GoldArc Resources Limited Overview

GoldArc Resources is a Perth-based junior gold company. It is the third identity of a 45-year-old listed shell that has held the Mt Stirling ground near Leonora, Western Australia, under the Torian and Asra names. The company controls about 936 km² of tenure in the Leonora–Kookynie belt of the Eastern Goldfields, alongside major producers Vault Minerals (King of the Hills), Genesis Minerals (Gwalia/Leonora) and Northern Star. Its JORC 2012 resource is modest at about 200,000 oz at 1.82 g/t Au. Its strategic distinction is a "zero-capex" development model. Under a December 2025 Profit Share Mining Agreement, private operator BML Ventures funds 100% of grade-control drilling, development and mining at Mt Stirling and Stirling Well in exchange for 50% of net profit. A similar arrangement with Mineral Mining Services covers the Orion and Sapphire deposits in the south. Management targets first gold in Q4 2026. The investment case is therefore a hybrid: a small-scale, partner-operated cash-flow pathway layered over an exploration portfolio with recent high-grade, blind-discovery results.


Company's own description (FY2025 Annual Report, paraphrased)

The 2025 Annual Report describes GoldArc as a Western Australian gold exploration company with two complementary hubs in the Eastern Goldfields:

  • the Leonora North Gold Project (Mt Stirling Goldfields), about 40 km from Leonora; and

  • the Leonora South Gold Project (Kookynie Goldfields), about 60 km south of Leonora along the Goldfields Highway.

The company frames 2025 as a pivot "from a diversified explorer into a focused, development-ready gold vehicle." It describes a dual-track strategy:

  1. de-risk the existing 200,000 oz JORC base through partner-funded development; and

  2. run systematic exploration aimed at new high-grade discoveries.

The stated principal activity for FY2025 was "mineral exploration for gold in Western Australia" (2025 Annual Report, Directors' Report).

Independent characterisation

LayerDescriptionRevenue/cash mechanismStatus (Oct 2026)
Partner-operated mining: Mt Stirling and Stirling Well (M37/1306, M37/1305, M37/1354)BML Ventures Pty Ltd (BMLV) is the statutory mine operator. It funds 100% of capex, mobilisation, grade control, mining and processing. Toll milling is to be negotiated by BMLV.GoldArc receives 50% of net profit after BMLV recovers its costs. A A$2.5 million Profit Cash Advance Facility is repayable only from GoldArc's share of profits and is secured by a mining mortgage.Grade-control drilling largely complete (28,785 m drilled by Aug 2026). Mining Development and Closure Proposal (MDCP) approved 10 Aug 2026. Production targeted for Q4 2026.
Partner-operated mining: Orion and Sapphire (Leonora South)Mineral Mining Services Pty Ltd (MMS) is under a binding development agreement (announced 15 Apr 2026, following an October 2025 letter of intent). It also has an equity-for-drilling services arrangement of up to A$750,000.Cost-recovery and profit-share structure "mirroring" the BMLV deal. Detailed economics not publicly disclosed.5,734 m development drilling across 85 holes in H1 2026, funded by MMS.
Exploration portfolioAbout 936 km²: Ursus Fault corridor (12 km, about 9 km untested), Hydra, Tyrannus, soil anomalies S1–S5, Eclipse, Cosmopolitan, Whistler, Jessop's Creek, Niagara Trend, the Yttria REE deposit, and Higginsville tenements earmarked for monetisation.No revenue. Value is realised through resource growth, asset sales or farm-outs.Planned 38,500 m program for 2026; record H1 2026 drilling of over 21,000 m.

GoldArc is best characterised as a pre-revenue explorer that has outsourced development risk and capital. The economic model has three layers.

Revenue model mix: 100% resource and asset development; there are no products, services, subscriptions or licensing. Historically the company booked minor revenue from cattle sales and mining-contracting services through its Tarmoola pastoral subsidiary (A$20,247 in FY2024). It booked no operating revenue in FY2025.

Value chain position: Upstream exploration and, prospectively, ore supply. Under the partnership structure, GoldArc will not own processing infrastructure. Ore will be toll-treated, potentially at nearby third-party mills; the annual report notes the King of the Hills plant is about 5 km from the Leonora North project.

Customers and end-markets: If production proceeds, gold doré would be sold by BMLV as operator, and ultimately by the toll-treating mill, into the global gold market. Direct customers are not publicly disclosed. The secondary "customer" set for exploration assets is the cluster of regional producers that buy tenements, as shown by sales to Northern Star (Boorara, A$200,000) and Vault Minerals (Tarmoola, A$3.0 million).

Strategy

Stated strategy themes (2025 Annual Report, June and September 2026 presentations, paraphrased)

  1. From explorer to "development-ready gold vehicle", with a clear and fast path to production in the Leonora and Kookynie districts (Chairman's Letter 2025).

  2. Capital-light / zero-capex development: partners fund 100% of capex and opex for first production (June 2026 presentation, via Kalkine, 11 Jun 2026).

  3. Dual track: de-risk the 200,000 oz base while pursuing high-grade discoveries (2025 Review of Operations).

  4. District-scale consolidation: 100% ownership of core tenements; bolt-ons such as Kookynie East, Niagara West & North and P40/1622.

  5. Portfolio focus: divest non-core assets (Tarmoola, Boorara, Higginsville under review); de-emphasise the Yttria REE asset.

  6. Resource growth: grow beyond 200,000 oz. Management performance hurdles in the cancelled 2024 rights referenced 150,000 oz Indicated or 350,000 oz Inferred, and 250,000 oz Indicated or 500,000 oz Inferred.

