Guangdong Investment Limited Overview
Guangdong Investment Limited is the Hong Kong-listed flagship of Guangdong Holdings, the Guangdong provincial government's offshore conglomerate. Since spinning out its property-development arm in January 2025, it has become an almost pure-play regulated water utility with a portfolio of stable infrastructure and commercial-property cash flows attached. Its core asset is the Dongjiang–Shenzhen (Dongshen) Water Supply Project. Dongshen has a designed capacity of 2.423 bn tonnes a year and delivers 70–80% of Hong Kong's fresh water under a government-to-government agreement whose basic water price rises each year. In FY2025 it generated HK$4.16 bn of pre-tax profit before finance items, about 55% of group segment results. Around this sits a fast-growing Mainland water and wastewater platform (17.2 m t/d designed supply capacity), Guangzhou and Tianjin shopping malls, hotels, a coal-fired power plant and a Guangxi toll road. The investment case rests on low leverage (20.3% gearing), a 65% payout policy, a dividend yield of about 5.8% and RMB-linked earnings growth. The central long-term question is the Dongshen concession beyond 2030.
The company's own description (FY2025 annual results, segment note)
The Group describes itself as organised into seven reportable operating segments based on products and services:
-
Water resources — water distribution, sewage treatment, construction of water-supply and sewage-treatment infrastructure, water-pipeline installation and consultancy, and machinery sales, for customers in Mainland China and Hong Kong.
-
Property investment — properties in Mainland China and Hong Kong held for rental income, plus property-management services to certain commercial properties.
-
Department store operation — department stores in Mainland China, including direct sales, concessionaire sales, and management and sub-letting of operating area.
-
Electric power generation — coal-fired power plants supplying electricity and steam in Guangdong Province.
-
Hotel operation and management — the Group's own hotels and management of third-party hotels in Mainland China and Hong Kong.
-
Road and bridge — toll-road operation and road management in Mainland China.
-
Others — treasury and corporate services.
In its FY2025 Chairman's Statement the company says it intends to "concentrate resources on extending the water resources segment business into higher value-added areas," with "organizational leanness," "precision management" and "lean operations" as operating principles.
Independent characterisation
GDI is in substance a quasi-sovereign water infrastructure annuity with a diversified tail. Three features stand out:
-
Contracted, inflation-linked bulk-water revenue from a single sovereign customer. The Hong Kong SAR Government (Water Supplies Department) paid HK$5,259 m in FY2025, 27.9% of group revenue. The FY2025 segment note discloses a single customer at HK$5,258.9 m. Under the 2024–2026 Water Supply Agreement the annual basic water price is HK$5,136.24 m (2024), HK$5,259.00 m (2025) and HK$5,384.69 m (2026). It is subject to a "package deal deductible sum" mechanism that reduces the price for water conserved below the 820 mcm annual ceiling. The Dongshen project also sells to Shenzhen and Dongguan (HK$1,193 m in FY2025).
-
A Mainland water platform built by acquisition and concession bids. The "Other Water Resources Projects" generated HK$7,736 m of revenue in FY2025 (+7.2%) and HK$4,185 m in 1H2026 (+13.7%). The platform runs as BOT/TOT/PPP concessions accounted under HK(IFRIC)-Int 12 (operating concession rights of HK$22.9 bn and service-concession receivables of HK$18.1 bn at 30 June 2026). It is concentrated in Guangdong, with outposts in Jiangsu, Jiangxi, Guangxi, Hainan, Hebei, Hubei, Hunan, Guizhou, Yunnan and Zhejiang.
Legacy non-core assets: These are GDH Teem shopping malls, five to three department stores, hotels, a 600 MW coal plant, a 17.48% stake in Yudean Jinghai Power, and the Xingliu Expressway. Management is pruning them: the Hua Du store closed in 2024, TeemLife and Dong Pu closed in 2026, the Aeon Teem stake was sold in 2026, and the Yudean Jinghai stake was diluted in 2025.
Revenue model mix (FY2025, continuing operations)
| Revenue type (FY2025) | HKD Mn | % of total | Nature |
|---|---|---|---|
| Water distribution — Hong Kong (Dongshen) | 5,259 | 27.9% | Contracted government-to-government bulk supply; annual basic price with deduction mechanism |
| Water distribution — Mainland | 4,644 | 24.7% | Regulated municipal tariffs plus Dongshen sales to Shenzhen and Dongguan |
| Sewage treatment services | 968 | 5.1% | Concession service fees |
| Water pipeline installation and consultancy | 1,248 | 6.6% | Project and service revenue |
| Construction services (water infrastructure) | 455 | 2.4% | IFRIC-12 construction revenue |
| Sale of machineries | 702 | 3.7% | Product sales |
| Finance income from service concession arrangements | 865 | 4.6% | Accounting interest income on concession receivables (mainly water and roads) |
| Rental income (malls, offices) | 1,503 | 8.0% | Leasing |
| Property management fee income | 244 | 1.3% | Service |
| Department store (commission, goods, fees) | 416 | 2.2% | Retail |
| Electricity and steam | 1,237 | 6.6% | Merchant/regulated power sales |
| Hotel income and management fees | 671 | 3.6% | Hospitality |
| Toll revenue and road management fees | 614 | 3.3% | Toll concession |
| Total | 18,825 | 100% | — |
Source: FY2025 Annual Results Announcement, note 4. Percentages are analyst calc.
Characterisation of the mix. About 85% of revenue is utility- or infrastructure-type: concession, contracted or tariff-based. About 10% is real-estate leasing and retail. About 4% is hospitality. There is no subscription or licensing revenue in the software sense.
Value-chain position, customers and end-markets
Value chain: raw-water abstraction and long-distance conveyance (Dongshen); water treatment and municipal distribution; wastewater collection and treatment; engineering, procurement and construction plus pipeline installation; and equipment supply. The Bestwise acquisition in 2026 adds Hong Kong public-works water engineering.
Customer types: governments (HKSAR WSD; Mainland municipal water bureaus as offtakers of bulk water and sewage services), retail water users served by municipal concessions, retail tenants and shoppers in malls, power-grid offtakers (Guangdong Power Grid), hotel guests, and toll-road users.
End-markets: urban water supply and sanitation in the Guangdong–Hong Kong–Macao Greater Bay Area and inland provinces; Guangzhou and Tianjin consumer retail; Hong Kong and southern China hospitality; Guangdong electricity; and Guangxi road transport.
Strategy
Stated strategy (themes from the FY2025 Chairman's Statement and 1H2026 Prospects)
Development strategy: "seeking progress amidst stability, improving quality and increasing efficiency" (FY2025), restated in 1H2026 as "balancing progress and stability and enhancing quality and efficiency".
