GR Engineering Services Limited Overview
GR Engineering Services is a Perth-based, mid-cap engineering, procurement and construction (EPC) contractor focused on mineral processing plants. It offers fixed-price lump-sum delivery, which is rarer and carries more risk than the EPCM/reimbursable model used by most engineering peers. The company is one of the most recognised "process plant builders" in Western Australian gold and base metals. It also has three adjacent capabilities: GR Production Services, an operations and maintenance provider to the east-coast and Northern Territory gas sector; Mipac, a process-control and operational-technology specialist; and Paradigm Engineers, an electrical and controls engineering firm. The group is capital-light, debt-free and pays out more than 100% of earnings as fully franked dividends. FY26 revenue was $493.2m and EBITDA was a record $63.1m. More than $1.0bn of contracts have been awarded since April 2026, and FY27 revenue guidance is $825–850m. That points to a step-change in scale, with greater diversification into copper, iron ore, silver-lead and zinc, financed by a $110m equity raising.
Company's own description (FY26 Annual Report, Principal Activities). The consolidated entity's activities are "the provision of high quality process engineering, detailed engineering design, process control and automation design and construction services to the mining and mineral processing industry and the provision of operations, maintenance, engineering and advisory services to the energy sector." The corporate boilerplate (2026) describes GR Engineering as specialising in "fixed price engineering design and construction services to the global resources and mineral processing industries", with project delivery in more than 20 countries across all major commodities.
Operating businesses (FY26 Annual Report).
Business and revenue model. Revenue is almost entirely service and contract revenue recognised over time. There is no material product, subscription or licensing revenue disclosed. Mipac's software IP is carried as a $1.27m intangible, which shows it is a minor revenue contributor. The group runs two distinct contracting models:
-
Mineral Processing (FY26: $394.9m, 80.1% of revenue). These are mainly EPC fixed-sum or guaranteed-maximum-price contracts, plus EPCM. Revenue is recognised over time using a cost-to-cost input method. Each contract is generally treated as a single performance obligation. The company bears cost, schedule, plant performance and defects-period risk, and accrues a project completion and close-out provision of about 3% of project costs (FY26 Annual Report, Note 3).
-
Oil & Gas (FY26: $98.2m, 19.9%). These are master service agreements with individual work orders, billed on hours multiplied by agreed rates plus recoverable equipment at cost. This is low-risk, annuity-style revenue, recognised on a billings basis under the practical expedient.
Value-chain position. GRES sits at the project development and construction stage of the mining value chain. It moves from metallurgical testwork support and studies through FEED and early contractor involvement into lump-sum EPC, then commissioning and handover. The study book (28 studies at 30 June 2026) is the feeder for future EPC awards. Mipac and Paradigm operate across the asset lifecycle, from greenfield control-system design to brownfield optimisation. GRPS operates in the production stage of gas assets.
Customer types and end-markets. Customers are mid-tier and major miners and gas producers. Named FY26 mineral processing clients include Genesis Minerals, Vault Minerals, Ora Banda Mining, BHP Iron Ore, Develop Global (Venturex), Brightstar Resources, Boab Metals, AIC Mines, Evolution Mining (Northparkes), Bellevue Gold, Medallion Metals, Maritana Minerals and Sev.en Investments (Lake Way). Named process controls clients include First Quantum Minerals, Glencore Technology, BHP, Rio Tinto, Anglo American, Ok Tedi Mining and HudBay Minerals. Named GRPS clients include Santos (Surat and Cooper basins), Shell QGC, Westside Corporation, Santos GLNG, Senex Energy, QPM Energy (in administration/receivership), INPEX (Ichthys), Mitsui E&P Australia (Waitsia), Chevron (Wheatstone and Gorgon) and the Sturt Plateau Compression Facility owner.
Two customers each provided more than 10% of FY26 revenue (FY25: two). End-markets are gold, copper, iron ore, silver-lead, zinc, rare earths, potash/SOP, and conventional and coal-seam gas/LNG. Management guides that over 60% of FY27 revenue will come from commodities other than gold.
Independent characterisation. GNG is best described as a niche lump-sum process-plant constructor with a small recurring services tail. Its economics depend on three things: (i) winning a handful of $50–300m contracts each year; (ii) executing them within tight fixed-price margins; and (iii) using customer advance payments (contract liabilities of $65.4m at 30 June 2026) to run negative working capital, which supports high returns on equity and a payout ratio above 100%. Its competitive edge is a long record of delivering plants accurately in the WA Goldfields and Pilbara. Its key vulnerability is concentration: a few contracts and a few clients drive most revenue in any year. The July 2026 Tower Hill update shows this. A client's M&A decision put a $229m contract under review within weeks of signing.
Strategy
Stated strategic themes (FY26 Annual Report and FY26 results release).
-
Capture the resources capex upcycle. Management describes "strong market sentiment, which is driving a boom in expansion projects and greenfield development projects across a broad range of commodities" (FY26 results release).
