Greenwing Resources is a Brisbane-based, ASX-listed critical-minerals company that grew out of Bass Metals, a Tasmanian base-metals miner of the late 2000s. It owns 100% of three projects that each carry a JORC Mineral Resource: the San Jorge lithium brine project in Catamarca, Argentina (1.07Mt LCE at 195mg/L Li, covering the entire San Francisco salar within ~38,000 hectares); the Graphmada large-flake graphite mining complex in eastern Madagascar (61.9Mt at 4.5% fixed carbon, with a built plant that produced and sold concentrate in 2018–2019 but has been on care and maintenance since); and the Que River polymetallic project in Tasmania (2.39Mt at 9.5% ZnEq), being studied for an open-pit restart via third-party processing and possible data-centre hosting. With a market value around A$40–50 million, no debt and limited cash, Greenwing is an option-value story whose rerating depends on partner deals, study outcomes and funding.
Company's own description
In its FY2025 Annual Report, Greenwing describes itself as a critical-minerals business developing the Graphmada Mining Complex in eastern Madagascar, exploring the San Jorge lithium brine project in Argentina and owning the Que River polymetallic project in Tasmania. It states an aspiration to become a diversified producer and developer of critical mineral concentrates, positioned to benefit from lithium and graphite market fundamentals. Principal activities in FY2025 were exploration, development and care-and-maintenance work across the graphite mine, the polymetallic project and the lithium assets.
The company's 2026 investor materials (April, July and August 2026) reframe the story around three 100%-owned "strategic assets", positioned against two demand themes: (1) battery materials for electric vehicles, and (2) a "second demand pillar" from AI infrastructure, data centres and grid-scale stationary storage. The August 2026 RIU Roadshow presentation also introduces "Green River Resources" as a heading for the Que River workstream, consistent with the stated plan to separate Que River from the critical-minerals business.
Independent characterisation
Greenwing is, in substance, a pre-revenue project owner and developer. It has no recurring revenue: FY2025 "other income" was only A$48,512 (interest and sundry income), and the most recent product sales were graphite concentrate sales from Graphmada in FY2019–FY2020 before the mine was suspended (December 2019 / March 2020). The business model is to:
-
Define and grow JORC resources through drilling and geophysics;
-
De-risk via studies (scoping, pre-feasibility) and metallurgical/process testwork (e.g. direct lithium extraction, DLE);
-
Monetise via strategic partners, joint ventures, offtake-linked financing, asset sales or demergers, rather than solo construction.
The value chain position is upstream (mineral resources and, potentially, concentrate production). Prospective customers are battery-material processors and anode/cathode producers (graphite and lithium carbonate equivalent), industrial graphite users (refractories, expandable graphite), base- and precious-metal smelters (Que River concentrate via a third-party concentrator), and potentially data-centre developers (site-hosting at Que River).
Revenue model mix (current and prospective)
| Revenue stream | Status | Notes |
|---|---|---|
| Product sales — graphite concentrate | Dormant | Graphmada sold concentrate into the EU, USA, India, Japan and China (company presentations); operations suspended since December 2019 |
| Product sales — lithium (LCE / lithium chloride) | Prospective | San Jorge scoping study and DLE testwork under way |
| Product sales — Zn/Pb/Cu/Au/Ag concentrate | Prospective | Que River open-pit restart concept with third-party (toll) processing |
| Site-hosting / infrastructure | Conceptual | Que River data-infrastructure assessment (stage 2) |
| Services / subscription / licensing | — | Not applicable |
| Asset sales | Ongoing, minor | Sale of surplus Graphmada equipment is a stated 2026 objective; FY2026 recorded A$0.2m from PP&E sales (S&P data) |
End-markets served
| End-market | Asset exposure | Demand drivers cited by the company |
|---|---|---|
| Lithium-ion batteries (EV) | San Jorge (lithium), Graphmada (graphite anode feedstock) | EV adoption; ex-China supply security |
| Stationary energy storage / grid batteries | San Jorge, Graphmada | Company cites forecasts of stationary storage growing from 335 GWh (2024) to 3,000 GWh (2030) and 5,500 GWh (2035), sourced to Fastmarkets conference material (August 2026 presentation) |
| Industrial graphite (refractories, expandable graphite, foils) | Graphmada (large/jumbo flake) | Premium for large flake sizes |
| Base and precious metals | Que River | Copper, gold and silver price strength |
| Data centres / digital infrastructure | Que River site | Tasmanian renewable power, cool climate, ~63MW substation, ~200ML water |
Strategy
Stated corporate strategy (themes from the FY2025 Annual Report and 2026 presentations)
-
Critical minerals for the energy transition. Advance a lithium and graphite portfolio aligned with lower-carbon economies (FY2025 Chairman's Review).