Strategic priorities: concentrate resources on extending the water resources segment into higher value-added areas; transform and upgrade the business structure; consolidate "organizational leanness"; advance "precision management" and "lean operations"; optimise asset portfolios and resource allocation; seize opportunities from the Guangdong–Hong Kong–Macao Greater Bay Area Outline Development Plan; and actively monitor M&A opportunities.
Talent: a "talent-driven enterprise" strategy with performance-linked remuneration.
Strategic initiatives in the last 24 months
| Initiative | Date | Detail / quantification |
|---|---|---|
| Real-estate exit (GD Land distribution in specie) | Dec 2024 – Jan 2025 | Removed about HK$40 bn of assets, HK$19.5 bn of borrowings and HK$4.7 bn of mortgage guarantees from the group |
| Injection of parent water assets | Oct–Dec 2025 | Shantou Guangdong Water (920,000 t/d) and Yangjiang Qingyuan from Guangdong Yuehai Water for RMB266.99 m |
| Concession bids | 2,025 | Maoming sewage, 194,000 t/d; expected investment about RMB667 m (HK$738 m) |
| Bolt-on M&A | 1H2026 | Shantou Chenghai Yuehai Water Supply, 51% for RMB163.2 m (designed capacity 645,000 t/d; total investment about RMB421 m) |
| Hong Kong engineering entry | 1H2026 | Bestwise Envirotech, 51% for HK$44.39 m; gives access to HKSAR public works |
| Retail rationalisation | 2024–2026 | Hua Du, TeemLife and Dong Pu closed; Aeon Teem 35% sold for RMB152.2 m |
| Power portfolio de-emphasis | 2,025 | Did not join Yudean Jinghai's capital injection; stake diluted to 17.48% |
| Cost programme | FY2025 | Administrative expenses -10.9% and finance costs -30.6% year on year; no formal cost target published |
| Financing diversification | Aug 2026 | First onshore RMB corporate bond (RMB500 m, 3-year, 1.49%) to refinance floating-rate debt cheaply. 95.1% of debt is floating rate. |
| ESG / low carbon | 2022–2025 | Distributed photovoltaic (31 plants and 23.4 MW in 2022; 55 PV plants by 2023); "carbon-neutral water plants" (Daluo); energy savings at Taiyuan Pumping Station; ISO 37301 compliance certification |
Medium-term financial targets and guidance
GDI does not publish numeric revenue or profit guidance. The only explicit financial policy is a dividend payout ratio of about 65% of attributable profit, applied consistently for FY2023, FY2024, FY2025 and the 1H2026 interim. Capex, leverage and return targets are not publicly disclosed.
Products & Services
Water resources
| Offering | Description and key specifications | Target customer | Latest data point | Pricing model |
|---|---|---|---|---|
| Dongshen Water Supply Project (flagship) | Raw-water conveyance from the Dongjiang (East River) to Hong Kong, Shenzhen and Dongguan. Designed annual capacity 2.423 bn tonnes. FY2025 supply 2.078 bn t. | HKSAR Government (WSD); Shenzhen and Dongguan water authorities | 2024–26 agreement; 1H2026 volume 1.110 bn t | Hong Kong: annual basic price (HK$5,384.69 m for 2026) less a deduction for conserved water (difference between the 820 mcm ceiling and actual imports, minimum 615 mcm a year) at HK$0.331/m³ in 2026. A nine-year average of at least 700 mcm applies for 2021–2029. Shenzhen and Dongguan: volumetric tariffs. |
| Municipal water supply concessions | 50+ subsidiaries. Operated supply capacity 10.80 m t/d at 30 Jun 2026 (subsidiaries), plus 1.03 m t/d at associates. Designed capacity 17.16 m t/d. | Municipal end-users | 30 Jun 2026 | Regulated volumetric tariffs; BOT/TOT/PPP concession terms |
| Largest supply concessions | Zhanjiang Hedi (1.06 m t/d); Shantou Guangdong Water (920,000 t/d); Jiangxi Guangdong Public Utilities (823,500 t/d); Guangzhou Nansha GDH Water (750,000 t/d); Shaotou Water (674,000 t/d); Jieyang (560,000 t/d); Puning (500,000 t/d); Shantou Chenghai (450,000 t/d operated, 645,000 t/d designed, acquired 2026); Enshi (400,000 t/d) | Municipal | 1H2026 capacity table | Tariff |
| Wastewater treatment concessions | Operated capacity 2.298 m t/d. Designed 3.095 m t/d. Largest: Hebei Guangdong Water Group (468,000 t/d), Meizhou (250,000 t/d), Wuxi Debao (225,700 t/d), Maoming (194,000 t/d, won 2025). | Municipal governments | 30 Jun 2026 | Service fee per tonne treated |
| Projects under construction | 565,000 t/d supply (Shanwei Water Supply 410,000; Jiangxi 155,000) and 20,000 t/d wastewater (Hainan Danzhou) | Municipal | 30 Jun 2026 | Concession |
| Smart and low-carbon plants | Nansha Smart Water Plant (featured in the 2023 ESG report); Daluo "carbon neutral" water plant (2023) | Municipal | 2,023 | Embedded in concessions |
| Water pipeline installation and consultancy | Connection installation and engineering consultancy. FY2025 HK$1,248 m; 1H2026 HK$647 m. | Developers, municipalities | 1H2026 | Project fees |
| Construction services (IFRIC 12) | Construction of owned concession assets. FY2025 HK$455 m. | Concession grantors | FY2025 | Construction revenue recognised under IFRIC 12 |
| Machinery sales | Water-treatment equipment. FY2025 HK$702 m (+83.5%); 1H2026 HK$364 m. | Third-party utilities | 1H2026 | Product sales |
| Bestwise Envirotech (51%, 2026) | Hong Kong contractor for potable-water and wastewater infrastructure, on the HKSAR "List of Approved Suppliers of Materials and Specialist Contractors for Public Works" | HKSAR public works | Acquired 1H2026 for HK$44.4 m | Contracting |
Property investment (GDH Teem and Guangdong Investment Tower)
| Asset | Location | Lettable area (sq m) | FY2025 occupancy | FY2025 revenue (HKD Mn) | 1H2026 revenue (HKD Mn) | Ownership |
|---|---|---|---|---|---|---|
| Teem Plaza – Teemmall (flagship) | Tianhe, Guangzhou | 107,000 (104,000 in 1H26) | 99.1% | 713.3 | 376.3 | Owned |
| Teem Plaza – TeemTower (office) | Tianhe, Guangzhou | 88,000 | 78.4% | 155.3 | 66.7 | Owned |
| Panyu Teemmall | Panyu, Guangzhou | 144,000 | 96.4% | 299.6 | 159.5 | Owned |
| Tianjin Teemmall | Tianjin | 145,000 | 96.3% | 309.5 | 156.6 | Owned |
| Guangzhou Comic City | Guangzhou | 23,000 | 99.6% | 86.6 | 46.7 | Owned |
| Shenzhen Teemmall | Shenzhen | 105,000 | 94.4% | 95.1 | 47.0 | Leased-in |
| Yuehai Tiandi (粤海天地) | Guangzhou | 19,000 | 93.9% | 44.8 | 23.9 | Leased-in |
| GDH Teem total | — | 631,000 | — | 1,704.2 | 876.7 | — |
| Guangdong Investment Tower | Sheung Wan, Hong Kong | — | 94.2% (88.7% in 1H26) | 47.6 | 21.7 | Owned |
Pricing model: fixed and turnover rents plus management fees. GDH Teem PBT (excluding fair-value changes and interest) was HK$972.4 m in FY2025 (+7.3%) and HK$532.1 m in 1H2026 (+8.2%).
