Grange Resources Ltd. Overview
The rows are not like-for-like: 659 is IBISWorld (2024, consolidated), 581 is an aggregator figure, and 700 is a government estimate that includes contractors. A consistent 3-year company-reported trend is not publicly disclosed.
Grange Resources describes itself as "Australia's most experienced magnetite producer" (FY2025 Financial Report cover). It is a single-asset, vertically integrated iron ore pellet producer. It mines magnetite at Savage River in north-west Tasmania, concentrates it on site, and pipes the slurry 85 km to its Port Latta pellet plant and port.
The company produces about 2.2–2.5 Mt a year of premium, low-impurity blast-furnace pellets. These are sold under term and spot contracts to Asia-Pacific steelmakers, of which about 30% by value goes to its 47.9% shareholder, Jiangsu Shagang.
Grange is debt-free and held A$267.9 million of cash and liquid investments at 30 June 2026. That compares with a market capitalisation of about A$145 million. The balance sheet has been reset by a A$690.7 million pre-tax impairment. This followed management's decision to shelve the A$1.2 billion block-cave underground expansion in favour of a smaller, self-funded sub-level cave (SLC). The SLC extends mine life to about 2035.
A second asset, the undeveloped Southdown magnetite project in Western Australia (over 1.2 billion tonnes of resource), provides long-dated optionality. It depends on finding equity partners.
Company's own description
In the FY2025 Directors' Report, the Group's principal activities are described as two things:
-
mining, processing and selling iron ore; and
-
the ongoing exploration, evaluation and development of mineral resources.
The H1 2026 report is more specific. It names the Tasmanian operations as the producing business and the Southdown Magnetite Project near Albany, Western Australia, as the main exploration and evaluation asset.
The Annual Report 2025 frames the business as follows. Grange owns and operates the Savage River integrated iron ore mining and pellet production business in north-west Tasmania. It owns a downstream pellet plant and port at Port Latta on Tasmania's north-west coast. It also owns a major magnetite development project at Southdown.
The 2025 strategic statement (Directors' Report, "Likely developments") sets the goal as generating shareholder value by safely producing high-quality iron ore products from Savage River and Port Latta. At Southdown, a bridging study and final project scope will follow once suitable partners have joined.
Independent characterisation
Grange is a price-taking, mid-cost, single-commodity producer of a niche premium product: magnetite-derived blast-furnace pellets. Its economics differ from Pilbara hematite producers in three ways:
-
Processing intensity. Magnetite must be crushed, ground, magnetically separated and then indurated (fired) into pellets. This makes the business energy-intensive (electricity, diesel and historically anthracite), with high fixed costs. The FY2025 C1 cash cost was A$164.69/t (FY2025 Directors' Report).
-
Pricing. Pellet revenue is linked to index pricing plus pellet premiums, with provisional pricing finalised one to three months after shipment. Realised prices were US$122.57/t in FY2024–25 and US$119.95/t in H1 2026 (H1 2026 Report). These are well above the 62% Fe fines benchmark, which reflects the pellet premium.
-
Customer concentration and related party. Sales of pellets to the Shagang group were A$145.7 million in FY2025, about 30.5% of revenue (FY2025 Remuneration Report, related-party note). The FY2025 financial risk note says credit risk is concentrated in a limited number of customers.
Business model and revenue model
| Dimension | Characterisation |
|---|---|
| Revenue model | 100% product sales (iron ore pellets, plus small volumes of iron ore chips and occasional concentrate). There is no service, subscription or licensing revenue. Freight revenue arises on Cost and Freight (CFR) contracts and is recognised over time as a separate performance obligation. |
| Product mix by volume, FY2025 | Pellets 2,159,771 dmt (93.9%); chips 140,880 dmt (6.1%); concentrate 20 dmt (negligible) — FY2025 Directors' Report |
| Revenue recognition, H1 2026 | Point in time A$201.7m (87.4%); over time, i.e. freight, A$29.1m (12.6%) — H1 2026 Note 2 |
| Pricing basis | Index-linked with pellet premium; provisional pricing; FOB Port Latta or CFR. The company does not hedge iron ore price — FY2025 Note 3 |
| Contract structure | A mix of term offtake agreements and spot cargoes. Management says it will continue delivering into secured term offtake agreements for 2026 (H1 2026 Report). |
| Value chain position | Upstream mining and mid-stream beneficiation and pelletising. Grange owns the mine, concentrator, slurry pipeline, pellet plant and ship-loading port. |
| Customer types | Integrated blast-furnace steelmakers in the Asia-Pacific region |
| End markets | Primarily China (including Shagang), with sales also to Australia, South Korea and Indonesia. The geographic list is taken from Simply Wall St and Investing.com company descriptions. |
| Currency exposure | Revenue in US$; costs mostly in A$. A 10% weaker A$ raises post-tax profit by A$6.7m; a 10% stronger A$ cuts it by A$8.1m (FY2025 Note 3, financial-instrument sensitivity only). |
Physical value chain
-
Mining at Savage River, about 100 km south-west of Burnie. Open-cut mining has used Centre Pit (completed Q1 2026, now being backfilled for wall stability) and the North Pit cutback. The planned transition is to underground SLC mining below North Pit.