-
Value definition across three JORC-resourced assets. Move each project from "discovery" to "defined opportunity" via studies, rather than spreading capital thinly.
-
Partner-led development. Actively seek strategic partners for each of the three projects, and fund the next phase of San Jorge with project-level capital to limit dilution at the parent.
-
Structural separation. Evaluate separating Que River from the critical-minerals business (Greenwing Critical Minerals vs. a Que River vehicle, labelled "Green River Resources" in the August 2026 deck).
-
New demand narrative. Position lithium and graphite against AI, data-centre and grid-storage demand, alongside EVs.
-
Ex-China supply security. Market Graphmada to governments and agencies (EU, JOGMEC) seeking secure non-Chinese graphite.
Strategic initiatives (last 24 months)
| Date | Initiative | Asset | Objective / target |
|---|---|---|---|
| October 2024 | DLE processing testwork (IBC, Xtralit), >98% recovery reported | San Jorge | Confirm brine amenability to DLE |
| FY2025 | MT and TEM geophysics | San Jorge | Expand brine footprint (>4km west, >5km north) |
| 25 March 2025 | Updated JORC resource | Que River | Re-establish the asset's value |
| April 2025 | Exploration updates (PQ Lens southern extensions; open-cut targets) | Que River | Upside definition |
| 27 May 2025 | NIO option lapses; full control of San Jorge regained | San Jorge | Strategic freedom; A$6m liability released |
| 8 October 2025 | Scoping study completed | Que River | ~A$10m capex restart via toll treatment |
| December 2025 quarter | San Jorge option agreement amended (deferral of next two instalments) | San Jorge | Cash preservation |
| December 2025 quarter | Stage 2 Scoping Study launched | Graphmada | Restart and expansion pathways |
| 5 February 2026 | Two-stage strategy (mining restart + data infrastructure) | Que River | Unlock site value |
| 12 February 2026 | Zelandez engaged as project manager | San Jorge | Scoping study, drill targeting |
| 3 March 2026 | A$5.5m equity raising | Corporate | Fund 2026 work programs; debt-free |
| 25 March 2026 | PFS commenced | Que River | Define mining, processing, approvals and economics |
| 8 April 2026 | Scoping study formally commenced with Zelandez | San Jorge | Development pathway and initial economic framework |
| 5 May 2026 | Development strategy update; updated Decommissioning and Rehabilitation Plan | Que River | Regulatory milestone |
| 20 May – 23 June 2026 | Water studies, DLE study and bulk brine sampling | San Jorge | Inputs to the scoping study |
| 9 June 2026 | Mining lease renewed to 2035 | Que River | Tenure security |
| 18 August 2026 | Four DLE pilot partners selected (three technology classes) | San Jorge | Technology selection ("flowsheet first, technology second") |
| 2026 (ongoing) | Undrawn A$8m ATM facility with Alpha Investment Partners | Corporate | Flexible funding backstop |
| 2026 (ongoing) | Surplus equipment sale program | Graphmada | Cash generation and cost reduction |
Management targets and guidance
Greenwing provides no financial guidance (revenue, EBITDA, production). Its stated 2026 objectives (August 2026 presentation) are:
San Jorge: complete the scoping study, including an updated MRE and metallurgical testwork; complete further DLE testwork; attract a strategic partner (targeted by end-2026, per the 3 September 2026 cleansing statement); then recommence deeper drilling.
Graphmada: complete a scoping study targeting increased production; complete the surplus equipment sale; attract a strategic partner; open dialogue with EU, JOGMEC and other agencies.
Que River: identify the best separation pathway; refine pit design and economics; refine third-party processing economics with three nearby processing facilities; continue assessing data-infrastructure suitability; advance the PFS and approvals.
ESG and sustainability commitments
No quantified emissions or sustainability targets are disclosed. The FY2025 risk section lists climate-change risk and describes generic mitigation approaches (an EMS of the ISO 14001 type and emissions reduction) without specific commitments.
Products & Services
Greenwing has no commercial products currently on the market. Its "portfolio" is a set of mineral projects and prospective concentrate products, listed below asset by asset.