Department stores (Teemall Department Store brand)
| Store | Leased area (sq m) | FY2024 revenue (HKD Mn) | FY2025 revenue (HKD Mn) | 1H2026 revenue (HKD Mn) | Status |
|---|---|---|---|---|---|
| Teemmall Store | 41,000 (34,600 in 1H26) | 706.9 | 327.2 | 157.7 | Operating |
| Wan Bo Store | 17,100 | 47.2 | 48.3 | 28.4 | Operating |
| Ao Ti Store | 21,500 | 39.1 | 42.4 | 33.1 | Operating |
| Dong Pu Store | 13,700 | 48.1 | 29.9 | 6.4 | Closed Feb 2026 |
| TeemLife | 140 | 0.2 | 0.2 | 0.0 | Opened May 2024; closed Jan 2026 |
| Hua Du Store | — | 20.1 | — | — | Closed Nov 2024 |
Pricing model: concessionaire commissions, direct sale of goods and management fees. Three stores (73,200 sq m) remained at 30 June 2026.
Hotels
| Item | Detail (FY2025 / 1H2026) |
|---|---|
| Hotels managed | 17 (4 in Hong Kong, 13 in the Mainland); down from 19 in 2024 |
| Hotels operated by the Group | 7 (3 Hong Kong, 2 Zhuhai, 1 Shenzhen, 1 Guangzhou); 6 owned |
| Sheraton Guangzhou Hotel | Managed by a third-party international group (Marriott/Sheraton brand). ADR HK$1,256 in FY2025 and HK$1,382 in 1H26; occupancy 93.9% and 95.0%. |
| Holiday Inn Zhuhai City Center | Operated under franchise |
| Oasis Aurum 181 Hotel | Leased, 181 Connaught Road West, Hong Kong; opened mid-December 2024 |
| Other six hotels (blended) | ADR HK$754 in FY2025 and HK$765 in 1H26; occupancy 74.5% and 72.0% |
| Segment revenue | HK$704.9 m in FY2025 (+8.7%); HK$359.2 m in 1H26 (+6.7%) |
Energy
| Asset | Specification | FY2025 | 1H2026 |
|---|---|---|---|
| Zhongshan GDH Energy (75%) | Two coal-fired units, 600 MW total; electricity and steam | Sales 3,263 GWh (+18.3%); revenue HK$1,540.9 m (-3.9%); PBT HK$152.1 m (+9.5%) | Sales 1,745 GWh (+3.9%); revenue HK$901.4 m (+17.1%); PBT HK$84.7 m (-7.2%) |
| Yudean Jinghai Power (17.48% associate) | Grew from 4 units / 3,200 MW (FY2025) to 6 units / 5,260 MW (30 Jun 2026) | Sales 15,611 GWh; revenue HK$5,844.6 m (-17.8%); PBT HK$108.9 m; GDI share HK$28.1 m | Sales 10,764 GWh (+73.2%); revenue HK$4,118.2 m (+71.4%); PBT HK$79.2 m; GDI share HK$12.5 m |
Road and bridge
| Asset | Specification | FY2025 | 1H2026 |
|---|---|---|---|
| Xingliu Expressway (Guangxi GDH Highway) | About 100 km main line plus about 53 km of connecting lines to Xingye, Guigang and Hengzhou | Average daily traffic 23,825 (-7.4%); toll HK$592.0 m (-4.3%); PBT HK$306.4 m (-2.9%) | Traffic 23,346 (-4.5%); toll HK$297.3 m (+2.6%, RMB-aided); PBT HK$149.6 m |
| Yinping PPP (Dongguan) | Five non-toll project roads completed; cumulative cost RMB2,094 m | Interest and maintenance fees HK$156.3 m; PBT HK$135.9 m | Fees HK$71.9 m (-11.0%); PBT HK$59.8 m (-13.4%) |
Financial Narrative
Income statement
Basis: FY2021–FY2023 as originally reported (including GD Land); FY2024–FY2025 continuing operations.
Notes:
-
FY2021 EPS is analyst calc. (HK$4,697.0 m ÷ 6,537.8 m shares). Diluted EPS equals basic because there are no dilutive instruments.
-
FY2021 and FY2022 DPS are derived from etnet's reported payout ratios (84.507% and 84.175%) multiplied by EPS. The FY2022 final dividend is confirmed at HK 42.62 cents (2022 Annual Report). FY2023 DPS of 31.04 cents (interim 18.71, final 12.33) is from the FY2023 annual results. FY2024 is 31.24 cents (interim 23.97, final 7.27) and FY2025 is 46.29 cents (interim 26.66, final 19.63).
-
FY2025 D&A of HK$2,476.5 m and FY2024 D&A of HK$2,479.6 m are from the segment note.
-
The company's own EBITDA/finance-cost-incurred cover was 15.9x for FY2025 and 10.5x for FY2024. This implies EBITDA of about HK$10.25 bn and HK$9.67 bn, consistent with the analyst calculation within about 2%.
-
FY2023 restated continuing-operations PBT was HK$6,425.8 m.
Margins (analyst calc.)
Revenue CAGR. FY2021–FY2025 on a reported basis: -10.8% a year. This is distorted by the removal of GD Land's property-development revenue (HK$6.76 bn in FY2024) and is not a meaningful growth indicator. Continuing-operations growth was +1.7% in FY2025 and +8.4% in 1H2026. The Mainland water platform grew +7.2% in FY2025 and +13.7% in 1H2026.
Commentary. The five-year record falls into three phases:
FY2021–FY2022: stable profit of about HK$4.7–4.8 bn and a payout ratio of about 84%.
FY2023–FY2024: a property-driven trough. Attributable profit fell to about HK$3.1 bn as GD Land absorbed inventory write-downs (HK$1,034 m in FY2024) and high finance costs. Management cut the payout ratio to 65%.