-
Concentration at Savage River. Ore is crushed, autogenously milled, ball-milled and magnetically separated. FY2025 concentrate output was 2.22 Mt at a 39.6% weight recovery (FY2025 Directors' Report).
-
Slurry pipeline carrying concentrate to Port Latta.
-
Pelletising at Port Latta, about 70 km north-west of Burnie. Four operating furnace lines are in use. Furnace Line 4 runs without anthracite, and the Furnace Line 5 balling drum was replaced in H1 2026.
-
Ship-loading at the company-owned Port Latta jetty.
Strategy
Stated strategy (FY2025 Annual Report and Directors' Report themes)
-
Core purpose. Responsible extraction of mineral resources to support sustainable development, and production of high-quality steelmaking raw materials efficiently and economically.
-
Savage River and Port Latta priorities (FY2025 "Likely developments"):
-
integrate and transition the life-of-mine plan from open cut to underground;
-
underground financing, originally expected in Q2 2026 (since superseded);
-
completion of the Independent Technical Expert assessment;
-
underground contract mining from July 2026 (since superseded);
-
deliver secured offtake;
-
keep investing in mine development;
-
maintain critical infrastructure;
-
productivity and cost control.
-
-
Southdown. Keep tenements and permits in good standing and secure JV partners.
-
"Green steel" positioning. The Annual Report 2025 describes the green steel market as an opportunity for premium high-grade products, and says a consistent financial performance will position Grange well through low-price cycles.
-
Values. Safety, respect, accountability, efficiency, sustainability, teamwork, and people development (corporate presentation, 25 Aug 2026).
Strategic initiatives in the last 24 months
| Initiative | Status (Oct 2026) | Targets and metrics | Source |
|---|---|---|---|
| North Pit Underground — Block Cave (proposed investment up to A$1.2bn; life of mine to about 2040) | Technically validated by the ITE (no fatal flaws), but deprioritised. Funding and guarantee requirements, together with price volatility, are weighing on risk appetite. No final investment decision. | First ore was originally targeted for late 2028 or mid-2029 | H1 2026 Report; Premier's release 9 Mar 2026; Mar 2025 Quarterly |
| Sub-Level Cave (SLC) Standalone — self-funded | Being optimised; no FID yet. The impairment model assumes SLC investment starts in 2027 with first SLC ore in Q1 2028. | Life of mine to about 2035; capex 2027–31 of A$413.7m (model) | H1 2026 Note 17 |
| Open Pit optimisation (alternative case) | Being assessed against the SLC | — | H1 2026 Report |
| Lease tenure: Alternative Application Period Act 2026 | Royal Assent 5 Jun 2026. Allows early renewal of four leases for up to 20 years before 7 Aug 2031. Renewal is not automatic. | Gives lenders tenure certainty | Tasmanian Parliament fact sheet; Act 3 of 2026 |
| Furnace decarbonisation | Furnace 4 ran anthracite-free through FY2025; design being rolled out to the other furnaces | Lower coal use and CO2-e | FY2025 Directors' Report |
| Port Latta asset renewal | Furnace Line 5 drum replaced; transformer and motor control upgrades preparing for furnace efficiency upgrades | Reliability | H1 2026 Report |
| Powering the Regions Fund grant (up to A$20m) | Awarded 2024; covers underground electrification and anthracite elimination | — | Company disclosures summarised by ROIC.ai |
| Southdown partnering | Feasibility study completed April 2025; DFS review continuing; equity investors sought | LTI milestone: secure a JV partner or a sale at a board-approved price | FY2025 Directors' Report; FY2025 LTI terms |
| Mt Windsor exit | Option granted Jun 2025; sale agreement reached H1 2026; liability for rehabilitation after Sep 2026 derecognised (A$2.6m) | Removes legacy liability | H1 2026 Note 14 |
| Fleet and plant renewal | DT256 powertrain rebuild; 789 haul truck rebuild programme; Ball Mill Shell #1 replaced after 57 years | Sustaining capital | June 2026 Quarterly; FY2025 Directors' Report |
| Cost programme | LTI target to cut underground costs 10% from DFS estimates | -10% vs DFS | FY2025 Remuneration Report |
Medium-term guidance
Grange does not publish formal production, cost or earnings guidance in the documents reviewed.
The disclosed planning parameters are the life-of-mine horizon (about 2035 under the SLC case) and the assumptions used in the impairment model. The latter are accounting assumptions, not guidance.
There is no stated dividend policy. A 2023 LTI milestone referred to implementing a capital-management plan that includes dividend policy, but no policy has been published.
Products & Services
Grange is a single-segment company with a short product list. Each product is set out below.