Strategic initiatives register (last 24 months)

DateInitiativeDetailStatus
Sep 2024 – Jan 2025Tarmoola divestmentA$3.0 million sale to Red 5 / Vault Minerals; camp retainedCompleted 16 Jan 2025
2,025Boorara saleA$200,000 to Northern StarCompleted
Aug–Sep 2025Rebrand and 1:10 consolidationAsra → GoldArc; ASR → GA8Completed 17 Sep 2025
Sep 2025Strategic review of Leonora NorthLed by Lubieniecki; prioritised Mt Stirling depth/north, Stirling Well depth, Hydra, Tyrannus and the Ursus FaultCompleted; drives the 2026 program
Sep–Nov 2025Less-than-marketable parcel sale facilityCost reduction for holdings under A$500Completed 24 Nov 2025
Oct 2025 – Apr 2026MMS partnership, Orion–SapphireLoI (28 Oct 2025), then binding development agreement (15 Apr 2026), plus an equity-for-drilling deal of up to A$750,000Active
Nov 2025 – Jan 2026Mt Stirling ownership consolidation100% secured; residual 10% of M37/1306 completed 20 Jan 2026Completed
Dec 2025BMLV Profit Share Mining Agreement50/50 net profit share; BMLV funds 100%; A$2.5 million advance facilityConditions precedent satisfied Jan 2026
Mar 202634,000 m grade control programBMLV-funded28,785 m completed by Aug 2026
Mar 20268,500 m RC development drilling, Leonora SouthOrion, Sapphire and advanced prospectsExecuted in H1 2026 (15,260 m total at Leonora South)
May 2026A$7.2 million placement at A$0.07Funds expanded drilling; BMLV participatesCompleted (ratification at GM 16 Oct 2026)
Jun 2026Production targetFirst gold targeted Q4 2026Pending
H1 2026Mt Stirling maiden/updated MRE, metallurgy, pit optimisationFeeds the mine planIn progress
Aug 2026MDCP approvalRegulatory clearance for miningReceived 10 Aug 2026
Aug 2026Niagara West & North acquisitionA$1.5 million in shares plus A$1.0 million contingentSubject to shareholder approval
Sep 2026~6,600 m RC program on soil anomalies around Mt StirlingAssays from October 2026Underway

Medium-term targets and guidance

TargetDetailSource
First productionQ4 CY2026 at Mt Stirling; earlier guidance was "second half of CY2026"June 2026 presentation; Kalkine 15 May 2026
2026 drilling38,500 m planned2025 Chairman's Letter
ResourceGrow beyond 200,000 oz; no numeric public target2025 Annual Report
Financial guidanceNone provided. The Directors' Report states that likely developments were withheld to avoid unreasonable prejudice.2025 Annual Report
Cost programsNo formal program with numeric targets; LMP facility and office consolidation only—
ESG commitmentsNone formalised (see Section 20)—

Products & Services

As an explorer, GoldArc's "products" are its mineral assets. Each is catalogued below.

Leonora North Gold Project (Mt Stirling Goldfields)

AssetDescription / specificationsResource (JORC 2012, 0.5 g/t cut-off)StagePartner / commercial model
Mt Stirling deposit (M37/1306)Shear-hosted gold in high-strain schistose–mylonitic mafic rocks controlled by the Hydra Fault, lying on the Ursus Fault corridor. The resource is open at depth and to the north, with defined high-grade shoots.Indicated 391,000 t @ 2.1 g/t for 26,000 oz; Inferred 2,158,000 t @ 1.6 g/t for 111,000 ozMDCP approved (10 Aug 2026); grade control phase 1 largely complete; mining targeted Q4 2026BMLV 50/50 net profit share; 100% owned by GoldArc
Stirling Well / Mt Stirling Well (M37/1305)Narrow, flat-dipping quartz veins about 700 m south-west of Mt StirlingInferred 198,000 t @ 2.3 g/t for 15,000 ozGrade control completed in six rounds; best result 1 m @ 59.9 g/t Au (17 Aug 2026)BMLV 50/50
M37/1354Third tenement included in the Mt Stirling Project definitionNo standalone resourceDevelopment supportBMLV 50/50
Hydra prospectStructural corridor extending about 1 km from Mt Stirling; untested by modern drilling; primary gold confirmed—Priority drill target100% GoldArc
Tyrannus prospectParallel mineralised system about 500 m from Mt Stirling, with shallow historic intercepts—Priority drill target100% GoldArc
Soil anomalies S1–S5902-sample soil survey. S4 is a coherent 1.2 km × about 0.5 km anomaly that management says is stronger than the anomaly that originally led to the Mt Stirling discovery.—A ~6,600 m RC program is underway, with assays expected from October 2026100% GoldArc
Ursus Fault corridorAbout 12 km strike, of which about 9 km is untested; regional hosting structure—Regional exploration100% GoldArc
Mt CutmoreCore Leonora North tenement, held 100% unencumberedNone disclosedExploration100% GoldArc
Yttria REE depositClay-hosted rare earth elements; MREO about 22.5% of TREO; Dy+Tb 27.7 ppm. A July 2026 aircore program discovered two gold trends longer than 600 m.15.0 Mt @ 490 ppm TREO (Indicated 7.7 Mt @ 480 ppm; Inferred 7.3 Mt @ 500 ppm)Non-core since the 2025 gold pivot100% GoldArc

Leonora South Gold Project (Kookynie Goldfields)

AssetDescription / specificationsResourceStagePartner
Orion depositCoarse gold; part of the Niagara Trend. H1 2026 result: 3 m @ 52.58 g/t from 111 m, including 1 m @ 145 g/t.Inferred 370,000 t @ 2.2 g/t for 26,409 ozDevelopment drilling (MMS-funded)MMS development agreement (Apr 2026); Vox Royalty holds a royalty linked to the deposit
Sapphire depositCoarse gold. H1 2026 result: 8 m @ 66.76 g/t from 101 m, including 1 m @ 363.7 g/t.Inferred 320,000 t @ 2.1 g/t for 21,605 ozDevelopment drillingMMS; Vox royalty
Eclipse prospectNear-surface, high-grade system. 2025 result: 1 m @ 7.49 g/t from 12 m. 2026 infill: 4 m @ 9.43 g/t from 46 m and 9 m @ 2.54 g/t from 21 m.—Advanced prospect100%
Challenge prospectGold system confirmed on strike extensions—Exploration100%
Cosmopolitan Mine areaHistoric production of about 360,000 oz at about 15 g/t Au; potential repeated high-grade lodes at depth—Diamond drilling planned100%
Whistler prospectBlind discovery under cover with four mineralised zones. 8 m @ 811 ppb from 44 m in 2025; Zone 2 vein system at depth with a 4.12 g/t intercept (31 Aug 2026). High-zirconium granite host, which the company compares to Gruyere.—Discovery follow-up100%
Jessop's Creek / Woodpecker SouthNiagara Trend soils up to 808 ppb Au—Aircore tested100%
Justice prospect2 m @ 47.92 g/t from 42 m, including 1 m @ 90.2 g/t (H1 2026)—Exploration100%
May prospect / P40/1622Application acquired along strike from the advanced May prospect—Exploration100%
Kookynie East70% interest acquired from Kalgoorlie Mining Associates Pty Ltd and Zigmund WolskiIncludes Orion–Sapphire area per 2024 releasesExploration70% GoldArc
Niagara West & North (7 PLs)P40/1506, 1513, 1515, 1516, 1517, 1518 and 1536, purchased from Regener8—Pending completion and shareholder approval100% on completion
New ELs (4 applications)80.60 km² added through applications filed in 2025—Application100%