Segment: Exploration – Lithium
| Attribute | Detail |
|---|---|
| Description | Lithium brine project covering the entire San Francisco salar (~2,800ha) within a consolidated landholding of ~38,000ha. The FY2025 Annual Report cites 15 granted exploration licences over ~36,600ha |
| Strategic rarity | Company says the salar is one of only 23 in the Lithium Triangle and that Greenwing is one of five companies controlling an entire salar (FY2025 Chairman's Review) |
| Mineral Resource | 1.07Mt LCE at 195mg/L Li (0.67Mt Indicated, 0.40Mt Inferred), zero cut-off; brine volumes 0.65km³ and 0.38km³; specific yield ~7.4% / 7.3% (ASX, 27 May 2024) |
| Depth potential | MT reinterpretation suggests brine to ~1,000m, versus 402m maximum drilled depth; grades up to 248mg/L Li at depth (ASX, 20 April 2026) |
| Lateral potential | MT/TEM show brine >4km west of the salar boundary and >5km north (FY2025 Annual Report) |
| Processing route | Direct Lithium Extraction (DLE). Earlier testwork with IBC and Xtralit reported >98% lithium recovery. Four DLE pilot partners covering the three principal DLE technology classes were selected on 18 August 2026 |
| Study status | Scoping study under way with Zelandez (commenced 8 April 2026); water studies (20 May 2026); DLE study (1 June 2026); bulk brine sampling (23 June 2026) |
| Remaining acquisition obligation | US$1.75m payable by Andes Litio to complete acquisition of remaining interests (FY2025 Annual Report, going-concern note); timing of the next two instalments deferred by amendment (December 2025 quarter) |
| Target customer | Battery-chemical converters; EV and stationary-storage supply chains |
| Pricing model | Not applicable (pre-development) |
| Commercial status | Strategic partner process targeted to complete by end-2026 (cleansing statement, 3 September 2026, as reported by Medianet) |
| Attribute | Detail |
|---|---|
| Description | Hard-rock lithium (spodumene) exploration project; channel sampling and field programs in 2017–2018 (Smallcaps coverage) |
| Status | Lease transfer still being finalised with vendors amid Madagascar's new Mining Code; company intends to restart field activities (FY2025 Annual Report) |
| Resource | No JORC resource disclosed |
| Prominence | Not featured in the 2026 investor presentations (de-emphasised) |
(a) San Jorge Lithium Brine Project — Catamarca Province, Argentina (100% ownership right via Andes Litio SA option)
(b) Millie's Reward Lithium (Spodumene) Project — central Madagascar
Segment: Graphite Mining
| Attribute | Detail |
|---|---|
| Description | Integrated graphite mine and processing plant with infrastructure and logistics in place |
| Tenure | 40-year mining permits and 20-year landholder agreements (FY2025 Annual Report); presentations describe "20+ year" permits |
| Mineral Resource (JORC 2012, 12 July 2022) | 61.9Mt at 4.5% FC = 2.78Mt contained graphite. Measured 18.7Mt at 4.9% (911kt); Indicated 12.3Mt at 4.7% (582kt); Inferred 30.9Mt at 4.2% (1,288kt) |
| Deposits | From Lohorano in the north to Ambatofafana in the south; also Mahefedok (2017 maiden resource) and the Andapa discovery (auger drilling confirmed further mineralisation, FY2025) |
| Production history | Plant produced premium concentrate consistently for ~20 months (company presentation); first sales August 2018; nameplate Stage 1 production August 2018 |
| Products | Range of large, jumbo and fine flake concentrates. 2018 basket price achieved: US$1,051/t (ASX, 23 August 2018) |
| Markets historically served | EU, USA, India, Japan, China (August 2026 presentation) |
| Status | Care and maintenance since December 2019 / March 2020; Stage 2 Scoping Study launched (December 2025 quarter) to assess restart and expansion |
| 2026 objectives | Complete scoping study targeting increased production; complete sale of surplus equipment; attract a strategic partner; engage the EU, JOGMEC and other agencies on ex-China graphite supply |
| Target customer | Anode-material producers, refractories, expandable-graphite producers |
(c) Graphmada Large Flake Graphite Mining Complex — eastern Madagascar (100%)
Discontinued / held-for-sale (FY2025) → standalone (2026): Polymetallic
| Attribute | Detail |
|---|---|
| Description | High-grade volcanogenic massive sulphide (VMS) deposit next to major mining and processing infrastructure; mined underground in the 1980s and by open pit in the 2000s |
| Tenure | Mining Lease ML 68M/1984, renewed to 29 March 2035 (ASX, 9 June 2026) |
| Mineral Resource (JORC 2012, 25 March 2025) | 2,392kt at 3.1% Zn, 1.5% Pb, 0.40% Cu, 0.77g/t Au, 49g/t Ag (9.5% ZnEq; 5% ZnEq cut-off). Open-pit portion 445kt at 11.3% ZnEq; underground 1,947kt at 9.1% ZnEq |