Savage River resource base (Resource Statement, 31 Dec 2025, released 2 Apr 2026):
DTR = Davis Tube Recovery, the measure of recoverable magnetic iron.
Product Portfolio
| Product / offering | Description and specifications | Target customer | Volume (latest) | Pricing model | Status |
|---|---|---|---|---|---|
Savage River iron ore pellets (flagship) | Indurated blast-furnace pellets made from magnetite concentrate at Port Latta. Marketed as high-iron, low-impurity feed that helps steelmakers cut coke rates and emissions. Detailed chemistry (Fe %, SiO2, Al2O3) is not given in the filings reviewed. | Integrated blast-furnace steelmakers, Asia-Pacific | FY2025 sales 2,159,771 dmt; H1 2026 sales 1,135,678 dmt | Index-linked plus pellet premium; provisional pricing; FOB or CFR | In production since the late 1960s; capacity over 2.5 Mtpa |
Iron ore chips | Fines or undersize by-product from pellet handling and screening, sold separately | Steelmakers and traders | FY2025 140,880 dmt; H1 2026 45,488 dmt | Index-linked at a discount | Ongoing |
Magnetite concentrate (merchant) | Concentrate sold without pelletising; occasional only | Pellet makers and steelmakers | FY2025: 20 dmt (immaterial) | Index plus grade premium | Opportunistic |
Freight services (CFR contracts) | Shipping arranged by Grange and recognised as a separate performance obligation | Same customers | H1 2026 freight revenue A$29.1m | Pass-through | Ongoing |
Southdown magnetite concentrate (development) | Planned 5 Mtpa of about 69.5% Fe concentrate over a 28-year life (2022 PFS and 2025 FS); resource over 1.2 bn t | Pellet makers and direct-reduction (DR)-grade steelmakers ("green steel") | Not in production | Not applicable | Feasibility complete; partners sought |
| Category | Tonnes | Grade | Notes |
|---|---|---|---|
Mineral Resource | 464 Mt | 44% DTR | Above a 15% DTR cut-off; down 3.6 Mt (0.8%) year on year from depletion |
Ore Reserve | 96 Mt | 44.7% DTR | To be mined by open-cut and underground methods |
Ore reserves used in the H1 2026 impairment model | 31.8 Mt proven + 68.3 Mt probable | — | H1 2026 Note 17 |
Financial Narrative
Source hierarchy for this section:
-
FY2025 and FY2024: statutory statements in the FY2025 Financial Report.
-
FY2021–FY2025 revenue, NPAT, EPS, dividends paid and share price: FY2025 Remuneration Report 5-year KPI table (company-published).
-
FY2021–FY2023 balance-sheet and cash-flow items not in that table: TipRanks aggregator (flagged).
-
FY2023 closing equity: statutory statement of changes in equity (opening balance at 1 Jan 2024).
-
FY2021–22 equity: derived from ROIC.ai book value per share × 1,157 million shares (flagged as derived).
Income statement
Dividends per share are derived: dividends paid in the year divided by 1,157.3 million shares. FY2024 = 2.0c final for FY2023 plus 0.5c interim for H1 2024 (FY2025 Directors' Report).
Margins and growth
Revenue CAGR FY2021–FY2025: –11.6% a year (A$781.7m to A$477.85m).
Commentary. FY2021 was a cyclical peak. Iron ore prices and pellet premiums were exceptionally high after COVID-era steel restocking, producing a 41% net margin and A$162m in dividends.
Since then, the business has been squeezed from three directions:
-
Price normalisation. The realised price was US$120.31/t in FY2024 and US$122.57/t in FY2025, well below 2021 peaks.
-
Lower volumes. Total sales fell from 2.53 Mt in FY2024 to 2.30 Mt in FY2025 as the open-pit sequence moved into heavy waste stripping (FY2025 Directors' Report).
-
Cost inflation. C1 cost rose from A$146.14/t to A$164.69/t, and weight recovery fell from 41.0% to 39.6%.
The gap between statutory gross margin (about 13.5%) and aggregator EBITDA margin (about 36%) is large. It reflects heavy depreciation and amortisation of deferred stripping and mine development, which is the cost of sustaining the open pit. Finance income (A$16.5m in FY2025, A$23.3m in FY2024) from the cash pile made up a meaningful share of pre-tax profit: about 25% in FY2025.
Key operating metrics
Source: FY2025 Directors' Report. C1 margin is derived.
Half-year comparison
Source: H1 2026 Report and Appendix 4D: Commentary. H1 2026 operations were materially better than H1 2025:
-
Concentrate output rose 18% to 1.19 Mt.
-
C1 cost fell 18.5% to A$146.95/t.
-
Operating cash flow almost doubled.
Two things offset this. The A$ appreciated to 0.70, which wiped out the US$ price gain in A$ terms. Diesel costs rose, linked to Middle East disruption (June 2026 Quarterly).