Other assets

AssetDescriptionStatus
Higginsville tenements (E15/2066, E15/2028)Won in a tenement ballot (4 Mar 2026)The company is exploring monetisation options (ASX release 4 Mar 2026)
Tarmoola Exploration CampAccommodation, kitchen, laundry and access roadRetained after the pastoral lease sale
Equity investmentsFinancial assets at fair value through OCI of A$1,429 (FY2025). The Monger Gold stake from 2021 appears to have been disposed of or written down.Immaterial

Pricing model: not applicable. Product launch years: not applicable. Gold sales under the BMLV agreement will be at prevailing spot price through the operator; offtake terms are not publicly disclosed.

Financial Narrative

All figures are in A$ and drawn from audited annual reports. FY2021–FY2023 net loss, EPS and year-end share price come from the five-year table in the 2025 Annual Report Remuneration Report, restated post-consolidation.

Income statement

Operating income is derived as pre-tax loss plus finance costs less interest income. Margins (gross, operating, EBITDA, net) and a revenue CAGR are not meaningful because operating revenue is near zero or nil. FY2024 was 100% gross margin on A$20,247 (Simply Wall St reports a net margin of −17,708%). No dividend has ever been paid (Market Index).

Commentary. The five-year pattern is one of persistent losses with a large spike in FY2023. The FY2023 loss of A$21.3 million is about five times the run-rate. Retrieved sources do not explicitly attribute it, but its size relative to the exploration asset base strongly suggests an asset write-down during the Asra REE and multi-commodity period. Readers should verify against the FY2023 annual report.

FY2025's loss narrowed sharply to A$1.29 million for three reasons:

  • a one-off A$1.46 million profit on the Tarmoola sale;

  • lower professional fees (A$234,756 versus A$565,919); and

  • lower exploration impairments (A$717,340 versus A$1.28 million).

Administration and compliance costs doubled to A$1.19 million, reflecting the rebrand, the consolidation and the unmarketable parcel facility. Excluding the Tarmoola gain, the underlying FY2025 loss was about A$2.75 million.

In H1 2026, the net loss widened to A$2.90 million, compared with a A$513,957 profit in H1 2025 that had been flattered by the Tarmoola gain. The wider loss reflects the most intensive exploration period in the company's history (GoldArc H1 2026 report, via Kalkine, 10 Sep 2026).

Balance sheet

Sources: 2025 Annual Report statements of financial position and changes in equity, and the cash flow statement (FY2023 closing cash). Total debt excludes trade payables. FY2025 working capital matches the A$639,256 of net current assets disclosed in the going-concern note.

Commentary. The balance sheet is dominated by capitalised exploration (A$19.3 million, or 92% of total assets at FY2025). Accumulated losses of A$96.9 million against A$116.1 million of issued capital show that more than four decades of shareholder funding has been largely consumed.

The FY2024 position was acutely stressed. Year-end cash was A$59,500, working capital was negative A$0.78 million and payables were A$1.99 million. This explains the 2025 asset sales and dilutive raisings. By FY2025, the company had cleaned up the balance sheet: net cash of A$1.01 million, borrowings down 84%, and payables down to A$0.56 million.

Note, however, that the BMLV Profit Cash Advance Facility (A$1.0 million drawn by 30 March 2026) is a contingent, profit-linked liability secured by a mining mortgage. It sits after the FY2025 balance date. A$1.0 million of it was subsequently offset against BMLV's subscription in the May 2026 placement (Kalkine, 15 May 2026).

Cash flow

FY2024 equity raised includes share issues of A$2,164,501, option exercise proceeds of A$5,404 and option issue proceeds of A$262,325. FY2024 asset proceeds include the A$250,000 Tarmoola deposit, A$185,545 from tenement disposals and A$164,727 from PP&E sales. FY2025 proceeds include A$2.75 million of the Tarmoola option, A$200,000 from tenements and A$224,546 from PP&E.

Commentary. Exploration intensity rose 65% year on year in FY2025, to A$5.36 million. This was funded by about A$6.25 million of equity raised during the year (per the going-concern note) and A$3.17 million of asset sale proceeds. The corporate cash burn excluding exploration is stable at about A$1.7 million a year.

From 2026 onwards, a key analytical point is that substantial drilling has shifted off GoldArc's cash flow statement onto partners' balance sheets:

  • the 34,000 m Mt Stirling grade control program is funded by BMLV; and

  • the 5,734 m Orion–Sapphire program is funded by MMS.

GoldArc's own reported exploration spend therefore understates total activity on its tenure.

Ratios

Derived from 2025 Annual Report figures. ROIC, net debt/EBITDA and interest coverage are not meaningful because EBIT and EBITDA are negative. The cash conversion cycle is not applicable because the company has no inventory or trade receivables cycle. Simply Wall St's 6.0% debt/equity for FY2024 is consistent with the derived 6.7% including leases.

Going-concern status

The FY2025 accounts carry a material uncertainty related to going concern. The directors rely on five supports:

  1. the company's record of raising capital (about A$6.25 million in FY2025);

  2. the A$2.5 million BMLV facility, drawable in five A$500,000 tranches;

  3. BMLV funding 100% of Mt Stirling costs;

  4. a potential MMS joint venture; and

  5. the ability to sell assets or scale back exploration.