| Contained metal | ~75kt Zn, 10kt Cu, 59koz Au, 3.7Moz Ag, 36kt Pb (FY2025 Annual Report) |
| Scoping study (8 October 2025) | ~A$10m pre-production capex; ~665kt processed at NSR ~A$189/t; metal revenue ~A$125m; undiscounted cash flow ~A$63m over less than 12 months of production; toll treatment at nearby third-party plants |
| Updated metals prices (24 February / 5 March 2026) | NSR up ~40%; conceptual cash flows lifted from ~A$40–60m to ~A$90–100m (after discounting and capital allocation) |
| PFS | Commenced 25 March 2026 |
| Stage 2 concept | Data-infrastructure hosting: adjacent ~63MW substation, ~200ML water, cool climate, cleared sites; preliminary non-binding talks with potential partners (August 2026 presentation) |
| Rehabilitation | Updated Decommissioning and Rehabilitation Plan submitted (5 May 2026 update); A$2m rehabilitation provision booked in FY2025; A$1.3m bond obligation to Mineral Resources Tasmania |
| Corporate plan | Evaluate separating Que River from the critical-minerals business |
(d) Que River Polymetallic Project — Mount Read Volcanics, north-west Tasmania (100%)
Divested legacy assets (for completeness)
| Asset | Description | Disposal |
|---|---|---|
| Hellyer Mill Operations / Hellyer gold tailings / Fossey mine | Tasmanian base-metal and gold operation | Sold to LionGold-linked interests, 2012–2013 (A$13.5m) |
| Hellyer base-metal sublease rights and Mt Block EL48/2003 | Tasmanian exploration rights | Agreed for sale to NQ Minerals, December 2019 (A$360k plus bond) |
Financial Narrative
Sources: FY2025 Annual Report (FY2024–FY2025 audited figures); S&P Global Market Intelligence via StockAnalysis.com (FY2022–FY2026; updated 25 September 2026). Where the two sources present items differently, the difference is noted.
Income statement: notes and sources
Notes: EPS for FY2022–FY2025 is from the FY2025 Annual Report remuneration table, adjusted for the July 2021 50:1 consolidation. FY2026 EPS is computed (net loss A$3.90m ÷ 401m weighted shares) and should be checked against the annual report. FY2021 net loss was A$6.28m (EPS -7.93 cents).
Margins and growth
Gross, operating, EBITDA and net margins are not meaningful, because revenue is nil in every year. Revenue CAGR (FY2022–FY2026): not applicable.
Balance sheet
FY2025 detail (FY2025 Annual Report): exploration and evaluation assets A$19.93m (up from A$6.26m after Andes Litio was consolidated); development assets A$2.23m; plant and equipment A$2.07m; inventories A$0.59m; assets held for sale A$0.50m; liabilities held for sale A$2.50m.
Ratios (computed on year-end balances)
Not meaningful or not applicable: ROIC (negative operating income on a pre-production asset base), net debt/EBITDA (EBITDA negative; net cash position from FY2023), interest coverage (negative EBIT), asset turnover (zero revenue) and cash conversion cycle (no trading activity).
Commentary on trends, inflections and drivers
Funding model. Over the five years the company issued ~A$31m of equity (FY2022–FY2026) to fund cumulative free cash outflows of ~A$14.5m, A$11m of investment in Andes Litio and debt reduction. Issued capital rose from A$105m to A$129m, while accumulated losses (~A$103m) remain close to issued capital. This reflects the large historical losses from the Bass Metals Tasmanian era and the Graphmada build. Book equity of ~A$26m is almost entirely capitalised exploration and development cost.
The NIO cycle (FY2023–FY2025). The A$12m NIO placement (completed 12 January 2023) produced the FY2023 cash peak of A$8.05m. It came with a call option for NIO over 20–40% of Andes Litio, recorded as a A$6m derivative liability. Because NIO gained joint control, Andes Litio was equity-accounted (A$5.29m in FY2023, A$11.72m in FY2024). Cash was then spent on the maiden San Jorge drilling (A$6.79m invested in the JV in FY2024), and year-end cash fell to A$0.71m. When the option lapsed on 27 May 2025, the A$6m liability was released to profit (the only "profitable" year, FY2025) and Andes Litio was re-consolidated. This explains the jump in E&E assets to A$19.9m.
Liquidity stress and repair. FY2024 and FY2025 closed with negative working capital (-A$6.06m and -A$2.34m) and an auditor-highlighted material uncertainty about going concern (FY2025). Contributing factors were a A$1.3m Que River bond obligation, a US$1.75m San Jorge payment, and a A$1m unsecured facility from the former Chairman (A$382k drawn). FY2026 repaired the balance sheet: ~A$7.5m of equity was raised, including the A$5.5m placement at A$0.042 in March–April 2026. Debt was repaid to zero and working capital turned positive (A$3.05m). Cash at 30 June 2026 was A$2.91m, plus an undrawn A$8m at-the-market (ATM) facility with Alpha Investment Partners.