-
Accurate project delivery and lump-sum discipline. The company points to "a proven successful track record of project delivery across multiple commodities and geographies since the formation of the company in 2006", supported by documented lessons learnt and regular project reviews.
-
Diversification by business, commodity, customer and geography as the primary mitigation of economic-cycle risk (Risk Management section).
-
Study-led pipeline. "Based on the pipeline and the high levels of study work, the Group's medium to long term visibility for project work remains high." There were 28 studies at 30 June 2026.
-
Capital-light, debt-free, high payout. Nil external borrowings, low capital intensity and fully franked dividends with a DRP.
-
Inorganic growth in adjacent capabilities. Mipac (2021) and Paradigm (2024) were acquired. The August 2026 raising explicitly provides "funding flexibility for future acquisition opportunities".
Initiatives announced in the last 24 months (Oct 2024 – Oct 2026)
Medium-term financial targets. Management provides revenue-only annual guidance: FY27 revenue of $825–850m. No margin, EBITDA or EPS target is published, and no explicit medium-term (3–5 year) targets are disclosed. FY27 guidance assumes "similar revenue from studies, minor works and other new work for the relevant period with no change in market conditions" (FY26 Annual Report, footnote).
Sustainability commitments. No emissions-reduction targets are disclosed.
Products & Services
GNG sells engineered services rather than catalogue products. Each offering is listed below by segment. Pricing models are taken from the revenue-recognition notes. "Launch year" is given where known.
Mineral Processing — GR Engineering Services (GRES)
| Offering | Description and capabilities | Target customer | Pricing model | Flagship / named examples |
|---|---|---|---|---|
| Studies (scoping, PFS, DFS/BFS) | Metallurgical testwork assistance, process design, flowsheet development, capex/opex estimation | Developers and producers in Australia and abroad | Fee-for-service / reimbursable (not separately disclosed) | 28 studies in progress at 30 June 2026 (FY26 Annual Report) |
| FEED and early contractor involvement (ECI) / early works | Front-end engineering, long-lead procurement ahead of final investment decision | Developers nearing FID | Capped early-works agreements, later replaced by EPC | Sulphur Springs early works (Jun 2026); Black Swan early works for Maritana (Jul 2026, ~$25m total program committed by client); Cosmic Boy $7.6m early works replaced by EPC |
| EPC — greenfield process plants | Single-point fixed-price design, procurement, construction, installation and commissioning | Mid-tier miners | Fixed sum or GMP lump-sum | Davyhurst 3.0 Mtpa plant ($233m), Yitirrti 1.5 Mtpa Cu-Ag-Zn plant ($275m), Laverton 1.5 Mtpa gold plant ($110m), Tower Hill 3.5–4.0 Mtpa gold plant ($229m, under review) |
| EPC — brownfield upgrades and expansions | Throughput upgrades, crushing circuits, flotation upgrades, paste plants | Producing miners | Fixed sum | Yandi Eastern front-end facility 20 Mtpa crushing upgrade for BHP ($230m); King of the Hills Stage 1 and 2 ($155m); Eloise expansion ($78m); Northparkes coarse particle flotation ($68m); Bellevue paste plant ($35m); Lake Way SO4 upgrade ($38m) |
| Plant relocation and refurbishment | Disassembly, refurbishment, redesign, relocation and recommissioning of second-hand plants | Capital-constrained developers | Fixed sum | DeGrussa plant relocated to Sorby Hills silver-lead ($109m); Cosmic Boy concentrator conversion to standalone Cu concentrate/gold doré, 650 ktpa ($50m) |
| EPCM and owner's team services | Project management, owner's representatives, construction management | Majors and mid-tiers | Reimbursable / fee | Not separately quantified |
| Plant evaluation, condition reports, ops and maintenance support | Audits, reviews, optimisation, asset management plans | Producers | Fee-for-service | Not separately quantified |
| Infrastructure development | Associated non-process infrastructure | Miners | Within EPC packages | Not separately quantified |
Mineral Processing — Mipac (acquired 2021; established 1997)
| Offering | Description | Target customer | Pricing model | Flagship |
|---|---|---|---|---|
| Control systems engineering | DCS/PLC/SCADA design, configuration, commissioning | Mining, minerals and metals; energy | Fee-for-service / project lump sums | Repeat clients include First Quantum, Glencore Technology, BHP, Rio Tinto, Anglo American, Ok Tedi, HudBay |
| Operational technology and digital solutions | OT architecture, data and digital enhancements, advanced process control | Same | Project / service | — |
| MPA software suite | Mipac's in-house product suite (per the Mipac website). Detailed specifications not disclosed | Concentrators and refineries | — | MPA |
| TCard | Specialised monitoring technology for electrolytic tankhouses (per Mipac product literature). Earlier supplied to the Kyshtym copper electrolytic plant via MESCO (GRES release) | Copper/zinc refineries | — | TCard |