(2025 Annual Report, Note 1)

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Financial Detail

Segment Overview

SegmentContentsProducts/services

Exploration

Leonora North (Mt Stirling, Stirling Well, Hydra, Tyrannus, Yttria REE); Leonora South (Orion, Sapphire, Eclipse, Challenge, Cosmopolitan, Whistler, Jessop's Creek, Woodpecker, Justice, May, Kookynie East); Higginsville tenements (2026)

Gold exploration; prospective partner-operated gold production

Tarmoola (pastoral)

Tarmoola Pastoral Lease, livestock, plant and mining-contracting services (sold January 2025)

Cattle, contracting services

Revenue by Segment (AUD) and Segment Assets & Liabilities (AUD)

MetricFY2024FY2025

Exploration segment revenue (AUD)

00

Exploration segment other income (AUD)

174,546138,127

Tarmoola segment revenue (AUD)

20,2470

Tarmoola segment other income incl. profit on sale (AUD)

01,541,002

Exploration segment EBITDA (AUD)

-3,157,358-2,565,277

Tarmoola segment EBITDA (AUD)

-77,7881,537,830

Unallocated EBITDA (AUD)

3,7000

Exploration segment loss before tax (AUD)

-3,415,024-2,848,253

Tarmoola segment profit/(loss) before tax (AUD)

-184,4421,537,830

Unallocated profit before tax (AUD)

14,12218,131

Exploration segment assets (AUD)

16,419,32321,074,775

Tarmoola segment assets (AUD)

1,549,6122,751

Income Statement (AUD) and Per-Share Data

MetricFY2021FY2022FY2023FY2024FY2025

Operating revenue (AUD)

———20,2470

Other income incl. interest (AUD)

———191,956220,131

Profit on sale of assets (AUD)

———01,458,998

Total revenue and income (AUD)

———212,2031,679,129

Gross profit (AUD)

———20,2470

Employee benefits expense (AUD)

———577,709397,994

Impairment of exploration (AUD)

———1,276,521717,340

EBITDA per segment note (AUD)

———-3,231,446-1,027,447

Operating income approx. EBIT excl. interest (AUD)

———-3,557,993-1,260,904

Pre-tax income (AUD)

-3,275,380-4,567,443-21,319,979-3,585,344-1,292,292

Net income (AUD)

-3,275,380-4,567,443-21,319,979-3,585,344-1,292,292

EPS basic and diluted post-consolidation (A cents)

-3.68-3.76-14.48-1.84-0.34

Dividends per share (A cents)

00000

Balance Sheet (AUD)

MetricFY2023FY2024FY2025

Total assets (AUD)

—17,992,75421,077,526

Cash and equivalents (AUD)

2,849,08259,5001,184,354

Exploration and evaluation asset (AUD)

—15,198,74719,332,484

Property plant and equipment (AUD)

—797,774381,926

Short-term borrowings (AUD)

—612,528109,485

Long-term borrowings (AUD)

—287,90231,608

Lease liabilities total (AUD)

—102,22629,376

Total debt incl. leases (AUD)

—1,002,656170,469

Net debt (negative means net cash) (AUD)

—943,156-1,013,885

Total liabilities (AUD)

—2,990,785726,988

Total equity (AUD)

14,923,44815,001,96920,350,538

Goodwill and intangibles (AUD)

—00

Working capital (AUD)

—-776,143639,256

Issued capital (AUD)

106,822,043110,022,581116,086,987

Accumulated losses (AUD)

-93,214,985-96,056,329-96,904,944

Cash Flow (AUD)

MetricFY2021FY2022FY2023FY2024FY2025

Operating cash flow (AUD)

———-1,524,774-1,715,665

Exploration and evaluation spend (AUD)

———-3,252,700-5,363,888

PP&E capex (AUD)

———-167,629-25,292

Free cash flow incl. exploration (AUD)

———-4,945,103-7,104,845

Free cash flow excl. exploration (AUD)

———-1,692,403-1,740,957

Asset sale proceeds incl. Tarmoola and tenements (AUD)

———600,2723,174,546

Equity raised net of costs (AUD)

———2,432,2305,868,207

Debt repaid incl. convertible notes (AUD)

———-2,250,912-759,337

Dividends paid (AUD)

00000

Buybacks (AUD)

00000

Net change in cash (AUD)

———-2,789,5821,124,854

Returns & Leverage Ratios (%) and Financial Ratios (x)

RatioFY2024FY2025

ROE on average equity (%)

-23.97-7.31

ROA on year-end assets (%)

-19.93-6.13

Current ratio (x)

0.711.92

Debt to equity (%)

6.680.84

Asset turnover (x)

0.0010.000

Revenue by Region (AUD) and Revenue by Region (%)

RegionFY2023FY2024FY2025

Australia operating revenue (AUD)

—20,2470

Rest of world operating revenue (AUD)

000

Australia share of revenue (%)

100100100

Asset geography

Area

Notes

—

Leonora North (Shire of Leonora)

Mt Stirling area about 222 km² (Yahoo/Simply Wall St); earlier cited as about 160 km²

About 40 km north-west/north-east of Leonora (sources differ on orientation)

—

Leonora South (Kookynie)

About 549 km² of mining leases, plus 80.6 km² in applications, plus the Niagara purchase

About 60 km south of Leonora

—

Higginsville

2 ELs

Non-core; earmarked for monetisation

—

Valuation Snapshot

MetricValueSource

Latest close

A$0.048 (15 Oct 2026)

StockInvest.us

52-week range

A$0.028–0.100

Investing.com (Oct 2026)

YTD 2026

About −21% (A$0.0495 on 6 Oct 2026)

MarketScreener

1-year

Not precisely verified. Market Index shows +27.6% versus the ASX 200. Earlier snapshots: +255% (May 2026), +113% (Simply Wall St).