The quarterly path matters. C1 cost was A$136.56/t in Q1 2026 and rose to A$157.69/t in Q2. Over the same period the realised price fell from US$126.29/t to US$114.32/t. The C1 margin therefore fell to about A$2.6/t in the June quarter, before sustaining capital and royalties.
The statutory loss is entirely due to the non-cash impairment (see 6.8).
Balance sheet
FY2021–23 total assets and cash plus liquid investments: TipRanks (aggregator; rounded). FY2025 total assets: statutory figure of A$1,395.5m; TipRanks shows A$1.44bn, and the statutory figure is used. FY2021–22 equity: derived from ROIC.ai book value per share. FY2023 equity: statutory. FY2024–25: statutory.
Post-impairment balance sheet at 30 June 2026 (H1 2026 Report):
Net tangible assets per share were A$0.49 at 30 June 2026, against A$0.93 a year earlier (Appendix 4D).
Commentary. Grange has had no financial debt throughout the period. Its rehabilitation provision is now the largest liability on the balance sheet. It rose to A$147.9m at June 2026, mainly because a lower discount rate added A$38.3m (H1 2026 Note 14).
Inventory of about A$250m is unusually high relative to revenue, at about 52% of annual sales. It includes A$133m of ore stockpiles and A$57m of finished pellets.
Cash flow
FY2024–25: statutory cash-flow statement. FY2021–23 OCF, FCF, investing and financing cash flows: TipRanks. FY2021–23 capex is derived as OCF minus FCF. No buybacks are disclosed in any period reviewed.
FY2025 capex comprised PP&E of A$44.2m and mine properties and development (mainly deferred stripping) of A$110.2m. In H1 2026, capex was A$73.8m (A$51.6m mine development and A$22.2m PP&E), giving free cash flow of about A$3.3m.
Commentary. Cumulative free cash flow from FY2022 to FY2025 was roughly zero (A$–0.5m), against A$191m of dividends paid. Since FY2021, the business has essentially reinvested all its operating cash in waste stripping to keep the open pit going. Dividends since then have been funded from the FY2021 cash windfall. That explains why the board has suspended dividends since the H1 2024 interim.
Ratios
How each ratio was calculated (all derived by the analyst):
ROE and ROA: FY2021 uses year-end balances because FY2020 balances are unavailable.
ROIC: after-tax operating profit (EBIT × (1 – 30%)) divided by average equity, ignoring cash. Because invested capital excluding cash is smaller, a cash-adjusted ROIC would be higher.
Net debt to EBITDA: negative values indicate net cash. Uses aggregator EBITDA and cash plus liquid investments.
Interest cover: finance expense is mainly unwinding of the rehabilitation discount and lease interest.
Cash conversion cycle: not calculable from the disclosures reviewed.
The H1 2026 impairment — anatomy
Source: H1 2026 Note 17: Trigger. Market capitalisation at 30 June 2026 was below book net assets, which prompted an impairment test.
Cause. The Savage River cash-generating unit (CGU) was revalued on a "SLC Standalone" life-of-mine plan, which runs to about 2035. The previous plan combined SLC and block-cave phases and ran to about 2040. The company attributes the change to financing constraints that prevent progression to the block-cave phase, together with lower forecast iron ore prices.
Valuation method: fair value less costs of disposal, Level 3, using a post-tax nominal discount rate of 11%.
Key assumptions (H1 2026 Note 17):
Sensitivity of the post-impairment headroom (the carrying amount now equals fair value, so any adverse move creates further impairment):
Tax detail. The company did not recognise A$28.3m of additional deferred tax assets arising from the impairment, and impaired A$40.6m of deferred tax assets relating to the decommissioning liability. Both were judged non-recoverable.