Dilution. Shares on issue rose ~4.2x, from 123m (June 2022) to ~525m (September 2026). This is the key cost of the funding model. Book value per share fell from A$0.09 to A$0.05.
FY2026 loss. The FY2026 net loss of A$3.90m (S&P data) includes A$2.33m of asset write-downs (not itemised in the data retrieved; likely Graphmada plant and equipment and/or inventory) and A$0.28m of share-based payments. FY2026 operating cash burn doubled to A$2.42m as study work restarted across all three assets.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Income Statement and Per-Share Data
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Revenue (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Other income incl interest (AUD Mn) | 0.00 | 0.06 | 0.41 | 0.05 | 0.07 |
Gross profit (AUD Mn) | 0 | 0 | 0 | -0.20 | 0 |
SG&A / administration (AUD Mn) | 1.45 | 2.11 | 1.35 | 1.32 | 1.56 |
Operating income S&P basis (AUD Mn) | -2.70 | -3.23 | -1.18 | -4.05 | -1.61 |
EBITDA S&P basis (AUD Mn) | -2.69 | -3.23 | -1.18 | -4.05 | -1.61 |
Interest expense (AUD Mn) | 1.30 | 0.96 | 0.03 | 0.10 | 0.05 |
Asset write-downs (AUD Mn) | 0 | 0.31 | 0.14 | 0.26 | 2.33 |
Pre-tax income (AUD Mn) | -4.02 | -4.35 | -1.84 | 1.60 | -3.90 |
Net income (AUD Mn) | -4.20 | -4.52 | -1.99 | 1.60 | -3.90 |
EPS basic (AUD cents) | -3.74 | -3.33 | -1.15 | 0.68 | -0.97 |
EPS diluted (AUD cents) | -3.74 | -3.33 | -1.15 | 0.63 | -0.97 |
Dividends per share (AUD cents) | 0 | 0 | 0 | 0 | 0 |
Weighted basic shares (M) | 112 | 136 | 173 | 236 | 401 |
Balance Sheet and Share Count (M)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Cash and equivalents (AUD Mn) | 1.90 | 8.05 | 0.71 | 0.79 | 2.91 |
Total current assets (AUD Mn) | 3.00 | 9.55 | 2.11 | 1.95 | 3.55 |
PP&E plus exploration and development assets (AUD Mn) | 11.69 | 10.33 | 11.06 | 24.24 | 23.48 |
Equity-accounted investment Andes Litio (AUD Mn) | 0 | 5.29 | 11.72 | 0 | 0 |
Total assets (AUD Mn) | 15.19 | 25.17 | 24.89 | 26.19 | 28.23 |
Short-term debt (AUD Mn) | 3.97 | 4.30 | 0.47 | 0.38 | 0 |
Long-term debt (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Total debt (AUD Mn) | 3.97 | 4.30 | 0.47 | 0.38 | 0 |
Net debt (AUD Mn) | 2.07 | -3.75 | -0.24 | -0.41 | -2.91 |
Total current liabilities (AUD Mn) | 5.41 | 11.92 | 8.17 | 4.29 | 0.49 |
Total liabilities (AUD Mn) | 5.66 | 12.33 | 8.41 | 4.50 | 2.25 |
Shareholders equity (AUD Mn) | 9.53 | 12.84 | 16.48 | 21.69 | 25.98 |
Goodwill and intangibles (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Working capital (AUD Mn) | -2.41 | -2.37 | -6.06 | -2.34 | 3.05 |
Issued capital (AUD Mn) | 105.16 | 112.03 | 118.18 | 121.62 | 129.08 |
Accumulated losses (AUD Mn) | -101.86 | -106.37 | -102.81 | -100.09 | -103.44 |
Shares outstanding year-end (M) | 123.25 | 149.91 | 181.25 | 293.03 | 516.27 |
Cash Flow
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
Operating cash flow (AUD Mn) | -1.88 | -1.89 | -0.89 | -1.27 | -2.42 |
Capex incl capitalised exploration (AUD Mn) | 2.01 | 1.27 | 0.80 | 0.71 | 1.37 |
Investment in Andes Litio JV (AUD Mn) | 0.25 | 2.38 | 6.79 | 0.81 | 0.70 |
Investing cash flow (AUD Mn) | -2.26 | -3.59 | -7.48 | -1.49 | -1.95 |
Free cash flow OCF less capex (AUD Mn) | -3.90 | -3.16 | -1.68 | -1.98 | -3.79 |
Equity issued (AUD Mn) | 6.01 | 12.00 | 2.26 | 3.20 | 7.48 |
Net debt issued or repaid (AUD Mn) | 0 | 0 | -0.86 | -0.17 | -0.43 |
Financing cash flow (AUD Mn) | 5.47 | 11.44 | 1.24 | 2.77 | 6.60 |
Dividends paid (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Buybacks (AUD Mn) | 0 | 0 | 0 | 0 | 0 |