| SMART Tankhouse | Tankhouse digital solution (per the Mipac website); specifications not disclosed | Electrowinning/refining operations | — | SMART Tankhouse |
Mineral Processing — Paradigm Engineers (acquired 13 March 2024)
| Offering | Description | Target customer |
|---|---|---|
| Control systems design and maintenance | Iron ore, gold, battery minerals | BHP, Rio Tinto, Newmont, Coronado (per Australian Mining, Feb 2024) |
| Functional safety management | Safety instrumented systems lifecycle | Mining |
| Electrical engineering | Design and electrical packages | Mining |
| Asset management and project management | Lifecycle support | Mining |
Oil & Gas — GR Production Services (GRPS)
| Offering | Description | Named FY26 clients / assets | Pricing |
|---|---|---|---|
| Operations and maintenance of gas production facilities | Maintenance and operational support covering more than 3,000 CSG and conventional wells across QLD, VIC, NSW and SA | Santos (Surat, Cooper), Shell QGC, Westside, Santos GLNG, Senex | Hours × rates under MSAs plus recoverable equipment |
| Regulated operator services | Acts as regulated operator of the Moranbah Gas Project | QPM Energy (Administrators and Receivers Appointed) | Rates-based |
| Offshore/onshore maintenance (NT) | Blacktip gas field facilities, onshore and offshore | Blacktip operator (client not named) | Rates-based |
| LNG production and technical personnel | Upstream and downstream personnel; shutdown planning and execution support | INPEX (Ichthys LNG) | Rates-based |
| WA maintenance services | Waitsia Gas Plant maintenance; growing support for Wheatstone and Gorgon | Mitsui E&P Australia; Chevron | Rates-based |
| Compression facility O&M | 5-year O&M contract (~$57m, plus a 3-year option) awarded 4 May 2026 | Sturt Plateau Compression Facility, Beetaloo Basin, NT | Rates-based |
| Brownfield engineering and construction | Facility upgrades and sustaining capital programs (newly broadened offering in FY26) | East-coast gas operators | — |
| Carbon sequestration and green hydrogen advisory | Operational advisory for CCS and hydrogen developments | Various (not named) | Advisory fees |
Financial Narrative
Sources: FY26 Annual Report five-year table ("Relationship between company performance and remuneration policy"); FY26 and FY25 audited statements; EBITDA from the FY24 and FY26 results releases. FY22–FY24 full balance sheet and cash-flow line items were not available in the documents reviewed and are reported only where verifiable.
Margins — 5-year (analyst calculations, %)
Revenue CAGR FY22–FY26 (4-year): −6.7% per year (analyst calculation). Revenue fell from the FY22 peak during a gold and lithium construction lull and the West Musgrave handback. It then recovered from FY24. Earnings followed a different path: NPAT CAGR FY22–FY26 was +3.0% per year, because margins rose by about 4 percentage points at PBT level.
EBITDA and detailed P&L — years with verified data
Gross profit is not reported. GNG uses a nature-of-expense P&L. A proxy "contribution" (revenue less direct materials/subcontractors) was $268.4m in FY26 (54.4%) and $254.9m in FY25 (53.2%). This is an analyst construct; it is not a true gross margin because project labour sits inside employee benefits.
Half-year phasing (AUD M; HY26 and FY26 releases)
H2 FY25 is derived as FY25 less H1 FY25. One trade-press article (investmets.com) misreported H1 FY26 EBITDA as $34.5m. The audited figure is $27.8m.
Guidance track record. FY26 revenue guidance of $500–520m was restated at the HY26 result in February 2026. Actual FY26 revenue of $493.2m was about 1.4% below the bottom of the range, while EBITDA was a record. The likely cause is timing, as several large awards came only in May–August 2026, but the company did not explicitly explain the shortfall. FY27 guidance is $825–850m (midpoint +70%).
Balance sheet
Post-balance-date pro forma. After the $100m placement and $10m SPP, the company stated pro forma cash of about $198m with no debt (FY26 results presentation). Pro forma equity would be about $185m before raising costs (analyst estimate: $76.6m plus $110m gross less costs, not disclosed). This excludes the 13.0c final dividend paid on 23 September 2026.
Ratios (analyst calculations from reported figures)
Net debt to EBITDA uses net cash excluding leases, so negative means net cash.
ROIC is not meaningful. Invested capital (equity plus leases less cash) was negative at 30 June 2026 (about −$1m). The business runs on client prepayments. Cash conversion cycle is not meaningful for an EPC contractor; DSO and contract-liability coverage are better indicators. Trade payables equalled about 82 days of direct material/subcontractor costs in FY26.
Commentary on trends, inflections and drivers
-
Revenue cyclicality but margin structural improvement. Revenue fell 35% from FY22 to FY24, yet PBT margin rose from 7.7% to 10.9% and has since reached 11.7%. Three drivers explain this: (i) higher-margin process controls (Mipac from FY22, Paradigm from FY24); (ii) a more selective tendering stance after the low-margin FY22–FY23 period; and (iii) strong close-out on projects such as King of the Hills Stage 1, which finished on schedule in March 2026.