Auditor. PwC's review report includes an emphasis of matter on the impairment judgement. Its conclusion is unmodified.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Income Statement and Margin Analysis (%)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Revenue from operations (AUD Mn) | 781.70 | 594.60 | 614.70 | 520.81 | 477.85 |
Revenue growth YoY (%) | 48.5 | -23.9 | 3.4 | -15.3 | -8.2 |
Gross profit, statutory (AUD Mn) | — | — | — | 70.39 | 64.78 |
Gross profit, aggregator basis (AUD Mn) | 435.55 | 239.40 | 199.51 | 61.32 | 59.41 |
Operating income, aggregator (AUD Mn) | 431.77 | 234.83 | 194.54 | 60.90 | 52.16 |
Operating profit before finance costs, statutory (AUD Mn) | — | — | — | 61.06 | 53.79 |
EBITDA, aggregator (AUD Mn) | 538.92 | 308.67 | 274.53 | 243.74 | 171.75 |
Profit before tax (AUD Mn) | — | — | — | 81.00 | 67.14 |
Net profit after tax (AUD Mn) | 321.60 | 171.70 | 150.10 | 58.50 | 46.60 |
Basic EPS (AUD cents) | 27.84 | 14.84 | 12.97 | 5.06 | 4.03 |
Diluted EPS (AUD cents) | — | — | — | 5.04 | 4.01 |
Dividends paid per share, cash basis (AUD cents) | 14.0 | 12.0 | 2.0 | 2.5 | 0.0 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansMargin Analysis (%)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Gross margin, statutory (%) | — | — | — | 13.5 | 13.6 |
Operating margin, aggregator (%) | 55.2 | 39.5 | 31.6 | 11.7 | 10.9 |
EBITDA margin, aggregator (%) | 68.9 | 51.9 | 44.7 | 46.8 | 35.9 |
Net margin (%) | 41.1 | 28.9 | 24.4 | 11.2 | 9.8 |
Effective tax rate (%) | — | — | — | 27.7 | 30.6 |
Operating Metrics (Mt) and Margin Analysis (%)
| Metric | FY2024 | FY2025 |
|---|---|---|
Total material mined (M BCM) | 16.25 | 14.28 |
Ore mined (M BCM) | 2.27 | 1.92 |
Concentrate produced (Mt) | 2.61 | 2.22 |
Weight recovery (%) | 41.0 | 39.6 |
Pellets produced (Mt) | 2.47 | 2.21 |
Pellet stockpile at year end (Mt) | 0.24 | 0.29 |
Pellet sales (Mt) | 2.36 | 2.16 |
Total product sales (Mt) | 2.53 | 2.30 |
Average realised price (USD per t FOB) | 120.31 | 122.57 |
Average realised AUD:USD | 0.6577 | 0.6470 |
Average realised price (AUD per t FOB) | 182.94 | 189.44 |
C1 cash operating cost (AUD per t) | 146.14 | 164.69 |
C1 margin, realised price minus C1 (AUD per t) | 36.80 | 24.75 |
Income Statement and Per-Share Data
| Metric | H1 2025 | H1 2026 |
|---|---|---|
Revenue (AUD Mn) | 206.43 | 230.79 |
Cost of sales (AUD Mn) | 194.15 | 213.19 |
Gross profit (AUD Mn) | 12.27 | 17.60 |
Adjusted EBITDA (AUD Mn) | 37.44 | 32.74 |
Impairment, pre-tax (AUD Mn) | 0.00 | 690.68 |
Finance income (AUD Mn) | 14.02 | 3.64 |
Profit or loss before tax (AUD Mn) | 18.71 | -675.04 |
Statutory NPAT (AUD Mn) | 13.77 | -541.85 |
Underlying NPAT (AUD Mn) | 13.77 | 10.50 |
Basic EPS (AUD cents) | 1.19 | -46.82 |
Pellet sales (Mt) | 1.00 | 1.14 |
Realised price (USD per t) | 113.31 | 119.95 |
Realised AUD:USD | 0.6343 | 0.7023 |
Realised price (AUD per t) | 178.63 | 170.79 |
C1 cost (AUD per t) | 180.25 | 146.95 |
Operating cash flow (AUD Mn) | 41.37 | 77.09 |
Interim dividend (AUD cents) | 0 | 0 |
Balance Sheet
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Total assets (AUD Mn) | 1,120 | 1,100 | 1,240 | 1,301.3 | 1,395.5 |
Cash and cash equivalents (AUD Mn) | — | — | 109.7 | 71.4 | 94.5 |
Cash plus liquid investments (AUD Mn) | 464.7 | 298.6 | 282.6 | 298.1 | 275.2 |
Total borrowings (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Lease liabilities (AUD Mn) | — | — | — | 1.3 | 0.2 |
Net cash incl. leases (AUD Mn) | — | — | — | 296.7 | 275.0 |
Total equity (AUD Mn) | 868 | 902 | 1,031.3 | 1,061.3 | 1,108.2 |
Goodwill and intangibles (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Working capital (AUD Mn) | — | — | — | 471.8 | 511.3 |
Inventories (AUD Mn) | — | — | — | 225.7 | 247.6 |
Mine properties and development (AUD Mn) | — | — | — | 461.0 | 574.5 |
Property, plant and equipment (AUD Mn) | — | — | — | 287.5 | 232.6 |
Rehabilitation and other provisions (AUD Mn) | — | — | — | 125.2 | 149.4 |
Financial Analysis
| Item | Amount (AUD Mn) |
|---|---|
Total assets | 787.4 |
Cash | 98.7 |
Term deposits | 169.2 |
Inventories | 250.9 |
Mine properties and development | 81.1, down from 574.5 |
Property, plant and equipment | 89.4, down from 232.6 |