FY2025 onwards: a clean-utility reset. Deconsolidating GD Land removed the losses and about HK$19.5 bn of debt. Continuing-operations finance costs fell 30.6% (HK$919.6 m → HK$638.1 m) and administrative expenses fell 10.9% (HK$2,478 m → HK$2,209 m). Continuing attributable profit rose 13.9%.
Gross margin stepped up structurally to about 53% once low-margin property sales left the mix. Group profitability now depends on Dongshen's pre-tax margin of about 64%. In 1H2026, RMB appreciation (+4.4% against the HKD year on year) and a HK$123.5 m disposal gain added to underlying growth. PBT rose 9.9% and attributable profit 9.5% to HK$2,935 m.
Interim trend
Q1 2026 (announced 28 April 2026): revenue HK$5,046 m (+9.3%); attributable profit HK$1,438 m (+10.3%). 9M2025: attributable profit from continuing operations HK$4,067 m (+13.2%) and revenue HK$14,281 m.
Balance sheet
Sources: FY2025 Annual Results and 1H2026 Interim. FY2024 total assets include HK$40,663 m of GD Land assets held for distribution.
Analyst observation: net debt falls further if the HK$6.63 bn of RMB principal-protected bank deposits is treated as cash-like. Net debt including those deposits was about HK$1.15 bn at 30 June 2026. This makes GDI one of the least levered utilities in China.
Cash flow
Notes:
-
GD Land's operating cash flow (HK$1,936 m in FY2024; HK$268 m from 1 to 21 January 2025) is excluded.
-
Dividends paid in FY2025 = 2024 final HK$475.3 m + 2025 interim HK$1,743.0 m. FY2024 = 2023 final (12.33 cents × 6,537.8 m shares = HK$806 m) + 2024 interim HK$1,567.1 m.
-
No buybacks were made in FY2024, FY2025 or 1H2026 (corporate-governance sections).
-
1H2026: OCF HK$3,430 m (1H2025: HK$3,339 m); capex HK$1,258 m (1H2025: HK$566 m). FY2025 capex includes acquisitions of subsidiaries; water segment capex was HK$4,652 m.
-
The decline in FY2025 OCF is consistent with a HK$908 m rise in trade receivables: overdue balances older than one year doubled from HK$628 m to HK$1,268 m.
Ratios (analyst calc. unless noted)
Notes:
-
FY2024 ROA and asset turnover are distorted by HK$40.7 bn of GD Land assets held for distribution. The FY2024 current ratio includes held-for-distribution items; excluding them it was 0.98x.
-
ROIC uses tax rates of 27.3% (FY2025) and 28.5% (FY2024).
-
1H2026 company-reported EBITDA/finance cost was 20.1x and gearing 20.3%.
Cash conversion cycle: not meaningful for a concession utility. Trade receivables were HK$4,746 m at FY2025 (about 92 days of revenue) and HK$5,914 m at 1H2026. Trade payables were HK$5,603 m and HK$5,855 m, mostly due within three months.
Trend commentary. Every leverage and coverage metric improved sharply in FY2025 because of the GD Land distribution: gearing fell from 30.9% to 19.7%, and EBITDA/finance cost rose from 10.5x to 15.9x and then 20.1x. Returns improved to an 11% ROE and 8.8% ROIC. That is attractive for a regulated utility, but it reflects the unusually profitable, largely depreciated Dongshen asset rather than the economics of new Mainland concessions, which earn about 23% pre-tax margins on revenue. The main deterioration is in working capital quality. Receivables more than one year overdue rose from HK$628 m (FY2024) to HK$1,268 m (FY2025) and HK$1,285 m (1H2026). Management discloses it is issuing demand letters and filing lawsuits to preserve claims, which points to slow payment by Mainland local-government counterparties.
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansFinancial Detail
Segment revenue (HKD Mn)
| Segment revenue (HKD Mn) | FY2024 | FY2025 |
|---|---|---|
Water resources | 13,511.0 | 14,139.6 |
Property investment | 1,576.9 | 1,681.8 |
Department store operation | 861.6 | 448.0 |
Electric power generation | 1,268.7 | 1,237.4 |
Hotel operation and management | 648.4 | 704.6 |
Road and bridge | 638.7 | 613.6 |
Total revenue | 18,505.3 | 18,824.9 |
Revenue by Segment
| Segment result (HKD Mn) | FY2024 | FY2025 |
|---|---|---|
Water resources | 5,643.6 | 5,902.6 |
Property investment | 722.4 | 939.4 |
Department store operation | -102.3 | 72.5 |
Electric power generation | 147.8 | 141.5 |
Hotel operation and management | 103.5 | 93.2 |
Road and bridge | 438.3 | 450.2 |
Others | -140.9 | -41.3 |
Eliminations | 207.0 | -12.3 |
Total segment results | 7,019.3 | 7,545.8 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansSegment Overview
| Segment | Rev. YoY | Result YoY | Result margin (result ÷ ext. revenue) | % of group revenue | % of segment results |
|---|---|---|---|---|---|
Water resources | +4.7% | +4.6% | 41.7% | 75.1% | 78.2% |
Property investment | +6.7% | +30.0% | 55.9% | 8.9% | 12.4% |
Department store | -48.0% | n.m. (loss → profit) | 16.2% | 2.4% | 1.0% |
Electric power | -2.5% | -4.3% | 11.4% | 6.6% | 1.9% |
Hotel | +8.7% | -10.0% | 13.2% | 3.7% | 1.2% |
Road and bridge | +3.9% decline (-3.9%) | +2.7% | 73.4% | 3.3% | 6.0% |
Segment Revenue
| Segment (1H) | Ext. revenue 1H2025 | Ext. revenue 1H2026 | YoY | Result 1H2025 | Result 1H2026 | YoY |
|---|---|---|---|---|---|---|
Water resources | 7,153.1 | 7,717.0 | +7.9% | 3,402.2 | 3,643.7 | +7.1% |
Property investment | 810.7 | 870.0 | +7.3% | 479.6 | 446.1 | -7.0% |
Department store | 216.5 | 225.5 | +4.2% | 23.9 | 21.1 | -11.6% |
Electric power | 610.9 | 737.1 | +20.7% | 84.6 | 69.6 | -17.7% |