-
H2 FY26 inflection. H2 FY26 revenue of $275.2m was 26% higher than H1 ($218.0m), as awards from February to June began contributing. This underpins the FY27 guidance step-up.
-
Working-capital quality. FY26 operating cash flow of $62.7m (99% of EBITDA) was helped by a $17.3m rise in contract liabilities and a $34.4m rise in payables. These were partly offset by a $41.2m rise in receivables. Cash is partly client money. As FY27 projects progress, contract liabilities will unwind unless new awards replace them, which is a key reason management raised working capital in August 2026.
-
Receivables and credit. Expected credit losses rose to $1.5m (FY25: $0.2m), including a $1.46m loss allowance against contract assets. The counterparty was not disclosed, but GRPS's client QPM Energy is in administration and receivership. A 9% fixed-rate loan receivable ($5.1m total) is secured over a plant GR designed and built, a non-standard exposure worth watching.
-
Payout above 100% and thin retained earnings. Dividends have exceeded NPAT in each of the last two years. Retained profits were only $15.8m at 30 June 2026. The DRP (2.5% discount) and the equity raising support continued payouts while funding growth.
-
Tax. The effective rate of 32.2% is above 30%. Unrecognised foreign losses ($0.43m tax effect) show that offshore entities (UK/Greece/Turkey/PNG/US) are loss-making or dormant.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Revenue by Segment
| Segment | FY2025 | FY2026 |
|---|---|---|
Mineral Processing revenue (AUD Mn) | 383.1 | 394.9 |
Oil and Gas revenue (AUD Mn) | 95.9 | 98.2 |
Total revenue (AUD Mn) | 479.0 | 493.2 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansResults by Segment
| Segment | FY2025 | FY2026 |
|---|---|---|
Mineral Processing PBT (AUD Mn) | 43.0 | 49.3 |
Oil and Gas PBT (AUD Mn) | 8.1 | 8.3 |
Total PBT (AUD Mn) | 51.1 | 57.6 |
Segment Margins & Growth (%) and Revenue by Segment (%)
| Segment | FY2025 | FY2026 |
|---|---|---|
Mineral Processing PBT margin (%) | 11.2 | 12.5 |
Oil and Gas PBT margin (%) | 8.5 | 8.5 |
Mineral Processing share of revenue (%) | 80.0 | 80.1 |
Oil and Gas share of revenue (%) | 20.0 | 19.9 |
Mineral Processing revenue YoY growth (%) | 0 | 3.1 |
Oil and Gas revenue YoY growth (%) | 0 | 2.4 |
Segment Assets & Liabilities and Revenue by Segment
| Item | FY2025 | FY2026 |
|---|---|---|
Mineral Processing segment assets (AUD Mn) | 156.2 | 215.0 |
Oil and Gas segment assets (AUD Mn) | 34.7 | 37.5 |
Corporate assets (AUD Mn) | 1.6 | 9.3 |
Mineral Processing segment liabilities (AUD Mn) | 109.9 | 170.7 |
Oil and Gas segment liabilities (AUD Mn) | 13.7 | 14.5 |
Mineral Processing D&A (AUD Mn) | 5.8 | 5.5 |
Oil and Gas D&A (AUD Mn) | 2.1 | 2.1 |
Income Statement and Per-Share Data
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue (AUD Mn) | 651.7 | 551.4 | 424.1 | 479.0 | 493.2 |
Profit before tax (AUD Mn) | 50.3 | 39.7 | 46.1 | 51.1 | 57.6 |
Net profit after tax (AUD Mn) | 34.7 | 27.5 | 31.2 | 34.2 | 39.0 |
Basic EPS (AUD cents) | 21.55 | 17.02 | 18.92 | 20.46 | 23.10 |
Diluted EPS (AUD cents) | 20.85 | 16.43 | 18.38 | 19.86 | 22.67 |
Dividends settled in year (AUD Mn) | 25.8 | 30.7 | 31.3 | 33.4 | 40.5 |
Year-end share price (AUD) | 1.94 | 2.14 | 2.15 | 3.25 | 5.31 |
Margin Analysis (%)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
PBT margin (%) | 7.7 | 7.2 | 10.9 | 10.7 | 11.7 |
Net margin (%) | 5.3 | 5.0 | 7.4 | 7.1 | 7.9 |
Revenue YoY growth (%) | 0 | -15.4 | -23.1 | 13.0 | 3.0 |
Income Statement and Margin Analysis (%)
| Metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
EBITDA (AUD Mn) | 50.9 | 57.2 | 63.1 |
EBITDA margin (%) | 12.0 | 11.9 | 12.8 |
Metric (FY26 Annual Report) | FY2025 | FY2026 | — |
Direct materials and subcontractor costs (AUD Mn) | 224.2 | 224.8 | — |
Employee benefits expense (AUD Mn) | 180.3 | 183.9 | — |
Administration (AUD Mn) | 14.5 | 17.1 | — |
Depreciation and amortisation (AUD Mn) | 7.9 | 7.5 | — |
Share-based payments (AUD Mn) | 2.5 | 2.6 | — |
Finance costs, lease interest (AUD Mn) | 1.4 | 0.7 | — |