Deferred tax asset | 34.6 (swing from a A$98.4m liability) |
Leases | 3.4 |
Rehabilitation provision (non-current) | 147.9 |
Net assets | 566.4 |
Cash Flow
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Operating cash flow (AUD Mn) | 498.16 | 196.94 | 267.11 | 239.92 | 132.51 |
Capex, PP&E plus mine development (AUD Mn) | 80.07 | 224.57 | 258.19 | 199.79 | 154.43 |
Free cash flow, OCF minus capex (AUD Mn) | 418.09 | -27.63 | 8.92 | 40.13 | -21.91 |
Dividends paid (AUD Mn) | 162.0 | 138.9 | 23.1 | 28.9 | 0.0 |
Share buybacks (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Investing cash flow (AUD Mn) | -79.57 | -396.24 | -241.90 | -253.38 | -109.52 |
Financing cash flow (AUD Mn) | -165.25 | -145.55 | -25.19 | -30.73 | -1.79 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
ROE on average equity (%) | 37.0 | 19.4 | 15.5 | 5.6 | 4.3 |
ROA on average assets (%) | 28.7 | 15.5 | 12.8 | 4.6 | 3.5 |
ROIC, approx. (%) | — | — | — | 4.6 | 4.0 |
Current ratio (x) | — | — | — | 7.92 | 8.88 |
Debt to equity (x) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Net debt to EBITDA (x) | -0.86 | -0.97 | -1.03 | -1.22 | -1.60 |
Interest cover, EBIT over finance expense (x) | — | — | — | 18.4 | 17.3 |
Asset turnover (x) | — | — | — | 0.41 | 0.35 |
Asset class
| Asset class | Impairment (AUD Mn) |
|---|---|
Deferred stripping | 369.8 |
Mine properties and development | 174.7 |
Property, plant and equipment | 144.0 |
Right-of-use assets | 2.3 |
Total pre-tax | 690.7 |
Net deferred tax impact | –138.3 |
Total after tax | 552.3 |
Share Price and Cash Flow
| Assumption | 2026 | 2027–2031 | 2032–2035 |
|---|---|---|---|
Pellet price (USD per dmt FOB) | 119.64 | 119.23–125.52 | 128.72–134.07 |
AUD:USD | 0.71 | 0.71–0.73 | 0.73 |
Capital expenditure (AUD Mn) | 93.3 | 413.7 | 21.7 |
Operating expenditure (AUD Mn) | 355.9 | 1,846.1 | 1,116.0 |
Change in Assumption Details
| Change in assumption | Reduction in recoverable value (AUD Mn) |
|---|---|
US$1/dmt lower pellet price | 19.4 |
A$0.01 higher AUD:USD | 37.5 |
1% higher operating costs | 21.6 |
25 bp higher discount rate | 4.8 |
Revenue by Region and Revenue by Region (%)
| Indicator | FY2024 | FY2025 |
|---|---|---|
Sales to Shagang group, mainly China (AUD Mn) | 145.13 | 145.70 |
Shagang share of revenue (%) | 27.9 | 30.5 |
Revenue from all other customers (AUD Mn) | 375.68 | 332.15 |
Revenue by Region
| Region | FY2023 | FY2024 | FY2025 |
|---|---|---|---|
Total revenue, all regions (AUD Mn) | 614.74 | 520.81 | 477.85 |
Per-Share Data
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Share price at year end (AUD cents) | 75.5 | 84.5 | 46.5 | 22.0 | 28.5 |
Share Price & Returns
| Reference point | Price (AUD) | Change to Sep 2026 |
|---|---|---|
31 Dec 2025 | 0.285 | –56% |
Late Feb 2026 (results) | about 0.24 | –48% |
2 Apr 2026 (reserves release) | 0.19 to 0.145 intraday | — |
28 Apr 2026 | 0.17 to 0.14 | — |
28 Jul 2026 | 0.14 to 0.13 | — |
21 Sep 2026 | 0.125 | — |
31 Dec 2021 | 0.755 | –83% |
Valuation Snapshot
| Multiple | Value | Basis |
|---|---|---|
Market capitalisation | About A$144.7m | Price × shares |
Enterprise value | About A$–119.8m (negative) | Market cap minus A$267.9m cash and liquid investments plus A$3.4m leases |
P/E, statutory trailing 12 months | Not meaningful (TTM loss about A$–509m) | FY2025 A$46.6m − H1 2025 A$13.8m + H1 2026 A$–541.8m |
P/E, underlying trailing 12 months | About 3.3x | Underlying TTM NPAT about A$43.3m |
P/B | About 0.26x | Net assets A$566.4m |
Price to NTA | About 0.26x | NTA A$0.49 per share |
EV/EBITDA and EV/Sales | Not meaningful (negative EV) | TTM revenue about A$502.2m |
Dividends & Capital Returns
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Dividends paid in cash year (AUD Mn) | 162.0 | 138.9 | 23.1 | 28.9 | 0.0 |
Analyst Conclusions
Management guidance
There is no formal guidance on volume, cost or earnings. The disclosed direction is:
-
Optimise a self-funded SLC with life of mine to about 2035. The impairment model assumes SLC investment from 2027 and first SLC ore in Q1 2028, with 2027–31 capex of A$413.7m.
-
Continue delivering into term offtake through 2026.
-
Keep the block-cave option alive.
-
Seek Southdown partners.
-
Exit Mt Windsor.