Net change in cash (AUD Mn) | 1.29 | 6.15 | -7.34 | 0.08 | 2.13 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Metric | FY2022 | FY2023 | FY2024 | FY2025 | FY2026 |
|---|---|---|---|---|---|
ROE year-end equity (pct) | -44.1 | -35.2 | -12.1 | 7.4 | -15.0 |
ROA year-end assets (pct) | -27.6 | -18.0 | -8.0 | 6.1 | -13.8 |
Current ratio (x) | 0.55 | 0.80 | 0.26 | 0.45 | 7.24 |
Debt to equity (x) | 0.42 | 0.33 | 0.03 | 0.02 | 0.00 |
Book value per share (AUD) | 0.08 | 0.09 | 0.09 | 0.07 | 0.05 |
Geographic Revenue
| Geography | Asset | Segment | FY2024 segment assets (AUD Mn) | FY2025 segment assets (AUD Mn) |
|---|---|---|---|---|
Madagascar | Graphmada; Millie's Reward | Graphite Mining / Lithium | 11.157 | 9.648 |
Argentina | San Jorge | Exploration – Lithium | 13.038 | 15.236 |
Australia (Tasmania) | Que River | Held for sale / discontinued | 0.500 | 0.500 |
Australia (corporate) | Head office | Unallocated | 0.199 | 0.808 |
Share Price
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Share price at 30 June (AUD) | 0.25 | 0.20 | 0.23 | 0.05 | 0.03 |
Share Price & Returns
| Period | Approximate performance | Basis |
|---|---|---|
Since 30 June 2025 (~15 months) | +163% | A$0.030 → A$0.079 |
3-year (30 June 2023 → October 2026) | -66% | A$0.23 → A$0.079 |
5-year (30 June 2021 → October 2026) | -68% | A$0.25 → A$0.079 |
Valuation Multiples
| Multiple | Greenwing | Note |
|---|---|---|
Market cap | ~A$41.5m | A$0.079 × ~525.0m shares |
Enterprise value | ~A$38.6m | Market cap less A$2.91m cash (30 June 2026); no debt |
P/E | n/m | FY2026 net loss |
EV/EBITDA | n/m | Negative EBITDA |
EV/Sales | n/m | No revenue |
P/B | ~1.6x | Market cap / FY2026 equity of A$25.98m |
EV per tonne LCE (San Jorge only, illustrative) | ~A$36 per tonne LCE | A$38.6m / 1.07Mt. This attributes the entire EV to San Jorge, so it overstates San Jorge's implied value |
Share Price & Returns by Date
| Date | Type | Price (AUD) | Amount (AUD) | Notes |
|---|---|---|---|---|
September 2022 – January 2023 | Strategic placement (NIO) | 0.55 | 12.0m | 21.8m shares |
| — | Placement plus conditional placement | 0.24 | 6.15m | Bizzell and Morgans as joint lead managers (MiningNews) |
FY2025 | Placements | 0.038 / 0.030 | 2.11m / 1.56m | 55.4m and 51.9m shares |
Post FY2025 (July–September 2025) | Placement | — | 2.31m | Part of the April 2025 raising |
March–April 2026 | Placement plus conditional placement | 0.042 | 5.5m | ~131m shares; 32.75m options at A$0.08 |
| 2026 | At-the-market facility (Alpha Investment Partners) | Market | Up to 8.0m | Undrawn at 30 June 2026 |
Grant Details
| Grant | Expiry | Exercise price (AUD) | Number | Status |
|---|---|---|---|---|
14 July 2022 / 6 October 2022 | 31 December 2025 | 0.725 | 4.40m | Expired (cessation notice 5 January 2026) |
12 May 2025 | 30 June 2027 | 0.12 | 2.50m | Outstanding |
April 2026 | — | 0.08 | 32.75m | Free-attaching options from the March 2026 raise; in the money at A$0.079 is marginal |
Analyst Conclusions
Management guidance
No financial guidance is given. Operational guidance for 2026 is to: complete the San Jorge scoping study; conclude the San Jorge partner process by end-2026; advance the Que River PFS and approvals and settle a separation pathway; complete the Graphmada scoping study and surplus equipment sales; and attract partners for all three assets.
Consensus growth expectations
None published.
Bull case
-
San Jorge partner transaction. A project-level farm-in or JV, the company's stated end-2026 target, could fund deeper drilling without parent dilution. The ~1,000m interpreted brine depth and grades rising to 248mg/L at depth imply resource growth potential well beyond the 1.07Mt LCE drilled to only 402m.