Interest income (AUD Mn) | 3.1 | 2.7 | — |
Expected credit losses (AUD Mn) | 0.2 | 1.5 | — |
EBIT, EBITDA less D&A (AUD Mn) | 49.3 | 55.6 | — |
Income tax expense (AUD Mn) | 16.9 | 18.5 | — |
Effective tax rate (%) | 33.1 | 32.2 | — |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansIncome Statement
| Metric | H1 FY2025 | H2 FY2025 | H1 FY2026 | H2 FY2026 |
|---|---|---|---|---|
Revenue (AUD Mn) | 272.1 | 206.9 | 218.0 | 275.2 |
EBITDA (AUD Mn) | 34.5 | 22.7 | 27.8 | 35.3 |
Balance Sheet
| Metric | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
Cash and cash equivalents (AUD Mn) | 74.6 | 71.0 | 87.9 |
Total equity (AUD Mn) | 66.3 | 68.8 | 76.6 |
Trade receivables net (AUD Mn) | 66.7 | 44.6 | 86.8 |
Contract assets (AUD Mn) | 23.3 | 14.5 | 20.3 |
Balance Sheet (FY2025–FY2026)
| Metric | FY2025 | FY2026 |
|---|---|---|
Total assets (AUD Mn) | 192.5 | 261.8 |
Total current assets (AUD Mn) | 137.8 | 202.3 |
Total current liabilities (AUD Mn) | 115.5 | 175.6 |
Working capital (AUD Mn) | 22.3 | 26.7 |
Contract liabilities (AUD Mn) | 39.0 | 65.4 |
Trade and other payables (AUD Mn) | 46.4 | 78.1 |
Borrowings, bank debt (AUD Mn) | 0 | 0 |
Lease liabilities current (AUD Mn) | 2.5 | 3.0 |
Lease liabilities non-current (AUD Mn) | 6.7 | 7.2 |
Net cash excluding leases (AUD Mn) | 71.0 | 87.9 |
Net cash including leases (AUD Mn) | 61.8 | 77.8 |
Goodwill (AUD Mn) | 18.3 | 18.2 |
Other intangibles, customer and IP (AUD Mn) | 9.2 | 7.7 |
Listed equity investments at FVOCI (AUD Mn) | 1.6 | 9.3 |
Warranty and defects provision (AUD Mn) | 9.0 | 10.0 |
Retained profits (AUD Mn) | 17.3 | 15.8 |
Cash Flow and Margin Analysis (%)
| Metric | FY2025 | FY2026 |
|---|---|---|
Operating cash flow (AUD Mn) | 38.2 | 62.7 |
Capex, PP&E (AUD Mn) | 2.4 | 3.2 |
Free cash flow, OCF less capex (AUD Mn) | 35.8 | 59.4 |
Lease principal payments (AUD Mn) | 3.9 | 3.3 |
FCF after leases (AUD Mn) | 31.9 | 56.2 |
Cash dividends paid (AUD Mn) | 33.4 | 38.7 |
Dividends settled via DRP shares (AUD Mn) | 0 | 1.8 |
Share buybacks (AUD Mn) | 0 | 0 |
Income tax paid (AUD Mn) | 20.1 | 20.2 |
Cash conversion, OCF / EBITDA (%) | 66.8 | 99.3 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2025 | FY2026 |
|---|---|---|
ROE, NPAT / average equity (%) | 50.6 | 53.7 |
ROA, NPAT / average assets (%) | 0 | 17.2 |
Current ratio (x) | 1.19 | 1.15 |
Debt to equity, bank debt (x) | 0 | 0 |
Debt to equity incl. leases (x) | 0.13 | 0.13 |
Net debt to EBITDA (x) | -1.08 | -1.23 |
Interest coverage, EBIT / lease interest (x) | 36.5 | 84.4 |
Asset turnover, revenue / average assets (x) | 0 | 2.17 |
DSO, trade receivables / revenue × 365 (days) | 34 | 64 |
Dividend payout, DPS / basic EPS (%) | 107.5 | 108.2 |
Revenue by Region and Revenue by Region (%)
| Region | FY2025 | FY2026 |
|---|---|---|
Australia revenue (AUD Mn) | 385.2 | 425.9 |
Overseas revenue (AUD Mn) | 93.8 | 67.3 |
Total revenue (AUD Mn) | 479.0 | 493.2 |
Australia share of revenue (%) | 80.4 | 86.4 |
Region growth | FY2026 YoY (%) | — |
Australia | 10.6 | — |
Overseas | -28.3 | — |
Region Assets & Liabilities
| Region | FY2025 | FY2026 |
|---|---|---|
Australia non-current assets (AUD Mn) | 50.0 | 55.6 |
Overseas non-current assets (AUD Mn) | 4.7 | 3.9 |
Share Price and Per-Share Data
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Year-end share price (AUD) | 1.94 | 2.14 | 2.15 | 3.25 | 5.31 |
Basic EPS (AUD cents) | 21.55 | 17.02 | 18.92 | 20.46 | 23.10 |
Dividends settled (AUD Mn) | 25.8 | 30.7 | 31.3 | 33.4 | 40.5 |
Year-end P/E on basic EPS (x) | 9.0 | 12.6 | 11.4 | 15.9 | 23.0 |
Valuation Multiples
| Multiple | GNG on FY26 actuals | Basis |
|---|---|---|
P/E (x) | 26.4 | $6.10 / 23.1c basic EPS |
EV/EBITDA (x) | 15.3 | $963m / $63.1m |
EV/Sales (x) | 1.95 | $963m / $493.2m |
EV/Sales on FY27 guidance midpoint (x) | 1.15 | $963m / $837.5m |
P/B (x) | ~6.3 | $1,160.8m / ~$185m pro forma equity (estimate) |
Dividend yield (%) | 4.1 | 25.0c / $6.10, fully franked |
Per-Share Data and Margin Analysis (%)
| Metric | FY2025 | FY2026 |
|---|---|---|