Market Index; Kalkine

3-year and 5-year

Deeply negative on a consolidation-adjusted basis (see table below)

2025 Annual Report

Metric

FY2021

FY2022

Year-end share price post-consolidation (AUD)

0.230.20

Basic EPS post-consolidation (A cents)

-3.68-3.76

Valuation Multiples

MultipleGA8Comment

P/B

About 1.3x

About A$34 million market cap / A$20.35 million FY2025 book (Market Index book value per share A$0.038)

EV per resource ounce

About A$165/oz

About A$33 million EV / 200,014 oz. EV approximated as market cap less FY2025 net cash; not adjusted for 2026 raisings.

Capital Markets

ItemStatus

Analyst consensus

None. GA8 is not covered by a major broker (Market Index) and is covered by 0 analysts (Simply Wall St).

Dividend history and policy

No dividends ever paid; no policy

Credit ratings (Moody's / S&P / Fitch)

Not rated

Debt maturity profile

Borrowings of A$141,093 at FY2025 (A$109,485 current, A$31,608 non-current). Lease liability of A$29,376 is current. BMLV advance facility (A$1.0 million drawn by 30 Mar 2026) is repayable only from profits, with A$1.0 million subsequently offset against equity.

Capital Instruments

InstrumentNumberTerms

Unlisted options

100,000

A$0.40, expiring 23 Jun 2026

Listed options

193,318,747

A$0.04, expiring 30 Jun 2028

Unlisted options

52,437,938

A$0.10, expiring 2 Sep 2027

Performance rights

46,250,000

Classes A/B/C; VWAP hurdles of A$0.05, A$0.075 and A$0.10

Analyst Conclusions

Management guidance

  • First gold at Mt Stirling targeted for Q4 2026 under the BMLV partnership (June 2026 investor presentation).

  • About 38,500 m of drilling planned in 2026 (2025 Chairman's Letter).

  • An updated or maiden Mt Stirling MRE is in progress, informed by grade control, metallurgy and pit optimisation (H1 2026 report).

  • No financial guidance is provided.

Consensus

None; there is no analyst coverage.

Bull case

  1. Cash flow without capex. If BMLV starts mining in Q4 2026 and toll milling is secured, GoldArc moves from cash burner to profit-share recipient. It would retain 100% tenement ownership and would not have funded a dollar of development (PSMA, 8 Dec 2025).

  2. Grade upside. Consistent high-grade grade-control results (106 g/t, 59.9 g/t) suggest mined grade could exceed the 1.6–2.3 g/t resource grade, improving net profit per tonne.

  3. Discovery optionality. Unexplored structure and blind-target success at Whistler, alongside the Niagara consolidation, provide multiple paths to growth beyond 200,000 oz. The market capitalisation of about A$34 million (about A$165/oz EV) prices in little of this.

Bear case

  1. Half the economics, all the dilution. GoldArc gives away 50% of flagship profit and has still diluted from about 573 million to about 704 million shares in 2026. A further 193 million in-the-money options are outstanding.

  2. Toll-milling and timing risk. No toll agreement had been announced by October 2026. The stock fell about 20% after the MDCP approval, suggesting the market doubts the Q4 2026 timetable.

  3. Thin resource, weak governance. Small, mostly Inferred ounces and a history of value destruction (A$96.9 million in accumulated losses; A$21.3 million FY2023 loss) sit with a three-person board that has related-party dealings and no committees.

Catalysts and monitorables (next 12 months)

CatalystExpected timingWhat to watch
September 2026 quarterly and Appendix 5BBy 30–31 Oct 2026Cash balance, burn and BMLV facility drawdowns
General Meeting outcome16 Oct 2026Ratification of placement shares
Toll-milling agreement (BMLV)Before first oreCounterparty, cost per tonne, capacity
First ore mined / first goldQ4 2026 targetTiming slippage; mined grade versus model
Updated Mt Stirling MRELate 2026 / 2027Indicated conversion; grade
~6,600 m RC assays (S1–S5 anomalies)From October 2026New discoveries along the Ursus Fault
Niagara acquisition approval and completionLate 2026Share issue of about 21.4 million
MMS Orion–Sapphire mine plan2026–27Economics and timetable
Board renewalOngoingIndependent director appointments
FY2026 Annual ReportAbout 29 Mar 2027Going-concern language; first profit-share receipts

Concluding analyst verdict

Torian Resources has had three names, 45 years of listed history and close to A$97 million of accumulated losses. As GoldArc Resources, it has finally assembled a credible, if modest, route to gold production. The core insight is structural. Management has swapped half of Mt Stirling's future profit for a partner, BML Ventures, that carries 100% of development capital and operating risk. That partner has already funded about 29,000 m of grade control and helped secure MDCP approval in August 2026. For a company that ended FY2024 with A$59,500 in cash and negative working capital, this is a rational, survival-driven choice. It sharply lowers the dilution normally required to build even a small open pit.

The trade-offs are significant. The resource is small at 200,014 oz, 87% Inferred and at 1.82 g/t. The 50/50 split caps leverage to the gold price. Toll-milling terms remain unannounced. The share count has continued to expand, and about 193 million in-the-money options overhang the register. Governance is thin: a three-person board with no committees and several related-party arrangements. The audited FY2025 accounts carry a material going-concern uncertainty.

On valuation, an EV of about A$33 million (about A$165/oz) prices in some, but not all, execution risk. The share price retreat from about A$0.061 to about A$0.048 since mid-August 2026 signals scepticism about the Q4 2026 timetable.

Verdict: GoldArc is a speculative, catalyst-driven junior. Its near-term rerating depends on three verifiable events: a signed toll-milling agreement, first ore at Mt Stirling, and a grade-control-informed resource update. Discovery upside at Whistler, the Niagara Trend and the untested Ursus Fault offers asymmetric optionality, but it should be treated as a call option rather than core value.