-
Que River as a near-term cash-flow or demerger catalyst. With ~A$10m capex, lease tenure to 2035 and conceptual cash flows updated to ~A$90–100m, a successful PFS and spin-out could by itself approach or exceed the group's current ~A$39m EV.
-
Graphmada as a strategic ex-China asset. China's export controls and agency interest (EU, JOGMEC) could turn a stranded, built plant with a 61.9Mt resource and qualified product into a partnered restart.
Bear case
-
Funding treadmill. With A$2.9m of cash at June 2026, quarterly E&E outflows of ~A$0.44m and rising study costs, further equity or ATM draws are likely within 6–12 months. Share count has already quadrupled since FY2022, and book value per share has halved.
-
Low-grade brine and DLE risk. At 195mg/L, San Jorge economics depend on DLE performance and capex. Pilot outcomes across three technology classes are uncertain, and NIO walked away from a US$40–80m option in 2025.
-
Graphmada's prolonged idleness and Madagascar risk. Seven years of care and maintenance, recurring write-downs (A$2.33m in FY2026), unrecovered VAT and an open tax review argue the asset's book value may be optimistic.
Key catalysts and monitorables (next 12 months)
| Catalyst | Expected timing | What to watch |
|---|---|---|
| San Jorge strategic partner outcome | By end-2026 (company target) | Valuation implied, funding commitment, retained interest |
| San Jorge scoping study | 2026–2027 | Production rate, capex, opex per tonne LCE, DLE flowsheet |
| DLE pilot results | Late 2026 – 2027 | Recovery, reagent and water use, technology selection |
| Que River PFS | 2026–2027 | Pit design, toll-treatment terms, approvals, NPV |
| Que River separation | 2026–2027 | Structure (demerger vs. sale), distribution to shareholders |
| Graphmada scoping study / partner | 2026–2027 | Restart capex, agency or offtake engagement |
| Funding | Ongoing | ATM drawdowns, placement pricing, cash in quarterly 5B reports |
| Madagascar tax review | Ongoing | Any assessment notice |
| Board strengthening | Ongoing | Independent director appointments |
Analyst verdict
Greenwing Resources, formerly Bass Metals, is a classic ASX micro-cap "sum-of-options" story: three genuinely interesting, 100%-owned, JORC-resourced assets held inside a balance sheet that can fund only a few quarters of work at a time. Its strengths are real but early. It controls an entire salar in the Lithium Triangle; it has a built graphite mine whose product sold internationally before market conditions and COVID-19 forced its closure; and it holds a high-grade Tasmanian polymetallic deposit now benefiting from strong copper, gold and silver prices. In 2026 management did the right things — engaging Zelandez, opening a DLE pilot program, launching a Que River PFS, renewing the mining lease to 2035, and raising A$5.5m to become debt-free.
The investment problem is sequencing and capital. At ~A$39m of enterprise value, the market is paying a modest sum for three assets, but that discount reflects a decade of value destruction: accumulated losses of ~A$103m, roughly fourfold dilution since FY2022, a five-year share price decline of ~68%, a lapsed NIO option, and a going-concern warning as recently as FY2025. San Jorge's 195mg/L grade makes DLE success a precondition, not an upside, and Graphmada's restart economics remain unproven at prevailing flake prices.
The near-term thesis therefore turns on two binary events. The first is whether a credible strategic partner funds San Jorge at project level by end-2026, as management targets. The second is whether the Que River PFS supports a value-crystallising separation. Positive outcomes on either could re-rate the stock materially from its current level; failure on both would likely mean further dilutive raises at depressed prices. On balance, the profile is high risk and catalyst-driven, suited only to speculative capital. Monitoring should centre on quarterly cash, the partner process, DLE pilot data and governance renewal on a now three-member board.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Appointed | Background | Other directorships |
|---|---|---|---|---|
James Brown | Non-Executive Chairman (from 21 July 2025); chaired the Audit and Remuneration Committees (FY2025) | 15 June 2021 | Mining engineer. 22 years at New Hope Corporation, then 12 years at Altura Mining / Morella Corporation (Managing Director from 2010). Director and former MD/CEO of Sayona Mining | Morella Corporation Ltd; Sayona Mining Ltd |
Peter Wright | Managing Director (titled Executive Director/CEO in FY2025; CEO since May 2023) | 2 September 2016 | Executive Director of Bizzell Capital Partners (Brisbane corporate advisory and funds management), a joint lead manager to company raisings. 20–25 years in resource financial markets | Savannah Goldfields Ltd (since 2017); DGR Global Ltd (since 2021) |
Jeffrey (Jeff) Marvin | Non-Executive Director; Audit and Remuneration Committee member | 12 June 2015 | US-based. 25–35 years bringing international minerals companies to public markets, project finance and restructuring; energy-technology entrepreneur | Icon Energy Limited (since 31 March 2023) |
Executive Leadership Team
| Name | Title | Appointed | Background |
|---|---|---|---|
Peter Wright | Managing Director | CEO since May 2023 | As above |
Angus Craig | Company Secretary and CFO | 24 April 2020 | 25+ years in public-company CFO/secretarial roles, M&A, equity funding and governance |
Chris Godfrey | Chief Operating Officer | Not disclosed (appears in 2026 presentations) | 30+ years in mining operations (metalliferous and coal, open pit and underground, processing) |
Marcelo Sanchez | Country Manager – Argentina | — | Chemical engineer with 25+ years in Argentine mining; led the Olaroz lithium project from exploration to production |
“—” = not publicly disclosed.