Hotel | 336.4 | 359.2 | +6.8% | 51.4 | 51.6 | +0.3% |
Road and bridge | 300.7 | 308.4 | +2.6% | 221.2 | 222.4 | +0.6% |
Others / eliminations | — | — | — | -27.6 | 75.9 | — |
Total | 9,428.3 | 10,217.2 | +8.4% | 4,235.3 | 4,530.5 | +7.0% |
Revenue by Segment by Water Sub-unit
| Water sub-unit (HKD Mn) | FY2024 | FY2025 |
|---|---|---|
Dongshen revenue | 6,360 | 6,452 |
Dongshen revenue from Hong Kong | 5,136 | 5,259 |
Dongshen revenue from Shenzhen and Dongguan | 1,224 | 1,193 |
Dongshen PBT excl. FX and finance costs | 4,020 | 4,158 |
Other water projects revenue | 7,218.5 | 7,736.2 |
Other water projects PBT excl. FX and finance costs | 1,733.9 | 1,793.8 |
Dongshen volume (bn tonnes) | 2.093 | 2.078 |
Income Statement and Per-Share Data
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Revenue (HKD Mn) | 29,715.5 | 23,196.2 | 24,199.9 | 18,505.3 | 18,824.9 |
Gross profit (HKD Mn) | 11,637.8 | 9,823.2 | 10,075.2 | 9,822.5 | 10,034.3 |
Operating income, EBIT = PBT + finance costs (HKD Mn, analyst calc.) | — | — | — | 7,413.4 | 7,879.6 |
EBITDA = EBIT + D&A (HKD Mn, analyst calc.) | — | — | — | 9,893.0 | 10,356.1 |
Finance costs (HKD Mn) | — | — | — | 919.6 | 638.1 |
Profit before tax (HKD Mn) | 8,456.8 | 7,243.5 | 4,604.1 | 6,493.9 | 7,241.5 |
Income tax (HKD Mn) | 2,969.3 | 1,719.3 | 1,790.2 | 1,852.8 | 1,975.1 |
Profit attributable to owners, total (HKD Mn) | 4,697.0 | 4,763.5 | 3,122.1 | 3,142.1 | 4,656.3 |
Profit attributable, continuing ops (HKD Mn) | — | — | — | 4,102.9 | 4,673.3 |
EPS basic, total (HK cents) | 71.84 | 72.86 | 47.75 | 48.06 | 71.22 |
EPS diluted (HK cents) | 71.84 | 72.86 | 47.75 | 48.06 | 71.22 |
Dividends per share (HK cents) | 60.71 | 61.33 | 31.04 | 31.24 | 46.29 |
Payout ratio (%) | 84.5 | 84.2 | 65.0 | 65.0 | 65.0 |
Margin Analysis (%)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Gross margin (%) | 39.2 | 42.3 | 41.6 | 53.1 | 53.3 |
Operating (EBIT) margin (%) | — | — | — | 40.1 | 41.9 |
EBITDA margin (%) | — | — | — | 53.5 | 55.0 |
PBT margin (%) | 28.5 | 31.2 | 19.0 | 35.1 | 38.5 |
Net margin, attributable total (%) | 15.8 | 20.5 | 12.9 | 17.0 | 24.7 |
Effective tax rate (%) | 35.1 | 23.7 | 38.9 | 28.5 | 27.3 |
Per-Share Data
| Metric | 1H2025 | 1H2026 |
|---|---|---|
Revenue | 9,428.3 | 10,217.2 |
Gross profit | 5,246.4 | 5,628.0 |
Finance costs | 341.5 | 301.6 |
PBT | 4,105.1 | 4,511.2 |
Profit attributable | 2,681.7 | 2,935.4 |
EPS (HK cents) | 41.02 | 44.90 |
Interim DPS (HK cents) | 26.66 | 29.19 |
Balance Sheet and Margin Analysis (%)
| Metric | FY2024 | FY2025 | 1H2026 |
|---|---|---|---|
Total assets (HKD Mn) | 135,595.4 | 101,741.1 | 108,608.1 |
Cash and bank balances (HKD Mn) | 12,154.0 | 14,783.3 | 14,890.8 |
Other financial assets at amortised cost, MYR Bn bank deposits (HKD Mn) | 3,384.9 | 3,553.6 | 6,630.6 |
Short-term borrowings (HKD Mn) | 7,330.2 | 6,252.4 | 6,029.0 |
Long-term borrowings (HKD Mn) | 16,531.8 | 15,359.2 | 16,643.7 |
Total borrowings (HKD Mn) | 23,862.0 | 21,611.6 | 22,672.7 |
Net debt = borrowings − cash (HKD Mn, analyst calc.) | 11,708.0 | 6,828.3 | 7,781.9 |
Equity attributable to owners (HKD Mn) | 41,658.0 | 42,924.3 | 46,252.5 |
Non-controlling interests (HKD Mn) | 15,017.4 | 15,214.7 | 16,000.6 |
Total equity (HKD Mn) | 56,675.5 | 58,139.1 | 62,253.1 |
Goodwill (HKD Mn) | 811.0 | 793.2 | 811.3 |
Other intangible assets (HKD Mn) | 593.8 | 573.5 | 578.2 |
Operating concession rights (HKD Mn) | 20,040.4 | 22,852.3 | 22,687.7 |
Receivables under service concessions, non-current (HKD Mn) | 16,966.0 | 17,511.0 | 18,080.8 |
Investment properties (HKD Mn) | 15,886.6 | 16,321.9 | 17,010.7 |
Net current assets / working capital (HKD Mn) | 5,010.6 | 3,195.4 | 6,546.5 |
Company gearing, net financial indebtedness ÷ equity excl. NCI (%) | 30.9 | 19.7 | 20.3 |
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansCash Flow
| Metric | FY2024 | FY2025 |
|---|---|---|
Operating cash flow, continuing (HKD Mn) | 11,086 | 8,805 |
Capital expenditure (HKD Mn) | 1,857 | 5,434 |
Free cash flow = OCF − capex (HKD Mn, analyst calc.) | 9,229 | 3,371 |
Dividends paid to owners (HKD Mn, analyst calc.) | 2,373 | 2,218 |
Share buybacks (HKD Mn) | 0 | 0 |
Returns & Leverage Ratios (%) and Financial Ratios (x)
| Ratio | FY2024 | FY2025 |
|---|---|---|
ROE, attributable profit ÷ average owners' equity (%) | — | 11.0 |
ROE, continuing attributable ÷ closing equity (%) | 9.8 | 10.9 |
ROA, continuing profit for the year ÷ closing total assets (%) | 3.4 | 5.2 |
ROIC, NOPAT ÷ (total equity + debt − cash) (%) | 7.8 | 8.8 |
Current ratio (x) | 1.09 | 1.15 |
Debt / total equity (%) | 42.1 | 37.2 |
Net debt / EBITDA (x) | 1.18 | 0.66 |
Interest coverage, EBIT ÷ finance costs (x) | 8.1 | 12.3 |
EBITDA ÷ finance costs incurred, company-reported (x) | 10.5 | 15.9 |
Asset turnover, revenue ÷ closing total assets (x) | 0.14 | 0.19 |
Region revenue (HKD Mn)
| Region revenue (HKD Mn) | FY2024 | FY2025 |
|---|---|---|
Chinese Mainland | 18,224.3 | 18,472.0 |
Hong Kong | 280.9 | 352.9 |
Total | 18,505.3 | 18,824.9 |
Revenue by Region (%)
| Region (%) | FY2025 YoY | Share FY2025 |
|---|---|---|
Chinese Mainland | +1.4% | 98.1% |
Hong Kong | +25.6% | 1.9% |
Segment Overview — Water resources
| Segment | Chinese Mainland | Hong Kong | Total |
|---|---|---|---|
Water resources | 13,274.3 | — | 13,274.3 |