Source register (principal documents)

#DocumentDate
1GoldArc Resources Ltd, 2025 Annual Report (year ending 31 Dec 2025)30 Mar 2026
2GoldArc Resources, Half Year Financial Report (30 Jun 2025)11 Sep 2025
3GoldArc H1 2026 results (via Kalkine Media summary)10 Sep 2026
4GoldArc ASX: "Asra Minerals Completes Rebranding and Commences Trading as GoldArc"17 Sep 2025
5GoldArc ASX: "GoldArc Accelerates Mt Stirling Development with Strategic Mining…"8 Dec 2025
6GoldArc ASX: "Newly Awarded Strategic Tenure Proximal to Higginsville"4 Mar 2026
7GoldArc ASX: grade control releases (May–Aug 2026), including final Stirling Well round17 Aug 2026
8GoldArc ASX: "GoldArc Secures MDCP Approval – Clearing Path to Development"10 Aug 2026
9Regener8 Resources ASX: Kookynie Gold Project divestment to GoldArc6 Aug 2026
10Asra Minerals ASX releases: Tarmoola acquisition (23 Dec 2022); Tarmoola sale (4 Sep 2024); CEO appointment (9 Dec 2024); bonus options (27 Sep 2024)2022–2024
11Asra Minerals Half-Year Reports (Jun 2022, Jun 2024); 2024 Annual Report2022–2025
12Torian Resources Financial Reports FY2019 and FY2021; H1 2021 report2020–2022
13Market Index GA8 profile (top 20, director interests, former names, calendar)Accessed Oct 2026
14Kalkine Media (placement, presentation, GM notice)May–Sep 2026
15Vox Royalty Corp Form 6-K (MMS term sheet reference)2,026
16MarketScreener, StockInvest.us, Investing.com, Yahoo Finance, Simply Wall St, PitchBook, IBISWorld (market data and profiles)2025–2026
17Stockhead; Business News WA; Mining.com.au; Discovery Alert (historical and news coverage)2019–2026

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Executive Leadership

Board of Directors

NameTitleTenurePrior roles / backgroundEducation

Paul Summers

Non-Executive Chairman (previously Executive Chairman)

Director since 2018 (Investing.com). Current service agreement from 30 Oct 2022.

Legal practitioner since 1985; founded Summers Legal in 1989; company legal counsel for more than 10 years, including during the Cascade Resources takeover

LLB

Paul Stephen

Managing Director

CEO from 9 Dec 2024; MD from 5 Jun 2025

Co-founder and Executive Director of Crusader Resources (Posse iron ore mine, Brazil; oversaw delineation of more than 2.6 Moz of gold); former director of Core Energy (formerly OAR Resources), resigned 9 Sep 2024

BComm

Zbigniew (Ziggy) Lubieniecki

Executive Technical Director

Consultant from 5 Jun 2025; Non-Executive Director from 3 Sep 2025; executive from 6 Jan 2026

Credited with discovering the 6.2 Moz Gruyere deposit; formerly Executive Director at Gold Road Resources, Chief Mine Geologist at Plutonic and Exploration Manager at Australian Platinum Mines; previous directorships at Cosmo Metals and Hammer Metals (both 2023)

B AppGeol

Leonard Math

CFO and Company Secretary (formerly also NED)

Company Secretary from Mar 2022; NED 9 Jul 2024 to 29 May 2026

Chartered Accountant; former Deloitte auditor; CFO, company secretary and director roles at several ASX companies (Askari Metals, resigned Apr 2025). Services provided through Lilhorse Corporate Pty Ltd.

BCom, CA

Austin Gow

Senior Geologist

Appointed 2025

More than six years of gold and base metals exploration experience

—

“—” = not publicly disclosed.

Directors' Remuneration

NameYearCash salary/feesSuperannuationShare-based paymentsTotal% performance-linked

Paul Summers

2025113,333013,914127,24711

Paul Stephen

2025336,81834,75946,906418,48311

Ziggy Lubieniecki

202512,2161,46622,29035,97262

Leonard Math

202529,900013,91443,81432

Mathew Longworth

202540,0000040,0000

Total KMP

2025

532267

36225

97024

665516

—

Paul Summers

2024180,00000180,0000

Robin Longley (MD to Jul 2024)

2024296,8250-39,314257,511-15

Mathew Longworth

202476,5000076,5000

Paul Stephen

202419,3182,22298522,5254

Leonard Math

202411,4840011,4840

Bishoy Habib

20248,129008,1290

Total KMP

2024

592256

2222

-38329

556149

—

Executive Leadership Team

PersonTerms

Paul Stephen

A$400,000 salary plus superannuation; 1-month notice

Ziggy Lubieniecki

A$270,000 plus superannuation from 6 Jan 2026

Paul Summers

A$80,000 per year plus GST; 3-month notice

Leonard Math

A$3,500 per month as director plus A$8,000 per month for CFO and Company Secretary services through Lilhorse

Governance Overview

AttributeAssessment

Board size

4 at 30 Mar 2026 (Summers, Stephen, Lubieniecki, Math); apparently 3 after Math's resignation on 29 May 2026

Independence

Weak. Summers (NE Chair) has related-party office rent through Summers Legal/NSFA Pty Ltd (A$79,667). Math was paid CFO fees through Lilhorse (A$80,000). Lubieniecki is executive and his related entity Silver Asset Pty Ltd provided geological services (A$45,382). No director appears unambiguously independent under ASX Corporate Governance Principles.

Chair/CEO separation

Yes, formally (Summers chairs; Stephen is MD)

Committees

None standing. The full board performs the Audit & Risk and Nomination & Remuneration functions (2025 Annual Report).