Interim DPS (AUD cents) | 10.0 | 12.0 |
Final DPS (AUD cents) | 12.0 | 13.0 |
Total DPS (AUD cents) | 22.0 | 25.0 |
Franking (%) | 100 | 100 |
Analyst Conclusions
Management guidance. FY27 revenue of $825–850m (+67% to +72%). Over 60% from non-gold commodities. The contracted and near-term pipeline for FY27 and FY28 is "strong and continuing to grow". King of the Hills Stage 2 is due for completion in Q2 FY27. No EBITDA or NPAT guidance is given. Applying FY26's 12.8% EBITDA margin to the guidance midpoint would imply about $107m of EBITDA. This is an illustrative analyst calculation, not guidance. Lump-sum projects in their early phases usually recognise margin conservatively, so FY27 margins could be lower.
Bull case
-
Visible step-change in earnings. More than $1.0bn of signed EPC awards and revenue guidance of $825–850m point to record FY27 profits even at a modestly lower margin. The order book also extends into FY28 (Davyhurst, Yitirrti, Yandi).
-
Quality and diversification upgrade. Tier-one clients (BHP, Evolution) and over 60% non-gold revenue reduce the "WA gold junior" discount. Mipac/Paradigm and GRPS provide a recurring base.
-
Optionality from $198m of cash. Accretive acquisitions in controls/OT or O&M could raise recurring earnings. If none emerge, surplus capital supports dividends and bonding.
Bear case
-
Execution overload. Running ten major lump-sum projects at the same time, against a business that delivered about $500m of revenue in FY26, increases the risk of an onerous contract in a tight WA labour market. One overrun on a $230–275m contract could wipe out a year of segment profit.
-
Client-driven attrition. Tower Hill ($229m) may be descoped. The original Sulphur Springs estimate of ~$295m was signed at $275m. GNG also missed FY26 revenue guidance. These show that awarded value does not convert one-for-one into revenue.
-
Valuation and dilution. At about 26x trailing P/E and 15x EV/EBITDA (placement price), the stock prices in flawless delivery. The August raising diluted holders by about 11%, and a payout above 100% leaves little margin for error if cash from advance payments unwinds.
Key catalysts and monitorables (next 12 months)
Analyst verdict. GR Engineering Services enters FY27 at the strongest point in its 20-year history. It has record earnings, its largest-ever order intake, a debt-free balance sheet holding about $198m of pro forma cash, and a client list that now reaches tier-one miners such as BHP and Evolution. The investment case rests on a simple but demanding proposition: can a founder-led contractor that delivered about $490m of revenue in FY26 roughly double its execution throughput without compromising the fixed-price discipline that has produced 11–12% pre-tax margins? The evidence so far is encouraging. Margins have expanded every year since FY23. Cash conversion is near 100%. King of the Hills Stage 1 was delivered on schedule. The TRIFR improved materially. Management also chose to strengthen the balance sheet ahead of the ramp rather than stretch it, which is prudent for a lump-sum contractor whose bonding capacity and client confidence depend on liquidity.
There are clear caveats. FY26 revenue missed restated guidance. The Tower Hill episode shows how quickly client consolidation can remove awarded work. Disclosure is thin on backlog value, margins by business and ESG. At the placement price the shares trade on about 26x trailing earnings, which leaves little room for a project overrun.
On balance, GNG is a high-quality, high-execution-risk growth story. The upside skew depends on FY27 margins holding close to 11–13% EBITDA on roughly $840m of revenue. The downside is concentrated in one or two contracts going wrong. Investors should focus less on new award headlines and more on four signals: (i) HY27 EBITDA margin; (ii) the trajectory of contract liabilities and operating cash flow; (iii) the Tower Hill resolution; and (iv) disciplined use of the acquisition war chest. If these hold, the premium rating is defensible. If not, multiple compression could be sharp.