Property investment (management fees) | 243.8 | — | 243.8 |
Department store | 416.4 | — | 416.4 |
Electric power | 1,237.4 | — | 1,237.4 |
Hotel | 384.2 | 287.2 | 671.4 |
Road and bridge | 613.6 | — | 613.6 |
Revenue from contracts with customers | 16,169.7 | 287.2 | 16,456.8 |
Finance income from service concessions | (not split) | — | 865.2 |
Rental income | (not split) | — | 1,502.8 |
Share Price History
| Date | Price (HKD) | Note |
|---|---|---|
2 Oct 2024 | 5.87 | +12.2% that day during the China stimulus rally; market cap HK$38.4 bn (moomoo) |
26 Aug 2025 | 7.39 | +4.1% intraday after 1H2025 results |
17 Apr 2026 | 8.01 | etnet; market cap HK$52.8 bn |
About 10 Oct 2026 | 8.36 | CFD quote retrieved on 10 Oct 2026; verify against the live HKEX price |
Valuation Snapshot
| Multiple | Value | Basis |
|---|---|---|
Market capitalisation | HK$54.7 bn | 6,537.8 m shares |
P/E (trailing 12 months) | 11.1x | LTM EPS 75.10 cents = FY2025 71.22 − 1H2025 41.02 + 1H2026 44.90 |
P/E (FY2025) | 11.7x | EPS 71.22 cents |
Dividend yield (trailing) | 5.8% | 19.63 + 29.19 = 48.82 cents |
P/B | 1.18x | Owners' equity HK$46,253 m at 30 Jun 2026 |
Enterprise value | About HK$71.8 bn | Market cap 54.7 + borrowings 22.7 + NCI 16.0 − cash 14.9 − RMB deposits 6.6 |
EV / EBITDA (LTM) | About 6.6x | LTM EBITDA about HK$10.86 bn = FY2025 EBITDA 10.36 + (1H26 EBITDA 6.14 − 1H25 EBITDA 5.64) |
EV / Sales (LTM) | About 3.7x | LTM revenue HK$19.61 bn |
Per-Share Data and Returns & Leverage Ratios (%)
| Metric | FY2021 | FY2022 | FY2023 | FY2024 | FY2025 |
|---|---|---|---|---|---|
Interim DPS (HK cents) | — | 18.71 | 18.71 | 23.97 | 26.66 |
Final DPS (HK cents) | — | 42.62 | 12.33 | 7.27 | 19.63 |
Total DPS (HK cents) | 60.71 | 61.33 | 31.04 | 31.24 | 46.29 |
Payout ratio (%) | 84.5 | 84.2 | 65.0 | 65.0 | 65.0 |
Debt maturity bucket (HKD Mn)
| Debt maturity bucket (HKD Mn) | FY2025 | 1H2026 |
|---|---|---|
Repayable within 1 year | 6,252 | 6,029 |
Repayable in 2–5 years | 4,592 | 5,146 |
Repayable beyond 5 years | 10,768 | 11,498 |
Total borrowings | 21,612 | 22,673 |
Analyst Conclusions
Management guidance
There is no quantitative guidance. Management's qualitative outlook (1H2026 Prospects) is to focus on stable development of the core businesses, keep risks "preventable and controllable," extend water into higher value-added areas, advance precision management, optimise the asset portfolio, pursue Greater Bay Area opportunities and M&A, and "achieve new breakthroughs in profit growth." The 65% payout policy is maintained.
Consensus expectations
The run-rate implied by reported data (analyst inference, not consensus):
-
Revenue growth of about 6–8% on 1H2026 momentum (+8.4%).
-
Attributable profit growth of about 8–10%. 1H2026 was +9.5% but included a HK$124 m one-off gain and RMB tailwind.
-
FY2026 DPS around 50 cents if the payout stays at 65%. This is illustrative, not a forecast.
Bull case
-
Clean, compounding utility. Continuing attributable profit rose from HK$4,103 m (FY2024) to HK$4,673 m (FY2025), and 1H2026 added +8.7% on continuing operations. Contracted Hong Kong price escalation, Mainland tariff reform and acquisitions (Shantou 920,000 t/d; Chenghai 645,000 t/d designed) support high-single-digit growth.
-
Balance-sheet optionality. Gearing of 20.3%, about HK$21.5 bn of cash plus RMB deposits, and 1.49% onshore funding allow accretive parent injections or a payout increase without equity issuance (BofA judged a rights issue unlikely).
-
Yield with a valuation floor. A 5.8% trailing yield at 11x trailing P/E and about 6.6x EV/EBITDA, for an asset generating a 64% pre-tax margin on a sovereign contract, is attractive. RMB appreciation (+4.4% year on year in 1H2026) adds reported growth for HKD investors.
Bear case
-
The 2030 concession cliff. Dongshen (about 55% of segment results) depends on renewal of a concession dated August 2000. A debt-funded renewal payment or a less favourable term could reset returns and dividend capacity, and current terms are undisclosed.
-
Volume and deduction drift. Dongshen volume fell 3.2% in 1H2026 and Shenzhen/Dongguan revenue keeps declining. A 2027–2029 agreement could carry lower escalation or higher deductions as Hong Kong expands desalination. That agreement is pending and must be signed by the end of 2026.
-
Quality-of-earnings erosion in the Mainland. Receivables more than one year overdue doubled to about HK$1.3 bn, against a provision of only HK$71 m. Combined with the legacy retail, coal and toll drags, an acting chairman and dated sell-side targets below the current price, the shares could de-rate.
Catalysts and monitorables (next 12 months)
New Dongjiang Water Supply Agreement (2027 onward): basic price escalation, deduction unit rates and the 615/700 mcm benchmarks. Expected by December 2026.
9M2026 results: (late October 2026) and FY2026 results (March 2027): water-segment growth, the RMB effect and payout.
Permanent Chairman appointment: and resolution of the CG Code B.3.5 gender deviation.
Further asset injections: from Guangdong Holdings/Yuehai Water; Shantou Chenghai ramp-up to 645,000 t/d.
Receivables collection trend: and any impairment charges.
Disclosure on the Dongshen concession renewal: (term, cost, financing).
Coal prices: and Yudean Jinghai's 5,260 MW ramp-up; Xingliu traffic.