Board meetings, FY2025

9 held; full attendance by all directors during their tenure

Say-on-pay

98.43% support for the FY2024 remuneration report at the 2024 AGM

Gender diversity

All-male board; no disclosed gender targets

Board & Management Changes

DateChange

9 Jul 2024

Robin Longley resigns as MD; Leonard Math appointed NED

22 Jul 2024

Bishoy Habib appointed NED (resigned 4 Oct 2024)

9 Dec 2024

Paul Stephen appointed CEO

5 Jun 2025

Paul Stephen becomes MD; Ziggy Lubieniecki engaged as consultant

3 Sep 2025

Lubieniecki joins the board as NED; Mathew Longworth resigns

6 Jan 2026

Lubieniecki becomes Executive Technical Director

29 May 2026

Leonard Math resigns as NED

Major Shareholders

RankHolderShares%
1

Black Crow (WA) Pty Ltd <The Harper Valley Fund A/C>

30,244,6615.28
2

HSBC Custody Nominees (Australia) Ltd

29,146,1475.09
3

Zenith Pacific Limited

28,500,0004.98
4

Netwealth Investments Ltd <Wrap Services A/C>

17,588,1343.07
5

Steele Investments Superannuation Fund Pty Ltd

14,500,0002.53
6

Townley Family Super Pty Ltd

13,500,0002.36
7

Mr Hugo & Mrs Marianne Bombara <Lazy Kate A/C>

12,500,0002.18
8

BNP Paribas Nominees Pty Ltd

11,993,6682.09
9

Nova Minerals Limited

11,896,8322.08
10

Buckingham Investment Financial Services Pty Ltd

11,494,8972.01

Directors' Shareholdings

DirectorSharesApprox. stake

Summers

11,093,924 (indirect)

~1.6%

Lubieniecki

10,142,857

~1.4%

Stephen

4,214,286

~0.6%

Math

3,000,000

~0.4%

Competitive Landscape

Key Competitors

CompetitorTickerSegment overlapRelative positioning

Vault Minerals (formerly Red 5 / Silver Lake)

VAU

Operates King of the Hills (about 5 km from Mt Stirling); bought Tarmoola

Mid-tier producer; potential mill counterparty and acquirer

Genesis Minerals

GMD

Leonora/Gwalia and Kookynie operations adjoining Leonora South

Consolidating mid-tier producer; dominant local mill owner

Northern Star Resources

NST

Kalgoorlie operations; bought Boorara

Tier-1 major; acquirer of non-core tenure

Brightstar Resources

BTR

Menzies/Laverton hub; small-scale development

Comparable development-stage junior; DFS 2.0 (Jan 2026) targeting 2H 2026 production

Horizon Minerals

HRZ

Kalgoorlie–Coolgardie small-mine/toll-milling model

Similar capital-light, toll-treatment strategy

Kalgoorlie Gold Mining

KAL

Eastern Goldfields explorer

Junior explorer peer

Monger Gold

MMG

Former Torian spin-out

Small explorer

Regener8 Resources

R8R

Former Kookynie neighbour, exiting WA

Vendor, not a future competitor

Nova Minerals

NVA

Strategic shareholder; Alaskan focus

Not a direct competitor

Croydon Critical Minerals / Carnavale Resources

—

Named by PitchBook as competitors

Junior explorers

Competitor Detail

MetricGoldArc (GA8) FY2025

Revenue (AUD Mn)

0

Exploration intensity (AUD Mn)

5.36

JORC gold resource (koz)

200

Market cap approx. (AUD Mn)

34

Recent Developments

Share price context: the stock fell from A$0.061 at the time of the 17 Aug 2026 release to about A$0.048–0.050 by October 2026. YTD 2026 is about −21% (MarketScreener, 6 Oct 2026). Plausible contributors include placement overhang, the absence of a production start announcement after the MDCP approval, and the Niagara share issuance.*

Company Snapshot

1981

Founded

West Perth, Australia

Headquarters

SWOT Analysis

Strengths

  • Partner-funded development. BMLV funds 100% of Mt Stirling costs, including 28,785 m of grade control by August 2026, at no cash cost to GoldArc (ASX release 17 Aug 2026).
  • Regulatory milestone achieved. MDCP approval was received on 10 August 2026, the key permit required before mining (Market Index).
  • High-grade confirmation. 1 m @ 106 g/t at Mt Stirling (28 May 2026); 1 m @ 59.9 g/t at Stirling Well (17 Aug 2026); 8 m @ 66.76 g/t at Sapphire (H1 2026).
  • Non-dilutive asset monetisation track record. A$3.2 million realised from the Tarmoola and Boorara sales in 2025 (2025 Annual Report).
  • Technical leadership. The Executive Technical Director is credited with the 6.2 Moz Gruyere discovery (2025 Annual Report).
  • Improved balance sheet. Net cash of A$1.01 million at FY2025 versus net debt of A$0.94 million at FY2024; borrowings cut by 84%.
  • Strategic investor alignment. The operating partner, BMLV, invested A$1.5 million of equity at A$0.07 (May 2026).

Weaknesses

  • Resource quality. 87% Inferred; total of only 200,014 oz at 1.82 g/t (2025 Annual Report, Table 1).
  • Going-concern uncertainty in FY2025 audited accounts (Note 1).
  • Accumulated losses of A$96.9 million against A$116.1 million of issued capital, reflecting decades of value erosion.
  • FY2023 net loss of A$21.3 million, indicating past capital misallocation during the REE/pastoral diversification.
  • Governance. A three-director board after May 2026, no standing committees, and three related-party service arrangements (rent, CFO services, geology).
  • Heavy dilution. About 573 million to about 704 million shares within roughly seven months of 2026, plus about 245 million options outstanding (2025 Annual Report options table).
  • Profit share cap. GoldArc receives only 50% of net profit from its flagship.

Opportunities

  • First gold in Q4 2026 would convert GoldArc into a cash-receiving company.
  • Resource growth. About 9 km of the Ursus Fault is untested; soil anomaly S4 is described as stronger than the original Mt Stirling anomaly.
  • Blind discoveries at Whistler (Zone 2, 4.12 g/t) with a Gruyere-analogue granite host.
  • Niagara Trend consolidation through the Regener8 acquisition, adding 7 PLs along a 5 km high-grade trend.
  • Second production stream at Orion–Sapphire via MMS.
  • Monetisation of non-core assets: Higginsville ELs and the Yttria REE resource.
  • Updated Mt Stirling MRE incorporating about 34,000 m of grade control could upgrade Inferred ounces to Indicated.

Threats

  • Toll-milling dependency. Terms are not finalised, and regional mills are owned by potential competitors.
  • Gold price reversal would compress the net profit available for the 50/50 split.
  • Execution risk at BMLV, a private operator whose financial capacity is not publicly disclosed.
  • Further dilution if production slips and cash is needed. The H1 2026 burn produced a A$2.9 million loss.
  • Royalty leakage at Orion–Sapphire (Vox Royalty).
  • Native title, heritage and environmental compliance risks (2025 Annual Report risk section).
  • Key-person risk concentrated in the MD and Technical Director.