Directors' Remuneration
| KMP | FY2024 total | FY2025 cash fees | FY2025 bonus | FY2025 share-based | FY2025 total |
|---|---|---|---|---|---|
Peter Wright (Exec Director/CEO) | 275,000 | 395,000 | 0 | 0 | 395,000 |
Rick Anthon (Chairman) | 100,000 | 100,000 | 0 | 0 | 100,000 |
James Brown (NED) | 45,000 | 45,000 | 0 | 0 | 45,000 |
Jeff Marvin (NED) | 45,000 | 45,000 | 0 | 0 | 45,000 |
Alan Zeng (NED) | 45,000 | 45,000 | 0 | 0 | 45,000 |
Angus Craig (CFO/CoSec) | 72,000 | 152,000 | 0 | 0 | 152,000 |
Total | 582,000 | 782,000 | 0 | 0 | 782,000 |
Major Shareholders
| Holder | Stake | Source / date |
|---|---|---|
Peter Wright (direct and indirect) | Multiple change-of-interest notices followed in December 2025 – July 2026 | FY2025 Annual Report |
Jeff Marvin | 3,656,501 shares at 30 June 2025 (4,156,501 at report date) | FY2025 Annual Report |
James Brown | 3,051,667 shares at 30 June 2025 (3,451,667 at report date) | FY2025 Annual Report |
Angus Craig | 3,700,000 shares at 30 June 2025 | FY2025 Annual Report |
Directors' March 2026 placement participation | A$200,000 total | Equity Raising announcement, 3 March 2026 |
Competitive Landscape
Competitors by Segment
| Segment | Competitor | Listing | Asset / relevance | Relative positioning vs. Greenwing |
|---|---|---|---|---|
Lithium brine (Argentina) | Galan Lithium | ASX: GLN | Hombre Muerto West, Catamarca (named in Medianet coverage as nearby) | More advanced (development stage); larger resource |
Lithium brine (Argentina) | Lake Resources | ASX: LKE | Kachi DLE project, Catamarca | Larger, DLE-focused; also faced funding difficulties |
Lithium brine (Argentina) | Lithium Americas / Arcadium (now Rio Tinto) / Allkem legacy assets | Various | Producing salars nearby (e.g. Olaroz, Fénix) | Producers; potential partners or acquirers rather than direct peers |
Lithium brine (Argentina) | Patagonia Lithium | ASX: PL3 | Argentine brine exploration (former chairman Anthon is a director) | Similar early stage |
Lithium brine (Argentina) | Lithium South / Argentina Lithium & Energy | TSXV | Junior brine explorers | Similar or smaller scale |
Graphite (Madagascar) | NextSource Materials | TSX: NEXT | Molo graphite mine, Madagascar | Most direct Madagascan peer; further advanced, with an operating mine |
Graphite (Madagascar) | Tirupati Graphite | LSE | Sahamamy and Vatomina, Madagascar | Producing at small scale |
Graphite (Africa / global) | Syrah Resources | ASX: SYR | Balama (Mozambique), Vidalia (USA) | Large-scale producer and price-setter for ex-China flake |
Graphite (Australia / Africa) | Renascor, EcoGraf, Black Rock Mining, Walkabout Resources | ASX | Developers of graphite and anode projects | Compete for the same ex-China graphite funding and offtake |
Polymetallic (Tasmania) | MMG Rosebery | HKEX: 1208 | Operating mine and concentrator nearby | Potential toll-treatment counterparty, not a competitor |
Peer Comparison FY2026
| Metric | Greenwing (FY2026) | Syrah Resources | NextSource Materials | Galan Lithium |
|---|---|---|---|---|
Stage | Exploration / study | Producer | Early producer | Developer |
Market cap (approx.) | ~A$41.5m (8 October 2026) | — | — | — |
Recent Developments
ASX regulatory interaction was limited to a price query (24 July 2026). There is an uncertain tax position in Madagascar.