Source list (primary documents referenced)
| Document | Date |
|---|---|
| GR Engineering Services FY26 Annual Financial Report (Appendix 4E, Directors' Report, Remuneration Report, audited statements) | 24 Aug 2026 |
| ASX Release: FY26 Financial Results, Guidance and Equity Raising; Investor Presentation | 24 Aug 2026 |
| ASX Release: Successful Completion of $100 Million Placement | 26 Aug 2026 |
| ASX Release: Share Purchase Plan Opens | 2 Sep 2026 |
| ASX Release: GR Engineering successfully completes Share Purchase Plan | 29 Sep 2026 |
| ASX Release: HY26 Financial Results | 20 Feb 2026 |
| ASX Releases: Tower Hill preferred contractor (23 Feb 2026), Tower Hill EPC (21 May 2026), Market Update Tower Hill (14 Jul 2026) | 2,026 |
| ASX Releases: Laverton and Sorby Hills EPC (26 May 2026), Sulphur Springs preferred contractor (10 Jun 2026), Davyhurst EPC (15 Jun 2026) | 2,026 |
| Medallion Metals ASX release: Cosmic Boy EPC | 1 Sep 2026 |
| Maritana Minerals ASX release: Black Swan Early Works | 20 Jul 2026 |
| GRES news release: Acquisition of Mipac | 27 Apr 2021 |
| ASX Release: Mipac Acquires WA Based Process Controls Business (Paradigm) | 1 Feb 2024 |
| FY24 Results Release; 2024 AGM Investor Presentation | Aug 2024 / Nov 2024 |
| Mipac website (Paradigm completion, offices, products) | 2,024 |
| Lycopodium FY26 Results release | 19 Aug 2026 |
| Argonaut transaction note (placement) | Sep 2026 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Title | Tenure | Prior roles | Education | Shares held (30 Jun 2026) |
|---|---|---|---|---|---|
Tony Marco Patrizi | Managing Director (also Executive Director) | Co-founder (2006). | Operations Manager, JR Engineering (300+ staff); 40+ years as director, operations manager, project manager and maintenance engineer | BE (Mech Eng) | 9,795,000 |
Omesh Motiwalla | CFO & Company Secretary | Since 16 Apr 2019 | Corporate Finance Partner, Deloitte Touche Tohmatsu (to Dec 2017); 25+ years corporate/financial advisory and Big 4 experience | BCom, FCA | 80,000 (plus 80,000 performance rights vesting 28 Aug 2026) |
Eddie de Rivera | Managing Director, Mipac (subsidiary) | — | — | — | — |
Garry McGrechan | Founder / Managing Director, Paradigm Engineers (subsidiary) | Retained post-acquisition (2024) | Paradigm founder | — | — |
“—” = not publicly disclosed.
Board of Directors — Phillip (Phil) Lockyer
| Name | Role | Appointed | Background | Other listed boards (last 3 yrs) | Committees | Shares |
|---|---|---|---|---|---|---|
Phillip (Phil) Lockyer | Non-Executive Chairman | — | Mining engineer/metallurgist, 50+ years. WMC Resources 20 years (GM WA, nickel and gold); Director Operations at Dominion Mining and Resolute. Formerly on boards of Swick, Perilya, Focus Minerals and CGA Mining | RTG Mining (2013–present) | Audit & Risk (member); Remuneration & Nominations (member) | 50,000 |
Tony Patrizi | Managing Director | Co-founder | See above | — | — | 9,795,000 |
Peter John Hood AO | Non-Executive Director | 10 Feb 2011 | Chemical engineer, 50+ years. WMC; CEO of Coogee Chemicals and Coogee Resources 1998–2009. Former Vice-Chair of APPEA; past President of CCI WA and ACCI. AO 2020. Harvard AMP | Cue Energy (2018–present); De Grey Mining (Nov 2018–May 2025); Matrix Composites & Engineering (2011–Jul 2026) | Chair, Remuneration & Nominations; member, Audit & Risk | 300,000 |
Giuseppe (Joe) Totaro | Non-Executive Director | 1 Jul 2019 (as NED) | CPA, 40+ years in mining/mining services. Co-founder and former CFO/Company Secretary of the Group | Tasmea Ltd (Apr 2024–present) | Audit & Risk (reported as Chair; the Annual Report layout is ambiguous, so verify); Remuneration & Nominations (member) | 5,000,000 (sold 3,000,000 in FY26) |
Deborah (Deb) Morrow | Non-Executive Director | 18 Apr 2024 | 30+ years in energy and mining. 24 years at Woodside; senior executive at OZ Minerals (pre-BHP acquisition 2023); Executive Director of Miner's Promise; Chair of Holyoake | Agrimin (Sep 2023–Feb 2025; former MD/CEO) | Audit & Risk (member); Remuneration & Nominations (member) | Nil |