There are no consensus growth expectations available.
Bull case
-
Deep value. Liquidity of A$267.9m exceeds the market cap of about A$145m, and enterprise value is negative. Even assuming SLC capex of about A$414m over 2027–31, operating cash flow at the H1 2026 run rate (about A$150m a year annualised) could fund development without dilution, provided prices hold.
-
Operating leverage to a price or FX turn. Each US$1/t adds about A$19.4m and each A$0.01 lower AUD:USD adds about A$37.5m to CGU value. With the asset base now written down, any recovery could flow through to impairment reversals and lower amortisation (deferred stripping has been written to nil).
-
Strategic optionality. Lease tenure has been de-risked by the 2026 Act; the ITE found no fatal flaws in the block cave; Southdown (over 1.2 bn t) remains a potential monetisation; and a 47.9% strategic holder could consolidate the company.
Bear case
-
Margin compression. The Q2 2026 C1 margin was about A$2.6/t. Sustaining stripping and capex absorb cash, and cumulative FCF from FY2022 to FY2025 was about nil. Cash could erode if prices stay at US$110–120/t with a strong A$.
-
Life-of-mine cliff. The 2035 horizon limits terminal value. The rehabilitation provision (A$147.9m and rising) will become a call on cash. Any SLC slippage brings further impairment, since headroom is now zero.
-
Governance discount. The controlling holder is also the largest customer; the board is not majority-independent; there is no dividend policy; and earlier milestone timelines were missed. Minority holders may never see the cash returned.
Catalysts and monitorables (next 12 months)
-
Q3 2026 quarterly report (expected late October 2026): C1 cost, realised price, cash balance.
-
SLC final investment decision and funding plan; any revision of the open-pit alternative.
-
Lodgement and grant of the mining lease renewal under the 2026 Act.
-
FY2026 results (expected late February 2027): impairment testing, dividend decision.
-
Southdown partner or sale announcement.
-
Completion of the Mt Windsor sale.
-
Pellet premium trends, AUD:USD and diesel prices.
-
Board composition, including whether independence is maintained after the 2026 appointments.
-
Any capital management (buyback or special dividend) given the gap between cash and market cap.
-
Centre Pit backfill progress and geotechnical stability.
Analyst verdict
Grange Resources sits at an inflection point defined less by its operations than by capital allocation. The Savage River system ran well in the first half of 2026. Concentrate output rose 18%, C1 cost fell to A$146.95/t and operating cash flow nearly doubled. That shows a 60-year-old asset can still be operated efficiently.
The problem is the future of the mine, not its present. Without a bankable block cave, the reserve base supports production only to about 2035. Management has accepted this, writing A$690.7 million off the asset base and cutting book equity roughly in half.
The result is unusual. A producing, debt-free miner trades at roughly half its cash and liquid investments, with negative enterprise value. Markets rarely price industrial companies like this unless they doubt the cash will reach minority shareholders. Here those doubts have substance:
-
the next five years need over A$400 million of SLC capex;
-
unit margins compressed sharply in the June quarter;
-
rehabilitation liabilities are rising;
-
the controlling shareholder is also the largest customer;
-
dividends have been suspended for two years.
The investment case therefore rests on three questions. Can the SLC be funded from internal cash flow without draining liquidity? Will the board commit to a transparent capital-return framework once the SLC is funded? Can Southdown or the block-cave option be crystallised with partners?
A credible FID on a fully costed SLC, combined with any shareholder distribution, would likely narrow the discount quickly. Continued price weakness or a strong A$ would instead raise the prospect of further impairment and cash burn.
On balance, Grange screens as a high-risk, deep-value special situation rather than a quality cyclical.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Independence | Appointed | Background | FY2025 fees (AUD) |
|---|---|---|---|---|---|
Dr Michelle Li (PhD, GAICD) | Chairperson; member of Audit & Risk and Remuneration & Nomination committees | Independent | Before 2024; exact date not given in the excerpt reviewed | More than 30 years in international mining, including senior roles at Citic Pacific, Rio Tinto and Iluka. PhD, University of Queensland. Former NED of Ardiden, Orion Metals and Sherwin Iron. | 210,000 |
Fong Hoon (MBus, CA, FCPA, FGIA, GAICD) | NED; chairs both the Audit & Risk and the Remuneration & Nomination committees | Independent | 17 Apr 2024 | Chartered accountant with commercial, finance and audit background and Australian and South-East Asian networks | 112,499 |
Ajanth Saverimutto (BEng Mining Hons, BBus) | NED; member of Audit & Risk | Independent | Before 2024 | Mining engineer and accountant with more than 25 years' experience. Managing Director of Wildcat Resources. Former MD of Venturex; mining manager at Freeport-McMoRan and BHP Billiton; COO of Unity Mining. | 91,500 |
Guo Wei | NED | — | 10 Mar 2026 | — | Not applicable (appointed 2026) |
Jie Yu | NED | — | 2 Jun 2026 | — | Not applicable |
“—” = not publicly disclosed.