Further onshore bond issuance: and the shift away from floating-rate HIBOR/LPR debt.
Analyst verdict
Guangdong Investment has completed the most important restructuring in its recent history. The January 2025 distribution of GD Land removed a loss-making, highly levered property developer. What remains is a high-margin, low-leverage water infrastructure group. The FY2025 numbers bear this out: continuing attributable profit up 13.9%, finance costs down 30.6%, gearing at 19.7% and a 48.2% higher dividend on an unchanged 65% payout. The 1H2026 results showed the trajectory continuing, with revenue up 8.4% and profit up 9.5%, although part of that came from a one-off disposal gain and RMB strength.
At about HK$8.36 the shares trade at roughly 11x trailing earnings, 1.2x book and 6.6x EV/EBITDA, with a 5.8% yield. That is reasonable for an asset whose crown jewel earns about 64% pre-tax margins from a sovereign counterparty under escalating contracts. Earnings visibility for 2026 is high.
The investment debate is now about duration, not near-term earnings. Two contractual events dominate. The first is the 2027-onward Dongjiang agreement, due by year-end 2026. The second, more consequential, is the Dongshen concession renewal around 2030, whose cost and terms are undisclosed. Investors should also weigh the deterioration in aged Mainland receivables, the acting-chair situation and the remaining legacy assets (retail, coal, tolls), which add little value.
Verdict: a high-quality, defensive income holding with moderate growth, suited to yield-oriented portfolios. The near-term risk/reward is balanced to mildly positive, supported by dividend growth and balance-sheet optionality. Re-rating potential depends on clarity over the Dongjiang pricing renewal and the post-2030 concession framework, which are the two disclosures most worth monitoring. The thesis would weaken if the 2027 agreement cuts escalation materially, receivable impairments emerge, or concession-renewal funding requires a meaningful cut to the payout ratio.
SOURCES (primary documents first)
-
Guangdong Investment Ltd — 2026 Interim Results Announcement (28 Aug 2026): https://www1.hkexnews.hk/listedco/listconews/sehk/2026/0828/2026082802402.pdf
-
Guangdong Investment Ltd — 2025 Annual Results Announcement (30 Mar 2026): https://www1.hkexnews.hk/listedco/listconews/sehk/2026/0330/2026033002806.pdf
-
Guangdong Investment Ltd — Interim dividend announcement EF002 (28 Aug 2026): https://www1.hkexnews.hk/listedco/listconews/sehk/2026/0828/2026082802460.pdf
-
Guangdong Investment Ltd — Board meeting notice (17 Aug 2026): https://www1.hkexnews.hk/listedco/listconews/sehk/2026/0817/2026081700728.pdf
-
Guangdong Investment Ltd — 9M2025 Results (27 Oct 2025): https://www1.hkexnews.hk/listedco/listconews/sehk/2025/1027/2025102701066.pdf
-
Guangdong Investment Ltd — 2025 Interim Results (25 Aug 2025): https://www1.hkexnews.hk/listedco/listconews/sehk/2025/0825/2025082501502.pdf
-
Guangdong Investment Ltd — 2024 Annual Results (24 Mar 2025): https://www1.hkexnews.hk/listedco/listconews/sehk/2025/0324/2025032401132.pdf
-
Guangdong Investment Ltd — Change of Directors and MD (24 Mar 2025): https://www1.hkexnews.hk/listedco/listconews/sehk/2025/0324/2025032401168.pdf
-
GD Land — Change of directors (24 Mar 2025): https://www1.hkexnews.hk/listedco/listconews/sehk/2025/0324/2025032400832.pdf
-
Guangdong Investment Ltd — NED change (27 Oct 2025): https://www1.hkexnews.hk/listedco/listconews/sehk/2025/1027/2025102701176.pdf
-
Guangdong Investment Ltd — Resignation of Chairman (6 Jan 2026): https://www1.hkexnews.hk/listedco/listconews/sehk/2026/0106/2026010601498.pdf
-
Guangdong Investment Ltd — 2023 Annual Results / 2023 Annual Report: https://newsfile.moomoo.com/public/NN-PersistNoticeAttachment/7781/20240325/11113144-0.PDF ; https://www1.hkexnews.hk/listedco/listconews/sehk/2024/0424/2024042400614.pdf
-
Guangdong Investment Ltd — 2022 Annual Report: https://www1.hkexnews.hk/listedco/listconews/sehk/2023/0427/2023042700213.pdf
-
Guangdong Investment Ltd — Update on the 2024–26 Dongjiang Water Supply Agreement (27 Dec 2023): https://www1.hkexnews.hk/listedco/listconews/sehk/2023/1227/2023122701050.pdf
-
Guangdong Investment Ltd — 2023 ESG Report: https://www1.hkexnews.hk/listedco/listconews/sehk/2024/0424/2024042402314.pdf
-
HKSAR Development Bureau — 2024–26 Dongjiang agreement press release (27 Dec 2023): https://www.devb.gov.hk/en/sdev/press/index_id_12710.html ; https://www.info.gov.hk/gia/general/202312/27/P2023122700500p.htm
-
HKSAR Development Bureau — 2021–23 agreement press release (28 Dec 2020): https://www.devb.gov.hk/en/sdev/press/index_id_10774.html
-
LegCo Development Panel papers on Dongjiang water: https://www.legco.gov.hk/yr2023/english/panels/dev/papers/dev20231213cb1-1110-3-e.pdf ; https://www.legco.gov.hk/yr20-21/english/panels/dev/papers/devcb1-529-1-e.pdf
-
etnet — financial history and market data for 0270: https://www.etnet.com.hk/www/eng/stocks/realtime/quote_ci_pl.php?code=270 ; https://www.etnet.com.hk/www/eng/stocks/realtime/quote_ci_basicdata.php?code=270
-
Tiger Brokers / Futu news — Q1 2026, 1H2025, profit alert, board updates: https://www.itiger.com/news/1158260306 ; https://www.itiger.com/news/1159542771 ; https://www.itiger.com/news/1109508304 ; https://www.itiger.com/news/1116967763 ; https://www.itiger.com/hans/news/1188672594 ; https://www.futunn.com/en/stock/00270-HK/institutional-ratings ; https://moomooapp.com/stock/00270-HK
-
Peer filings — BEWG FY2025: https://www1.hkexnews.hk/listedco/listconews/sehk/2026/0325/2026032500223.pdf ; China Water Affairs FY2026: https://www1.hkexnews.hk/listedco/listconews/sehk/2026/0629/2026062900497.pdf ; BEHL FY2025: https://www1.hkexnews.hk/listedco/listconews/sehk/2026/0326/2026032600576.pdf
-
Market-data aggregators (lower confidence): moomoo company profile https://moomoo.com/stock/00270-HK/company ; roic.ai https://www.roic.ai/quote/GGDVY ; capital.com price https://capital.com/mn-int/markets/shares/guangdong-investment-limited-share-price-1 ; knowesg https://knowesg.com/esg-ratings/guangdong-investment-ltd ; sustainabilityreports.com (2022, 2023, 2025 ESG summaries)
Unlock Company Financials
Unlock this company profile to view its financial data.