Directors' Remuneration
| Name | Cash salary/fees | Non-cash | Other (bonus/leave) | Superannuation | Equity (rights) | Total FY2026 | Total FY2025 | % performance-based FY26 |
|---|---|---|---|---|---|---|---|---|
Phil Lockyer (Chair) | 112,320 | 0 | 0 | 13,479 | 0 | 125,799 | 114,727 | 0.0 |
Tony Patrizi (MD) | 718,752 | 10,148 | 218,753 | 30,000 | 0 | 977,653 | 869,290 | 19.3 |
Peter Hood | 90,477 | 0 | 0 | 5,319 | 0 | 95,796 | 84,816 | 0.0 |
Joe Totaro | 85,532 | 0 | 0 | 10,264 | 0 | 95,796 | 84,816 | 0.0 |
Deb Morrow | 85,532 | 0 | 0 | 10,264 | 0 | 95,796 | 84,816 | 0.0 |
Omesh Motiwalla (CFO) | 478,884 | 5,026 | 82,462 | 30,000 | 36,325 | 632,697 | 555,426 | 17.2 |
Total KMP | 1,571,497 | 15,174 | 301,215 | 99,326 | 36,325 | 2,023,537 | 1,793,891 | 14.7 |
Board & Management Changes
| Date | Change | Context |
|---|---|---|
18 Apr 2024 | Deb Morrow joins board | Adds energy, ESG and project leadership; follows OZ Minerals' takeover by BHP |
May 2025 | Peter Hood leaves De Grey Mining board | Northern Star's acquisition of De Grey |
Jul 2026 | Peter Hood leaves Matrix Composites board | External change only |
FY26 | Joe Totaro sells 3.0m shares; Peter Hood sells 0.2m | Insider selling into share-price strength (company disclosure) |
Major Shareholders
| Holder | Shares | Approx. % (post-raising, ~190m shares; analyst estimate) |
|---|---|---|
Tony Patrizi (MD) | 9,795,000 | 5.1 |
Joe Totaro (NED) | 5,000,000 | 2.6 |
Peter Hood (NED) | 300,000 | 0.2 |
Omesh Motiwalla (CFO) | 80,000 | 0.04 |
Phil Lockyer (Chair) | 50,000 | 0.03 |
Competitive Landscape
Key Competitors
| Competitor | Listing / ownership | Segment overlap | Positioning vs. GNG |
|---|---|---|---|
Lycopodium (LYL) | ASX | Mineral processing studies and EPCM; selective EPC | Closest listed peer. FY26 revenue $377.5m, NPAT $40.2m, EBITDA $59.5m, cash $106.2m; FY27 guidance $540–580m revenue and $54–58m NPAT; ~1,500 staff and 18 offices; strong in Africa and the Americas. More EPCM-weighted and more global than GNG |
Ausenco | Private (formerly ASX) | Mineral processing EPC/EPCM, studies | Global competitor for large copper and gold projects; revenue not disclosed publicly |
Sedgman | Part of CIMIC Group | Mineral processing EPC, coal and minerals | Strong in QLD; backed by a large balance sheet |
Primero Group (NRW Holdings, NWH) | ASX, via NRW | Lithium/gold process plant EPC and non-process infrastructure | Competes directly on WA EPC; part of a diversified contractor |
DRA Global | — | EPCM/EPC minerals | South African-origin global competitor |
Monadelphous (MND) | ASX | Engineering construction and maintenance (resources and energy) | Larger; overlaps in brownfield construction and in O&M for gas/LNG (vs. GRPS) |
Worley (WOR) | ASX | Engineering consulting, EPCM, O&M | Global major; competes in studies, EPCM and energy services |
Hatch / Wood | Private / LSE | Studies and EPCM; energy O&M (Wood) | Global engineering houses |
Southern Cross Electrical Engineering (SXE) | ASX | Electrical and controls (vs. Mipac/Paradigm) | Electrical contracting overlap |
Ventia, Downer, Altrad | ASX / ASX / private | Energy O&M | Compete with GRPS for east-coast gas maintenance |
ABB, Rockwell system integrators, Mintek | Global | Process control/automation (vs. Mipac) | Larger technology vendors and integrators |
Peer Comparison FY2027
| Metric | GR Engineering | Lycopodium |
|---|---|---|
FY26 revenue (AUD Mn) | 493.2 | 377.5 |
FY26 EBITDA (AUD Mn) | 63.1 | 59.5 |
FY26 EBITDA margin (%) | 12.8 | 15.7 |
FY26 NPAT (AUD Mn) | 39.0 | 40.2 |
FY26 NPAT margin (%) | 7.9 | 10.6 |
FY26 revenue growth (%) | 3.0 | 11.0 |
Cash at 30 Jun 2026 (AUD Mn) | 87.9 | 106.2 |
FY27 revenue guidance midpoint (AUD Mn) | 837.5 | 560.0 |
FY27 implied revenue growth (%) | 69.8 | 48.3 |
R&D intensity (%) | 0 | 0 |
Recent Developments
Litigation, regulatory actions, layoffs: *