Board of Directors — Chongtao Xu
| Name | Role | Date left |
|---|---|---|
Chongtao Xu | Executive Director (former head of steel M&A at Shagang Investment Holding) | 10 Apr 2025; remains Investment Director |
Tianxiao Shen | NED (Shagang International Singapore) | 30 Dec 2025 |
Jiajia Jiang | NED (Shagang Group Investment Holding) | 15 Apr 2026 |
Executive Leadership Team
| Name | Title | Tenure | Salary and fees (AUD) | STI (AUD) | LTI rights expense (AUD) | Total (AUD) | Performance-related (%) |
|---|---|---|---|---|---|---|---|
Weidong Wang | Chief Executive Officer | CEO since 15 Jul 2024 | 386,897 | 97,637 | 71,765 | 656,090 | 26 |
Steven Phan | Chief Financial Officer | KMP since at least 2019 | 403,096 | 96,320 | 75,033 | 660,923 | 26 |
Ben Maynard | Chief Operating Officer | KMP since at least 2019 | 456,126 | 109,835 | 85,735 | 717,030 | 27 |
Grant Bramich | General Manager Operations | KMP since 1 Jan 2024 | 289,008 | 52,231 | 40,788 | 436,723 | 23 |
Chongtao Xu | Investment Director (Executive Director until 10 Apr 2025) | Since 2023 | 210,124 | 39,537 | 29,655 | 347,430 | 21 |
Piers Lewis | Company Secretary | — | Not KMP | — | — | — | — |
“—” = not publicly disclosed.
Share-Based Incentives
| Tranche | Weighting | Hurdle |
|---|---|---|
| 1 | 35% | TSR against the ASX 300 Metals & Mining index |
| 2 | 35% | ROE, with an 8% target and 15% stretch |
| 3 | 30% | Strategic milestones |
Major Shareholders
| Rank | Holder | Shares | Stake (%) | Source and date |
|---|---|---|---|---|
| 1 | Shagang International (Australia) Pty Ltd | 305,375,639 | 26.4 | Simply Wall St, Feb 2026 |
| 2 | Jiangsu Shagang Group Company Limited | 249,387,017 | 21.6 | Simply Wall St, Feb 2026 |
1+2 | Shagang International Holdings and associates (combined substantial holding) | 554,762,656 | 47.90 | InvestSMART / Morningstar substantial holder data |
| 3 | Mitsubishi UFJ Trust and Banking Corporation | 56,162,396 | 4.85 | Simply Wall St; became a substantial holder around 2 Dec 2025 |
| 4 | Dimensional Fund Advisors LP | 37,204,605 | 3.21 | Simply Wall St |
| 5 | First Sentier Investors (Australia) IM Ltd | 34,120,187 | 2.95 | Simply Wall St |
| 6 | Pacific International China Limited | — | 2.48 | Simply Wall St |
7–10 | Not reliably disclosed in sources reviewed | — | — | — |
Competitive Landscape
Key Competitors
| Competitor | Country | Product overlap | Relative positioning against Grange |
|---|---|---|---|
Vale | Brazil | Blast-furnace and DR pellets | Largest seaborne pellet supplier; vastly larger scale and lower cost |
LKAB | Sweden | Magnetite pellets | State-owned European leader; strong in DR pellets |
Samarco (Vale/BHP JV) | Brazil | Pellets | Large scale; restarting capacity after the 2015 dam failure |
Iron Ore Company of Canada (Rio Tinto) | Canada | Pellets and concentrate | Larger, more diversified, Atlantic-focused |
Champion Iron | Canada | 66%+ Fe concentrate, DR-grade upgrade | High-grade concentrate competitor in the same "green steel" premium niche |
Ferrexpo | Ukraine | Pellets | Similar-size pellet niche producer; war-disrupted |
Metalloinvest | Russia | Pellets and HBI | Large; sanctions-constrained market access |
CITIC Pacific Mining (Sino Iron) | Australia (WA) | Magnetite concentrate and pellets | Largest Australian magnetite operation; Chinese-owned |
Karara Mining (Ansteel) | Australia (WA) | Magnetite concentrate | Australian magnetite peer |
Fortescue (Iron Bridge) | Australia (WA) | 67% Fe magnetite concentrate | New large-scale Australian high-grade entrant |
Cleveland-Cliffs | USA | Pellets (mainly captive) | Largely domestic US; limited seaborne overlap |
Developers: Magnetite Mines (Razorback), Hawsons Iron | Australia | Future high-grade concentrate | Compete with Southdown for capital and partners |
Competitor Detail
| Metric | Grange FY2025 |
|---|---|
Revenue | A$477.9m |
Revenue growth | –8.2% |
Statutory gross margin | 13.6% |
Net margin | 9.8% |
R&D intensity | Not disclosed (exploration and evaluation 0.7%) |
Net debt | Net cash of A$275m |



