73 | 0.76 | — |
Debt / equity (x) | 1.33 | 1.25 | 3.06 | 3.22 | — |
Net debt / EBITDA (x) | — | — | — | 23.6 | — |
Interest coverage, EBIT / interest (x) | -0.25 | -0.80 | -0.70 | 0.17 | -2.76 |
Asset turnover (x) | 0.38 | 0.48 | 0.71 | 0.93 | 0.38 |
Geographic Revenue
| Metric | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Total revenue (ARS Mn; Argentina estimated as the large majority, split not disclosed) | 117,633 | 125,912 | 58,075 |
Geography Overview
| Geography | Share of revenue | Evidence | Trend |
|---|---|---|---|
Argentina | Not disclosed (estimated large majority) | All flagship 2023–2026 works are in Argentina | Declining sharply in FY2025–TTM 2026 |
Uruguay | Not disclosed (estimated small) | UPM building completed 2023; residual Forum Montevideo | Likely declining after 2023 completion |
United States | Nil operating revenue disclosed | GCDI LLC holding entity | — |
Share Price & Returns
| Date | Close (ARS) | Source |
|---|---|---|
15 Dec 2025 | 21.10 | StockAnalysis.com |
23 Jul 2026 | 12.35 | StockAnalysis.com (Investing.com shows 12.50) |
6 Oct 2026 | 11.50 | StockAnalysis.com |
52-week range (to 23 Jul 2026) | 11.75 – 27.20 | Investing.com |
Period | Performance | — |
~1-year (to Jul 2026) | About -32% (Investing.com) | — |
15 Dec 2025 → 6 Oct 2026 | -45.5% (derived) | — |
Valuation Multiples
| Multiple | GCDI | Comment |
|---|---|---|
Market cap | ~ARS 10.5bn (~US$7–8M) | 915.24M shares × ARS 11.50 |
Enterprise value (approx.) | ~ARS 35.9bn | Market cap + ARS 25.4bn financial liabilities (Mar 2026) − minimal cash; excludes trade and Astor-linked liabilities |
EV/Sales (TTM) | ~1.3x | ARS 35.9bn / ARS 26.8bn |
Capital Markets
| Item | Status |
|---|---|
Analyst coverage / consensus | None identified; Investing.com shows no analyst sentiment coverage |
Dividend history | None paid FY2021–FY2025; no dividend capacity (accumulated losses, negative equity) |
Capital Instruments
| Instrument | Currency | Issue date | Maturity | Status |
|---|---|---|---|---|
ON Class XVII | USD | 11 Feb 2020 | 11 Feb 2027 | Interest default 11 May 2026; stayed by the concurso |
ON Class XVI | USD (reported) | — | — | Included in the concurso |
Astor San Telmo mortgage financing | USD (>US$12M original) | ~2016 | — | Part of ARS 27.6bn Astor-linked liabilities |
Bank and other financial debt | ARS / USD | Various | Short-term | Part of ARS 25.4bn financial liabilities (Mar 2026) |
“—” = not publicly disclosed.
Analyst Conclusions
Management guidance and consensus
There is no management guidance and no sell-side consensus. The only forward-looking commitments are operational: continued execution of the Rueda de Buenos Aires (450-day term, opening targeted around mid-2027), the Plaza Hotel and other works. The key forward event is the formulation of a creditor proposal within the concurso.
Bull case
-
Credible recapitalization path. A sponsor holding 42.5% plus authorization for up to 3bn new shares could convert or retire the ARS 25.4bn of financial debt and restore positive equity.
-
Captive demand and reputation. Sponsor-linked project flow (Rueda, ARS 10.2bn) and the hotel and River Plate references could rebuild backlog quickly once the concurso lifts supplier and bonding constraints.
-
Hidden asset value. Astor San Telmo (ARS 51.7bn book) and La Maltería could offset liabilities if the permit dispute is settled or the assets are sold, giving creditors a substantial recovery and possibly leaving residual equity value.
Bear case
-
Deep insolvency. Liabilities exceeded assets by about ARS 17.8bn at March 2026, and TTM losses of ARS 75.3bn suggest further write-downs. A cramdown or debt-for-equity outcome would likely wipe out or massively dilute current shareholders.
-
Operating economics broken. Gross margin turned negative on a TTM basis and revenue fell about two-thirds, so even a cleaned balance sheet may not support a viable contractor without new capital.
-
Litigation and governance overhang. Astor-linked liabilities (ARS 27.6bn), labour judgments and related-party contracting undermine minority-shareholder confidence and could slow court approval.
Catalysts and monitorables (next 12 months)
-
Concurso milestones: individual claims report by the trustee, the company's categorization proposal, filing of the creditor proposal, the vote, and court homologation.
-
Execution and pricing of the authorized share issuance, including any sponsor participation or debt capitalization.
-
Astor San Telmo resolution: court rulings on the permit, a sale or a settlement with claimants.
-
New contract awards, notably the River Plate next stage and other hotel or private works.
-
Q3 2026 interim results, due around November 2026: further impairments, gross margin recovery.
-
Rueda de Buenos Aires construction progress against the 450-day plan.
-
CNV/BYMA listing-regime actions linked to negative equity.
-
Board reconstitution and independence under the new controlling shareholder.
Analyst verdict
GCDI S.A., the former TGLT S.A., is no longer an equity story in the conventional sense. It is a court-supervised restructuring of a capable but structurally overleveraged contractor.