View Subscription PlansExecutive Leadership
Board of Directors
| Name | Role | Board tenure | Background (disclosed) | Age |
|---|---|---|---|---|
WANG Min | Non-Executive Director; Acting Chairman of the Board and of the Nomination Committee (from 30 Mar 2026) | NED since 25 Mar 2025 | Bachelor's in Clinical Medicine; Master's in Surgery (Southern Medical University); doctorate in Military Science (PLA Logistics College); prior roles in research, PLA cadre administration and State-owned Assets Supervision. Holds no GDI shares and currently receives no remuneration from GDI. | 50 (per Mar 2026 announcement) |
KUANG Hu | Executive Director and Managing Director (chief executive) | Since 25 Mar 2025 | Formerly General Manager of the Operation Department of Guangdong Holdings; formerly Executive Director and Vice Chairman of GD Land. Chaired the June 2026 AGM. | — |
TSANG Hon Nam | Executive Director and Deputy General Manager | Long-serving; on the board at least since FY2022 | — | — |
LIANG Yuanjuan | Executive Director and Chief Financial Officer | On the board at least since FY2022 | — | — |
LI Wenchang | Non-Executive Director | — | Guangdong Holdings nominee (presumed) | — |
HE Zhifeng | Non-Executive Director | Appointed late October 2025 | Previously Board Secretary and Director of the Board Office at a Guangdong SOE; Chairman of Yuehai Property Investment (International) from September 2020 to June 2023 | — |
Dr. CHAN Cho Chak, John, GBS, JP | INED; Audit Committee Chairman; member of Remuneration and Nomination Committees | Long-serving | Senior Hong Kong public figure | — |
FUNG, Daniel R., SBS, QC, SC, JP | INED; member of Audit, Remuneration and Nomination Committees | Long-serving | Senior Counsel (Hong Kong) | — |
Dr. the Hon. CHENG Mo Chi, Moses, GBM, GBS, OBE, JP | INED; member of Audit, Remuneration and Nomination Committees | Long-serving | Senior Hong Kong solicitor | — |
LI Man Bun, Brian David, BBS, JP, MA (Cantab), MBA, FCA | INED; Remuneration Committee Chairman; member of Audit and Nomination Committees | — | Banker; FCA | — |
Board & Management Changes
| Date | Change | Context |
|---|---|---|
25 Mar 2025 | Kuang Hu appointed ED and MD, replacing Wen Yinheng (MD since November 2012). Wang Min, Wang Surong and Fan Fan appointed NEDs. | Parent-led rotation alongside the GD Land separation. Wen Yinheng moved to the GD Land board. |
Late Oct 2025 | He Zhifeng appointed NED; Wang Surong resigned as NED | Parent nominee rotation |
6 Jan 2026 | Chairman Bai Tao resigned "due to other work arrangements"; she confirmed no disagreement with the Board | Chair vacant for about three months |
30 Mar 2026 | Wang Min appointed Acting Chairman of the Board and Nomination Committee until a new chairman is elected | Restores compliance with HKEX Rule 3.27A |
| 2026 | Auditor changed from KPMG to Deloitte | — |
FY2025 board list | Fan Fan no longer listed among NEDs by March 2026 | — |
Major Shareholders
| Holder | Stake | Source / note |
|---|---|---|
GDH Limited / Guangdong Holdings Limited (controlling) | About 56.7% (March 2024) | Aggregator data; free float of about 2.72 bn shares (about 41.6%) per a market-data provider is consistent with roughly 58% held by insiders and the parent |
Directors' personal holdings | Wang Min: nil (disclosed). | — |
Competitive Landscape
Competitors by Segment
| Segment | Named competitors | Positioning versus GDI |
|---|---|---|
Water — Hong Kong bulk supply | None. The Dongshen project is the sole cross-border raw-water supplier. HKSAR desalination (Tseung Kwan O plant) and local yield are substitutes. | Monopoly-like position, contracted |
Water — Mainland municipal | Beijing Enterprises Water Group (0371.HK); China Water Affairs Group (0855.HK); Beijing Enterprises Holdings (0392.HK, water via BEWG); China Everbright Environment (0257.HK); Guangdong Yuehai Water (sister company, unlisted); Shenzhen Water (Group); Guangzhou Water Investment Group; Chongqing Water (601158.SS); Xingrong Environment (000598.SZ); CGE / Veolia China; Suez (China) | GDI is smaller in total capacity than BEWG but far more profitable and less levered; concentrated in Guangdong |
Shopping malls (Guangzhou / Tianjin) | China Resources Mixc Lifestyle; Yuexiu REIT / Yuexiu Property; Grandview / Taikoo Hui (Swire Properties); Wanda Commercial; Joy City | Teemmall is an iconic Tianhe mall (99% occupancy) but subscale nationally |
Department stores | Guangzhou Grandbuy (Guangzhou Friendship); Parkson; Intime | Shrinking legacy segment |
Power (Guangdong) | Guangdong Electric Power Development (Yudean); China Resources Power; Huaneng; Guangzhou Development Group | Minor player (600 MW) |
Toll roads (Guangxi / Guangdong) | Yuexiu Transport Infrastructure (1052.HK); Guangxi Communications Investment; Shenzhen Expressway (0548.HK) | Single asset |
Hotels (Hong Kong / southern China) | Regional and state-owned hotel groups | Small portfolio |
Peer Comparison FY2025
| Metric | Guangdong Investment (0270) | Beijing Enterprises Water (0371) | China Water Affairs (0855) | Beijing Enterprises Holdings (0392) |
|---|---|---|---|---|
Fiscal year | FY Dec-2025 | FY Dec-2025 | FY Mar-2026 | FY Dec-2025 |
Currency | HKD | RMB | HKD | RMB |
Revenue (m) | 18,825 | 22,062 | 10,336 | 87,228 |
Revenue growth | +1.7% | -9.1% | -11.3% | +3.8% |
Gross margin | 53.3% | 38.5% | 34.4% | — |
Profit attributable (m) | 4,656 | 1,561.5 | 986.2 | 5,056 |
Profit growth | +48.2% | -6.9% | -8.2% | -1.3% |
Net margin (attributable ÷ revenue) | 24.7% | 7.1% | 9.5% | 5.8% |
Leverage indicator | Gearing 19.7% (net debt ÷ owners' equity) | — | Gearing 64.2% | — |