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Key Developments

DateEventSignificance
Early 20251,300 m RC/diamond program at Orion and Sapphire confirms coarse gold at depthValidated Leonora South resources
H1 2025Two-tranche A$3.0 million placement completedFunded mid-2025 work
5 Jun 2025Paul Stephen appointed MD; Lubieniecki engagedLeadership reset
Jun 2025Shares issued to cover drilling costs (MarketBeat/TipRanks, 10 Jun 2025)Equity used as currency for services
27 Aug 2025General Meeting approves rebrand and 1:10 consolidationCapital restructure
3 Sep 2025Lubieniecki joins the board; Longworth resignsTechnical credibility
11 Sep 2025H1 2025 report: profit of A$513,957, driven by the Tarmoola gainOne-off
17 Sep 2025Trading begins as GA8; A$3.25 million placement completedNew identity
Sep 2025Strategic review of Leonora North publishedTarget prioritisation
3 Oct 2025Gold system confirmed at Eclipse and Challenge (1 m @ 7.49 g/t)New priority prospect
20 Oct 2025High-grade gold identified at the Cosmopolitan MineHistoric 360,000 oz @ 15 g/t mine area
27 Oct 2025Multiple new untested targets defined at Leonora North (anomalies S1–S5)Pipeline
28 Oct 2025Strategic LoI signed with MMSSecond partnership
3 Nov 2025Extensive RC drilling underway at Leonora SouthActivity
13 Nov 2025Mt Stirling joint venture "optimised" to 100% ownershipPrerequisite for PSMA
24 Nov 2025Unmarketable parcel facility completedRegister clean-up
1 Dec 2025High-priority targets identified at Jessop's Creek and WhistlerDiscovery pipeline
2 Dec 202541.25 million performance rights granted to directorsIncentive alignment
8 Dec 2025BMLV Profit Share Mining Agreement and A$2.5 million facilityTransformational funding model
15 Dec 2025Maiden aircore program completed (119 holes, 3,321 m) at Whistler and Jessop's CreekBlind targets
6 Jan 2026Lubieniecki becomes Executive Technical DirectorFull-time technical lead
Jan 2026PSMA conditions precedent satisfied; first A$500,000 drawdown; residual 10% of M37/1306 acquired (20 Jan)Development unlocked
1 Feb 202660.09 million GA8O options (A$0.18) expire unexercisedOverhang removed
9 Feb 2026"Strong start to 2026" with aggressive Leonora North explorationActivity
4 Mar 2026Higginsville tenements won by ballot; 8,500 m RC and 30,000 m grade control programs flaggedPortfolio/activity
Mar 2026Grade control RC rig begins at the northern sector of Mt Stirling (Phase 1 includes 179 holes for 4,206 m at Stirling Well)Execution
30 Mar 2026FY2025 Annual Report released; going-concern material uncertainty notedDisclosure
15 Apr 2026Binding MMS development agreement for Orion and SapphireSecond pipeline
17 Apr 20267.5 million new listed options (GA8OC, expiring 30 Jun 2028) quotedCapital structure
27–29 Apr 2026Trading halt, then material Leonora drilling resultsPrice-sensitive
8 May 2026503,000 shares issued on option or convertible exerciseMinor
11–13 May 2026Trading halt, then material Leonora resultsPrice-sensitive
14–15 May 2026A$7.2 million placement at A$0.07 (up to 102.9 million shares); BMLV A$1.5 million; directors A$135,000 subject to approvalFunding
20 May 2026High-grade continuity extended at Mt StirlingMine planning
22 May 2026Placement allotment; directors convert Class A performance rightsDilution and alignment
28 May 20264th grade control round: 1 m @ 106 g/t Au (BMLRC767), the best of the program; 17,080 m of 34,000 m completeGrade confidence
29 May 2026Leonard Math resigns as NEDBoard shrinks
11 Jun 2026Investor presentation targets Q4 2026 production with zero capexGuidance
29–30 Jun 20267th round: Mt Stirling phase 1 grade control largely complete; second tranche of placement shares issuedTransition to mine planning
6–7 Jul 2026Stirling Well delivers strongest grades to date; 8th Mt Stirling batchGrade confidence
27 Jul 2026Yttria aircore discovers two gold trends longer than 600 mExploration upside
6 Aug 2026Niagara West & North acquisition from Regener8 (A$2.5 million)Consolidation
10 Aug 2026MDCP approval receivedKey regulatory milestone
11 Aug 2026Fifth Stirling Well batchGrade control
17 Aug 2026Final (6th) Stirling Well round: 1 m @ 59.9 g/t; 28,785 m drilledGrade control complete
26 Aug 2026Eight new Leonora North targets, six of them untestedPipeline
31 Aug 2026Blind gold vein system confirmed beneath Whistler Zone 2 (4.12 g/t)Discovery
1–3 Sep 2026Sydney Mining Club presentation; ~6,600 m RC program underway; assays from OctoberCatalyst timing
10 Sep 2026H1 2026 results: net loss A$2.90 million; record drilling; notice of General MeetingDisclosure
16 Oct 2026General Meeting to ratify 43.6 million placement shares and approve 800,000 shares to Summers–

Financial Performance

Explore key financial metrics, segmented revenue, balance sheet health, and performance trends.

Revenue

5 charts
Income Statement (AUD): Total revenue and income to Employee benefits expense: Total revenue and income rose from AUD 0.2 Mn in FY2024 to AUD 1.7 Mn in FY2025.
GoldArc Resources Limited — Income Statement (AUD): Total revenue and income to Employee benefits expense
Series (AUD Mn)FY2024FY2025
Total revenue and income0.21.7
Operating revenue00
Other income incl. interest0.20.2
Profit on sale of assets01.5
Gross profit00
Employee benefits expense0.60.4

Unlock Company Financials

Unlock this company profile to view its financial data.

View Subscription Plans

Unlock Company Contacts

Connect with Key Decision-Makers

Access verified employee contacts and decision-maker information from this company to support your sales, lead generation, and business development efforts.