The operational franchise is real. Caputo's heritage, the Más Monumental, the Ezeiza departures hall and the RA-10 reactor building show the company can execute complex works. Gross margins held at 15–18% through four years of extreme inflation. The problem has always been the capital structure and the legacy of the development strategy. USD-denominated notes, Astor San Telmo's litigation-frozen capital and recurring legal settlements turned modest operating results into losses every single year from FY2021 to FY2025. Equity turned negative at end-2025, and the March 2026 court filing showed liabilities of ARS 125.5bn against assets of ARS 107.7bn.
The arrival of MFX Holding in November 2025 changes the probability distribution but not the arithmetic. A sponsor with captive leisure demand and an authorized issuance of up to 3bn shares makes a reorganization more plausible than liquidation. That issuance would be more than three times the existing share count, which signals that any recapitalization will be highly dilutive. Meanwhile, the TTM loss of ARS 75.3bn to June 2026 and the two-thirds revenue decline show the operating business is shrinking while the process unfolds.
For existing shareholders, the expected outcome is severe dilution at best. The current market capitalization of roughly US$7–8 million prices an option on a sponsor-led recovery rather than any fundamental value. For creditors, recovery hinges on the realizable value of Astor San Telmo and on whether the sponsor injects new money. For counterparties, GCDI remains a technically competent contractor whose bonding and supply chain are impaired.
Assessment: high-risk, speculative, event-driven. Fundamentals are negative and the outcome is binary on the concurso terms. Investors should wait for the creditor proposal and the terms of the capital increase before attributing any value to the existing equity.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Executive Leadership Team
| Name | Title | Tenure start | Prior roles / notes |
|---|---|---|---|
Ramiro Juez | Director General (CEO) | 13 Jan 2026 | Appointed after MFX Holding's entry; mandate to recover position in private, civil, industrial and infrastructure works |
Cristian Bruno | Director de Administración y Finanzas (CFO) | Date not disclosed (TTR Data) | — |
Daniel Antúnez | Responsable de Relaciones con el Mercado (market relations officer) | In role as of May 2026 | Signed the CNV notice on the Class XVII non-payment |
Federico Weil | Founder; former CEO/President | 2005–2021 | Left during reconversion; filed a labour claim above ARS 288M plus interest |
Teodoro "Teddy" Argerich | CEO / General Manager (ex-Caputo; UBA civil engineer; ex-Grupo Cartellone; former VP of the Cámara Argentina de la Construcción) | Joined Caputo 2005; led more than 10 years until 2021 | Dismissed 2021; won a labour judgment initially above ARS 3,800M, reduced on appeal to about ARS 1,000M (Feb 2026) |
Alejandro Belio | CEO | Aug 2021 – 1 Apr 2024 | Led the debt renegotiation and the rebrand to GCDI; previously director of real estate operations |
Francisco Fiorito | CEO and Commercial Director | Sep 2024 – about 4 months | Ex-Development Director at Arcos Dorados; short tenure |
Federico Wilensky | Director | Reported 2019 | Disclosed the IRSA and RSA creditor negotiations |
“—” = not publicly disclosed.
Major Shareholders
| Holder | Stake | Date / source | Notes |
|---|---|---|---|
MFX Holding (Marcelo Fígoli) | 42.5% | Acquired Nov 2025 from PointState (Forbes Argentina; EMIS) | Fígoli owns Fénix Entertainment Group, Parque de la Costa and Alpha Media (Radio Rivadavia, Rock & Pop, Metro, Blue FM, Newsweek Argentina, Noticias Argentinas) and controls Grupo Vía out-of-home advertising |
IRSA Inversiones y Representaciones (successor by merger to IRSA Propiedades Comerciales) | 27.82% | iProfesional (2022–2024) | — |
Free float | ~30% | iProfesional | Retail and local institutional |
PointState (Point Argentum Master Fund) | ~0% residual (previously 41.73%) | Sold to MFX, Nov 2025 | Exited |
Competitive Landscape
Key Competitors
| Competitor | Segment overlap | Ownership / listing | Relative positioning vs. GCDI |
|---|---|---|---|
Techint Ingeniería y Construcción | Large infrastructure, industrial, energy | Private (Techint Group) | Far larger, multinational, strong balance sheet |
SACDE (ex-IECSA) | Infrastructure, buildings | Private (Mindlin group) | Larger; diversified; strong in public works |
Benito Roggio e Hijos (BRH) | Infrastructure, buildings | Private (Roggio group) | Larger; concessions-backed |
José Cartellone Construcciones Civiles | Infrastructure, energy | Private | Larger in heavy civil works |
Dycasa S.A. | Buildings, infrastructure | Listed historically on BYMA | Comparable scale; listed peer |
Criba S.A. | Commercial and residential buildings | Private | Direct competitor in private buildings |
Riva S.A. | Buildings, infrastructure | Private | Direct competitor in buildings |
Eling (Grupo Eling) | Residential and commercial buildings | Private | Direct competitor in private residential |
IRSA | Real estate development (legacy segment) | BYMA / NYSE | Shareholder and competitor; far larger, profitable rental base |
Consultatio (now controlling Argencons) | Premium development | BYMA | Strong premium developer; acquired control of Argencons for more than US$12M (2025) |
Raghsa | Premium office and residential development | Private | Strong USD-funded developer |
Competitor Detail
| Metric | GCDI (FY2025) |
|---|---|
Revenue | ARS 58,075M |
Revenue growth (nominal) | -53.9% |
Gross margin | 3.3% |
EBITDA margin | -14.7% |
R&D intensity | Not disclosed (~0) |
Balance-sheet status | Concurso, negative equity |